Loading...
HomeMy WebLinkAboutDrainage Reports - 01/08/199610 1 t Final Drainage and Erosion Control Report for LOT 2, MASON STREET P.U.D. Ft. Collins, Colorado Prepared for: Substantial Building Corporation 5727 Bueno Drive Ft. Collins, Colorado 80525 Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1490-01-95 Date: November, 1995 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 November 16, 1995 Project No: 1490-01-95 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lot 2, Mason Street P.U.D.; Fort Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Lot 2, Mason Street P.U.D. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March, 1984, and the Erosion Control Reference Manual. The plans and report have been revised according your comments dated October 26,1995. We have been discussing the issue of releasing stormwater from our site on to the Veterinary Center property with Dr. Corbin, the owner, and Dick Rutherford of Stewart and Associates. They have given us verbal approval to release the stormwater into the Veterinary Center detention pond. We are currently waiting for the written approval. Per our conversations with Dick Rutherford, we have supplied him with our calculations pertaining to the amount of stormwater released and the effect of this stormwater on the required storage volume in the Veterinary Center detention pond. We expect to get the written approval from Dr. Corbin after Dick has reviewed our calculations. This should occur in very near future. If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334. Sincerely, Brian W. Shear, P.E. '— Shear Engineering Corporation BWS / meo cc: Substantial Building Corporation 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 PAGE 1 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. INTRODUCTION: This report presents the pertinent data, methods, assumptions and calculations used in analyzing and preparing the grading, drainage, and erosion control plans for Lot 2, Mason Street P.U.D. L GENERAL LOCATTON AND DESCRIPTION: A. Location 1. Lot 2, Mason Street P.U.D. is located in the northeast quarter of Section 35, UN, Range 69 West of the 6th P.M., Ft. Collins, (Larimer County), Colorado. 2. More specifically, it is located on South Mason Street at the northwest corner of the intersection of South Mason Street and Colboard Drive (See Vicinity Map). 3. The site is immediately south and adjacent to the recently completed South Fort Collins Veterinary Center. B. Description of Property 1. A 7185 square foot warehouse/ office building with accompanying parking and loading areas is proposed for the 1.0 acre site. A future 5600 square foot warehouse / office building is also proposed for the site. At this time there is no timetable for the future building. All detention calculations take the future building into account. 2. The site is bounded on the west by Colorado and Southern Railroad, on the north by Lot 7 of the Creger Plaza 2nd Replat (South Fort Collins Veterinary Clinic), on the east by State of Colorado Office Building and on the south by RCD Plaza Subdivision, Lot 1. Harms Labs new facility is currently under construction on Lot 1, RCD Plaza Subdivision. 3. There are no major drainage ways located on or within the project site. 4. There are no irrigation canals or systems located on or within 100' of the project site. 5. The site is currently not in use and is covered with native grasses. PAGE 2 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is situated within the McClelland -Mail Creek Drainage Basin as designated on the City of Fort Collins Stormwater Basin Map. a. The Basin fee rate for this basin is $ 3717.00 per gross acre according to the development fee section of the City of Fort Collins Development Manual. 2. The site is part of the South Mason Street Special Improvement District. B. Sub -Basin Description 1. The 1.0 acre site has approximately 2-2'/2 feet of relief from west to east. 2. An existing 15" RCP storm sewer outfall is located at the southeast corner of the site. The pipe conveys storm water runoff to the South Mason Street storm sewer system. The storm sewer system was designed with the South Mason Street Special Improvement District (SID). III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: A. Regulations 1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria Manual was followed. 2. Storm Drainage design criteria modification was considered based on data provided by City of Fort Collins Storm Water Utility personnel concerning allowable Mason Street Improvement District detention release rates. 3. All erosion control design criteria from the City of Fort Collins Erosion Control Reference Manual. B. Development Criteria Reference and Constraints 1. Previous studies which were considered include: a. Final Storm Drainage & Erosion Control Report for South Fort Collins Veterinary Center, prepared by Stewart & Associates, dated September 28, 1992. b. Mason Street Improvement District drainage improvement recommendations. c. Final Drainage Report for the Harms Labs New Facility, prepared by CDS Engineering Corporation, dated May 5, 1995. It was approved on July 12, 1995. PAGE 3 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: (continued) C. Hydrological Criteria 1. The Rational method (Q = CIA) was used to determine the pre -developed and post development peak flows for the 10 and 100 year storm events (commercial requirements). 2. The mass diagram method was used to determine the required detention volume utilizing an outflow rate of 0.5 cfs per acre of contributing area. The 0.5 cfs per acre is based on the Mason Street Special Improvement District Requirements. D. Hydraulic Criteria 1. Orifice and weir equations and coefficients suggested by the City of Fort Collins Storm Drainage Criteria Manual were used. IV. DRAINAGE FACILITY DESIGN: A. General Concept 1. A combination of gutter and overland flow will be used to convey a majority of the storm runoff to the southeast corner of the property where detention pond will be located. The area where the detention pond is located will be grassed until development of the future building -takes place. At that time part of the pond will be located in a paved parking area and the rest in a grassed area. 2. A minor portion of site runoff (0.13 acres, Sub basin lb) will be conveyed to the South Fort Collins Veterinary Center detention pond, immediately north of the Lot 2, Mason Street P.U.D. site. a. The South Fort Collins Veterinary Center has indicated acceptance of the additional storm water contribution to the detention pond. A copy of the letter stating that the South Fort Collins Veterinary Center will accept the stormwater from Lot 2, Mason Street P.U.D. is attached in Appendix VI. b. South Fort Collins Veterinary Center drainage calculations which were provided by Stewart and Associates, have been reviewed and modified to consider the impacts of the additional contribution to the South Fort Collins Veterinary Center detention pond. These revised calculations are included with this report and are found in Appendix U. 3. The western portion of the site (Sub basin Id) will contribute runoff to the Railroad Right of Way. This will be undetained flow. There will be a slight increase in runoff to the Railroad ROW due to development of the site. The release rate from the detention pond will be reduce to compensate for this undetained flow. Sub basin Id is considered in the detention pond sizing calculations. PAGE 4 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. IV. DRAINAGE FACILITY DESIGN: A. General Concept (continued) 4. A site specific detention pond will be constructed in the extreme southeast corner of the property. a. The net area contributing to the detention pond is summarized as follows: Lot 2, Mason Street P.U.D. 1.00 acre Mason Street R.O.W. (200 x 30) / 43560 0.14 acres Subtotal: 1.14 acres Contributing to South Fort Collins Veterinary Center Pond 0.13 acres Contributing to the Railroad ROW (undetained) (Sub -basin Id) 0.05 acres Total net area contributing to Lot 2 detention pond (Sub -basin la & Ic) 0.96 acres Area used to size the detention pond (Sub basins Ia, Ic, & Id) 1.01 acres b. According to City of Fort Collins Storm Water Utility personnel, the Mason Street storm drainage system is designed to accommodate 0.5 cfs / acre from the contributing area. The area considered in determining the release rate from the site is 1.01 acres. This includes Sub basins la, Ic & Id only. c. The maximum allowable release rate from the site is therefore 0.50 cfs. The 100-year peak flow from sub -basin Id onto the Railroad R.O.W. is 0.12 cfs. The release rate is reduced by 0.12 cfs to compensate for the undetained flow from sub basin Id. d. The required storage volume, based on the mass diagram method, is 7810 cubic feet. Refer to page 7 in the drainage calculations. The following data was used to determine the pond size. i area = 1.01 acres ii release rate = 0.38 cfs iii C,00 = 0.96 e. A drainage easement will be dedicated for the detention pond by separate instrument. PAGE 5 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. IV. DRAINAGE FACILITY DESIGN: B. Specific Details 1. The detention pond is located in the southeast portion of the property. Portions of the pond will be located in grassy areas as well as the parldng area of the future building. a. The detention pond has an available storage volume of 8013 cubic feet according to the Ultimate Conditions Grading Plan and the Stage -Storage curve for the pond. Refer to pages 8 and 8a of the calculations. i. A Detention pond summary for phase 1 and the Ultimate conditions is provided on the Drainage and Erosion Control plan. b. A Type 2 outlet structure with one (1) restricting orifice will be constructed around the existing 15" RCP stub which extends into the property. The storm sewer stub to the property was provided with the Mason Street Special Improvement District for future use in meeting storm drainage release recommendations and requirements. c. The outlet structure will have a 2 3/4"" (0.23') orifice at an elevation of 31.05 feet. The top of the outlet structure is set an elevation of 33.78 feet. i. 0.65 is the orifice coefficient utilized for orifice flow calculations. d. The expected 100-year water surface elevation is approximately 33.78 feet. Refer to pages 8 and 9, of the calculations and the Stage -Storage curves for phase one and the ultimate condition on pages 8b and 8c respectively. The 100- year water surface elevation is for both the Phase 1 and Ultimate conditions. e. The maximum depth of stormwater in the parldng area for the future building is one and a half (1.5') feet. This exceeds City of Fort Collins Standards for commercial sites. A variance request is enclosed with this report in Section VI PAGE 6 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 2. A portion of the Lot 2, Mason Street P.U.D. site (0.13 acres, Sub basin lb) contributes storm runoff to the South Fort Collins Veterinary Center detention pond. a. This detention pond has a theoretical capacity of approximately 16,160 cubic feet according to the plans and calculations prepared by Stewart And Associates for the South Fort Collins Veterinary Center. We have reviewed the as -built spot elevations of the pond area and have concluded that the pond was built in substantial compliance with the design. Therefore, it can be concluded that the As -built volume is approximately equal to the design volume. A copy of the as - built elevations is included in Appendix VL b. The required capacity for the detention facility is 10,260 cubic feet (not including contribution from Lot 2, Mason Street P.U.D.) according to the calculations prepared by Stewart And Associates for the South Fort Collins Veterinary Center (Appendix In. c. The additional 0.13 acres of contributing area from Lot 2, Mason Street P.U.D., increased the required capacity to 11,162 cubic feet (refer to Mass diagram spread sheet on page 5 in Appendix I). Based on our review of the spot elevations of the Veterinary center detention pond, there is still sufficient capacity in the pond to accept the additional contribution. d. The outlet structure for the South Fort Collins Veterinary Center detention pond consists of a 4 3/8" orifice plate attached to the existing 15" RCP pipe. The capacity of the orifice for the anticipated high water, is 0.50 cfs. 3. The stormwater from a portion of sub basin Ib is intercepted by a trench drain which is located along the east end of the loading dock. The stormwater is conveyed to the Veterinary Center detention pond via a 6" PVC pipe. a. The slope of the trench drain and the pipe is 2.67 percent. Refer to to the profile on sheet 4 of 7 of the utility plans. b. The invert of the PVC pipe at the detention pond is at an elevation of 32.0 feet. This is two (2') feet below the expected high-water mark in the pond which is at 34.0 feet per the plans and drainage report for the site prepared by Stewart and Associates. c. During the 100-year storm event some water may pond up in the loading dock area for a short period of time. This will not be a problem as the grate of the trench drain is also at an elevation of 34.0 feet. Therefore, the ponding should be minimal. PAGE 7 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. V. EROSION CONTROL: A. General Concept 1. The proposed detention facility will act as a temporary sediment pond until the completion of the project. Generally accepted erosion control measures are also specified. 2. An Erosion control security deposit will be required according to current City of Fort Collins policy as presented in the City of Fort Collins Development Manual. a. The security deposit is based on one and one-half times the estimated cost to reseed the actual affected property area during overlot grading activity. Currently, security deposit estimates are based on $ 1300.00 per acre to reseed sites that are 1 acre and less. Reseeding cost estimates have been provided by the City's Storm Water Utility and are based on recent experience. i. The estimated security deposit for the entire 1.0 acre would be $1950.00 (1.5 X $ 1,300.00). B. Specific Details 1. The detention pond will be shaped and graded according to the design. The pond will function as a temporary sedimentation basin until construction is completed and landscaping is installed. 2 Two possible scenarios may occur with the outlet structure. a. The outlet structure may be constructed immediately and protected with a silt fence or gravel barrier at the orifice. b. Hay bales may be placed at the existing 15" RCP stub invert during construction. The outlet structure may be constructed when the sod can be placed and the soil is permanently stabilized immediately after construction of the outlet structure. Our experience indicates that the fast option is preferable. Completion at the time of Certificate of Occupancy (C.O.) issuance, allows a complete (instead of a partial) drainage certification. Drainage certification will be required by the City of Fort Collins Storm Water Utility prior to C.O. issuance. 3. All sediment will have to be removed from sediment pond prior to permanent soil stabilization. 4. Silt fencing is called for along the majority of the eastern and western property lines in accordance with the silt fencing details provided on the detail sheet of the plan set. PAGE 8 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. VI. VARIANCE REQUEST: A. Variance from City of Fort Collins requirements 1. With this report, the developer is formally requesting a variance from the requirement that a minimum of 1.0 feet freeboard be provided with the detention pond. 2. This variance is being requested for the following reasons: a. Due to the on site and surrounding topography, we are unable to provide the 1.0 foot of freeboard without grading on the property to the south, Lot 1 of RCD Plaza South Subdivision. b. The existing back of walk at the southeast corner of the site is used as an emergency overflow. This was done in order to minimize the depth of flow in parking area. 3. With this report, the developer is formally requesting a variance from the requirement that the maximum ponding depth in a parking lot be less than or equal to one (1.0') foot. 4. This variance is being requested for the following reasons: a. In order to provide the storage volume required for the detention pond, the top of the outlet structure is set at an elevation of 33.78 feet. This produces a 100-year water surface elevation of 33.78 feet. The resultant depth at the lowest point in the parking lot is 1.5 feet. b. Approximately 7 of the 12 parking places will have less than one (1.0') foot of water during the 100-year storm event. c. The proposed finished floor of the future building is set at an elevation of 36.00 feet. The finished floor is 2.22 feet above the 100-year water surface elevation. PAGE 9 Project No. 1490-01-95 Lot 2, Mason Street P.U.D. A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual and the City of Fort Collins policy. 2. All Erosion Control design complies with the City of Fort Collins Erosion Control Reference Manual and generally accepted practices. B. Drainage Concept 1. The drainage design for lot 2, Mason Street P.U.D. is in accordance with the City of Fort Collins requirements, particularly those of the Mason Street Improvement District. 2. There are no adverse downstream effects due to the development of the site. VIM REFERENCES: 1. Fort Collins Storm Drainage Criteria Manual 2. Urban Drainage and Flood Control District Drainage Criteria Manual 3. Final Storm Drainage & Erosion Control Report for South Fort Collins Veterinary Center, prepared by Stewart & Associates, Inc.; report dated September 28, 1992. 4. Final Drainage Report for the Harms Labs New Facility, prepared by CDS Engineering Corporation, report dated May 5, 1995. It was approved on July 12, 1995. APPENDIX I Storm Drainage Calculations for Lot 2, Mason Street P.U.D. FLOW SUMMARY FOR LOT 2 MASON STREET PUD DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc I2 I10 I100 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASINS) ac. min. min iph iph iph cfo cfe cfe ++r+r+rr+r+ttttttttttttrrrrrrr+r+rttt+tttrrrtrrr♦rrr+r+r+tttrxrr+rrrrrtrx•rarr+r+txrr+r+rtx+rrrrrrrrrr A Ia 0.81 0.80 0.80 1.00 5.00 5.00 3.29 5.64 9.30 2.13 3.65 7.53 DST POND VET CLINICIb 0.13 0.78 0.78 0.97 5.00 5.00 3.29 5.64 9.30 0.33 0.57 1.17 DST POND RR ROW Id 0.05 0.20 0.20 0.25 5.00 5.00 3.29 5.64 9.30 0.03 0.06 0.12 UNDET E Ie 0.11 0.68 0.68 0.85 5.00 5.00 3.29 5.64 9.30 0.25 0.42 0.87 SWALE ABBREVIATIONS DET POND = DETENTION POND SUBBASIN Ia CONTRIBUTES TO ONSITS POND SUBBASIN Ib CONTRIBUTES TO VET CLINIC POND UNDET = UNDETAINED FLOW SWALE = SWALE ALONG SOUTH SIDE OF FUTURE BUILDING SHEAR ENGINEERING CORPORATION OVERALL RUNOFF COEFFICIENT FOR ENTIRE SITE - ULTIMATE CONDITIONS PAGE 1 PROTECT :LOT 2 MASON STREET PUD PROJ.NO. :1490-01-95 DATE: 11/16/95 LOCATION :MASON STREET BY: MRO FILE :MASONCOP NOTES :INCLUDES 1/2 ROW RUNOFF SURFACE COEF. CHARACTERISTICS AREA C C+A (acres) STREETS, ASPHALT 0.500 0.950 0.475 CONCRETE 0.080 0.950 0.076 GRAVEL 0.000 0.500 0.000 ROOFS 0.320 0.950 0.304 LAWNS SANDY SOIL FLAT < 211 0.000 0.100 0.000 AVERAGE 2 - 74 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 2% 0.240 0.200 0.048 AVERAGE 2 - 7t 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 1.140 0.903 C2 CIO C100 COMPOSITE C VALUE 0.792 0.792 0.990 USE 0.79 0.79 0.99 SURFACE CHARACTERISTICS STREETS ASPHALT CONCRETE GRAVEL ROOFS LAWNS SANDY SOIL PLAT < 2% AVERAGE 2 - 7% STEEP > 7% LAWNS HEAVY SOIL > SHEAR ENGINEERING CORPORATION RUNOFF COEFFICIENT FOR SUBBASIN Is PAGE 2 PROJECT :LOT 2 MASON STREET PUD PROJ.NO. :1490-01-95 DATE: 11/16/95 LOCATION :MASON STREET BY: MRO PILE :MASONCOP NOTES :CONTRIBUTES STORMWATRR TO ONSITE DETENTION POND RUNOFF CORP. AREA C C*A (acres) 0.380 0.950 0.361 0.020 0.950 0.019 0.000 0.500 0.000 0.260 0.950 0.247 0.000 0.100 0.000 0.000 0.150 0.000 0.000 0.200 0.000 PLAT < 2% 0.150 0.200 0.030 AVERAGE 2 - 7% 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 0.810 0.667 C2 C10 C100 COMPOSITE C VALUE 0.811 0.811 1.000 USE 0.80 0.80 1.00 SURFACE CHARACTERISTICS STREETS ASPHALT CONCRETE GRAVEL ROOFS LAWNS SANDY SOIL FLAT < 2% AVERAGE 2 - 7% STEEP > 7% LAWNS HEAVY SOIL SHEAR ENGINEERING CORPORATION RUNOFF COEFFICIENT FOR SUBBASIN Ib PAGE 3 PROJECT :LOT 2 MASON STREET PUD PROJ.NO. :1490-01-95 DATE: 11/16/95 LOCATION :MASON STREET BY: MHO FILE :MASONCOF NOTES :CONTRIBUTES STORMWATHR TO VBT CLINIC DETENTION POND RUNOFF CORP. AREA C C*A (acres) 0.020 0.950 0.019 0.020 0.950 0.019 0.000 0.500 0.000 0.060 0.950 0.057 0.000 0.100 0.000 0.000 0.150 0.000 0.000 0.200 0.000 FLAT < 21, 0.030 0.200 0.006 AVERAGE 2 - 7% 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 0.130 0.101 C2 C10 C100 COMPOSITE C VALUE 0.777 0.777 0.971 USE 0.78 0.78 0.97 SHEAR ENGIN13BRING CORPORATION RUNOFF COEFFICIENT FOR SUBBASIN Ic PAGE 4 PROJECT :LOT 2 MASON STREET PUD PROJ.NO. :1490-01-95 DATE: 11/16/95 LOCATION :MASON STREET BY: HBO FILE :MASONOOF NOTES :1/2 ROW OF MASON STREET RUNOFF SURFACE COBF. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.100 0.950 0.095 CONCRETE 0.040 0.950 0.038 GRAVEL 0.000 0.500 0.000 ROOFS 0.000 0.950 0.000 LAWNS SANDY SOIL FLAT < 21, 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 21k 0.010 0.200 0.002 AVERAGE 2 - 7% 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 0.150 0.135 C2 C10 C100 COMPOSITE C VALUE 0.900 ) 0.900 1.000 USE 0.90 0.90 1.00 SUMMARY OF RUNOFF COEFFICIENTS FOR LOT 2 MASON STREET PUD BASIN C2 C10 C100 AREA ENTIRE SITE 0.79 0.79 0.99 1.14 SUBBASIN Ib 0.78 0.78 0.97 0.13 SUBBASIN Ia 0.80 0.80 1.00 0.81 SUBBASIN Ic 0.90 0.90 1.00 0.15 Is and Ic 0.82 0.82 1.00 0.96 SUBBASIN Id 0.20 0.20 0.25 O.OS Ia,Ic, and Id 0.79 0.79 0.96 1.01 PAGE 5 SHEAR ENGINEERING CORPORATION VETERINARY CENTER DETENTION POND PROJECT: LOT 2 MASON STREET POO DATE: 11/16/95 PROJ.NO. 1490-01-95 BY HBO DESCRIPTION: FLOW TO VET CENTER PILE MASCUHP PROD. LOCATION: PORT COLLINS NOTES: RBLEMB RATE TAKEN FROM REPORT FOR SOUTH PORT COLLINS VET CENTER BY STEWART AND ASSOCIATES AREA INCLUDES VET CLINIC & CONTRIBUTING AREA FROM LOT 2 MASON STREET 1.87+0.13 CUMULATIVE HYDROGRAPH METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.77 ' RELEASE RATE: 0.93 CPS AREA: 2.00 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES rrrrxrr• rrrrrrrr rxxxrrr• rOUTPUT* rrrrrrrr rrrrrrrr rrrrrrrr rxrrrrrr INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min eec iph cfe cf cf cf ac-ft rxrrrrrr rrrrrrrr rrrrrrrr rrrrrrrr rrrrrrrr rrrrrrrr rrrrrrrr rxrrrrrr 5 300 9.30 14.32 4296.6 279.0 4017.6 0.09 10 600 7.14 11.00 6597.4 558.0 6039.4 0.14 15 900 6.06 9.33 8399.2 837.0 7562.2 0.17 20 1200 5.21 8.02 9628.1 1116.0 8512.1 0.20 25 1500 4.63 7.13 10695.3 1395.0 9300.3 0.21 30 1800 4.20 6.47 11642.4 1674.0 9968.4 0.23 35 2100 3.81 5.87 12321.5 1953.0 10368.5 0.24 40 2400 3.60 5.54 13305.6 2232.0 11073.6 0.25 45 2700 3.28 5.05 13638.2 2511.0 11127.2 0.26 50 3000 3.02 4.65 13952.4 2790.0 11162.4 0.26 55 3300 -2.80 4.31 14229.6 3069.0 11160.6 0.26 60 3600 2.60 4.00 14414.4 3348.0 11066.4 0.25 65 3900 2.43 3.74 14594.6 3627.0 10967.6 0.25 70 4200 2.30 3.54 14876.4 3906.0 10970.4 0.25 75 4500 2.17 3.34 15038.1 4185.0 10853.1 0.25 80 4800 2.07 3.19 15301.4 4464.0 10837.4 0.25 85 5100 1.96 3.02 15393.8 4743.0 10650.8 0.24 90 5400 1.87 2.88 15550.9 5022.0 10528.9 0.24 95 5700 1.77 2.73 15537.1 5301.0 10236.1 0.23 10260 CP = REQUIRED VOLUME PER REPORT BY STEWART AND ASSOCIATES 11162 CP = REQUIRED VOLUME WITH ADDITIONAL CONTRIBUTING AREA FROM LOT 2 MASON STREET 16416 CF = VOLUME OF PER PLAN BY STEWARTS AND ASSOCIATES CONCLUDE:POND IS ADEQUATE SHEAR ENGINEERING CORPORATION FOR REFERENCE ONLY DETENTION POND FOR LOT 2 MASON STREET PUD - ULTIMATE CONDITIONS PAGE 6 PROJECT: LOT 2 MASON STREET PUD DATE: 11/16/95 PROJ.NO. 1490-01-95 BY MHO PROJ. LOCATION: FORT COLLINS FILE MASCUHP NOTES: AREA USED FOR SIZING IS BASED ON ENTIRE SITE + HALF ROW RELEASE RATE BASED ON MASON STREET S. I. D. REQUIREMENTS REFER TO PAGE 1 FOR DETERMINATION OF RUNOFF COEFFICIENT A PORTION OF THE SITE CONTRIBUTES STORMWATER TO THE VET CLINIC DETENTION POND SHE PAGE 3 CUMULATIVE HYDROGRAPH METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.96 RELEASE RATE: 0.59 CFS AREA: 1.170 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES t**x*+t* r******r **r*r*** *OUTPUT* t******* ******** ******** ***x**** INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfs cf cf cf ac-ft r*rt**** ***t**t* t+*t**t* t*tttt*+ *xtt*ttt +ttxtx*+ **+***** rr****** 5 300 9.30 10.45 3133.7 177.0 2956.7 0.07 10 600 7.14 8.02 4811.8 354.0 4457.8 0.10 15 900 6.06 6.81 6125.9 531.0 5594.9 0.13 20 1200 5.21 5.85 7022.2 708.0 6314.2 0.14 25 1500 4.63 5.20 7800.6 885.0 6915.6 0.16 30 1800 4.20 4.72 8491.4 1062.0 7429.4 0.17 35 2100 3.81 4.28 8986.7 1239.0 7747.7 0.18 40 2400 3.60 4.04 9704.4 1416.0 8288.4 0.19 45 2700 3.28 3.68 9947.1 1593.0 8354.1 0.19 SO 3000 3.02 3.39 10176.2 1770.0 8406.2 0.19 55 3300 2.80 3.14 10378.4 1947.0 8431.4 0.19 60 3600 2.60 2.92 10513.2 2124.0 8389.2 0.19 65 3900 2.43 2.73 10644.6 2301.0 8343.6 0.19 70 4200 2.30 2.58 10850.1 2478.0 8372.1 0.19 75 4500 2.17 2.44 10968.0 2655.0 8313.0 0.19 80 4800 2.07 2.33 11160.1 2832.0 8328.1 0.19 85 5100 1.96 2.20 11227.5 3009.0 8218.5 0.19 90 5400 1.87 2.10 11342.1 3186.0 8156.1 0.19 95 5700 1.77 1.99 11332.0 3363.0 7969.0 0.18 6431 CF = REQUIRED VOLUME SHEAR ENGINEERING CORPORATION FOR DESIGN DETENTION POND FOR LOT 2 MASON STREET PUD - ULTIMATE CONDITIONS PAGE 7 PROJECT: LOT 2 MASON STREET PUD DATE: 11/16/95 PROJ.NO. 1490-01-95 BY HBO PROD. LOCATION: FORT COLLINS FILE MASCUHP NOTES: . AREA USED FOR SIZING IS BASED ON SUBBASIN Ia, Ic, & Id ONLY RELEASE RATE BASED ON MASON STREET S. I. D. REQUIREMENTS USING Ia & Ic RELEASE RATE REDUCED TO COMPENSATE FOR UNDETAINED FLOWS FROM SUB BASIN Id REFER TO PAGE 1 FOR DETERMINATION OF RUNOFF COEFFICIENT A PORTION OF THE SITE CONTRIBUTES STORMWATER TO THE VET CLINIC DETENTION POND SSE PAGE 5 CUMULATIVE HYDROGRAPH METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.96 RELEASE RATE: 0.38 CPS AREA: 1.01 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES rrrrrrrr rr+rx+r+ rrrrrrrr *OUTPUT* rrrrrrrr rr+r++rr rrrrr+rr ++rxrrrr INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfe cf cf cf ac-ft rrxxxrrr rrrrrrxr +rr:rrxr r+rrrrrr rrr+r+rr rrrrrrrr :xrrrrrr rrrr+rrx 5 300 9.30 9.02 2705.2 114.0 2591.2 0.06 10 600 7.14 6.92 4153.8 228.0 3925.8 0.09 15 900 6.06 5.88 5288.2 342.0 4946.2 0.11 20 1200 5.21 5.05 6061.9 456.0 5605.9 0.13 25 1500 4.63 4.49 6733.9 570.0 6163.9 0.14 30 1800 4.20 4.07 7330.2 684.0 6646.2 0.15 35 2100 3.81 3.69 7757.8 799.0 6959.8 0.16 40 2400 3.60 3.49 8377.3 912.0 7465.3 0.17 45 2700 3.28 3.18 8586.8 1026.0 7560.8 0.17 50 3000 3.02 2.93 8764.6 1140.0 7644.6 0.18 • 55 3300 2.80 2.71 8959.1 1254.0 7705.1 0.18 60 3600 2.60 2.52 9075.5 1368.0 7707.5 0.18 65 3900 2.43 2.36 9188.9 1482.0 7706.9 0.18 70 4200 2.30 2.23 9366.3 1596.0 7770.3 0.18 75 4500 2.17 2.10 9468.1 1710.0 7758.1 0.18 80 4800 2.07 2.01 9633.9 1824.0 7809.9 0.18 85 5100 1.96 1.90 9692.1 1938.0 7754.1 0.18 90 5400 1.87 1.81 9791.0 2052.0 7739.0 0.18 95 5700 1.77 1.72 9782.3 2166.0 7616.3 0.17 100 6000 1.70 1.65 9889.9 2280.0 7609.9 0.17 105 6300 1.63 1.58 9956.8 2394.0 7562.8 0.17 110 6600 1.57 1.52 10047.0 2508.0 7539.0 0.17 115 6900 1.50 1.45 10035.4 2622.0 7413.4 0.17 120 7200 1.44 1.40 10052.8 2736.0 7316.8 0.17 7810 CF = REQUIRED VOLUME CONCLUDE: MAXIMIZE VOLUME AND USE 7810 CF AS MINIMUM DESIGN VOLUME SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR DETENTION BASIN VOLUMES ULTIMATE CONDITIONS PAGE e PROJECT :LOT 2 MASON STREET PUD DATE: 11/16/95 PROD. NO:1490-01-95 BY MBO LOCATION:MASON STREET FILE: MASONAVG CONSTANT: 65.5 = 1 SQ IN. FIRST EVEN CONTOUR 32 FEET INVERT 31.05 FEET TOP BLBV 33.82 FEET INCREMENT 1 FOOT SCALE: 1" 20 FRET � !i!!f}1f ffifffYf ttlxtrr♦ ff lffff! !}flff if ♦fffffff fft4x4tr ff lffflf BLEV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft READING eq in eq ft cf cf cy ac-ft x trlff!! ff rrftrt ttrf r4rx rtrtf rlx rf lrlr!• ftf lffff lfffrerr f!rltf if 31.05 0 0.00 0 0 0 0 0.00 32 195 2.98 1191 566 566 21 0.01 33 730 11.15 4458 2824 3390 126 0.08 33.82 1116.5 17.05 6818 4623 8013 297 0.18 FORMULAE:A1= (PLANIMBTER READING)/CONSTANT A2= (A1)4SCAL8 SQUARED VOLUME REQUIRED = 7810 CP VOLUME PROVIDED = 8013 CF REQUIRED W.S.BL. = 33.78 FEET CONCLUDE: BECAUSE OF SITE RESTRICTIONS ON GRADING WE ARE NOT ABLE TO OBTAIN ENOUGH STORAGE VOLUME TO MEET THE WHOLE SITE TARGET VOLUME. HOWEVER THE RUNOFF FROM SUBBASIN Ib IS DETAINED IN THE VET CLINIC POND. THE POND IS SIZED FOR THE REMAINING SITE AREA AND THE RELEASE RATE IS REDUCED SLIGHTLY FROM 0.50 TO 0.38 CPS TO LIOMPBNSATE FOR THE UNDETAINED PLOW FROM SUBBASIN Id THEREFORE, THE POND IS ADEQUATE .0 9 r,7 ti e It 03) 5)f-)etS SHEAR ENGINEERING CORPORATION PAGE 9 PROJECT: LOT 2 MASON STREET DATE: 1111619S PROJECT NO: 1490-01-95 BY MHO PROJECT LOCATION: MASON STREET FORT COLLINS FILE NAME: MASONOUT INPUT FOR OUTLET STRUCTURE STRUCTURE TYPE: 2 WEIR TYPE NONE DETERMINE ORIFICE SIZE LOWER ORIFICE DIAM. (ft) - 0.23 WEIR LENGTH (ft) - 8.00 LOWER ORIFICE INV. (ft) = 31.05 WEIR INVERT (ft) - 33.78 Q= CA(2gH)"0.5 LOWER ORIFICE COEF. (Cl) = 0.65 WEIR COEF. (CW) = 2.60 A = Q/(C(2gH)"0.5 UPPER ORIFICE DIAM.(ft) - NA TOP OF BERM (ft) = 33.82 H (ft) = 2.73 UPPER ORIFICE INV. (ft) - NA INIT. DELTA (ft) - 0.45 C = 0.65 UPPER ORIFICE COEF. (Cu) = NA DELTA HEAD (ft) = 0.50 Q (cfe)= 0.38 2 YR. RELEASE RATE (cfa) - NA A = 0.04 10 YR RELEASE RATS (cfa) = HA 10 YR WSEL REQUIRED (ft) - NA R (ft) = 0.118 100 YR RELEASE RATE (cfe)= 0.38 100 YR WSEL REQUIRED (ft)= 33.78 D (ft) = 0.237 OUTLET PIPE DIAM. (ft) = 1.25 EMERGENCY OVERFLOWS/W ® SE CORNER PIPE SLOPE (t) = 4.92 WEIR TYPE BROADCRESTED MANNINGS n = 0.013 WEIR LENGTH (ft) = 5.00 WEIR INVERT (ft) - 33.82 WEIR COEF. (Cw0) = 2.50 *rr*r**t rx****r* +#*r*r*x *OUTPUT* *t***+** r******* x******* •*##**** PIPE AREA (SF) = 1.23 WETTED PERIMETER = 3.93 FEET HYD. RAD (FT) = 0.313 FEET R-2/3 = 0.4603 OUTLET PIPE CAPACITY = 14.32 CPS LOWER ORIFICE AREA (A) = 0.0415 SQUARE FEET UPPER ORIFICE AREA (A) = 0.0000 SQUARE FEET #*rx*** ******* ******* *OUTPUT* *r*tr## ♦t***** +rrx*** fr*r+r* r****** tr*xfi** **rrrrr rr***x* HEAD HEAD EMERGENCY OVERFLOW ELEV. OVER LOWER OVER UPPER HEAD SUB HEAD LOWER ORIFICE UPPER ORIFICE OVER WEIR TOTAL OVER WEIR TOTAL ELEV. ORIFICE FLOW ORIFICE FLOW WEIR FLOW FLOW WEIR FLOW FLOW ft ft cfa ft cfs ft cfe cfe ft cfs cfa ft 31.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.05 31.50 0.45 0.15 0.00 0.00 0.00 0.00 0.15 0.00 0.00 0.15 31.50 32.00 0.95 0.21 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.21 32.00 32.50 1.45 0.26 0.00 0.00 0.00 0.00 0.26 0.00 0.00 0.26 32.50 33.00 1.95 0.30 0.00 0.00 0.00 0.00 0.30 0.00 0.00 0.30 33.00 33.50 2.45 0.34 0.00 0.00 0.00 0.00 0.34 0.00 0.00 0.34 33.50 33.82 2.77 0.36 0.00 0.00 0.04 0.17 0.53 0.00 0.00 0.57 33.62 33.78 2.73 0.36 0.00 0.00 0.00 0.00 0.36 0.00 0.00 0.36 33.78 33.75 2.70 0.36 0.00 0.00 0.00 0.00 0.36 0.00 0.00 0.36 3.3.75 34.00 2.95 0.37 0.00 0.00 0.22 2.15 2.52 0.18 0.95 3.69 34.00 ORIFICE EQUATION: CA(2gH)^1/2 WEIR FLOW EQTN. : CwLH^3/2 SHEAR ENGINEERING CORPORATION DEVELOPED PAGE 10 PLOW TO CONCENTRATION POINT A FROM SUBBASIN Ia PROJECT: LOT 2 MASON STREET PUD DATE 11/16/95 PILE: MASONRAT PROJ. NO.1490-01-95 NOTES: BY MEO AREA (A)= 0.810 ACRES RUNOFF COED. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.80 0.80 1.00 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH =? FEET SLOPE _? 'k 2 YEAR 10 YEAR 100 YEAR C =? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) = 165 S M = 1 GUTTER L (ft) = 18 S (4) = 1.32 GUTTER L (ft) _? S (1) = 2.87 GUTTER L (ft) _? S (}) _? ? L (ft) _? S (i) _? ? L (ft) _? S (t) _? ? L (£t) _? S (t) _? ? NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 1.51 1.51 1.51 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfo) 2 YEAR 10 YEAR 100 YEAR Q = 2.13 3.65 7.53 CONCLUDE:FLOW IS DETAINED IN ON SITE POND V (fps) = 2 Tt(min)= 1.38 V (fps) = 2.2 Tt(min)= 0.14 V (fps) = 3.32 Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 TOTAL TRAVEL TIME (min) = 1.51 SHEAR ENGINEERING CORPORATION DEVELOPED PAGE 11 FLOW TO VET CLINIC FROM SUBBASIN Ib PROJECT: LOT 2 MASON STREET PUD DATE 11/16/95 FILE: MASONRAT PROJ. NO.1490-01-95 NOTES: BY HBO AREA (A)= 0.130 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.78- 0.78 0.97 SEE SPREAD SHEET ATTACHED ON PAGE ? TIME OF CONCENTRATION (Tc) ASSUME Tc = 5 MINUTES BASED ON SIZE OF SUBBASIN OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH =7 FEET SLOPE _? It 2 YEAR 10 YEAR 100 YEAR C =1 ? ? Ti (min) = 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) _? S ($) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S'.(%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (c£s) 2 YEAR 10 YEAR 100 YEAR Q = 0.33 0.57 1.17 CONCLUDB:FLOW IS DETAINED IN VET CLINIC POND REFER TO PAGE 5 SHEAR ENGINEERING CORPORATION DEVELOPED PAGE 12 FLOW TO CONCENTRATION POINT RR ROW FROM SUBBASIN Id PROJECT: LOT 2 MASON STREET PUD DATE 11/16/95 FILE: MASONRAT PROD. NO.1490-01-95 NOTES: BY MBO AREA (A)= 0.050 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 ALL GRASS TIME OF CONCENTRATION (TO ASSUME Tc = 5 MINUTES BASE ON SIZE OF BASIN OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH -? FEET SLOPS =? i 2 YEAR 10 YEAR 100 YEAR C =? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60+V) FLAW TYPE L (ft) _? S (4) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (t) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (5) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S M _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (6) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.03 0.06 0.12 CONCLUDE:THE FLOWS ARE NEGLIGIBLE INCLUDE THIS BASIN IN THE SIZING OF THE POND REDUCE RELEASE RATE FROM THE POND BY 0.12 CPS TO COMPENSATE FOR THE UNDETAINED FLAWS ONTO THE RAILROAD ROW SHEAR ENGINEERING CORPORATION PAGE 13 FLOW TO CONCENTRATION POINT E FROM SUBBASIN Is PROJECT: LOT 2 MASON STREET PUD DATE 11/16/95 FILB: MASONRAT PROJ. NO.1490-01-95 NOTES: FOR SWALE DESIGN BY MEO AREA (A)= 0.110 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.66 0.68 0.85 ROOF = 0.07 ACRES, GRASS - 0.04 ACRES TIME OF CONCENTRATION (TO ASSUME Tc - 5 MINUTES EASED ON BASIN SIZE OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH =? FEET SLOPE _? } 2 YEAR 10 YEAR 100 YEAR C =? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (TO=L/(60*V) FLOW TYPE L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (t) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.25 0.42 0.87 CONCLUDE:DESIGN SWALE FOR 133% OF Q100 SHEAR ENGINEERING CORPORATION PAGE 14 CHANNEL CAPACITY PROJECT NAME: LOT 2 MASON STREET DATE: 11/16/95 PROJECT NO. 1490-01-95 BY : MRO SWALB DESCRIPTION: SWALE ALONG SOUTH PROPERTY LINE PILE: MASCHAN CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRIANGULAR DESIGN PLOW (cfe) 1.16 CHANNEL LINING: GRASS Da Db Dc Sc n W I (ft) (ft) (ft) (t) (ft) (ft) ---- -=-- ---- ---- ----- ---- ---- 4.00 4.00 0.50 2.00 0.032 0.00 0.05 0.13 = L8FT BANK SLOPE 0.13 = RIGHT BANK SLOPE DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (e.f.) (ft) (s.f.) (ft) (A/P) (cfe) (ft/sec) ------ ------- ------- ------- ------- ------- ------- ------- 0.50 8.00 2.00 8.06 0.39 0.14 5.19 2.59 0.45 7.20 1.62 7.26 0.37 0.14 3.92 2.42 0.40 6.40 1.28 6.45 0.34 0.14 2.86 2.23 0.35 5.60 0.98 5.64 0.31 0.14 2.00 2.04 0.30 4.80 0.72 4.84 0.28 0.14 1.33 1.84 0.25 4.00 0.50 4.03 0.25 0.14 0.82 1.63 0.20 3.20 0.32 3.22 0.21 0.14 0.45 1.41 0.15 2.40 0.18 2.42 0.18 0.14 0.21 1.16 0.10 1.60 0.08 1.61 0.14 0.14 0.07 0.89 0.05 0.80 0.02 0.81 0.09 0.14 0.01 0.56 0.00 0.00 0.00 0.00 0.00 0.14 0.00 0.00 0.285 4.56 0.65 4.60 0.27 0.14 1.16 1.78 *r• rrrrrrrrrrrrrr rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr •** APPROXIMATE PLOW DEPTH CONCLUDE:SWALE IS ADEQUATE APPENDIX II Storm Drainage Calculations for the South Fort Collins Veterinary Center ` Amended Storm Drainage Calculations for the South Fort Collins Veterinary Center STEWART&ASSOCIATES l Consulting Engineers and Surveyors August 3, 1.993 Mr. Glen Schlueter Storm Water Utility City of Fort Collins P.O. - Box 580 Fort Collins, Colorado 80522 Dear Glen: This is to certify to you that an "As Built" *Survey of the Detention Pond at the South Fort Col.lins Veterinary Center was made under my supervision on July 28, 1993, and is shown on the enclosed red —lined copy of the Final Grading, Drainage and Utility Plan. The pond was built in substantial compliance with the approved plan. The detention is from elevation 5032.0 to 5034.0. There is a permanent pool of water or retention below elevation 5032.0. The water surface elevation on July 28th was 5028.2. The outlet pipe invert is 5032.03. The restriction plate on the outlet works is under construction. I will certify the restriction plate in the next several days. If you have any questions regarding the pond, please call. Sincerely, Richard A. Rutherford,.. P.E. & L.S. President jrr enclosure James H. Stewart and Associates. Inc. 103 S. Metdrum Street P.O. Box 429 FL Collins. CO 80522 7/ SUBJECT _LQ2_% BY-9_A2-- -- DATE -L0,422- 1- / f�f Scv�t�B�e�62__Sr2P SHEETNO.-- 4- -CA _L c.:u -A_T_L2NJ------------- PROJECTNO.------_--- !C��oss;.AeeA _ = /• 67 Ate. IvE:.7 :A`2sC—� /i!o'4-` Ac. I i i I. Jan Pe � '6 iui ' i4 .4 / N :PE Ovi °:. •I I "o Ev• C = ! �/: X� 00:474 1 H Is r � 3/IMi•v. i -; 8 }..,0.4r-7 ' SI.T. .QZ �!= D.ZX. i,'Q-Z.x /•(s9- Hllr Q./oy,� =. 0.Z x �z,;SS..X /.6 4�• = o, 84 c.F.J. IC= 29.M%v. Hilt. ►ooye x:Q-.'Ls x I.64•= A4 t•F.t. NE7fAREA�' DEv. TL = _�IL = ZI AI.V. p.11/31 DEv• Qzyie. = C�•58 Xi /;84 x /• 64 = 1'71 e•F•t. '. Dom./. Qioy,e= S s8iC;3:I0 x /. ✓04 _ 3,04-.c.F.s. -rc /.SM/Al. D6v. �looy2.=_ Azs X. QIJ$.x.S•iJ X /.G4; 7.07G• F.s. 14A.CO4 •ST,eCcr AR•eA = D;Z3 AG. ' : Z /tq panvlovj A R.EA 0, /9 ..Ar:. ' �Z.�'/v 7. DEv. C = Q x o•Ez(,) . +CO,z. x DE/•87 (l•/-D. BG�¢flVr. _ /0 MI'a14 . 0.5013 /3 .r� COMPUTATIONS Stewart & Associates, Inc. 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 iy:�Af� Date JAu• /„J�Client: 7�f= :CyAw gVA) Sheet No.�of ;likd By: Date Project:.5OUTFi EOXT Cee,L/NI 1%E i E e/AJA ley r E vTE P ;object C'r012M D2-A,rAlA6B CAt-C,24-6T/DNr —�vT% G26rF_R PL61rA fv� AS-0 tJ S72EC7- RvAJOFF t'ceur•�: I ! I D E v. 0. 8 (f x Z 'S X D. Z 3:=� p. ?3 9 a •'� J C , X 4 .4- % F. I. Dev: Q wyC, D•86 K O•t�3: -. Q Tom' 4M/•v• Dr- • Qrooyr, /,Zsrx0- Lx 7,2.x 0,2,3;= I, ;GC c•F.t, i AU�0W'ABLE RE LeASEr ZATE FtoP, MAfio.AJ'Sr,2EET..rrOeM DRA IN :• Is 0•.S c._F..r ; pl E i4�;; E • ( �. 7 X O•S = o. 93 G.FJ. G R o rS 1e E A 87 AG, 1 =MPE,evrovi APeA = 0•917A l5v9% PF P— tov-, AP -EA = 0,70 Ac• i 149,1 016 i i✓= (max o•srq� t�o.z x.0.4r� 0• GZ- is 1v0 " I i Resrzic,r/oxi A O 6 L¢.¢x Z. U � i 0113 0PE1J/nl6 zr- 7 ' t SUBJECT •LO-:r- ----- By 'J4 _--. DATE W-UL91 l,Nll �O_C.RA .6=-=-me.bL SHEETNO._1v_----- ------- ---------------- PROJECT NO.---------- �,A .� C —' �_ ..' _' GFS VOLUME iJ 9 01-6 30 • (,..09 /0,91-L 1• I SO t. 3•. A' s i s .� i ! I I? � g.3 13, 0-TV Gv Z• . �}} :�.. j ! �:. ' �. + 3.77 13,57Z. 90' /•87 i ;..i ..� �` i i Z:..7/ 14,634- rZv /.4s :, ..� ..;, ; I Z. ro rs, IZo l80 1.0S; ! i I ! �. i /•SL 1G,4-!L 1 16,000 i i 00 /4,•0gp 1 { i � IZ,OOD I ;• , is 6.00 w i q3 a F fa %coo A.00o i i � ' APPENDIX III Erosion Control Calculations RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: STANDARD FORM A COMPLETED BY: MEO / 51i6fkR EN&lNC-6R1N& DATE: 2� �►3 DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) M (feet) M M T Low I,o +O5lD 4.05 I,10%o • d�cFcr io 1" 5` of �r , v ,S` c�lcs �oi �ev� ��,e �� 71�1a �o OA 36.5 MARCH 1991 B-14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: MgSON ST, la�o Lod STANDARD FORM B COMPLETED BY:1E0 S1�EAR CN61N�6�trob DATE: Zi ti3 Erosion Control C-Factor P-Factor Method Value Value Comment olc $��,rcitwt hvS1n 1,0 U,� >or 5 ,�� TCrl�e, l��Ylci I,u r 6.3Z.SL U,� C s•l.ti /aorvt�c� Sod O,o\ I,O U,1Yh� Cn tis5 MAJOR PS SUB AREA BASIN (�) BASIN (Ac) CALCULATIONS � `1'l ,� � -1' 1,0 h�3'U i C0,01)(0 ,3m) + 10,w)0,w) + - G , -L4 Ct:F: (d,l�X o,z�;) x IOU = % ,n oju : 1T, �S )'o old MARCH 1991 8-15 DESIGN CRITERIA O O Pm000 4 to to wM O O O O O mo%omo00000 o 4444Uw tnw t L[ O w Ot Ot of of of of o1 of of of of O O O . . . . . . . . . . . . . . . O V d V V V V V 4 4 4 4 V' to to to M w w w w w w w w w w w w w w w O � w w w o1 01 01 01 01 of w Q1 01 of o1 Q1 0\ 01 01 01 O OM V'Inwwwwt-tl-t`t`r`t`�r`�t`�rwwwwwCo O O V' V' d sr sr sr a V W V "Cr V' Nr V' V! V' V' V' V' V .,sr v v v sr [] rt wwwwwwwwwwwwwww00CID w00w00ooCowww O w N m Vw to to to to tD %o %D tD tD r� r� t- t- t- t, t, t, t- N w w w O ►a rn M d d d V d V V V V V V V V V V s1 V V V sr V sr V. �r V U wwwwwwwwwwwwwwwwwww.000o„o0woo.wCO.. O tD O N fM V' v to In In to tD %D tD w %D tD %D tD w t0 t` N t� t` t` ..t` t.w r444444444444444444.4444444-4 z 00w00w0000000000w00www00000000w'w00www00w H a O v o1 H N M M V' v sr V' to to to m In In tn'-tn to %o %o tD tD %o 1D t` . . . . . . . . . . . . . . . . . U wwww00wwwwwwwCowwwwwwwwwwwww a O OtOwoHr c-4NMcnmcnv'-wv V'vvvtntnlntnwtD . . . . . . . . . . . . . . . . . . . . Ri ..O toNmt-wm00HHHNNNNNMMMMMvv V'vv 1 O \O . . . . . . . . . . . . . . . . . . . . . . co ".M N M cn M fn M v V' v v V' V' IT sr V v V' v v Rrvv-it v IV CD w w w w w w w w w w w w w w CO w w w w w w w CO w w W fn W mQ Otn rlwrlM V tntn%0Wr,t�t,wwwwwwOtONON00000 . . . . . . . . . . . . . . . . . . . . 4 a V' N N M M M M M M M M M M M M M M M M M M M [1 to w w w w w w w w w w w 0 w w w w w w w w w w w w w w O tD to w O rl N M V' sr In w w tp t0 t0 10 t0 !` !` n n w w w H 00 . . . . . . . . . . . . . . . . . . . . . lA 'd' .-1 N N M M M M M M M M M en C1 en M M M M M Cn M M M en M w w w w w w w w CO CO CO CO w CO CO CO w CO CO w w w w w w w W U to rAritnt-w00rINNMP'1MV v V V V tntnlntD%D%Dr-r, . . M ri N N N N M M M M M M M M M M M M M M M M M M M M M OD w w w w w w w w w w CO w w w w w w w w w w w w w w O O MNWwm0rINNMMM V'vvar V etotototowtDtDw G4 (Yi - M O.-irl.-i'iNNNNNNNNNNNNNNNNNNNNN W w w w w w w w w w w CO w w w w w w w w w w w w w w w a to to to of N M v to tD t` t` t- w CO w of 0% 0% of w 0 0 0 O O O 0 a .. 1� N of OO riHHH r1.-I rl H.i H H H rtH-4 ri r1N NNNNN a'. t- w 00 OD CID w w w w w w w w w w w w w w w w w w w ww W O V'1nOMtn%Dww01000Hr4rlrtNNNNMMMMMen a N w o\ O O O O OOO rt rl rl r1 rt 4444 44.-; rt rl rl44 [Ln wNw MfNwm000.i.4rlrlrlNNNMMCIMM0 w wo1OOto101C•00OOOOOOOOOOOO tD M 0 0 o rI N M M .r V. M o o o w tD tD tD to t- %D w w w Co Co C. C. C. .ww w w 00 Co w w Co Co C. w l` N t� t- t- r t� t- t- N t- t- t, t- t, t, t` tl- t, t- rl to 0%0 V%Dt'wCIO t't-t'%0%D%DMV''0MMNNM%D10r-lo%%D . . . . . . • . C. . . . . . . . . . . . . . O ONNNNNNNNNNNNNNNNNNNrtrlrtrt88 jrrrrrrrrnrrnrrrrnrrr-rrrrrr x 3cP 00000000000000000000000000 00Ei 00000000000000000000000000 W Wv rlNM wrw �O ri ri ri r♦rl rl rl I-q H MMvvM a ' 1 N 1 PI/L.,� • 1 •. L � J's , 3 W u SEND j. •.l polo rw • •+. t, ,. .• tit •-, � • '/ -t^ '7 0 - �J � - - 11 ��ala in .1,...� ��..a � ^ J " - . �w+'.Yg' � � !„��•� 6 ter. • 7 �1' � V '_ w•••awt i .7 •J•II f". j��. I + • = : � —; . 7 lit j'f• ,• � '� ... I 1 f •. rw.a .w ...•w 1 1 9 ___—._ some .&.-Y �..Pw�-� •O. 970 t•q7 / • t y ID .. -. .: . to .i �' � ,. ..•.r • • r i 1 t ' ' e ..• it ..•. t, � r� i .Ja•.w • �4 r. CONSTRUCTION SEQUENCE PROJECT: Lot 2, Mason Street P.U.D. STANDARD FORM C SEQUENCE FOR 19 93 ONLY COMPLETED BY:MEO/Shear Engineering Cor. Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. Year 1931 I I I941 I I I I I I I I. I I Month IS 101 NJ -DI JI FI MIAI MI JIJ.IAI SI OINI OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Bctriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other/Gravel VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other STRUCTURES: INSTALLED BY: VEGETATION/MULCHING CONTRACTOR: DATE PREPARED: August, 1993 APPROVED BY THE CITY OF FORT COLLINS ON: MAINTAINED BY: DATE SUBMITTED:August, 1993 November 16, 1995 Project No. 1490-01-95 Basil Hamdan City of Fort Collins Storm Water Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lot 2, Mason Street P.U.D.; Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Lot 2, Mason Street P.U.D. y1CMM 245 LF of silt fence at $3.50 per LF 3 - Hay bale barrier in swale Q $75.00 each 1 - Gravel Inlet Filter ® $150.00 each TOTAL ESTIMATED COST: ESTIMATE 2: re -vegetate the disturbed area of 1.0 acre at $1,300.00 per acre TOTAL ESTIMATED COST: The total required erosion control security deposit will be $ 1950.00 If you have Brian W. Shea Shear Engineering Corporation questions, please call at 226-5334. BWS / meo cc: SB Corporation Dave Stringer, City of Fort Collins $ 857.50 $ 225.00 $ 150.00 $ 1,232.50 x 1.50 $ 1,848.75 1,300.00 $ 1,300.00 x 1.50 $ 1,950.00 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 APPENDIX IV Tables and Figures Table 3-3 Rational Method Runoff Coefficients Table 3-4 Rational method frequency adjustment factors Figure 3-2 Travel Time Velocity for Rational Method Figure 3-1 City of Fort Collins Rainfall Intensity Curve November 1975 Table 3-1 Inlet Coefficient for outlet control MAY 1984 .-1 times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of tot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt................................................................................................ 0.95 Concrete............................................................................................. 0.95 Gravel......................................::......................................................... 0.50 Roofs.......................................................................................................... 0.95 Lawns, Sandy Soil: Flat<2% 0.10 ............................................................................................. Average2 to 7% 0.15 .................................................................................. Steep>7%.......................................................................................... 0.20 Lawns•, Heavy Soil: Flat<2%............................................................................................. 0.20 Average2 to 7%.................................................................................. 0.25 Steep>7%.........:................................................................................ 0.35 3-4 DESIGN CRITERIA 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of ,the lessening amount of infiltration, depression retention, and other losses that have a proportionally, smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period (years) 3.2 Analysis Methodology Frequency Factor C, 2 to 10 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shall not exceed 1.00 The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods. such as SWMM CTPRM. nnri HP('-1 are allowable if results are not radically different than these two. Where DRAINAGE CRITERIA MANUAL RUNOFF 50 30 t- 2 0 z w U cc w a 10 z w a O 5 Cl) w ( 3 O U 2 w F- 3 1 ME■011111 /III I OEMFA FA M Its � - ���e���■ �� / r I� •I Il ,' MFA■WM/ AWA�MMMEM■■� MM1I ■W—AeMMOME■■� _�►F��MW 5' .1 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *.MOST FREQUENTLY OCCURRING"UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT No Text DRAINAGE CRITERIA MANUAL 3. DRAINAGE INLETS INLETS L CULVERTS The design of a culvert, including the inlet and the outlet, requires a balance between cost, hydraulic efficiency, purpose, and topography at the proposed culvert site. Where there is sufficient allowable head- water depth, a choice of inlets may not be critical. but where headwater depth is limited, where erosion Is a problem, or where sedimentation is likely, a more efficient inlet may be required to obtain the necessary discharge for the culvert. The primary purpose of a culvert is to convey water. A culvert may also be used to restrict flow, that is, to discharge.a controlled amount of water while the upstream basin of the stream channel is used for detention storage to reduce a storm runoff peak. For this case, an inefficient inlet may be 0-. most desirable choice. The inlet types described in this chapter may be selected to fulfill either of the above requirenents depending on the topography or conditions imposed .by the designer. The entrance coefficient, Ke as defined by equation 2-5 is a measure of the hydraulic efficiency at the inlet type, with lower valves indicating greater efficiency. y Inlet coefficients recommended. for use are given in Table 3-1, TABLE 3-1 INLET COEFFICIENTS FOR OUTLET CONTROL Type of Entrance Entrance Coefficient, Ke Pipe Entrance with Headwall Grooved edge 0.20 Rounded edge (0.15D radius) 0.15 Rounded edge (0.25D radius) O JO Square edge (cut concrete and CMP) 0.40 Pipe entrance with Headwall L 450 Wingwall Grooved edge 0.20 Square edge 0.35 Headwall with Parallel Wingwalls Spaced 1.251) apart Grooved edge 0.30 Square edge 0,40 Special Inlets - See 3.3.2 and 3.3.3 Projecting Entrance Grooved edge 0.25 4MSquare edge 0.50 Sharp edge, thin wall .0.90 I1-15-68 WEIRS AND DAMS 4-59 prevent the nappe from springing clear, the coefficient for weirs of this type has a very nearly constant value of 2.63 or 2.64 for heads of 1 ft or more and for all crest widths. Woodburn t found (see Table 10) that this constant value is not reached below heads of 1.4 ft. Rounding the upstream corner of a broad -crested weir reduces contraction and increases the weir coefficient. Woodburn found that for heads of 1,5 and less there was no appreciable benefit from rounding the corner on a radius greater than 2 in. (see Table 10). Curvature on radii of 2, 3, 6, and 8 in. respectively gave practically Flo. 59. Broad crested weir. the same coefficient. Also, elliptical entrances gave practically the same coefficients as circular entrances. If the upstream corner is rounded sufficiently to prevent con- traction and the crest is given sufficient slope to offset loss of head due to friction, flow occurs at critical depth (see p. 4-85), and the rational formula for discharge is . Q - 3.087LHK a &67LD)i (114) where D (Fig. 59) is the depth of water on the weir crest below the downdrop curve. Woodburn found from experiments in a smooth wooden flume 2 ft wide with models made Of planed lumber that the greatest discharges he could obtain with a crest slope of 0.026 were 1 to 3 percent less than are given.by Eq, (114). Table 10 giving values of the co - TABLE 10, COEFFICIENT C FOR $ROAD -CRESTED WEIRS FOR DIFFERENT HEADS H Upstream corner I Crest 10.5 10.6 10.7 I. 0.8 10.9 11.0. 11.2 11.4 11.5 Sharp........... 2-in. radius...... Level Level 2.60 2.60 2.60 2.60 2.60 2.61 2.63 3-in.radius ..... . Level 2.78 2.77 2.79 2.79 2.80 2.80 2.83 2.84 2.85 2.85 2.85 6•in. radius..... , 8-in. radius, Level Level 2.78 2.79 2.80 ]2.81 2.83 2,82 2.84 2.83 2.85 2,85 2.85 2.85 2.85 ... , . 2.78 2.79 .2.80 2.82 2.83 2.84 2.85 2.85 285 3- by 6-in. ellipse. 8 by ellipse. Level Level 2.78 2.79 2.80 2,83 2.84 2.85 2.85 2.85 radin.us &in. radius...... 6-in. radius...... Slope, 0.004 2.77 2.95 2.78 2.94 2.80 2,93 2,81 2.92 2.82 2.91 2.83 2.85 2.86 2.86 Slope, 0.026 3.07 3.06 3.05 3.04 3.03 2.90 3.02 2.88 3.00 2.87 2,99 2.87 efficient C [Eq, (1101 for broad -crested weirs 10 ft wide is taken from Wo- «]� x- periments. The coefficient for all the models with rounded entrance corner appears to approach a common value of about 2.85 which remains constant for the higher heads. The drop in water surface (Fig. 59), neglecting velocity of approach and entrance losses, is h = 11=/2g where v is the velocity on the weir crest just below the downdrop DsI 'reet8 Of per do riBroad-crated Weir, with appendix by A, IL Webb. Roe, ASCE, September. 1030, Thin variety of mooddel, an i nest experimental study o conditions of Bow over broad -created weirs, A wide 'as inzive a ted. APPENDIX V Detention Pond Easement Information EASEMENT DEDICATION KNOW ALL MEN BY THESE PRESENTS: That the undersigned being the owner of Lot 2, Mason Street P.U.D., City of Fort Collins, County of Latimer, State of Colorado, as recorded in Latimer County records at Book 2231, Page 1450, do hereby dedicate and convey to the City of Fort Collins for public use forever hereafter a drainage easement described as follows: Beginning at the Southeast corner of Lot 2, Plat of Mason Street P.U.D., said point being on the Mason Street Right -of -Way line and being the POINT OF BEGINNING of this description. Thence continuing along the south property line of said Lot 2, North 89055'45" W, 208.66 feet; thence leaving said south property line and continuing North 00°04'1.5" East, 9.97 feet; thence South 89055'45" East, 125.00 feet; Thence North 00°04'15" East 90.56 feet; Thence South 89055'45" East 77.66 feet to a point along the Mason Street Right -of -Way; Thence along the arc of a curve to the left, whose radius is 2629.02 feet, central angle is 02'11'42", and whose chord bears South 03°20'42" East, a distance of 100.71 feet to the POINT OF BEGINNING. It is understood by the undersigned that, by acceptance of this dedication, the City of Fort Collins does not have the duty to maintain the easement. Witness our hands and seals this day of 119 Owner of Lot 2, Mason Street P.U.D. STATE OF COLORADO ) )SS COUNTY OF LARRSAER ) The foregoing instrument was acknowledged before me this day of 19 , by Owner of Lot 2, Mason Street P.U.D. Witness my hand and official seal. Notary Public My Commission Expires: ATTORNEY'S CERTIFICATE This is to certify that on the day of , A.D. 19 , I examined the title to the property hereon described and established that the owners and proprietors of record of said property as construed in C.R.S. 1973, 31-23-111, are as shown hereon as of said date. Signature: Address: Registration APPENDIX VI Stuffer Envelope: Grading Plan (Phase 1 Construction) Grading Plan (Ultimate Conditions) Drainage and Erosion Control Plan Erosion Control Security Document Letter from Vet Clinic Accepting Stormwater . till a'�SsQ I / i 1 I r I I I I I I I I. I r I I I I I I I Aryl I ro '15I mY / r I r � i ,L it It I�\�V 7:Z \\ �It I. m It 34)`jo t. • . j° P6NoK\At SWALA r � I / I 'j I Itilhdrn .1 'r-DIP 19 klkI l< _J r (W G MJAI1. r ' AS, PNAI.� r I r -fGl r-pe4r* of I'VMt �1 �a°I'r�r'W (r8,00' qlo. I•la GF� \� l�loo=2,3qGF� D�AINa�I� �A��h�Nfy \ gk3¢'0 ; Di2f o \sl�' WL o_ 4LI_ hG��N � �� � �p� Eti�'IDt�• ` F \` 3� rQ.. pwomw- LINE rI;I%MovE r%xl�l' � .• 13010 rI 4r,00' GuIs Guff 3$ ;1 .3 i8) VO z ; , 3 fl ' I �r I -I hi a �'.�{�' WOW --212_ZII----------- --- - .S_EDI_MENT.' '7-9.AP.___ u�iM� K = INVIG°A I F-Li PPI-MAt! KI SE S.D ET�,ri-Th%i J-Hcdr roNn WAtm LIAVIiL, gf,�GJW toL J R G14,100*441f i�oµw PoL.,to ofl 112� N'Yp N{' " or v-A b{Z . AND MAho�! �I s DI�WtSI.� WUW� co NG. IiI,�Yb'Clou - 6o�s.4� PxI. MAHIJ PKIVN FL o t�p November 16, 1995 Project No. 1490-01-95 Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Lot 2, Mason Street P.U.D.; Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. i The cost to install the proposed erosion control measures is approximately $1,235.50. Refer to the cost estimate attached in Appendix .I. 1.5 times to install the erosion control measures is $ 1,848.75 ii. Based on current data provided by the City of Fort Collins Storm Water Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 1.0 acre), we estimate that the cost to re - vegetate the disturbed area will be $1,300.00 ($1,300.00 per acre x 1.0 acre). 1.5 times the cost to re -vegetate the disturbed area is $1,950.00 The $1,300.00 per acre for re -seeding sites of less than 1 acre was quoted to us by the City of Fort Collins Stormwater Utility staff. CONCLUSION: The erosion control security deposit amount required for Lot 2, Mason Street P.U.D. will be $1,950.00 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 CREGER PLAZA SECOND REPAINT LOT 7 (SOUTH FORT COLLINS VET. CLINIC) I �I IT u.EI `ne) / IEXIST D ETENTON POND I ° —33— AIR. ELEV-340 1 ! VOL vu 0�ieiro c:r' rue: r=m 3. a U.E: INV.w0c 3i3 A\ �.,o—_ �1 ' I PPI1U AMON\ d \ Dp y p� . m S 8955'45" E 112.2 1 J � 3a0 _ aw�rsl I 33 N_ y.. .w•, tw N PROPOSED NEW +,w, •wI _ I D i w AS MAN 1w. 0 x w SAW, 51 a 4D AN FA p o ilk, 'A MAk LOT 2 1 p Ins, 3 0 o c o :11 U w Z T Nfr IA I� I � I 1 \ w 34 0L `6' U.E. (rvv1 3 1.onpia3o ,. -_ --- DMcr STRUCTURE 2 : �6• JE. (rra RCD PLAZA SOUTH SUBDIVISION I LOT 1 6u.E MP) I I I I I I III R[VISION3 b N RE b DSAEYm I I 16 I 1 PROPOSED NEW BUILDING FF ELEV: 35.50 ib5 33v 4a a. I W I �� 4 r .� • � I 0 _ ENTRYWAY DETAI 'i I F SCALE. 1':10 �ZOI 0 1 Qi I LOT E MASON A MEET k i l I 0 as DOCK C JTOT T ONE IS PLAZA R LINT 11_I 1 0 n.ED Uaw I e I I IIW I y I MONCIED E awLwao II I rr•3D.30 - I I 1 1 I n•eo ,CMU 4i 34.01) 1! 'i 'All al I 74 TRENCH OR TE.uroINS SWEET) _---_---_ TRASH SIRATE i WN•E)W \ 32 1Ej; I`1 1 13LF ENCN ROw - nLF CARD S z, x IMN.EE.CO 1 H I M Df0' L', I �' NN•.w. 0 621'33" 29. 2' 20g02- S 01715'44" E 199197' I I COLBOARD DRIVE I I I I I I I � ' I I I I I � I I SHE ENGINEERING CORPORATION CAr1EE R.W.S. SUBSTANTIAL BUILDING CORPORATION 4836 SO. COLLEGE AVE. SMITE 12, FORT COLUNS, COLORADO W525 NPPDRE B.W.S. PHONE 303) 226-5334 ( (303) 226-1451 0.10 0,20 0+30 TRENCH DRAIN PROFILE SCALE N.:'.'j SOTC:INCNOONC NA:N INCEOFTHE D„iEE p RENCNDRWWL E iN :PAT. „i I mR_!�_,. RAN VIEW TRASH GRATE DETAR. mommommommomom GRADING PLAN (PHASE I CONSTRUCTIO: LOT 2, MASON STREET P.U.D. FORT COLLINS, COLORADO City of Port Collins, Colorado U11IdTV PLAN APPROVAL AVPxD.lR N:anu a Dw:Nns wrz D[EK[D IT ANN rla0¢D PUT CNFCKm EY PNa.N:mRRm, D.rz CHECKED lff INS CHECKED V i SCNF: 1'•]P CREGER PLAZA SECOND REPLAT LOT 7 ; I It (SOUTH FORT COLLINS VET. CLINIC) I 11.§I I oRn. mumoN Moxo N.M. 11EV-340 , I 'NL MW0-11.253 CS. WL VNL.16,1E0 CS. � 1 1 AI I ' 1 14 S 89055'45" E I / I IA zr Y.• 34m5 I .in :3➢LOLL' 1TBY I r i uNwi� 414 Iml 1 TT FF ELEV: 35.50 31, .r« ,Lox • PROPOSED NEW 344Z M BUILDING - } sl SIX, Y... a ��I in _- J II _ ,v. " V I t-m in LOT 2 "Is \1 el o m n Is All, IT it a o31 ° o Im w �'.I h, 2'F; 4. 71 m n P� w I -- - --�I�rz ••I I I ' I , �,�ill FF ELEV: 36.00 II II FUTURE BUILDING II z_u -L W h AUZI 1„ 2 2- - 'I -- _-- nift 39 in I Ow •N0 6� _ I 6' U.E. (IVP.)O0RH UONN _--—_______ --- --- I `*\ -- I �6- U.E. (WP.) RCD PLAZA SOUTH SUBDIVISION LOT 1 6• U.E. (rP.) I I I II I I II II II I � I :4 -1I E.1 j 11-W �_-•Rr-.. -- I W I I' tj O I IIi — -- ----ill CO ml 1. ; 'ItI I�C); ' ' o II IF --- — ----A nd; , I a II III q III Ili I I o II II ...II'I'II o III° I ,j I V �Il nl[V IT Tini� li ; /AI: i II b 41, I�tJ 223.82 I yl I I I 11I RIY I ILIJ KT--f I1'11��E� A- I`` DELTq- Oy'21'33" R= 2629.002' i V15'44" E 19%97' 1 _ COLBOARD DRIVE I I I lI f{ ( I I I 1 I I I I 11 I I II I I I I I City of Fort Collins, Colorado UTILITY PLAN APPROVAL °m swnrz, rz oom.c °u< CHECKS) 1r rm � � uMr drz CHECKED P nwsrm MITI` On ' CHECKED BYOUT a,y w vasnw urz LIIECR[0 BY CHECIIED D p GRADING PLAN IDLTIYATE GUNDITIonsl "'----' --- LOT 2, MASON STREET P.U.D. 1490-01-95 5 FORT COLLINS, COLORADO Gab oar PTEN9ER 1995 016,E CAO m ans SHEAR ENGINEERING CORPORATION eoSE cHla.a o ws. SUBSTANTIAL BUILDING CORPORATION 6836 50. COLLEGE AVE, SUITE Iz. Pom COLLINS. cotoRAoo eoszs �, e 1 = 20' Iwrve6 6.W.s. PHONE: (303) 226—WU (303) zz6-/631 CREGER PLAZA SECOND REPLAT LOT 7 I j It I (SOUTH FORT COLLINS VET. CLINIC) 7 I I �..". likkkkkkkS ,`. r.oil ` II I I it gl I wa 7~ r=' -10 of (TTF.) una LAt w,'o._`,. aaROilMO Ems.. nP. .� _ �..C� B' u.E. ( ) Esmnw e.4E a1KE CUM: FnTER $GI1. 1'=$e J01 \ ,il�-e CNnMXF1 nMLIG ART FENCE __. O3 aVRLP 1AIM .} I W to' "I (nit a...r.+� .rw >a�� lauw wx.oa 1 TIIXI 4RRVEL _ _ _ _. _ _ _ _._ _ _ _ _ _ _ _ Fj LS C �'�' ,ov uN4 cIXM1um +' SIT 0x 0.38 ISSIf 0.r5 ua sil�i rG[E,T2 1 I mwonceeuwLRwencE non _. — }�• I - Tr a bRgf ..r'Je°o...• _ bN.. ��°` �....,Y..,rw'N'.Y`La`..`. r aed — im J-em.>.,... I j I c2 �w«""' �_-�,E� US Is .. v.... u I I� 0.13AC. F "..uWre nx aCk - -_- AwR.,—y = ( I Zn.uN rYu Rrwe Ck ��..�CGli6Sin .,r�y��'� - - - FA.., w rA.1 rower �Y4�eaW1tiu1/rW win ,. _ R I T I U :., RIeY� at _ F ELEV' to 35.50 ... E YWReYF+`a..:Y- t W I J. r i .., Id 1 BUILDING f [] Imo^ wW smw R�ewn ,,,,1L,.. i a I � T. r ww _� "��.a b - + ` " m) ' .+�. w+..".-` ..: I I,..: j E I o .w."WJ.�b.rrllb sWw.0 i Ys,wu w.Nu u�u�K.xb4�• + ' .•�r I ISO I W WUCrAY-EwwC�IWW�1Ylr _ Q _ iu (r 7 I 1- .._.w....l. pillyid wjkkIIITFlbmq I'll, lit w jilkill Hill pklk� III I. [I skill, rr�" `�4e p �{ It I,_ `— { 1C ♦I O 1 I N �uwrv�r. �iw,u. - .r` �n'E%..s ' R", i.' la HTUISfilt °re'. r,�. ru~Yu+x+.R r.er K �l I6I IN't it h yy,b�u.u. N.b�r.KK ... .. I . ...I "I d I I O rrLb �r.es.� JaEJK. li.r'+.r YIN srrrw..•ti '.e�l.�s.w �. p I Y''♦.'a4,.W.�.bYUR.. z Ilk A � W� .,.y 4 i 11 I o`a"'�"'e:.'=LAW.} w''e"7' :.,�".E.Y IS \ .. ,T6 I@ Sit"o;�.b ....... " r'u.`,.E.`e-`.'Y'; "ice w.P`e.•-rr..w,.R.rr r:v LOT 2 rSin"Yy�y ,b I i I Rla aYlw�.r.a+-rwa.wYwR�Luor.asr,.Y�= O �l+'.' —� f 1 I i DR INA E ONTO YTONN(YIFf u ly.�•uii•W Y.6�Y..,W b�Yb,rbe.Y� Qr I I Q NCES&I r4: rW..�M rubb..mErrJ urxaaa"r, ..w,....,b� 0Ck: _ .�y,�1.� _. I �I O�Im ! - - e,.IeWgrAvnbJ.s.Le4 s.,rw.r.rr..n....rbs�..�..e�....v. x..�.._ WkIL R�r O L+wouryp. Asw�yu skit —AI I a.... " x.r..,w.il.rr..b�.......ebr n�.irAeirav ��Y'o` U Y�Y'' „m - - 'St..�'3 .' I I II �} RID'w,, rm.raRvcl:w „},; Z I 0.81AC I IGH "' WATER V '°I I r """'°�} .xu+ouu}ow. Ia ELEV: 33.78 �^ (INCLUDES le) ITS- - L'•+- J',J N :yva, f.Jllmu vc:, duiu FF ELEV: 36.00 / - I °"" �•FUTURE BUILDING— ...u.=,..=R � — _- - ..�m�... / + -- w......,�... I Q 0.11 AC 1 I �� - > O �TeLL. ,.-. .. I evws� A •y.. L .uLEa, xr,. I M. wrmev,eumn i - `� I '• �' R^ur M1aYng "Ilk ry •^uwr Ilk R,uE vJra3R Sk A W° .. W - m.R A R„c.Au 1 F.9. 2 L.' ... Haw= ° L+� ; I AN i 200(02' '� •�' R^^"„u"•, 1ouxmix4rni°N I I BRG S Q2'IS'49" E I ,1 CHDJ 1991.97' ^+. k - - 1 Ilk ill COLBOARD DRIVEIlk ry I 'ILL i RCD PLAZA SOUTH SUBDIVISION /� 1 '), I 1 ewe p w.�ww W r city Of Fort COWva, Colorado 6u E. (TYP.) -' 1 I L= PLAN APPROVAL LOT 1 I � �', I w .,.. e w .. r,. ,,. b R,. R... w.. mm k"Lil il { kill AERR6no: I I I I I ..� .. jf4 moilma.Nn. ........................`:.....................�............�..........».........�.............-Ec".519I1it l., a.�a. cx¢KEC ark.R, E W.,,.,<. vt, __ .. t 11 kil ! j ♦w CHECKED Dom__ 1 I I I I . .......... ,.,..... , . ,.. , ,, .'St -Csil.ililil. I 'L'il I ill .ww .CHECKED eT. P,il.:�roil,. .R m CHECKED el. _.. SECTION A -A amsin skr rx a'm"w •f .Y.. ru,uv .well. ,,oil n. am.. Ru�o.n C410Em ere PTENRER, 1995 wdm-- cA01rox --__— CUM SHEAR ENGINEERING CORPORATION - DRAINAGE AND EROSION CONTROL PLAN °RO1BC1 N0 STEM MO- rR FINK Pout. _ _ _ ;necked_- III SUBSTANTIAL BUILDING CORPORATION 4536 SO. COLLEGE AVE, SUITE 12, EMT COLLINS, COLORADO e0526 LOT 2, MASON STREET P.U.D. C 1490-01-95 V kPa 11111111 = 20' oleo- ew5. PHONE: 303225-5334 d03 22F-u5I FORT COLLINS. COLDRADO