Loading...
HomeMy WebLinkAboutDrainage Reports - 01/19/1990FINAL DRAINAGE INVESTIGATION FOR LAURIE SUBDIVISION FORT COLLINS, COLORADO Prepared for Dr. William Musslewhite 5001 S. Sheilds Street Fort Collins, Colorado 80526 December 29, 1989 Commission No. 1180-01-01-02 CONSULTING ENGINEERS FOUNDATION ENGINEERING 320 N. CLEVELAND AVENUE LOVELAND, COLORADO 80537 f.. December 29, 1989 Commission No. 1180-01-01-02 Dr. William Musslewhite 5001 S. Shields Street Fort Collins, Colorado 80526 Dear Dr. Musslewhite, The enclosed report represents the results of the final drainage investigation for the LAURIE SUBDIVISION located in the Northeast Quarter of Section 3, Township 6 North, Range 69 West of the 6th P.M. Larimer County, Colorado. This investigation was based upon the proposed site development plan and plat; proposed site development construction plans; on -site observations; and available topographic information. The investigation was performed in accordance with the criteria established in the City of Fort Collins -"Storm Drainage Design Criteria and Construction Specification Standards" manual. It is our opinion that the proposed construction is feasible provided that the recommendations contained in the attached report and the incorporated final design are performed in accordance with the final approved plans for the project. FOUNDATION ENGINEERING KWP/drm s, please call. TABLE OF CONTENTS Letter of Transmittal i Table of Contents Scope 1 Site Description 1 Existing Conditions 1 Proposed Development 2 Conclusions and Recommendations 2 EXHIBITS ,�/� Vicinity Map — V v 0411 Exhibit A Calculations Exhibit B I� The following report represents the results of a drainage investigation for a proposed development to be known as the LAURIE SUBDIVISION located on a parcel of land situated in the Northeast Quarter of Section 3, Township 6 North, Range 69 West of the 6th P.M., Larimer County, Colorado. The investigation was performed for Dr. William Musslewhite. The purpose of this inv igation is to determine the effects of the proposed development on the ar s xisting drainage conditions and to determine the improvements, if any, and the appropriate sizing for proposed improvements so that it may be incorporated with the construction of the project. The conclusions and recommendations presented in this report are based upon the proposed site development plan and plat; proposed site development construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins- "Storm Drainage Design Criteria and Construction Standards" manual. SITE DESCRIPITION The site is generally rectangular in shape and contains approximately eight acres. The sites East-West dimension is approximately 1,150 feet and its North -South dimension varies from approximately 390 feet at the westerly boundary to approximately 280 feet at the easterly boundary. The site abuts the westerly right-of-way of Sheilds Street at a point approximately one-half mile south of Harmony Road. The site is located on the Burns Tributary of the FOSSIL CREEK DRAINAGE BASIN. The site is presently used as a large residential tract with the existing structures located at the southeast corner of the site near Sheilds Street. The Pleasant Valley and Lake Canal passes throughh the adjacent property to the north with a lateral of that ditch flowing through tli€site. Near the center of thsite is a ravine that has been created by scouring action associated with an W overflow discharge from the Canal as it flows across the site toward the South. According to the irrigation company's officials the overflow to the ravine is designed to discharge a maximum flow of 30 c.f.s. (cubic feet per second) East of the lateral ditch passing through the site, the property slopes gently to the East toward Sheild Street at a slope of approximately 2%. The area below the ditch is irrigated and is used for pasture except for the residence and out -buildings at the southeast corner of the site. 1 The portion of the site that lies West of the ravine is not irrigated and slopes. rather steeply at approximately 15% toward the Burns Tributary of FOSSIL CREEK. The area is sparsely veaated with ground cover consisting mainly of % native grasses and sage brush. The site abuts THE RIDGE Subdivision at the West and South. AO1A4 The site receives run-off from the properties to the North and West. For the purposes of this investigation, the area above the Pleasant Valley and Lake Canal was not considered to effect the conditions onsite since the ditch flow is controlled to the extent that there is an existing. overflow structure that directs excess flow to the ravine through the site, as previously stated. The area to the North consists of approximately 10.5 acres which drains easterly to Sheilds Street and then southerly along the west side of Sheilds Street through the site. n area of a roximatel 2.5 acres drains into the smaller sid ravine that enters the site at the mid -point of lbe.tbe nQrthern boundary.,/00 pproximately 4.5 acres drains directly into the major ravine before it enters the site near the northwest corner. A `I PROPOSED DEVELOPMENT ow A , ,0 r The proposed construction is to consist of a v S'� ry clinic with associated parking that is to be located near the northeast corner of the site adjacent to Sheilds Street. A new cul de sac street is to be constructed to serve the new clinic and the existing residence. The cul de sac is to be extended to a circular turn -around west of the existing and proposed construction in order to provide access to the area to the west. At this time the future development to the west is being proposed to be residential in nature with nine (9) lots to be platted. CONCLUSIONS AND RECOMMENDATIONS 2 /V 1. The proposed development will retain the existing drainage patterns./Q' 2. The site is located in the FOSSIL CREEK DRAINAGE BASIN. The site is not �li1 GG�wc located within the floodway or flood plain. p„ 3. All development is to be performed in accordance with City of Fort Collins Standards and Specifications. 1� 4 nsite detention of stormwater is not recommended due to the sites " Al proximity to the existing "Major" drainage course. 1`%f? itWwAezwn� 2 VICINITY � � AP 7 CALCULATIONS EXH�I�BIT "B" e Dr. Musslewhite-Laurie Subdivision Commission No. 1180-01-01-02 By: DRM Date: Dec. 29, 1989 Calculations for Drainage Investigation for LAURIE SUBDIVISION located in the NE1/4 of Section 3, Township 6 North, Range 69 West of the 6th P.M., City of Fort Collins, Larimer County, Colorado Total Site Area = 8 acres +/- EXISTING CONDITIONS Rational "C" Factor = 0.20 for Offsite Irrigated Areas "11 of= 0.25 for Offsite Steeper Non -irrigated Areas to " of = 0.25 for Onsite Irrigated Areas to " " = 0.30 for Onsite Steeper Non -irrigated Areas PROPOSED DEVELOPMENT Rational "C" Factor �or Lawns and Landscaped Areas itof= 0.95 for Roofs, Decks, Patios, etc. "of= 0.95 for Streets, Drives, and Parking Lawns and Landscaped Areas = 29,413 sq.ft. Roofs, Decks, Patios, etc. = 4,400 sq.ft. Streets, Frives, and Parking = 13,800 sq.ft. Area of Site Consideration = 325' x 146.5' = 47,613 sq.ft. "�avg = {(29,413 x 0.225) + (4,400 x 0.95) + (13,800 x 0.95)) / 4�,613 cllavg = 0.50 C - . 50 Refer to following calculations for runoff quantity determination. CULVERT SIZING w . New culvert to be installed at cdf"de sac street from Shields Street. The culvert is considered to be at "Inlet Control". Based upon the runoff calculations the U" design flows at this point are: Q2 = 6 cfs and Qloo = 20 cfs ; therefore - Using the Design Nomograph for Circular Pipe at Inlet Control: @ HW/D = 1.0 and Q = 6 cfs an 18" dia. pipe will be sufficient @ HW/D = 1.5 and Q = 20 cfs a 24" dia. pipe will be required�- USE a 24" dia. pipe to meet both conditions 41'x �,�,� Dr. Musslewhite-Laurie Subdivision Commission No. 1180-01-01-02 By: DRM Date: Dec. 29, 1989 CULVERT SIZING(cont.) 2.) Culvert at cul de sac street crossing on ravine in central portion of site. 7 Design "Q"= 49.5 cfs (from report) o Since irrigation flow is incorporated consider only HW/D = 1.0 From Design Nomograph: @ HW/D = 1.0 and "Q" = 49.5 cfs a 42" dia. pipe will be sufficient. Since a 48" culvert exists immediately downstream and considering for trash build-up at he culvert entrance, recommend a 48" dia. pipe. The primary area of concern is the ravine running thru the site. This may require. VM ,f some type of "drop structures" along its course and inlet and outlet protection J at the proposed culvert under the cul de sac street. Additional protection at the inlet and outlet ends of the culvert at Shields Street should also be provided. 7 ►� W ray (The City's Standard Erosion treatments for wind and storm -runoff should also � . be incorporated during the course of construction. 44,0 4"' �t7 3 Calculated By: DRM STORM DRAINAGE INVESTIGATION # 1180-01-01-02 Client : Dr. Musslewhite Date : Dec. 29, 1989 RATIONAL METHOD PROCEDURE Project: LAURIE SUBDIVISION Checked By: KWP Design Storm: 2 YEAR Existing Conditions Location Point Area Runoff Coeff. Freq. Factor AxCxCf Flow Time Flow Time Rain Intens. Runoff Comments Description Designation (acres) C. 'cf. Tchan(min.)Tc (mi 'I"(in./hr,)'Q'(c.f.s.) Offsite Area 'A' Pt. A 10.5 0.2 1 2.10 7 1 5 2.4.41 Onsite Area 1 Pt. A+1 2 0.25 1 0.50 20 1.85 0.93 Pt. A+1 12.5 0.2 1 2.50 ? 20 1.85 4.63 Flow at west side of Shields flowing to south �xn Offsite Area 'B' 2.5 0.25 1 0.63 V 10 2.5 1.56 � VI'Ai Onsite Area 3 B+3 1 0.3 1 0.30 10 2.5 0.75 J Pt. 3.5 0.26 1 0.91 10 2.5 2.28 Flow at 'minor' ravine at north central area p1 Offsite Area 'C' Pt. C 4.5 0.25 1 1.13 W' �I 0 2.5 2.81 Onsite Area 4 Pt. C+4 1 0.3 1 0.30 1 0 2.5 0.75 Pt. C 6.5 0.26 1 1.43 iii��� 10 2.5 3.58 Flow from north and west- add 30 c.f.s. irrig 111 33.60 Total with irrigation flow n Onsits Area 6 Pt. 6 1 0.3 1 0.30 10 2.5 0.75 Total at Ravine Pt. + 10 0.26 1 2.60 115 2.1 5.46 Flow exiting site - add 30 c.f.s. irrig. 35.50 Total with irrigation flow Onsite Area 2 Pt. 2 1 0.3 1 0.30 10 2.5 0.75 Flow to south offsite overland Onsite Area 5 Pt. 5 1 0.3 1 0.30 1 10 2.5 0.75 Flow to south offsite to "major' ravine Calculated By: DRM STORM DRAINAGE INVESTIGATION # 1180-01-01.02 Client : Dr. Musslewhite Date : Dec. 29, 1989 RATIONAL METHOD PROCEDURE Project: LAURIE SUBDIVISION Checked By : KWP Design Storm:100 YEAR - Existing Conditions Location Point Area Runoff Coeff. Freq. Factor AxCxCf Flow Time Flow Time Rain Intens. Runoff Comments Description Designation (acres) C. 'cf. Tchan(min.) Tc (, ' .) 'I'(in./hr.)'Q'(c.f.s.) Offsite Area 'A' Pt. A 10.5 0.2 1.25 2.63 1 6 15.75 Onsite Area 1 Pt. A+1 2 0.25 1.25 0.63 20 5.15 3.22 Pt. A+1 12.5 0.2 1.25 3.13 I 20 5.15 16.09 Flow at west side of Shields flowing to south Offsite Area 'B' Pt. B 2.5 0.25 1.25 0.78 1 0 7 5.47 Onsite Area 3 Pt. B+3 1 0.3 1.25 0.38 1 0 7 2.63 Pt. 8+3 3.5 0.26 1.25 1.14 1 0 7 7.96 Flow at "minor' ravine at north central area Offsite Area 'C' Pt. C 4.5 0.25 1.25 1.41 1 0 7 9.84 Onsite Area 4 Pt. C+4 1 0.3 1.25 0.38 1 0 7 2.63 Pt. C+4 5.5 0.26 1.25 1.79 1 0 7 12.51 Flow from north and west- add 30 c.f.s. irrig 42.50 Total with irrigation flow Onsite Area 6 Pt. 6 1 0.3 1.25 0.38 10 7 2.63 Total at Ravine Pt. B+C+6 10 0.26 1.25 3.25 1 5 6 19.50 Flow exiting site = add 30 c.f.s. Irrig. 49.50 Total with Irrigation flow Onsite Area 2 Pt. 2 1 0.3 1.25 0.38 1 0 7 2.63 Flow to south offsite overland Onsite Area 5 Pt. 5 1 0.3 1.25 0.38 1 0 7 2.63 Flow to south offsite to "major" ravine I Page 1 'J Tl ,(� ram, Cps- f v... bat, NJ: H too rat . S ` -{-- (. &70. L'Z (- C U S 3 Calculated By : DRM STORM DRAINAGE INVESTIGATION 9 1180-01-01-02 Client: Dr. Musslewhite Date: Dec. 29, 1989 RATIONAL METHOD PROCEDURE Project: SHIELDS STREET PR RTY Checked By: KWP Design Storm: 2 YE Developed onditions Location Point Area Runoff Coeff. Freq. Factor AxCxCf Flow Time Flow Time Rain Intens. Runoff Comore Description Designation (acres) C. 'cf. Tcha Tc (min.) 'I'(in./hr.)'O'(c.f.s.) Offsite Area 'A' Pt. A 10.5 0.2 1 2.10 1 5 2.1 4.41 Onsite Area 1 Pt. A+1 2 0.5 1 1.00 5 1.85 1.85 Pt. A+1 12.5 0.25 1 3.13 20 1.85 5.78 Flow at west side of Shields flowing to south lJ O=6 cis for Culvert sizing Offsite Area 'B' Pt. B 2.5 0.25 1 0.63 10 2.5 1.56 Onsite Area 3 Pt. B+3 1 0.3 1 0.30 10 2.5 0.75 Pt. 13+3 3.5 0.26 1 ( 0.91 10 2.5 2.28 Flow at 'minor' ravine at north central area Offsite Area "C' Pt. C 4.5 5 1 1.13 10 2.5 2.81 Onsite Area 4 Pt. C+4 1 0.3 1 0.30 10 2.5 0.75 Pt. C+4 5.5 0.2 1 1.43 10 2.5 3.58 Flow from north and west- add 30 c.f.s. irrig 33.60 Total with Irrigation flow Onsite Area 6 Pt. 6 1 0.3 0. 10 2.5 0.75 Total at Ravine Pt. B+C+6 10 0.2 � t 15 2.1 5.46 Flow exiting site - add 30 c.f.s. Irrig. 35.50 Total with irrigation flow Onsite Area 2 Pt. 2 1 0.3 0.30 I 10 2.5 0.75 Flow to south offsite overland Onsite Area 5 Pt. 5 1 0. 1 0.30 1 2.5 0.75 Flow to south offsite to 'major' ravine Calculated By: DRM STORM DRAINAGE INVESTIGATION # 1180-01-01-02 Client : Dr. Musslewhite Date : Dec. 29, 1989 RATIONAL METHOD PROCEDURE Project: SHIELDS STREET PROPERTY Checked By: KWP Design Storm: 1 W R -Developed onditions Location Point Area Runoff Coeff. Freq. Factor AxCxCf Flow Time ow Time Rain Intens. Runoff Commdrtts Description Designation (acres) C. 'cf. Tchan(min.) Tc (min.) 'I'(in./hr.)'O'(c.f.s.) Offsite Area 'A' Pt. A 10.5 0.2 1.25 2.63 6 15.75 Onsite Area 1 Pt. A+1 2 0.5 1.25 1.25 20 5.15 6.44 Pt. A+1 12.5 0.25 1.25 3.91 20 5.15 20.12 Flow at west side of Shields flowing to south 0=20 cfs for Culvert sizing Offsite Area 'B' Pt. B 2.5 0.25 1.25 0.78 1 0 7 5.47 Onsite Area 3 Pt. B+3 1 0.3 1.25 0.38 1 0 7 2.63 Pt. B+3 3.5 0.26 1.25 1.14 1 0 7 7.96 Flow at 'minor' ravine at north central area Offsite Area 'C' Pt. C 4.5 0.25 1.25 1.41 1 0 7 9.84 Onsite Area 4 Pt. C+4 1 0.3 1.25 0.38 10 7 2.63 Pt. C+4 5.5 0.26 1.25 1.79 1 0 7 12.51 Flow from north and west- add 30 c.f.s. Irrig 42.50 Total with irrigation flow Onsite Area 6 Pt. 6 1 0.3 1.25 0.38 1 0 7 2.63 Total at Ravine Pt. B+C+6 10 0.26 1.25 3.25 1 5 6 19.50 Flow exiting site - add 30 c.f.s. Irrig. 49.50 Total with irrigation flow Onsite Area 2 Pt 2 1 0.3 1.25 0.38 1 0 7 2.63 Flow to south offsite overland I Onsite Area 5 Pt 5 1 0.3 1.25 0.38 1 0 7 2.63 Flow to south offsite to 'major' ravine Page 2 I I r-✓ r �� �� �. �\t� ��� \�� fir,-.. r...+� ` � � `� i SHEET INDEX_ i I.AK 116 fiNhL BITE 1�r'.I�L L 6 FpUNji/CT�TI PWI.L 3 6 Fipp� N 5 � ELfL�%rV, W'IN a G WL4i ANN CXL FL,4N FIWL 5rrf- FLAN I A I Fj"l_ ��TE P,JIu LAriD�CAPE T'LAN (� I IhNDka� fL#I VTILI-fY fLHNS I'g- NDGX,VIGIKjjTY Md,p> IMt_ `4tff7 ;L4 L74,:7Y F 4 VTLl7r 13A14 9 4 j7ErPdLC PLA7, �U�� �/�IV�IN 101 LgUF4E 7UF FIR`T PILING final Plan statement of plantains OY no proposed Veterinary Clinic is O distant 1OT located le orate . can ..Dahl r. y a people . dale:odd to t uvael•to character oa Will GaWLt nt tine ding be Use. a statement of proposed Ownership rtalp Of Public and Private Open $.ceIZ OIL oPev Psce 'III a Prlvv Open ,part and maintained by the near. estimate Of Number of employees fat Business no eat mate for the nu er Of employees four no Duet,ptdOn of pR(optl• The veterinorY Ctecf= was designed nutfui the vva, c he ovvvr and be a deafrole ,n: m9 virobvbt for people utlll,tug the services a a veterinary The Pilot" anlava„apme Is deaipva pP,a, desirable from the wields street art risl. Description of eft,9=tlev of Land US, C onflictu The veterinary Clinic in assigns o be residentialIn character. Laamaplo9 is propnetd s1 oddonmm bidder .amg aides Of ehramie. essential of Barney dareavytf®: The Veterinary Cl:mt Will be aetfgmd ath an ...lobo, ,yetes that Will be "Ole the area. rtw round provides n the building Its air= LOf SIZE: u,:c7'5Prr d LI Pr EEXUA1 FLCEPIIOAI tan Gras-. CAT ft1113EL5 I9Z5iC? pImL den sa K FA¢FINd a`fp�- (th z7cts FINAL SITE PLAN /LOT 5, UFIE "'L i L9` IcN FlPi7r flLJN 6_. I 4 M N[ k , 6 Out 4 _ ,#l r-�WSv .D Fo>fi I PLANNING AND ZONING CERTIFICATION 'Approved by the Planning and Zoning Board Of the City Of Fort Collins. Colorado, on th's_day lof A.D. 1990 SeC[eta[y OI Planning antl Zoning Board OWNER CERTIFICATION The understanding, being the lawful owners Of the property described on this site plan, do hereby certify that they accept the Condition and restrictions set forth on said site plan. (signed) THIS IS TO CERTIFY THAT ON THE DAY OF 19 . I EXAMINED THE TITLE TO THE PROPERTY AS DESCRIBED HEREON AND ESTABLISHED THAT THE: DRNERS AND PROPRIETORS OF RECORD OF THE SAID PROPERTY AS CONSTRUED IN C.R.S. 1973, 31-23-I11, ARE AS SHORN HEREON AS OF SAID DATE. REGISTRATION NO. �2a I tracec 5 4 C/QLMG yN mY.oIUG LG N(R �\ 1\ /o<KT /also, i M1RzI. �s P'�fHN-T lrr�� � b• t� -rwv� / \ / A -I IAPKINc / 30 j do - w+F.'G65 G gNTnE 4(AV FZI / l �,asiYf I — 2T� }_E��cF t..11Y.roM1 i. 4Erra0\ AWN I5-R5-R. ¢ro Ti I-e4�PluY- [fr­l It ar/HTRt � ��d1EEwtti p. hiT'uv I i I ( d- xs.LL PERSPECTIVE VIEW E �F--dl Zl cee t SECTION A -A i� tt lid y;_�y'x5-1eC• _ i _e:o'� •Id •_"'drit'�. �5-y ' unn aA[ia Y � ive } I\\ 5 n 1 T 1 e el ITT — am DRIVE -OVER LURLGU TE0. AND 510EWAweveLNSO --IN ii Pik -�r8. _%-I NL C�� 7, 7,; I IO efae.wo Tawly B" MtRQ: espat'T'E7 T< I O .wwet owxw e5110 Y.eE[T OP Q