Loading...
HomeMy WebLinkAboutDrainage Reports - 05/13/20051 Addendum No. I Project Development Plan Drainage and Erosion Control Study for the Lind Property Filing 1 Fort Collins, Colorado March 28, 2005 Stantec Consulting Inc 209 South Meldrum Street Fort Collins CO 80521.2603 Tel: (970) 482-5922 Fax: (970) 482-6368 - stanW.com Stantet March 28, Mr. Basil Hamden City of Fort Collins Water Utilities--Stormwater 700 Wood Street Fort Collins, Colorado 80521 RE: Addendum No. 1 Project Development Plan Drainage and Erosion Control Study for Lind Property, Filing 1 Dear Basil: As discussed we have re-examined the outfall from Pond 100 of Lind Farms Filing I (AKA Brightwater Landings). We have prepared a short Addendum to the Filing I plans to address this. We have also revised the plans to reflect the Filing two Outfall rate of 3 cfs and the WQCV that will be required with Filing 2 We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, Sear -Brown A RE%� Preps d by: P Jim Allen -Morley, Senior Project Ma ADDENDUM No.1 . PROJECT DEVELOPMENT PLAN DRAINAGE AND EROSION CONTROL STUDY FOR LIND PROPERTY FILING I FORT COLLINS, COLORADO The purpose of this addendum it to address changes caused by the change in location of the outfall from Pond 100. The outfall will now discharge to the existing Richards Lake Subdivision Pond outfall. There are two reasons for this. One- If detention Pond 100 has an outlet it can control the run-off in such a way that there will be no storm drainage over flow from the Lind Farms Development to Maple Hill Development., Two — there is extra capacity in the Richards Lake Outfall Pipe. The Development of Lind Farms Filing II has further refined the hydrology of Pond 100 and now Pond 100 is constructed to its full capacity. When an outlet structure is constructed to the requirements of Filing II, Pond 100 will be able to detain all runoff from developed and historic basins and release the outflow at 3.00 cfs. See Filing II Attachments. The 3.0 cfs outflow from Detention Pond 100 will discharge fo the Richards Lake outfall pipe. The outfall pipe -now receives 9.0 cfs from Richards Lake per the July 2000 City of Fort Collins, Richards Lake PUD, Master Drainage Study (see attached table from the Master Drainage Plan). The Capacity of the Richards Lake Outfall pipe is 16 cfs (see attached flow master work sheet), which is greater than the 12 cfs required (9cfs from Richards Lake and 3cfs from Lind Farm). There are no other developments other than Lind Farms(Brightwater Landings) and Richards Lake contributing to this storm sewer. r At this time it is the intent to modify the current plans to reflect the Lind Farms Filing 1 and 2 outfall configuration. This will allow the connection to the Richards Lake Development and eliminate an unnecessary 36" diameter pipe that was being built with the Maple Hill Devlopment. 3 POND 100 OUTFALL STRUCTURE CALCULATIONS 00 Stantec --- ------ - --- - - -- �J"E:s.Y PM is lot,? Zoo A `J L G ......... ......... Ci �VU l�{ c�3cH.Z cLcC�2.t,'t' 7 (� - 3.�` cfi N•�, Elw, = 5-0Zc:%,Yi, (�'} i.,a. 6(ev, = 56IT. ZtU L 322 Z ;.. rf �C0 ode EI2, _ > c23 yTAI 11 F�I� Ox �4yF PSvtl z 47 L}. Z � j.z�.PICde ..7 Designed by: Checked by: Detention Pond Rating Curve Used for SWMM Model Pond 100 Elev Depth Area Area Storage Storage from Orifice (ft) (ft) (ft2) (ac) (ac-ft) (ac-ft) Calc (cfs) 5013 0 8756.0051 0.2010102 0.00 0.00 0.00 5014 1 38699.931 0.8884282 0.50 0.50 1.07 5015 2 132893.87 3.0508234 1.86 2.37 1.51 5016 3 137252.62 3.1508865 3.10 5.47 1.86 5017 4 141668.14 3.2522529 3.20 F-8-67-1 2.14 5018 5 146140.43 3.3549225 3.30 11.97 2.40' 5019. 6 150669.49 3.4588955 3.41 15.38 2.62 5020 7 155255.32 3.5641717 3.51 18.89 2.83 5020.85 7.85 8.85 159197.91 163888.77 3.6546812 3.7623684 3.07 3.71 21.96 25.67. 3.00 3.19 5021.85 Orifice Calc q=ca(2g(h))".5 c 0.65 WQCV Diameter 0.10 ft area 0.01 100-Year Diameter 0.51 ft area 0.21 300 S70f44t �tiA 10 I�� 41 il�lQiO.�+�.fn. l..�i 37•S R501,4 76, `76i rx ;11'0691a , 4 " 2 54 _ _' , ;;1:54 x, 2 i ' 'u ,1'93 0>44� ; , <= WQSEL ,sx5020 84 ,7 84r< t159162 << `,3°65: r t 3:07r °,y4 2,1 93_ 3 00 "{t <= 100 Year *100-year Required Storeage:1 20.00 acre-feet (from 100-year SWMM Model) *Add 1.93 ac-ft to account for WQCV Tailwatar• 5.Q13,00 € 0.00 8756 0.20 0.00 IV OO r~z;I At tc = X x5013`00 „,y 0.00 8756 0.20 0.00 }x, 0 00 At tc = X I allwatPr, `5Q13 OO u 0.00 8756 0.20 0.00 <. 0 QOA At tc = X 10 0.00 8756 0.20 0.00e 0 OO�i At tc = X 702100 1 Swmm Pond rating Curves 12-21-04.xls Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: John Gooch Company: Sear -Brown Date: February 26, 2004 Project: Lind Filing 2 Location: Fort Collins 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = 18 / 100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0 ' (0.91 ' 13 - 1.19' 12 + 0.78 ' 1)) D) Design Volume: Vol = (WQCV / 12)Area 1.2 Ia = i = Area = WQCV = Vol = 60.00 0.60 81.58 0.24 1.927 % acres watershed inches acre-feet 2. Outlet Works A) Outlet Type (Check One) X Orifice Plate Perforated Riser Pipe Other: B) Depth at Outlet Above Lowest Perforation (H) H = 1.84 feet C) Required Maximum Outlet Area per Row, (A,) Ao = 4.60 square inches D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR D = 1.0000 inches, OR ii) 2" Height Rectangular Perforation Width W = inches E) Number of Columns (nc, See Table 6a-1 For Maximum) nc = .6 number F) Actual Design Outlet Area per Row (A.) Ao = 4.71 square inches G) Number of Rows (nr) nr = .6 number H) Total Outlet Area (At) At = 26.01 square inches 3. Trash Rack A) Needed Open Area: A, = 0.5' (Figure 7 Value) ' Aot At = 885 square inches B) Type of Outlet Opening (Check One) X < 2" Diameter Round 2" High Rectangular Other: C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): i) Width of Trash Rack and Concrete Opening (Wwnc) from Table 6a-1 W - wnc - 36 inches ii) Height of Trash Rack Screen (HTR) HTR = . 46 inches UDFCD Form Pond100.x1s, EDB RICHARDS LAKE OUTFALL FLOW CAPACITY CALCULATION .. % CITY OF FORT COLLINS RICRARD'S LAKE P.U.D. MASTER DRAINAGE STUDY PREPARED FOR: WINTERGREEN HOMES P.O. ]BOX 978 AVON, COLORADO 81620 J ULY 2000 PROJECT NO. 95-0178 8392 Continental Divide Road, Suite #107 G Littleton, Colorado 80127 � Phone: 303/948-6220 • Fax: 303/948-6526 77 Metcalf Road, #200 - Box 978 ^ .Avon, Colorado 81620 0 Phone: 970/949-5072 ^ From Denver Direct: 893-1531 Richard's Lake Outfall Worksheet for Circular Channel Project Description Worksheet Circular Channel Flow Element Circular Channel Method Manning's Formu Solve For Full Flow Capacit Input Data Mannings Coeffic 0.013 Channel Slope 005000 ft/ft Diameter 24.0 in Results Depth 2.00 ft Discharge 16.00 cfs- Flow Area 3.1 ft' Wetted Perime 6.28 ft Top Width 0:00 ft Critical Depth 1.44 ft Percent Full 1100.0 % Critical Slope 006612 ft/ft Velocity 5.09 f /s Velocity Head 0.40 ft Specific Energ: 2.40 ft Froude Numbe 0.00 Maximum Disc 17.21 cfs Discharge Full 16.00 cfs Slope Full Og5000 ft/ft^""' Flow Type N/A Project Engineer: Alicia Forward c:\program files\haestad\fmw\lindfiling2.fm2 Sear -Brown Group FlowMaster v7.0 [7.0005] 01/25/05 04:17:38 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 u TABLE 2-3 DEVELOPED BASIN DISCHARGE QUANTITIES r . • :- Raw NO 3 •• : •- ISO of mom �. qt- _20_