Loading...
HomeMy WebLinkAboutDrainage Reports - 02/25/20254025 Automation Way, Ste B2 | Fort Collins, CO 80525 | 970-698-6046 |www.civilworxeng.com Final Drainage and Erosion Control Report Bloom Multi Family Fort Collins, CO Prepared for: Hartford Acquisitions, LLC 4801 Goodman Road Timnath, CO 80547 June 25, 2024 City of Fort Collins Approved Plans Approved by: Date: Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO i C22026 - Bloom Multi Family Drainage Report FDP 3rd Round.docx June 25, 2024 Mr. Wes Lamarque City of Fort Collins Engineer 4750 Signal Tree Drive Timnath, CO 80547 RE: Bloom Multi Family Final Design and Erosion Control Report Project Number: C22026 Dear Wes, CivilWorx, LLC is pleased to submit this updated Final Design and Erosion Control Report for the Bloom Multi Family Development in Fort Collins, Colorado. This report serves to document the Final design plans for the Bloom Development. The recent modifications include some changes to the local catchment delineations based on a review of the overall drainage plan for the greater subdivision and minor internal changes to the site. In general, the proposed plan is not substantially different from the drainage plan presented with the preliminary plan review. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in City of Fort Collins Storm Drainage Design Criteria and Construction Standards. This report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the City of Fort Collins Storm Drainage Design Criteria. If you should have any questions or comments as you review this report, please feel free to contact me at your convenience. Respectfully, Kelly W. Hafner, PE Senior Project Manager CivilWorx, LLC Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO ii C22026 - Bloom Multi Family Drainage Report FDP 3rd Round.docx TABLE OF CONTENTS PAGE I. General Location and Description ........................................................................................................................ 1 A. Location ....................................................................................................................................................... 1 B. Description of Property ............................................................................................................................... 1 II. Drainage Basins and Catchments ......................................................................................................................... 2 A. Major Basin Description............................................................................................................................... 2 B. Pre-Project Drainage Patterns ..................................................................................................................... 3 III. Drainage Design Criteria ...................................................................................................................................... 3 A. Regulations .................................................................................................................................................. 3 B. Development Criteria Reference and Constraints ....................................................................................... 3 C. Hydrological Criteria .................................................................................................................................... 3 D. Hydraulic Criteria and Governing Standards ............................................................................................... 3 IV. Drainage Facility Design ....................................................................................................................................... 4 A. General Developed Project Overview .......................................................................................................... 4 V. Sediment/Erosion Control .................................................................................................................................. 12 VI. Conclusions ........................................................................................................................................................ 13 A. Compliance with Standards ....................................................................................................................... 13 B. Drainage Plan ............................................................................................................................................. 13 VII. References ..................................................................................................................................................... 14 VIII. Certification ................................................................................................................................................... 14 List of Figures Figure 1. Vicinity and Phase Map................................................................................................................................... 1 Figure 2. Lower Cooper Slough Drainage Basin As Shown on the City of Fort Collins Website .................................. 2 Figure 3. Proposed Drainage Plan .................................................................................................................................. 5 List of Tables Table 1. Existing Catchment Runoff Summary............................................................................................................... 3 Table 2. Developed Catchment Runoff Summary ......................................................................................................... 7 Table 3. Storm Sewer Piping Summary .......................................................................................................................... 8 Table 4. Storm Sewer Hydraulic Grade Line Summary .................................................................................................. 9 Table 5. Storm Sewer Inlet Interception Summary ..................................................................................................... 10 APPENDICES APPENDIX A Drainage and Erosion Control Plans APPENDIX B Hydrological Modelling (EPA SWMM) APPENDIX C LID/Water Quality Calculations APPENDIX D Referenced Reports Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 1 I.General Location and Description A. Location The Bloom Development (referred herein as is located north of State Highway 14 (Mulberry Street) and just west of Interstate 25. The site is located within the southwest half of Section 9, Township 7 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, County of Larimer, State of Colorado. The site is located on the parcel of land # 8709300004 with coordinates of 40.587086, - 105.016334. A vicinity map is shown with Figure 1. Figure 1. Vicinity and Phase Map B. Description of Property Currently, the property is undeveloped but surrounded by developing roads and a larger new subdivision. There are no structures or significant infrastructure located within the site. The historic use of the property was agriculture and farming and thus characterized as a tilled field. The site currently has been overlot graded and largely filled. Below is a detailed summary of the existing conditions: Ground Cover - The site was being used as cropland and therefore ground conditions can be characterized as tillage/field with varying seasonal crops. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 2 Grades In general, the entire site drains to the south. These grades are generally less than 1%, with a few localized areas that slope at approximately 2%. Soil Type -According to the Natural Resources Conservation (NRCS) websoil survey and report, the site consists of Garret loam and Ascalon sandy loam soils of hydrologic soils groups Type B and C. Soils are assumed type C/D for drainage purposes. Utilities The site does not have an existing utilities with the exception of storm sewer within property. Domestic water, sanitary sewers, and storm water utilities have been designed and are planned to be built with the adjoining roads which are being constructed by others. Natural gas, telephone, fiber, and electric are planned to be installed in and around the site at a future time. Storm Drainage / Irrigation Facilities The site does contain storm drainage infrastructure previously designed for the greater subdivision. No irrigation facilities are present on the site. Groundwater was observed at depths of 10 to 12 below the general project site (Appendix D). Note the site has been filled several feet with the initial overlot grading and Pond G was excavated for the greater subdivision overlot activity. Groundwater is interpolated not be within 2 of sub- surface drainage facilities designed with this project. II.Drainage Basins and Catchments A. Major Basin Description This site is located within the Cooper Slough drainage basin as most recently described in the Mulberry Master Drainage Plan (MDP) by Galloway Engineering Firm and dated April 6th, 2021, with the last revision of the report being dated as June 20, 2023. Figure 2. Lower Cooper Slough Drainage Basin As Shown on the City of Fort Collins Website Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 3 B. Pre-Project Drainage Patterns The project site is located within the Cooper Slough Drainage Basin as shown Figure 2 above. The proposed site area consists of approximately 15.8 acres. Four (4) proposed roads that will be constructed as part of the Bloom 1st Filing Project and shown in the construction plans by Galloway engineering surround the site property: Aria way on the west, Greenfields Drive on the east, International Boulevard to the north, and Donella Drive to the south. The entire site drains to the south but the site is generally at a very low gradient. The site has localized areas that have grades of approximately 2%, but most grades are less than 1%. The nearest receiving waters to the site are the Cooper slough drainage and wetlands (approximately 1,200 feet from the site) that flow into the Boxelder Creek, which further transports water to the Poudre River. Below is summary of the existing runoff generated by the site as it exists pre-development. Table 1. Existing Catchment Runoff Summary Existing Site Area (ac.) % Imperv. Q2 cfs Q100 cfs Bloom Property 15.83 2 0.92 19.0 III. Drainage Design Criteria A. Regulations The design criteria for this development are the City of Fort Collins Stormwater Drainage Criteria Manual (FCSDCM) dated March 2018 and the Mile High Flood District Criteria Manuals Volumes 2, and 3 (referred to herein as MHFDCM). B. Development Criteria Reference and Constraints The criteria used as the basis to analyze and design stormwater features of this project were done so according to the references cited in this report. C. Hydrological Criteria In accordance with the City of Fort Collins policy, a minor and major storm are identified as the 2-year and 100-year storms, respectively. These storms have been used as a basis for planning and design. The proposed developed drainage networks, including the stormwater detention system, are designed using the USEPA Stormwater Management Model (SWMM version 5.2.4) software. SWMM input parameters for catchment runoff utilized Table 4.1-1 of the referenced FCSDCM. Post development runoff for the site will be in accordance with the Mulberry and Greenfields Master Drainage Plan developed by Galloway Engineering. D. Hydraulic Criteria and Governing Standards The developed site will convey runoff to a proposed detention pond on the southeast corner of the site via a combination of channelized flow, sheet flow, and storm sewer, then release to the downstream system per the approved Mulberry and Greenfields Master Drainage Report as currently amended by Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 4 Galloway Engineering. SWMM modeling was used to estimate the required detention pond volume for the Bloom site. Hydraulic calculations for all pipes and swales were also completed using EPA-SWMM and are included in this report. SWMM catchment width parameters are calibrated using the theory of cascading planes (see Guo reference). This method was also documented in the 2016 SWMM Hydrology Reference Manual published by the EPA. IV. Drainage Facility Design A. General Developed Project Overview The developed Bloom project site area includes the construction of multi-family homes, parking areas, landscaped areas and access roads. The Bloom multi-family subdivision project is part of the Cooper Slough basin whose ultimate outfall is the Boxelder Creek, located south of Colorado Highway 14 (Mulberry Street). Runoff from the Bloom-multifamily site will be captured using a combination of curb & gutter and storm sewer pipe and conveyed to a proposed onsite detention facility. The proposed detention pond, designated as Pond G, will also include inflow from adjacent property to the east, west and north as shown on the Mulberry and Greenfields Master Drainage Plan (as currently amended) by Galloway Engineering. Information on the proposed Bloom site detention pond (Pond G) outlet structure listed the peak outflow is limited to 13.5 cfs and requires a minimum of 4.8 AF of storage to work with the overall drainage master plan. It is noted that the Galloway drainage modelling for the Bloom site and Pond G assumed 100% impervious coverage based on the catchment parameters within the referenced report (Appendix D). The proposed impervious area which considerably less than the full impervious coverage originally assumed by the drainage master plan. Modifications to the drainage plan from previous submittals include the addition of building roof drain collection and a more detailed design for the LID chamber system. The changes in the local catchment reflect the additional collection of roof drainage which is brought into the site internal drainage system and directed to the LID system. Overall Drainage Plan The overall drainage plan is to convey runoff to the detention facility on the southeast corner of the site prior to discharging via a proposed outlet structure and storm pipe. Following is an analysis of the site drainage concepts and routing as well as a summary of all of the proposed on site drainage Catchments. All flow summaries at design points, including conveyance facilities, have been designed in detail as part of the EPA SWMM model. Catchment 01: The 01 Catchment has an area of 2.29 acres and generally flows to the southeast. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the southeastern corner of the Catchment. From here it is carried through Storm Line A into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 02: The 02 Catchment has an area of 1.77 acres and generally flows to the southeast. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the southern side of the Catchment. From here it is carried through Storm Line C & B and A respectively, after which it drains into Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 5 the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Figure 3. Proposed Drainage Plan Catchment 03: The 03 Catchment has an area of 2.18 acres, is located at the central eastern portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet located at the southern portion of the Catchment. From here it is carried through Storm Lines C, B, and A respectively, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 04: The 04 Catchment has an area of 1.65 acres, is located at the central western portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the south side of the Catchment. From here it is carried through Storm Line A, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 05: The 05 Catchment has an area of 1.03 acres, is in the central portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet located at the southern portion of the Catchment. From here it is carried through Storm Lines B and A respectively, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 06: The 06 Catchment has an area of 0.31 acres, is in the central portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a sidewalk chase/curb Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 6 cut where water then travels further south via a grass swale and into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 07: The 07 Catchment has an area of 2.01 acres, is located at the southwestern portion of the site and flows to the center of itself where a proposed low point and Type R inlet is located. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to the Type R inlet. From here it is carried north and east through Storm Lines A, after which it drains into the proposed-on site detention pond. During to Pond A to control the HGL in this location for major storm events. Street capacities, inlet sizing, and storm sewer sizing were all assessed using the post-project EPA-SWMM model. Catchment 08: The 08 Catchment has an area of 2.39 acres and is located at the southwestern portion of the site. This Catchment is where the proposed detention pond for the site lies, and water eventually leaves the detention pond via an outlet control structure located at the southwest corner of the Catchment. Overall pond volume requirements were calculated with EPA-SWMM in conjunction with the Mile High Flood District Drainage Criteria. OS (offsite)_Catchments OS 1: Catchment OS-1 is 0.46 acres, located at the Northwestern portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. All of the OS-1 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe to detention features planned with Bloom Filing 1 detention facilities. OS 2: Catchment OS-2 is 0.22 acres, located at the Northwestern portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the existing-off site detention pond located on the north side of International Boulevard. OS 3: Catchment OS-3 is 0.58 acres, located at the Northeastern portion of the site and drains offsite to the north and east via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to an offsite detention pond to the east of the site. OS 4: Catchment OS-4 is 0.51 acres, located at the western portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. OS-4 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the off-site detention facilities associated with Bloom Filing 1. OS 5: Catchment OS-5 is 0.40 acres, located at the southwestern portion of the site and drains to the west via sheet flow and curb and gutter flow. OS-5 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the off-site detention facilities associated with Bloom Filing 1. OS 6-9: Catchments OS-6 through OS-9 comprise perimeter and local street catchments that are not part of the site but are included on the initial drainage plan as designs collaboration continues with the Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 7 Galloway project. These catchments comprise 1.21 acres and are made up of areas that will be flowing to the proposed detention pond that are not on the Bloom-multifamily property and is not included in the pond WQ calculations provided in Appendix B. These Catchments include areas that surrounds the site located within City of Fort Collins Right-of-Way and includes mostly from back of curb and towards the property line primarily perimeter landscaping, walks, and drive areas. The surrounding street drainage system was designed by Galloway. Drainage Catchment Summaries The following is a summary of the Catchment runoff characteristics: Table 2. Developed Catchment Runoff Summary Catchment Area (ac.) % Imperv. C2 Q2 cfs C100 Q100 cfs C-01 2.296 83% 0.757 2.7 0.926 16.0 C-02 1.769 83% 0.759 2.3 0.927 12.9 C-03 2.181 87% 0.793 2.7 0.94 15.7 C-04 1.646 88% 0.803 2.4 0.944 12.8 C-05 1.030 71% 0.656 1.5 0.889 7.6 C-06 0.314 46% 0.445 0.4 0.809 2.1 C-07 2.105 94% 0.854 2.7 0.963 15.6 C-08 2.387 23% 0.135 0.8 0.713 14.9 C-OS-1 0.464 52% 0.487 0.5 0.821 2.9 C-OS-2 0.224 21% 0.206 0.1 0.699 1.0 C-OS-3 0.579 22% 0.215 0.3 0.703 2.7 C-OS-4 0.506 55% 0.519 0.7 0.837 3.5 C-OS-5 0.400 27% 0.265 0.3 0.733 2.2 C-OS-6 0.275 40% 0.374 0.2 0.767 1.3 C-OS-7 0.303 23% 0.222 0.2 0.702 1.3 C-OS-8 0.164 33% 0.317 0.1 0.752 0.9 C-OS-9 0.464 24% 0.227 0.3 0.685 1.6 Note the infiltration parameters prescribed by the FCSDCM represent fully saturated underlying soil moisture conditions and thus produce very high runoff rates and volumetric yields. Storm Sewers The proposed drainage system for the Bloom Multifamily development was modeled in EPA-SWMM to determine pipe sizing and flow routing. The SWMM models for the 100-year and 2-year storms are included in Appendix B for reference. Storm Line A This system drains the western portion of the site to the proposed WQCV chambers and detention pond. This storm sewer connects to the other storm sewer networks proposed at the site at STMH A-1-1. This system contains connected Type C inlets and manholes working in series. Building roof drains are connected to this system. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 8 Storm Line B This system collects drainage from the central and southern portions of the site via a type R inlet and receives flows from Storm Line C. This line is connection to the LID chambers. Storm Line C This system collects drainage from the eastern central and northern of the site using 2 Type C inlets and conveys it through Storm Lines B then to the A system respectively and into the proposed LID system and then to the detention pond. Building roof drains are connected to this system. Storm Line D This system collects drainage from the southwesterly portion of the site ern central and northern of the site using manholes and a Type R inlet and conveys to the Storm Lines A system respectively and into the proposed LID system. Building roof drains are connected to this system. Storm Line D-1 This system is an overflow outlet for major storm ponding in catchment 7. A higher stage outlet pipe is connected to a type R inlet to allow major storm surcharge in the storm sewer network to reach Pond G. Table 3 summarizes the pipe flows for the storm sewer systems for the project. Table 3. Storm Sewer Piping Summary Link Element Size (in) V2 fps Q2 cfs V100 fps Q100 cfs Upstream Node Downstream Node P-A-1 18 3.7 1.2 3.9 3.8 J-SDI-A-1-5 J-SDI-A-1-4 P-A-2 18 2.6 1.8 3.7 6.5 J-SDI-A-1-4 J-SDMH A-1-3 P-A-3 18 4.1 6.4 4.7 8.3 J-SDMH A-1-3 J-SDI A-1-2 P-A-4 18 5.2 9.2 7.9 13.9 J-SDI A-1-2 J-SDMH A1-1 P-A-5 24 3.9 10.2 6.3 19.7 J-SDMH A-4 J-SDMH A1-1 P-A-6 24 1.3 4.1 6.2 19.6 J-SDMH A-4 J-SDMH A-3-IN P-A-7 24 2.9 4.2 6.4 20.2 J-SDMH A-3-OUT J-SDMH A-2 P-A-8 24 3.3 4.2 6.4 20.2 J-SDMH A-2 POND-G P-B-1 18 1.4 1.3 4.0 7.1 J-SDI B-1 J-SDMH A1-1 P-C-A 18 1.7 1.0 1.8 3.1 J-SDI C-3 J-SDI-C-3-1 P-C-B 18 2.4 2.2 3.4 5.9 J-SDI-C-3-1 J-SDMH C-1 P-C-C 18 2.2 2.4 3.2 5.6 J-SDI-C-1 J-SDMH C-1 P-C-D 18 4.0 4.6 4.1 6.4 J-SDMH C-1 J-SDMH A-1-3 P-D-1-A 18 1.0 1.7 2.0 3.0 J-SDMH_D.1.1 J-SDMH A-4 P-D-1-B 18 3.0 1.7 3.9 3.0 J-SDMH_D.1.1 J-SDMH D-1.2 P-D-1-C 18 2.1 1.3 2.6 2.1 J-SDMH D-1.3 J-SDMH D-1.2 P-D-1-D 18 0.9 1.2 1.2 2.0 J-SDMH D-1.3 J-SDMH D1.5 P-D-1-E 18 0.4 0.3 0.5 0.5 J-SDMH D1.6 J-SDMH D1.5 P-D-1-F 18 4.1 2.6 4.0 5.9 J-SDI-D-1.5.1 J-SDMH D1.5 P-D-2-A 18 0.5 0.5 0.7 1.1 J-SDMH_D.2.1 J-SDMH D-1.2 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 9 Table 3. Storm Sewer Piping Summary Link Element Size (in) V2 fps Q2 cfs V100 fps Q100 cfs Upstream Node Downstream Node P-D-2-B 18 0.3 0.2 0.6 0.6 J-SDMH_D.2.2 J-SDMH_D.2.1 P-D-2-C 8 0.0 0.0 0.6 0.2 POC_RD-D-2.2 J-SDMH_D.2.2 P-D-2-D 8 0.1 0.0 0.7 0.2 POC_RD-D-2.1 J-SDMH_D.2.1 P-E-1-N 24 3.5 8.5 4.1 12.0 J-SDMH A-4 J-SDZ-CHAMB_N P-E-1-S 24 4.2 3.5 4.7 7.8 J-SDMH D1.5 J-SDZ-CHAMB_S P-E-CHAMB chamber 0.2 4.1 0.4 5.3 J-SDZ-CHAMB_S J-SDZ-CHAMB_N P-E-UD 6 1.8 0.4 2.9 0.6 J-SDZ-CHAMB_N J-SDMH A-3-IN P-F-1 18 1.9 0.8 3.2 5.7 J-SDI-D-1.5.1 POND-G P-Z-POND-OUT 18 2.7 1.0 2.7 1.0 POND-G OUT-POND Table 4 summarizes the hydraulics for of the proposed drainage plan for the major and minor storm events. Table 4. Storm Sewer Hydraulic Grade Line Summary Node Element D2 ft HGL2 ft Q2 cfs D100 ft HGL100 ft Q100 cfs Storm Sewer Structures J-SDI A-1-2 2.8 4935.9 9.2 6.6 4939.7 14.8 J-SDI B-1 2.3 4935.7 1.3 5.4 4938.8 10.5 J-SDI C-3 0.3 4938.6 1.0 2.5 4940.8 3.1 J-SDI-A-1-4 0.7 4936.1 1.8 5.4 4940.8 6.5 J-SDI-A-1-5 0.3 4938.7 1.2 2.7 4941.2 3.8 J-SDI-C-1 0.9 4937.0 2.4 3.9 4940.0 5.6 J-SDI-C-3-1 0.9 4936.9 2.3 4.6 4940.6 5.9 J-SDI-D-1.5.1 2.2 4935.7 2.6 4.3 4937.8 11.0 J-SDMH A1-1 3.3 4935.7 10.3 5.7 4938.2 19.8 J-SDMH A-1-3 1.2 4936.1 6.4 5.6 4940.4 8.5 J-SDMH A-2 1.0 4932.3 4.2 3.3 4934.6 20.2 J-SDMH A-3-IN 3.8 4935.6 4.3 4.7 4936.5 20.2 J-SDMH A-3-OUT 0.9 4932.7 4.3 4.4 4936.2 20.2 J-SDMH A-4 3.8 4935.7 10.2 5.8 4937.7 19.7 J-SDMH C-1 1.0 4936.8 4.6 4.6 4940.4 6.6 J-SDMH D-1.2 2.5 4935.7 1.7 4.6 4937.7 3.0 J-SDMH D-1.3 2.9 4935.7 1.3 5.0 4937.7 2.1 J-SDMH D1.5 3.4 4935.7 3.6 5.4 4937.7 7.9 J-SDMH D1.6 2.9 4935.7 0.1 4.9 4937.7 0.3 J-SDZ-CHAMB_N 3.7 4935.7 8.8 5.7 4937.7 12.3 J-SDZ-CHAMB_S 3.4 4935.7 7.5 5.4 4937.7 12.4 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 10 Table 4. Storm Sewer Hydraulic Grade Line Summary Node Element D2 ft HGL2 ft Q2 cfs D100 ft HGL100 ft Q100 cfs J-STMH-D-1.1 3.2 4935.7 1.7 5.2 4937.7 3.0 Roadway Flowline/Curb at Storm Sewer Inlets RD-SDI A1-2 0.2 4939.2 2.9 0.74 4939.74 20.0 RD-SDI-A-1-4 0.1 4941.2 1.4 0.27 4941.4 11.6 RD-SDI-A-1-5 0.2 4942.7 2.7 0.3 4942.9 15.8 RD-SDI-B-1 0.1 4938.3 1.4 0.7 4938.9 44.3 RD-SDI-C-1 0.2 4939.3 2.5 0.8 4939.9 27.6 RD-SDI-C-3-1 0.2 4940.6 3.8 0.4 4940.8 24.2 RD-SDI-C-3A 0.1 4942.2 2.3 0.3 4942.4 12.8 RD-SDI-D-1.5.1 0.2 4937.2 2.6 1.0 4938.0 11.9 RD-SOUTHPARKING* 0.2 4937.2 2.7 0.9 4938.0 15.6 * Note this is the parking lot in catchment 7 modeled for ponding potential. Street Capacity The proposed drainage system for the development was modeled in SWMM with depths captured at the storm sewer inlet locations. This included internal surface conveyance pathways. The internal gutter system capacity is presented as adequate for the conveyance of runoff to the perspective outfalls. Inlets The proposed drainage system was modeled in EPA-SWMM. Inlet sizing and intercepted flows were modeled using the SWMM analysis, with corresponding flowline depths associated with inlets listed in Table 4 from the assessment. Table 5 below summarizes intercepted flow with the proposed inlets for the minor and major storms: Table 5. Storm Sewer Inlet Interception Summary Inlet Name Inlet Type/Size Q2 cfs Q100 cfs SDI A1-2 2.8 8.5 SDI B-1 1.3 10.5 SDI C-3 Type C 1.0 3.1 SDI-A-1-4 Type C 0.7 2.7 SDI-A-1-5 Type C 1.2 3.8 SDI-C-1 2.4 5.6 SDI-C-3-1 Type C 1.3 3.6 SDI-D-1.5.1 2.6 11.0 Detention Pond Summary The onsite detention pond (G) was modeled in the system noting the pond volumes and release rates were completed with the overall subdivision drainage assessment (Appendix D). The Bloom site detention pond G also includes off-site flows and therefore, final calculations were taken from the Bloom Filing 1 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 11 Amendment Drainage Modifications report by Galloway Engineering for the overall development. Amendment 1, excerpts in Appendix D, required a minimum storage volume of 4.8 Acre-ft of storage. The grading design shown on the submitted plans for this facility includes an active storage of 5.1 AF with 1 foot of freeboard below spillway. The proposed design exceeds the required volume for the overall drainage master plan. WQCV Overall Subdivision The Bloom site detention pond G also includes provisions for WQCV for the greater subdivision. Final calculations for the facilities previously designed were taken from the Bloom Filing 1 Amendment Drainage Modifications report by Galloway Engineering for the overall development. Amendment 1, excerpts in Appendix D, required a minimum WQCV 0.78 Acre-ft of storage. The grading design for Pond G shown on the submitted plans for this facility includes an active WQCV of 1.1 AF. The proposed design exceeds the required volume for the overall drainage master plan. Spillway Design The proposed detention system is a cut-in or depressed system with limited embankment. broad-crested weir outlet is in the southern part of the east side of the proposed detention facility. Emergency overflow will be directed towards Greenfield Drive and south towards the Donella Drive intersection. Water Quality and LID Design The site will incorporate water quality capture volume into the proposed detention pond for the settlement and deposition of particles and contaminants. Sizing and calculations for this water quality volume and outlet release structure can be found in Appendix C. For additional Low-Impact Development water quality control, an underground stormwater chamber system is proposed with the site that will treat on-site runoff prior to discharge into the proposed-on site detention pond. The criterion for this approach requires one of the following options: 1) 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved (vehicle use) areas must be pervious. 2) 75% of all newly added or modified impervious area must be treated by LID techniques. For this site Option 2 is utilized. The below table outlines the LID treated area calculations. SF Acre % of Total Total Site Area 692,610 15.900 100.0% Measured Impervious 469,190 10.771 67.7% Measured Landscaped 223,420 5.312 32.3% New Impervious Required to LID 368,213 8.453 75% Actual to LID Feature 410,665 9.428 75.1% Required LID Volume Min. Required Volume 16,650 CF Provided Volume 17,548 CF Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 12 The required LID volume calculations assumed 8.453 acres of impervious tributary area. The proposed design utilized the ADS StormTech design software for preliminary sizing and general layout recommendations. The proposed system is a StormTech MC-3500 system and is slightly modified and oversized to fit the site drainage plan. Appendix C contains the vendor recommended design and details for the proposed system. The found groundwater in this area was between 10 and greater than 12 grade (prior to development). The base of the proposed LID chambers is above 4932 with the geotech estimate of groundwater below 4926 with a differential of >6 . The proposed system was modelled in SWMM to evaluate the drain time to reach the target 40-hour drain It was noted that the 6-inch underdrain recommended for the project is installed per the 2nd round review. A 3.4 -3 is proposed to meet the LID requirements for the site. The LID controls are included with the modelling and impacts on the HGLs for the minor and major storm. Mapping of the LID calculations along with calculations for the water quality chamber system can be found in Appendix C. V. Sediment/Erosion Control In addition to the information provided below, A separate Storm Water Management Plan (SWMP) was prepared for this site in accordance with the Stormwater Discharge Permit for Colorado Department of Public Health and Environment and the City of Fort Collins criteria. This document is not included with this report but is part of the submittal. The SWMP has more detailed information on the sediment and erosion control items for this project. For reference, the erosion control plan sheets are provided in Appendix A. LID SYSTEM PERFORMANCE Elapsed Time (hours) 6050403020100 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Node J-SDMH A-3-IN Depth (ft) Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 13 VI. Conclusions A. Compliance with Standards Storm drainage calculations have followed the guidelines provided by the City of Fort Collins Stormwater Criteria Manual and the Mile High Flood District Manuals Volumes 2, and 3. B. Drainage Plan The drainage system is not anticipated to have issues associated with conveyance, collection or detention based on the work to date in the subdivision planning. No negative impacts are expected due to this development as related to the existing downstream drainage networks or subdivisions. The proposed development is proposed at less impervious than originally assumed for the greater subdivision. Pond 5, as designed with this system meets or exceeds the required volume required by the referenced Galloway drainage plan. The Final drainage plan for the Bloom multifamily development is submitted as being both viable and sound in terms of drainage planning in both the short and long-term for the City of Fort Collins. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 14 VII. References 1. City of Fort Collins Stormwater Criteria Manual, As adopted by the City Council of the City of Fort Collins, as referenced in Section 26-500 of the Code of the City of Fort Collins, Revised December 2018. 2. Mile High Floor District Drainage Criteria Manuals 2 and 3, Urban Drainage and Flood Control District, Denver, Colorado, November 2010 with some sections revised January 2021. 3. Storm Water Management Model, Reference Manual Volume I, Hydrology, U.S. Environmental Protection Agency, January 2016. 4. Storm Water Management Model, Reference Manual Volume II, Hydraulics, U.S. Environmental Protection Agency, May 2017. 5. Mulberry Master Drainage Report, City of Fort Collins Galloway, revised October 13th, 2021. VIII. Certification "I hereby attest that this report for the Final drainage design of the Bloom Multi-Family was prepared by me, or under my direct supervision, in general accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria for the responsible parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others. <Sealed with Final Approval> _____________________________________ Kelly W. Hafner Registered Professional Engineer State of Colorado No. 40968 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO A APPENDIX A DRAINAGE AND EROSION CONTROL PLAN MAPS Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO B APPENDIX B SWMM Calibration Parameters Inlet Calibration Parameters SWMM Model Overview 100-Year SWMM Model Status Report 2-Year SWMM Model Status Report Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO C APPENDIX C WATER QUALITY AND LID CALCULATIONS & MAP LID Design Tool Outlet Pr o j e c t : Ba s i n I D : WQ C V D e s i g n V o l u m e ( I n p u t ) : Ca t c h m e n t I m p e r v i o u s n e s s , I a = 9 0 . 0 p e r c e n t Ca t c h m e n t A r e a , A = 1 9 . 5 0 a c r e s D i a m e t e r o f h o l e s , D = 1 . 5 9 3 i n c h e s De p t h a t W Q C V o u t l e t a b o v e l o w e s t p e r f o r a t i o n , H = 3 . 7 5 f e e t N u m b e r o f h o l e s p e r r o w , N = 1 Ve r t i c a l d i s t a n c e b e t w e e n r o w s , h = 4 . 0 0 i n c h e s OR Nu m b e r o f r o w s , N L = 11 . 0 0 Or i f i c e d i s c h a r g e c o e f f i c i e n t , C o = 0. 6 5 H e i g h t o f s l o t , H = i n c h e s Sl o p e o f B a s i n T r i c k l e C h a n n e l , S = 0 . 0 0 8 f t / f t W i d t h o f s l o t , W = i n c h e s Ti m e t o D r a i n t h e P o n d = 4 0 h o u r s Wa t e r s h e d D e s i g n I n f o r m a t i o n ( I n p u t ) : 3. 7 5 Pe r c e n t S o i l T y p e A = 0 % Pe r c e n t S o i l T y p e B = 0 % Pe r c e n t S o i l T y p e C / D = 1 0 0 % Ou t l e t D e s i g n I n f o r m a t i o n ( O u t p u t ) : Wa t e r Q u a l i t y C a p t u r e V o l u m e , W Q C V = 0 . 4 0 1 w a t e r s h e d i n c h e s Wa t e r Q u a l i t y C a p t u r e V o l u m e ( W Q C V ) = 0 . 6 5 2 a c r e - f e e t 0 . 0 0 De s i g n V o l u m e ( W Q C V / 1 2 * A r e a * 1 . 2 ) V o l = 0 . 7 8 2 a c r e - f e e t Ou t l e t a r e a p e r r o w , A o = 1 . 0 8 s q u a r e i n c h e s To t a l o p e n i n g a r e a a t e a c h r o w b a s e d o n u s e r - i n p u t a b o v e , A o = 1. 9 9 s q u a r e i n c h e s To t a l o p e n i n g a r e a a t e a c h r o w b a s e d o n u s e r - i n p u t a b o v e , A o = 0. 0 1 4 s q u a r e f e e t 3 Ro w 1 R o w 2 R o w 3 R o w 4 R o w 5 R o w 6 R o w 7 R o w 8 R o w 9 R o w 1 0 R o w 1 1 R o w 1 2 R o w 1 3 R o w 1 4 R o w 1 5 R o w 1 6 R o w 1 7 R o w 1 8 R o w 1 9 R o w 2 0 R o w 2 1 R o w 2 2 R o w 2 3 R o w 2 3 49 2 9 . 0 0 4 9 2 9 . 3 3 4 9 2 9 . 6 7 4 9 3 0 . 0 0 4 9 3 0 . 3 3 4 9 3 0 . 6 7 4 9 3 1 . 0 0 4 9 3 1 . 3 3 4 9 3 1 . 6 7 4 9 3 2 . 0 0 4 9 3 2 . 3 3 Fl o w 49 2 9 . 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 0 0 49 2 9 . 5 0 0 . 0 5 1 1 0 . 0 2 9 8 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 0 8 49 3 0 . 0 0 0 . 0 7 2 2 0 . 0 5 9 1 0 . 0 4 1 5 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 1 7 49 3 0 . 5 0 0 . 0 8 8 5 0 . 0 7 8 1 0 . 0 6 5 8 0 . 0 5 1 1 0 . 0 2 9 8 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 3 1 49 3 1 . 0 0 0 . 1 0 2 2 0 . 0 9 3 3 0 . 0 8 3 3 0 . 0 7 2 2 0 . 0 5 9 1 0 . 0 4 1 5 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 4 5 49 3 1 . 5 0 0 . 1 1 4 2 0 . 1 0 6 4 0 . 0 9 7 7 0 . 0 8 8 5 0 . 0 7 8 1 0 . 0 6 5 8 0 . 0 5 1 1 0 . 0 2 9 8 0 . 0 0 0 0 0 . 0 0 0 0 0 . 0 0 0 0 0. 6 3 49 3 2 . 0 0 0 . 1 2 5 1 0 . 1 1 8 0 0 . 1 1 0 3 0 . 1 0 2 2 0 . 0 9 3 3 0 . 0 8 3 3 0 . 0 7 2 2 0 . 0 5 9 1 0 . 0 4 1 5 0 . 0 0 0 0 0 . 0 0 0 0 0. 8 1 49 3 2 . 5 0 0 . 1 3 5 1 0 . 1 2 8 6 0 . 1 2 1 5 0 . 1 1 4 2 0 . 1 0 6 4 0 . 0 9 7 7 0 . 0 8 8 5 0 . 0 7 8 1 0 . 0 6 5 8 0 . 0 5 1 1 0 . 0 2 9 8 1. 0 2 49 3 3 . 0 0 0 . 1 4 4 5 0 . 1 3 8 4 0 . 1 3 1 8 0 . 1 2 5 1 0 . 1 1 8 0 0 . 1 1 0 3 0 . 1 0 2 2 0 . 0 9 3 3 0 . 0 8 3 3 0 . 0 7 2 2 0 . 0 5 9 1 1. 1 8 49 3 3 . 5 0 0 . 1 5 3 2 0 . 1 4 7 5 0 . 1 4 1 4 0 . 1 3 5 1 0 . 1 2 8 6 0 . 1 2 1 5 0 . 1 1 4 2 0 . 1 0 6 4 0 . 0 9 7 7 0 . 0 8 8 5 0 . 0 7 8 1 1. 3 1 49 3 4 . 0 0 0 . 1 6 1 5 0 . 1 5 6 1 0 . 1 5 0 3 0 . 1 4 4 5 0 . 1 3 8 4 0 . 1 3 1 8 0 . 1 2 5 1 0 . 1 1 8 0 0 . 1 1 0 3 0 . 1 0 2 2 0 . 0 9 3 3 1. 4 3 49 3 4 . 5 0 0 . 1 6 9 4 0 . 1 6 4 2 0 . 1 5 8 8 0 . 1 5 3 2 0 . 1 4 7 5 0 . 1 4 1 4 0 . 1 3 5 1 0 . 1 2 8 6 0 . 1 2 1 5 0 . 1 1 4 2 0 . 1 0 6 4 1. 5 4 49 3 5 . 0 0 0 . 1 7 6 9 0 . 1 7 2 0 0 . 1 6 6 8 0 . 1 6 1 5 0 . 1 5 6 1 0 . 1 5 0 3 0 . 1 4 4 5 0 . 1 3 8 4 0 . 1 3 1 8 0 . 1 2 5 1 0 . 1 1 8 0 1. 6 4 49 3 5 . 5 0 0 . 1 8 4 2 0 . 1 7 9 4 0 . 1 7 4 4 0 . 1 6 9 4 0 . 1 6 4 2 0 . 1 5 8 8 0 . 1 5 3 2 0 . 1 4 7 5 0 . 1 4 1 4 0 . 1 3 5 1 0 . 1 2 8 6 1. 7 4 49 3 6 . 0 0 0 . 1 9 1 1 0 . 1 8 6 6 0 . 1 8 1 7 0 . 1 7 6 9 0 . 1 7 2 0 0 . 1 6 6 8 0 . 1 6 1 5 0 . 1 5 6 1 0 . 1 5 0 3 0 . 1 4 4 5 0 . 1 3 8 4 1. 8 3 49 3 6 . 5 0 0 . 1 9 7 8 0 . 1 9 3 4 0 . 1 8 8 8 0 . 1 8 4 2 0 . 1 7 9 4 0 . 1 7 4 4 0 . 1 6 9 4 0 . 1 6 4 2 0 . 1 5 8 8 0 . 1 5 3 2 0 . 1 4 7 5 1. 9 1 49 3 7 . 0 0 0 . 2 0 4 3 0 . 2 0 0 1 0 . 1 9 5 6 0 . 1 9 1 1 0 . 1 8 6 6 0 . 1 8 1 7 0 . 1 7 6 9 0 . 1 7 2 0 0 . 1 6 6 8 0 . 1 6 1 5 0 . 1 5 6 1 1. 9 9 49 3 7 . 5 0 0 . 2 1 0 6 0 . 2 0 6 5 0 . 2 0 2 1 0 . 1 9 7 8 0 . 1 9 3 4 0 . 1 8 8 8 0 . 1 8 4 2 0 . 1 7 9 4 0 . 1 7 4 4 0 . 1 6 9 4 0 . 1 6 4 2 2. 0 7 49 3 8 . 0 0 0 . 2 1 6 7 0 . 2 1 2 7 0 . 2 0 8 5 0 . 2 0 4 3 0 . 2 0 0 1 0 . 1 9 5 6 0 . 1 9 1 1 0 . 1 8 6 6 0 . 1 8 1 7 0 . 1 7 6 9 0 . 1 7 2 0 2. 1 5 49 3 8 . 5 0 0 . 2 2 2 6 0 . 2 1 8 7 0 . 2 1 4 7 0 . 2 1 0 6 0 . 2 0 6 5 0 . 2 0 2 1 0 . 1 9 7 8 0 . 1 9 3 4 0 . 1 8 8 8 0 . 1 8 4 2 0 . 1 7 9 4 2. 2 2 49 3 9 . 0 0 0 . 2 2 8 4 0 . 2 2 4 6 0 . 2 2 0 6 0 . 2 1 6 7 0 . 2 1 2 7 0 . 2 0 8 5 0 . 2 0 4 3 0 . 2 0 0 1 0 . 1 9 5 6 0 . 1 9 1 1 0 . 1 8 6 6 2. 2 9 49 3 9 . 5 0 0 . 2 3 4 1 0 . 2 3 0 4 0 . 2 2 6 5 0 . 2 2 2 6 0 . 2 1 8 7 0 . 2 1 4 7 0 . 2 1 0 6 0 . 2 0 6 5 0 . 2 0 2 1 0 . 1 9 7 8 0 . 1 9 3 4 2. 3 6 49 4 0 . 0 0 0 . 2 3 9 6 0 . 2 3 6 0 0 . 2 3 2 2 0 . 2 2 8 4 0 . 2 2 4 6 0 . 2 2 0 6 0 . 2 1 6 7 0 . 2 1 2 7 0 . 2 0 8 5 0 . 2 0 4 3 0 . 2 0 0 1 2. 4 2 49 4 0 . 5 0 0 . 2 4 5 0 0 . 2 4 1 4 0 . 2 3 7 7 0 . 2 3 4 1 0 . 2 3 0 4 0 . 2 2 6 5 0 . 2 2 2 6 0 . 2 1 8 7 0 . 2 1 4 7 0 . 2 1 0 6 0 . 2 0 6 5 2. 4 9 49 4 1 . 0 0 0 . 2 5 0 2 0 . 2 4 6 8 0 . 2 4 3 1 0 . 2 3 9 6 0 . 2 3 6 0 0 . 2 3 2 2 0 . 2 2 8 4 0 . 2 2 4 6 0 . 2 2 0 6 0 . 2 1 6 7 0 . 2 1 2 7 2. 5 5 49 4 1 . 5 0 0 . 2 5 5 4 0 . 2 5 2 0 0 . 2 4 8 5 0 . 2 4 5 0 0 . 2 4 1 4 0 . 2 3 7 7 0 . 2 3 4 1 0 . 2 3 0 4 0 . 2 2 6 5 0 . 2 2 2 6 0 . 2 1 8 7 2. 6 1 49 4 2 . 0 0 0 . 2 6 0 4 0 . 2 5 7 1 0 . 2 5 3 6 0 . 2 5 0 2 0 . 2 4 6 8 0 . 2 4 3 1 0 . 2 3 9 6 0 . 2 3 6 0 0 . 2 3 2 2 0 . 2 2 8 4 0 . 2 2 4 6 2. 6 7 49 4 2 . 5 0 0 . 2 6 5 4 0 . 2 6 2 1 0 . 2 5 8 7 0 . 2 5 5 4 0 . 2 5 2 0 0 . 2 4 8 5 0 . 2 4 5 0 0 . 2 4 1 4 0 . 2 3 7 7 0 . 2 3 4 1 0 . 2 3 0 4 2. 7 3 49 4 3 . 0 0 0 . 2 7 0 3 0 . 2 6 7 1 0 . 2 6 3 7 0 . 2 6 0 4 0 . 2 5 7 1 0 . 2 5 3 6 0 . 2 5 0 2 0 . 2 4 6 8 0 . 2 4 3 1 0 . 2 3 9 6 0 . 2 3 6 0 2. 7 9 49 4 3 . 5 0 0 . 2 7 5 1 0 . 2 7 1 9 0 . 2 6 8 6 0 . 2 6 5 4 0 . 2 6 2 1 0 . 2 5 8 7 0 . 2 5 5 4 0 . 2 5 2 0 0 . 2 4 8 5 0 . 2 4 5 0 0 . 2 4 1 4 2. 8 4 49 4 4 . 0 0 0 . 2 7 9 8 0 . 2 7 6 7 0 . 2 7 3 4 0 . 2 7 0 3 0 . 2 6 7 1 0 . 2 6 3 7 0 . 2 6 0 4 0 . 2 5 7 1 0 . 2 5 3 6 0 . 2 5 0 2 0 . 2 4 6 8 2. 9 0 49 4 4 . 5 0 0 . 2 8 4 4 0 . 2 8 1 3 0 . 2 7 8 2 0 . 2 7 5 1 0 . 2 7 1 9 0 . 2 6 8 6 0 . 2 6 5 4 0 . 2 6 2 1 0 . 2 5 8 7 0 . 2 5 5 4 0 . 2 5 2 0 2. 9 5 49 4 5 . 0 0 0 . 2 8 8 9 0 . 2 8 5 9 0 . 2 8 2 8 0 . 2 7 9 8 0 . 2 7 6 7 0 . 2 7 3 4 0 . 2 7 0 3 0 . 2 6 7 1 0 . 2 6 3 7 0 . 2 6 0 4 0 . 2 5 7 1 3. 0 1 49 4 5 . 5 0 0 . 2 9 3 4 0 . 2 9 0 5 0 . 2 8 7 4 0 . 2 8 4 4 0 . 2 8 1 3 0 . 2 7 8 2 0 . 2 7 5 1 0 . 2 7 1 9 0 . 2 6 8 6 0 . 2 6 5 4 0 . 2 6 2 1 3. 0 6 49 4 6 . 0 0 0 . 2 9 7 8 0 . 2 9 4 9 0 . 2 9 1 9 0 . 2 8 8 9 0 . 2 8 5 9 0 . 2 8 2 8 0 . 2 7 9 8 0 . 2 7 6 7 0 . 2 7 3 4 0 . 2 7 0 3 0 . 2 6 7 1 3. 1 1 49 4 6 . 5 0 0 . 3 0 2 2 0 . 2 9 9 3 0 . 2 9 6 3 0 . 2 9 3 4 0 . 2 9 0 5 0 . 2 8 7 4 0 . 2 8 4 4 0 . 2 8 1 3 0 . 2 7 8 2 0 . 2 7 5 1 0 . 2 7 1 9 3. 1 6 49 4 7 . 0 0 0 . 3 0 6 5 0 . 3 0 3 6 0 . 3 0 0 7 0 . 2 9 7 8 0 . 2 9 4 9 0 . 2 9 1 9 0 . 2 8 8 9 0 . 2 8 5 9 0 . 2 8 2 8 0 . 2 7 9 8 0 . 2 7 6 7 3. 2 1 49 4 7 . 5 0 0 . 3 1 0 7 0 . 3 0 7 9 0 . 3 0 5 0 0 . 3 0 2 2 0 . 2 9 9 3 0 . 2 9 6 3 0 . 2 9 3 4 0 . 2 9 0 5 0 . 2 8 7 4 0 . 2 8 4 4 0 . 2 8 1 3 3. 2 6 49 4 8 . 0 0 0 . 3 1 4 9 0 . 3 1 2 1 0 . 3 0 9 3 0 . 3 0 6 5 0 . 3 0 3 6 0 . 3 0 0 7 0 . 2 9 7 8 0 . 2 9 4 9 0 . 2 9 1 9 0 . 2 8 8 9 0 . 2 8 5 9 3. 3 1 49 4 8 . 5 0 0 . 3 1 9 0 0 . 3 1 6 3 0 . 3 1 3 5 0 . 3 1 0 7 0 . 3 0 7 9 0 . 3 0 5 0 0 . 3 0 2 2 0 . 2 9 9 3 0 . 2 9 6 3 0 . 2 9 3 4 0 . 2 9 0 5 3. 3 5 49 4 9 . 0 0 0 . 3 2 3 0 0 . 3 2 0 4 0 . 3 1 7 6 0 . 3 1 4 9 0 . 3 1 2 1 0 . 3 0 9 3 0 . 3 0 6 5 0 . 3 0 3 6 0 . 3 0 0 7 0 . 2 9 7 8 0 . 2 9 4 9 3. 4 0 49 4 9 . 5 0 0 . 3 2 7 1 0 . 3 2 4 4 0 . 3 2 1 7 0 . 3 1 9 0 0 . 3 1 6 3 0 . 3 1 3 5 0 . 3 1 0 7 0 . 3 0 7 9 0 . 3 0 5 0 0 . 3 0 2 2 0 . 2 9 9 3 3. 4 5 49 5 0 . 0 0 0 . 3 3 1 0 0 . 3 2 8 4 0 . 3 2 5 7 0 . 3 2 3 0 0 . 3 2 0 4 0 . 3 1 7 6 0 . 3 1 4 9 0 . 3 1 2 1 0 . 3 0 9 3 0 . 3 0 6 5 0 . 3 0 3 6 3. 4 9 49 5 0 . 5 0 0 . 3 3 4 9 0 . 3 3 2 4 0 . 3 2 9 7 0 . 3 2 7 1 0 . 3 2 4 4 0 . 3 2 1 7 0 . 3 1 9 0 0 . 3 1 6 3 0 . 3 1 3 5 0 . 3 1 0 7 0 . 3 0 7 9 3. 5 4 Ov e r r i d e Ar e a Ro w 1 Ov e r r i d e Ar e a Ro w 2 Ov e r r i d e Ar e a Ro w 3 Ov e r r i d e Ar e a Ro w 4 Ov e r r i d e Ar e a Ro w 5 Ov e r r i d e Ar e a Ro w 6 Ov e r r i d e Ar e a Ro w 7 Ov e r r i d e Ar e a Ro w 8 Ov e r r i d e Ar e a Ro w 9 Ov e r r i d e Ar e a Ro w 1 0 Ov e r r i d e Ar e a Ro w 1 1 Ov e r r i d e Ar e a Ro w 1 2 Ov e r r i d e Ar e a Ro w 1 3 Ov e r r i d e Ar e a Ro w 1 4 Ov e r r i d e Ar e a Ro w 1 5 Ov e r r i d e Ar e a Ro w 1 6 Ov e r r i d e Ar e a Ro w 1 7 Ov e r r i d e Ar e a Ro w 1 8 Ov e r r i d e Ar e a Ro w 1 9 Ov e r r i d e Ar e a Ro w 2 0 Ov e r r i d e Ar e a Ro w 2 1 Ov e r r i d e Ar e a Ro w 2 2 Ov e r r i d e Ar e a Ro w 2 3 Ov e r r i d e Ar e a Ro w 2 4 Ce n t r a l E l e v a t i o n s o f R o w s o f H o l e s i n f e e t Co l l e c t i o n C a p a c i t y f o r E a c h R o w o f H o l e s i n c f s ST A G E - D I S C H A R G E S I Z I N G O F T H E W A T E R Q U A L I T Y C A P T U R E V O L U M E ( W Q C V ) O U T L E T Bl o o m F i l i n g 1 Po n d G HF H 2 2 _ P o n d G W Q C V _ F 1 A m e n d m e n t . x l s , W Q C V 5 / 8 / 2 0 2 3 , 3 : 4 4 P M Wo r k s h e e t P r o t e c t e d Pr o j e c t : Ba s i n I D : ST A G E - D I S C H A R G E S I Z I N G O F T H E W A T E R Q U A L I T Y C A P T U R E V O L U M E ( W Q C V ) O U T L E T Bl o o m F i l i n g 1 Po n d G 49 2 5 . 0 0 49 3 0 . 0 0 49 3 5 . 0 0 49 4 0 . 0 0 49 4 5 . 0 0 49 5 0 . 0 0 49 5 5 . 0 0 0. 0 0 0 . 5 0 1 . 0 0 1 . 5 0 2 . 0 0 2 . 5 0 3 . 0 0 3 . 5 0 4 . 0 0 Stage (feet, elev.) Di s c h a r g e ( c f s ) ST A G E - D I S C H A R G E C U R V E F O R T H E W Q C V O U T L E T S T R U C T U R E HF H 2 2 _ P o n d G W Q C V _ F 1 A m e n d m e n t . x l s , W Q C V 5 / 8 / 2 0 2 3 , 3 : 4 4 P M Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO D APPENDIX D Detention Pond Volume excerpt Geotechnical Borings Memorandum HFH22 - Memorandum F1 Amendment.docx Page 1 of 2 To: Wes Lamarque, PE City of Fort Collins From: Matthew Pepin, PE Galloway, Inc. Date: 06/20/2023 Re: Bloom Filing 1 Amendment - Drainage Modifications To Mr. Lamarque, Bloom Filing 1 required revisions that would include a modified pond, an added pond, and modifications to associated storm infrastructure. This memorandum is to help provide information on the changes from the approved Bloom F1 Final Drainage Report for the stated Amendment. Pond Modification / Addition Pond G was initially approved to provide 9.5 ac-ft of volume and release at a rate of 17.6 cfs. This pond is being split into two separate ponds to allow for increased development within the piece of land where Pond G initially was planned. Pond G will now be reduced to a volume of 4.8 ac-ft and releasing at 13.5 cfs. A second pond, Pond G1, will be located on the western part of the site. Pond G1 will provide 5.1 ac-ft of volume and release at 4.4 cfs. This would increase the amount of total flow existing both ponds from the original by 0.2 cfs. In order to maintain a maximum of 22.3 cfs releasing into the southern part of the Cooper Slough outfall, Pond I’s flow will be restricted from 0.35 cfs to 0.15 cfs. Storm Infrastructure The associated basin that were tributary to the effected modification storm infrastructure are labeled as A-G1, A-G2,…A-G6. Inlet calculations were added for these basins as well. An updated StormCAD output for the effected storm lines has been included a part of this memo. Tailwater conditions were set based on the 100-year WSEL for the major storm event and a free outfall condition in the minor event. Note: there is HGL surcharging from SD Inlet L1.5 and SD Inlet L1. The HGL at this location is .27 higher than the RIM at the MH of SD MH L1.4. This equates to 3.24 inches and would remain within the ROW, not impacting the lots. Storm Infrastructure incorporating Bloom F2 In order to take into account LID’s within Bloom F2, there is another modification to the storm pipe infrastructure. A concern of too much flow entering the LID in the major storm events would cause damage needed to be mitigated. To prevent this from happening, a manhole would split flow from outfalling into the LID and by passing downstream to outfall into the EDB (Pond E). This flow split would have flow entering into the LID at a maximum of 15.5 cfs in the major storm event. The flow split is achieved by having the smaller 15” pipe sit lower than the larger pipe, restricting flow for the minor event to only pass through the 15” pipe. The flow rate allowing for all flow in the minor storm event to enter the LID at a flow rate of 12.02 cfs. Bloom Filing 1 06/20/2023 HFH22 - Memorandum F1 Amendment.docx Galloway & Company, Inc. Page 2 of 2 CONCLUSION The modifications to the site will not change the overall design intent that was originally approved with Bloom F1 Drainage Report. Sincerely, GALLOWAY Matthew Pepin, PE Civil Project Engineer MatthewPepin@Gallowayus.com 01/02/2024