F�ai Drainage and Erosion Control Report
for ��o N {c'f✓i'
LOUDEN CREEK DRIVING RANGE AND GOLF CENTER k2a��2 J l�sfJ; J
(Tinian P.U.D.
Fort Collins, Colorado
INITIAL SUBMITTAL,
date: _ 12/0 2 /91 �+•
Prepared for
KNICKERS, NC.
Fort Collins, Colorado
M
Project No: 1230-02-91
Date: December 2, 1991
4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334
i is
E
A9RI //,4/& /Pe4,61646 A A47
............. ---------------- --------
74.47 —,kV
4F y -7
eo Ai
............
i
.,c,7Rl 16 vx4
v
e". _,OF._... j4o?17C A/
Ig "r zc.-
........ ...
7-4:-� kV
I
-----------
------ 77-0 AV45.77
71n7IA/C
W jo. j: 4� > ACP7
....... ... ..........
4L 4/WIL
.... . ....... ......
77.
.15 AZ.4
We" —15c. O/vf—.,o 6 -�5.
eCl o4,41 47 P"C=// x
77 l :51
_V1 5__,4.ey4E/
it
/Vp
................
W e4
------ - ---
oc
oz
FAF /72L_
--- 41,el
r,7 4
6_72 4,e.��F V 7 Oe.7 7.5. _'d_
_. __. 17#4 AC
A ?4.- -It .
_72
A7_770. &I _75� z_5,_4W_Ae_7_-x1
AIA-7--eel— ------------
,a
APPENDIX A
Storm Drainage Calculations
Figures
. ...........
ko
... .. . ... ......
- --------------
".0O3
A 0.61).71---C770 x 0-061)
- ---- --------- ----
--- ---- ---
Cq,4
— - - -------- .. .. .... .............. .. ...
--------- - - --- -------
REFERENCES
1. City of Fort Collins Storm Drainage Criteria Manual
2. City of Fort Collins Storm Erosion Control Manual
3. City of Fort Collins topographic Aerial for the SE 1/4 of Section
11, T6N, R69W
4. Preliminary Master Drainage Report for the Timan P.U.D.
by RBD, Inc., dated April 4, 1988
3.1.6 Runoff ;fficients
The runoff coefficients to be used with the Rational Method referred to in Section 3.2
"Analysis Methodology" can be determined based on either zoning classifications or the
1 types of surfaces on the drainage area. Table 3-2 lists the runoff coefficients for the various
types of zoning along with the zoning definitions. Table 3-3 lists coefficients for the different
kinds of surfaces. Since the Land Development Guidance System for Fort Collins allows land
development to occur which may vary the zoning requirements and produce runoff coeffi-
cients different from those specified in Table 3-2, the runoff coefficients should not be based
solely on the zoning classifications.
The Composite Runoff Coefficient shall be calculated using the following formula:
C = (ZC,A,)/At
,e,
Where C =Composite Runoff Coefficient
C, = Runoff Coefficient for specific area A,
A, =Area of surface with runoff coefficient of C,
n = Number of different surfaces to be considered
A,=Total area over which C is applicable; the sum of all A; s is equal to A,
Table 3-2
RATIONAL METHOD RUNOFF COEFFICIENTS FOR ZONING CLASSIFICATIONS
Description of Area or Zoning Coefficient
Business: BP, BL........................................................................................ 0.85 1" ;
Business: BG, HB, C.................................................................. ............ 0.95
Industrial: IL, IP.......................................................................................... 0.85
Industrial: IG..................................... .. 0.95
........................................................
Residential: RE, RLP................................................................................. 0.45
Residential: RL, ML, RP............................................................................. 0
1 Residential: FILM, RMP.............................................................................. 0 `
Residential: RM, MM.................................................................................. 0.65
Residential: RH.......................................................................................... 0.70
Parks, Cemeteries...................................................................................... 0.25
Playgrounds............................................................................................... 0.35 fyT%J
RailroadYard Areas................................................................................... 0.40
Unimproved Areas...................................................................................... 0.20
/V;
Zoning Definitions
R-E Estate Residential District — a low density residential area primarily in outlying
areas with a minimum lot area of 9,000 square feet.
R-L Low Density Residential District — low density residential areas located throughout iL
the City with a minimum lot area of 6,000 square feet.
R-M Medium Density Residential District — both low and medium density residential
areas with a minimum lot area of 6,000 square feet for one -family or two-family
dwellings and 9,000 square feet for a multiple family dwelling.
R-H High Density Residential District— high density residential areas with a minimum lot
area of 6,000 square feet for one -family or two-family dwellings, 9,000 square feet
for a multiple family dwelling, and 12.000 square feet for other specified uses.
R-P Planned Residential District —designation of areas planned as a unit (PUD) to pro-
vide a variation in use and building placements with.a minimum lot area of 6,000
square feet.
R-L-P Low Density Planned Residential District —areas planned as a unit (PUD) to permit
variations in use, density and building placements, with a minumum lot area of 6,000
square feet.
MAY 1984 3-3 DESIGN CRITERIA
R-M-P Medium Density Planned Residential District — desigi.adon for medium density
areas planned as a unit (PUD) to provide a variation in use and building placements
with a minimum lot area of 6,000 square feet.
R-L-M Low Density Multiple Family District —areas containing low density multiple family
units or any other use in the R-L District with a minimum lot area of 6,000 square feet
for one -family or two-family dwellings and•9,000 square feet for multiple -family
dwellings.
M-L Low Density Mobile Home District — designation for areas for mobile home parks
containing independent mobile homes not exceeding 6 units per acre.
M-M Medium Density Mobile Home District — designation for areas of mobile home
parks containing independent mobile homes not exceeding 12 units per acre.
B-G General Business District — district designation for downtown business areas,
including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total
floor area of the building.
B-P Planned Business District — designates areas planned as unit developments to
provide business services while protecting the surrounding residential areas with
minumum lot areas the same as R-M.
H-B Highway Business District — designates an area of automobile -orientated busi-
nesses with a minimum lot area equal to 1/2 of the total floor area of the building.
B-L Limited Business District — designates areas for neighborhood convenience
centers, including a variety of community uses with minimum lot areas equal to two
times the total floor area of the building.
C Commercial District —designates areas of commercial, service and storage areas.
I-L Limited Industrial District — designates areas of light industrial uses with a minimum
area of lot equal to two times the total floor area of the building not to be less than
20,000 square feet.
I-P Industrial Park District —designates light industrial park areas containing controlled
industrial uses with minimum lot areas equal to two times the total floor area of the
building not to be less than 20,000 square feet.
I-G General Industrial District— designates areas of major industrial development.
T Transition District — designates areas which are in a transitional stage with regard
to ultimate development.
For current and more explicit definitions of land uses and zoning classifications, refer to the
Code of the City of Fort Collins, Chapters 99 and 118.
Table 3-3
RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS
Character of Surface Runoff Coefficient
Streets, Parking Lots, Drives: t?�
Asphalt................................................................................................ 0.95
Concrete........................................................................................... 0.50 Gravel............................................................................................
Roofs.........................................................................................................: 0.95
Lawns, Sandy Soil: ` Ilj
Flat<2%............................................................................................ 0.10 I a �I ; r .
Average 2 to 7% ............................... 0.15 o
;. 5 y.
Steep>7%......................................................................................:... 0.20 u
Lawns, Heavy Soil: Flat <2%............................................................................................. 0.20
0.2
Average2 to 7% ......................................................................... 0.35
Steep>7% ......... :............................................................................. ...
MAY 1984 3-4 DESIGN CRITERIA
No Text
47 M -OR-T/
NC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
April 4, 1988
Susan Hayes
City of Fort Collins
Storm Drainage Department
P.O. Box 580
Fort Collins, Colorado 80522
RE: TIMAN P.U.D. MASTER DRAINAGE REPORT
Dear Susan:
Site Location
On behalf of Jeff Timan, RBD Inca submits the following Prelimi-
nary Master Drainage Report for the Timan P.U.D.
The Timan P.U.D. site is located along the west side of State
Highway 287 (South College Avenue) north of Trilby Road. The 56
acre parcel is bounded on the north by Skyway Drive, on the east
by State Highway 287 on the south by Trilby Road and on thewest
by the First Freewill Baptist Church, Skyway Acres Subdivision
and the Foothills Gateway facility. More precisely this location
can be described as being situated in the east half of the
southeast quarter of Section ll, 'Township 6 North, Range 69 West
of the 6th P.M. in Larimer County, Colorado.
Existing Drainage
The site currently contains a commercial parcel in its southeast
corner and one residence. The vast majority of the site is used
..for pasture. The site is traversed by a small irrigation lateral
which enters the site in the southwest corner, and exits the site
in the northwest corner. The lateral meanders along a ridgeline
through the site. . The site slopes generally eastward at slopes
of 1.5% to 8% below the ridgeline and approximately 2.57. above
the ridgeline. Two op ridges protrude eastward from the prin-
cipal ridge. Theseboar ridges have the effect of dividing the
lower area into three basins. Each of these basins have- low
areas which are formed by the state highway embankment. These
areas are drained by culverts which run under State Highway 287
Other Offices: Vail, Colorado 303/476.6340 • Colorado Springs, Colorado 3031574.3504
and the commercial areas on the other side of the highway. The
two northern basins appear to have limited wetlands in their low
lying areas.
Offsite Drainage
Offsite drainage flows have a definite impact on this site. Of-
fsite flows will impact the site along the west property line.
No offsite flows are anticipated from any other region.
The first and most southern offsite area contributing flows along
the west property line is largely undeveloped area occupied by a
single church building with an unimproved parking area (see Of-
fsite Exhibit A in Appendix). Flows from this 7.6 acre area are
currently diverted into the forementioned irrigation lateral.
This lateral appears to have adequate capacity to handle 100 year
flows from this area, without substantially impacting the Timan
P.U.D.
The second offsite area is comprised of portions of the Skyway
Acres residential area and the Good Samaritan Center. Drainage
flows are collected in the street system in this area and flow
undetained into a concrete lined swale that runs northward just
west of the west property line of the Timan P.U.D. This swale
appears to be greatly undersized for 10 year as well as 100 year
flows. Therefore the majority of these flow will enter -the —site
undetained along the described swale.
The third offsite area is comprised principally of the Foothills
Gateway facility. Drainage from this area flows eastward until
it is intercepted by a grass swale which is a continuation of the
concrete swale mentioned in Offsite Area 2. This grass.swale has
greater capacity due to a more substantial berm along its eastern
sideslope. This swale carries flows northward to the storage
pond which lies just west of the northwest corner of the Timan
P.U.D. At this point flows either enter the storage pond or fol-
low the Foothills Gateway entrance road and flow into Skyway
Drive. As a result of these conditions no offsite flows are an-
ticipated from this area.
Proposed Drainage
The attached Master Drainage and Utility Plan illustrates the ap-
proach taken in facilitating drainage onsite. Onsite drainage
will be handled rather simply utilizing the two. northern low
areas for the required site detention. This will be done in or-
der to reduce or eliminate grading in the wetland areas. An ad-
ditional improvement will be the piping of the irrigation lateral
from a point close to where the lateral crosses the west property
line to the north property line. This will simplify site grading
and access to the area above the lateral.
Basin A comprises roughly the northern third of the site.
Drainage flows in this area will be conveyed through a system of
curb and gutter, culverts, swales and storm drain piping to the
forementioned low area. This area provides the required deten-
tion with a minimal amount of grading. Most of this grading will
be above the wetlands thus reducing its impact. The culvert
opening will be redesigned to restrict outfall to the required
rate. No offsite flows will enter this basin.
Basin B comprising the remainder of the site will be handled in
much the same manner. Drainage flows will be conveyed in a
similar system to the low area at the midpoint of the highway
frontage. Again grading will be limited in the low area to areas
above the wetlands. The principal difference from Basin A, will
be that facilities carrying flows from the area adjacent to Of-
fsite Area 2 will be oversized to accommodate the undetained of-
fsite flows.
Conclusion
Calculations which substantiate the proposed approach appear in
the attached Appendix. All calculation reflect use of the City
of Fort Collins Storm Drainage Criteria. Detailed calculations
for the sizing of culverts and the design of outlet works will be
submitted with the Final Master Drainage Report. The approach
outlined in this report should provide for the efficient and safe
conveyance of drainage through the site.
Sincerely,
RBD, Inc.
Stan A. Myers, P.E.
cc: 272-001
APPEND 2X
Q
MA ATPA
GO D.
-A R
I R
/#
cr-
OFFSITE DRAINAGE
EXHIBIT A
y
-.40, D VISION j
F
f -0
5
FF
OTHILLS
E 'i
/,,GATE��",
Xz 47
r 7.
Z,
41
o'
f
QFff
FSIT
XRE V,_
C CRET DRAIN P N
GRASS,SWAL
ti \1 1 99 KB -
ZEEE�� -Z::7-
. SCALE: 1'=200'
0 40 4
J)
if ::.J
Q10" 6.4 cfs/
07. 22.3.cfs
Q = 36.85 dfs
10
Q 100 55.5 Cfs RWINC
znm;nm,r*;nn rnncidfgntos
j
v
I
DATE: 3/23/99
PROJECT: TIMAN
JOB NUMBER: 272-001
DESIGN ENGINEER: SAM
BASIN DESIGNATION = Al
DETERMINE EXISTING Q FOR 2 YEAR STORM
HISTORIC RUNOFF COEFFICIENT
BASIN SLOPE: 4.2
BASIN LENGTH 1200
AREA: 20.09 ACRES
HIST TC = 1.87*(1.1-( 1
))*SQRROOT 1200
1/3 =
HISTORIC RAINFALL INTENSITY:
HISTORIC OUTFALL: 7.055368
.25
PERCENT
FEET
34.14359
C
.2J
.4.2
MINUTES
1.404752 1INCHES/HOUR
CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED STORM: 100
DEVELOPED RUNOFF COEFFICIENT
CCFAC =
20.09
.85
DURATION
MIN
5
10
15
30
45
60
90
120
180
.360
*
21.34563
GROSS VOL.
CU. FT.
54966.24
84619.08
107762.6
148987.4
179001.9
188765.6
203953.7
208293.1
225650.9
2516B7.5
YEAR STORM
.85
1.25
OUTFLOW VOL.
CU. FT.
2116.61
4233.221
6349.831
12699.66
19049.49
25399.32
38098.99
50798.65
76197.97
152395.9
DETENTION VOL.
CU. FT
52849. 64
80385.86
101412.9
136287.8
159952.4
163366.3
165854.7
157494.5
149452.9
99291.58
REQUIRED DETENTION VOLUME IS 165854.7 CU. FT. OR
.3.8075 ACRE FEET
CLIENT
INC / _—-�JOBNO.�L
PROJECT—T/AiIANSCALCULATIONMR t
Engineering Consultants MADEBY.j P-DATE.��pyL +-
CNECKEDSY-DATE SHEET_OF
ync i t•� . .
554
1818 ; r8r9 ` ° CIO Ac: Fr
i O7JSb3 ! n538;z A C�
`J8.0 0500 I i
S/C100 .743ea 1.75Ac Per
SDa�.o 335pp I
Vez/rWAA. G WAUI/OG (A*44 OF BA5/N•,4� i !
.i
S
41 so i I? 1 632 j 2.79
i 48813 406788 s' 3.»2,va.Fr,
• i
EVENTUAL QeAO/A1Ce
. I
5r f'.t S4 SE CCnr;N� i i
Soo
I I is
DATE: 3/28/88
PROJECT: TIMAN
JOB NUMBER:
272.001
DESIGN ENGINEER:
SAM
BASIN DESIGNATION
DETERMINE EXISTING 0
FOR
2
YEAR STORM
aaaaaaaaaeanaaaeaaaaaaaaaaa¢a¢¢�=s¢aaaaaaaaa=aaaa¢aa¢aaaaaaaaaaan¢aaa
HISTORIC RUNOFF COEFFICIENT
.25
BASIN SLOPE:
2.4
PERCENT
BASIN LENGTH
1850
FEET
AREA: 39.3
ACRES
HIST TC ■ 1.87•(1.1•(
1
•
.25
))"SQRROOT
1850
))/
2.4 1/3
=
51.07826 .
MINUTES
HISTORIC RAINFALL INTENSITY:
1.126278
INCHES/HOUR
HISTORIC OUTFALL:
11.06569
CUBIC FEET
PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
aaasaaasaaaaaa¢saaasaaaanaasa¢asaaanaaaaaanas¢aaaanaaea=assaaasaxa
DEVELOPED STORM:
100
YEAR STORM
DEVELOPED RUNOFF COEFFICIENT
.85
CCFAC ■ .85
*
1.25
* 39.3
= 41.75625
DURATION
GROSS VOL.
OUTFLOW VOL.
DETENTION VOL.
MIN
CU. FT.
CU..FT.
CU. FT
5
107524.8
3319.706
104205.1
10
165531.6
6639.411
158892.2
15
210805.2
9959.116
20D846.1
30
291448.8
19918.23
271530.6
45
350163
29877.35
320285.7
60
369262.8
39836.47
329426.3
90
398973.6
59754.7
339218.9
120
407462.4
79672.93
327789.5
180
441417.6
119509.4
321908.2
360
492350.4
239018.8
253331.6
REQUIRED DETENTION VOLUME IS
339218.9
CU. FT. OR
7.787395
ACRE FEET
RMINC
CLIENT
?'1M. L :1�
-. JOB NO. ,?7. C� 1
_—_
PROJECT M A L.T!,-:F CALCULATIONS FOR
Engineering Consultants
MAOEBT tL DATE ���_� CHECKED BY_,_DATE
SHEET -OF
JAN 6PAWA)C..
ELF V
493b.z
o
-
�f870
�1780
p,5 Ac. PT
Soo 0
24300
36080. ;
2.25
.;ao�.
-
132000
23008C)
-
/8s�
� 4/5080
9,53 •
401 G CAC1N(a
:. .......:
..... ...-........ ..
E.42V
AZCj)6
VOL
1/OL
49°i8.2
0
'
-
a i E'00
cZ I'MO
0.5 AC- F7-
rood
-
��300
l08080
�.Sp
-
/S1000
2(�0080
SI 7
acoc
88000
.
CLIENT JOB NO..22.�
�NC PROJECT ��/if lt!/_• CALCULATIONS FOR _aELL Tf ��t�Y.�•��
Engineering Consultants MADE BY- DATE -CHECKED By- DATE SHEET_OF
AeEA = 7 (.4Ae.
C= O. 2d�s))ASO 35.3
Ce
u • a Tc,� = 37.uw
37
c efel� _ (il:zslo.20(sso) (7,�4) = -7,3 ef:,
Q,o
Aet-A= ;zo.o S.
RWW
Engineering Consultants
CLIENT
PROJECT
MADEBY _ DATE CHECKED BY
JOB NO.
CALCULATIONSFOR
DATE SHEET __OF
■�/YINC
Engineering Consultants
CLIENT
PROJECT
MADE BY_ DATE
JOB NO.
CALCULATIONS
CHECKED BY -DATE SHEET_OF
1
.
_.... :..... ._ _ .....
_ .__..
/2 r4a:
i
..II'
i
I - .
'
I)
CLIENT
NO.
■AINC
Engineering Consultants
PR04ECT
MADE BY _ DATE CHECKED BY
CALCULATIONS FOR
DATE -SHEET -OF
►Anr�t'Tt!//ov
.AREA A83 0.25 /.74
A/Uc3(7AP16-0
- c�/.95....._.p.a5 —_
as.�� -- . 7.��j _ .0.304
. .. �
4
87 ►
- 0. 3046'-�S1) =
/oo
_ 1.13S
. (47.43) i
/�
Qioo ' , _
i
/, 2s (0.3�).� �.Si3 �,77>:=
4g(4.4)
.<O9.�...10.ctrN..'.�c"—a:`-
_ _.....
.�..........!..
Q = C'P(2, ,4
10
FOCT'•.c/iLLS CATEr�A`/. %�/�=�..:•'►LE__�''C. __.....
--- -
,
:
+
\al
C�.4
/P.?13. ' e.o5 .. _ . .... 1
;�o.....:..174/146�
!/ 11
/AK)046 Q/0O
i FO CL .
.i