Loading...
HomeMy WebLinkAboutDrainage Reports - 06/14/1994Sinai roved impart wo DRAINAGE INVESTIGATION For A PROPOSED ADDITION TO "JAX" 1200 NORTH COLLEGE AVENUE FORT COLLINS, COLORADO Prepared for: p SCHMID ENGINEERING 1204 N. Lincoln Avenue Loveland, Colorado 80537 "Revised" April 1994 Project No. HYD-129-94 Prepared By: s 1MESSNER Engineering Associates 150 East 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 Civil and Environmental Engineering Consultants April 14, 1994 Project No. HYD-129-94 Mr. Gregory Schmid, P.E. Schmid Engineering 1204 N. Lincoln Avenue Loveland, Colorado 80537 Dear Mr. Schmid, The enclosed report represents revisions to our previous report. The revisions have been requested by the City of Fort Collins staff following their review of the proposed the Utility Plan and drainage investigation report for the proposed building addition to JAX located at 1200 N. College Avenue, Fort Collins, Colorado. This investigation was based upon the proposed site development plan and plat; proposed site grading plan; on -site observations; and available topographic information. The investigation was performed in accordance with the criteria established in the City of Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards" manual and incorporates the comments and concerns expressed during the City staffs review of the project. Thank you for the opportunity to be of service to you. If you should have any questions, please feel free to contact this office. Respectfully Submitted, MESSNER Engineering Associates f%-I r � e', � Dennis R. Messner, P.E. DRM/mkm Enclosures Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 Letter of Transmittal Table of Contents Scope Site Description Existing Conditions Proposed Development Erosion Control Measures Conclusions and Recommendations ii 2 2 Vicinity Map Existing Conditions Exhibit Floodway Exhibit Grading & Drainage Exhibit Calculations Drainage Summary n SCOPE The following report represents the results of a drainage investigation for a proposed building addition to the existing "JAX" located at 1200 North College Avenue, Fort Collins, Colorado. The purpose of this investigation is to determine the effects of the proposed development on the area's existing drainage conditions and to determine the improvements, if any. The appropriate sizing for any proposed improvements has been determined so that the improvements may be incorporated with the construction of the project. The conclusions and recommendations presented in this report are based upon the proposed site development plan; proposed site grading construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" manual. SITE DESCRIPTION The entire "JAX" site is irregular and contains approximately 5.9 acres. The portion of the site that is currently being considered in conjunction with the proposed building addition is the area situated between the existing structure and Conifer Street. This area is approximately 50 feet from the building to the curb and approximately 360 feet parallel with Conifer Street. The site is located in the drainage basin boundary known as the DRY CREEK BASIN. The site is located within the "Floodway" as depicted on the DRY CREEK DRAINAGEWAY PLAN. EXISTING CONDITIONS The area being considered is used as an access drive and temporary parking. Several trees and a landscaped strip have recently been established in the area between the curb and the access drive. The ground surface has been graded to drain away from the existing structures toward the street. The area between the existing structures and Conifer Street slopes from South to North toward Conifer Street at rates varying from 3.5% to 0.7%. The area does receive a minor amount of run-off from the roofs to the South. The run-off generated on the parking lot to the West flows southwesterly toward the southern boundary of the site and then overland in a poorly defined drainage ditch to Dry Creek. Run-off from the northern portion of the site that flows onto Conifer Street is directed to the East in the existing curb and gutter. The run-off which is directed along the curb and gutter ultimately flows into the detention facilities located at the intersection of Conifer Street and Redwood Drive. PROPOSED DEVELOPMENT The proposed construction is to consist of the addition of approximately 3,500 square feet of building together with associated access driveway and parking. The proposed building addition will be situated in an area between existing structures. The building addition area is presently used as an open storage area. The storage area has a concrete floor and is partially enclosed by a metal structure. A paved access drive and parking area to be constructed will provide a one-way east bound drive lane and parking for 17 cars. The drive and parking will be located between the structure and Conifer Street. Access to the site is to be provided through existing driveway cuts located at the east and west sides of the existing structures. The proposed site plan indicates that the eastern third of the site is to remain vacant. This investigation has considered that the access drive to the East of the existing structures will be paved as a part of this construction or at a future date. 1 PROPOSED DEVELOPMENT (cont.) The current City policies require that the difference between the historic rate of run-off and the developed rate of run-off be detained onsite. The release rate is to be no greater than the 2 Year Storm historic rate. The City's policies normally require that the flows in the adjacent streets be incorporated with the onsite detention requirements. Conifer Street has been constructed and slopes from West to East at a grade of approximately 0.4%. In order to divert the flow from the gutter onto the site and then route the flow through an onsite detention facility, it would be necessary to have a minimum of 2.5 feet of drop between the point that the flow would exit the gutter to the point that the flow would reenter the gutter. This is not physically possible due to the extremely flat topography on the site and the flat gutter slope of the existing street section. Therefore a variance to the City's policy with regard to the detention of the adjacent street flows is being requested. EROSION CONTROL MEASURE Erosion control considerations have been made based upon the short term, i. e., during construction activities and the long term, through the life of the facility. The long term measures incorporated to eliminate erosion are the proposed methods and materials to be used to provide a surface covering for the driveways, parking areas, walkways and the landscaped open areas. The structure and hard surfaced areas will provide a covering to deter erosion. The landscaping will provide a combination of plantings and ground covers to deter erosion. The short term erosion control method to be incorporated into the construction requirements for the project is the placing of a "Sediment Trap" at the detention pond to retain mud and debris onsite. The proposed construction area is exempt from providing wind erosion measures since it is less than one acre in area. The schedule for construction activities is anticipated to be: April 11- April 22, perform demolition, site preparation, and related construction; April 25 - May 6, foundation construction; May 9 - July 19, building construction; June 6 - July 1, construct parking and drives, and install landscaping and signage. CONCLUSIONS AND RECOMMENDATIONS 1. The proposed development will retain the existing drainage patterns. 2. The site is located in the DRY CREEK BASIN. The site is located within a defined floodway or flood plain. 3. All development is to be performed in accordance with City of Fort Collins criteria. A request for a variance to the City's policy with regard to the detention of the adjacent street flows is made as a part of this investigation. It is not physically feasible to route the flow from the street through on -site detention facilities and back onto the street. 4. Onsite detention of stormwater is required by the City of Fort Collins. The volume of run-off estimated to be the difference between the existing and the proposed condition is 5,042 cubic feet. This volume has been determined based upon the difference between the run-off from a 2 Year Storm at the current condition and the run-off from a 100 Year Storm at the proposed conditions. The flow is to be released at a controlled rate not to exceed 1.84 c.f.s. 5. The City of Fort Collins Standards for temporary erosion control measures are to be incorporated with the construction activities. 2 EX14HII: ITS No Text i 1� Scale: V = 100' / CONIFER The "Shaded" area depicts the specific area under consideration in this Investigation Arrows Indicate direction of drainage flow.. EXISTING CONDITIONS DATA: Roofs = 20,920 sq.ft. Paved Drives and Parking = 970 sq.ft. Gravel Surfaced Drives and Parking = 21,065 sq.ft. 'Inimproved Area = 3,360 sq.ft. TOTAL AREA = 46,315 sq.ft. = 1.063 ac. EXISTING CONDITIONS EXHIBIT W W 7 i Mir COL lite 0 t•iAha.' iV-.t.-�.fi , w:..:. %'''f�"I V {r �`"�'S•�j t T"`� FA f JAX ! � t I `t 1 O 'r i ri �c• i� 496 ry The information shown hereon has been taken from: "Major Drainageway Planning - DRY CREEK - Fort Collins, Larimer County, Colorado" Prepared by: Gingery Associates, Inc. for the City of Fort Collins, Larimer County and the Colorado Water Conservation Board. dated April 1980. Data taken from above referenced report that pertains to the subject site: Cross Section 25 = Sta. 162 + 60 Thalweg Elevation @ Cross Section 25 = 4967.0 10 Year Elevation @ Cross Section 25 = 4967.7 100 Year Elevation gel Cross Section 25 = 4968.3 Floodway Elevation @ Cross Section 25 = 4969.1 Floodway Width @ Cross Section 25 = 640 ft. W A O 04 44 CALCULATIONS Client: Schmid Engineering Project No. HYD-129-94 By: DRM Date: Feb 22,1994 (Revised Mar. 29, 1994) Calculations for Drainage Investigation for JAX building addition located at 1200 N. College Ave., Fort Collins, Colorado Site area considered in this investigation = 1.063 acres± (Total Property Area =5.9 ± acres) The proposed construction is to consist of the addition of approximately 3,535 sq.ft. to the existing commercial structure(s) together with the associated parking and access drives. Rational "C" Factor = 0.20 for Lawns and Landscaped Areas It it 11 = 0.95 for Roofs, Decks, Patios, etc. it it to = 0.95 for Asphalt and Concrete Streets, Drives, and Parking it of to = 0.50 for Gravel Drive and Parking It to" = 0.20 for Unimproved and Open Areas of to = 0.20 for Railroad Right -of -Way "C"avg (Existing): Lawns and Landscaped Areas = 0 sq.ft.± Roofs, Decks, Patios, etc. = 20,920 sq.ft.± Streets, Drives, and Parking = 970 sq.ft.± Gravel Drive and Parking = 21,065 sq.ft.± Unimproved and Open Area = 3.360 sg,ft.± Total Area = 46,315 sq.ft.± "C" avg = ((0 x 0.20) + (20,920 x 0.95) + (970 x 0.95) + (21,065 x 0.50) + (3,360 x 0.20)) + 46,315 "C"avg (Proposed): "C" avg (Existing) = 0.691 Lawns and Landscaped Areas Roofs, Decks, Patios, etc. Streets, Drives, and Parking Gravel Drive and Parking Unimproved and Open Area Total Area 6,580 sq.ft.± 20,235 sq.ft.± 19,250 sq.ft.± 250 sq.ft.± 0 SQ.& 46,315 sq.ft.± "C" avg = ((6,580 x 0.20) + (20,235 x 0.95) + (19,250 x 0.95) + (250 x 0.50) + (0 x 0.20)) + 46,315 "C"avg (Proposed) = 0.841 Page 1 Client: Schmid Engineering Project No. HYD-129-94 By: DRM Date: Feb. 22,1994 (Revised Mar. 29, 1994) EXISTING CONDITIONS TIME -OF -CONCENTRATION Time of Concentration overland from Roof to Flowline of Gutter ® easterly limit of area considered. Time for flow to travel from roof to ground = 5 minutes Time for flow to travel from ground to street with Distance, L = 50' and Slope = 2%, From Fig. 602 Velocity = 1.45 ftJsec. T(min.) = L(ft.) + [Vel. (ftJsec.) x 60 minJsec.] T = 50 + [1.5 x 60 ] = 0.55 min. Time for flow to travel in gutter with Distance, L =335' and Slope = 0.4%, From Fig. 602 Velocity = 1.5 ftJsec. T = 335 + [1.5 x 60 1 = 3.72 min. Therefore, T Total = 5.00 + 0.55 + 3.72 = 9.27 min. USE 10 minutes as Time of Concentration 12 ® 10 min. = 2.50 inJhr. Iio ®10 min. = 4.40 inJhr. Iwo ®10 min. = 7.25 inJhr. RUN-OFF Run-off, Q= C x I x A x Cf A= 46,315 + 43,560 =1.063 acre f Cf at 2 year Storm = 1.0 Cf at 10 Year Storm = 1.00 Cf at 100 Year Storm =1.25 RUN-OFF FROM SITE AT EXISTING CONDITIONS: Q2 = 0.691 x 2.50 x 1.063 x 1.00 =1.84 c.fs. QYo = 0.691 x 4.40 x 1.063 x 1.00 = 3.23 c.fs. Qioo = 0.691 x 7.25 x 1.063 x 1.25 = 6.66 c.fs. Proposed Conditions Tc = IJ180 + 10 Tc = 385/180 + 10 =12.14 USE 10 minutes as Time of Concentration 12 ®10 min. = 2.50 inJhr. Iio ®10 min. = 4.40 inJhr. Iioo @ 10 min. = 7.25 inJhr. RUN-OFF FROM SITE AT PROPOSED CONDITIONS WITHOUT DETENTION Q2 = 0.841 x 2.50 x 1.063 x 1.00 = 2.23 c.£s. Qio = 0.841 x 4.40 x 1.063 x 1.00 = 3.93 c.fs. Qioo = 0.841 x 7.25 x 1.063 x 1.25 = 8.10 c.£s. Page 2 Client: Schmid Engineering By: DRM Proj. No.: IM-129-94 Date: Feb. 25, 1994 (Revised Mar. 29, 1994) DETENTION VOLUME DETERMINATION FOR 'RATIONAL METHOD" Time (min.) Q100 Prop. (c.f.s.) Vol. @ Q100 (cu.ft.) Q dis. ® 2 Yr. (c.f.s.) Vol. dis. (cu.ft.) Vol. Diff. (cu.ft.) 10 8.10 4,861 1.84 1,102 3,759 15 6.70 6,034 1.84 1,653 4,382 20 5.81 6,973 1.84 2,204 4,769 25 1 5.14 7,711 1.84 2,754 4,956 30 4.64 8,348 1.84 3,305 41M 40 3.91 9,387 1.84 4,407 4,980 50 3.35 10,057 1.84 5,509 4,548 60 2.91 10,460 1.84 6,611 3,849 Q = CIACf Q2 Existing = 0.691 x 2.50 x 1.063 x 1.0 = 1.84 c.f.s. At Q100 Proposed = 0.841 x I x 1.063 x 1.25 = Therefore, a minimum of 5,042 cu. ft. of Detention Storage Volume is required DETENTION VOLUME CHECK OF PROPOSED POND Elevation Area (S .Ft.) Avg. Area (S .Ft.) Elevation Diff. (Ft.) Volume (Cu.Ft.) Sum of Volume (Cu.Ft.) (Outlet) 0.00 100 2,619 1 2,619 2,619 1.00 5138 5,311 0.25 1,328 3,947 1.25 5484 5,662 0.25 1,416 5,362 1.50 5840 5,362 z 5,042 Therefore, sufficient volume is available in the pond at a depth of 1.5 feet. Page 3 Client: Schmid Engineering By: DRM DETERMINE OUTLET ORIFICE SIZE ORIFICE Equation, Q = 0.56 A42gh Q = 1.84 c.f.s. g = 32.2 Project No. HYD-129-94 Date: Feb. 22, 1994 (Revised Mar. 29, 1994) A = Area of Orifice Opening h = Headwater depth in feet A = Q + 0.56 42gh = 1.84 + [0.56 x 4(2 x 32.2 x 1.5)] A = 0.33 sq.ft. for Round Opening A = n r^2 r = 4A/n r = 40.33n = 0.325 ft. = 3.9 in. Check with 8" dia. pipe A = 0.349 sq.ft. h =1.167 ft. Q = 0.56 x 0.349 4( 2 x 32.2 x 1.5) = 1.92 = 1.84 OK Therefore USE 8" dia. pipe for outfall to street DETERMINE OVERFLOW SIZE WEIR Equation, Q = CLH^3/2 C = 3.0 Q=8.1Oc.f.s. L=5ft. H = Q + (CL^3/2) H=[8.10+(3.Ox5)]^2/3=0.66ft. <1ft. OK Therefore USE 5 ft. wide bottom @ overflow section DETERMINE SWALE SIZE Q = 1.486/n A R^2/3 CIS Swale w/ 2.5' bottom & 4:1 side slopes @ 1.0 ft. depth: A = 6.5 sq.ft. Wp = 10.75 ft. R = A / Wp = 6.5 / 10.75 = 0.605 S = 0.40% n = 0.030 (grassed swale) .7-11 . 1 .1 1 11 1 1 1 Q=14.6c.f.s.>>8.10 OK Therefore, USE I'Deep Swale w/ 2.5 bottom & 4:1 side slopes Page 4 RAINFALL PERFORMANCE STANDARD EVALUATION a PROJECTS JAR• - Building Addition STANDARD FORM A Rev. Mar. 29, 1994 COMPLETED BY: Dennis Messner DATE: 2-28-94 DEVELOPED ERODIBILITY Asb L9b Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) (t) (feet) (t) M Moderate 0.67 450 0.5 72.7 Note that Cit 's "Wind rodibilit Map" do s not acc rately re lect the highly sa y-gravel nature th t exists. Note that the rea.cons dared is he area hat will a open an subject to possible a sion•and does not nclude a isting st uctures aid pavemert considered as part of the drain ge inves igation. MARCH 1991 8-14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: JAX - Building Addition STANDARD FORM B COMPLETED BY: Bennis Messner DATE:Mar:f 29, 1994: Erosion Control C-Factor P-Factor Method Value Value Cominent Bare Soil 1.00 1.00 @ Detention Pond Gravel 0.05 1.00 @ Existing Drives Straw Bale Barrier 1.00 0.80 @ Pond Outlet Landscaped Area 0.45 1.00 @ Existing Street Scap MAJOR PS SUB AREA BASIN ($) BASIN (AC) CALCULATIONS 72.7 0.67 Bare Soil = 0.17 ac. Landscaping = 0.08 ac. Gravel = 0.42 ac. Wtd. "C" - Factor =[(0.17xl.00)+(0.08xO.45)+(0.42xO. 0.67 = 0.34 Wtd. "P" - Factor = 0.8Oxl.0Ox1.00xl.00 = 0.80 Eff = [ 1 - (0.34xO.80)] x 100 =72.8 ? 72.7 OK. i5)] MARCH 1991 9-15 DESIGN CRITERIA CONSTRUCTION SEQUENCE PROJECTS ,TAR - Building Additinn STANDARD FORM C t vNCE FOR 19 �94 ONLY COMPLETED BY$ -Dennis Mecanar DATES 2-28-94 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 1 1994 MONTH Apr -May IJunelJuly) OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettinge/Mats/Blankets Other NOT APPLICABLE STRUCTURES: INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS-ON- MARCH 1991 8-18 DESIGN CRITERIA STORMWATER DETENTION SUMMARY SITE DRAINS TO DRY CREEK BASIN GROSS SITE AREA = 5.9 ACRES t NET SITE AREA (EXCLUDING CONIFER STREET R-O-W) = 46,315 SQ.FT. = 1.063 ACRES t EXISTING "C" = 0.691 PROPOSED "C" = 0.841 CRITERIA BASED DETENTION VOLUME = 5,042 cu.ft. PLAN DETENTION VOLUME = 5,362 cu.ft. MAXIMUM DEPTH OF DETAINED WATER = 1.5 ft. PEAK DISCHARGE, Q = 1.84 t c.f.S. April 15,1994 Project No. HYD-129-94 Mr. Glen D. Schlueter Stormwater Utility City of Fort Collins 235 Mathews P.O. Box 580 Fort Collins, Colorado 80522-0580 Re: Proposed Addition to JAX, 1200 North College Avenue, Fort Collins, Colorado Dear Mr. Schlueter, The subject project's estimated erosion control security amount has been determined to be the minimum amount required by the City of Fort Collins. Therefore, an amount of $1,000.00 should be included for the erosion control guarantee along, with any other surety requirements that are a part of the City's "Developer's Agreement." If you should have any questions or desire additional information, please feel free to contact this office. Respectfully Submitted, MESSNER Engineering Assocciates Dennis R. Messner, P.E. cc: Mr. Greg Schmid, P.E., Schmid Engineering Mr. Jim Quinlan, JAX Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 I..rrN FFFFF.•••��� rr�rlrrrrrrrrrwgtlw• . r Nrrl N r wRrl W tlrtl ARrrs rbf 8�r.•r�•rPE\PRrr lF.r ter. Fl w YI►IY.M.e/FIYXMw tli.MrwrRr �. Y. R tY r. R r♦• r tlY. rFtlrPF �w r •R rr .b.n iY rrP EpYyY tlrwrb Yre Y.v lPb.tl rA •r'�irwi.Ya oftrr.r.,Yw°.. WWWWR Yiirlr1EY1wVw Ywlw.•.r�P�. R n Cwwrw w•NW M.F•rr rw .. .bwY •w.�rrrrrrrtlPtl�YwY .eY�w rF�+r ar.tl.l rwn i w •ul�. � w.r. y, e�rr+r� r r e.r r r r...r r rNr.. wrF r • ulempe.rY�waww.wu r Mr Few mw.m a mwwa F. 4. •rr r••r . r aNa a rrr. rr w r rr• ru.r ,.... Yw rFrOF Y rYr bwl Y FM r rliY r r Pwr A . rw YFYrY/ wrr' hrFb. lar rr r.la°e r ,tl.w A � Y M1a•aq. R �nrA MM. M1fIAaeW rY�Fw wr.ra ArM 4rR • R IF�F.wwulY .w Y.sYUY.Y F..uYrw�b N. lY Mlrwr• rFr.r FYr W rYY wrFwtl. rrrr tlw nu.wy w r> wr.r.F tl.w y.ra..R r r rr r..ww. rbYF r wwF IEIr r WFwr y r wFrr / �ti Y w IFs r w V •Y tY Rw Prr tlr FNtl tl tl •► �rFsaYA r�FbrarswsYNrar swell n u.0 mn w e.u. rv.us lee .vnry raEwrortlwp...s. x.. w.. r.. ra li mmu„°.Iw r! r�.w. rwF r r Prr awe.,. A carer. STORMWAT R OET "M similitil 8TE pt.NS i0 PlY CNE FY BISw Gfx$'SaENiFA-AeeCPFS a NET SITE AREA IEYCLIIM'l CONFER STREET AllAl l550.FT. ISO ACRES FASNgC-OA91 wAPOffno.a.rt {#191M Sul CETE• TON V0.1rE-50t2 w X. PLAN 0ETEND0N YCLUME.5.M2an. �aERINCF RT WATER. IS it rerx setw a -imli • Poll toes- . IMP BY rFw AsIYM is It or E.uM NSA stai eFPeEFrY 10 Its so " Scun 1 V4 t 1N• Y a101• b i1Ll, I Al INn YIN MII MM 1WIIA 1 9,t to ..f-- V.D. r 8' 1• I INr 5• _ry5�a • PMM ti how I✓•�r rr - TYPICAL OVERFLOW SECTION rxrxim--e'��'- 1• E wa, u nei PaYr, rr AM* (T 0 , r naval L a.6 im•:•.r"x IYPICAL SECTION THRU DRIVE r- "r M t6a' z.' s2 (@ West Side of Addition) I`_,�S l "°'"°�`•"' TRENCH DRAIN DETAIL •-'n�00606 b -^ _aFflul _ i • L XpN1peRpM• %aM k�tm5 _06IL0 �..�.. O :F �(.ii" Nola: A.I Ratl'I slopes to Lu 5 -. I Y f 1"I 6nI Curb A Gmis,J SECTION A - A 0 DETENTION POND wellsY °I 11 Sol IO(, rw YTMtlPaYrIMW. er dwn imrrrRF•ri Its% S TYPICAL SECTION THRU DRIVE CONCRETE CURB DETAIL wpl-to-SCMsj,yY- _ bst-au s _- (@ East Side of Addition) 2Fb SwMYJ VMOI CUR W GuIM A4Y L's IMta: All Berm abpaf b Ge 5 : 1 o, n uNl YIM6M her h Ca CUR $holm l _ Provide Ramp Approach on Sidewalk _O Driveways SECTION B DETENTION POND .., Conifer- street � -EnistinU' 1 2 - ' Jvewdy _ - '4 bullet For — - -- Existing Vert. Curb .Gutter_ _ _ _ _ A See Sectio —_==— PAYR9IM—� Ex sting Building Fin. Fir. Elev.=70.20 Drainage Basin Limit + d Zr— MINI 6120'�" e�8.iN7 A 1.0 l 9.e777777777 r / Qr AdditionZZ d Existing Building / ) a \ II ExistBuilding 1 sue.., pa.YNaN. °raw.a.w. h Dram 12. —Swale to Pond -- - - All All e Secbo s 2 .00 93 10cfs I R.s°LVuysw WlI�Nayyree2�� � � 6• iala� AVTW M A� a. ! a P I 1 I dis FMIINlY war Yp' wwtl r.rwr. M rraw.e Rr ~.rrrrtrr.I2 s.rr.r YlYrsa :.li I_ 1114' 1] 2 A It t25 5' 20 89.50 UERgAV 68 50 PIPEINLET Ni" I.F'i' 02 00 r— ,k)If'1w•� U' - �--- 'i'�u •_)0'OIAAO$N-12 Ya ' ' PLA$TC PIPE III°m1J 64 I3luz $ICEWA1NClAVENi SECTION Cal DETENTION POND OUTLET Net 10 Sol', 2 'Tz r 8. piiw +1zi,y .'.: YCPIrCAL t'uIM anWYelr Is D SECTION SECTION: a C IN°vl° 9< 1 et I, So ALE _ Y 0' r �I ____� Oullel Piq A 1 East NO Pll Caen 01 bPyF Asis is'loul 1 ].W] pal. PLAN INLET DIA 4 a�oF plpH IF O+IM Pees to ba ADS Nd2 of qual. Rs& to I'Jb" —N LL G O j 0 � � Q O 0 N N O OX U QU o �Z O U O 0 0 0 o 00 L 0 �g 0 90 30 cd, ry II an n 0 60 15 a 1"_.= 30' Contour Interval = 1/2' BFNCMIARR: MNTIEASi BONNET BQi ON FIRE HYDRANTLOLATFD AT THE p`THE WIFRSECIW 6MCTAILIEAYE.Nq GPiB1BT. CO m ELEVATwN. aB)6w ELEVATOR. 4970 Uy at N Easement o c0I of a Ica,.. I. n. x � ...... r.. = lr..lw Iwlmrl I I I I I I A MIILtIT =ssRi ,..car.. .w,r.l Ig u 8 ¢ {■5 Will r S 5 Refer to Architectural Plan for Pavement Thickness & Parking Stripping Plan z w LEGENE] Pzz .r— — Existing Ground Contour Line 0$'sird Proposed Ground Contour Line 0 AV +65.5 Existing Ground Spot Elev. 0 Proposed Finish Surface Spot Bev. LL Drainage Flow Direction Iwo pt.00 R( --- Drainage Basin Limit Proposed Curb W� W� AeMA[ E tTl�% SHEET NO. S1