Loading...
HomeMy WebLinkAboutDrainage Reports - 02/21/1995No Text RCE A Division of Ayres Associates December 13, 1994 Mr. Basil Harridan ' Stormwater Utility City of Fort Collins 235 Mathews Street ' Fort Collins, Colorado 80524 Re: Huntington Hills Filing 3 PUD Dear Basil: ' Enclosed is the "Addendum No. 1 to the Revised Final Drainage and Erosion Control Report of Huntington Hills Filing 3" for your review and approval. ' The purpose of the addendum is to change the overlot grading to lots 1 through 10 and provide additional erosion control measures to the overflow Swale at lots 201 and 202 Huntington Hills Filing 2. ' If you have any questions, please call. Sincerely, - i Resource Consultants & Engineers A Division of Owen Ayres & Associates, Inc. Paul R. Barker, P.E. Manager, Civil Engineering ' PRB\bbv Enclosure 1 1 Resource Consultants & Engineers Engineers/Scientists/Surveyors 3665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527 (303) 223-5556, Denver Metro (303) 572-1806, FAX (303) 223-5578 Printed on recycled paper HAMDENI2.LTR 93-0103.03 1 1 1 1 1 1 1 1 ADDENDUM NO. 1 TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HUNTINGTON HILLS PUD: FILING 3 Prepared for Huntington Hills L.L.C. 650 S. Cherry Street Suite 435 Denver, Colorado 80222 To Meet the Final PUD Submittal Requirements for the City of Fort Collins 256 West Mountain Avenue Fort Collins, Colorado 80521 RCE A Division of Ayres Associates Resource Consultants & Engineers A Division of Ayres Associates 3665. John F. Kennedy Parkway Building 2, Suite 300 Fort Collins, Colorado 80525 December 1994 HH-F3.ADM 0 I ' I. INTRODUCTION ' The purpose of this addendum is to document two proposed changes to the Final Drainage Report of Huntington Hills Filing 3. The proposed changes are to (1) modify the grading of lots 1 through 10, and (2) add a section of grouted riprap to the overflow swale ' behind lots 201 and 202, Huntington Hills Filing 2. 11. LOTS 1 THROUGH 10 OVERLOT GRADING ' Originally, the lots were proposed to be graded from the back of the lot to the front of the lot so drainage water would flow onto the street. It is now proposed to crown the ' lots so that the front half of the lot drains to the street and the back half drains to the back of the lot. A swale will be constructed adjacent to the back lot lines to collect the drainage. The swale for lots 1 through 5 will collect the drainage and convey it to the ' drainage swale along the northern boundary of Filing 3, which discharges into the drainageway on the Hahn property (see revised grading plan in back pocket). The swale for lots 6 through 10 will collect the drainage and convey it to the detention pond in Filing ' 2. Both of these swales are located in Huntington Hills Filing 5. Easements will be provided to the City. ' Basin A has been modified to include the back of lot areas for lots 1 through 10 and an area just east of these lots in Filing 5 which will drain into the swale. This offsite area ,was determined from topographic maps used for Filing 5 which was mapped this fall by JR ' Engineers. This new topography is slightly different from the topography shown on the grading plan. Basin B was also modified to exclude the back lot area of lots 1 through 10. The new area for Basins A and B are 0.61 and 0.53 acre, respectively. New flowrates for ' the 2- and 100-year storms were computed at concentration points 10 and 12. At concentration point 10, the new flowrates increased and are 0.39 and 1.40 cfs, respectively for the 2- and 100-year events. At concentration point 12, the flowrates ' decreased to 0.85 and 3.26 cfs, respectively for the 2- and 100-year events. Basin D was subdivided,into Basins D1 and D2 to reflect the changes in the grading ' of lots 6 through 10. The area of Basins D1 and D2 are 0.51 and 0.59 acre, respectively. At concentration point 13, the flowrates decreased to 0.94 and 3.61 cfs, respectively for the 2- and 100-year flood events. The flowrates at concentration point 15, increased to 0.42 and 1.54 cfs, respectively for the 2- and 100-year flood events. Table 4.1 was revised based on the new areas. This table and detailed calculations are included in the Appendix. Both swales along the back lot lines will have 4 to 1 sideslopes and a minimum slope of 2 percent. The minimum full depth capacity of the swales will be 8.7 cfs which far exceeds the required capacity. The swale along the northern boundary of the property which connects to the back of lot swale for lots 1 through 5 has the same configuration and capacity. ' No detailed calculations were completed of the street drainage structures (gutters, inlets, and overflow swales) since the original street flowrates were larger than the proposed street flowrates. The original calculations showed the design was adequate; therefore, they will also be adequate with lower flowrates. 1 Resource Consultants & Engineers A Division of Ayres Associates I I III. GROUTED RIPRAP SWALE BEHIND LOTS 201 AND 202 ' Along the northern boundary of Filing 2 from lot 201 to the west, a 24-inch storm drain was proposed and constructed to convey offsite drainage to the Hahn drainageway. ' Above the storm drain, an overflow swale was proposed and constructed to convey excess offsite drainage and local drainage to the Hahn drainageway. Due to topographic conditions at Manhole A between lots 201 and 202 (refer to sheet 8 of the construction ' drawings), a steep channel (21 percent slope) section is needed to convey the drainage water to the Hahn. drainageway. The proposed channel will be a trapezoidal section with 3 to 1 s' lopes and 1.5-foot bottom width. This channel will be lined with grouted riprap — 9 sfl = I Z �r .1 1 I [J 1 1 1 I I 2 Resource Consultants & Engineers ' A Division of Ayres Associates I 1 1 1 1 1 11 1 1 1 L C 1 1 1 1 1 1 APPENDIX Revised Table 4.1 and Detailed Calculations 1 m m m m m m m m r m m m m m m m m m m I /BYRES I 1 1 h I I I I I I I ASSOCIATES DESIGN COMPUTATIONS � / fCom�Jo��:at: O. /Oac %ou;e5, G,SiGc .5ci� O, S/Dcc xT;�el�;<�c:... ion Ler\ ,,_ «.6 /o G01.i::�t 71 Ov.� Lena �j t = �Z r La. C 7o 1/ V = ITS- of. �q� /k .-L 100 � G V I 1 n/ ^r- 1 I.c j 0. 9 cis C- o,s� Overlic"d Lzf, ;tk = sS' s = a. � �7o T = � v= D.a �luo- �,y min -Lloo' 490 cp \ 1 ut Project No: Co Remarks m ation b Date Project Name i 1 J Checked by Date Title/Rem V Sheet of I /BYRES ASSOCIATES DESIGN COMPUTATIONS �t :G O L- 5- , .5 1 yy� ? l IX I 1� ayy r S = y.0 CPS Too 9.00 ; r. Project No.G, — _ _ _ Remarks Computation by r Date Project Name` Checked by �R �/� Date Title/Rem Sheet of i AyRES ASSOCIATES DESIGN COMPUTATIONS 1 —fix-Ie, _h.. 1 Qoo= C. r, Q. CGc I c-ts o-, v = O. 06 O IUD0 . V= Project No. Remarks Computation by Date Project Name I Checked b Date 1 nw� y Yeti Title/item USheet of Flow in Trapezoidal Channels Swales on Basins A and D2 Given Depth Compute Discharge 1 I 4.000 I 8.246 I 0.485 I 8.0 I 2.17 I 8.67 AVRES ASSOCIATES DESIGN COMPUTATIONS F- (' Z A `4y �c Vy V 3 `j s = Z I �/O '�Y— �'(.c.r,clr1 = 87. 1 Project No. Remarks 14 ! `r a_ Computation by �2 ? Date Project Name i! i Checked by Date Title/Item Sheet of NML_CRIT.XLS Normal —Depth 12/13/94 11:44 AM Compute Normal Depth for a Trapezoidal or Triangular Channel mannings n 0.06 sideslope (_H:1 V) 5 bottom width 0 bedslope 0.21 Riprap Sizing Factor for use with Table 8.2 Fort Collins SDDC Known wetted hydraulic Computed difference: Discharge Depth Area perimeter radius discharge velocity known q -computed q VSo.17/(S.- 1)0.ea 17.06 0.76 2.90 7.77 0.37 17.06 5.88 0.00 3.24 Normal Depth = 0.76 Page 1 of 1 M M M M M M M s M M M M MMM MMMM Critical —Depth Compute Critical Depth for a Trapezoidal or Triangular Channel sideslope (_H:1 V) 3 bottom —width 1.5 bedslope 0.015 Riprap Sizing Factor for use with Table 8.2 Fort Collins SDDC Known Assumed Specific Energy Discharge Critical Depth Area Topwidth velocity Depth + V2/2g VSo.17/(SS 1)o.66 17.06 0.93 4.00 7.09 4.26 1.21 1.50 Critical De th = 0.93 Page 1 Flow in Trapezoidal Channels Channel, Side Bottom • `MaMn�ng's, Given Depth R F Slope` ;,Slo es 1Niath,"" N ` Compute Discharge ,' 0.21 3 1.5 0.06 Depth _ Area W P, R = Topwidth UefOct Q feet 3 ` ., s 1.5 9.000 10.987 0.819 10.5 9.96 89.67 n AVRES ASSOCIATES DESIGN COMPUTATIONS G v,/) P� -Fv o V1�%lon� \ Y hvc 5,86 s 9 Project No. 9 3 _ 1 03 , 0 Remarks �� -�L3 Computation by � i13 Date I,1 y 7 Project Name 1 I t7i-, tb Checked by Date Title/Item Sheet of 1 1 1 1 1 i 1 i 1 1 1 1 i I SIZE OF RIPRAP TO BE USED DOWNSTREAM FROM STILLING BASINS 4 12 6 re - • •. . 1 1 1 • 1 1 •. 1 1 1 1 1 .ME, ....MEN mirl ■■,1■....■. No ■.■■■..... .■...■.■■..■...�■.. ■ No .■...■.......■ r,.■... ..I ■■.■.■■.■... .rn.■■■■..■ ■:■■■■:■:C■::�■■■■■■■■■ME ■ .�...■..... .■'.■■■.■...■ ■■■..■...■■...� ■....■.. ■■.■■.......� .........� • ....■■■....��■ • ■ ... .■■ 1 1 11 • . . .• 1 . .. ... . its 1 . 1 9.9 .■■..■.■■....■. ■■.I,..■ ■. .■■■.■■■Ii■.■.■ ......■,I■■.■... .......■■..... ■■■..■■■�■■■ ■■■■■�■■■■■■ : mm duo MEN BOTTOM VELOCITY IN FEET PER SECOND rl('-UI!L ]G5.--Curve to delerntine Maxintum store size in rihrap mixlure. - 5000 - 4000 - 3500 F- 0 - 3000 O U- U - 2500 In U 2000 W a 0 1500 O d N (D - 1000 900 600 U) 700 z 600 O a 500 Z 400 W Z 300 FO 250 N J 200 Q U ISO W IL -100 N 75 u' O 50 I- 2 0 25 W 3 10 5 0 25 209 p MALE I S gk-j- - 01 F_ �� p \/ SWALE00 e AC PICKY yi �40' ORA GE r LOR, RIP RAP WITH 40. ORA MA \ A Q•QS9 it RL4XREi EASEME 1 / �E15FMEHi as) 04 A 1 THIS p S10 MANHOLE / tiro L N2E E/ a _e18F1 TI L „ We 2. 4�Sa -2c b ADS `e Sn As Nonvoters up4m p pRN EASEMENT I Fi A 635 T OVERFLOM BCITLE %" [0 NLAP CITY E ET 02 ' 4•AO! : F663 666 'yd 667 f.f]9i 'TYP/E 12' TYPE X 4 10.86 [1e MA•O SS --- --L 613 sale I WSTALL CMM E`6S'O Y6 9 WLET FILTER 13• RCp E EXISTING w%, M Fi /1 IOX oft 0� 5.32 cis I L. f 10y 10.2OSIS CIO Proposed change to approves Filing 2 drainage ta<Itos by TST Inc. Su Sheet 6 for siRow MULCH \ aelaile. I Ai 2 TLANS/A B •OR 53a- \ FM6 aeFO L I I 1 1 III II II See I II I I II I \ I I T INSTALL STRAW MVLGH AT TON IL .aye A 1019 \r Sep ail• It \ reposed his ye \�Carder F1683 \ �LINE 9 SWALE 54.'/e OCTO pCi0BE6 1994 90 LOPO. G G ew �E t DRAINAGE [Mf Ni % S F1699 /( 1 1 I I I I L LII I1 1��FL 899 / y I (ITO ! Huntington Hills / gA Filing No. 2 SATURN DRIVE - - - T- I Oro I I T �.,.,....�.... 11 / _ Ilaye... II 11-_ 1 L_... 'five I I 1 IDab ST efil i 1 /}v S Cag20.59eM ExsTINO Owl OR� . f_ -I,6po L F. _ l i Kore INSTALL cURs �L S / INLET FILTER V" EVSi H4 t4 125 art - INLET /6 8 I. �6 I11 Qy491 ISI 1 IEASENEN T� 1 L NM.. I 24- Aps/ri a �- le•-OVERFLOW SWALEi� / STORM 10 LePPC1TY SEWER SYSTEM 8 3.pi r_ 1 ) Q-a6L / eeee RPRAP ae e f BLANKET '` ,0i �t I I ED m: CAPACITYl jjIPY STRAW INSSWALE TALL j s 6ma ` 1A 1 _ %IJS ell CAPACITY 1 TRACT _ 4, I I � 1 g I I I 1 I L I -� \y / I I / � I I I DETENTION POND INSTALL STRAW OIRE TABLE 41 BASIN DISCHARGES - RATIONAL A 41 TARI F A 1 1ITTFO T-APAITITV Street Manning. a N Z Y 2 Slope Thearsical Capacity Hoduclian Factor PI CKUPb0 I capacity Ilelq (felt) (feet) Y (eis) (cis) Dunne Dr. O.OW IB 0.36 50 133 14 0.9 11.2 Derry Dr. O.dB Ifi ED 36 50 4.00 23 0.6 13.8 ITTI TEMPORARY ACCESS ROAD cf$ fit \ Huntington Hills P.U.D Future Filings TALL STRAW MULCH 2 i0NA/AC Coca -215 CIS \ Y EASEM ENT r EASEMENT LINE l LINE 4 1 B 1 SWALE CROSS SECTION G-G �- /0 Be OF 6• PIPRAP EACH GUTTER. .SHAPE TO FIT BORROW DITCHES, PLACE ON FILTER CLOTH, MIRAFI PLACE 6" TOP SOIL OVER RIPRAP AND SEED. SWALE AND OMd26.OScb 0� \ SWALE CROSS SECTION A -A STRAWMULCH 2 TOxSI I Y20 .59' CIS \\\ EASEMENT 1 EASEMENT LIN LIN44 I V q ... - aeo III e' 2 // d' SWALE CROSS SECTION B-6 •ye cents `E/ J90� EASEMENT �4 EASEMENT LINE LINE lllA/ ,� 5 Even Nso I YE BxfEi Ba L _. 40' SWALE CROSS SECTION C-C 44 Wy ' 0ao-914c1s 1 a 0 AN in In » Y•0.75' 1 EASEMENT I EASEMENT I LINE N I (arm) I ] IrcL a SO S. 5 0 1. 54cfs Y°6 sz /{�����r�� EASEMENT 1 E4"ta• -f EASEMENT e"ill LINE L LINE W OVERFLOW SWALE CROSS SECTION D-D a / Is Pt Y-Creo, EASEMENT EASEMENT r- 'arts L heceep. IN SWALE CROSS SECTION F-F PROPOSED SPILLWAY EC o I 10' OVERFLOW SWALE CROSS SECTION E-E BASIN A CUMULATIVE AR A RUNOFF CF CF OVERLAND FLOW AVERAGE OVERLAND OUTTEP FLOW AVERAGE GUTTER GUTTER FLOW OVERLAND TIME OF CONCENTRATION GUTTER TRAVEL TOTAL NET TIME To To RAINFALL INTENSITY I 1 PEAK DI CHARGE 0 0 'Y - - - - (cc) (as) C 2-YR 100-YR (It) (1) (it) 1Y) (fps) (min.) (min.) (min.) (min.) (min.I 0a/hrl (in./hr) Icls) left) A 1.0t 101 025 1CO 1.25 GO 2.60 383 2.00 2.1 BID 8.3 30 12.0 11.3 233 Sol 0.59 2.15 B 0.53 0.53 0.59 1.00 1,25 58 2.60 345 1ISS L33 83 62 2.7 11.0 SW 2.73 8.34 0'" 3.26 C 0.26 0.26 051 1.00 1.25 60 3.30 165 1.40 1.40 5.7 4.5 13 7.0 5,8 2.as 8.64 03e 1.43 ➢1 0.51 051 0.59 1.00 1.25 57 3,N 244 4.00 4.0 4.6 33 1.0 5.6 4.3 312 9.60 0.94 3.61 E 0.27 22T 0A9 1.00 1.25 TB 3.30 165 1.40 A2.I 6.8 5.4 1.3 0.1 6.7 2.71 8.22 0.36 1.36 D2 On 059 0,29 1.00 1.25 59 4.20 445 2DO 21 22 6.6 3,5 107 10.1 243 7.IB 042 1.54 PROJECT: HUNTINGTON HILLS- FILING 3 STANDARD FORM C SEQUENCE FOR 1994 ONLY COMPLETED BY Chris Careen DATE: 3/8/94 Indicate by use at a bar line of Symbols when erosion Control measures v II be t II a. Major moo rc01 ors too approved Schedule may reaure submitting anew schedule for approval by In Coy Engineer. JULY OVERLOT GRADING WIND EROSION CONTROL Sell Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap / Basin Inlet Friers Straw Barriers Silt Fence Seniors Sand 8091 Bare Sol Preparation Contour Furrows Terracing Asphalt / Concrete Paving VEGETATIVE Permanent Seed Planting Mulching / Sealant Temporary Seed Planting See Installation Nett ngs /.Malt / Blankets HOME CONSTRUCTION: I ENRON Convocer MAINTAPE]br 11 'o.. Contractor STRUCTURES: INSTALLED BY VEGETATION / MULCHING CiryTRACTOR' DATE SUBMITTED: 5/11/94 APPROVED BY CITY OF FOE1O _ .S wwwAN ey.aeO� 01 I Notes: I. Each lot owner Will be responsible for grOdmg end Ondin3ping as (squired by the covenantsn h e 1Storm rurrolf to the front and roar lot Jinov All foundations ore to be designed such that the finished floor oevatiormsn th e plans '• met to Mlowpolitso drainage y from the t 1 rs On II bu and driveways f 1 e to provide positive drainage Stay from the godge, 2. Topsod AA to be removed and replaced to a depth of 6" In all Arabs Inat will be disturbed by graierg. 3. Topsail stockpiled are not to exceed 6'In height. are to be aInarowed or roughened on Ibp.. and are to have A 2' berm bum round the toe Wmdrove to be HE to SW), 4. All disturbed I twing p d are to be reseeded and mulched win a mixture1 q 30 percent blue grame And 50 percent iftermedad whoolgrato dr,f d at a role of 1140 PLS/AC. and the mulch anchored s. Straw Sale dikes Are to doinstalled as Shan as the Swale has been fi l graded. 6. All little h II keep their gravel Intel tiller, which rare eadled for Filing 2, until Filing is bltol. L The details to all ovs,to utilitiesfound on The plans for Huntington Hills, Filing 2 prepared by TST. INC. July 1992. B. All storm drainage facilitiesthe public 'ght 1 aY 'llhe mbl l dby Ih City fFort Cll otherwise they are to be maintained by the pruper fy owner. �9. The developer will be reepanable 'or 31, dancer, a ro ic loen the north button per the Tremble oreegoofed by t alto construction is mplrean. T ere camr Term She' be responsible during Constructions LEGEND ODesign Point D2 Subbaaln Identification 59a Are Basin Boundary Existing Contour Proposed Contest Swale IF 72,5 First Floor Elevation � WiU US eyw US ENO C 2x0Wt IN Aron. 0 M / STRAW BAIL / / DIKE A. RIPRAP 24" ADS PIPE —\ 24' ADS PIPE I Y / MATCH EXISTING {•sAs GROUTED flIP F,lt*r Cloth SECTION A -A �_. UNEO CHANNEL IB• OF Q 1 I DWl RIPRAP I SWAIF � iT Filler Cloth I Mine 00� E m n H CIRRI WHI TOOK .. yie 3s w00 u UJ J Q r W O W a Q z Ix c� f O r Q a J J O =z ZO OZ r- � J ZLL r Z l,ilij