HomeMy WebLinkAboutDrainage Reports - 02/17/1994No Text
1
1
1
1
1
1
1
1
RCERA
January 27, 1994
Mr. Basil Harridan
Stormwater Utility
City of Fort Collins
235 Mathews Street
Fort Collins, Colorado 80524
1RCE CONSULTANTS & ENGINEERS, INC.
Engineering Group Company
Re: Huntington Hills Filing #2 (RCE Job Number 93-167)
Dear Mr. Harridan:
Enclosed is our revised Addendum to the Final Drainage and Erosion Control Report for Huntington Hills,
Filing #2. We have addressed the concerns in your January 5, 1994, letter and incorporated the changes
into this revision.
To address your concerns, we refined the HEC-2 models and performed additional analyses. First, we
confronted the conveyance change issues. In the original model, large changes in conveyance were noted
just upstream of the sanitary sewer crossing structure (Section 250) and at the upstream end of the culvert
passing under Colby Street (Section 9.2). An interpolated cross section was added halfway between
Sections 200 and 250 (Section 225). The addition of this section provided sufficient modeling detail to
eliminate the conveyance change problems at Section 250. Next, on review of the cross sections located
at the ends of the culvert crossing under Colby Street (Section 16 at the downstream end and Section 9.2
at the upstream end), the effective flow areas were modified to reflect the portion of cross section capable
of conveying water. The effective flow width at these sections was set approximately equal to the diameter
of the culvert. Split flow option in the model was used to reflect discharge actually passing through the
culvert (cfs). The analysis performed with these refinements, however, is still subject to a large conveyance
change from Section 16 to Section 9.3. This is a result of the model limitations and is unavoidable.
Examination of the detailed output indicates that the flow topwidths at Section 9.2 are identical, as are the
shapes of the effective cross section areas. The conveyance change is a result of increased depth from
Section 16 to Section 9.2, which is necessary to force the water through the culvert. Since HEC-2 has no
mechanism for modifying the effective flow area in the vertical axis, it is impossible to further refine Section
9.2 to eliminate the large conveyance change noted there. Lastly, change between Sections 9.2 and 9.3
is due to the change in flow rate between these two cross sections. The flow rate increases 55 cfs, which
is the amount which overflows the upstream side of Colby Street.
The other point of concern in your review comments regarded the cautionary statements noting that critical
depth was computed for several cross sections. Per recommendations in the HEC-2 manual, a supercritical
HEC-2 deck was built from the downstream end of the culvert to the detention pond to examine the
possibility that flow in the ditch is actually supercritical. The results of this analysis, indicate that the ditch
is not supercritical. Cautionary statements are present at nearly every cross section, indicating that the
model could not converge on a solution within 20 trials, and critical depth was assumed (as opposed to the
3665 JFK Parkway, Building 2, Suite 300 • P.O. Box 270460 • Fort Collins, CO 80527
(303) 223-5556 • Denver Metro (303) 572-1806 • FAX (303) 223-5578
Fort Collins, CO • Davis, CA • Laramie, WY
I
I
1
Mr. Basil Harridan
2
January 27, 1994
original model, in which convergence was obtained at critical depth). The supercritical model was given no
further consideration. Using the subcritical model, the critical depth was computed at each cross section.
Gose examination of the results attests to the fact that the ditch is flowing very near critical for much of its
length. It is not surprising that some sections actually reach critical depth. It is noted that the hydraulic
model is correctly computing critical depth for these sections; it is not assuming critical depth after failing
to converge on a solution. Finally, the critical depth at Section 170 is reasonable, as this section is located
at a sharp grade break where the ditch drops steeply (5 percent) into the detention pond.
If you have further questions or comments, please call.
' PRB:sp
Enclosures
C:\DATA\WP51\HAMDAN1.LTR
1
1
Sincerely,
REW RCE CONSULT NOINEERS, INC.
Paul R. Barker, P.E.
Vice President
' RCE
1
1
1
1
1
ADDENDUM
TO
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
HUNTINGTON HILLS FILING 2
Prepared for
MSP Companies
650 South Cherry Street, Suite 435
Denver, Colorado 80222
Resource Consultants & Engineers, Inc.
3666 JFK Parkway, Building 2, Suite 300
P.O. Box 270460
Fort Collins, Colorado 80527
Revised January 1994
RCE Job Number 93-167
1
1
1
1
TABLE OF CONTENTS
Paw
1.1 SCOPE AND PURPOSE.................................................1
2.1 HYDRAULIC ANALYSIS OF EXISTING CHANNEL ............................... 1
3.1 PROPOSED CHANNEL IMPROVEMENTS....................................2
4.1 HYDRAULIC ANALYSIS OF PROPOSED CHANNEL .............................5
5.1 RECOMMENDATIONS..................................................8
6.1 REFERENCES........................................................9
LIST OF FIGURES
Figure 1 Existing conditions of drainage channel along southern boundary of
project........................................................3
Figure 2 Proposed plan of drainage channel along southern boundary of project ........ 4
Figure 3 Plan of sanitary sewer crossing structure ............................... 6
Figure 4 Cross section sanitary sewer corossing structure ......................... 7
LIST OF TABLES
Table 1 Summary of Existing Drainage Channel Characteristics .................... 2
Table 2 Summary of Proposed Drainage Channel Characteristics ................... 8
i Resource Consultants & Engineers, Inc.
I
1
1
1
1
1
1
1
1.1 SCOPE AND PURPOSE
This report is an addendum to the approved "Final Drainage and Erosion Control Report for
Huntington Hills Filing 2" prepared by TST, Inc. on June 1, 1992 (fST, 1992). The report summaries the
results of drainage investigations of the drainage channel which crosses the southern portion of project
The purpose of the study is to evaluate the proposed improvements of the drainage channel
and determine if alternative construction techniques can be utilized. In addition an analysis of the
sanitary sewer crossing structure required by the South Fort Collins Sanitation District was evaluated
to determine the impacts of the structure to the floodplain elevations and velocities.
2.1 HYDRAULIC ANALYSIS OF EXISTING CHANNEL
Detailed cross sections of the channel were surveyed from the existing detention pond to Colby
Street. The existing drainage channel had two distinct reaches. The upper reach is characterized by
a 2- to 10-foot-wide channel with sideslopes that range from 3 to 1 to 6 to 1. The channel has an
average bed slope of 3.3 percent and is heavily overgrown with vegetation, including trees and shrubs.
This reach extends from Colby Street to the stormdrain outfall at Brinn Court The Manning's n value
for this reach is estimated at 0.080. The lower reach is characterized by a 7- to 10-foot wide channel
with sideslopes that range from approximately 3 to 1 to 10 to 1. The channel has an average bed slope
of 2.7 percent and is lined with a good stand of grasses. This reach extends from the stormdrain outfali
structure at Brinn Court to the detention pond. The Manning's n value for this reach is estimated at
0.045. At the upstream limit of this channel, there is a 42-inch culvert which crosses under Colby Street
The pipe is 69 feet long and has flared end sections at both ends.
The topographic data collected from the field was reduced and used for input data to the U.S.
Army Corp of Engineers HEC-2 step backwater curve analysis program (USCOE, 1982) to determine
the flooding elevation and velocities in the existing drainage channel for the 100-year flood event Flow
rates used in the HEC-2 program were directly from the TST report (TST, 1992). The starting water
surface elevation was 4941 feet, the maximum water surface elevation in the detention pond. Table 1
summarizes the results of the HEC-2 run of the existing conditions and a copy of the HEC-2 output
results is enclosed in Appendix A. The depth of flow ranged from 1.2 to 3.3 feet and the velocities
ranged from 1.3 upstream of the Colby Street culvert to 6.6 feet per second (fps) at cross section 2.
Not all of the drainage flow upstream of the Colby Street goes through the culvert The split flow option
in the HEC-2 model was used to determine the amount of water flowing through the culvert and how
much overflows the street. Approximately 101 cts goes through the culvert and the remainder overflows
the culvert and flows down Colby Street to the south. It will overflow the east side of Colby Street near
lot 108 and return to the drainage channel near cross section 7.
Resource Consultants & Engineers, Inc.
I
1
[J
Table 1.
Summary of Existing
Drainage Channel Characteristics.
100 Year
Cf 453ItSW8fo
.
.. Waker
ire
V�
5:.................
cfs ...
Su
:.:..........
G
1
213
4941.0
3.4
2.3
2
213
4943.0
2.4
6.6
3
213
4945.6
2.5
4.9
4
160
4948.5
1.9
5.8
5
160
4951.5
1.5
5.2
6
156
4954.2
2.0
3.9
7
156
4957.2
2.2
3.5
8
101
4961.2
3.3
5.7
9
101
4965.8
2.6
5.1
9.1
101
4967.1
3.0
5.6
9.2
101
4971.4
5.3
5.5
9.3
156
4972.0
5.4
1.3
Figure 1 shows the location of the drainage channel, flooding limits, and locations of cross
sections. As shown on the figure, the flooding limits extend onto lots 108, 122, and 123.
3.1 PROPOSED CHANNEL IMPROVEMENTS
In the TST report (TST, 1992), the entire length of the drainage channel was proposed to be
regraded. From the hydraulic analysis of the existing channel, the lower reach does not need regrading.
The channel is in good condition with an established vegetation cover. Maximum velocity in this reach
was 6.6 fps at cross section 2. This velocity is less than the maximum permissible velocity allowed of
7 fps for soils that are erosion -resistant soils having a slope of less than 5 percent.
The remainder of the channel (upper reach) will require removal of the trees and shrubs and
realignment to remove the floodplain from the platted lots. The channel proposed by TST (5-foot bottom
width and 5 to 1 sideslopes) was used for the upper reach of drainage channel. The drainage channel
was moved to south of lots 122 and 123 and moved to the north of lot 108 to keep the floodplain within
Tract A (see Figure 2).
2 Resource Consultants & Engineers, Inc.
r-------------
I
i
121
\ 122
\ (Z) \ \�
\
I
I
i
I
I
1d
I
ss Section
)dplain Limits
Inage Channel
ter Line
131
n
/ / \ Col"
\/ S
123 / \
129 /
/ 128
11 127
124
\ I
/ 139 \
—_� 126
/ s M
ewer a
140 /
125
\
\ 108
\\
\
��\\ /
141
\
Floodplain
1
Limits
\ /
II
107
\
/
\v/ /
h
L--------------
\
A
I \ \
I \ �
106 \\ w Tract
A..
I _ \
L— — — — — — — — — — — — — — — — — 1 ------------------
Sewer Main
142
c° / 145 /1
J � /
1
\ /
\ 144 /
I /
143 /
1
l
1.
— — — — — — — ---J I
--------- -- --
Detention
Pond
Figure 1. Existing conditions
of drainage channel
along southern
boundary of project.
N
r--------- \
)rap i \\ \ 131
cture
121 \ /
130 /
/
129
128
\ --
\ 122
123 / 1I 127
// 139
126
124
Place Fill as / \
Necessary to / y
provide I' of / Sewer Main
\ \ New Drainage \ \ / \ freeboard / 140 /
\ Channel, see ^ \ / /
�\ \ 125
Detail Below / \ � \\ / \\ /.
Fill to /
El, 4951.8 \ /
:GETATE WITH
.AND GRASSES
108 \\ \ \ \\ / 141 \ a'
Fill to / T
econstruct and Realign \ — \ \\ El. 4949.6
rainage Channel
"am 50' Downstream \
f Brinn Court Outfall
142
tructure to Colby
treet Culvert I \ \ / / Grose Back of
Lots to Drain
Floodplain \ /:
) CHANNEL I I 107 \\ Limits
I /Fill to
I \\ \ \ I. '4946.1
1 — - - - - - - - - - - - -
I --A \, i
I
i \
d I I 106 \\ a Tract
A"Section I I \
plain Limits I \
age Channel
r Line
Sewer Main
o /
1/4
/ 145
\ /
� 144 /
I /
i
143 /
Fill to / Fill to
EI. 4 44 0
/ / Fill to El. 4944.6 /X
tO El. 4945.1
haq
Sewer
Crossing
Structure
x
Detention
Pond
Figure 2. Proposed plan of
drainage channel
along southern
boundary of project.
I
'
Due to elevation problems with the sanitary sewer and drainage channel the South Fort Collins
Sanitation District required a special drainage channel crossing structure. The negotiated structure is
'
shown in Figures 3 and 4. This structure is a basic 0.5-foot drop structure with a concrete cap over
the sanitary sewer pipe.
1
Due to a location conflict with a 100-pair telephone cable at the Colby Street outlet structure,
'
the culvert was extended 16 feet downstream. The outlet structure will be constructed at the end of the
culvert as planned.
'
4.1 HYDRAULIC ANALYSIS OF PROPOSED CHANNEL
1
The
input data for the HEC•2 program were revised for the channel improvements described
above. Table 2 summarizes the results of the HEC-2 run of the proposed conditions and a copy of the
HEC-2 output results is enclosed as Appendix B. The upper reach of channel flows near critical depth
for most of the reach and has a depth of water less than 2 feet with velocities in the range of 6 fps. The
'
flooding limits are contained within the channel. Again, a split flow analysis within the HEC-2 model was
used to determine the amount of water flowing through the culvert and the amount which overflows
'
Colby Street. The additional length of culvert at Colby Street did not affect the amount of flow through
the culvert; 101 cfs still flows through the culvert. The restriction of flow through the culvert is due to
the upstream entrance configuration. The overflow returns to the channel near cross section 12. In the
lower
reach of the drainage channel the floodplain elevation was increased near the sanitary sewer
crossing structure (Figure 1). Velocities exceeded 7 fps only at the downstream limit of the drop
'
structure.
' Figure 2 presents the location of the proposed drainage channel, floodplain limits, channel
construction details, and location of cross sections.
' Due to the realignment of the upper reach of channel and the extension of the culvert 16 feet
' downstream, the radius of the bend in the channel downstream of the Colby Street outfall structure is
less than previously prepared. The new radius will be approximately 75 feet. The superelevation of the
water in the channel is 0.34 feet in this bend. Since this is a short radius bend the outside of the bend
' will be lined with riprap for a length of 30 feet. The minimum riprap size (D.� should be 9 inches.
1
1
5 Resource Consultants & Engineers, Inc.
R
m
9
3
i L. 43.9
GROUTED
RIPRAP i
EL. 43.9
I—►
7' I Sanitary
Sewer
Ce3
2-1 i
M
/
EL. 43.9
6'
2:1
on5
EL. 40 9
10
Weep Holes
co / 00)
L. 40.4
76'
la
7'
Figure 3. Plan of sanitary sewer crossing structure.
EL. 43.9
V
Extend New FIII Upstream •
0.5X Slope (Approx. 25 Feet) 5'
Reseed Disturbed Areas.
6' New FIII
050- V Grouted Riprop
Existing Flowlins at S.
Drainage Way
P.E. Bond Breaker 4•r
I
12,
L
3'
3' 23'
EL. 40.9
24'
1 3 1� �EL. 40.4
�I Compacted FIII
Concrete Cap
8* Sever Pipe
— Granular Bedding
— Stabilization Material
(if necessary)
Figure 4. Cross section sanitary sewer crossing structure.
Fabric
Existing Flowlins of
Drainage Way
1
1
1
1
5.1 RECOMMENDATIONS
Considering the Investigations conducted the following recommendations are provided:
1. The upper reach of drainage channel, Colby Street to Brinn Court outfall, should be
reconstructed to a grassed -lined channel with a 5-foot bottom width, maximum sideslopes of
5 to 1, and 3 feet depth (2-foot water depth, 1-foot freeboard.) In addition, the channel should
be realigned to keep the channel totally contained in Tract A
2. The lower reach of the drainage channel should not be reconstructed, but left in its natural
state.
8 Resource Consultants & Engineers, Inc.
1
1
1
1
1
1
1
3. Riprap should be placed In the bend downstream of the Colby Street outlet structure. The
minimum riprap size (D.0 should be 9 inches and extend downstream at least 30 feet.
4. The sanitary sewer crossing structure will raise the floodplain in the area of the structure. Fill
should be placed on the property line of the lots to keep the flooded water with 1 foot of
freeboard contained in Tract A.
6.1 REFERENCES
TST, Inc., 1992, "Final Drainage and Erosion Control Report for Huntington Hills Filing 2," Presented to
the City of Fort Collins, June 1.
U.S. Army Corp of Engineers, 1982. "HEC-2, Water Surface Profiles, Users Manual," Hydrologic
Engineering Center, Water Resources Support Center, Davis, California.
9 Resource Consultants & Engineers, Inc.
' APPENDIX A
Existing Channel HEC-2 Output
1
1
1
1
1
1
1
1
1
1
1
1
1
0
ARh*kRh*d*hk#ktA*AkAk*htAhh*kd**dh***kA**#**
* NEC-2 WATER SURFACE PROFILES
R p
* Version 4.6.2; May 1991
h h
* RUN DATE 26JAN94 TIME 18:04:02
#k***k##AAk**hh*hAh*hhdd*Ahdhh**hh#Ahhhh*Ahh
x x
XXXXXXX
xxxxx
xxxxx
x x
x
x
x
x x
x x
x
x
x
XXXXXKX
xxxx
x
XXxxx
)DODO(
x x
x
x
x
x x
x
x
x
x
x x
xxxxxx
( xxxxx
xxxxxxx
*#*#to***#A*##**At*AAttt**#fA****##k
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* 609 SECOND STREET, SUITE D
* DAVIS, CALIFORNIA 95616-4687
* (916) 756-1104
1
1
1
1
26JAN94 18:04:02
BEC-2 WATER SURFACE PROFILES
Version 4.6.2; May 1991
a*kAAAh*****AkAAR*#***kkkpp*p#***AAAb
SPLIT FLOW BEING PERFORMED
SF SPLIT FLOW -- OVERFLOW FROM CULVERT
JC
JP 0 0 0 1 0
TW WIER ALONG ROAD AND SOUTHERN PROPERTY
WS 4 9.2 9.3 7 2.5
WC 100 4974.3 160 4971.1 180 4971.1 181 4975.
PAGE 1
THIS RUN EXECUTED 26JAN94 18:04:02
26JAH94 18:04:02 PAGE 2
T1
HUNTINGTON HILLS FILING 2
T2
Resource Consultants and Engineers
T3
SOUTH DRAINAGE
CHANNEL
'
T4
Original Ditch Conditions
J1
ICHECK INQ
NINV IDIR
STRT
METRIC
HVINS
Q
WSEL
FQ
'
2
4941.0
JS
**********ASSUMED
DISCHARGES FOR
SPLIT FLOW**********
40
'
J2
NPROF IPLOT
PRFVS XSECV XSECH
FN
ALLDC
IBW
CHNIM
ITRACE
1
'
QT
1 213
NC
.060 .060
.045
.1
.3
X1
1 8
44.1
62.5
0
0
0
GR
4939.9 0
4939
44.1
4937.6
50.7
4937.6
60
4939.2
62.5
GR
4939.2 62.7
4941.4
72.5
4941.9
97
'
X1
2 12
45
73
92
92
92
-100
GR
5043.2 0
5044.2
35
5043.9
45
5041.6
53
5041.0
57
GR
5040.6 59
5041.1
64
5042.0
67
5042.6
70
5043.9
73
GR
5044.6 82
5042.7
116.
X1
3 8
54
103.2
105
120
115
-100
GR
5046.3 53
5046.3
54
5044.2
71
5043.1
75.5
5043.4
78.3
'
GR
5043.5 81.4
5044.1
86.3
5047.7
103.2
QT
1 60
'
X1
4 10
4 10
30.8
86.9
140
145
141
-100
GR
5049.8 30
5049.8
30.8
5048.2
47.4
5046.6
56.7
5046.7
60.5
GR
5046.6 63.1
5047.7
66.1
5050.3
86.9
5049.7
126
5051.2
158.9
X1
5 9
38.9
72.3
118
109
115
-100
GR
5052.5 38
5052.5
38.9
5050
51.6
5050
59.4
5050
64.7
'
GR
5051.7 72.3
5053.5
92.2
5052.4
110.7
5054
152.1
QT
1 156
NC
0.065 0.065
0.080
'
X1
6 8
49.6
113.6
90
95
92
-100
GR
5054.4 0
5054.8
49.6
5053.5
62.7
5052.3
70
5052.2
74
GR
5052.2 77.4
5053.3
84.4
5058.5
113.6
'
X1
7 9
51.6
95
104
111
110
-100
GR
5057.9 51
5057.9
51.6
5057
60.9
5055.1
67.5
5055
74.7
'
GR
5055.1 79.9
5058.6
95
5060.3
125
5063.1
144.5
26JAN94 18:04:02
X1
8
8
61.9
66.1
120
104
111
GR
5062.4
39
5062.4
39.7
5060.6
55.3
5060.1
'
GR
5058
64.2
5060.7
66.1
5062.2
100
X1
9
6
24.4
37.4
88
85
87
'
GR
GR
5069.9
5067.4
0
52.3
5066
24.4
5063.2
27.3
5063.5
NC
.3
.5
X1
9.1
6
105
111.1
27
27
27
X3
30
0
0
105
111.1
OR
4966
100
4964.9
105
4964.1
105.1
4964.1
'
GR
4966
116
SC
1.013
0.10
2.6
10
3.5
0
69
X1
9.2
4
100
145
69
69
69
X2
2
4969.6
4978
0
'
X3
10
131
134.5
GR
4972
100
4956.1
130
4966.1
136
4972
'
X1
9.3
4
100
145
20
20
20
X3
10
111
155
GR
4972.5
100
4966.6
130
4966.6
136
4972.5
PAGE 3
-100
61.9 5057.9 62.5
-100
31.6 5065.9 37.4
111 4964.9 111.1
1.2 4966.1 4964.1
145
145
I
' 26JAN94 18:04:02
'
SECNO DEPTH CWSEL
CRIWS
WSELK
EG
BV
HL
OLOSS
L-BANK ELEV
Q QLOB QCH
QROB
ALOE
ACH
ARDS
VOL
TWA
R-HANK ELEV
TIME VLOB VCH
VROB
XNL
XNCH
XNR
WIN
ELMIN
SSTA
'
SLOPE XLOBL XLCH
XLOBR
ITRIAL
IDC
ICONT
CORAR
TOPWID
ENDST
*PROF 1
'
CCHV= .100 CEHV= .300
*SECNO 1.000
3280 CROSS SECTION 1.00 EXTENDED
1.10 FEET
'
1.000 3.40 4941.00
.00
4941.00
4941.06
.06
.00
.00
4939.00
213.0 76.6 130.3
6.1
68.4
55.9
7.6
.0
.0
4939.20
.00 1,12 2.33
.10
.060
.045
.160
.010
4131*60
.001180 0. 0.
0.
0
0
0
.00
70.72
.00
70.72
*SECNO 2.000
3265 DIVIDED FLOW
'
3280 CROSS SECTION 2.00 EXTENDED
.31 FEET
3301 HV CHANGED MORE THAN HVINS
3685 20 TRIALS ATTEMPTED WSEL,CWSEL
3693 PROBABLE MINIMUM SPECIFIC
ENERGY
'
3720 CRITICAL DEPTH ASSUMED
2.000 2.41 4943.01
4943.01
.00
4943.68
.67
.29
.18
4943.90
'
213.0 .0 212.0
.00 .00 6.57
1.0
1.11
.0
.000
32.3
.045
.9
.060
.2
.000
.1
4940.60
4943,90
48.08
.025808 92. 92.-
92.
20
19
0
.00
28.47
116.00
'
*SECNO
3.000
3.000 2.49 4945.59
.00
.00
4945.96
.36
2.25
.03
4946.30
213.0 .0 213.0
.0
.0
44.0
.0
.3
.2
4947.70
t
.01 .00 4.85
.00
.000
.045
.000
.000
4943.10
59.69
.015329 105. 115.
120.
2
0
0
.00
33.64
93.33
'
*SECNO
4.000
7185 MINIMUM SPECIFIC ENERGY
3720 CRITICAL DEPTH ASSUMED
'
4.000 1.85 4948.45
4948.45
.00
4948.97
.52
2.82
.05
4949.80
160.0 .0 160.0
.0
.0
27.7
.0
.4
.3
4950.30
.02 .00 5.78
.00
.000
.045
.000
.000
4946.60
44.83
.030535 140. 141.
145.
3
19
0
.00
27.25
72.08
PAGE 4
1
26JAN94 18:04:02
' SECNO
DEPTH
CWSEL
CRIWS
WSELK
EG
Q
QLOB
QCH
QROB
ALOE
ACE
TIME
VLOB
VCH
VROB
XNL
XNCH
SLOPE
XLOBL
XLCH
XLOBR
ITRIAL
IDC
'
*SECNO 5.000
5.000
1.51
4951.51
.oc
160.0
.0
160.0
.0
.02
.00
5.22
.oc
.021972
118.
115.
109.
*SECNO 6.000
'
6.000
2.04
4954.24
.00
156.0
.0
156.0
.0
.03
.035352
.00
90.
3.86
92.
.01
95.
'
*SECNO 7.000
7.000
2.24
4957.24
.00
156.0
.0
156.0
.0
.04
.00
3.45
.00
'
.021026
104.
110.
111.
*SECNO 8.000
7185 MINIMUM SPECIFIC
ENERGY
3720 CRITICAL DEPTH ASSUMED
8.000
3.33
4961.23
4961.23
100.8
33.6
60.1
7.1
.05
4.49
5.74
2.27
.058874
120.
111.
104.
*SECNO 9.000
'
9.000
2.56
4965.76
.00
100.8
.0
100.8
.0
.05
.00
5.06
.00
'
.046066
88.
87.
85.
CCHV- .300
CEHV=
'
*SECNO 9.100
.500
3280 CROSS SECTION
9.10 EXTENDED
1
.00 4951.93
.0 30.6
000 .045
4 0
.00 4954.47
.0 40.4
000 .080
3 0
.00 4957.43
.0 45.3
000 .080
3 0
.00 4961.64
7.5 10.5
065 .080
5 8
.00 4966.16
.0 19.9
000 .080
4 0
1.04 FEET
HV
HL
OLOSS
L-HANK ELEV
AROB
.VOL
TWA
R-BANK ELEV
XNR
WTN
ELMIN
SSTA
ICONT
CORAR
TOPWID
ENDST
.42
2.96
.01
4952.50
.0
.5
.4
4951.70
000
.000
4950.00
43.93
0
.00
27.51
71.45
.23
2.52
.02
4954.80
.0
.5
.4
4958.50
000
.000
4952.20
55.22
0
.00
34.46
89.69
.18
2.95
.00
4957.90
.0
.7
.5
4958.60
000
.000
4955.00
58.39
0
.00
30.75
89.14
.42
3.33
.07
4960.10
3.1
.7
.6
4960.70
065
.000
4957.90
49.88
0
.00
28.10
77.97
.40
4.52
.00
4966.00
.0
.8
.6
4965.90
000
.000
4963.20
24.65
0
.00
12.40
37.06
3470 ENCROACHMENT STATIONS= 105.0 111.1 TYPE= 1 TARGET= 6.100
1
1
PAGE 5
' 26JAN94 18:04:02
tSECNO
DEPTH
CWSEL
CRIWS
WSELK
EG
HV
HL
OLOSS
L-BANK ELEV
Q
QLOB
QCH
QROB
ALOB
ACH
AROB
VOL
TWA
R-BANK ELEV
TIME
VLOB
VCH
VROB
XNL
XNCH
XNR
WIN
ELMIN
SSTA
SLOPE
XLOBL
XLCH
XLOBR
ITRIAL
IDC
ICONT
CORAR
TOPWID
ENDST
3495 OVERBANK AREA ASSUMED NON -EFFECTIVE, ELLEA- 4964.90 ELREA= 100000.00
9.100 2.95 4967.05
.00
.00 4967.54
.49
1.33
.05
4964.90
'
100.8 .0 100.8
.0
.0 17.9
.0
.8
.6
100000.00
.05 .00 5.64
.00
.000 .080
.000
.000
4964.10
105.00
.052952 27. 27.
27.
2 0
0
.00
6.10
111.10
'
SPECIAL CULVERT
SC CUNO CUNV ENTLC
COFQ
RDLEN RISE
SPAN
CULVLN
CHRT
SCL
1 .013 .10
2.60
10.00 3.50
.00
69.00
1
2
'
CHART 1 - CONCRETE PIPE CULVERT;
NO BEVELED RING ENTRANCE
SCALE 2 - GROOVE END ENTRANCE WITH HEADWALL
'
*SECNO 9.200
SPECIAL CULVERT INLET CONTROL
'
EGIC = 4971.842 EGOC = 4971.337
PCWSE= 4967.047 ELTRD= 4978.000
SPECIAL CULVERT
'
EGIC EGOC H4
QWEIR
QCULV VCH
ACULV
ELTRD
WEIRLN
4971.84 4971.34 4.30
0.
101. 5.447
9.6
4978.00
0.
3470 ENCROACHMENT STATIONS=
131.0
134.5 TYPE= 1
TARGET=
3.500
3495 OVERBANK
AREA ASSUMED NON -EFFECTIVE,
ELLEA= 100000.00
ELREA=
100000.00
9.200 5.28 4971.38
.00
.00 4971.84
.46
4.30
.00
100000.00
'
100.8 .0 100.8
.0
.0 18.5
.0
.8
.6
100000.00
.05 .00 5.45
.00
.000 .080
.000
.000
4966.10
131.00
'
.059727 69, 69,
69.
2 0
0
.00
3,50
134.50
*SECNO 9.300
3302 WARNING: CONVEYANCE CHANGE
OUTSIDE
OF ACCEPTABLE RANGE,
KRATIO =
12.12
3470 ENCROACHMENT STATIONS=
111.0
155.0 TYPE= 1
TARGET=
44.000
PAGE 6
ELCHU ELCED
4966.10 4964.10
1
' 26JAN94 18:04:02
' SECNO
DEPTH
CWSEL
CRIWS
WSELK
EG
HV
HL
OLOSS
L-BANK ELEV
Q
QLOB
QCH
QROB
ALOB
ACH
AROB
VOL
TWA
R-HANK ELEV
TIME
VLOB
VCH
VROB
XNL
XNCH
XNR
WTN
ELMIN
SSTA
SLOPE
XLOBL
XLCH
XLOBR
ITRIAL
IDC
ICONT
CORAR
TOPWID
ENDST
3495 OVERBANK AREA ASSUMED NONEFFECTIVE, ELLEA- 100000.00 ELREA-
9.300
5.39
4971.99
.00 .00
4972.02
.03
'
156.0
.0
156.0
.0 .0
121.5
.0
.06
.00
1.28
.00 .000
.080
.000
.000975
20.
20.
20. 2
0
0
1
4972.50
.05 .13 100000.00
.9 .6 4972.50
.000 4966.60 111.00
.00 33.22 144.22
PAGE 7
26JAN94 18:04:02
TW WIER ALONG ROAD AND SOUTHERN PROPERTY
ASQ QCOMP ERRAC TASQ TCQ TABER NITER DSWS USWS DSSNO USSNO
55.24 55.25 .01 55.24 55.25 .01 10 4971.842 4972.018 9.200 9.300
PAGE 8
' PROFILE FOR STREAM SOUTH DRAINAGE CHANNEL
'
PLOTTED POINTS
(BY PRIORITY) E-ENERGY,W-WATER SURFACE, I -INVERT, C-CRITICAL W.S.,L-LEFT BANK,R-RIGHT BANK,M-LOWER END STA
1
ELEVATION
4938.
4943. 4948. 4953. 4958. 4963. 4968. 4973. 4978. 4983.
'
SECNO
CUMDIS
1.00
0.
I
L M E ,
10.
CI
LM E
'
20.
CI
LME ,
30.
C I
L WE.
40.
C
I L E. ,
50.
C
I LWE
'
60.
C
I MWE .
70.
C
I MWE
'
0.
90.
C
C
I MWE
I MWE .
2.00
100.
I MWEL
110.
C
I .W E
120.
C
I .MWER
130.
C
I WELR .
140.
C
I WER
150.
C
I WELR _
'
160.
C
I. WE R • .
170.
C
I. WELR
180.
C
I. WEL R
'
190.
C
I WE R.
200.
C
I WEL R.
3.00
210.
C
.I WE R
'
220.
C
.I WEL .R
230.
C
I WE .R .
240.
C
Z WEL.R ".
250.
C
I EL. R
'
260.
C
I WEL R
270.
C
I WEL R
280.
C
I WEL R
'
290.
C
I WEL R
300.
C
I WEL R
310.
C
I WEL R
320.
C
I WE LR
'
330.
C
I .WEL R .
340.
C
I .WE LR
'
4.00
350.
360.
C
I . WELR
I. WE LR
370.
C
I. WELR
380.
C
I WE L
'
390.
C
I WEL
400.
C
.I WE L
410.
C
I WEL
420.
C
I WERL
'
430.
C
I WEL . .
440.
C
I WERL.
40.
C
I WEL.
'
460.
C
I E L .
5.00
470.
C
I WEL
I
1
1
1
1
1
1
1
1
1
u
480.
C
I WEL ,
490.
C
I WEL ,
500.
C
I EL R
510.
C
I WEL R
520.
C
I .EL R
530.
C
I .WEL R
540.
C
I WE R.
550.
C
I. EL R
6.00
560.
C
I. WE R ,
570.
C
I EL R ,
580.
C
I WEL R ,
590.
C
.I EL R
600.
C
,I WEL R ,
610.
C
I EL R
620.
C
I EL R ,
630.
C
I WE R
640.
C
I EL. R
650.
C
I WE. R
660.
C
I EL R ,
7.00
670.
C
I WELR
680.
C
I ELR
690.
C
I .EMR ,
700.
C
I .WEB ,
710.
C
I WER
720.
C
I ER
730.
C
I LEM
740.
C
I LWEM
750.
C
I. LWEM
760.
C
I LRE M .
770.
C
I LWEM .
8.00
780.
.I LRWEM.
790.
C
I LRWEM ,
800.
C
I LWE M ,
810.
C
I LWE M
820.
C
I LWE M ,
830.
C
I WE M
840.
C
I LE M
850.
C
I. LE M ,
860.
C
I E M. ,
9.00
870.
C
.I WE M
880.
C
I LWEM.
9.10
890.
C -.
I L M WE
900.
C
I MWE
910.
C
I MWE ,
920.
C
I MWE ,
930.
C
I WE ,
940.
C
I WE
950.
C
I WE
9.20
960.
C
I EM.
970.
C
I WE,
9.30
980.
C
I ER
R
R
L
L
L
L
L
L
L
L
L
' 26JAN94 18:04:02
1
' Addb*h*hhhkddk*hkxd**bbhhh*xhkxb***b*
HEC-2 WATER SURFACE PROFILES
' Version 4.6.2; May 1991
*hhwx*xxx*hh**kdxk*Ahh**AhhA#hhhhh*x*
PAGE 9
THIS RUN EXECUTED 26JAN94 18:04:05
NOTE- ASTERISK (*) AT LEFT OF CROSS-SECTION NUMBER INDICATES MESSAGE IN SUMMARY OF ERRORS LIST
' SOUTH DRAINAGE CHANNEL
SUMMARY PRINTOUT TABLE 150
1
*
1
A
*
1
1
d
1
SECNO
XLCH
ELTRD
ELLC
ELMIN
Q
CWSEL
CRIWS
EG
10*KS
1.000
.00
.00
.00
4937.60
213.00
4941.00
.00
4941.06
11.80
2.000
92.00
.00
.00
4940.60
213.00
4943.01
4943.01
4943.68
258.08
3.000
115.00
.00
.00
4943.10
213.00
4945.59
.00
4945.96
153.29
4.000
141.00
.00
.00
4946.60
160.00
4948.45
4948.45
4948.97
305.35
5.000
115.00
.00
.00
4950.00
160.00
4951.51
.00
4951.93
219.72
6.000
92.00
.00
.00
4952.20
156.00
4954.24
.00
4954.47
353.52
7.000
110.00
.00
.00
4955.00
156.00
4957.24
.00
4957.43
210.26
8.000
111.00
.00
.00
4957.90
100.76
4961.23
4961.23
4961.64
588.74
9.000
87.00
.00
.00
4963.20
100.76
4965.76
.00
4966.16
460.66
9.100
27.00
.00
.00
4964.10
100.76
4967.05
.00
4967.54
529.52
9.200
69.00
4978.00
4969.60
4966.10
100.76
4971.38
.00
4971.84
597.27
9.300
20.00
.00
.00
4966.60
156.00
4971.99
.00
4972.02
9.75
VCH
AREA
.01
2.33
131.87
62.
6.57
33.17
13.
4.85
43.96
17.
5.78
27.69
9.
5.22
30.65
10.
3.86
40.41
B.
3.45
45.27
10.
5.74
21.06
4.
5.06
19.89
4.
5.64
17.87
4.
5.45
18.50
4.
1.28
121.46
49.
' 26JAN94 18:04:02
' SOUTH DRAINAGE CHANNEL
SUM ARY PRINTOUT TABLE 150
1
w
1
n
1
SECNO
Q
CWSEL
DIFWSP
DIFWSX
DIFWSS
TOPWID
XLCH
1.000
213.00
4941.00
.00
.00
.00
70.72
.00
2.000
213.00
4943.01
.00
2.01
.00
28.47
92.00
3.000
213.00
4945.59
.00
2.58
.00
33.64
115.00
4.000
160.00
4948.45
.00
2.85
.00
27.25
141.00
5.000
160.00
4951.51
.00
3.06
.00
27.51
115.00
6.000
156.00
4954.24
.00
2.73
.00
34.46
92.00
7.000
156.00
4957.24
.00
3.00
.00
30.75
110.00
8.000
100.76
4961.23
.00
3.98
.00
28.10
111.00
9.000
100.76
4965.76
.00
4.54
.00
12.40
87.00
9.100
100.76
4967.05
.00
1.28
.00
6.10
27.00
9.200
100.76
4971.38
.00
4.33
.00
3.50
69.00
9.300
156.00
4971.99
.00
.61
.00
33.22
20.00
PAGE 10
' 26JAN94 18:04:02
1
SUMMARY OF ERRORS AND SPECIAL NOTES
CAUTION
SECNO=
CAUTION
SECNO=
CAUTION
SECNO=
CAUTION
SECNO=
'
CAUTION
SECNO=
CAUTION
SECNO=
' CAUTION SECNO=
WARNING SECNO=
1
1
1
1
1
1
1
1
2.000 PROFILE= 1 CRITICAL DEPTH ASSUMED
2.000 PROFILE= 1 PROBABLE MINIMUM SPECIFIC ENERGY
2.000 PROFILE= 1 20 TRIALS ATTEMPTED TO BALANCE WSEL
4.000 PROFILE= 1 CRITICAL DEPTH ASSUMED
4.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
8.000 PROFILE= 1 CRITICAL DEPTH ASSUMED
8.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
9.300 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE
PAGE 11
APPENDIX B
Proposed Channel HEC-2 Output
' Note: Cross section label numbers 3 through 16 were multiplied by 100 and
9.1 through 9.3 were multiplied by 1,000 to provide Increasing cross
section numbers. This is required in the HEC-2 model when the split
' flow option is used.
1
1
1
1
1
pwhphppk*Ahhh*fih##kh**fipkfihfihfifiphrt#A##kh#hnp
* HEC-2 WATER SURFACE PROFILES
k p
* Version 4.6.2; May 1991
w p
* RUN DATE 26JAN94 TIME 16:19:34
*bdfi*##hhdAfirth##hh*hh**fid##wh###hhh#phhhdhhh
x x
xxxxm
xxxxx
X)O=
x x
x
x
x
x x
x x
x
x
x
xxxxxxx
xxxx
x
xxxxx
xxm
x x
x
x
x
x x
x
x
x
x
x x
xxxxm
xxxxx
xxxxxxx
*#hhpkkwhM1M1prtM1kh#AAfiAAApkhk#Ahp*****
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* 609 SECOND STREET, SUITE D
* DAVIS, CALIFORNIA 95616-4687
* (916) 756-1104
fih*h*#*hhh#hhd*bh#bhfi *hhAh#kwAAAhAAw
1
26JAN94 16:19:35
THIS RUN EXECUTED 26JAN94
#A*k#*#A*hk*kkAAM1##k#kh*hAh#*b*#bh#bh
HEC-2 WATER SURFACE PROFILES
Version 4.6.2; May 1991
*****A*AA*A#A*kbhA#*h**Akk#k*Ak*#**#A
SPLIT FLOW BEING PERFORMED
SF SPLIT FLOW -- OVERFLOW FROM CULVERT
JC
JP 0 0 0 1 0
TW WIER ALONG ROAD AND SOUTHERN PROPERTY
WS 4 9200 9300 1200 2.5
WC 100 4974.3 160 4971.1 180 4971.1 181 4975.
PAGE 1
16:19:35
'
26JAN94
16:19:35
'
T1
HUNTINGTON HILLS
T2
Resource Consultants and Engineers
T3
South
Drainage Channel
'
T4
Upstream Channel
Improvement and Drop Structure at Sanitary Sewer
J1
ICHECK
INQ NINV
IDIR STRT
METRIC
HVINS
Q
'
2
JS
**********ASSUMED DISCHARGES
FOR SPLIT FLOW**********
'
40
J2
NPROF
IPLOT PRFVS
XSECV XSECH
FN
ALLDC
IBW
-1
-1
-1
QT
1
213
NC
0.06
0.06
0.045
0.1
0.3
X1
1
8
44.1
62.5
0
0
0
GR
5039.9
0
5039
44.1
5037.6
50.7
5037.6
'
GR
5039.2
62.7
5041.4
72.5
5041.9
97
'
X1
GR
170
5044.4
11
34
54.2
5044.4
82.1
35
60
5043.9
60
54.2
60
5041.6
GR
5040.6
68.5
5041.1
73.1
5042
75.9
5042.6
GR
5044.6
91
,
X1
180
7
58
76
5
5
5
GR
5043.8
38
5043.4
58
5040.4
64
5040.4
GR
5043.5
81
5045
84
'
X1
190
7
58
76
5
5
5
GR
5043.8
38
5043.4
58
5040.4
64
5040.4
GR
5043.5
81
5045
84
1
X1
195
9
58
76
3
3
3
GR
5043.8
38
5043.4
58
5041.4
62
5040.9
'
GR
5041.4
72
5043.4
76
5043.6
80
5045
'X1
200
9
58
76
5
5
5
GR
5043.8
38
5043.4
58
5041.4
62
5040.9
GR
5041.4
72
5043.4
76
5043.6
80
5045
PAGE 2
WSEL FQ
4941.0
CHNIM ITRACE
-100
60 5039.2 62.5
-100
62 5041 65.6
78.8 5043.9 82.1
-100
70 5043.4 76
-100
70 5043.4 76
-100
63 5040.9 71
84
-100
63 5040.9 71
84
' 26JAN94 16:19:35 PAGE 3
'
XL
225
9
56
76
11
11
11
-100
GR
5044.0
38
5043.6
56
5041.6
60
5041.1
61
5041.1
71
'
GR
5041.6
72
5043.6
76
5043.6
80
5045.2
84
X1
250
11
54.2
82.1
12
12
12
\
-100
'
GR
5044.4
34
5044.4
35
5043.9
54.2
5041.6
62
5041.4
63.5
GR
5041.4
69.2
5041.4
74.3
5042
75.9
5042.6
78.8
5043.9
82.1
GR
5044.6
91
QT
1
160
X1
300
8
71
86.3
87
97
92
-100
'
GR
5046.3
53
5046.3
54
5044.2
71
5043.1
75.5
5043.4
78.3
GR
5043.5
81.4
5044.1
86.3
5047.7
103.2
QT
1
160
X1
400
10
30.8
86.9
140
145
141
-100
GR
5049.8
30
5049.8
30.8
5048.2
47.4
5046.6
56.7
5046.7
60.5
GR
5046.6
63.1
5047.7
66.1
5050.3
86.9
5049.7
126
5051.2
158.9
X1
1000
4
100
139.5
82
82
82
-100
GR
5051.6
100
5049.1
119.5
5049.1
124.5
5052.4
139.5
'
QT
1
156
X1
1100
4
100
135.0
100
100
100
-100
GR
5055.0
100
5052
115.0
5052
120.0
5055.0
135.0
'
X1
1200
0
100
100
100
2.8
X1
1300
0
100
100
100
2.9
1
X1
1400
4
100
147
100
100
100
-100
'
GR
5066.4
100
5060.5
121.8
5060.5
126.8
5064.5
147
'
XL
GR
1510
5064
4
100
100
5060.9
123
109
20
5060.9
20
114
20
5064
123
-100
'
NC
.3
.5
X1
1600
6
105
111.1
5.2
5.2
5.2
X3
10
0
0
107
110.5
GR
4966
100
4964.5
105
4963.5
105.1
4963.5
111
4964.5
111.1
GR
4966
116
' 26JAN94 16:19:35
' SC 1.013
X1 9200
' X2
X3 10
GR 4972
' X1 930 1
X3 10
GR 4972.5
t
1
0.10
2.6
10
3.5
0
85
4
100
145
85
85
85
2
4969.6
4978
0
131
134.5
100
4966.1
130
4966.1
136
4972
4
100
145
20
20
20
111
155
100
4966.6
130
4966.6
136
4972.5
PAGE 4
1.2 4966.1 4963.5
145
145
26JAN94 16:19:35
SECNO DEPTH CWSEL CRIWS WSELK EG
Q QLOB QCH QROB ALOB ACH
TIME VLOB VCH VROB XNL XNCH
SLOPE XLOBL XLCH XLOBR ITRIAL IDC
' *PROF 1
CRITICAL DEPTH TO BE CALCULATED AT ALL CROSS SECTIONS
CCHV- .100 CEHV= .300
' *SECNO 1.000
3280 CROSS SECTION 1.00 EXTENDED 1.10 FEET
' 1,000 3,40 4941,00 4939,71 4941,00 1141,06
213.0 76.6 130.3 6.1 68.4 55.9
.00 1.12 2.33 .80 .060 .045
.001180 0. 0. 0. 0 10
*SECNO 170.000
' 3301 HV CHANGED MORE THAN HVINS
' 7185 MINIMUM SPECIFIC ENERGY
3720 CRITICAL DEPTH ASSUMED
170.000 2.37 4942.97 4942.97 .00 4943.69
213.0 .0 213.0 .0 .0 31.4
.00 .00 6.79 .00 .000 .045
.027879 60. 60. 60. 0 19
' *SECNO 180.000
180.000 2.66 4943.06 4942.95 .00 4943.83
213.0 .0 213.0 .0 .0 30.1
' .00 .00 7.07 .00 .000 .045
.022923 5. 5. 5. 2 8
*SECNO 190.000
190.000 3.00 4943.40 4942.95 .00 4943.94
' 213.0 .0 213.0 .0 .0 35.9
.00 .00 5.93 .00 .000 .045
.014206 5. 5. 5. 4 8
' *SECNO 195.000
195.000 2.42 4943.32 4943.19 .00 4944.05
' 213.0 .0 213.0 .0 .0 31.1
.00 .00 6.85 .00 .000 .045
.022037 3. 3. 3. 3 11
HV
HL
OLOSS
L-BANK ELEV
AROB
VOL
TWA
R-HANK ELEV
XNR
WIN
ELMIN
SSTA
ICONT
CORAR
TOPWID
ENDST
.06
.00
.00
4939.00
7.6
.0
.0
4939.20
O60
.000
4937.60
.00
0
.00
70.72
70.72
.72
.19
.20
4943.90
.0
.1
.1
4943.90
000
.000
4940.60
57.35
0
.00
22.40
79.74
.78
.13
.02
4943.40
.0
.1
.1
4943.40
000
.000
4940.40
58.68
0
.00
16.54
75.32
.55
.09
.02
4943.40
.0
.1
.1
4943.40
000
.000
4940.40
58.01
0
.00
17.98
75.99
.73
.05
.05
4943.40
.0
.1
.1
4943.40
000
.000
4940.90
58.16
0
.00
17.69
75.84
PAGE 5
1
26JAN94 16:19:35
'
SECNO
DEPTH
CWSEL
CRIWS
Q
QLOB
QCH
QROB
TIME
VLOB
VCH
VROB
'
SLOPE
XLOBL
XLCH
XLOBR
*SECNO 200.000
'
200.000
2.75
4943.65
4943.19
213.0
1.1
211.4
.5
.00
.69
5.71
.78
'
.012450
5.
5.
5.
*SECNO 225.000
'
225.000
2.83
4943.93
4943.18
213.0
1.6
209.9
1.5
'
.00
.007807
,66
11.
4,76
11.
1,01
11.
*SECNO 250.000
250.000
2.75
4944.15
4943.21
213.0
.5
212.3
.2
.00
.44
3.74
.44
'
.005136
12.
12.
12.
'
*SECNO 300.000
7185 MINIMUM SPECIFIC
ENERGY
3720 CRITICAL DEPTH ASSUMED
300.000
1.99
4945.09
4945.09
'
160.0
6.8
147.9
5.2
.01
2.14
6.43
2.28
'
.022375
87.
92.
97.
*SECNO 400.000
'
400.000
1.95
4948.55
4948.44
160.0
.0
160.0
.0
.02
.00
5.24
.00
.024014
140.
141.
145.
'
*SECNO 1000,000
7185 MINIMUM SPECIFIC
ENERGY
3720 CRITICAL DEPTH ASSUMED
1000.000
1.74
4950.84
4950.84
160.0
.0
160.0
.0
.02
.00
5.85
.00
.030470
82.
82.
82.
WSELK
EG
BV
HL
OLOSS
L-BANK ELEV
ALOB
ACH
AROB
VOL
TWA
R-BANK ELEV
XNL
XNCH
XNR
WIN
ELMIN
SSTA
ITRIAL
IDC
ICONT
CORAR
TOPWID
ENDST
.00
4944.15
.50
.08
.02
4943.40
1.6
37.0
.6
.1
.1
4943.40
O60
.045
.060
.000
4940.90
45.45
4
11
0
.00
34.70
80.15
.00
4944.28
.35
.11
.02
4943.60
2.5
44.1
1.5
.1
.1
4943.60
O60
.045
.060
.000
4941.10
41.12
2
15
0
.00
39.71
80.83
.00
4944.37
.22
.08
.01
4943.90
1.2
56.8
.4
.2
.1
4943.90
O60
_ .045
.060
.000
4941.40
44.62
2
14
0
.00
40.65
85.27
.00
4945.69
.60
.78
.12
4944.20
3.2
23.0
2.3
.2
.2
4944.10
O60
.045
.060
.000
4943.10
63.81
0
19
0
.00
27.12
90.94
.00
4948.97
.43
3.27
.02
4949.80
.0
30.6
.0
.3
.3
4950.30
.000
.045
.000
.000
4946.60
43.78
2
11
0
.00
29.12
72.89
.00
4951.37
.53
2.21
.03
4951.60
.0
27.4
.0
.4
.3
4952.40
.000
.045
.000
.000
4949.10
105.94
0
11
0
.00
26.47
132.40
PAGE 6
26JAN94 16:19:35
' SECNO DEPTH CWSEL CRIWS
Q QLOB QCH QROB
TIME VLOB VCH VROB
' SLOPE XLOBL XLCH XLOBR
' *SECNO 1100.000
7185 MINIMUM SPECIFIC ENERGY
3720 CRITICAL DEPTH ASSUMED
1100.000 1.83 4953.83 4953.83
' 156.0 .0 156.0 .0
.02 .00 6.04 .00
.029753 100. 100. 100.
*SECNO 1200.000
1210,000 1.88 4956.68 4156.63
155.0 .0 156.0 .0
.03 .00 5.78 .00
.026340 100. 100. 100.
*SECNO 1300.000
' 1300.000 1.60 4959.30 4959.18
101.1 .0 101.1 .0
.04 .00 4.83 .00
' .121982 100. 100. 100.
*SECNO 1400.000
' 7185 MINIMUM SPECIFIC ENERGY
3720 CRITICAL DEPTH ASSUMED
1400.000 1.54 4962.04 4962.04
' 101.1 .0 101.1 .0
.04 .00 5.62 .00
.030744 100. 100. 100.
1 *SECNO 1500.000
1500.000 1.69 4962.59 4962.59
' 101.1 .0 101.1 .0
.04 .00 6.00 .00
.029396 20. 20. 20.
CCHV= .300 CEHV= .500
*SECNO 1600.000
3280 CROSS SECTION 1600.00 EXTENDED
1
WSELK
EG
HV
HL
OLOSS
L-HANK ELEV
ALOB
ACH
AROB
VOL
TWA
R-BANK ELEV
XNL
XNCH
XNR
WIN
ELMIN
SSTA
ITRIAL
IDC
ICONT
CORAR
TOPWID
ENDST
.00
4954.39
.57
3.01
.01
4955.00
.0
25.8
.0
.5
.4
4955.00
000
.045
.000
.000
4952.00
105.87
0
8
0
.00
23.27
129.13
.00
4957.20
.52
2.80
.00
4957.80
.0
27.0
.0
.5
.4
4957.80
000
.045
.000
.000
4954.80
105.61
2
5
0
.00
23.77
129.39
.00
4959.66
.36
2.45
.02
4960.70
.0
20.9
.0
.6
.5
4960.70
000
.045
.000
.000
4957.70
106.97
2
15
0
.00
21.07
128.03
.00
4962.53
.49
2.58
.04
4966.40
.0
18.0
.0
.6
.5
4964.50
000
.045
.000
.000
4960.50
116.13
0
8
0
.00
18.42
134.55
.00
4963.15
.56
.60
.02
4964.00
.0
16.8
.0
.6
.5
4964.00
000
.045
.000
.000
4960.90
104.07
1
8
0
.00
14.85
118.93
45 FEET
PAGE 7
26JAN94 16:19:35 PAGE 8
'
SECNO DEPTH CWSEL CRIWS WSELK
EG
HV
EL
OLOSS L-BANK ELEV
Q QLOB QCH QROB ALOE
ACH
AROB
VOL
TWA R-BANK ELEV
TIME VLOB VCH VROB XNL
XNCH
XNR
WIN
ELMIN SSTA
'
SLOPE XLOBL XLCH XLOBR ITRIAL
IDC
ICONT
CORAR
TOPWID ENDST
3301 HV CHANGED MORE THAN HVINS
7185 MINIMUM SPECIFIC ENERGY
'
3720 CRITICAL DEPTH ASSUMED
3470 ENCROACHMENT STATIONS- 107.0 110.5 TYPE= 1
TARGET-
3.500
3495 OVERBANK AREA ASSUMED NON -EFFECTIVE, ELLEA=
100000.00 ELREA=
100000.00
1600,000 2,95 4966,45 4966,45 .00
101.1 .0 101.1 .0 .0
4967,94
10.3
1,41
.0
.23
.6
.46 100000.00
.5 100000.00
.04 .00 9.79 .00 .000
.045
.000
.000
4963.50 107.00
.077553 5. 5. 5. 0
14
0
.00
3.50 110.50
SPECIAL CULVERT
SC CUNO CUNV ENTLC COFQ RDLEN
RISE
SPAN
CULVLN
CHRT SCL ELCHU ELCHD
1 .013 .10 2.60 10.00
3.50
.00
85.00
1 2 4966.10 4963.50
CHART 1 - CONCRETE PIPE CULVERT; NO BEVELED RING ENTRANCE
SCALE 2 - GROOVE END ENTRANCE WITH HEADWALL
'
*SECNO 9200.000
'
SPECIAL CULVERT INLET CONTROL
EGIC - 4971.863 EGOC = 4971.353 PCWSE= 4966.452
ELTRD=
4978.000
'
3301 HV CHANGED MORE THAN HVINS
'
3302 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE,
KRATIO =
2.03
SPECIAL CULVERT
'
EGIC EGOC H4 QWEIR QCULV
VCH
ACULV
ELTRD
WEIRLN
4971.86 4971.35 3.92 0. 101.
5.446
9.6
4978.00
0.
1
3470 ENCROACHMENT STATIONS= 131.0 134.5 TYPE= 1
TARGET-
3.500
'
3495 OVERBANK AREA ASSUMED NON -EFFECTIVE, ELLEA=
100000.00 ELREA=
100000.00
9200.000 5.30 4971.40 .00 .00
4971.86
.46
3.92
.00 100000.00.
101.1 .0 101.1 .0 .0
18.6
.0
.7
.5 100000.00
.05 .00 5.45 .00 .000
.045
.000
.000
4966.10 131.00
018861 85. 85. 85. 2 0 0 .00 3.50 134.50
I
26JAN94 16:19:35
'
SECNO
DEPTH
CWSEL
CRIWS
WSELK
EG
HV
HL
Q
QLOB
QCH
QROB
ALOB
ACH
AROB
VOL
TIME
VLOB
VCH
VROB
XNL
XNCH
XNR
WTN
'
SLOPE
XLOBL
XLCH
XLOBR
ITRIAL
IDC
ICONT
CORAR
*SECNO 9111,000
3302 WARNING:
CONVEYANCE CHANGE
OUTSIDE
OF ACCEPTABLE RANGE,
KRATIO
= 12.02
OLOSS
L-BANK ELEV
TWA
R-BANK ELEV
ELMIN
SSTA
TOPWID
ENDST
3470 ENCROACHMENT STATIONS=
111.0
155.0
TYPE- 1
TARGET=
44.000
'
3495 OVERBANK AREA ASSUMED NON -EFFECTIVE,
ELLEA=
100000.00
ELREA=
4972.50
9300.000 5.38 4971.98
4968.54
.00
4972.01
.03
.01
.13
100000.00
156.0 .0 156.0
.0
.0
121.1
.0
.7
4972.50
'
.05 .00 1.29
.00
.000
.045
.000
.000 4966.60
.5
111.00
.000311 20. 20.
20.
2
22
0
.00 33.21
144.21
PAGE 9
26JAN94 16:19:35
TW
WIER ALONG ROAD AND SOUTHERN PROPERTY
ASQ
QCOMP ERRAC
TASQ
TCQ TABER NITER DSWS USWS DSSNO USSNO
54.86
54.89
, .05 54.86
54.89 .05 10 4971.863 4972.008 9200.000 9300.000
PAGE 10
I
' 26JAN94 16:19:35 PAGE 11
THIS RUN EXECUTED 26JAN94 16:19:40
k**k*A#A#A**x#hA#k#Aka**hkh##hkhh#hhh
HEC-2 WATER SURFACE PROFILES
' Version 4.6.2; May 1991
A**kk#axkabxxa#k*#a*x#k**xxkk#*#Ahfr*A
NOTE- ASTERISK (*) AT LEFT OF CROSS-S
' South Drainage Channel
SUMMARY PRINTOUT TABLE 150
tSECNO XLCH ELTRD E
' 1.000 .00 .00
* 170.000 60.00 .00
' 180.000 5.00 .00
' 190.000 5.00 .00
195.000 3.00 .00
' 200.000 5.00 .00
225.000 11.00 .00
' 250.000 12.00 .00
* 300.000 92.00 .00
400.000 141.00 .00
' * 1000.000 82.00 .00
* 1100.000 100.00 .00
1200.000 100.00 .00
1300.000 100.00 .00
' * 1400.000 100.00 .00
' 1500.000 20.00 .00
* 1600.000 5.20 .00
ECTION
NUMBER INDICATES
MESSAGE IN
SUMMARY
OF ERRORS LIST
LLC
ELMIN
Q
CWSEL
CRIWS
EG
10*KS
.00
4937.60
213.00
4941.00
4939.71
4941.06
11.80
.00
4940.60
213.00
4942.97
4942.97
4943.69
278.79
.00
4940.40
213.00
4943.06
4942.95
4943.83
229.23
.00
4940.40
213.00
4943.40
4942.95
4943.94
142.06
.00
4940.90
213.00
4943.32
4943.19
4944.05
220.37
.00
4940.90
213.00
4943.65
4943.19
4944.15
124.50
.00
4941.10
213.00
4943.93
4943.18
4944.28
78.07
.00
4941.40
213.00
4944.15
4943.21
4944.37
51.36
.00
4943.10
160.00
4945.09
4945.09
4945.69
223.76
.00
4946.60
160.00
4948.55
4948.44
4948.97
240.14
.00
4949.10
.160.00
4950.84
4950.84
4951.37
304.70
.00
4952.00
156.00
4953.83
4953.83
4954.39
297.53
.00
4954.80
156.00
4956.68
4956.63
4957.20
263.40
.00
4957.70
101.14
4959.30
4959.18
4959.66
219.82
4960.50
101.14
4962.04
4962.04
4962.53
307.44
.00
.00
4960.90
101.14
4962.59
4962.59
4963.15
293.96
.00
4963.50
101.14
4966.45
4966.45
4967.94
775.53
VCH
AREA
.01
2.33
131.87
62.
6.79
31.38
12.
7.07
30.11
14.
5.93
35.89
17.
6.85
31.10
14.
5.71
39.20
19.
4.76
48.03
24.
3.74
58.43
29.
6.43
28.48
10.
5.24
30.56
10.
5.85
27.36
9.
6.04
25.82
9.
5.78
27.01
9.
4.83
20.95
6.
5.62
17.98
5.
6.00
16.84
5.
9.79
10.33
3.
1
' 26JAN94
SECNO
* 9200.000
' * 9300.000
1
1
1
1
1
1
16:19:35
PAGE 12
XLCH
ELTRD
ELLC ELMIN
Q
CWSEL
CRIWS
EG
10*KS
VCH AREA
.01
85.00
4978.00
4969.60 4966.10
101.14
4971.40
.00
4971.86
188.61
5.45 18.57
7.
20.00
.00
.00 4966.60
156.00
4971.98
4968.54
4972.01
3.11
1.29 121.14
88.
' 26JAN94 16:19:35 PAGE 13
' South Drainage Channel
SUMMARY PRINTOUT TABLE
150
SECNO
Q
CWSEL
DIFWSP
DIFWSX
DIFWSS
TOPWID
XLCH
'
1.000
213.00
4941.00
.00
.00
.00
70.72
.00
*
170.000
213.00
4942.97
.00
1.97
.00
22.40
60.00
180.000
213.00
4943.06
.00
.08
.00
16.64
5.00
'
190.000
213.00
4943.40
.00
.34
.00
17.98
5.00
195.000
213.00
4943.32
.00
-.07
.00
17.69
3.00
'
200.000
213.00
4943.65
.00
.33
.00
34.70
5.00
225.000
213.00
4943.93
.00
.28
.00
39.71
11.00
250.000
213.00
4944.15
.00
.22
.00
40.55
12.00
*
300.000
160.00
4945.09
.00
.94
.00
27.12
92.00
400.000
160.00
4948.55
.00
3.46
.00
29.12
141.00
' *
1000.000
160.00
4950.84
.00
2.29
.00
26.47
82.00
*
1100.000
156.00
4953.83
.00
2.99
.00
23.27
100.00
'
1200.000
156.00
4956.68
2.85
23.77
100.00
.00
.00
'
1300.000
101.14
4959.30
.00
2.62
.00
21.07
100.00
*
1400.000
101.14
4962.04
.00
2.74
.00
18.42
100.00
'
1500.000
101.14
4962.59
.00
.55
.00
14.85
20.00
*
1600.000
101.14
4966.45
.00
3.85
.00
3.50
5.20
' *
9200.000
101.14
4971.40
4.95
3.50
85.00
.00
.00
' *
9300.000
156.00
4971.98
.00
.58
.00
33.21
20.00
1
1
26JAN94 16:19:35 PAGE 14
SUMMARY OF ERRORS AND SPECIAL NOTES
CAUTION SECNO= 170.000 PROFILE- 1 CRITICAL DEPTH ASSUMED
' CAUTION SECNO= 170*110 PROFILE- 1 MINIMUM SPECIFIC ENERGY
CAUTION SECNO= 300.000 PROFILE- 1 CRITICAL DEPTH ASSUMED
CAUTION SECNO= 300.000 PROFILE- 1 MINIMUM SPECIFIC ENERGY
' CAUTION SECNO= 1000.000 PROFILE- 1 CRITICAL DEPTH ASSUMED
CAUTION SECNO- 1000.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
' CAUTION SECNO= 1100.000 PROFILE= 1 CRITICAL DEPTH ASSUMED
CAUTION SECNO= 1100.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
' CAUTION SECNO= 1400.000 PROFILE=. 1 CRITICAL DEPTH ASSUMED
CAUTION SECNO= 1400.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
' CAUTION SECNO= 1600.000 PROFILE= 1 CRITICAL DEPTH ASSUMED
CAUTION SECNO= 1600.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY
WARNING SECNO= 9200.000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE
WARNING SECNO= 9300.000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE
1
t
1