HomeMy WebLinkAboutDrainage Reports - 02/11/2025JANUARY 9, 2025
City of Fort Collins Approved Plans
Approved by:
Date:
1/9/2025
North East College Corridor Outfall (NECCO) Design
Report
North East College Corridor Outfall
(NECCO) Design Report
North East College
Corridor Outfall (NECCO) Design Report
North East College Corridor Outfall (NECCO) Design Report
Urban Storm Drainage Criteria Manual
Detained and Undetained Areas
Project Site Area (acres) 11.08
Area of Undetained Area (acres) 1.71
Area of Detained Runoff (acres) 9.36
Max. Release Rate (cfs) 1.87
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
Table 3.4-1. IDF Table for Rational Method
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
5 2.85 4.87 9.95 39 1.09 1.86 3.8
6 2.67 4.56 9.31 40 1.07 1.83 3.74
7 2.52 4.31 8.80 41 1.05 1.80 3.68
8 2.40 4.10 8.38 42 1.04 1.77 3.62
9 2.30 3.93 8.03 43 1.02 1.74 3.56
10 2.21 3.78 7.72 44 1.01 1.72 3.51
11 2.13 3.63 7.42 45 0.99 1.69 3.46
12 2.05 3.50 7.16 46 0.98 1.67 3.41
13 1.98 3.39 6.92 47 0.96 1.64 3.36
14 1.92 3.29 6.71 48 0.95 1.62 3.31
15 1.87 3.19 6.52 49 0.94 1.6 3.27
16 1.81 3.08 6.30 50 0.92 1.58 3.23
17 1.75 2.99 6.10 51 0.91 1.56 3.18
18 1.70 2.90 5.92 52 0.9 1.54 3.14
19 1.65 2.82 5.75 53 0.89 1.52 3.10
20 1.61 2.74 5.60 54 0.88 1.50 3.07
21 1.56 2.67 5.46 55 0.87 1.48 3.03
22 1.53 2.61 5.32 56 0.86 1.47 2.99
23 1.49 2.55 5.20 57 0.85 1.45 2.96
24 1.46 2.49 5.09 58 0.84 1.43 2.92
25 1.43 2.44 4.98 59 0.83 1.42 2.89
26 1.4 2.39 4.87 60 0.82 1.4 2.86
27 1.37 2.34 4.78 65 0.78 1.32 2.71
28 1.34 2.29 4.69 70 0.73 1.25 2.59
29 1.32 2.25 4.60 75 0.70 1.19 2.48
30 1.30 2.21 4.52 80 0.66 1.14 2.38
31 1.27 2.16 4.42 85 0.64 1.09 2.29
32 1.24 2.12 4.33 90 0.61 1.05 2.21
33 1.22 2.08 4.24 95 0.58 1.01 2.13
34 1.19 2.04 4.16 100 0.56 0.97 2.06
35 1.17 2.00 4.08 105 0.54 0.94 2.00
36 1.15 1.96 4.01 110 0.52 0.91 1.94
37 1.16 1.93 3.93 115 0.51 0.88 1.88
38 1.11 1.89 3.87 120 0.49 0.86 1.84
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 9
Figure 3.4-1. Rainfall IDF Curve – Fort Collins
0.00
5.00
10.00
15.00
20.00
25.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
10.00
20.00
30.00
40.00
50.00
60.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
5.00
10.00
15.00
20.00
25.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
Project:
Inlet ID:
Gutter Geometry:
Maximum Allowable Width for Spread Behind Curb TBACK =2.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020
Height of Curb at Gutter Flow Line HCURB =6.00 inches
Distance from Curb Face to Street Crown TCROWN =14.0 ft
Gutter Width W =2.00 ft
Street Transverse Slope SX =0.060 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX =14.0 14.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches
Check boxes are not applicable in SUMP conditions
MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm
MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Crowne at Suniga
Inlet H6
1
Design Information (Input)MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches
Number of Unit Inlets (Grate or Curb Opening)No =1 1
Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) =N/A N/A feet
Width of a Unit Grate Wo =N/A N/A feet
Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches
Angle of Throat Theta =63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67
Low Head Performance Reduction (Calculated)MINOR MAJOR
Depth for Grate Midwidth dGrate =N/A N/A ft
Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A
Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =0.9 3.4 cfs
CDOT Type R Curb Opening
INLET IN A SUMP OR SAG LOCATION
1
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
0.50
1.00
1.50
2.00
2.50
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
10.00
20.00
30.00
40.00
50.00
60.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
0.50
1.00
1.50
2.00
2.50
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
5.00
10.00
15.00
20.00
25.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
Stage (ft)
Stage - Discharge Curves
Series1
Series2
0.00
0.50
1.00
1.50
2.00
2.50
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Stage (ft)
Stage - Discharge Curves
Shallow Weir
Orifice
Project Title Date:
Project Number Calcs By:
City
Basins
0.8
WQCV = Watershed inches of Runoff (inches)79%
a = Runoff Volume Reduction (constant)
i = Total imperviousness Ratio (i = Iwq/100)0.258 in
A =9.36 ac
V = 0.2413 ac-ft
V = Water Quality Design Volume (ac-ft)
WQCV = Water Quality Capture Volume (inches)
A = Watershed Area (acres)
10509 cu. ft.
Drain Time
a =
i =
WQCV =
Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event
The Crowne at Suniga March 25, 2024
1893-001 F. Wegert
Fort Collins
Stormtech LID Pond
0.278
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
Total Imperviousness Ratio (i = Iwq/100)
Water Quality Capture Volume
6 hr
12 hr
24 hr
40 hr
Pond No :
Stormtech Pond
WQ
0.81
5.00 min 7668 ft3
9.36 acres 0.18 ac-ft
Max Release Rate =1.81 cfs
Time (min)
Ft Collins
WQ
Intensity
(in/hr)
Inflow
Volume
(ft3)
Outflow
Adjustmen
t Factor
Qav
(cfs)
Outflow Volume
(ft3)
Storage Volume
(ft3)
5 1.425 3241 1.00 1.81 542 2699
10 1.105 5027 1.00 1.81 1084 3943
15 0.935 6380 0.67 1.20 1084 5296
20 0.805 7324 0.63 1.13 1355 5969
25 0.715 8131 0.60 1.08 1626 6505
30 0.650 8870 0.58 1.05 1897 6974
35 0.585 9314 0.57 1.03 2168 7146
40 0.535 9735 0.56 1.02 2439 7296
45 0.495 10133 0.56 1.00 2710 7423
50 0.460 10463 0.55 0.99 2981 7482
55 0.435 10883 0.55 0.99 3252 7632
60 0.410 11190 0.54 0.98 3523 7668
65 0.385 11384 0.54 0.97 3794 7590
70 0.365 11623 0.54 0.97 4065 7558
75 0.345 11770 0.53 0.96 4336 7435
80 0.330 12009 0.53 0.96 4607 7403
85 0.315 12180 0.53 0.96 4878 7302
90 0.305 12487 0.53 0.95 5149 7338
95 0.290 12532 0.53 0.95 5420 7113
100 0.280 12737 0.53 0.95 5691 7046
105 0.270 12896 0.52 0.95 5962 6935
110 0.260 13010 0.52 0.94 6233 6777
115 0.255 13340 0.52 0.94 6504 6836
120 0.245 13374 0.52 0.94 6775 6599
*Note: Using the method described in FCSCM Chapter 6 Section 2.3
A =
Tc =
Project Location :
Design Point
C =
Design Storm
WATER QUALITY CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF
Input Variables Results
Required Detention Volume
Fort Collins, Colorado
1893-001
The Crowne at Suniga
Project Number :
Project Name :
Stormtech LID Pond
Page 2 of 4
1893-001 LID Chamber Sizing FSW.xlsx
Va
u
l
t
I
D
To
t
a
l
Re
q
u
i
r
e
d
WQ
V
o
l
u
m
e
(c
f
)
Fl
o
w
,
WQ
(c
f
s
)
Ch
a
m
b
e
r
Ty
p
e
Ch
a
m
b
e
r
R
e
l
e
a
s
e
Ra
t
e
a
(c
f
s
)
Ch
a
m
b
e
r
Vo
l
u
m
e
b
(c
f
)
In
s
t
a
l
l
e
d
C
a
m
b
e
r
w/
A
g
g
r
e
g
a
t
e
c
(c
f
)
Mi
m
i
m
u
m
N
o
.
of
C
h
a
m
b
e
r
s
d
To
t
a
l
R
e
l
e
a
s
e
Ra
t
e
e
(c
f
s
)
Re
q
u
i
r
e
d
St
o
r
a
g
e
Vo
l
u
m
e
b
y
FA
A
M
e
t
h
o
d
(c
f
)
Mi
m
i
m
u
m
No
.
o
f
Ch
a
m
b
e
r
s
f
St
o
r
a
g
e
Pr
o
v
i
d
e
d
wi
t
h
i
n
t
h
e
Ch
a
m
b
e
r
s
g
(c
f
)
Mi
n
i
m
u
m
To
t
a
l
In
s
t
a
l
l
e
d
Sy
s
t
e
m
Vo
l
u
m
e
h
(c
f
)
St
o
r
m
t
e
c
h
L
I
D
P
o
n
d
1
0
5
0
9
1
1
.
4
3
M
C
-
7
2
0
0
0
.
0
4
5
1
7
5
.
9
0
2
6
7
.
3
0
4
0
1
.
8
1
7
6
6
8
44
77
4
0
1
1
7
6
1
a.
R
e
l
e
a
s
e
r
a
t
e
p
e
r
c
h
a
m
b
e
r
,
l
i
m
i
t
e
d
b
y
f
l
o
w
t
h
r
o
u
g
h
g
e
o
t
e
x
t
i
l
e
w
i
t
h
a
c
c
u
m
u
l
a
t
e
d
s
e
d
i
m
e
n
t
.
b.
V
o
l
u
m
e
w
i
t
h
i
n
c
h
a
m
b
e
r
o
n
l
y
,
n
o
t
a
c
c
o
u
n
t
i
n
g
f
o
r
v
o
i
d
s
p
a
c
e
s
i
n
s
u
r
r
o
u
n
d
i
n
g
a
g
g
r
e
g
a
t
e
.
c.
V
o
l
u
m
e
i
n
c
l
u
d
e
s
c
h
a
m
b
e
r
a
n
d
v
o
i
d
s
p
a
c
e
s
(
4
0
%
)
i
n
s
u
r
r
o
u
n
d
i
n
g
a
g
g
r
e
g
a
t
e
,
p
e
r
c
h
a
m
b
e
r
u
n
i
t
.
d.
N
u
m
b
e
r
o
f
c
h
a
m
b
e
r
s
r
e
q
u
i
r
e
d
t
o
p
r
o
v
i
d
e
f
u
l
l
W
Q
C
V
w
i
t
h
i
n
t
o
t
a
l
i
n
s
t
a
l
l
e
d
s
y
s
t
e
m
,
i
n
c
l
u
d
i
n
g
a
g
g
r
e
g
a
t
e
.
e.
R
e
l
e
a
s
e
r
a
t
e
p
e
r
c
h
a
m
b
e
r
t
i
m
e
s
n
u
m
b
e
r
o
f
c
h
a
m
b
e
r
s
.
f.
N
u
m
b
e
r
o
f
c
h
a
m
b
e
r
s
r
e
q
u
i
r
e
d
t
o
p
r
o
v
i
d
e
r
e
q
u
i
r
e
d
F
A
A
s
t
o
r
a
g
e
v
o
l
u
m
e
s
t
o
r
e
d
w
i
t
h
i
n
t
h
e
c
h
a
m
b
e
r
o
n
l
y
(
n
o
a
g
g
r
e
g
a
t
e
s
t
o
r
a
g
e
)
.
g.
V
o
l
u
m
e
p
r
o
v
i
d
e
d
i
n
c
h
a
m
b
e
r
s
o
n
l
y
(
n
o
a
g
g
r
e
g
a
t
e
s
t
o
r
a
g
e
)
.
T
h
i
s
n
u
m
b
e
r
m
u
s
t
m
e
e
t
o
r
e
x
c
e
e
d
t
h
e
r
e
q
u
i
r
e
d
F
A
A
s
t
o
r
a
g
e
v
o
l
u
m
e
.
h.
S
y
s
t
e
m
v
o
l
u
m
e
i
n
c
l
u
d
e
s
t
o
t
a
l
n
u
m
b
e
r
o
f
c
h
a
m
b
e
r
s
,
p
l
u
s
s
u
r
r
o
u
n
d
i
n
g
a
g
g
r
e
g
a
t
e
.
T
h
i
s
n
u
m
b
e
r
m
u
s
t
m
e
e
t
o
r
e
x
c
e
e
d
t
h
e
r
e
q
u
i
r
e
d
W
Q
C
V
.
Ch
a
m
b
e
r
C
o
n
f
i
g
u
r
a
t
i
o
n
S
u
m
m
a
r
y
P:
\
1
8
9
3
-
0
0
1
\
D
r
a
i
n
a
g
e
\
L
I
D
\
1
8
9
3
-
0
0
1
L
I
D
C
h
a
m
b
e
r
S
i
z
i
n
g
F
S
W
.
x
l
s
x
Chamber Dimensions SC-160 SC-310 SC-740 MC-3500 MC-7200
Width (in)34.0 34.0 51.0 77.0 100.0
Length (in) 85.4 85.4 85.4 90.0 83.4
Height (in) 16.0 16.0 30.0 45.0 60.0
Floor Area (sf) 20.2 20.2 30.2 48.1 57.9
Chamber Volume (cf) 6.9 14.7 45.9 109.9 175.9
Chamber/Aggregate Volume (cf) 29.3 29.3 74.9 175.0 267.3
Flow Rate* 0.35 gpm/sf
1 cf =7.48052 gal
1 gallon =0.133681 cf
1 GPM = 0.002228 cfs
*Flow rate based on 1/2 of Nov 07 QMAX in Figure 17 of UNH Testing Report
SC-160 SC-310 SC-740 MC-3500 MC-7200
Flow Rate/chamber (cfs) 0.015724 0.015724 0.023586 0.037528 0.045164
end caps have a volume of 115.3 cu. ft.
StormTech Chamber Data
Chamber Flow Rate
Chamber Flow Rate Conversion (gpm/sf to cfs)
end caps have a volume of 45.1 cu. ft.
P:\1893-001\Drainage\LID\1893-001 LID Chamber Sizing FSW.xlsx
De
s
i
g
n
P
o
i
n
t
(
B
a
s
i
n
I
D
)
1
To
t
a
l
A
r
e
a
(a
c
)
T
r
e
a
t
m
e
n
t
M
e
t
h
o
d
A
r
e
a
T
r
e
a
t
e
d
(
a
c
)
Pe
r
c
e
n
t
Im
p
e
r
v
i
o
u
s
(%
)
Ar
e
a
o
f
Im
p
e
r
v
i
o
u
s
(a
c
)
2
Re
q
u
i
r
e
d
L
I
D
(c
u
.
f
t
.
)
Pe
r
c
e
n
t
o
f
Im
p
e
r
v
i
o
u
s
Ar
e
a
Pr
o
v
i
d
e
d
L
I
D
(c
u
.
f
t
.
)
Ma
j
o
r
B
a
s
i
n
S
C
9.
3
6
St
o
r
m
t
e
c
h
C
h
a
m
b
e
r
s
9.
3
6
79
%
7.
3
9
13
,
4
3
4
98
%
11
,
7
6
1
Ma
j
o
r
B
a
s
i
n
O
S
C
1.
7
1
N/
A
N/
A
10
%
0.
1
7
N/
A
2%
0
1.
R
e
f
e
r
t
o
R
a
t
i
o
n
a
l
C
a
l
c
u
l
a
t
i
o
n
s
f
o
r
a
d
d
i
t
i
o
n
a
l
c
l
a
r
i
f
i
c
a
t
i
o
n
.
2.
C
a
l
c
u
l
a
t
e
d
b
y
m
u
l
t
i
p
l
y
i
n
g
t
h
e
p
e
r
c
e
n
t
i
m
p
e
r
v
i
o
u
s
b
y
a
r
e
a
t
r
e
a
t
e
d
LI
D
S
u
m
m
a
r
y
T
a
b
l
e
B2
100-yr
1.00
5.00 min Storage 133324 ft3
11.08 acres
Max Release Rate =1.87 cfs 3.06 ac-ft
Time (min)
Ft Collins
100-yr
Intensity
(in/hr)
Inflow
Volume
(ft3)
Outflow
Adjustment
Factor
Qav
(cfs)
Outflow Volume
(ft3)
Storage
Volume
(ft3)
5 9.950 33074 1.00 1.87 561 32513
10 7.720 51323 1.00 1.87 1122 50201
15 6.520 65017 1.00 1.87 1683 63334
20 5.600 74458 1.00 1.87 2244 72214
25 4.980 82768 1.00 1.87 2805 79963
30 4.520 90147 1.00 1.87 3366 86781
35 4.080 94933 1.00 1.87 3927 91006
40 3.740 99454 1.00 1.87 4488 94966
45 3.460 103509 1.00 1.87 5049 98460
50 3.230 107365 1.00 1.87 5610 101755
55 3.030 110789 1.00 1.87 6171 104618
60 2.860 114080 1.00 1.87 6732 107348
65 2.720 117537 1.00 1.87 7293 110244
70 2.590 120528 1.00 1.87 7854 112674
75 2.480 123653 1.00 1.87 8415 115238
80 2.380 126578 1.00 1.87 8976 117602
85 2.290 129403 1.00 1.87 9537 119866
90 2.210 132229 1.00 1.87 10098 122131
95 2.130 134522 1.00 1.87 10659 123863
100 2.060 136949 1.00 1.87 11220 125729
105 2.000 139608 1.00 1.87 11781 127827
110 1.940 141868 1.00 1.87 12342 129526
115 1.890 144494 1.00 1.87 12903 131591
120 1.840 146788 1.00 1.87 13464 133324
*Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2.
DETENTION VOLUME CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF
Input Variables Results
Required Detention Volume
Fort Collins, Colorado
1893-001
The Crowne at Suniga
Project Number :
Project Name :
Stormtech System - Detention
A =
Tc =
Project Location :
Design Point
C =
Design Storm
Storage System :
Page 1 of 1
1893-001_Pond_FAA_Fort Collins_Detention Volume.xls
Project:Crowne at Suniga
Project Number:1893-001
Date:3/25/2024
By:B. Mathisen
MC-7200 StormTech Cambers & End Caps volume/part (CF)Quantity Total (CF)
Required/Provided LID 1 267.3 44 11,761.20
Installed LID (Including Endcaps) See Table Below 86 Chambers 4 End Caps 2 22,914.40
Required Detention N/A N/A 133,324
Installed Detention Chamber Storage Not In Isolator Row 267.3 444 118,681.20
Installed Detention Chamber Storage In Isolator Row 267.3 42 11,226.60
Installed Detention Endcap Storage 115.3 60 6,918.00
Total Installed Detention Storage See Below 136,825.80
145,085.20
148,513.60
Notes:
1. Refer to the "Stormtech LID Pond" Calculations
4. The red numbers indicates what was summed to calculate the Required combined LID and Detention volumes.
5. The blue numbers indicate what was summed to calculate the installed combined LID and Detention volumes.
3. Total Installed Detention Storage is a sum of 444 non isolator row chambers plus 32 isolator chambers plus 64 end caps. (118,681.20 +
8,553.60 + 6,918.00 = 134,152.80 cf)
Required combined LID and Detention Volumes
Summary
MC-7200 Stormtech Volume Specifications
LID
Detention
2. The two isolator rows are comprised of 84 chambers and 4 end caps. Only 54 chambers and 0 endcaps are required to provide the the
required LID volume. Therefore, a portion of the isolator rows (32 chambers [86-54 = 32]) will be utilized for detention. Additionally, the
end caps associated with the isolator rows (4) will be utilized for detention.
Installed combined LID and Detention Volumes
Pr
o
j
e
c
t
:
Cr
o
w
n
e
a
t
S
u
n
i
g
a
Pr
o
j
e
c
t
N
u
m
b
e
r
:
18
9
3
-
0
0
1
Da
t
e
:
3/
2
5
/
2
0
2
4
By
:
B.
M
a
t
h
i
s
e
n
Bo
r
i
n
g
#
Ex
i
s
t
i
n
g
Su
r
f
a
c
e
E
l
e
v
.
(F
T
)
Pr
o
p
o
s
e
d
Su
r
f
a
c
e
E
l
e
v
.
(F
T
)
GW
S
E
L
(
F
T
)
Su
b
g
r
a
d
e
El
e
v
a
t
i
o
n
(F
T
)
Se
p
e
r
a
t
i
o
n
b
e
t
w
e
e
n
P
r
o
p
o
s
e
d
an
d
G
W
(
F
T
)
Se
p
e
r
a
t
i
o
n
b
e
t
w
e
e
n
Su
b
g
r
a
d
e
a
n
d
G
W
(
F
T
)
SB
-
5
51
.
0
3
54
.
9
3
43
.
1
0
45
.
1
11
.
8
3
2
SB
-
6
5
0
.
1
3
5
8
.
0
5
4
1
.
8
8
4
4
.
2
4
1
6
.
1
7
2
.
3
6
No
t
e
s
:
1.
8
"
p
a
v
e
m
e
n
t
d
e
p
t
h
a
s
s
u
m
e
d
.
2.
R
e
f
e
r
t
o
S
u
b
g
r
a
d
e
P
l
a
n
i
n
U
t
i
l
i
t
y
P
l
a
n
s
f
o
r
a
d
d
i
t
i
o
n
a
l
i
n
f
o
r
m
a
t
i
o
n
3.
R
e
f
e
r
t
o
B
o
r
i
n
g
E
x
h
i
b
i
t
i
n
U
t
i
l
i
t
y
P
l
a
n
s
f
o
r
a
d
d
i
t
i
o
n
a
l
i
n
f
o
r
m
a
t
i
o
n
4.
R
e
f
e
r
t
o
S
t
o
r
m
t
e
c
h
D
e
t
a
i
l
s
i
n
U
t
i
l
i
t
y
P
l
a
n
s
f
o
r
a
d
d
i
t
i
o
n
a
l
i
n
f
o
r
m
a
t
i
o
n
5.
G
W
S
E
L
=
G
r
o
u
n
d
w
a
t
e
r
S
u
r
f
a
c
e
E
l
e
v
a
t
i
o
n
7.
S
u
b
g
r
a
d
e
e
l
e
v
a
t
i
o
n
s
b
a
s
e
d
o
n
s
e
p
e
r
a
t
i
o
n
f
r
o
m
g
r
o
u
n
d
w
a
t
e
r
.
A
d
d
i
t
i
o
n
a
l
r
o
c
k
b
e
l
o
w
s
u
b
g
r
a
d
e
e
l
e
v
a
t
i
o
n
i
s
re
q
u
i
r
e
d
t
o
m
a
i
n
t
a
i
n
s
t
r
u
c
t
u
r
a
l
s
t
a
b
i
l
i
t
y
w
i
t
h
i
n
t
h
e
n
a
t
i
v
e
s
o
i
l
s
.
Pr
o
p
o
s
e
d
S
u
r
f
a
c
e
E
l
e
v
a
t
i
o
n
,
S
t
o
r
m
t
e
c
h
S
u
b
g
r
a
d
e
E
l
e
v
a
t
i
o
n
,
a
n
d
G
r
o
u
n
d
w
a
t
e
r
E
l
e
v
a
t
i
o
n
S
u
m
m
a
r
y
6.
G
r
o
u
n
d
w
a
t
e
r
e
l
e
v
a
t
i
o
n
s
c
o
m
e
f
r
o
m
"
S
u
p
p
l
e
m
e
n
t
a
l
G
e
o
t
e
c
h
n
i
c
a
l
S
u
b
s
u
r
f
a
c
e
E
x
p
l
o
r
a
t
i
o
n
Re
p
o
r
t
"
b
y
E
a
r
t
h
E
n
g
i
n
e
e
r
i
n
g
C
o
u
n
s
u
l
t
a
n
t
s
,
L
L
C
D
a
t
e
d
J
u
n
e
7
,
2
0
2
3
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Selected BMP Type = EDB Stage [ft] Area [ft^2] Stage [ft]Discharge [cfs]
Watershed Area = 11.08 acres 0.00 17,538 0.00 0.00
Watershed Length =1,000 ft 1.00 17,538 1.00 0.68
Watershed Length to Centroid = 300 ft 2.00 17,538 2.00 0.97
Watershed Slope =0.020 ft/ft 3.00 17,538 3.00 1.18
Watershed Imperviousness = 71.0%percent 4.00 17,538 4.00 1.37
Percentage Hydrologic Soil Group A = 0.0%percent 5.00 17,538 5.00 1.53
Percentage Hydrologic Soil Group B = 0.0%percent 6.00 17,538 6.00 1.67
Percentage Hydrologic Soil Groups C/D = 100.0%percent 7.00 17,538 7.00 1.81
Target WQCV Drain Time = 40.0 hours 7.60 17,538 7.60 1.88
User Input
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
Create a new stormwater facility, and attach the PDF of this
worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =N/A 0.98 1.36 1.71 2.31 2.91 in
CUHP Runoff Volume =0.258 0.600 0.928 1.247 1.822 2.405 acre-ft
Inflow Hydrograph Volume =N/A 0.600 0.928 1.247 1.822 2.405 acre-ft
Time to Drain 97% of Inflow Volume =25.3 26.3 27.3 28.7 31.2 33.7 hours
Time to Drain 99% of Inflow Volume =33.2 34.2 35.3 36.6 39.1 41.6 hours
Maximum Ponding Depth =0.64 1.25 1.98 2.71 4.06 5.44 ft
Maximum Ponded Area =0.40 0.40 0.40 0.40 0.40 0.40 acres
Maximum Volume Stored =0.258 0.501 0.796 1.091 1.634 2.188 acre-ft
Once CUHP has been run and the Stage-Area-Discharge
information has been provided, click 'Process Data' to
interpolate the Stage-Area-Volume-Discharge data and
generate summary results in the table below. Once this is
complete, click 'Print to PDF'.
Stormwater Detention and Infiltration Design Data Sheet
Crowne at Suniga - Stormtech System Detention
Fort Collins, CO
Location for 1-hr Rainfall Depths (use dropdown):
After providing required inputs above including 1-hour
rainfall depths, click 'Run CUHP' to generate runoff
hydrographs using the embedded Colorado Urban
Hydrograph Procedure.
Stormtech Detention_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 3/25/2024, 12:09 PM
Booleans for Message Booleans for CUHP
Watershed L:W 1 CUHP Inputs Complete
Watershed Lc:L 1 CUHP Results Calculated
Watershed Slope FALSE Time Interval
RunOnce 1
CountA 1
Draintime Coeff 1.0
User Precip 1
Equal SA Inputs 1
Equal SD Inputs 1
Stormwater Detention and Infiltration Design Data Sheet
0
10
20
30
40
50
60
0.1 1 10TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
0.1 1 10 100
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
Stormtech Detention_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 3/25/2024, 12:09 PM
4396 G REENFIELD D RIVE
W INDSOR , C OLORADO 80550
(970) 545-3908 FAX (970) 663-0282
www.earth-engineering.com
June 7, 2023
Crowne Partners, Inc.
505 North 20th Street – Suite 1150
Birmingham, AL 35203
Attn: Mr. Oaky Dover (odover@crownepartners.com)
Re: Supplemental Geotechnical Subsurface Exploration Report
Proposed Apartment Complex Development – Crowne at Suniga
Approximate 11-Acre Parcel – Northeast Corner of 9th Street and Suniga Road
Fort Collins, Colorado
EEC Project No. 1222009
Mr. Dover:
Earth Engineering Consultants, LLC (EEC) personnel have completed the supplemental
geotechnical subsurface exploration as requested for the approximate 11-acre parcel –
proposed Crowne at Suniga apartment complex development located at the northeast corner
of 9th Street and Suniga Road in Fort Collins, Colorado. In the summer of 2022, Earth
Engineering Consultants, LLC (EEC) conducted a subsurface exploration for the referenced
project by drilling a total of twenty-one (21) test borings throughout the property using a Geo-
Probe drill rig in lieu of a more conventional CME – 75 rig due to the previous property
owner’s concerns of potential “crop/terrain” damage. Unfortunately, the Geo-Probe utilized
did not have the torque capacity to turn the hollow stem augers through the very dense cobble
zones encountered across the site and the borings terminated at approximate depths of 5 to 10
feet below existing site grades. EEC prepared an appropriate project-specific Geo-Report for
foundation, slab, and pavement support; however, the civil design team required greater
depths of borings to assist in their utility design approach for the project. EEC hereby
confirms that all of the recommendations provided in the preceding subsurface
exploration/report are valid and those results were confirmed by the findings of this
supplemental exploration/report. For further information and recommendations based on the
21 shallow borings, please refer to our “Subsurface exploration Report”dated June 9, 2022,
EEC Project No. 1222009.
For this supplemental subsurface exploration, EEC completed eight (8) additional test borings
across the site at pre-selected locations determined by the design team, using a conventional
CME-75 drill rig to approximate depths of 20 to 25 feet below the existing site grades at
DATE:
RIG TYPE: CME-75
FOREMAN: DG
AUGER TYPE: 4" HAS
SPT HAMMER: AUTOMATIC
SOIL DESCRIPTION D N QU MC DD -200
TYPE (FEET)(BLOWS/FT)(PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF
VEGETATION AND TOPSOIL _ _
1
SILTY/CLAYEY SAND (SM-SC) _ _
brown, dry, medium dense 2
_ _
WELL GRADED SAND WITH SILT AND GRAVEL (SW-SM)3
white/brown/rust/black, dry to moist to wet _ _
very dense 4
_ _
SS 5 50/11" 1.9 8.7
_ _
6
_ _
7
_ _
8
_ _
9
_ _
SS 10 50/9" 9.5
_ _
11
_ _
12
_ _
13
_ _
14
_ _
15
_ _
16
_ _
17
_ _
18
_ _
CLAYSTONE 19
gray _ _
hard CS 20 50/7" 9000+ 15.2 117.1
BOTTOM OF BORING DEPTH 20' _ _
21
_ _
22
_ _
23
_ _
24
_ _
25
_ _
Earth Engineering Consultants, LLC
GRAHAM PROPERTY APARTMENT COMPLEX
PROJECT NO: 1222009 LOG OF BORING SB-5 JUNE 2023
FORT COLLINS, COLORADO
SHEET 1 OF 1 WATER DEPTH
START DATE 5/3/2023 WHILE DRILLING 8.5'
SURFACE ELEV N/A CHECKED 5/24/23 8'
FINISH DATE 5/3/2023 CHECKED 5/18/23 8'
A-LIMITS SWELL
DATE:
RIG TYPE: CME-75
FOREMAN: DG
AUGER TYPE: 4" HAS
SPT HAMMER: AUTOMATIC
SOIL DESCRIPTION D N QU MC DD -200
TYPE (FEET)(BLOWS/FT)(PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF
VEGETATION AND TOPSOIL _ _
1
SANDY LEAN CLAY / CLAYEY SAND (CL / SC) _ _
brown, dry, medium stiff/medium dense 2
_ _
SAND WITH SILT AND GRAVEL (SP-SM) 3
white/brown/rust/black, dry to moist to wet _ _
dense 4
_ _
SS 5 50 1.0 8.7
_ _
6
_ _
7
_ _
8
_ _
9
_ _
SS 10 50 11.8
_ _
11
_ _
12
_ _
13
_ _
14
_ _
15
_ _
16
_ _
17
_ _
CLAYSTONE 18
gray _ _
hard 19
_ _
SS 20 50/8" 6000 16.9
_ _
BOTTOM OF BORING DEPTH 20.5' 21
_ _
22
_ _
23
_ _
24
_ _
25
_ _
Earth Engineering Consultants, LLC
GRAHAM PROPERTY APARTMENT COMPLEX
PROJECT NO: 1222009 LOG OF BORING SB-6 JUNE 2023
FORT COLLINS, COLORADO
SHEET 1 OF 1 WATER DEPTH
START DATE 5/3/2023 WHILE DRILLING 9'
SURFACE ELEV N/A CHECKED 5/24/23 8' 3"
FINISH DATE 5/3/2023 CHECKED 5/18/23 8' 3"
A-LIMITS SWELL
GEOTECHNICAL SUBSURFACE EXPLORATION REPORT
PROPOSED APARTMENT COMPLEX DEVELOPMENT - GRAHAM PROPERTY
NORTHEAST CORNER OF 9TH STREET AND SUNIGA ROAD
FORT COLLINS, COLORADO
EEC PROJECT NO. 1222009
Prepared for:
Crowne Partners, Inc.
505 North 20th Street - Suite 1150
Birmingham, AL 35203
Attn: Mr. Cary Levow (clevow@crownepartners.com)
Prepared by:
Earth Engineering Consultants, LLC
4396 Greenfield Drive
Windsor, Colorado 80550
4396 G REENFIELD D RIVE
W INDSOR , C OLORADO 80550
(970) 545-3908 FAX (970) 663-0282
June 1, 2022
Crowne Partners, Inc.
505 North 20th Street - Suite 1150
Birmingham, AL 35203
Attn: Mr. Cary Levow (clevow@crownepartners.com)
Re: Geotechnical Subsurface Exploration Report
Proposed Apartment Complex Development Graham Property
Approximate 11-Acres Parcel Northeast Corner of 9th Street and Suniga Road
Fort Collins, Colorado
EEC Project No. 1222009
Mr. Levow:
Enclosed, herewith, are the results of the geotechnical subsurface exploration completed by Earth
Engineering Consultants, LLC (EEC) for the proposed multi-family apartment complex planned
for construction in Fort Collins, Colorado. For this exploration, EEC personnel advanced twenty-
one (21) soil borings to depths of approximately 4 to 13 feet below present site grades at pre-
selected locations within the various proposed building footprints and associated on-site
pavement improvements. This exploration was completed in general accordance with our
proposal dated January 17, 2022.
In summary, the subsurface conditions encountered beneath the surficial vegetation/fescue grass
generally consisted of cohesive to slightly cohesive lean clay with sand to silty/clayey sand soils
extending to granular gravel/sand with silt/clay soils at depths of approximately ½ to 8 feet. The
cohesive soils were generally dry to moist and soft/very loose to stiff/dense and exhibited nil to
low with an occasional high swell potential (at boring B-15) and slight tendency to hydro-
compact at current moisture and density conditions. Gravel/sand with silt/clay soils were
encountered below the cohesive to slightly cohesive soils and extended to the depths explored at
approximately 4 to 13 feet below the site grades. Zones of larger cobbles were also encountered
in the gravel/sand soils. The gravel/sand soils were generally dry to moist and medium dense to
very dense. Groundwater was observed in the two deepest borings; B-14 and B-20 which
advanced to depths of approximately 13 and 10 feet below the site grades at depths of
approximately 7 to 9 feet, respectively. Groundwater was not observed in the rest of the borings
advanced to maximum depths of approximately 7 feet below the ground surface at the time of
drilling.
very dense. Groundwater was observed in the two deepest borings; B-14 and B-20 which
advanced to depths of approximately 13 and 10 feet below the site grades at depths of
approximately 7 to 9 feet, respectively. Groundwater was not observe
advanced to maximum depths of
approximately 7 to 9 feet, respapproximately 7 to 9 feet, resp
LE
G
E
N
D
DR
A
I
N
A
G
E
B
A
S
I
N
BA
S
I
N
N
U
M
B
E
R
BA
S
I
N
A
R
E
A
(
A
C
R
E
S
)
EX
H
I
B
I
T
4
.
2
FU
T
U
R
E
D
E
T
E
N
T
I
O
N
A
N
D
W
A
T
E
R
Q
U
A
L
I
T
Y
R
E
Q
U
I
R
E
M
E
N
T
S
RE
S
T
R
I
C
T
A
M
O
U
N
T
O
F
R
U
N
O
F
F
TO
E
X
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
I
F
RE
-
D
E
V
E
L
O
P
E
D
.
W
A
T
E
R
Q
U
A
L
I
T
Y
PR
O
V
I
D
E
D
I
N
R
E
D
W
O
O
D
P
O
N
D
RE
Q
U
I
R
E
F
U
T
U
R
E
O
N
-
S
I
T
E
DE
T
E
N
T
I
O
N
&
W
A
T
E
R
QU
A
L
I
T
Y
.
R
E
L
E
A
S
E
R
A
T
E
@
0
.
2
0
c
f
s
/
a
c
r
e
RE
Q
U
I
R
E
F
U
T
U
R
E
O
N
-
S
I
T
E
DE
T
E
N
T
I
O
N
.
WA
T
E
R
Q
U
A
L
I
T
Y
P
R
O
V
I
D
E
D
IN
R
E
G
I
O
N
A
L
P
O
N
D
.
FU
T
U
R
E
R
E
-
A
L
I
G
N
E
D
V
I
N
E
DR
I
V
E
.
W
A
T
E
R
Q
U
A
L
I
T
Y
PR
O
V
I
D
E
D
W
I
T
H
S
N
O
U
T
S
.
DI
S
C
H
A
R
G
E
I
N
T
O
RE
G
I
O
N
A
L
P
O
N
D
W
I
T
H
O
U
T
FU
T
U
R
E
D
E
T
E
N
T
I
O
N
O
R
WA
T
E
R
Q
U
A
L
I
T
Y
.
RE
S
T
R
I
C
T
A
M
O
U
N
T
O
F
R
U
N
O
F
F
TO
E
X
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
I
F
RE
-
D
E
V
E
L
O
P
E
D
.
F
U
T
U
R
E
W
A
T
E
R
QU
A
L
I
T
Y
R
E
Q
U
I
R
E
D
.
RE
S
T
R
I
C
T
A
M
O
U
N
T
O
F
R
U
N
O
F
F
TO
E
X
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
I
F
RE
-
D
E
V
E
L
O
P
E
D
.
W
A
T
E
R
Q
U
A
L
I
T
Y
PR
O
V
I
D
E
D
I
N
R
E
G
I
N
A
L
P
O
N
D
.
BA
S
I
N
1
0
3
:
N
O
D
E
T
E
N
T
I
O
N
O
R
WA
T
E
R
Q
U
A
L
I
T
Y
R
E
Q
U
R
E
D
I
F
DI
S
C
H
A
R
G
I
N
G
I
N
T
O
EV
E
R
G
R
E
E
N
W
E
S
T
P
O
N
D
COLLEGE AVENUE
RED CEDAR CIRCLE
LEMAY AVENUE
DRY CREEK
BRISTLECONE DRIVE
CONIFER STREET
NOKOMIS COURT
BLUE SPRUCE DRIVE
CONIFER STREET
LUPINE DRIVE
RE
D
W
O
O
D
PO
N
D
RE
G
I
O
N
A
L
PO
N
D
REDWOOD STREET
COLLEGE AVENUE
JEROME STREET
BONDELL STREET
OSIANDER STREET
EAST VINE DRIVE
70
.
0
a
c
68
.
2
a
c
13
.
2
a
c
18
.
5
a
c
8.
7
a
c
29
.
3
a
c
11
.
4
a
c
9.
8
a
c
11
.
4
a
c
4.
8
a
c
16
.
4
a
c
3.
3
a
c
1.
3
a
c
31
.
6
a
c
52
.
7
a
c
21
.
3
a
c
7.
4
a
c
18
.
1
a
c
17
.
0
a
c
2.
5
a
c
2.
7
a
c
2.
0
a
c
4.
6
a
c
2.
5
a
c
13
.
1
a
c
3.
9
a
c
13
.
7
a
c
1.
8
a
c
0.
2
a
c
7.
2
a
c
6.
0
a
c
3.
8
a
c
0.
6
a
c
2.
4
a
c
5.
2
a
c
1.
6
a
c
2.
6
a
c
35
.
7
a
c
2.
6
a
c
1.
8
a
c
1.
8
a
c
1.
6
a
c
1.
2
a
c
0.
7
a
c
4.
2
a
c
2.
6
a
c
13
.
6
a
c
13
.
0
a
c
8.
6
a
c
7.
1
a
c
5.
1
a
c
4.
5
a
c
4.
2
a
c
10
.
9
a
c
8.
2
a
c
19
.
2
a
c
16
.
0
a
c
32
.
4
a
c
17
.
5
a
c
9.
8
a
c
16
.
6
a
c
29
.
3
a
c
6.
0
a
c
10
.
3
a
c
5.
9
a
c
1.
5
a
c
1.
3
a
c
21
.
2
a
c
1.
2
a
c
1.
5
a
c
1.
1
a
c
1.
1
a
c
8.
2
a
c
1.
0
a
c
8.
6
a
c
5.
2
a
c
14
.
8
a
c
2.
0
a
c
1.
6
a
c
3.
3
a
c
1.
4
a
c
5.
3
a
c
1.
2
a
c
1.
0
a
c
2.
7
a
c
2.
2
a
c
3.
9
a
c
3.
3
a
c
3.
4
a
c
4.
4
a
c
7.
9
a
c
0.
2
a
c
4.
2
a
c
1.
1
a
c
1.
7
a
c
2.
4
a
c
2.
0
a
c
1.
0
a
c
36
.
2
a
c
5.
5
a
c
49
.
1
a
c