Loading...
HomeMy WebLinkAboutDrainage Reports - 07/13/2004I FMrrITY OF FinalReport FORT CO�b UTat� a Date 3 0i, Final Dramage Report for Fort Collins Coloradoan Laruner County Colorado May 27 2004 NORTHERN ENGINEERING NESERVICES, INC Final Drainage Report for Fort Collins Coloradoan Larimer County, Colorado May 27, 2004 Prepared For: Coloradoan 1212 Riverside Avenue Fort Collins, CO 80525 Prepared By: NORTHERN ENGINEERING SERVICES, INC. 420 S. Howes, Suite 202 Fort Collins, Colorado 80521 Phone: (970) 2214158 Fax: (970) 2214159 Project Number: COD:03-050 1 I I I 1 I �I NE NORTHERN ENGINEERING SERVICES, INC. May 27, 2004 Fort Collins Utilities - Stormwater P.O. Box 580 Ft. Collins, CO 80522 Attn Basil Hamdan, RE: Fort Collins Coloradoan Fort Collins, Larimer County, Colorado Project Number: COD:03-050 Dear Basil: Northern Engineering is pleased to resubmit this Final Drainage Report for the Fort Collins Coloradoan Office for your review. This report summarizes the final drainage design for Fort Collins Coloradoan Office. The design of the drainage infrastructure conforms to the current City of Fort Collins Standard Design Criteria and Standard Construction Requirements dated January 2003. The plans and calculations have been revised per comments received from the City dated March 31, 2004. If you should have any questions or comments as you review this report, please feel free to contact me at your convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Mark Oberschmidt, PE Project Engineer 420 SOUTH HOWES, SUITE 202 / FORT COLLINS, COLORADO 80521 1 970.221.4158 / FAX 970.221.4159 Table of Contents VICINITY MAP IINTRODUCTION .................................................................................................................. 2 II SITE LOCATION AND DESCRIPTION.............................................................................. 2 ASite Location.......................................................................................................................2 BSite Description................................................................................................................... 2 III DEVELOPED DRAINAGE............................................................................................... 3 A Design Criteria and References.......................................................................................... 3 BProject Constraints.............................................................................................................. 3 IVDRAINAGE CONCEPTS.................................................................................................. 4 AGeneral Concepts................................................................................................................ 4 BOn Site Detention................................................................................................................ 4 CFloodplain Considerations .................................................................................................. 4 VDRAINAGE DESIGN............................................................................................................ 4 ASwales ................................................................................................................................. 4 BDetention .............................................................................................................................4 CCurb Cuts............................................................................................................................ 5 DStorm Sewer........................................................................................................................ 5 VIWATER QUALITY............................................................................................................ 5 AWater Quality Measures and Criteria................................................................................. 5 VIIEROSION CONTROL....................................................................................................... 6 AErosion Control Plan ........................................................................................................... 6 VIIICONCLUSIONS .................................................................................................................6 ACompliance with Standards................................................................................................ 6 BEffectiveness of Design...................................................................................................... 6 DCREFERENCES ................................................................................................................... 6 Appendix A — Hydrology Calculations Appendix B — Water Quality Calculations Appendix C — Swale Design Calculations Appendix D — Curb Cut Design Calculations Appendix E — Erosion Control Calculations Appendix F — Erosion Control Cost Estimate Appendix G — Storm Sewer Design Calculations Final Drainage Report Fort Collins Coloradoan May 27, 2004 Northern Engineering Services, Inc. I hereby certify that this report (plan) for the final drainage design of Fort Collins Coloradoan prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the City of Fort Collins Criteria. NUMBER 35nI ,hzAA Mark Oberschmidt L tered Professional Engineer State of Colorado No. 35721 (Seal) Pd-C I Final Drainage Report Fort Collins Coloradoan May 27, 2004 I II Final Drainage Report For the Fort Collins Coloradoan Fort Collins, Colorado May 27, 2004 INTRODUCTION Northern Engineering Services, Inc. 1 This Final Drainage Report summarizes the drainage design for the proposed development of Fort Collins Coloradoan, an expansion of the existing facilities. All calculations and design associated with this project are done in accordance with the current City of Fort Collins Standards. SITE LOCATION AND DESCRIPTION A Site Location The site is located in Northwest Quarter of Section 18, Township 7 North, Range 68 West of the 6`h Principal Meridian, City of Fort Collins, County of Latimer, State of Colorado. More specifically, the site is located at 1212 Riverside Avenue. (See Vicinity Map). The site is bounded by BNSF Railroad ROW on the north, Riverside Avenue on the south and developed properties on the east and west. B Site Description The site slopes from southwest to northeast with about 6 feet of relief across the site. The site encompasses approximately 2.86 acres. There are existing buildings on the site, which will be removed. A proposed 19,600 sf building will be constructed on the site along with revisions to the existing parking areas in Phase 1. The parking on the east side of the site will be permanent. The parking along the west side of the building will be temporary, as another building will be constructed there in the future with Phase 2. This will not significantly affect the runoff quantities in the future, as it will be replacing one impervious surface with another 2 Historically stormwater from the site leaves the site via surface flow at northeast corner of the site. A site visit on Saturday 12/13/03 showed this to be the case. This outfall is poorly defined and appears to be drain rather poorly. We have verbal reports from the neighbors that water ponds up in the area on the north side of the property to the east in heavy storms and then percolates into the soil. In addition, runoff from the street would only enter the site if the flows in the curb and gutter overtopped the drives at the north and south ends of the site. Page 2 ' Final Drainage Report Northern Engineering Services, Inc. Fort Collins Coloradoan ' May 27, 2004 ' 3 The developed site is subdivided in 5 sub -basins designated 1-5. Basins 1-4 contribute runoff to the northeast comer of the site. Basin 5 contributes runoff to the street at the southeast corner of the site. Basin 5 consists of the existing half ROW ' along the frontage of the site and the landscaping areas along the frontage of the site. Refer to Appendix A for the rational calculations. Table 1 summarizes the sub -basin information. 1 1 Table 1 Basin Summary Basin Area ac C2 C10 C100 % Imp 1 0.70 0.69 0.69 0.87 66% 2 0.48 0.87 0.87 1.00 90% 3 1.12 0.87 0.87 1.00 89% 4 0.30 0.90 0.90 I.00 93% 5 0.72 0.83 0.83 I.00 83% ' 4 The existing site has an imperviousness of approximately 97%. Development of the site will reduce the overall imperviousness by adding landscaping in addition to the proposed building. ' S Basins 1-4 contribute stormwater to a proposed water quality pond in the northeast comer of the site. Basin 1,2 and 4 will be routed to the pond via a grassed swale ' along the north property line of the site. Basin 3 is routed to the pond via the parking lot. III DEVELOPED DRAINAGE A Design Criteria and References 1 Drainage criteria City of Fort Collins Rainfall IDF curves were used in conjunction ' with the Rational Method to determine peak flows at design points on the site. B Project Constraints 1 All grading on the site will have to match the existing or proposed grades at the limits of the site. ' 2 Detention is not required for this site. Measures to improve the water quality before it leaves the site are required. 3 The outfall from the site is located at the northeast corner of the site. This outfall is poorly defined east of site as noted in the site description. The percolation that occurs Page 1 Final Drainage Report Fort Collins Coloradoan May 27, 2004 Northern Engineering Services, Inc. on the property to the east will also work to remove particulates from the stormwater runoff. ' IV DRAINAGE CONCEPTS A General Concepts 1 Stormwater is conveyed generally via surface flows across the site to the water quality pond. 2 Swales are provided in areas where concentrated flows occur outside of the parking lot. A swale is provided along the north property line that will convey stormwater to the water quality pond in the northeast corner. An existing swale along the east ' property line to convey flows from the site to the east to the northeast corner of the Coloradoan site. B On Site Detention 1 Detention is not required for this site. C Floodplain Considerations ' 1 No portion of the site lies within a FEMA or City of Fort Collins delineated floodplain. The FIRM map Community Panel Number 08100102-004C Dated March ' 18, 1996 is attached in the map pocket. ' V DRAINAGE DESIGN A Swales 1 A proposed swale will be constructed along the north property line to convey flows from the west parking lot and the building to the northeast corner of the site. Design ' flows are 133% of the Q 100 to the design point. Refer to Appendix C for additional detail on the swale design. ' B Detention 1 No detention is required for this site. 1 1 ' Page 4 ' Final Drainage Report Northern Engineering Services, Inc. Fort Collins Coloradoan May 27, 2004 ' C Curb Cuts I Two curb cuts are provided in the parking lot to convey water from the parking lot ' into the swale or the water quality pond. The cuts are sized to pass the 2-year storm with a maximum head of 0.5 feet and the 100-year storm with a maximum head of I foot. Thus the maximum depth of flow in the parking lot will be less than I foot. D Storm Sewer ' 1 Storm sewer is provided at 3 locations on the site. Refer to the calculations in Appendix G for additional detail. a An area inlet will be constructed in the plaza area on the west side of the building. b An area inlet will be constructed in the parking lot on the west side of the building. Sub -basin 4 contributes to this inlet. This inlet and the storm sewer will be removed in the future when the future building is constructed. ' c A trench drain and storm sewer will be constructed under the trash dumpster pad on the east side of the building. ' VI WATER QUALITY A Water Quality Measures and Criteria ' 1 Water quality criteria from the Urban Drainage and Flood Control District were used ' in designing water quality measures. Refer to Appendix B for the water quality Calculations. 2 A water quality pond located along the north property line of the site will treat the surface runoff before it leaves the site. The water quality pond has an available volume of 3,896 cubic feet. The required water quality volume is approximately ' 3,890 cf. 3 A water quality outlet structure will be built into the retaining wall that defines the ' pond. A concrete pan is provided as an outlet from the water quality pond. 4 The water quality pond will allow for sediment to settle out in the pond Periodic ' maintenance of the water quality pond will be required. The owners will be responsible for this maintenance ' 5 The water quality pond outlets to the northeast into an existing swale area that flows to the east. It is apparent from site visits that some ponding does occur in the swale to the east and the runoff percolates into the ground. This pending and percolations will act as an additional water quality measure for the site. ' Page 5 I 1 1 Final Drainage Report Fort Collins Coloradoan May 27, 2004 VII EROSION CONTROL A Erosion Control Plan Northern Engineering Services, Inc. 1 The erosion control measures shown on the erosion control plan will control both wind and rainfall erosion. 2 The following temporary sediment control measures are specified to be put in place and remain until permanent vegetation is established. a Gravel bag dikes in swales b Gravel inlet filters on curb cuts c Silt fence along the east, south and north property lines d Vehicle tracking control pads at the construction entrance (�a 3 Permanent erosion protection will consist of buried riprap protection at the drop into the water quality pond from the east parking lot. A construction schedule for the riprap aprons is shown on the Grading and Erosion Control Plan. A construction detail is provided on the detail sheet. Riprap is also provided at the outlet from the water quality pond. 4 All disturbed areas outside of the parking lots will be seeded and or landscaped to establish permanent ground cover. A seeding table is provided on the grading and erosion control plan. ' VIII CONCLUSIONS A Compliance with Standards I 1 '1J 1 All drainage analysis has been performed according to the City of Fort Collins Standards. B Effectiveness of Design 1 The design of the drainage improvements associated with the Coloradoan will adequately treat the stormwater before it leaves the site. IX REFERENCES Drainage Criteria Manual, Urban Drainage and Flood Control District, Wright Water Engineers, Inc., Denver, Colorado, Updated June 2001. Page 6 I 1 I [I 1 1 1 I Final Drainage Report Fort Collins Coloradoan May 27, 2004 Northern Engineering Services, Inc. Erosion Control Reference Manual for Construction Sites, City of Fort Collins, Colorado, Hydrodynamics, Inc., January 1991. Storm Drainage Design Criteria and Construction Standards, City of Fort Collins, Colorado, Updated April 1999. 1 Page 7 ill W a 5/24/2004 Northern Engineering Services Inc. By: meo Fort Collins Coloradoan Proj. No. COD:03-050 Flow Summary for Coloradnan.Rita Finaneinn Design Upstream Total C2 C100 Tc Tc 12 1100 Q2 Point Basins Area 2-yr 100-yr Q100 Developed Flows acres min min iph iph cfs cfs 1 1,2,3,4, 2.60 0.83 1.00 11.00 10.50 2.13 7.57 4.57 19.68 2 2, 0.48 0.87 1.00 5.00 5.00 2.85 9.95 1.19 4.78 3 3, 1.12 0.87 1.00 11.00 10.50 2.13 7.57 2.07 8.48 4 4, 0.30 0.90 1.00 5.00 5.00 2.85 9.95 0.77 2.99 5 5, 0.72 0.83 1.00 11.00 11.00 2.13 7.42 1.27 5.34 COD -rational Flow Summary curb cut curb cut Sump Inlet Street flow, Page 1 of 7 � r M M r ® M M M M M M M M M M r M M 5/24/2004 Northern Engineering Services Inc. COD -rational By: meo Proj. No. COD:03-O50 Fort Collins Coloradoan Dbasins-Summary Sub -basin Information For Storm Sewer and Street Capacity Calculations Area Area C2 C10 C100 Travel %%imp C2*A Basin sf arrPa 1 30299 0.70 0.69 0.69 0.87 343 66% 0.49 2 20818 0.48 0.87 0.87 1.00 131 90% 0.42 3 48823 1.12 0.87 0.87 1.00 512 89% 0.97 4 12889 0.30 0.90 0.90 1.00 25 93% 0.27 5 31476 0.72 0.83 0.83 1.00 565 83% 0.59 Total 3.32 2.74 Average C 1 0.83 0.83 0.97 1 0.82 Weighted Average C 0.83 0.83 1.00 Sub- basin Paved/ Concrete ac Grass ac Roof ac Total Ac Check 1 0.02 0.24 0.44 0.70 OK 2 0.43 0.05 0.00 0.48 OK 3 1.00 0.12 0.00 1.12 OK 4 0.28 0.02 0.00 0.30 OK 5 0.60 0.12 0.00 0.72 OK Total 1 2.33 0.55 0.44 Impervious Area acres acres acres 2.77 Pervious Areal 0.55 Totall 3.32 Page 2 of 7 5/24/2004 Northern Engineering Services Inc. COD -rational By: meo Fort Collins Coloradoan C-dbasins Proj. No. COD:03-050 :omposite Runoff Coefficient for Sub -basins rcentaae of land use hreakdown Sub- basin Area ac Paved/ Concrete ac Landscaping ac I Roof ac Check 1 1 0.70 1 2.9% 34.3% 62.9% 100% 2 1 0.48 89.6% 10.41 0.0% l00% 3 1.12 89.3% 10.7% 0.0% 100% 4 0.30 93.3% 6.7%j 0.0% 100% 5 0.72 83 . 3F61 16.7%1 0.0°% 100°% Land use Breakdown Sub- basin Area acl Paved/ Concrete ac Landscaping ac I Roof ac Total Area ac 1 1 0.70 0.02 0.24 0.44 0.70 2 0.48 0.43 0.05 0.00 0.48 3 1.12 1.00 0.12 0.00 1.12 4 0.30 0.28 0.02 0.00 0.30 5 0.72 0.60 0.12 0.00 0.72 Determine Runoff Coefficient for 2 yr storm Area*C2 Sub- basin C Paved/ Concrete Landscaping Roof Total A*C2 0.95 0.20 0.95 1 0.69 0.02 0.05 0.42 0.49 2 0.87 0.41 0.01 0.00 0.42 3 0.87 0.95 0.02 0.00 0.97 4 0.90 0.27 0.00 0.00 0.27 5 0.83 0.57 0.02 0.00 0.59 Page 3 of 7 5/24/2004 Northern Engineering Services Inc. By: meo Fort Collins Coloradoan Proj. No. COD:03-O50 Determine Percent Impervious for each Basin Area*Imnerviou.cnPsa Sub- basin %impery Paved/ Concrete I Landscaping Roof Total A*I 100°s 0%i 100% 1 66% 0.02 1 0.00 0.44 0.46 2 90%1 0.43 1 0.00 0.00 0.43 3 89% 1.00 0.00 0.00 1.M 4 93% 0.28 0.005 83% 0.60 0.00 0.00 0. Determine Site Imperviousness Sub -basins 1 and 2 only Imperviousness 75.42%; Determine Existing Imperviousness for site Site Area 124SAS of - 0 Paved/ Sub- Concrete Landscaping I basin %impery ac ac Roof ac Total 10016 096 100% Ex Site 96.9% 2.05 0.09 0.72 2.86 COD -rational C-dbasins Determine Contributing area and peak flow to swale along east property line from existina site EPnaaved/ ete Landscaping I Check Area ac C2 ac Roof ac Area ac 0.95 0.20 0.95 0.40 0.86 0.24 0.04 0.12 0.40 Tc min I2 iph 1100 iph Q2 cfs C100 Q100 cfs 5.00 1 2.85 1 9.95 0.98 1.00 3.98 Page 4 of 7 5/24/2004 Northern Engineering Services Inc. By: meo Fort Collins Coloradoan Proj. No. COD:03-050 Design Point Summary Composite Runoff Coefficients COD -rational Dpointsummary DP Contributing Sub -basins Area ac C2 C10 I C100 °, Imp 1 1,2,3,4, 2.60 0.83 0.83 1 1.00 1 83.5% 2 2, 0.48 0.87 0.87 1.00 1 89.6°s 3 3, 1.12 0.87 0.87 1.00 89.3% 4 4, 0.30 0.90 0.90 1.00 93.3% 5 5, 0.72 0.83 0.63 1.00 83.3% Page 5 of 7 11M M M = = = = = = M = = M r r 5/24/2004 Northern Engineering Services Inc. COD -rational By: meo Fort Collins Coloradoan DQ-basin-Major Proj. No. COD:03-050 MAJOR STORM - 100-YEAR EVENT Fort Collins Colorado Overland Flow Time of Concentration: Intensity, I From Figure 3-1 Ti = (0.395 `( 1 . I -CCf)'L ^ 0.5)/5 ^ 0.33 Gutter/Swal Flow Time of Concentration: Rational Equation: Q = CiA (Equation RO-1) Tt = L / GOV Velocity (Gutter Flow), V = 20 5' T, = T, + Tt (Equation RO-2) Velocity (Swale Flow), V = 15 S" J Note: Actual Tc rounded to the nearest 0.5 minutes Pipe C factor = I .48GAR213/n C5 assumes all overland flow Is grass unless otherwise noted Sub-basm Info Slopes for Travel times are average slopes over the travel distance Overland Flow Gutter Flow Swale Flow Tc Sub- Area Basin acres flows C 100 CCf Length, L (ft) Slope, S M T. (min) Length, L 00 Slope, S M Vel, V (ft/s) Tt (min) Length, L (ft) Slope, S M) Vel, V (ft/s) Te (min) Comp. T� (min) Travel Length (ft) U180+ 10 Actual T� (min) Intensity, I (in/hr) Flow, (cis)Developed 1 2 3 4 5 Total Determine 0.70 0.48 1.12 0.30 0.72 3.32 Tc 0.e7 1.00 1.00 l.oa 1.00 0.00 to Pond 1.00 1.00 0.25 0.15 0.15 0.15 from 41 131 15 10 11 11 site 1.00 2.00 2.00 2.00 2.00 2.00 1.2 1.7 4.8 4.4 4.6 4.6 0 O 497 15 554 554 0.00 0.50 0.50 0.50 0.50 0.50 0.00 1.41 1.41 1.41 1.41 1.41 0.0 0.0 5.9 0.2 6.5 6.5 302 0 0 0 0 0 0.50 1.00 0.00 0.00 0.00 0.00 1.06 1.50 0.00 0.00 0.00 0.00 4.7 0.0 0.0 0.0 0.0 0.0 5.9 5.0 10.6 5.0 I.1 11.1 343 131 512 25 565 565 11.91 6.0 9.31 5.64 10.73 5.0 9.95 4.7E 12.84 10.5 7. s7 8.4E 10.14 5.0 9.95 2.99 13.14 I1.0 7.42 5.34 13.14 11.0 7.4z o.00 1 1 1-4 1-4 North South I.00 0.25 131 15 2.00 2.00 1.7 4.8 1497 0 0.50 0,50 1.41 1.41 0.0 5.9 I0 448 1 0.50 0.50 1 .06 1.06 1 7.0 0.0 1 8.7 10.6 579 13.22 8.5 NA NA 512 1 12.541 10.5 INA IMA Conclude: TC to pond fro 10.50 minutes Page 6 of 7 M = IM M =1 5/24/2004 Northern Engineering Services Inc. By: meo Fort Collins Coloradoan Proj. No. COD:03-050 MINOR STORM - 2-YEAR EVENT Fort CollinsColorado Overland Flow. Time of Concentration Intensity, I From Figure 3-1 Ti = (0.395"( 1 . I-CCf)'L^ 0.5)/5 ^ 0.33 Rational Equation: Q = CiA (Equation RO-1) Guttfr/Swate Flow Time of Concentration Tt = L / GOV Velocity (Gutter Flow), V = 20 5"' T, = T, + Tt (Equation RO-2) Velocity (Swale Flow), V = 15 5"' Note: Actual Tc rounded to the nearest 0.5 minutes C5 assumes all overland flow is grass unless otherwise noted Slopes for Travel times are avern,, ch,n« .,, Hk_ Y_, i Sub -brim Info Overland Flow Gutter Flow Swale Flow T 5ub- Length, 51ope, Length, Slope, Vel, Length, Slope, Vel, Comp. Travel Area lBa5m acresFC2 L(it) L 5 T. encjth CCf (ft) M (min) (t) M (ft/5) (min) (t) I%) (ft/5) (min) (min) (it) Developed flows 0.69 0.95 41 1.0 1.8 0.0 0.0 0.00 0.0 302.0 0.5 1.06 4.7 6.5 343 0.87 0.95 131 2.0 2.5 0.0 0.5 1.41 0.0 O.O I.0 I.50 0.0 5.0 131 0.87 0.20 15 2.0 5.1 497.0 0.5 1.41 5.9 0.0 0.0 0.00 N/A 10.9 512 0.90 0.1510 2.00 4.4 I5 0.50 I.41 0.2 O O.0 0.00 N/A 5.0 25 0.83 0.15 1 11 1 2.00 4.6 554 0.50 1.41 6.5 0 0.0 0.00 N/A I.I Determine To to Pond from site 565 COD -rational Dq-basin-Minor U180+ 10 Actual T� (min) Intensity, I (in/hr) Flow, (cf5) 11.31 6.5 2.60 1.26 10.73 5.0 2.85 1.19 12.84 11.11 2.13 2.17 10.14 5.0 2.85 0.77 13.14 I.0 2.13 1.27 1 i 1-4 1-4 North ISouthl 0.95 0.20 131 115 2.00 1 2.00 2.5 1 5.1 0 457 0.50 0.50 1.41 1 1.41 0.0 15.9 448 O 0.50 0.50 1.06 1 1.06 7.0 1 0.0 9.5 1 10.9 579 13.22 9.5 512 1 12.84 1 11.0 conclude: Tc to pond froll.00 minutes Page 7 of 7 1 1 1 1 1 1 1 G tz a a 4 I I 5/25/2004 By: meo Proj. No. COD:03-050 Reference Northern Engineering Services Inc. Coloradoan Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices, Urban Drainage and Flood Control District, September 1999. Project I I Location joloradoan Expansion IFort Collins, CO REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 2.170 <--INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 83.46 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = <- CALCULATED WQCV (watershed inches) _ <-- CALCULATED from Figure EDB-2 ' WQCV (ac-ft) _ <— CALCULATED from UDFCD DCM V.3 Section 6.5 10cf WQ Depth (ft) _'-` 2.730'" <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a (in2)_ <-- CALCULATED from Figure EDB-3 1 1 1 1 CIRCULAR PERFORATION SIZING dia (in) _ 5/16-.: . <-- INPUT from Figure 5 s. (in) = 2 <— INPUT from Figure 5 n = 2 '. <-- INPUT from Figure 5 t (in) _. 3/$ ;.a; <-- INPUT from Figure 5 number of rows = <— CALCULATED from WQ Depth, row spacing, and channel thickness round to lowest whole -number = total outlet area (in2)_ INPUT from above cell CALCULATED from total number of wholes TRASH RACK DESIGN Trash Rack Open Area Ratio =�fsF <-- CALCULATED from Figure 7 Required Trash Rack Open Area (inZ) ,l <-- CALCULATED from UDFCD DCM V.3 Section 6.6 Wconc (In) = 3 <-- INPUT from Table 6a-1 Wopentng (in) = 9 —INPUT from Figure 4 DON'T FORGET WELL -SCREEN * N/A <-- INPUT from Table 6a-2 WQCV EDB ' Page 1 of 3 5/25/2004 By: meo Proj. No. COD:03-050 Determine Volume for WQ pond Volume = 1/3'd"(A+B+sgrt(A"B)) Northern Engineering Services Inc. Fort Collins Coloradoan Overflow Pond First Even Top of Pond Weir Bottom It Increment ft Contour ft Elevation ft elevation It 4944.30 0.50 4945.00 494746F 4946.50 Stage ft Elev (E) ft Area (A) A Volume (VI) cf Cum Volume (Vc) of Cum Volume (Vc) AF 0.00 4944.30 0 0 0 0.00 0.70 4945.00 1113 260- 260 T 1 1.70 4946.00 2850 1915 2174 0.05 2.20 4946.501 3984 1701 3875 0.09 Determine Required WSEL for WQ Volume Required Volume cf WSEL ft Depth ft 3319 4946,34 2.04 Volume cf Stage ft 3875 2.20 3318.98 2.04 2174 1 1.70 WSEL = 4946.34 ft Concluded: Water Quality pond is adequate WQCV Pond Volume Page 2 of 3 5/25/2004 Northern Engineering Services Inc. By: meo Coloradoan Proj. No. COD:03-050 Size overflow weir from WQ pond Criteria - minimize head over weir since the length of wall required to obtain the volume will be extensive Design Q Maximum C Req'd Design Actual M100 Head (H) Length ft Length Head ft ft (Lr) (Ld)ft 4.57 0.2 2.6 19.67 20.00 - 0.20 Conclude: Design the weir to split the flow along the south and east retaining walls Elevation of overflow weir is 4946.50 ft Top of Wall is 4947.04 ft WQCV overflow weir Page 3 of 3 z 0 ., F Q aU d z w A w 3 U 2/9/2004 Northern Engineering Services Inc. COD -Swale By: meo Fort Collins Coloradoan Channel Proj. No. COD:03-050 Design of Triangular of Trapezoidal Swale Swale Description Swale along Railroad Legend Input Channel Configuration Trapezoidal Calculation Channel Lining Grass Error Check Design Storm 100 year Title Q Design Storm (Qds) 21.57 cfs Design Q = Qds* 1.33 28.69 cfs Da Db Dc Sc n W I ft ft ft ft/ft ft ft 5.25 5.25 1.75 0.0040 0.032 2.00 0.25 0.33 Left Bank Slope 3.0 :1 Side Slope 0.33 Right Bank Slope 3.0 :1 Side Slope Dc ft Top Area sf Perim ft R 2/3 Se 1/2 Q cfs V ft/sec Width ft (A/P) ft 1.75 1 12.50 1 12.69 1 13.07 1 0.98 1 0.06321 36.54 1 2.88 Formula Q = 1.486*A*R�2/3*S�0.5/n Conclude: Swale is adequate for flows Page 1 of 1 1 1 1 1 i 1 1 1 1 1 i 1 1 SO 5/24/2004 Northern Engineering Services Inc. COD -curb cuts By: meo Coloradoan Broadcrested Weir Proj. No. COD:03-050 Determine Required width of curb cut to pass 02 @ Maximum Head - only required to handle first flush (use the Q2) to water quality pond- for water quality purpose Maximum C Req'd Design Actual Head (H) Width ft Width Head ft I EDesign Q2 cfs ft (Lr) (Ld)ft h%=2.07 0:50 - $.00 196 6.00 0.24 ; 1:I`9' 0.50 3.00 ,= 1';17 -'2.00 034 Formula : Q = CLH^312 L = Q/CHA3n H = (Q/CL)A213 Determine required head for Q100- max head = 12" - max depth in parking lot allowed Maximum C 1 Design Actual Head (H) Width Head ft Design Point 0100 cfs ft (Ld)ft 3 d ;,8,48 100 3.00' ,„„` + t ', 6.00 mot, 0,61 2 4: � 1.00 3.00 Conclude: width is adequate to pass initial flows to water quality pond. There will be some overflow into the swale along the east property line @ DP 1 during the 100-yr event. Flow depths in the parking lot will be <= 1.0 foot at each location. Page 1 of 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i z w a G RAINFALL PERFORMANCE STANDARD EVALUATION STANDARD FORM A PROJECT: Fort Collins Coloradoan MAJOR BASIN: All Areas CALCULATED BY: MEO TOTAL BASIN AREA (Ai,) : 3.380 acres DATE: January 2 1, 2004 DEVELOPED 5UB-BA5(N ERODISILITY ZONE A,h (acres) L„r (ft) .,�, x A�> 5,b (%) A,6 x 5,6 Le (ft) Sy P5 (%). (%j l MODERATE 2.150 574. 1234.1 2.00 4.30 2 MODERATE 0.490 12C 61.7 2.00 0.98 3 MODERATE 0,740 4,59 3C.1.9 1.00 0.74 TOTAL 3.380 1G57.7 6.02 490 1.78 78.2- ' EQUATIONS: Lb l (Lsb X Lsb l / Sb (Ssb X L'sb / 1 — Ab `4b ' PS (during construction) = 78.2 (From Table 5.1) PS(after constru t1 n) 92.O Ps^ , / 0.85 EFFECTIVENESS CALCULATIONS 5TANDARD FORM B i e�wwi: i ur" wum5 i uioraaoan MAJUK BASIN: All Areas I CALCULATED BY: meo TOTAL BASIN AREA (Al,) : 3.350 acres DATE: January 21, 2004 CONSTRUCTION PROCE55: Dunna Sediment Basin / Trap 1 .00 1 0.50 lat all pond outlet structures and above -ground inlets Gravel Bag Barrier 1,00 1 0.80 Jim Swale along north property line Straw Bales 1.00 1 0.80 Inot applicable Asphalt / Concrete Pavement 0.01 1 1.00 jall roads, parking lots, walks, etc. Erosion Control Mats / Blankets 0.10 1.00 not applicable 5ilt Fence Barrier 1.00 0.50 jalong north and east property line Temporary Vegetation / Cover Crops 0.45 1.00 inot applicable Hydraulic Mulch @ 2 Tons / Acre 0.10 I .00 Inot applicable Hay or Straw Dry Mulch (From Table 5.2) 0.17 1.00 Inot applicable All Areas 1 75.2 > 78. PLAN INTENT: see "Grading and Erosion 3.380 Control Plan" from the set: Utility Plant for Fort Collins Coloradoan Roads: Impervious 3.380 1 Walks: all pervious areas have been grouped together Parking: Pervious 1 0.000 C"' = 0.01 P, = 0.20 EFF = 59.8% construction erosion control measures EQUATIONS: (Ai x Ci C. = A P. =P, xP,xP,... EFF=[1—(CxP)]x100 b 2/9/2004 Northern Engineering Services Inc. COD-EFF-Calcs By: meo Fort Collins Coloradoan Form B (after) Proj. No. COD:03-050 EFFECTIVENE55 CALCULATIONS STANDARD FORM B T: Fort Collins Coloradoan MAJOR BASIN: All Areas ATED BY: meo TOTAL BASIN AREA (A0 : 3.380 acres nuary 2 1, 2004 CONSTRUCTION PROCE55: After F I .00 all roads, parking btswalk.etc. Concrete Pavement 0.01 ed Native Grasses (riq., 5.1) 0.34 I .00 1n Swale abng north propertyy line Sod Grass 0.01 I .W all on -site Iandscapmg MAJOR Y'5 . BA51N {%) 'SUB BASIN (acI'r; PLAN INTLNTL see "Gradingand Erosion All Arcas 92.0 3.380 Control Plan' from the set: Utility Plans for Fort Collins Coloradoan Roads: Impervious 3,360 Walks: all pervious areas have been grouped together Parkmg: Pervious 0.000 Native Grass: 0.300 acres in along north property line and WO pond Sod Grass: 0.071 acres of permanent sod landscaping C , = 0.01 Pa= 1.00 EFF = 99.09E EQUATIONS: �(A,xC ) C.,= P,,=PxP=xP3... EFF=[1—(CxP)x100] Ae Page 1 of 1 w q� z w a d I 1 1 1 1 1 1 1 1 1 J 1 1 1 1 1 1 1 2/9/2004 Northern Engineering Services Inc. COD -Erosion Costs By: meo Fort Collins Coloradoan Sheetl Proj. No. COD:03-050 Fort Colhn5 Coloradoan Ero5lon Control Cost E5tIRIatC Project Number: COD:03-050 Location: Fort Collins, CO Date: January 21 ,2004 Total Acre: 3.35 Estimated Unit Total EP05ION CONTROL MEA5URE Units Quantity Price Price Gravel Bag Inlet Filters each 4 $75.00 $300.00 5ilt Fencing L.F. 900 $2.50 $2,250.00 Gravel Bag 5ediment Traps each 2 $100.00 $200.00 Gravel Bag Dikes each 4 $75.00 $300.00 Vehicle Tracking Control Pads each 2 $200.00 $400.00 TOTAL = $3, 450.00 AMOUNT OF 5ECURITY = 1.5 x $3,450.00 = TOTAL = $5,175.00 -OR- 005T TO VEGETATE: TOTAL ACRE5 x ($G55/acre) x 1.5 = TOTAL = $3,320.85 (WHICHEVER 15 GREATER) REQUIRED AMOUNT OF 5ECURITY = $5, /75.00 1 Page 1 of 1 I I 1 r L 1 r 1 1 1 1 1 I 1 1 I I C7 I 5/25/2004 Northern Engineering Services Inc. By: meo Coloradoan Proj. No. COD:03-050 Determine Capacity of Pin Wheel Drain and storm sewer under Building Contributing area sf Contributing area ac C Tc min I 1100 iph 0100 cfs I- 140010.031 0.951 51 9.951 0.38 Grate Type Area sq in Free Free Max Max Allowable Drain drain area Capacity allowable Capacity area % sf cfs flow cfs [13-1/2" (1) depth (d) ft Pinwheel 182.25 0.169 0.21 0.84 0.5 0.75 COD -area inlet Al Max Capacity based on 0.8 ft head over inlet (D) Flow in per sf Open Area 3.95 cfs per ft of head over inlet - Figure 5-3 Capacity if Grated inlet in sump Allowable capacity based 0.5 ft head over inlet (d) Flow in per sf Open Area 3.50 cfs per ft of head over inlet - Figure 5-3 Capacity if Grated inlet in sump Conclude: Sidewalk to southwest will overtop with flow depth of more than 0.10 feet so we can be fairly sure that icing will not be a problem Notes 1 - Free area percentage from the supplier 2 - Capacity Pipe Capacity Pipe Diam ft Pipe Area sf Pipe Perim ft Hyd Rad ft n C Slope ft/ft Capacity cfs 0,671 0.351 2.101 0.16751 13.26642 0.005 0.94 Conclude: Pipe and Inlet are adequate Page 1 of 2 5/25/2004 Northern Engineering Services Inc. By: meo Coloradoan Proj. No. COD:03-050 Determine Capacity of area inlet and storm sewer in west parking lot Basin I Q100 cfs 41 2.99' Grate Type Free Max drain area Capacity sf(1) cfs R-3340 B 1.30 5.14 Max Capacity based on E Flow in per sf Open Area ll—_ Conclude: Inlet is adequate Notes 1 - Free drain area from supplier Pipe Capacity head over inlet (D) s per ft of head over inlet - Pipe Diam ft Pipe Area sf Pipe Perim ft Hyd Rad ft n C Slope ft/ft Capacity cfs 1.0 ` k0;79 ;^ 314 0,251 0.013 ,35;5Zs05 Conclude: Inlet and Pipe adequate. Pipe will flow under pressure during the 100-year event COD -area inlet A2 inlet Page 2 of 2 49 47 46 p5 - - - 1 47 � 46 El A � Z / 7 cues cur 1' clu6e cur TRENCH DRAIN\ J / / s \ •.•\ 4(�\ .. "AND 6" HOPE / jb STORM DRAIN 3 8" HOPE \\ - / 1.01.12 \ i 1.0 D.4B STORM \ CIAWATE UALITY POND / DRAIN / EO'D VOL M - 3871 CF AVAI BLE VOL M = 3875 CF - - IN LUDES V LU E IN SWALE n w T P OF POND TOP WAL - 4947.04 FT OVE FLOW 4946.5 FT / INV UT = 4944.30 11 CURB CHASE 12" HDPE STORM TRAIN / / I �552 1 / IMF Miss GES 001 MEN gig 5p t 4 49 \ \ 2' CONCRETE TRICKLE PAN' \ I / \ I \ Nov 52 ♦ G, i '� 51 49 _ / _ 5 14 _ - 5 ' -- -4950- - - 1.0 D.72 z RIVERSIDE AVENUE----_495D-_ LEGEND/ ul"NO STORM S INLU -5020 m"NO CCNIWa -..-. -...- ECSBNQ RnuNE PRNmT KDMNDN., sim midiiiiiiii PROPOSED afR mumN xw ®xm NIX ImVR C V4E 1C0-YFA9 C VI LE L' DESIGN FORT PBOPER BQUNUAl P Nmm 2PAN DUSBIC CCNoUR5 PROPOSE➢ CURB AND :UTTR Flow Summary Coloradoan Site Expansion Design Point Basins Area acres C2 C100 Tc Tyr min Tc 100yr min 12 iph 1100 iph Q2 efs Q100 a1's Notes Developed Flows 1 1,2,3,4, 260 0.83 1.00 11.00 10.50 2.13 7.57 4.57 19.68 WQ pond 2_ 2, 0.48 0.87 1.00 5.00 50OT2.-851 9.95 1 1.19 1 4.78 curb cut 3 31 2 0.87 1.00 11.00 10.50 1 2.13 17.57 2.07 8.48 curb cut 4 4 0.30 0.90 1.00 5.00 5.00 2.85 9.95' 0.77 2 99 Sump Inlet 5 51 0.72 0.83 1.00 1 1.00 11.00 2.13 7.42 1.27 1 5.34 Street flows 20 0 20 W Ai 1,.L IN m I 1 imh . N IL City of Fort Collins, Colorado UTILITY PLAN APPROVAL CHECKED Rt;Y CHECKED 6r:� CHECKED W: �- CHECKED Bn� 6 CHECKED BT: -��