Loading...
HomeMy WebLinkAboutDrainage Reports - 01/21/1998i FM PARK ENGINEERING CONSULTANTS FIROlTY OF FORT COLLW6 FINAL DRAINAGE REPORT AND EROSION CONTROL PLAN HEALING ARTS INSTITUTE LOT 5A, REPLAT OF COLLINDALE BUSINESS PARK 3'd FILING FORT COLLINS, COLORADO 420 21 st Ave. Suite 101 • Longmont, CO 80501 • (303) 651-6626 • FAX (303) 651-0331 FINAL DRAINAGE REPORT AND EROSION CONTROL PLAN HEALING ARTS INSTITUTE LOT 5A, REPLAT OF COLLINDALE BUSINESS PARK 3°' FILING FORT COLLINS, COLORADO Prepared for: Bill A. Stashak, AIA Architecture - Planning 5 Forrest Hills Lane Fort Collins, Colorado 80522 (970)416-9080 Prepared by: ' Park Engineering Consultants 24021 ST Avenue ' Suite 101 Longmont, Colorado 80501 ' (303) 651-6626 October 6, 1997 ' Revised: November 21, 1997 January 6, 1998 ' PEC Job #23150001."d TABLE OF CONTENTS Certification I. General Location and Description II. Historic Drainage Ill. Drainage Design Criteria IV. Drainage Facility. Design V. Conclusion Appendix A - Drainage Calculations Appendix B - Erosion Control Map Pocket Appendix C - `Storm Drainage Report' Collindale Business Park March 14, 1989 by: Stewart & Associates Map Pocket " I hereby certify that this report (plan) for the drainage design of Healing Arts was prepared by me (or under my direct supervision) in accordance with the provisions of The City of Fort Collins Storm Drainage Design Criteria and Construction ndards forjo q wner�s, thereof' I. GENERAL LOCATION AND DESCRIPTION LOCATION ' The proposed Healing Arts Educational Facility is located within the Collindale Business Park, a subdivision located in the east % of Section 31, Township 7 North, Range 68 West ' ofthe 6'n P.M., City of Fort Collins, County ofLarimer, State of Colorado. More specifically known as Lot 5A of the Minor Subdivision plat of Lot 5 of Collindale Business Park, Third Filing, on the west side of Automation Way at the intersection of Automation Way and Lowe Street. The site occupies 1.39 acres of the existing 5.7 acre Parcel 2; which is 24.4% of said Parcel 2. The site's general location is shown on the enclosed Grading, Drainage and Erosion Control Plan located at the end of this report in the map pocket. TOPOGRAPHY ' The site is unimproved and is void oftrees, and has a ground cover of a variety of grasses and weeds. The site slopes northeasterly on an approximate slope of 1.4%. There are existing improvements that surround the site. Water and sanitary sewer lines are present within ' Automation Way right-of-way. Other utilities such as telephone, gas and electric are in the area. See enclosed map for existing contours and topographical features. II. HISTORIC DRAINAGE BASIN DESCRIPTION ' The Collindale Business Park subdivision lies within the Fox Meadow Drainage Basin. The Collindale Business Park was Master Planned by Stewart & Associates, Inc. in March 1989. The specific site basin is located within said Master Plan. The site totally drains to the ' northeast to the existing storm drainage infrastructure in Automation Way. A small amount of off -site drainage enters along the east property line from the Union Pacific Railroad. III. DRAINAGE DESIGN CRITERIA ' The city of Fort Collins "Storm Drainage Criteria Manual" was used as a standard. ' Additionally, these standards were supplemented with the `Storm Drainage Report' for Collindale Business Park presented to the City of Fort Collins by Stewart & Associates, Inc. on March 14, 1989, and as amended on August 6, 1993 (enclosed as Appendix Q. This ' report was developed using the above referenced manual and supplement. The Hydrologic criteria used for this report was based on the "Intensity - Duration - Frequency" curves for the City of Fort Collins. Using the rational formula method for runoff calculations, flow rates ' for the site basin were determined for the 10 and 100 year storms. Calculations are shown in Appendix A. IV. DRAINAGE FACILITY DESIGN ' The drainage concepts for the developed conditions will be discussed in the following paragraphs. The developed conditions are shown on the "Grading, Drainage and Erosion ' Control Plan" located in the map pocket at the end of this report. The Healing Arts Educational Facility site (Lot 5A) will be developed in a manner consistent ' with the storm water management master plan (see report/plans in Appendix Q. The development is typical with buildings, parking and landscaping. The runoff will be directed through curbs and gutters to the proposed detention pond. Off -site runoff from the railroad tracks to the west and an undeveloped lot to the south will be passed through the site. The detention pond will detain storm water volumes and will release the storm water to the existing storm water infrastructure in Automation Way at the allowable release rate. The detention volume and release rate were determined by using a percentage of Lot 5A to the total area of original `Parcel 2', as shown on the Master Plan. The required detention volume equals 8,452 cf and the allowable release rate is 0.30 cfs. Off -site drainage flows will enter the site and detention pond, which will be released through the Emergency Overflow during the 100-year storm or greater. Detailed calculations can be found in Appendix A. V. CONCLUSIONS The drainage concepts for this project are consistent with current policies and practices for storm drainage management and the subdivisions `Storm Drainage Report' for Collindale Business Park dated March 14, 1989 by Stewart & Associates, Inc. (See Appendix Q. The site will maintain the flow patterns and be consistent with the development practices in the area based on the master planning. Refer to Appendix B for erosion control measures for the site. APPENDIX A ' { Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS ' Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: ' Asphalt ....................................:. 0.95 Concrete.. 0.95 Gravel ....................................... 0.50 ' Roofs .......................................... 0.95 i Lawns, Sandy Soil: Flat <2%.............................. 0.10 ' Average 2 to 7%..................... 0.15 Steep >7%.. 0.20 tJ Lawns, Heavy Soil: Flat<2%..................................... ............................ 0.20 Average 2 to 7%. 0.25 —' Steep>7%..................................... 0.35 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. The time of concentration, Tt, represents the time for water to' flow from the most remote part of the drainage basin under consideration to the design point under consideration. The time of concentration can be represented by the following equation. T, = tov + tt Where: Tt - Time of Concentration, minutes t„ = overland flow time, minutes tt= travel time in the gutter, Swale, or storm sewer, minutes The overland flow: time, t,,, ,can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). l87(7.1-CCf)d 12 TOV S113 Where: T„ = Overland Flow Time of Concentration, minutes S = Slope, % C =.Rational Method Runoff Coefficient D Length of Overland Flow, feet (500' maximum) C= = Frequency Adjustment Factor The travel time, tt, in the gutter, Swale, or storm sewer can be estimated with the help of Figure 3-3. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is requiredbecause of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. . These frequency adjustment factors are found in Table 3-4. May 1984 Revised January 1997 Design Criteria 3-5 No Text HEALING ARTS INSTITUTE ■ DEVELOPED RUNOFF SITE BASIN: ' AREA = 1.39 -ACRES S — 1.00 % CALCULATIONS 'COMPOSITE'C'-FACTOR TYPE OF IMPROVEMENT AREA SF % C5 CIO C100 BUII,DING 7360 18 0.95 0.95 0.95 PARKING 22584 41 0.95 0.95 0.95 LANDSCAPING 30541 41 0.20 0.20 0.20 ' COMPOSITE'C'-FACTORS=> 0.57 0.57 0.57 RATIONAL METHOD ADJ. FACORS => 1.00 1.00 1.25 Q=CIA Tc = 1.87 1.1-CfC •S RT L / S^1/3 L = 380 S = 1.0 % ' Tc 10 = 19.29 MIN Tc 100 = 14.09 MIN I10 = 3.30 IN/HR ' I100 = 7.30 IN/HR =CIA ' 10 = CfC1A => 2.62 CFS 100=CfCIA=> 7.24 CFS Page 1 HEALING ARTS INSTITUTE ALLOWABLE RELEASE RATES: PER MASTER PLAN: ' PARCEL SIZE 1.39 ACRES ORIGINAL PARCEL 2 (TOTAL) 5.7 ACRES CONTRIBUTING PERCENT 24.39 % ' FROM MASTER PLAN: ' Qr(ALLOWABLE OUTFLOW) _> 1.25 cfs Q10r & Q100r (LOT 5A) _> 0.3 cfs ' ' VOLUME OF RELEASE @ 5 MIN. _> 91 Cf VOLUME OF RELEASE @ 10 MIN. _> 183 Cf VOLUME OF RELEASE @ 15 MIN. _> 274 Cf ' VOLUME OF RELEASE @ 30 MIN. _> 549 Cf VOLUME OF RELEASE @ 60 MIN. _> 1097 Cf VOLUME OF RELEASE @ 90 MIN. _> 1646 Cf VOLUME OF RELEASE @ 120 MIN. _> 2195 Cf ' VOLUME OF RELEASE @ 150 MIN. _> 2743 Cf VOLUME OF RELEASE @ 180 MIN. _> 3292 Cf Page 2 HEALING ARTS INSTITUTE ■ POND VOLUMES: AREA 1.39 ACRES ' C10 = 0.60 CfC10A = 0.834 C100= 0.77 CfC100A= 1.000 Q10r & Q100r (RELEASE RATE) => 0.3 cfs ' CUMULATIVE RUNOFF CF 10-YEAR 100-YEAR ' TIME 10-YEAR VOL. W/ 100-YEAR VOL. W/ MIN. 110 c RELEASE 1100 c RELEASE 0 0 0 0 0 ' 5 5.60 1401 1310 9.20 21760 2669 10 4.40 2202 2019 7.10 4,260 4077 15 3.73 2800 2525 6.00 5,400 5126 30 2.60 3903 3354 4.15 7,470 6921 60 1.62 4864 3767 2.60 9,360 8263 90 1.20 5404 3758 1.87 10,098 8452 120 0.92 5524 3330 1.43 10,296 8101 ' 150 0.75 5629 2886 1.18 10,620 7877 180 0.64 5765 2473 .1.05 11,340 8048 DETENTION POND => STAGE - STORAGE ' ACCUM. ELEVATION AREA VOLUME VOLUME ' FT FTA2 FTA3 FTA3 4952.05 0 0 3062 ' 4953.00 6447 3062 4953.07 3767 <= 10-YEAR ' 4953.57 8452 <= 100-YEAR 9499 ' 4954.00 12551 12561 Page 3 I O N I O _ O - O i - O W O a0 N } O O O �1 r T o� S `O E a1) ¢ d on .- _ o O x I O i _o M O N O I I I o I I i I 0 0 0 0 0 o O N 0 a00 co It N 63) 'lon gouna HEALING ARTS INSTITUTE RELEASE STRUCTURE 10 & 100-YEAR: ' ALLOWABLE RELEASE RATE = 0.30 CFS C = 0.65 H = 1.52 FT ORIFACE RELEASE Q100 = CA(SQRT(2gH)) tA = 0100/(C)(SQRT(2 H) _> 0.05 FTA2 R = 12*(SQRT(A/PI)) _> 1.463 IN ' D=2R=> 2.926 IN ' USE _> 3 INCH DIAMETER ORIFACE Page 4 HFALINGARTSINSTITUTE OFF -SITE RUNOFF OFF -SITE WEST OS - AREA= 0.38 ACRES S — 1.00 % Cl-FACTORS => CIO C700 0.25 0.50 RATIONAL METHOD ADJ. FACORS => 1.00 1.25 ' =CIA tTc = 1.87 1.1-CfC 'SQRT(L) / S^1/3 L = 490 S = 1.0 % Tc 10 = 35.19 MIN ' Tc 100 = 19.66 MIN 110 = 2.37 IN/HR 1100 = 5.20 IN/HR =CIA 10 = CfCIA => 0.45 CFS 100 = CfCIA => 1.24 CFS Page 5 HEALING ARTS INSTITUTE fl OFF -SITE RUNOFF OFF -SITE SOUTH (OS-S): ' AREA = 0.34 ACRES S — 1.00 % ' Cl-FACTORS => CIO C100 0.25 0.50 RATIONAL METHOD ADJ. FACORS => 1.00 1.25 ' —CIA ' Tc= 1.871.1-C1C'S RTL /S^1/3 L= 450 S= 1.0 % Tc 10 = 33.72 MIN Tc 100 = 18.84 MIN I10 = 2.45 IN/RR ' I100 = 5.30 IN/RR CIA ' 10=C1CIA=> 0.42 CFS 100 = C1CIA => 1.13 CFS Page 6 ' WEIRS nter up to 10 weirs. nter <Return> only for flowrate and length to end. LENGTH COEFF HEAD �LOWRATE (CFS) (FT) (-) (FT) ----------------------------------------- 0.46 10.0 3.100 '.61 7.84 1 10.0 3.100 0.40 ��ox£ D' =pus i¢2�F Gi,)£r) DRAINAGE CRITERIA MANUAL 50 30 t— 20 z w U a: W a 10 z L a 0 5 fA W 3 0 U 2 W Q RUNOFF 4-i :1 �nnn1■IIWAI1�KFA i . � . / Innilll� ���■® In . inii i �� : INNEENN� r �►,��1 �vr■voIWA�a��������� ;nn►�n�ann►inr� nn���� .2 .3. .5 I 1 1;5 2 .3 5 10 20 VELOCITY IN FEET PER SECOND Figure 3-3 ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. * MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE:: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5-1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT �r__.____�_ — — — see n 'eY i E /e.xOTr —� __�� /f� �_�_ NCO&CR f IU°.!!' It fee NOTE 1 smeldi ,rr,yY corries storm flirt a 'I If/`3 / I ' I ' l 1 / / l ' l \ Iron. ^ail.e<d Slidev i, / / / "Id Tn•o-• frolf covers, t MIL -It elf v.!. ,. rA.'dac4 h L 2/ / S71�, lL i rxcsy \ \ ^ O . •� OInMW ?°Ln e7.� / /RT[r.rTle/•I RE J•/'efD a4W�09 i �e / i I \\ — 4 z V e I I I y �'LL.Ow OJ E OUT LAW W e 1, 5 ci` EC? s0 ce // I \I \\ ` ////aVrr.o✓: J.l:oah / / �,. `,n; f/ 6.a Pic. I I s O C ♦R iY .9 / i II ' /� (`�i/ //O�•.. 1.. / / off ya/ / , e4�g. Ad w /11. to Left 4� my IN oa- old Ill ad If +rT[u rtewl d s :9//i3 �/ L¢T 3 /le" aw:us:iril If eongrrv9<r:u �.nx99 eS4JdrR l ..-or.yT .r.'rn.a., e..vu / Cl ' If/ If Jyca, did /' �// / / // / —� I / / / a,r/ / / v ru fee j de if If If le IS Tof \ y/ / k• fee G/ / / ' / YaY z _ ritT ++ / o /. / (nx IL'.sriol.a �\ /// 0 ^ ` r c [ I \ \ \\ C M ./ i / /4 t % / ^ /bE _' \ \ u p,� / / .a / // ': _ . — '✓ 1 vim,' t % CAR` _i : I. . , V = If te If of It PAN U / / // / /, Iui h ' / / 1 7`0/. rasa.✓. ? -J / a....Y - ° - r is ,i/ . / / _ °ie 6 _ __ r Id.ae.e'er. _ \'rr". It; _�—_—F^_, ——Ss ai i'L�AM on�t_� �� ��l nnO:runwu r -� �l uAd L C,,`'� C �r\.�� EAST 1# COR^G SECTION dL'}9C1—."nbrWG tFNE— i A�r.s n� ��\ cns• aI• PiAt c "•,� .c ( v _�— 1 ��• rlr—_cam �_ n�` J I it nriL�i..e fee,: cwj /~/e-grl4Fn'v :\ "67n/</ l '.ff I sn 'l z _-- JJVVwwll -h III le "] _ �:Y:'uJTtikL" t ✓ il: J�cr'If IS T It l' \..•../ ---_=..---. ..,.. reviser r.'o'•s, n ur..»,rr r....,I S. Pill,,,.,,... rr•,. r.r,.. Job ,j . III V � A 1• ,> rAe YYA ct II 1AAA1 e\,x I lr 1 ' spot? Russ.. AIAL // 11/6 Gravel fillers APPENDIX B EROSION CONTROL ' Temporary erosion control for this site consists of silt fence, hay bales and vehicular tracking precautions. Silt fence is to be place on the down slopping side(s) of all areas where ' earthwork will be done and where the soil will be disturbed. The sites access to Automation Way shall be the initial grading so the installation of the Tracking Control may occur. Prior to initiating the overlot grading, all silt fence shall be installed in accordance with the enclosed ' plan. The required hay bales shall be placed in front of the release structure prior to installing the proposed sidewalk chase section to the existing curb and gutter. Permanent ef6sion control will consist of concrete pans in the storm water flow charui6ls where required. Please ' refer to the G ading, Drainage and $rosion Control Plan for specific location of erosion control devices and notes. RAINFALL PERFORMANCE STANDARD EVALUATION ----------------------- ------------ ----------------------------------� PROJECT: ftci•xis STANDARD FORM A COMPLETED BY: pAe-fG �SwYA "ATE: /Z1 9 7 --------- -------------------------- ------------------------(r--------� DEVELOPEDIERODIBILITYI Asb Lsb Ssb Lb -� Sb I PS SUBBASIN I ZONE (ac) I (ft) (%) . (feet) (%) I (A) I ----- ---- I---- ---- ---I-------I----i----��---'------------I--- ----i f►« 1 /fie 1/39 5 / ! j77.7j sIT ---------------------- DI/SF-A:1989 . PAGE 23 I 1 1 1 1 1 1 1 1 1 1 1 ^ O .... to LU 0. Ln O' —i N ►1 M O M Ln N O N Ln O O cr. 0+Ooc c er Ll' v; Ln co q q co 00 01 01 M M C G O O O C C C C of Ln In Ln Ln Ln Ln q q q CX) g q q q q q q 01 01 O 01 01 C1 m O1 01 O1 O O O O der V' et et et � etv Q et et Ln Ln Ln i g q q q C q q q q q CO q 00 q q ' M * M O 01 01 O1 C1 C1 01 Ot "O1 O1 O1 01 C1 c'vv�v�cv'vv'�vv��a'�v�Q g q q q q q t: q q q CO 00 q q OD g q q q q O M Kr Ln t0 t0 t0 t0 r\ n r\ r\ r\ r\ n f\ r\ ^ r\ n q 00 q w w co et et teet er et Cet et et 4 et et et et et sT 4 ;et eta 4-0:4 et 00 00 co 00 00 q. co 00 q' q 00 00 00 00 q co g 00 q 00 g q q q rb 00 q N m et Ln Ln Ln t0 t0 t0 t0 t0 t0 n r\ 1-1 r` f` r\ r\ f\ 1\ r\ q q 00 g q q q q q q q Cp O q q CO g q q q O q q q O q 00 q q t0 O N M er et Ln Ln Ln Ln t0 t0 t0 t0 t0 t0 t0 t0 t0 t0 f, ^ r\ r\ r\ n ... . . . . . . . . . . . . . . . . . . . . . . . M V of -cr et etC���et�Q���a'�et q q Coco g q q q q q q q Coco q q Coco q q OOggq00 q M M C er et C' Ln Ln Ln Ln Ln Ln Ln Ln Ln t0 t0 t0 t0 t0 t0 00rMof00cc'ccetwwwetwetetwwct wwwwwww g q q q q q C q q q q q q q q q q q q q q q q q q q O t0 M O •-r .-r N N M M M M q:r R*- et a' et qd, et et Ln Ln Ln Ln t0 t0 MMM�C'cta'���Q'ef met met et et et et et et �et�ef ggqqOq ggqqqq0.^iqqqqOOOq00qqq00 Ln N Ln ^ W 4M O O r+ r+ r-t N N N N N M M M M M R C et et <f . . . . . . . . . . . . . . . . . . . . . . . . . . N M M M M M C qq qq 00 cc 00 co q q Co q co g q q q rb q 0000 q 00 00 00 14 q?- Met Ln Ln t0 t01\ r-I n 0000 co 00 cc co01 al C1 CDC O CD CD N N M M M M M M M M M M M M M M M M M M Met et et et tr q qqq gCO. CO. q q 0000cc co q q q cc q co g q q q q 0000 t0 Ln 00 O .-r N M q** 41*, Ln Ln Ln lO tO tO tO tO t� r-� 1�, 1�, q 00 00 01 01 r.NNM M M M C'; C7 M M C4 M M M CM r4(4 rM CM rM fM M MMM g q q q 00 q= 00 q q 0000 g q q q q q q q q q q q q q .--�.--i Ln I�qO C.--rNNMMM a'�'�- -W Q 4Y Ln Ln to tO tO r, r� .--r. N N N M M M M M M M M M M M M M M M M M M M M CO g q q q q q q q q q q q q 00 q 00 g q q q q q q q q q cn N t0 q 01 O .-t N N M M M C' et q*, e!' -XT tt Ln Ln Ln Ln t0 t0 t0 t0 G rr .-+rti r-. N N N N N N N N N N N N N N N N N N N N N Cow Coco Coco Coco qq oom 00000000 gg00qq00qq0000 Ln Ln C1 N M er Ln t0 r\ r\ n co q q C1 CT C1 C1 C1 m O O O co O O . . . . . . . . . . . . . . . . . . . . . . . . . . 01 C O N .-� r-1 .-+ .-� rti r-1 rti rH r-t .-L rti 1- rti rti 1; 1- N N N N N N r-I g co q q q q q q 00 q q 00 q q q q co co co q q 00 co g co V'Ln O M Ln t00000 C1'4= O O r4 NNMMMrM MM q 01 O O O O O O O 1: 1._; 1: 1; 11 1; 1: r4 r4 r-t 1: f-I r\ co g q q q q q q q q co q 00 q 00 q q q q q q q 00 c0 CO"Co rr-C Lnr, r�,q 01 ONO O.-4r-1 r-1 r-1.-INNNMMMMM . . . . . . . . . . . . . . . . . . . . . . . . . . t0 q q 0101 C1 C1 C1 C101 C1 O 00 00 O O 00 00 00 00 r-_ 1` rl% r-I rl. r%l r� r-I r�l 1-1 r-I g q q q q q q CO g q q q q q c0 t0 M O et C1 O r 4 " M M et et Ln Ln Ln Ln t0 t0 t0 t0 r\ r\ t0 t0 t0 eYt0r� �I�ggq00qqCOqqqqqqqq00q0000q n 1\nf\ r\nnn l\h n1\n^ f\ n f\ n.r\ r-Ir -Ir\n r-I r'� 01Oq*.t0r-00C0r\r,1,t0t0%0LneterMMNN0)t0etr4O1t0 . . . . . . . . . . . . . . . . . . . . . . O N N N N N N N N N N N N N N N N N N N r1 .; rl r/ O O 11. n r*l n ill ^ 1*l r\ ^ t\ 1-1 f\ n r\ ^ r\ t\ f\ n ^ n n r\ r\ n 1-1 ' 1 = 1 1 3 F-- ^ I O O O O O O G O 0 0 0 0 0 0 0 O. 0 0 0 0 0 0 0 Cl 0 0 I O C9 F- 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 1 JZ W 1 r-I NMerLnt0r�lwmCD M-q:rLnt01�wmCDLnOLnCDLnCD 1 Li W 1 r 4 r-i rt rti r1 N N m m et -14, Ln ' 1 J 1 TABLE 5.1 EFFECTIVENESS CALCULATIONS ---------------------------------------------------------------------- PROJECT: /Jft4.M� , .}-s STANDARD FORM B COMPLETED BY: 14.K- Ce,Jsvr,Wf --SDATE: `/ Q Erosion Control C-Factor Method Value ------------------------------- �JI� /kt*i r3i ---------------------------------- A" o P-Factor Value /,o -/,0 os p.8 Comment 49,67 4c MAJORS PS SUB AREA BASIN (%) BASIN+ (Ac) CALCULATIONS sn 77 � ----- I /, 39 - -C --- o z o:o j -t �.58ZO.�S tCos i 1,39 -- [/SF-B:1989 CONSTRUCTION SEQUENCE ' PROJECT^r(GTS STANDARD FORM C SEQUENCE. FOR 19 ONLY COMPLETED BY.:r,-2SrJ£9Ei,-y, DATE: -ALP 1 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule. for approval by the City Engineer.YEAR / ' MONTH I B ,�iA I !1'----------------------------------------------------------- /`u�7 VG►� '. OVERLOT GRADING �-- ' WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers - ' Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment.T.rap/Basin �. ' Inlet Filters . Straw Barriers ' Silt Fence Barriers Sand Bags Bare Soil Preparation ' Contour Furrows Terracing Asphalt/Concrete Paving Other 1 � VEGETATIVE: ' Permanent Seed Planting) Mulching/Sealant Temporary Seed Planting ' Sod Installation Nettings/Mats/Blankets Other ' ----------------------------I----------------------------------------------------------- STRUCTURES: INSTALLED BY MAINTAINED BY ' VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED. APPROVED BY CITY OF FORT COLLINS ON ' HDI/SF-C:1989 # Z,3 JOB PARK ENGINEERING CONSULTANTS SHEET NO OF 1240 Main Street LONGMONT, COLORADO 80501 CALCULATED BY DATE (303) 651.6626 FAX (303) 651-0331 CHECKED BY DATE SCALE /7S .......................... ............. . ........... .. ............ . . ............. . . ... .. .......... . .... . ....... . - .......... ......................... . ....... ......... ............. ............. L- ............. 4-7'�� .......... ........ ............ ONiT ............ . ........... ....... ......... ............. ..... . ...... . . ........... ...... . ........... ........... . ................... . ....... ........ ............... 73:5 . . ... ........ .............. .......... . ............ ...... ......... ...... ... . .. .......... ...... ........ ............. I .... ........ ............ ........... ... .......... ... ......... ............. ......... . ............ ....... ............... .......... ............. ... ..... .......... - ...... . ..... .... ... .. ............... . . ........ ............ ....... . .... .... .. ........... . ............. . ........ ... ....... ........ ........... ........... ...................... . . ...... ........... ............ ............... ............ ............. ............... . ............ ...... ............. . ......... ...... 7, ... ................. ......... .............. .......... . ... .. ........ ... .......... .. ............ - ... ... ............ ... .. . .. .......... .. . .... ..... .... ............. ............. ............. ........... ............. .............. - ......... .. ........ ..... ............. ....... . ........... ............. ...... ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... . ............ . . . . . . . . . . . . . . . . . . . . . . . . . . ...... .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........... - ......... . ............. . . . . . . . . . . . . . . . . . . . . . . . . . . .......... ............. ......... ......... .... . ............. ............. ... .... ......... ........... .... .......... .............. - .......... ............. ........... ... ...... .......... - .......... . ........... .......... .. . ........... . . ............. .. .............. ..... .... ................. ............. .. .............. . ...... . .. - ...... . ...... .............. . ... .............. - ...... ......... ..................... ........ ........... ............. . .......... .......... ... ... . ....... ....... ... ........ ........ ............. ............ ............. - . ..... ........ ........ .... ............. ............. ....... . ....... ...... ... ........ ........ ........ ....... .......... ............. ............... - ........... ............. ...... ..... ... . . ....... ...... ............................ ... ......... ............................. . ...... ...... . . .............. ............. ............. - ........ - ........... ............. . ..................... ............. . ... ............ - ................. ...... . ...... . ..... ..... ... . ....... . ............. ........................ - . . ....... ....................... ......... 011111- Al ................... .............. ........... . .... ......... PRODUCTM 1 (SmgkSfMjM I (P>�j MW 01471. TO O*r PHONE TOLL FREE 1-MMM APPENDIX C 1 STORM DRAINAGE REPORT COLLINDALE`BUSINESS PARK r MARCH 14, 1989 f PREPARED FOR K. BILL TILEY ' STEWART & ASSOCIATES. INC. 214 NORTH HOWES FORT COLLINS, CO 80521 STORM DRAINAGE REPORT COLLINDALE BUSINESS PARK Collindale Business Park is within the Fox Meadow Drainage Basin. The property is located on the west side of Timberline Road and extends west to the Union Pacific Railroad. The property begins 1330 feet south of Horsetooth Road and runs south approximately 1700 feet'to the top of a ridge. The Tiley property covers only the north 1330 feet, and the property to the south belongs to Tom Chandler and Don Chadwick. The gross area of the property, including the Chandler and Chadwick- properties, the west 16f Timberline Road, and the East -f' of the Union Pacific Railroad R.O.W. is 44.5 acres. There is no offsite run-off onto the site. The south boundary is a ridge from which the drainage goes southerly to the Chandler sump. Flows from the west are blocked by the Railroad embankment. The north boundary is the low point and drainage flows east along this north line. There is an irrigation ditch running east parallel to and about six feet north of the north line. This ditch belongs to Bob Shields. The ditch can carry irrigation water from Warren Lake across the golf course, under the railroad and along the north property line. Historically, this ditch has carried storm drainage under the railroad from the golf course and from the railroad right-of-way. This flow from the golf course, according to the Fox Meadows report is Q2=1.0 c.f.s. - Q10=3.0 c.f.s. - Q100=9.0 c.f.s. per page 12 of the report. We propose to not distrub this. ditch or alter the flows which it now receives. ' The attached map shows the entire 44.5 acres divided into 10 sub -basins and a detention pond area, which are shown as parcels 1 through 10 on the map. We propose to provide detention for parcels 1,4,6,7,8,9,10 and the ' pond area. The total area being detained in the pond will be 44.5 acres minus 5.7 acres in Parcel 2. minus 1.3 acres in Parcel 3, and minus 3.1 acres in Parcel 5. which equals 34.4 acres. Detention shall be provided on site on parcels 2 and 3 for the difference between 2 year undeveloped run-off and 100 year developed run-off. Parcel 5. the'Chadwick property, has a 10 year undeveloped run-off of 1.4 c.f.s. which will be carried through the proposed drainage system to the detention pond, area. Future ' detention must be provided on Parcel 5 when and if its present use is changed. The undeveloped 10 year out -flow from Parcels 2 and 3 was used to determine gutter flows because it is greater than the future allowable ' out -flow when the Parcels are developed and on -site detention is provided. These out -flows are shown on sheet 14 of this report. The proposed detention pond is located at the northeast corner of the site. The outfall from the pond will drain under Timberline Road to the east and then into ' the Sunstone swale. The new pipe under Timberline Road is per the design plans of the Fox Meadows Business Park Drainage Channel. We plan to carry the storm runoff by overland flows to the detention pond. The majority ' of the flow will be carried to the pond by a drainage swale which runs to the north along the west side of Timberline Road. Storm Drainage Report ' Collindale Business Park March 14, 1989 Page 2 ' The Collindale Business Park will be developed in phases. The first phase will be the streets, Parcel 1. the drain swale along Timberline Road, and the detention pond. The detention ' pond area will be used as a settling basin for erosion control during the^first phase construction period. No outlet shall be connected to the Sunstone swale before the streets and ' grading on Parcel 1 are.completed. At the time of connection, erosion control may be needed to protect the outfall from sedimentation. A concrete pan is to be placed in the drain swales to prevent erosion. Flow capacities of these pans are calculated on sheet 13 of this report. ' The attached calculation sheets show the run-off calculations from each of the parcels, the allowable gutter flows, the allowable outflow from ' the detention ponds, the required detention, and the volume of the pond. Also, therearerun-off computation sheets showing flows at design points. These design points are shown on the attached map. ' Out -flow from the detention pond will cross under Timberline Road in a 24 inch pipe which empties into the Sunstone swale. This 24 inch pipe will also carry out -flow from the W.W. Reynolds property located directly north of the Collindale Business Park. The W.W. Reynolds out -flow is approximately 5 c.f.s. There will not be a property owners association for this development. ' therefore we propose that the City of Fort Collins maintain the detention area and channels. A 2 year or 2 growing seasontime period is required. Plus, acceptance by Stormwater Utility, prior to assuming maintenance. ' Should the adjacent property owners desire to place more intense landscaping in the detention area and channel than that required by the City, they shall become responsible for placing and maintaining this additional ' landscaping. All landscaping in the detention area and channels shall be subject to approval by the Stormwater Utility, City of Fort Collins. ' Office of STEWART & ASSOCIATES, INC. 3�isf� ' Phillip Robinson.-P.E. & L.S. aatW :, a.Sri V` ` •1` �v CO CGS +,1 �t5024 i • /t 1 2 COMPUTATIONS ' James H. Stewart & Assoc: Fort Collins, Colored By Pig Date ! /6 8 Client: K. Bill %iley Sheet No. •3 of 14-- ' Chkd By: Date Project: lollinolale BclSineSs Bark Job No. Subject S�-Orr-t '%bra irl c+ G(n C:0)ct I'o f ) 0-�a1 Orr055 /4''ec` = . ¢4-. S acres ';4is4vr-fc G=•0.20 S = 0.88�C %- 1.0 7 /.1- .20) Fla O _ 74-S — i G! O;ZO 1� 0.6.1 �¢¢. 5Z.-J. 1 Z e__ 1+LL01,✓1=)-aLC ouTA.vZL ' .4llowadle ova- �10� Per- gcrC = 7.)Z 0.)6 G = Q, BS Pop" 7-0ri J ' slope 0-- Jofs - use /. O /"," 4r devPfaP ed lo45 ' SluPe o� Streets use o.4-�0 ✓e%ocd in 5 ✓4et = Z. Z Fps ) ■ OV0161me of- de�en�i0n Lwl"F- or- Pc)4/1> Etc✓a�-io� Area- U ' 4- Z &50o ' 4. 3 3 y 00 G 44 / O Z 000 0do re��ired 3/3Zo0 cv. {� = 7.19 volame, To zAL t/olvM e 1300 ) 300 Z1750 2 3 0 S0 70 r00 y3sso zu7 S�0 / 37 500 4( / q 0,20 3 d 0 SU ' 0 ve4) o..i c,i- e)evo.k oh 4-4 4-�/ there _ore Fr-ee boars = / , 0 V COMPUTATIONS ' James H. Stewart & Assoc. Fort Collins, Colorafl, By: EIIE Date Client: l/. L3ill % ,Ic y Sheet No._ -of 14- ' Chkd By: Date Project: COIL? ? �QIP 15/5f'7Pf5 hark Job No. �L Subject �741 ' lira 1 nGGfe ('cZ)C(.l c.�10k7I 'Tofa1 D.e�en�lo�. l��tU%r c� — /4rea_LTo--al)-C/Arts, oP porcelt z, 3 j5) 44. S - l 0.1 = -3 a c res- T z c;-� cP, v 7.3 (1.Z'06085)1.34-,4 157067Z '/0 La s. Z 3 3o d-.IS 7-15 G8 4U 3.S Z.88�66 FU Z.G 321ct 9° 18s 34-3GSC 12U /.9ti 3r91 3� 1000 `l or ° M � Lo nl � r: 0 ' C hisYori G 14 G o /o to so 60 90 1 i90 izo COMPUTATIONS STEWART&AS. )CIATES ConsultuY3 En.3ineers and Surveyors 214 N. Howes St. Ft., Collins, CO 80521 (303)482-9331 BY: Date Client: JT L3i// Tilfx Sheet No. s off4- Chkd By: Date Project: CO 1 h c10 If G VS i h L017 F2 I-r Subject -S-k-6r" Draln�ag On S 1, �t- --x J-1' 0 --A %{eon 0 n Jparfel-r zi 3 F Ai G~'i -3.7 -2 ... .rfcc s-i As- �I 1 l .i I I .. 0q1 CAH10a Les. T7, Ar- C-1 r ' i1.110.31 O . o 4rn�n L m L i`� �, VJ 's'o ° ' ,tea 7) r L •-r _ a J xx : C v( L i d 4v 6 J Oro 4 F a J a � b Q) V v - l o M �.�, O O o O g CL A _ s � tj co u .0 u tr d' a � G U 4 ^j N a_ <1I �� �I �I �I ill � > W v rj M Q t0. r fl v C O ... 4 l 91 ale y J W G > L C o V N i 1 E l9 fJ 14Y O M 1. 1V Q • Y ` _ � V1 IY - s • � - V 11f rbl ti � ' a IL o � o b d• c � I. C C a _C f) y /row L 4 7 CZw w� r 04 0 i d�C tl m i E o..y � o C o o i L ti r 6 Jo" c � J W p " O IZ5 oco n o h 1 i � r • d- H ,� `o � M � �Mrr O r M �f f w V s a d d rMn n C9 V t Y b o O p C p m N a b �' !� ►'� U1 m N � 41 � a — %Ir M Q 1 y J W ' p o f • O p is 0 0 'o y w u + + Cr+ O M �1 t M V O .� \3 v E � CD ao v- • C a -lull � J 1�1 � MATES 1 i O M P U TAT I O N S STEWART&ASE Consulting Engineers anc t:urveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482.9331 By: FIZZ II Date L I Client: N 73 i 1) Ti /P y Sheet No. of 14- �I ' hkd By: Date Project: Go hcl a I c vs I n eft Pork subject_ storm Drainog� - Gver Gaflaci�y — /ni�ial S�vl-^'+ ! L v c,y I I �l4 u I t c ross s� G' G=. I I I I I z L ' // Z; c !j G . ! -� , ;s �r I e� !i call I �_ ; 0• Z S i O z to 0 sr ' '� I• 11 i! � i ! � � I! � I I I i i� I ', ! �lC/ i I., 1e. I I !ecireF%icej i I ! V��Jion Fa!f�cr I i i4)l.,wa/� U! 5-1 ' Y•�l ?..00 I /2.Z i i i IpjS7f j 7.�` a s i 114, - I o: �zs a.if 4-i I Gi. 17 Z I I IO.'8 ! Z; 4f1; 1' 81 _I f e I V e r- I� T ee d (' I v,/ eI rI b' ! t I 1 8� P c.e -- sI✓ !j blc IS !a -. ' IO -�ic ! SIG _..� I t �... � I I I I � I� t l l i• • I 1 � t COMPUTATIONS STEWART&ASS MATES Consulting En3ineers ano purveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 ky: Pl F Date Client:.- I3 i I ! T )e-y Sheet No. ! I of —4— �hkd By: Date Project: Ifoll i n o%G Ic R cis %n es-e TPca rkf Subject -s Or-+-1 �rGi%na�P — Sf �PP>< �aDcrC/ �y — /Vja i or ,5-4 r/''1 -- T -_ -TLo1 -- I I iCI , i (fIII` q I Iz1 I � I I I I ` (iL I j �-Z,)(. U�)i I I � soar s r I /!P ! ro I k-¢B I I ! I .+#S - ar I re�lcc I� ' r�9 I i �ro.� '1-'c ,. I �; i I � a�✓cks Q! 0 U•OOf I (. i... I I (V/�'' I I I 1 1 17 1 i �� f '• I Iliilji!I!i'!; I I ! i I I� � I I I � I' I COMPUTATIONS STEWART&a,SSr -1ATES Consultin3lEn3ineersam ..jrveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: F- I R Date qzqS-'c7 Client: 771e-y Sheet No. IZ of 14- I:Iikd By: Date -Project: (toll t'r,cc;tle- / C US (n el ( -Pc- (k �ubject 0,4 -1 !V!= 0 v _ L �d i (f Tr z -4-1 r! ., � C, ; I ; j l I l l � I 13.- 1 S. 5. Vt- 7. Op V C e A .__.. L ► � c. 4-c _7 6r- r7e a:' 57 ri i s Lop ,Ili :;p :.i�or . �F L/ F! T. Z I ! I it I !ill � COMPUTATIONS STEWART&AS )CIATES Ccnsult n v3 Errv3n leers aj .J Surveyors 214 N. Howes St. Ft. Collins, CO 80521• (303) 482.933" • 3 By: P/ R Date Client: I' 13 i 11 Ti le y Sheet No. 1-3 of —L� Chkd By: L Date Project: C011ind0ir OVst.,Psr Pork Subject -5 orrn etjnerqf Cae OL./ pot nl j v�E3� %�•. O ��I �G C a �� i I I T`loiw icttl'GA z.i i) - % = I/•j0' .I i i • '? I• / L �. I i ; .I l 9 ,)Q o z W6 eh1. S %0 �I �i • S. o f I fr i i I i I i r — 3 , • 10 � I 1 'I 0l.G�� ' Jo !- I.. 0�.zb� .I ' :. ir t ! ! I w� J.a t-. I..Ar hl0 � /¢7�S I ;z� i yv�¢3. i� •� i� l i � i � � I� I � i I j I I — — -- - — — - _--VNR?fr —P�4C71`t C9RSt� — - — � i" • __ — _,� — — 1 n p6=3 \ ��_,i _/ ' ` 1 !— 2.4 Ac. E a42 7 _ �.-...� —J—� �--/ �\ Q$a: 3.0 cfs `— No0'O4I)'L IS30.E7l�/ vI,��a 9.0 cfs NOTE t SlTields irriga�ior fror Ra))road iRi iPIRC[L and f ro/rl G°If t wa Ppro pose t-0) S. 7 Adis+vrb 6hie)d$' Co✓: / G: 1 j , ' J7ETENno 99GBef OETEWTIO/N, REQUIRED = 480�0d.�. 1 1 oUtPp3T7c�� / ALLOW OLE OUTALOW c / � �� :• �. � �- , it / / t •. Owe •pi'to<e b / �oq FUTVRE sTR e; /� S7O A TOMATIp/�� E u I 101, � / P.QRCEL �Q� � � C�o fro.ii•2c l•r� ' y ..SAG/NV= ' 1` CokICT ¢ GgTCN 6.RtiA1 :7c) o" GoNST. t7w: n.s�c/ vans_ Af. � (i) / � �� � E ct->,a acv M/ITN NEAOVA�IS 110, 100, /—Lr-001J1T ¢' C.4TC.i.1 IjASoPI d/tt 6 eK-lL J RA �l V / pe X. e., °� ^' o EXIST/NG \ FrNISN 'C~1.0� %38'G. Y p e' A CONTOUR GONTOI/R \\ \ too- �4 "oc�' c z PIJ AREP./ /� 1 1 J 1 tip, If \\ Ice feIr 0 ZI-- (, o- e-OQCRE-re yawl . q u v iS.14 a ,\, ^ y 30-KRCP PROPOslo Z4.` OVTF ti•• I.,so...._ V. IS-K'RGv <.' eoNcaST p/aN ,-aLt P/PE \—�=-------- Fl•7.l' ♦1.. sCsai.s (PER PRR✓IOVS \yLaN \------- _ 500 MUw '4q'r , 30 T7OER— [ OV FL[•� =47.0 CONfr. 4- �-- CAST Y4 CORMER SFC770N3�-f.�1I.S A[. �_ / � / I 1 / , I �\ i ( \\ qT aa^ r•:cq � , � � E'XIST1nIG 24 v�aE t - //,+`+- d• i 1 / .__.�_\ I �\\7 ` w ZS sN I �,ca.Dt' W p,Tc,•l� 1.01 tj a °vim] N� uv i cri Zo 2 \u� 0 RFPnRT OF A PAVEMENT DESIGN FOR COLLINDALE BUSINESS PARK FORT COLLINS, COLORADO MR. BILL TILEY c/o UNIVERSITY REALTY FORT COLLINS, COLORADO PROJECT NO. 7834-89 BY EMPIRE LABORATORIES, INC. 301 NORTH HOWES STREET FORT COLLINS, COLORADO 80521 TABLE OF CONTENTS Table of Contents .............................................. Letter of Transmittal ........................................... Report.......................................0................. Appendix A ..................... Test Boring Location Plan .................................... Key to Borings ............................................... Log of Borings ............................................... Appendix B.................................................... Hveem Stabilometer Data ............. :................. �...... Summary of Test Results ..................................... Appendix C.................................................... u Empire Laboratories, Inc. CORPORATE OFFICE 8 P.O. Boa 503 a 1303) 484-0359 • GEOTECHNICAL ENGINEERING 6 MATERIALS TESTING - 301 Na Howes a Fan COMM Colorwo 80522. I January 30, 1989 Mr. Bill Tiley c/o University Realty, Inc. 2839 South College Avenue Fort Collins, Colorado 80525 Dear Bill: We are pleased to submit our Report of a Pavement Design prepared for the proposed streets located within the Coilindale Business Park west of Timberline Road in south Fort Collins, Colorado. The accompanying report presents our findings in the subsurface and our recommendations for this phase of the project for utility construction and for pavement design based upon these findings. Very truly yours, EMPIRE LABORATORIES, I C. Nell R. S rrod Senior Engineering Geologist Reviewed by: Chester C. Smith, P.E. President CIC 00" SR C. S"'4b�� �.���P DiSTEgFO fly 4808 6W i cc: Stewart E Associates - Mr: Jacu"'Ka" e lT wlch P.O. Boa 16859 P.O. Boa 1135 P.O. Bow 17e4C0104PO. Bow SBSO 1303) 5 o SWingi CO 60935 Longmont. CO 80502 Greeley, CO 80632 Cheyenne, WY 82000 13031597.2116 (303) 776.3921 (303) 351-0460 93071632.0224 Member of Consulting Engineers Coundt SITE LOCATION AND DESCRIPTION The study area is located between Timberline Road west and the Union Pacific Railroad in south Fort Collins, Colorado. More particularly, the site is described as Collindale Business Park, a subdivision situate in the East 1 /2 of Section 31, Township 7 North, Range 68 West of the Sixth P.M., Fort Collins, Larimer County, Colorado. The site consists of a large tract of land which is relatively flat and has minor drainage to the northeast. The property is vegetated with grass and weeds. The area is bordered on the west by the Union Pacific Railroad tracks, on the east by Timberline Road, and on the north and south by vacant land. The proposed center lines of Caribou Road and Lawrence Drive were staked at the time of the site exploration. LABORATORY TESTS AND EVALUATION Samples obtained from the test borings were subjected to testing In the laboratory to provide a sound basis for evaluating the physical properties of the soils encountered. Moisture. contents, dry unit weights, unconfined compressive strengths, water soluble sulfates, pH, sulfides, oxidation-reduction potential, resistivityand the Atterberg limits were determined. A summary of the test results is included in Appendix B. A Hveem stabilometer test was run to determine the "R" value of representative subgrade material at the site, and a curve showing this data is included in Appendix B. SOIL AND GROUND WATER CONDITIONS The soil profile at the site consists of strata of materials arranged in Is different combinations. In order of increasing depths, they are as I follows: r (1) Silty Topsoil: The area tested is overlain by a six (6) inch layer of. silty topsoil. The topsoil has been penetrated by root r 2- .r r� growth and organic matter and. should not be used as a bearing soil or as a fill and/or backfill material. ' (2) Silty Clay: This stratum underlies the topsoil and extends to depths of four and one-half. (4-1/2) to eight (8) feet below the surface. The silty clay is moderately plastic, is damp to moist and exhibits low to moderate bearing characteristics and low subgrade characteristics. (3) Sandy Silty Clay: A layer of tan to red sandy silty clay ' underlies the upper. clays and extends to the sand and gravel _ below and/or the depths explored. The sandy silty clay is rmoist to saturated and exhibits low bearing characteristics. (4) Clayey Sand and Gravel: The clayey sand and gravel was encountered in Borings 1 and 2 at depths of twelve and ' one-half (12-1/2) feet below the surface and extends beyond the depths explored. The sand and gravel contains varying amounts of clay, is poorly graded and exhibits moderate bearing characteristics in its saturated condition. ' (5) Ground Water: At the time of the investigation, free ground water was encountered in Borings 1 through 4 and 6 at depths of six and one-half (6-1 /2) to ten and one-half (10-1 /2) feet below the surface. Water levels in this area are subject to change due to seasonal variations and irrigation demands on and/or adjacent to the site. RECOMMENDATIONS AND DISCUSSION ' Timberline Road is to be widened at the site and has been classified as a major arterial street. The remaining streets within the subdivision are classified as industrial commercial streets. Due to the flat nature of the site, moderate amounts of site grading are anticipated. In addition, water and sewer line utilities will be placed below the proposed streets.. ' -3- Site Grading, Excavation and Utilities It is recommended that the upper six (6). inches of topsoil encountered at the site be stripped and stockpiled for reuse in planted areas. The upper six (6) inches of the natural subgrade below should be scarified and recompacted at or wet of optimum moisture to at least ninety-five percent (95%) of Standard Proctor Density ASTM D 698-78. (See Appendix C. ) All fill should consist of the on -site soils or imported material having an "IZ" value of 5 or greater, and this material should be approved by the geotechnical engineer. Any fill placed at the site should be placed in uniform six (6) to eight (8) inch lifts and compacted at or wet of optimum moisture to at least ninety-five percent (95%) of Standard Proctor Density ASTM D 698-78. The finished subgrade in cut sections below streets should be scarified a minimum of six (6) inches and recompacted at or wet of optimum moisture to at least ninety-five percent (95%) of Standard Proctor Density ASTM D 698-78. Finished subgrade below all pavement should be placed a minimum of three (3) feet above existing ground water. In areas where subgrade compaction cannot be met due to saturated or unstable conditions, the subgrade should be stabilized by use of granular pit run, geotextiles, fly ash, lime .or other - suitable means. Cut and fill slopes should be placed on grades no steeper than 3:1. All utility trench excavations should be dug on safe and stable slopes. It is suggested that excavated slopes be on minimum grades of 1-1/2:1 or flatter. The slope of the sites of the excavations should comply with local codes or OSHA regulations. Where this is not practical, sheeting, shoring and/or bracing of the excavation will be required. The sheeting, shoring and bracing of the excavation should be done to prevent sliding or caving of the excavation walls and to protect construction workers. The side slopes of the .excavation or sheeting, shoring or bracing should be maintained under safe conditions until completion of backfilling. In addition, heavy construction equipment should be kept a safe distance from the edge of the excavation. Where -4- utilities are excavated below ground water, dewatering will be needed during placement .of pipe and backfilling for proper construction. All piping should be adequately bedded for proper load distribution. Backfiil placed in utility trenches in open and planted areas should be compacted in uniform lifts at optimum moisture to at least ninety percent. (90%) of Standard Proctor Density ASTM D 698-78 the full depth of the trench. The upper four (4) feet of backfill placed in utility trenches under roadways and paved areas should be compacted at or near Optimum moisture to at least ninety-five percent (95%) of Standard Proctor Density ASTM D 698-78, and the lower portion of these trenches should be compacted to at least ninety. percent (90%) of Standard Proctor Density ASTM D 698-78. Addition of moisture to and/or drying of the subsoils may be needed for proper compaction. Proper placement of the bedrock as backfill may be difficult, as is discussed above. Stripping, grubbing, subgrade preparation, and fill and backfill placement should be accomplished under continuous observation of the geotechnical engineer. Field density tests should be taken daily in the compacted subgrade, fill, and backfill under the direction of the geotechnical engineer. Laboratory resistivity tests, pH, oxidation-reduction, and sulfide tests performed in the laboratory indicate .that the subsoils at the site are slightly corrosive, and it is recommended that protection of metal utility pipe be considered. Thrust Blocks All thrust blocks for proposed water lines should be founded on the original, undisturbed soil or structural fill properly compacted In accordance with the recommendations discussed in the "Site Grading and Utilities" section of .this report. Thrust blocks should be placed a minimum of thirty (30) inches below finished grade for frost protection. It is recommended that thrust blocks be designed for a maximum allowable bearing capacity of one thousand (1000) pounds per square foot (dead load plus maximum live load). The ultimate passive resistance of the -5- on -site natural clay soils should be computed using the equation Pp = 20OZ + 2000 pounds per square foot, where Z is the depth below the stratum. It is recommended that a minimum factor of safety of 2 be used in conjunction with the above equation. An adhesion of four hundred (400) pounds per square foot between .the concrete and the natural clay soils may be used in the design of the thrust blocks. Flexible Pavement It is our opinion that flexible pavement is suitable for the proposed street construction at the site. A flexible pavement alternate should consist of asphalt concrete underlain by crushed aggregate base course and subbase or asphalt concrete underlain by plant mix bituminous base course. Using the City of Fort Collins "Design Criteria and Standards for Streets" dated July 1986, a serviceability index of 2.5, a regional factor of 1.0, an "R" value of 5, a twenty (20) year design life, eighteen (18) kip equivalent daily load applications of 310 for Timberline Road, 20 for Caribou Road and Lawrence Drive and 15 for Lowe Street, and weighted structural numbers of 4.70 for Timberline Road, 3.0 for Caribou Road and Lawrence Drive and 2.85 for Lowe Street, the following minimum pavement thicknesses are recommended: . Timberline Road Asphalt Concrete 4" Plant Mix Bituminous Base Course 81" Total Pavement Thickness 121" Caribou Road and Lawrence Drive Asphalt Concrete 4" Crushed Aggregate Base Course 6" Select Subbase 611 Total Pavement Thickness 16" -6- 'I Asphalt Concrete 3" ' Plant Mix Bituminous Base Course 5" Total Pavement Thickness 8" ' Lowe Street Asphalt Concrete 4" Crushed Aggregate Base Course 6" Select Subbase 5" Total Pavement Thickness 15" ' Asphalt Concrete 3" Plant Mix Bituminous Base Course 4.111 ' Total Pavement Thickness 71" The select subbase should meet City of Fort Collins Class 1 specifications, and the crushed aggregate base course should meet City of Fort Collins Class 5 or 6 specifications. The subgrade below the proposed asphalt pavement should be prepared in accordance with the recommendations discussed in the "Site Grading and Utilities" section of this report. Upon ' proper preparation of the subgrade, the subbase and base course should be placed and compacted at optimum moisture to at least ninety-five percent (95%) of. Standard Proctor Density ASTM D 698-78. (See Appendix C.) ' It is recommended that the asphalt concrete and/or plant mix bituminous base course be placed in two (2) to three (3) inch lifts. All plant mix bituminous base course and asphalt concrete shall meet City of ' Fort Collins specifications and should be placed in accordance with these specifications. All subbase material shall have an "R" value between 50 and 69, the crushed aggregate base course shall have an "R" value between 70 and 77, the plant mix bituminous base course shall have an Rt value of 90 or greater, and the asphalt concrete shall have an. Rt value of 95 or greater.. The "R" value of the pavement materials used should be verified by laboratory tests. Field density tests should be taken in the aggregate base course, bituminous base course, and asphalt concrete under the direction of the geotechnical engineer. -7- Rigid Pavement A feasible pavement alternate at the site would be rigid pavement. Using the eighteen (18) kip equivalent daily load application described above, a modulus of subgrade reaction of one hundred (100) pounds per square inch per inch based on an "R" value of 5, a design life of twenty (20) years, and concrete designed with a modulus of rupture of six hundred (600) pounds per square inch, the following minimum pavement thicknesses are recommended: Timberline Road Nonreinforced Concrete - 8}�� Caribou Road and Lawrence Drive Nonreinforced Concrete - 5" Lowe Street Nonre:nforced Concrete - 5" Subgrade below proposed streets should be prepared in accordance with the recommendations discussed in the "Site Grading and Utilities" section of this report. Concrete pavement should be placed directly on the subgrade that has been uniformly and properly prepared in accordance with the above recommendations. All concrete used in the paving shall meet ASTM specifications, and -all aggregate shall conform to ASTM C-33 specifications. The concrete should be designed with a minimum modulus of rupture of six hundred (600) pounds per square inch in twenty-eight (28) days. It is recommended that laboratory mix designs be done to determine the proper proportions of aggregates, cement, and water necessary to meet these requirements. It is essential that the concrete have a low water -cement ratio, an adequate cement factor, and sufficient quantities of entrained air. Joints should be carefully designed and constructed in accordance with the City of Fort Collins "Design Criteria and Standards for Streets" to ensure good performance of the pavement. It is recommended that all concrete pavement be placed in accordance with City of Fort Collins specifications. If paving is done during cold weather, acceptable cold weather procedures as outlined in the City -8- specifications should be utilized. The concrete pavement should be �. properly cured and protected in accordance with the above. specifications. Concrete Injured by frost should be removed and replaced. It is irecommended that the pavement not be opened to traffic until a flexural strength of four hundred (400) pounds per square inch is obtained or a minimum of fourteen (14) days after the concrete has been placed. GENERAL RECOMMENDATIONS (1) Laboratory test results indicate that water soluble sulfates in the soil are negligible, and a Type 1-1I cement may be used in _ concrete exposed to subsoils.. Slabs on grade subjected to ' de-icing chemicals should be composed of a more durable concrete with low water -cement ratios and higher air contents. (2) It is recommended that compaction requirements in the project specifications be verified in the field with density tests performed under the direction of the gebtechnical engineer. GENERAL COMMENTS This report has been prepared to aid in the evaluation of the property and to assist the engineer in the design of this project. In the ' event that any changes in the street grade or designs are planned, the conclusions and recommendations contained in this report will not be ' considered valid unless said changes .are reviewed and conclusions of this report modified or approved in writing by Empire Laboratories, Inc, the geotechnical engineer of record. ' Every effort was made to provide comprehensive site coverage through careful locations of the test borings, while keeping the site ' investigation economically feasible. Variations in soil and ground water conditions between test borings may be encountered during construction. In order to permit correlation between the reported subsurface conditions and the actual conditions encountered during construction and to aid In '- -9- I carrying out the plans and specifications as originally contemplated, It Is recommended that Empire Laboratories, Inc. be retained to perform continuous construction review during the subgrade preparation, fill placement, and paving phases of the work. Empire Laboratories, Inc. assumes no responsibility for compliance with the recommendations included In this report unless they have been retained to perform adequate on -site construction review during the course of subgrade preparation and pavement placement.ii li T -10- r t- APPE14DIX A. j TEST BORING LOCATION PLAN Ue.S _6�lbou aa,st=p -�L.(. N4 KEY TO BORING LOGS TOPSOIL •• • GRAVEL FILL •���: SAND & GRAVEL SILT SILTY SAND & GRAVEL /// CLAYEY SILT71 0 p COBBLES SANDY SILT ' o� SAND, GRAVEL & COBBLES. ® CLAY ® WEATHERED BEDROCK SILTY CLAY PH SILTSTONE BEDROCK SANDY CLAY ® CLAYSTONE BEDROCK SANG SANDSTONE BEDROCK �• SILTY SAND ® LIMESTONE CLAYEYSAND ••• GRANITE L SANDY SILTY CLAY a SHELBY TUBE SAMPLE STANDARD PENETRATION DRIVE SAMPLER p WATER TABLE 24 HRS. AFTER DRILLING r_ HOLE CAVED T 5/12 Indicates that 5 blows of a 140 pound hammer Ialling 30 inches was required to penetrate 12 Inches. A=� r# r--Lsk)A'(iod 00.1 4950 4945 4940 4935 4930 LOG Of BORINGS rA MAIM WON in PRA 1� II!/6 LIM •' =7/ PA � Pr� MA l'- O 4925 p_n . '1 LOG OF BORINGS r� t4960 ' 4955 r. r4950 4945 t 1 4940 1 4935 4930 A-5 APPENDIX B. 0 t , c �� N N N N a m M M 1n n N et M M \ N N � wy Qx o U e .. J U 00 oHy coto .w to U 1 1� t0 4 Q n ■ 1� M ov O c r^1 i Y • � N -R:r v apt :C— N 0 N a. Mtrl l0 _ at N Z j 'Ir M F- J • D N W � n F- N W F- LL .2 : O 3=K } fA ] N Q C j LL t cn � 6 Oa 03 Cl O p d N O 0'A t� M to U n r — L = " r• to r` O :a M ' O a— O a% O rr 01 L C >< CT N •7 a' tD CT M tp et et 1� CO l0 cr •-/ N N CV .� In f, fb O M M r/ CO CV CIJ csj O O O O O C7 � CA O O O O O � O O O p « • LL N 1 M LA r• •-y 1 1 1 1 /n N N O .-. <n ~ N M Ln p Ln O O O 1 O 1 O O O O Ln 1 O 1 O 1 O 1 O 1 O •r oz ~ n M m EO to N E E M v cn O RESISTANCE R-VRLUE AND EXPANSION PRESSURE OF COMPACTm SOIL RSTH — D 2844 CLIENT: BILL TILEY PROJECT: COLLIIIDALE BUSINESS PARK LOCATION OF SAMPLE: BORIPIG 110. 1 B O.5'-3.5' SAMPLE DATA TEST SPECIMEN 1 2 3 COMPACTION PRESSURE - PSI 0 0 0 DENSITY - PCF 86.6 91.1 94.9 MOISTURE - % 33.9 30.1 26.8 EXPANSItill PRESSURE - PSI 0.00 0.00 0.00 HORIZONTAL PRESSURE 160 Psi 157 150 145 SAMPLE HEIGHT - in. 2.48 2.47 2.47 EXUDATI011 PRESSURE - PSI 175 239 358 UNCORRECTED R-VALUE 1.2 4.0 6.2 CORRECTED R-VALUE 1.2 4.0 9.2 R-VALUE AT 300 PSI E:<UDATION PRESSURE = 5.5 100 80 w 60 J J rL 40 2u rj Lu 100 e 200 300 400 500 600 EXUDATION PRESSURE — psi EVIPIRE LABORATORIES INC. B-2 C O C •ij N N �V N N N N N to M Cl) .r Co In M _N i m .r to l0 _4 =i ¢x O c o J U -O 3N� QQQQ 01 U n. ov (7 e N u • u wRi a N wax N p N ILO v.E X C6 H J N W = o. H W W F- lL w w a :�co O ip � K CD CD } N M O C) p cc Q In co a CD CD CD CD c LL 4 y rn Ql M Ol cf 1� O p o N M N y M IN rLL • 01 07 1n t U O i a. n O • ^ • O — .•� O Q1 p O o yx O CD to fi C*4 .to tOr "'4 M O1 .. CO et O O .--i ,tn.� N N .--� .-•� .--� .--� N N O O O O O CDCDr_ � O O O O IA O O tff CA O. Q= N f,f ll; .-r fh N M Le) to .�-4 O O O O O O O O O O I[] CD1 1 1 1 1 .4 N qw of .r .r CV tO 9 4 O •"� N In <t .r. .y Ol 1/1 GJ r- A Ln E E tO o .a SUMMARY OF TEST RESULTS Boring Depth q Resistivity. Oxidation -Reduction No. (ft.) Moisture ohm -cm Potential (mV) Sulfide pH 2 0.5-3.5 24.3 1200 240 trace 8.4 5 0.5-3.5 28.2 1600 253 trace 7.9 APPENDIX C. 2 1, APPENDIX C. Suggested Minimum Specifications for Placement of Compacted Earth Fill and/or Backfills GENERAL The geotechnical engineer shall be the owner's, architect's, engineer's or contractor's representative to observe placement of compacted fill and/or backfill on the project. The geotechnical engineer or his representative shall approve all earth materials prior to their use, the method of placement and the degree of compaction. MATERIALS Soils used for all compacted fill and backfill shall be approved by the geotechnical engineer or his representative prior to their use. Fill material shall be free from organic matter, frozen material and other unsuitable substance and shall not contain rocks or lumps having a diameter greater than six . (6) inches. SUBGRADE PREPARATION All tocpsoil, vegetation, trees, brush, timber, debris, rubbish and all other unsuitable material shall be removed to a depth satisfactory to the geotechnical engineer or his representative. The material shall be disposed of by suitable means prior to beginning preparation of the subgrade. The subgrade shall be scarified a minimum depth of six (6) inches, moisture conditioned as necessary and compacted in a suitable manner prior to placement of fill material. Fill shall not be placed until approval by the geotechnical engineer or his representative; and in no case, shall fill Subgrade which material be placed on is frozen or unstable ground. not stable may require material, geotextiles or other methods for stabilization the use of imported granular as approved by the geotechnical engineer. FILL PLACEMENT Fill material shall not be placed during unfavorable weatherC conditions. Material proposed for use as fill shall be approved by the tf geotechnical engineer or his representative prior to use. material shall be Proposed import approved representative prior to hauling by the geotechnical to the project site. Fill engineer or his. material shall be k C-2 uniformly mixed such as to preclude the formation of lenses of material differing from the surrounding material. All clods shall be broken Into small pieces. The contractor shall construct the fill in approximately horizontal lifts extending the . entire length of the fill. The thickness of the layers before compaction shall not be greater than eight (8) inches. Fill being placed on slopes or hillsides shall be. benched into the existing slope. A minimum two (2) foot horizontal bench shall be cut into the existing excavated slope for each four (4) feet vertical of fill, or each lift should be benched slightly into the existing grade. MOISTURE CONTROL Prior to and during compaction operations, the fill material being placed' shall be maintained within the' range of optimum moisture specified. A general recommendation is to maintain the fill material within two percent (2%) plus or minus of optimum moisture so that proper compaction to the specified density may be obtained with a minimal effort. In building pad and paved areas, 'material exhibiting swelling potential shall be maintained between optimum moisture and two percent (2%) wet of optimum moisture content. The moisture content of the fill material shall be maintained uniform throughout the fill. The contractor may be required to add necessary moisture to the fill material and to uniformly mix the water with the fill material if, in the opinion of the geotechnical engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface. If, in the opinion of the geotechnical engineer, the material proposed for use in the compacted fill is too wet to permit adequate compaction, it shall be dried in an acceptable manner prior to placement' and compaction. Uniform mixing may require discing, blading or other methods approved by the geotechnical engineer or his representative. Adjustments of moisture content shall be made on the basis of determinations of moisture content by field tests as construction progresses. COMPACTION The contractor shall furnish and operate the necessary types and kinds of equipment to perform the operations required to obtain the specified compaction. This equipment may include approved . tamping rollers, rubber tired rollers, smooth wheeled rollers and vibratory rollers. If a sheepsfoot roller is used, it shall be provided with cleaner bars so attached as to prevent the accumulation of material between the tamper feet. Fill areas which are not accessible to full-sized construction equipment shall be placed in maximum four (4) Inch lifts and compacted with power tampers to the specified density. C-3 1• 1 .. Compaction should meet the minimum percentages of maximum density as set forth in the project specifications or the recommendations of the report. The contract specifications supercede the recommendations given in this report. MOISTURE DENSITY RELATIONSHIP DETERMINATION Samples of representative fill materials to be placed shall be furnished by the contractor to the geotechnical engineer for determination of maximum density and optimum moisture or relative density. Sufficient laboratory moisture density or relative density curves will be made to determine the optimum moisture content and maximum density for the various soils placed as fill. Tests for this determination will be made using the appropriate method conforming to the requirements of ASTM C. 698 (Standard Proctor), ASTM D 1557 (Modified Proctor) or ASTM D 4253, D 4254 (Relative Density). The materials used for fill shall be classified In accordance with ASTM D 2487 in order to permit correlation betweer, the moisture density relationship data and the material being placed ant.: compacted. Copies of the results of these tests will be furnished to th* client and others as directed by the client. These test results shall be the basis of .control for all compaction effort. FIELD"DENSITY AND MOISTURE TESTS The in -place density and moisture content of compacted fill will b determined by the geotechnical engineer or his representative in accordance with ASTM D 1556 (sand cone method) or ASTM D 2922, D 3017 (nuclear methods). Material not meeting the required compaction and/or moisture specifications shall be recompacted and/or moisture conditioned until the required percent compaction and/or moisture content is obtained. Sufficient compaction tests shall be made and submitted to support the geotechnical engineer's or his representative's recommendations. The results of density tests will also be furnished to the client and others as directed. C-4 m MASTER DRAINAGE REPORT COLLINDALE BUSINESS PARK Collindale Business Park is located between Timberline Road on the east and the union Pacific Railroad on the west. To the south is the Harmony Half Acres subdivision and to the north is South Collins Tech Center. There is a 3.2 acre residential site which is surrounded on the south, west and north by the Collindale Business Park. This 3.2 acre area is included in my calculations. The total area of the site, including the 3.2 acres, is 59.9 acres. There is an irrigation ditch running west to east across the property at the high point. This ditch divides the drainage of the site to the north and south. There are 18.3 acres draining south to the Chandler sump, and 41.6 acres draining north to the proposed detention pond. The portion draining to the Chandler sump is not to be developed at this time and shall remain a pasture. Plans are presently under way to provide a satisfactory outlet from the Chandler sump. Drainage to the north will be from 41.6'acres, and will go into a detention pond located at the northeast corner of property. The Fox Meadows Basin report calls for a shared detention pond with South Collins Tech Center. This detention pond is to have a volume of 8.53 acre feet, and an outlet of 24 c.f.s. There is some offsite drainage from the golf course west of the railroad in a 24 inch steel pipe. The off -site flows are 1 c.f.s. for the 2 year storm and 9 c.f.s. for the 100 year storm per the Fox Meadows Report. The attached sheet 4 shows the site and the proposed drainage routing. Sheets 2 and 3 are drainage calculation sheets. Phillip Y. Robinson, P.E & L.S. 'Ca1STEK •.'t?'% *• 4502 .Q COMPUTATIONS STEWART&ALSE DATES '------:. Consu11in3 Engi x-ms W1O xifVeyOrs ; 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 ' By:y) R Date 8 9- 9B Client: W. 13 ill / ii I ey Sheet No. Z of 4- Chkd By: Date Project: Colli n d cz f e 13V s iri erS hck rlr ' Subject 54-O r.—i Dr G i n G 5 V TO I 1 _.. - A . ;J Y, 71 i _ j 1 3 I t 1 771 r P 1 �07 I ! J t U O a un- oi- jn ti v r o I I �i. 0.6 s 1 2L . C I e /.! 7-.. y 1 1 wi l.. C.. %S e-13 d; ... e oco OF S or 1 t ! w I fer 3 I t 91�� I 2- COMPUTATIONS STEWART&AS—c MATES ------- Consulibn Ep3inem and Sw�ey 214 N. Howes St. Ft. Collins, CO 80521 (303) 482.9331 :By: P) f? Date 6 BB Client: ISM Tle>e Sheet No. 3 of Chkd By: Date Project: Co r- u 5 i n 'e-rs Pc) r- kr Subject ra i n c? 14J+4-E a R + 0 0nIc�1Y+rG'nit' C IA Til. 7 1. r T - "7 AbI r,,- 'G C' 7.. & 0- 7, Q f Z 4 1Z. I I _ ... . _� __. _�__ _ I 'L4� 3X I-- t 0 7 e' Ic .2. 01 0 7, A I -u - � :�� - ---IG.?7.2—Fez -J t hi 6�1001 -Z 0- 7, 17 STORM DRAINAGE REPORT COLLINDALE BUSINESS PARK Collindale Business Park is within the Fox Meadows Drainage Basin. The property is located on the west side of Timberline Road from 1330 feet south of Horsetooth Road to 3050 feet south of Horsetooth Road. The gross area of the property is 44.5 acres, including the west s of Timberline Road and the east # of the Union Pacific Railroad R.O.W. There is no offsite run-off onto the site. The south boundary is a ridge from which the drainage goes southerly to the Chandler sump. Flows from the west are blocked by the Railroad embankment. The north boundary is the low point and drainage flows east along this north line. There is an irrigation ditch running east parallel to and about six feet north of the north line. This ditch belongs to Bob Shields. The ditch can carry irrigation water from Warren Lake across the golf course. under the railroad and the north property line. Historically, this ditch has carried storm drainage under the railroad from the golf course and from the railroad right-of-way. This flow from the golf course, according to the Fox Meadows report is Q2=1.0 c.f.s. - Q1O=3.0 c.f.s. - Q1OO=9.0 c.f.s. We propose to not disturb this ditch or alter the flows which it now receives. ' We propose to construct one detention pond for the entire 44.5 acre development, so that there will be no detention required on the individual lots. The proposed detention pond. is located at the northeast corner of ' the site. The outfall from the pond will drain under Timberline Road to the east and then into the Sunstone swale. The pipe under Timberline Road is per the design of the Fox Meadows Business Park Drainage Channel. We plan to carry the storm runoff by overland flows to the detention pond. The majority of,the flow will be carried to the pond by a drainage Swale which runs to the north along the west side of Timberline Road. The computation sheets of this report show the total required detention to be 404946 cubic feet, and the capacity of, the proposed detention pond is 405850 cubic feet. The attached map of the area shows the direction and quantity of flow at critical points. s Office of STEWART & ASSOCIATES. INC. Phillip VRobinson, P.E. & L.S. �,unnrrr,, L *' 4502 • 1 ' COMPUTATIONS James, H. Stewart & Assoc. Fort Collins, Coloram ' By: FIR Date 1 l6 8 Client: k<; L501 7—iiey Sheet No. z of 6 Chkd By: Date Project•_Collino/a1e BojinesS Pa/-k Job No. ' Subject sfOrr�i rairlct Calcyict -ioYgf ' J offal Gross Arec., = ¢4-.S c�cres innl. ;/z R,.-i/r ,J T�.-berll.e�•Fd,..J.rxt I�isirrric - G=.0.25 — S = 0.68L = /000 ' TL 1.07 6 i.l-.?sj i o 70 u.ee- Q z = GI /r _ (O.Z5)(0.4Y3) (4-¢. 5) f` L3 e-;5 f_Lo w�a c.E ouTAAfLL D(fvelo�e� - G- p s — ' .8 =0:.7. T L = I6900 T= = h c9 7 (/.25)(0- 8�� 7. J(¢¢,S) 2 3//. c-TS ' t�olvMe o� de en�ian re2virect _ 9.04-9¢G cv. 3 etc. VO (.. M E or F>044> EIC�aI JQ.� Areas TOTAL_ L/O/V/Ae - ! 3 00 • 4- z &Sov 1300 Z1750 ¢3 3 9 000 2 3050 7 0 s 06 �¢ /02-000 y355"0 ¢� I 16 OA Zu7r�0 137500 3a50s0' - ¢0 S8 SU COMPUTATIONS ■ James H. Stewart & Assoc. Fort Collins, Colors a ' BY: P/R Date Client: k• Hill 71sx Sheet No. -3 of _. Chkd By: Date Project: 60/WrTcfale EV5"7eu Pc'frk Job No. cC ' Subject �1ot�^^ bra i Sao C Calc��Gt%ohS T-%a!— ' MASS D► �GR,q -, MET#4oV T 2 LO S. Z 30 4-•�S 33Z41r ' 4.0 3.5 373»40 FU. Z. T2A 70 1'8S 444-�r ' 180 ►.US 5U¢6 30 'Lem0 300000 M .ocrvo v 'o0000 oLOT CALL, . 0 10 LO 30 ¢4 60 70 120 LBO 1 ' . COMPUTATIONS James H. Stewart & Assoc. Fort Collins, Colorado ' By: Pi R Date l h B9 Client: 1'� 6 i 1 / %�i 1 ey � � Sheet No. 4- of Chkd By: Date Project: Gollind ale business Pork Job No. ' Subject c5+0r-r 1 Dr-ct i no a e PC( rce1 4;.4- .4c G= 0.75 �c4q1cv10Li-e2) ' Paficel Z - .4rcti = 5.7 ,4c C =a•8 - L : 7�0S = 1.07 (O.a-)( 2'•1)C5-•i cry. - G/� =C�•�) > C s.a� /G.g c-)•c 1 l�/3.7 Pctrctesl 3 - ,4re•c2 1.3 A G = 0. - L z 33or _ S = 1.0710 TG = /U �.� : : Tc to. S mcn ' Gleov : ��-cl� : �.zs)Co.81� �)Cr•3)� �•! c�J ' Coknb,irncc/ Pc:rcelf Z c•.4 3 -. i-r-e',: 7.0 G =O. L y70 - S= 17 TG, l7 M,h %/OUv ro- Mln & Iup t A.� 7) (f 7 G) Z Farce/ 4- - 14rec0. = Z.'s G = 0.8 L : 3 4-0 % = /0 n 1 Tc, /cv = ' Qrari� �.f•C1A =�1.2f)C0.8)(�)(2.3) = /G,/ ' Co,..biped �arccls San C - A1"cti $.S�L G=O.!'i L GSv S= /.07o Gjr. - c1.4 o.B)(4.8)CSs� � Lr.l cfj Gtrvo = C 61,4 = f /.zs)(0.8>( 7)�S.S) = 36.SG-FS COMPUTATIONS ' James H. Stewart & Assoc. Fort Collins, Color By: PAR Date Client: K. r3i1/ Ti%y Sheet No. S ot;.. ' Chkd By: Date Project: 601I 1401(f 3vs finest r'7�rk Job No. ' Subject s)'o rrn Or-ct in o± Pcirc e I 7 - Areat;, ACu. G =' 4. 8 -I/►Z Z. Q, �� � G mil/} = (i• zs)�o.e)C �Xi. t) = 6.4- �f s ' Pct rcef v0 - .4rB0. : Z . q ac - G = O. t°i - L 8 ¢0 GZ CIp Pa rc e I q - Areo- - 3. S' ac . G = O. g L = S ao - s = l 7 Qtu = GI /} = ' (0.6)(3.8Y 3.5) z /0.G Gf S ' G2�vi = G�GI/°r =� �.25) �0.8�(%�C3. S). = L4-•t G*$ I r --_ �•\ -�� � _ Paz_=_—`--I``�3��w.aR}�,�/�/ J � � -/ /Nee• ♦'[ / `�` _� � ..r Y.0 II / // I /,� (rnw. ieil.enl a/r w. •e / Z / ` pre per• //el / s. 7 A.. '� Aj•`F / LAM/RE nY�E DRIVE w 1 � � J—CWI97 S'(I1I(Y 0-9-07 ;V� co"jrdo ✓.ir Ylwnw{I{ 1•�� L—Leos, ..' xr{,CI• na.ou Ile " _ __9• — • J fD // —..loc 'I,+R(IL / i.0 YY. rE>".97iDYR '� I • �('w` /L•h� III vc _ \ -CAST n dXR" S[Cft;.- S GJ4bLLE- S.. /„Z. ZZ5 ±..-- A cew.[dw / ..w ,e=.. Inrw r„. •. >, JJT *.. r,•+( /.- 1.. ., • /IMO/Il1.R JVl I{'/ . ].e • , i.Di~ r w�/ •` �.7—�u�ns��t►rt��-Roan-(:><,1----. \l1 -,--- 1 Y a lu R V Aa LAA w {0 M Final Approved Report io �ate.1� ADDENDUM TO STORM DRAINAGE REPORT FOR COLLINDALE BUSINESS PARK FOR THE AMENDED OVERALL DEVELOPMENT OF COLLINDALE BUSINESS PARK PREPARED FOR THOMAS CHANDLER PREPARED BY STEWART AND ASSOCIATES. INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 86521 303/482-9331 AUGUST 6. 1993 ' ADDENDUM TO STORM DRAINAGE REPORT FOR COLLINDALE BUSINESS PARK ' FOR THE AMENDED OVERALL DEVELOPMENT OF COLLINDALE BUSINESS PARK SITE DESCRIPTION The Amended Overall Development Plan for Collindale Business Park includes ' all land in the SEi of the NEi and in the NEI of the SET of Section 31, Township 7 North, Range 69 West of the Sixth P.M., City of Fort Collins, County of Larimer, State of Colorado, which lies east of the Union Pacific Railroad and north of the City of Fort Collins property known as Timberli-Wetlands. ' Included in the total site is that part of the Timberline St age P.U.D. and that part of the undeveloped Chandler property which drains :..)uth to the Timberline Wetlands, as well as all lands of Chandler, Chadwick and the ' previously developed Collindale Business Park area which flows northeast to the existing detention pond at the northeast corner of the Collindale Business Park. ' PROPOSED DRAINAGE We have included with this report a plan of the Collindale Business Park ' area. This map was a part of the 1989 Collindale Business Park Drainage Report.and all of the parcels draining northeast to the detention pond were shown. The enclosed map is updated to include the Timberline Storage P.U.D. ' and also the undeveloped Chandler property which drains south to the Timberline Wetlands. The Timberline Storage P.U.D. drainage report prepared in April 1993 by ' Stewart & Associakes, Inc. shows that a north sub —basin of 0.75 acres will drain to the north through a detention pond with a release rate of 0.32 c.f.s. into Automation Way. This onsite detention quantity and flow release rate into Automation Way substantially complies with the requirements of the 1989 Collindale Business Park Drainage Report. The south sub —basin of 3.63 acres will drain undetained into the Timberline Wetlands, with the appropriate erosion control procedures being utilitized. There are no development plans at this time for the.remainder of the Chandler property which will drain south into the Timberline Wetlands. At the time that development is proposed for this remaining land, a detailed drainage plan and report shall be prepared, and onsite detention shall be required if the developed imperviousness is greater than that provided for in the Fox Meadows Master. Plan. All that part of the Amended Business Park which drains to the patterns and quantities shown in therefore, further development in and with the City of Fort Collins Control. Phillip I. Robinson, P.E. & L.S. Overall Development Plan of the Collindale north will remain unchanged from the drainage the 1989 Collindale Business Park Report; that part shall comply with the 1989 report Criteria for Storm Drainage and Erosion 4502 :;_ AMENDED OVERALL Dt VELOPMENT PLAN OF COL L /NDAL E 9116INE-SS PARIr RLP Zone MEADOWS ;SUBDIVISION I ----------------__--_ -------_ 1 , , 4.5 acres gross__- / - -4.4 acres net ti �.^� M14 •rM1• I rip L 4 Wall 4--7 iE= l RLP Zone OdL L/NDAL E "'GOL F COURSE RAILROAD / , ;PHASE THREE 5.4 acres gross ; i 4.9 acres net 1 1, "As SE SEfi/EN a /35 acres gretf % PHASE TWO ,y 3.3 acres net 4.6 acres gross 3.5 acres net 1�; Ala RE Z�el; o Jp Zone' 41 f' ,-�H.45E ONE HAS.E E/ HT �. 9.7 oereJr gram % ' ; 4.4 acres gross B.2 acres not J-3 acres net LUAL 0ESC91/TIOI A trot of 1•d slWb U the East { of 1.ctlr Sl. TsaMe 1 brlh, coop Csl•r•pe,SMlih. lletsNo,eCiths 4st11os1detMC,brtlMnttSrolsu UtLntso of 51 a esow9 S 00. 0f' 00' [ sd .Ith oil ho•r1s s t.etos•es hone three. It t4losM .1 th1• lM h°°"VII Iloot .nith rtlalw el uN Sa m I sd m thsnte N °te,• st tM Eau Csnwr uN $1M. 31. S CC' 01' 7T Y 911.K loth, SetMsn 6 69'1f6'S}7• Ys10.� d 'set$ low. a lt• 01' s9• Y 791.9/ leets th�.te a 63• Si' 19• Y t79.45 costs Urn / 76. 61' 16• a 10.11 l.sts thwco a 61. 69' 16• Y 316.11 list to tly Eats right-,f-so, lUN of tlr Iwtso het/te Malin', thttn slay u,o npht- " 4bf�at 6 00' 00. has [ 1911.21 Iest$ tllres 5 19• Y' 27• [ lose.)$ f..t u • WNl r the Eaos hr sl lM flerthessl 6 01 osN Soests Jl, thsece slay uN Cost Itw. S or OS' or 1 1330.19 lest to the "lot of b1e•,sti trulo,y 69.6202 acres.osrs sit less, uN blof %*J•tt Ea all eosowto soldMost. -sbr/ sor u sltcs or of soitse. m' •.nmso r s /'tl C,- r *.is. J � SCALE-1 "00' C so 00 zoo 400 - 4954 ---_-_ ----- _---______-_-_-__ PH,4SE iz �68 ocrus gross 6.4 acres net rAw'st Nsosh1f11.fy PHASE FIVE S.5 acres grj 4.9 ocrot ne _-_-.----_-4946_-___ RL P Zone �I91Ao0i111 AM MulM0 CM111CAT101 Age ww 9i 1hl ►leosthe eN Jm1y 6eos4 of tb CIy of fort Comas. fileroes. 9J m this __ eV of _ H 51cnur9 of /I°1oso9 1.Losy 66e,1 . . *A%En SWUM[ Ios,I, .oin NW. bolt' the 1w.f.1 s.,wr• of NN psoortr e,tlrtee6 s 01, osN e1•e. .b htns/ °•rt1f1 Owt the/ "."k w eeeeltIms tee retlrlctim, oat forth M uu osto elect S19,ee Date SIPwe as to floor/. Ws, Sled aV 51 fod Dote 11foM gels W ' w . V DETENTION POND rNANEO OFrENr/ON ; ~ 4.4 acres gross 3.6 acres net ------ -jm_L9 =_ 1 1 SITE DATA i EdM/ef lmhq ./F W NE Aer/taw lu/M/v V./ly ••� 10 feet AAF/ JeN/wow FNw Arm 656.504 efeNe Are/ ANTICIPATED LA;VD USES off/es iYelfmforbf YYsdsee/e/�� `r5 % Al/ AefN/f1w Law "So e,// fs iw/Ae9b &, W FMsm. ONE es, ONF Scale I in feet I 1000 500 0 1200 7L Legend: —' drainage divides open channel with direction of flow stormsewers and drains with directiol of flow general direction of flow of surface drainage Qponding areas, detention ponds, etc. drainage concentration points A I see Table 31 FOX MEADOWS BASIN ( BASIN H Existing Drainage Patterns Figure 2 RESOURCE CONSULuANTS, INC. • Fort Collins, Colorac i ' \\ ;_---'� �.�\ I I •,a�'e)ei f /Nf.]'/'._� ���/ /1 -� �._��� _�_r/—�Nao•Oti 4] G --/ I)70.1D `\��—.� ' r,wc 1.0 cft N liTH'Pf3R7j of TIAhUEIZLINE STORAGE PUD. I f / CA _l 0,751 AC 0"1►•1 517E D:TPNTYON = 5366 c . F NOTE I 5hii/�r // / • —' L"5E-114 0 AUTV)"AT7ON WAj!lot O.32 c'f.$ � \ carriestro.W. �Md /fLro \ i+ / / /. / // ��:/ / _....0TORY9.�rE. �Vp — , J// l I / a'�L,,, / �' �/ �••� //' I 1 \ �` Q•3 r ^It vmMIO 9c� / DlTCUTION RL3•IIR:D a4CCio ti ! ; ,�C•� S /,y,. / .af I n..igetF ovr.c.(�✓ : j a. a / / .•� \ I 1 _ G� Gt �j avrr �. o.m.ft / I. ZS< • oc 1-7 // / / '!•/ •�/� I / / /' / �W ''/_• t.. // T• OML1ilOPh/. DgIVE 0'.': w 3 / / / , / T I �'•' j I P / \ / / / 'C+ICI I/ :7°tCTL—COkIfT 4ol fATCu Qnru l / // / ;• Q .� ..I I ' ,Y /` �.J , / cis a:�7 ,.:..T. ..a:�` /ta •Ib S S� \ / 1.-D Ap� Pq M•. Ke• Ut ' IDO"t[[I,; .. • cO~ ` /OIHTivuGrt •� // �4f >.:• Y J �� I I \ \ /.b 0�.1' oz w / uf[ / 3.B �e. ' • ! ^ xi . `\ ' / / / / / / /; °• C `� "1� • GCE ! / `� / ; e/ / :Th ' ' J. s' / = o I 1•ot \ a ��y �,..t., ll.d'F�://_ s •;�l // 1 G%. 14A a e � if p.N: �, S `� .• .: e , — vsr= =/— :` � —/ / / y. % .wv •4. _. ..c s.+ — e:� vow• 10-.<eil� I �.J= •. - ! .e, i• .�.ic / s\ vl' `—_� —. — -- S LV� 41' !O I — --- T,M QrfLw• Jvl�ls.a.r ,�i0 c��a:. _ usr.4tawnen seenairr:'Js�� — —�=-- ' ' —1 / - .. \ ._--i �rassiw— �\ .�a. sx13♦ sa" Rcn p Ir�_•,ST/MG La / //,i/� l= _= w �\lC\sc6le/f`—� l\ }� ; I i ja.,,.a7t' NOTE : _.-... DETENTIOYV SygLL 13E ::,' 1 4,,,'eaxas%s _ --•_ �: REQu1RED QN TH15 7-MACT. I F ' - T o _3_� ir: =ro• DEVELOPMENT /S MOTL� ✓ 7! % its t • JneeJS E $sc IMPEKV(0(/S o- rev:s ec o'o — T14AN FoI[.. M EADo {,f/i id.ASl til MASTER p/-^r1 USED....._..._- -- x RE1/IS ED PL^ti ) FO9 ' AMENDED 0✓ERAS(• DEVELOPMENT PLANT coLLIN0.4LE C3US/NFSS PARK �r__.____�_ — — — see n 'eY i E /e.xOTr —� __�� /f� �_�_ NCO&CR f IU°.!!' It fee NOTE 1 smeldi ,rr,yY corries storm flirt a 'I If/`3 / I ' I ' l 1 / / l ' l \ Iron. ^ail.e<d Slidev i, / / / "Id Tn•o-• frolf covers, t MIL -It elf v.!. ,. rA.'dac4 h L 2/ / S71�, lL i rxcsy \ \ ^ O . •� OInMW ?°Ln e7.� / /RT[r.rTle/•I RE J•/'efD a4W�09 i �e / i I \\ — 4 z V e I I I y �'LL.Ow OJ E OUT LAW W e 1, 5 ci` EC? s0 ce // I \I \\ ` ////aVrr.o✓: J.l:oah / / �,. `,n; f/ 6.a Pic. I I s O C ♦R iY .9 / i II ' /� (`�i/ //O�•.. 1.. / / off ya/ / , e4�g. Ad w /11. to Left 4� my IN oa- old Ill ad If +rT[u rtewl d s :9//i3 �/ L¢T 3 /le" aw:us:iril If eongrrv9<r:u �.nx99 eS4JdrR l ..-or.yT .r.'rn.a., e..vu / Cl ' If/ If Jyca, did /' �// / / // / —� I / / / a,r/ / / v ru fee j de if If If le IS Tof \ y/ / k• fee G/ / / ' / YaY z _ ritT ++ / o /. / (nx IL'.sriol.a �\ /// 0 ^ ` r c [ I \ \ \\ C M ./ i / /4 t % / ^ /bE _' \ \ u p,� / / .a / // ': _ . — '✓ 1 vim,' t % CAR` _i : I. . , V = If te If of It PAN U / / // / /, Iui h ' / / 1 7`0/. rasa.✓. ? -J / a....Y - ° - r is ,i/ . / / _ °ie 6 _ __ r Id.ae.e'er. _ \'rr". It; _�—_—F^_, ——Ss ai i'L�AM on�t_� �� ��l nnO:runwu r -� �l uAd L C,,`'� C �r\.�� EAST 1# COR^G SECTION dL'}9C1—."nbrWG tFNE— i A�r.s n� ��\ cns• aI• PiAt c "•,� .c ( v _�— 1 ��• rlr—_cam �_ n�` J I it nriL�i..e fee,: cwj /~/e-grl4Fn'v :\ "67n/</ l '.ff I sn 'l z _-- JJVVwwll -h III le "] _ �:Y:'uJTtikL" t ✓ il: J�cr'If IS T It l' \..•../ ---_=..---. ..,.. reviser r.'o'•s, n ur..»,rr r....,I S. Pill,,,.,,... rr•,. r.r,.. Job ,j . III V � A 1• ,> rAe YYA ct II 1AAA1 e\,x I lr 1 ' spot? Russ.. AIAL // 11/6 Gravel fillers