Loading...
HomeMy WebLinkAboutDrainage Reports - 08/25/1980�u6rru��1 � 2 /993 CORNER CONSUITINq COMPANY PO. box 646 f(WT r 161, C(I() xb 80522 pk)v: (303) 482.6650 � INANAC�EMEIVi�ENC�INEERINC� ' FIRST CHRISTIAN CHURCH P.U.D. DRAINAGE REPORT Prepared for FIRST CHRISTIAN CHURCH Fort Collins, Colorado August 25, 1980 CORNER CONSU[TINCi COMPANY po b» 646 low (c)1cm, Pl*>`E: (303) 182.6650 � MANAgWNThNC{ NEERiNq FIRST CHRISTIAN CHURCH P.U.D. DRAINAGE REPORT ABSTRACT This report is intended as a supplement to aid in the review of the drainage plan shown in The First Christian Church PUD Utility Plans. The drainage design is shown on Sheets C2 and C4 of these plans, with both sheets included in reduced format with this report. This report addresses the specific site conditions that impact the drainage system. It also presents the assumptions, methodology and final results of all drainage calculations. Although the PUD will be phased construction, the hydrologic study assumed ultimate developed conditions. SITE CONDITIONS General The First Christian Church i-s located southwest of the intersection of Drake Road and Lemay Avenue. The site, with.a net acreage of 24 acres, has been used as irrigated farmland.- Although it has laid fallow this past season, no improvements have yet been placed on the land. Contributing Runoff The general lay of the land is from the northwest to the southeast. However, Lake Parkwood just offsite at the northwest corner is an anomaly to this pattern, leaving the proposed site as a local high point. Lemay Avenue and Drake Road both discharge toward Lake Parkwood and are cut in lower than the existing church site. No offstream runoff contributes to drainage on this site. Basin and Proposed Detention The site is located in the Foothills Drainage Basin and is approximately 3/4 of a mile from the drainageway. The majority of discharge from the site is routed to existing culverts in Oxborough Lane and contributes to Lake Sherwood. After routing through the lake, storm water finally discharges into the drainageway. Included in the appendix are copies of the agreements between Lake Sherwood Venture and Vance concerning drainage easements, structural improvements, and flood damage liability between the church site and Lake Sherwood. The entire area between the drainage basin swale and the site has been platted at urban residential density. Drainage structures have all been installed between the site and Lake Sherwood. For these reasons, deten- tion volume to reduce a 100-year developed storm to a 2-year undeveloped release rate is chosen as a design criterium. -2- -3- METHODS AND ASSUMPTIONS In general, the Preliminary Draft Storm Drainage Design Criteria for the City of Fort Collins, dated April 1979, was,used as a -guideline in all hydrologic and hydraulic calculations. A more specific des- cription of the methodology follows. Hydrologic Analysis The Rational Method and Overland Time of Concentration formula were used to determine peak runoff. Basins were defined on the basis of proposed grading. The Runoff -to -Rainfall and Storm frequency Increase Coefficients (C and Cf) were applied based on actual pervious and impervious areas. Table 1 in the appendix lists these coefficients and the peak flows for the 2-year undeveloped and 2-year and 100-year fully developed and Phase 1 developed conditions. Detention Because of fully developed conditions immediately downstream, detention sufficient to reduce a 100-year developed event to a peak discharge equal to the 2-year undeveloped storm is provided. Required detention volume is determined by the Accumulated Runoff Method. Detention ponds are shown on Sheet C2 with stage storage curves and maximum water surface shown on Sheet C4. Note that above elevation 64.5 storm water will spread over proposed Phase 2 parking. Detention volume below this breakout elevation is equal to volume required by a 2-year fully developed storm. Culverts Hydraulic Charts for Selection of Highway Culverts was used to deter- mine culvert sizes. Oriface A discharge coefficient of 0.65 was assumed for orifice plate calculations. -4- CONCLUSIONS The drainage system for the .First Christian Church PUD has been designed. and analyzed in accordance with current criteria- This drainage system is designed to tie to existing drainage facilities in Eastborough and Drake/Lemay intersection. Following is a summary of this report: 1. No upstream flow passes through the First Christian Church site. 2. Runoff -to -rainfall coefficient based on final developed conditions, not zoning. 3. Detention reduces major storm to 2-year historic release. 4. Southeast detention pond is a two -stage pond with back- water on parking areas at return periods greater than 2-years. -5- C) C\i C) i0 (n to v CD cli -CT "I CD 4j: c� C� C) > C) o C) Lrl CZ) Lo 41) Cc > CD C%j Lf) • CO C) O y I u C\j C) Ln ON C� C) CD al O C, co DRfil N AvC1IE CA-L-C-L-kLkTic>iAS ARC ks rA. c tA r 3 = -4c - Li L+ Carr L zt P:k A4 c. :.k V, P H Tc i= Q Tc I C? 3-a 16 It to 23 .7.2 1,30 7.001 Nly. 32=) 4 z ._6 '7. tr 60 f5Y' 2 2-7 al j Tkas I tw pert /k'f c Q V o p .0t ` l O vt V n� Ac F-T 7 5 .� . 3o L3 -7 G ,2 z 3 -76•S so .4C 17 e-' c•nt�/� » 17 1 li w/ O y. � Q i 1�->Y Ar�ck vv1 z v 1 4 .33 72 618 INFaRPAXT-1 H ONt-`t .j CPLc. •.,t-\f- _ F =I-:- , -76 -."O\ to u Rcc�c��G 1�ov�c7L U' S�aa� Storo"o�C ' 1v � 6 `i • S f J :'t � 3 �'cGt� o c.� 1 � � � �J at � o r� F- lcv 6't .SS , ,`i 3 6 I,16 �T� L pT 2 kJ LISF- Tirtt� OR1 FACE CALC" t-AT ION S ex 7 " :AL 0� I - - - - - - - - - - - - Ir as v Y VE"TI!_pL L GG • 'ti:4• :,,Ir A .7 E:f ie ATE ;�� vrnt•i'N wV�~ � K PLVEYIEUT •STOP OLJ :"S=LL_L LU7✓$ �ETGIL A'•- • S' btwh SYbtau / Swb MI• 0,.) ,nl la•4 pnl fM+ YT [4r+•O. vaLY p'1 pit u PERSPECTIVE VIEW c!-J r-A.._ +.. .+. w �• 1 • SF.CTICN A -A wr_ DP.IVEWAY DETAILS VERTICAL CURB AND GUTTER ' 11i, vY t•.Yy i / � + Cr w•w. tv.. ry I L.aYtl ve,vl •'1... �'•'• •' �i� [.....•K wary Iw�-t . L�.+�.'IYyI<TOw'rO IC 50r_ o+t.•n.l� ♦SLY 0-aM _. r••� � i ` '•.. I. W. J-4-t9i a WONAMIC OAia TWA T152-c 370 a 011«/l A7 I.14 0.a lM«1 0.12 H LN a.9 10 H.O . U70 N s1 oat 7.7 0.80 7a 1.19 .t 10 7.05 to-t 14.0 1.1 :.a NO a - Oaf to 7.57 6.1 10 I.-S+11.; 9-7 S.0 ado to 0.0s to 7.37 11.7 10 %0 14 0.70 i7 I.SS 3.6 1 is I /.C)I A5.4 1 __ 1• 70.4 1570 la 1 0.55 77 I.71 P4.4 1 7a a.is I tf c ,7.79 •4Nn L p-tially tee,lpea Aft« "Me 1 tMilele. All at.e. C.-WIZlal 96% f "Is' e,I....- .., "Isu T[ ,w 1 ,n IK+A,Af 0 1s bl•4 fee"lt an aKaM Ir la) [ In Kh-/«t Y p t t . • . ' p(,•CaJTIOIA ,AOLaMtG ��G SIT.) Pq.1p eo •JTLG•C sTOCSSbE GutVE 9 y i Y , 3 Taa vc O . LO fJCt•t+VT4iW MC•�VMa[ (A.G.•+•T) F-0,JC> L hTLGE bTO CA4E GUCVE - S.U..re w 1 0, It ' i isd? . , - iwr +•� .\ w^0 trPw O+ttMPTI w1 rPl/Vn.. YW9r1 iN 11A' Mn. bM re61 t•vl•tlt[ orMe.r 11• bllow YVW Mat YM. All I- UNSTABLE TRENCH BOTTOM _NORMAL TRENCH wfi kit It WATER PIPE BEDDING I I (CAST IRON PIPE) ` /.w,W A,••aT•IbM I6 A.1NT I.•b I•JLT,t •. IC•rri. IV .i•J_ Af �MMt�Y, iw✓J . iw• cc.•...ctw .eM-c .:.jr. �EwEe L1aJ£Llu£ L•1.AGL4 E�Ha..I•T J�TpIL a.T . Wb••t {TW/aT A' sc a T ' :. vkss. o sPotw e r ••Ia•C I J� . V.• to, O 7- vs- .M. �. 41 STttft fIM•11,1,711)S SM L COW" to IHE 1tti1 Ea:a•A! ull Of 1h': COLL11q Vv lrlrr: Ilcr. All Rq)AT S:.fi CM'. a'.TI04 TWA Cw" TO Tw 00, G•%Rt AI,\ a Iwl 4A:IM+ Silt„=Y. As S,ECIf i[ATICMS. of %INM YLI (tv" 101w M.1 IV,P.t !IT H PILI with:, Y1,6 ca AY, L11111CAITM:. All I'AII. I'll-culli0S CoAiltu TIM S0141 GH/I'411.101w KV (LONIM (11101, fwl QUN s1AYXADi AYO 5K[II IC6:iuY. tATIK S"A =I Slut Us'. It Tort $oil& tItMT AND er4N•a Orsm% ARE A"'""D 1, 11[ 1111ICT0e Mo UWA000 c"AC110% TESTS TAIL 1<4 AMe01110 lsi4l:: MY). I+7 1\n. Sul. toCATlt+f Alt\ MM1E, Of all rAaLM =(eNMM 0I1171ts Ati unaIMRII pal Se4%a. IK OUMIILI. 11 SMALL AT I.i .r Stw• S:LIIIII M IC CONIMIOo 10 TPpI lw ttl11A%CC A15 tYa71t.. M All 1MEt0aWS tf11La11S ALOE tw A00TE OF THE WAX. ICI00.E Th73HClY M C095Tt0C110Y.'11Q EOM: rKIOII SKULL LE AEStOASICtC 102 MrAt4f l MV1L fSOX ollltl IES. AU WAS SH4I LC LWECT TO THE 1%SKC1 Its, AND Atn0Y4 Or iH( foot Ca LIAS CITY Lb IKLA. XM. C / yM.,n. M_ Oy GSM � � • .. ��vTaaMJ�Tb l f.Mra tI.VGT,If., PCOcp O� OY.�%a t •.•T,: I 4�.'.. tea.,.••'r •C•R/�JR'.bw.Tw.a.1 F�+C C...•ra Ce. wva0•.V,-la.rrtfit rrOT aY.w.J.J to e-b.A+b,aO L.c 9\.J .+ G/•Ti•a ea+.►,u Yr aJlr te./sY,J. q A _ YO r, _rc _ H _ Il _ Apt. a�Y. �teyr. r� b-va Y Y1 1 poufs •6e e.El_t=.SSE IIu -M, ,••4. uuY. f NORM I Ir �! �61JG1-t 7•'T/SeL� L�TIOU aa+C. b/T/N wTw +,c.co I zc J C do U `: 0 ! I TI a..4 -I c�y• Ly1 a�- atG� V cre" i F[ u 1 1 Cylj� V, I 4