Loading...
HomeMy WebLinkAboutDrainage Reports - 05/02/2009fORT CO LLINS Final Drainage and Erosion Control Report Arbor Plaza Sound Track Car Audio Install December 11, 2000 Prepared for: Ultimate Electronics Prepared by: EDAW Inc. 240 East Mountain Avenue Fort Collins, CO 80524 (970) 484-6073 Job No. 9F062 December 11, 2000 Mr. Basil I-Iamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80524 Re: Final Drainage and Erosion Control Report for Arbor Plaza Sound Track Car Audio Install Dear Basil: We are pleased to submit for your review and approval this Final Drainage and Erosion Control Report for Arbor Plaza Sound Track Car Audio Install. We appreciate your consideration in reviewing this submittal. Please call if you have questions. A Best Regards, C� ,• ' : G 18390 c N .q E�yC 7 QO Kay orce re f Design Engineer Principal in Charge cc: Encl. TABLE OF CONTENTS Page No. INTRODUCTION .............................................. HISTORIC OFF -SITE DRAINAGE ........................ PROPOSED OFF -SITE DRAINAGE ....................... HISTORIC ON -SITE DRAINAGE ......................... PROPOSED ON -SITE DRAINAGE ........................ DRAINAGE DESIGN CRITERIA ........................... DETENTION STORAGE ..................................... BEST MANAGAMENT PRACTICE ........................ EROSION CONTROL ......................................... CONCLUSION................................................. APPENDIX — DRAINAGE CALCULATIONS EROSION CONTROL CALCULATIONS 1. 1. 1. I. 1. 1. 1. 2. 3. 3. n Introduction This report is submitted as a Project Development Plan drainage and erosion control report for Ultimate Electronics, an unplatted parcel in Arbor Plaza, Fort Collins, Colorado. The parcel is 0.89 acres, of which 0.57 acres are undeveloped and 0.32 acres have been developed as surrounding curb, gutter and asphalt street. The site is bounded on the north by Amigos PUD, on the northeast by Soundtrack PUD, on the east by Fazoli's PUD, on the southeast by Ethan Allen PUD and on the west by South Mason Street. The majority of the site currently drains to an area drain on the east end of Fazoli's parking lot. The project proposes to collect runoff from a majority of the site, including a truck dock, and pass it through a Stormceptor manhole prior to discharging into the existing New Mercer Ditch concrete box culvert which runs through the site. The Ultimate Electronics site will develop the last 0.50-acre within an otherwise developed 1.23 acre basin. No'detention is required on the site, due to its proximity to the New Mercer Ditch box culvert, but BMP's will address stormwater quality. This consists of a proprietary manhole that will treat low flow events by separation of oils and sediment, while allowing high flow events to bypass into the New Mercer Ditch box culvert. Prior to entering the Stormceptor manhole, flows will travel over a turf area, removing a portion of the sediment. Historic Off -Site Drainage — There is currently no off -site drainage. Proposed Off -Site Drainage - There is no proposed off -site drainage. Historic On -Site Drainage - The majority of the site currently drains to Area Drain 2, on the east end of Fazoli's parking lot. A minority of the site drains to Curb Inlet 3 in South Mason Street adjacent to the site. Proposed On -Site Drainage — Installation of landscaping will cause a net ' decrease in the discharge into Curb Inlet 3. Likewise, proposed grading of the site will cause a net decrease in the discharge into Area Drain 2. Truck dock runoff and a majority of the developed storm runoff from the proposed development of 0.50 acres will be collected in area drains and directed through a Stormceptor manhole in the parking lot and discharged into the adjacent New Mercer Ditch box culvert. Drainage Design Criteria - Drainage criteria are based on the City of Fort Collins Storm Drainage Design Criteria, and calculations use the rational method. ' l Detention Storage — The developer requests a variance from the required on - site detention. As infill development on a small parcel, the entire site has been used. However the flows are being treated with 2 BMP's to insure the quality of the water leaving the site. Best Management Practice — Development requires implementation of a BMP to treat low flow storm runoff from the site. The site has a particular need to treat the runoff from the depressed truck dock. Because the elevation of the truck dock drain prevents use of a landscaped surface for collection and sedimentation, it is proposed to use the proprietary product "Stormceptor". This is a prefabricated manhole having a collection chamber beneath the inverts of the pipes. A weir within the manhole directs low flows into the sedimentation chamber, which is also configured to provide a space for oils to collect. Higher flows overtop the internal weir, passing through to the storm drain outlet, which is the New Mercer Box Culvert on the site. Configuration of the manhole allows flows up to 0.63 cfs to pass through the chamber. Flows in access of this will begin to bypass the chamber. The recommended "Stormceptor" size for this site provides sediment capacity of 115 c.f. and oil capacity of 240 gal. These elements are pumped separately from access through the manhole lid. The developer or current operator of the site will be responsible for pumping the manhole as needed. The size specified is estimated to need pumping approximately once a year, but this schedule could vary depending on maintenance of the site. Additionally, the area drain to the Stormceptor will be located in a turf area, allowing some filtering of sediment load prior to entering the Stormceptor. Erosion Control Design — The Sound Track Audio Install site lies within moderate rainfall and wind erodability zones per City of Fort Collins zone maps. Potential for erosion exists as construction commences and until paving and landscaping are completed. The site is required to meet a rainfall erosion performance standard of 79 during construction, and a performance standard of 93 after construction. Because the site is less than 1 acre, wind erodability will not be addressed. Overlot grading will begin in May of 2000. Paving should be installed within 12 weeks of the overlot grading, and permanent landscaping should follow as soon as possible after paving is complete. Prior to construction silt fencing will be installed around the entire site. Basin B3 will drain to inlets interior to the site. These facilities will be installed within approximately 8 weeks. During construction straw bale dikes will protect these inlets, and the Stormceptor unit itself will be immediately functional to prevent sediment from entering the New Mercer Ditch box culvert. Landscaped areas will be protected with erosion mats once the building walls are erected. At completion of construction, the entire site will be hard -surfaces or landscaped. Erosion Control Security — Temporary erosion control measures: Measure Unit t . Unit Cost Total ` Silt fence LF 1600 0.73 $1168 Erosion mat SY 985 1.11 $1181 Straw bale dike EA 2 90 180 Total $2529 Security = $2529 x 1.5 = $3794 Conclusion — All design and computations have been completed in compliance with the City of Fort Collins storm drainage design criteria. The site does not - substantially change existing drainage pattern. All site drainage will be directed to Mail Creek through existing and new storm sewers. Erosion control measures will protect the storm sewer system and Mail Creek from excessive water -born sediment. The project will also be scheduled to minimize the time bare ground is exposed to the elements. 3 Appendix Y Ultimate Electronics Runoff Calculations EDAW Job No. 9F062.01 By: KF Date: 1/18/00 Revised: 3/28/00 5/25/00 Revised to reflect new rainfall intensity curves. To Existing Inlet 2 Historic Discharge Historic discharge for Basin B is based on the Grading Plan for Fazoli's at Arbor Plaza PUD, Nov. 1995. Although not identified on that grading plan, basins B2 and B3 of the proposed Sound Track Audio Install contributed offsite drainage to Fazolis basin. Basin: Fazoli's Basin 131 Conditions: 100 Year Historic A= 0.73 acres Historic discharge= 6.67 cfs Basin: Sound Track Audio Install Basin B3 Conditions: 100 Year Historic C= 0.60 Cf= 1.25 A= 0.30 acres Flow length 194 feet Slope 0.03 Tc 11.00 min. 1 7.72 in/hr Historic discharge= 1.74 cis Basin: Ultimate Electronics Basin B2 Conditions: 100 Year Historic C= 0.60 Cf= 1.25 A= 0.17 acres Flow length 340 feet Slope 0.02 Tc 15.00 min. 1 6.52 in/hr Historic discharge= 0.83 cis Total Historic Discharge 9.24 cis Page 1 To Existing Inlet 3 Basin: Arbor Plaza Basin C1 Conditions: 100 Year Historic C= 0.95 CCf= 1.00 A= 0.58 acres Flow length 174 feet Slope 0.02 Tc 4.50 min. 1 9.95 in/hr Historic discharge= 5.48 cfs Basin: Ultimate Electronics Basin C2 Conditions: 100 Year Historic C= Cf= A= Flow length Slope Tc Historic discharge= Total Historic discharge: 0.60 1.25 0.10 acres 174 feet 0.02 9.00 min. 8.03 in/hr 0.60 cis 6.08 cfs Page 2 a To Existing Inlet 2 To Proposed Inlet 1 Developed Discharge -100 Year Proposed development of Sound Track Audio Install will decrease the extent of Fazoli's basin B1, and create the new basin B3. Basin: Fazoli's Basin B1 Conditions: 100 Year Developed A= 0.73 acres Developed discharge= 6.67 cfs (Approximate, based on area) Basin: Sound Track Audio Install Basin B2 Conditions: 100 Year Developed C= 0.95 CCf= 1.00 A= 0.17 acres Flow length 340 feet Slope 0.02 Tc 7.00 min. 1 8.80 in/hr Developed discharge= 1.50 cfs Total Dev. discharge= 8.17 cfs Basin: Sound Track Audio Install Basin B3 Conditions: 100 Year Developed C= 0.95 CCf= 1.00 A= 0.30 acres Flow length 153 feet Slope 0.01 Tc 3.50 min. 1 9.95 in/hr Developed discharge= 2.99 cfs u Page 3 To Existing Inlet 3 Basin: Arbor Plaza Basin Cl Conditions: 100 Year Developed C= 0.95 CCf= 1.00 A= 0.58 acres Flow length 174 feet Slope 0.02 Tc 4.50 min. 1 9.95 in/hr Developed discharge= 5.48 cfs (Unmodified) Basin: Sound Track Audio Install Basin C2 Conditions: 100 Year Developed C= 0.55 Cf= 1.25 A= 0.10 acres Flow length 174 feet Slope 0.02 Tc 9.00 min. 1 8.03 in/hr Developed discharge= 0.55 cfs Total Dev. discharge= 6.03 cis Page 4 To Proposed Inlet 1 0 Developed Discharge -10 Year Proposed development of Soud Tack Audio Install will create the new Basin B3. Basin: Sound Track Audio Install Basin B3 Conditions: 2 Year Developed C= 0.95 A= 0.30 acres Flow length 153 feet Slope 0.01 Tc 3.50 min. 1 4.87 in/hr Developed discharge= 1.39 cis Page 5 PROJECT: Soundtrack Truck Dock to Area Drain 1A Prepared by : EDAW inc. Date: 10/3/00 Manning's Equation, Pipe & Channel CHANNEL AND PIPE DATA Mannings n = 0.016 Side Slope = 0.00 x:1 Base Width = 0.33 feet Bottom Slope = 0.064 ft/ft Flow Depth = 0.33 feet ADDITIONAL PIPE DATA Pipe Diam. = 12.00 inches Prcnt Full = 6 percent RESULTS -CHANNEL Area [sq.ft] = 0.11 Hyd. Radius = 0.99 Flow [cfs] = 0.59 Flow [gpm] = 263 Vel [fps] = 5.37 Width [ft] = 0.33 RESULTS - PIPE Flow [cfs] = 0.05 Flow [gpm] = IN (max. flow) Vel [fps] _ PROJECT: Soundtrack Area Drain 1A to Stormceptor Prepared by: EDAW inc. Date: 10/3/00 Manning's Equation, Pipe & Channel CHANNEL AND PIPE DATA Mannings n = 0.016 Side Slope = 0.00 x:1 Base Width = 0.33 feet Bottom Slope = 0.073 ft/ft Flow Depth = 0.33 feet ADDITIONAL PIPE DATA Pipe Diam. = 15.00 inches Prcnt Full = 31 percent RESULTS -CHANNEL Area [sq.ft] = 0.11 Hyd. Radius = 0.99 - Flow [cfs] = 0.63 Flow, [gpm] = 282 Vel [fps] = 5.77 Width [ft] = 0.33 RESULTS - PIPE Flow [cfs] _ � 2 96 ( 2.99 cfs req'd) Flow [gpm] = 1330 Vel- [fps] - ���4F y,,, UR 1 PROJECT: Soundtrack Stormceptor to Box Culvert Prepared by :. EDAW inc. Date: 10/3/00 Manning's Equation, Pipe & Channel CHANNEL AND PIPE DATA Mannings n = 0.012 Side Slope = 0.00 x:1 Base Width = 0.33 feet Bottom Slope = 0.100 ft/ft Flow Depth = 0.33 feet ADDITIONAL PIPE DATA Pipe Diam. = 15.00 inches Prcnt Full = 25 percent RESULTS -CHANNEL Area [sq.ft] = 0.11 Hyd. Radius = 0.99 Flow [cfs] = 0.98 Flow [gpm] = 439 Vel [fps] = 8.98 Width [ft] = 0.33 RESULTS - PIPE Flow [cfs] _ :.:3'03 ( 2.99 cfs req'd) Flow [gpm] = 1360 Vel [fps] _ 1 263 City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1a Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/hr 5.00 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 8.03 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 13.00 1.98 3.39 6.92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 16.00 1.81 3.08 6.30 17.00 1.75 2.99 6.10 18.00 1.70 2.90 5.92 19.00 1.65 2.82 5.75 20.00 1.61 2.74 5.60 21.00 1.56 2.67 5.46 22.00 1.53 2.61 5.32 23.00 1.49 2.55 5.20 24.00 1.46 2.49 5.09 25.00 1.43 2.44 4.98 26.00 1.40 2.39 4.87 27.00 1.37 2.34 4.78 28.00 1.34 2.29 4.69 29.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 0.8 0.7 w 0.6 f- LU z 0.5 cr w > 0.4 0 z f- a 0.3 w 0 0 ? 0.2 0 z 0 a 0.1 EXAMPLE I 0.0 I I I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I L- 1 U J, AI I, l l l 1. 0 1 2 3 4 FLOW INTO INLET PER SO. F.T. OF OPEN AREA (CFS/FT2) Figure 5-3 CAPACITY OF GRATED INLET IN SUMP (From: Wright -McLaughlin Engineers, 1969) 2. 99 C l ao Lr - aev) •l MAY 1984 5-11 DESIGN CRITERIA RAINFALL PERFORMANCE STANDARD EVALUATION ----------�-----------------C---- -rr----- ---------------- PROJECT: STANDARD FORM A :OMPLETED BY: � -� DATE: �•(- o b ----------- --------------------- ------------------------------------- )EVELOPED ERODIBILITYI Asb Lsb. Ssb Lb Sb I PS SUBBASIN ZONE i (ac) ` (ft) I (%) .j(feet) -(%) I (%) ------------------ ------ I ------- ------- I ------- - -- I------- N iqc W.,oek I I i o.s7 i vj 1 2 70) lr= ------------- DI/SF-A:1989 s EFFECTIVENESS CALCULATIONS ------------------------------ ---------- ------............. ----------- PROJECT: 5ouv�"Tv�c Ca,r Ao-,d-�o tn.Azak STANDARD FORM B COMPLETED BY: K t- DATE: 8-1- ocv Erosion Control C-Factor P-Factor Method Value Value Comment ---------------------------------------------------------- SFarVv%cc¢A-J�or \.00 C.4O g3 S�'-AAAa eS 1. o o 0.90 Z'3 -bra.. (TW9�) -------------------------------------------- MAJORI PS SUB AREA I ------- ------------- BASIN I ("e) BASIN (Ac) !- CALCULATIONS -----i------ ----- ----- - ------------------------------------- C %4) g:�l-�-�'-�.c a Q• �'� = m. So II Cc .= o.'io C I o I lI 71 �. CZ O,Io �rvSto+� G•�uck - 0.10 �G2= k-c.1ox.$o>= E�* : �.\'[x ckS� �-�.30x71) S) 57 = aZ.>71 1 or-, ------------------------------------------------------- --------------- DI/SF-8:1989 EFFECTIVENESS CALCULATIONS ----------- -------------------------------------------- -------------- PROJECT: v%A7y-aLcPt STANDARD FORM B COMPLETED BY: K F DATE: 9-l- a0 Erosion Control C-Factor P-Factor I --- Method- -Value ---Value--------Comment ---- I II --------- .o--------- I aa\ b0.54 I I ass/L.S 0,015 t.00 62, C. I MAJORI PS BASIN (%)- t3 7 aj 0 c SUB BASIN RITA ----------------------------- --------- -------------i AREA (Ac) I - -----CALCULATIONS ------------------------------------------' ho � coN sT' Q.0 cT�oJJ o.1? 1 $ 3 10.30 70) ! C2 I o.lD 1O a R.d&h.b twaS-ka (-o'tZ.arc:) SOd fi `. (.098 1�i � G--FacF j �.olx ,0'12) 4-6e6x .648� L-7 1Koa6ZO/r,,C&S .ol )Lo . 3 a C-44-=,op3 SMA ?-04 4/wal�Gs Cg ra ss/ LS 0.04v --- "'=}--------- ' s?- OI/SF-B:1989 I ,i CONSTRUCTION SEQUENCE i O ROJECT: Souvc %— STANDARD FORM C EQUENCE. FOR 2WO ONLY COMPLETED BY: K'P DATE: • ( oo . Indicate by use of a bar line or symbols when erosion control measures will be installed. ajor modifications to an approved schedule may require submitting a new schedule for pproval by the City Engineer. YEARMONTH T Vk&j 1 7 I A I 5 1 O 1. 1 III ( I -----------------------:-----T--------------------------------- ---------- � VERLOT GRADING � I 4 IND EROSION CONTROL Sail Roughing i Perimeter Barrier Additional Barriers I Vegetative Methods I .Soil Sealant Other _ Par W\6Lute,"-t RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Sail Preparation { Contour Furrows Terracing Asphalt/Concrete Paving $ Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other TURES: INSTALLED BY MAINTAINED BY :VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON !.SDI/SF-C:1989 c i I -----------------� INE ID ---------------- I Into, 1 view MMER WvH Bp%COL`/ERT IX. AREA DRAM —aA2 I I I I I I 81 I 0.73 I I I I \\ I \ I \ \ I STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTON RAIN NOTES DRAINAGE NOTES Almon. 20OD The ClMdwn ColNns 3brmwaler Department ermbn comrd ivpwcarmuntr 1. M.M.e mmwv wrnam cumawk,cmmucrim.M1ON mrbmrb Gry Jinn 9. All cpmlrwcnion cosines must comply with line Sale W Colorado permieing moodall.et CNII24 ursariabommmment wme'R interw this site ass AMwarda Savenom ached«iaodor �wbpme poce�br5 sealer Discharges NeociolW with ConsWtlion Actively' Raw Igesm p loop Mi de'MommM^rMY �^aaeon occuninpM you core ins ten, plbase cancer lire Cdpado Deponent d Health,Kbk Qui A9r e xre wuno^ d em De"Icar as eemea shall marine nmm4ufian d no plan Nl AliPoameler sdefoaim0 shall Minnalled Tslmroany be counters oNuiry the Gas Engineer who may mi her hot An more Intensities, br4ndar& and byCaressedprsi N�.lnrQCDPE82. 4"Cho"Leek Drive SetDerruec Colorado Inockishme, sedppirg, pmdn.0. ewl- al Omer required srmiw, cwrxd mwsum shell sPodlmnom climate a Mat lines. 801-1530. Wkmion: Permit and Entertainers Section. Phi 303-692-3590. be Installed ore IM spatial lime 1n she conshoclion Weil as iNi,na in Me coarsened sector schedule, conmmown dam, and emlon towel noon. 2, The Mae, sea, lelection and number of of Worms urdx9murd uelina an apeemimore in 10, Bendlmar4. City d Fes Collins bercAmoh Y d02 Ele ase n= 5015.26Phii,dr. sknn at M. dm,:npe arrollMM. mPnrolbilihol M. eanmcar4rwihM Remorlureneotshall Maoand maimd wMnerlosses ,ucracaaTaungerotaarguulew&Me inlar6s4deance desfi^intention shall traheaseriacomme"y shucaoIM cannenashal he respubeblemy inflation mrmeeian mnnnnwn coosat, and bthe snstaa pomPonod ofNtime. onown9td ahines, 11. Owner ta hi r i responsible for frequent cleaning of Storm—ceptor, unless Wse indicates a more frequent schedule. An so.1s Asposedd eland d wrbbe tect smog p p d o '"AT small 3. The Enamel, iih, Ims Retained! Twoo Rom by sewan ^M/ar wellwidoes slukgl a Miller ect shall N kpl in a rougheink cartel by doing or dlsklrg Mnby harm ruPo bniry is in*Cry of Rod Cables, as aMwd par bwbhry ato And along land consumer unal mi aw1kAI onoM commissions Emissions,mnhol w Enta r too, Tar qwmiand nwo e d m these Romexd essential d small d N 'I tid qq rgMduvv F II resin wyeud Ery Ma mom be the Dissected Eyw rip shal'oewswo 1M Easpress, testa pmiaM land d h B,i me Time Mn M'M 130)Ali b q'rtd npvoryw hse m§mdall M1 p Hllry funM Me Erg' IwNrytgren4Fdd Mrmleu cannoneer nationm^hdl a aad/muM lseNse,riI I, installed. nes aM Indi me Cie alonecycle also artificial Aem and apYal all lealbseles, otherness, concreted by Me Sorm,mest 0epnmene. home aM dome,&wthis may armlmm mes west and mail as, hielm tri ' Mons. Tho inesseew ead be waived and make yaLlm dung mrv0oa bM Agmkvbhgp idlYe _e done �� mmee rya' nun wb IM, di ..mWm aaleaneplptYt. as �M1O DepeetrR(lTTdWpfmYWre!Fawn CaelydIII l-0Sfial dskmdmd at the OM dFan con" enoeemp Cepamere MenM'Mk12A1 haunadsete ode. 4 kmpmn lnncNml)encemon Set measures than be impeckd and munnid or 5.MwImsmi dm-lw intimate failures lMll M Mm.pxnibiry of M. ggnry occasional m nxrmry dM wash vnd eventln pin In mal mstwas o"mea perlamence of ins, intended fimemon. Nl nainM ud'srcnh, pmculaly Mou cn peed wd.q suntans, Ball at resultedanddispaud of in o miner oM lomnon 6. Nl ramn.mendofimsdMe finaldmino davlar vmld slut bM'e de el ere s,en Y m�^ so m nor to cause Melt release Ina ore dmitwpewar by EDAW Ine..r,If N complains one, No cast sal le new exmd Ann 1101 fml In height. N soil sadailes shell be P_Pne, To Anolimmaon and mamaro be the City, vertical of his dramote hoiGna, flooded form sedlmenl M1anmmpM by sudace muodenvq, wakenno Sri pernani n 0 nBmend professorial maniac mum besubmTd he and spatted by the forcing_ My mil sertlyile Fang aNx 30 doyi ehdi be seeded and nor. 3 ^^tall'uhre (mMopmrmNe^oh Mo„1. Pmt Me diiordrudient seal mbn rrenn.emnkMvrdddvinpff affiliates sell mmmeaioloMme Star ilvhw With adalAe$armwktUli Fly of kcal ME nYL rehOrdimnce mnknaonbed,mreeol al ma any Any [rudiment �paiha material whi or him, pi4raMapeeda n�ri:de shall b deoned immediaely by wine mmmcrot corhacce, chis ore doccupanry. Irdluidal bl mdlFmnm, m spcifid In me dedopnwe muncade of inedea Meerseen kr UNliMaleog h4 web praradw rtlnss d o cealicoh d occupnry tar sucM1 la. 8 sooner Detecting is aced As hail unifies, a Safo Cahrtudp Dstaknle VAseral ,urge Psi b requited it decisions area a man si channel, irrgrfion ditch 0 0 BASIN Q1pp_1par Q,pp_pl, Qlal B1 6.67 6.67 02 0,83 — -- 1.50 �.. 83 1.74 2.99 1.39 C1 5.48 5.48 C2 0.60 0.55 INLET 0100- IST Q100I Ql0_DEY 11 0 2.99 1.39 2Q 9.24 8,17 Q3 6.08 6.03 SCALE; 1'=20' NEW MERCER DITCH COMPANY APfppYE9; Niz MIT CNEGals it. Sounarrack 11111111011111111 Arbor Plaza, South Masou Strftt Fort Coffins, Coloradi Gensler A II. a e I .. r t. r•�1i: 11 Tel 1 1 an wvm+e IA WO /AICM TS ate EAST YrMM AY FORT 004LNe. CO mM tle.A FAR, el0 All YY gY ALLq EROSION CONTROL MT m g i STRAW BALE DIKE ,re secs OF CUIOQP 0 SILT FENCE mmmmminioa BASIN BDY. -------- SUB —BASIN all MR Is Mtn all ME Cil BY. smaMm vrun Mn 01ECAi6 No. PANS A wix 01ECKER) BY, moll!OyaO Mx GROADD BY; GRADING, STORM DRAINAGE AND EROSION CONTROL PLAN all —7ML=0 a 10 20 40 fcT NORTH Nodant Mama ARSO_PLAZA SOUDTRACK CAR Au01O NBTALL Project Number _ 0O.902&008 Dperlplbn FORT COLLNB, COLORADO Computer File KCF F®NpART 22, 2001 8csle AS MOOD All drimal end Wrltlen maWill appearing h Mn constitute orlglael and unpublished work of that rcNtect and my not be dup8ceted, used or dlsclwed Without rtitten consent of the architect, ®2001 Gensler AN Rights Reserved Sheet 4 of 6