HomeMy WebLinkAboutDrainage Reports - 03/16/2012City of Ft. Collins Ap rov Plans Approved By Date -�>--& —l.Z Final Drainage, Erosion Control and Water Quality Report For Colorado Iron & Metal Fort Collins, Colorado Prepared for: GTC INVESTMENTS, LLC 1400 EAST MULBERRY STREET C/O KENT GARVIN FORT COLLINS, CO 80524 Prepared by: ENGINEERING 908 LAPORTE AVENUE FORT COLLINS, CO 80521 970-219-2.834 JULY 15, 2011 Final Drainage Report Colorado Iron & Metal ENGINEER'S CERTIFICATION I hereby state that this Final Drainage and Erosion Control report for the Colorado Iron & Metal project was prepared by me or under my direct supervision for the owners thereof and meets or exceeds the criteria in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. Stacy J. Gowing Registered Professional Engineer State of Colorado No: 34290 Final Drainage Report • Colorado Iron & Metal TABLE OF CONTENTS I. INTRODUCTION................................................................................................ 3 II. GENERAL LOCATION AND DESCRIPTION......................................................3 A. Property Location....................................................................................................................................3 B. Property Description..............................................................................................................................3 M. DRAINAGE BASINS AND SUB-BASINS...........................................................4 A. Major Basin Description.......................................................................................................................4 B. Existing Conditions.................................................................................................................................4 C. Developed Conditions...........................................................................................................................4 IV. DRAINAGE DESIGN CRITERIA..........................................................................5 A. Development Regulations...................................................................................................................5 B. Development Criteria Reference and Constraints.......................................................................5 C. Hydrological Criteria..............................................................................................................................5 .. D. Hydraulic Criteria....................................................................................................................................5 V. DRAINAGE FACILITY DESIGN..........................................................................6 A. General Concept......................................................................................................................................6 B. Specific Details — Detention.................................................................................................................6 C. Specific Details — Stormwater Quality.............................................................................................7 D. Specific Details — Swales.......................................................................................................................7 E. Specific Details — Inlets and Storm Sewer.....................................................................................7 F. Specific Details — Curb Cuts................................................................................................................7 VI. SEDIMENT/EROSION CONTROL......................................................................8 A. General Concept......................................................................................................................................8 VII. CONCLUSIONS...................................................................................................9 A. Compliance with standards.................................................................................................................9 B. Drainage Concept..................................................................................................................................9 Vm. REFERENCES.......................................................................................................9 IX. APENDICES........................................................................................................10 Final Drainage Report Colorado Iron & Metal I. INTRODUCTION This report presents the pertinent data, methods, assumptions, and references used in analyzing and preparing the final drainage, erosion control and water quality design for the Colorado Iron & Metal project (the "project"). II. GENERAL LOCATION AND DESCRIPTION A. Property Location 1. The project is located on Lots 2 and 3 of Vanworks Subdivision Second Filing, consisting of 5.73 acres. The street address of the project is 903 Buckingham Street, Fort Collins, Colorado, as shown below: Mmn S u,vn 51 '. LopxiG wnC—•v'1 Nur era 51 x ., `SITE Vicinity Map, NTS B. Property Description 1. The project site is currently partially developed. Existing improvements consist of a large metal building, with two driveways and associated parking and hardscape. The project was originally developed in the late 1990's as part of the "Vanworks Subdivision Second Filing". 2. The site is relatively flat, with a gentle slope from north to south. There are no subsurface drainage facilities near the site, and the surrounding topography is generally flat. Final Drainage Report Colorado Iron & Metal M. DRAINAGE BASINS AND SUB -BASINS A. Major Basin Description 1. The project site lies within the City of Fort Collins Dry Creek Basin. 2. The project site is located outside the Dry Creek and Cache La Poudre River 100-year floodplains, but is inside the Cache La Poudre River 500-year floodplain. Copies of the FEMA FIRM panel 08069C0983G, dated June 17, 2008, and the City Floodplain Mapping are included in the appendix. B. Existing Conditions 1. As mentioned, the project site is currently partially developed. The existing development was part of the "Vanworks Subdivision Second Filing". The construction plans for that subdivision included Lots 1, 2 and 3. A detention pond was constructed within Lot 1 to mitigate storm water flows from all three lots. The original engineering plans were prepared by Shear Engineering and are dated March 1998. 2. The existing detention pond is located in the rear portion of Lot 1, which is located immediately east of the project site. The pond discharges through a control structure to a swale which connects to the borrow ditch along the west side of Lemay Avenue. Lots 2 and 3 are included in drainage basin A, which was shown to have a drainage area of 14.76 acres and a composite runoff coefficient of 0.48. C. Developed Conditions 1. The proposed use is an metal recycling and fabrication facility. The proposed project consists of the renovation of the existing building, construction of two new buildings, one new driveway, concrete and asphalt drive aisles and parking areas. The new buildings consist of a metal shop building and a building to house the bailer used in the paper recycling process. 2. Portions of the project site will continue to drain to the existing detention pond which was originally constructed for the entire site. In general, this includes the existing building, the existing pavement on the east side of the building, and a portion of the southern half of Buckingham Street. It should be noted that the existing pond was originally designed to mitigate all these existing improvements plus some existing areas that will be redirected to the new detention pond described below. Final Drainage Report • Colorado Iron & Metal 3. A large portion of the development site and a portion of the south portion of • Buckingham Street drains to a new detention pond located in the southwest corner of the site. This new detention pond drains through a proposed storm drain in a southerly direction to the borrow ditch along the north side if Lincoln Avenue. This has the effect of reducing the drainage area to the existing pond by 3.18 acres. Therefore, the only impact to the existing, previously approved pond is a reduction of drainage area in the proposed condition. IV. DRAINAGE DESIGN CRITERIA A. Development Regulations 1. Design criteria from the City of Fort Collins Storm Drainage and Design Criteria and Construction Standards were followed for this drainage report. B. Development Criteria Reference and Constraints 1. The proposed storm water release rate is 0.20 cfs/acre, in accordance with the Dry Creek Master Plan. The drainage area of the pond is 3.18 acres, which equates to a release rate of 0.64 CFS. C. Hydrological Criteria 1. Peak flow rates for the 100-year storm have been calculated in accordance with the City of Fort Collins Storm Drainage and Design Criteria and Construction Standards. Please see these calculations in the Hydrology section of Appendix I. D. Hydraulic Criteria 1. The City of Fort Collins Storm Drainage and Design Criteria and Construction Standards are used to determine the adequacy of the hydraulic structures associated with the project. 2. Analyses are performed using methodologies presented in Urban Storm Drainage Criteria Manual Volumes 1 and 2; Urban Drainage and Flood Control District, Denver, Colorado, September, 1999. Please see the various computation spreadsheets in the Hydraulics section of Appendix 1. • Final Drainage Report Colorado Iron & Metal V. DRAINAGE FACILITY DESIGN A. General Concept 1. The general direction of storm water flow is from north to south. 2. Storm water from Buckingham Street is carried through curb cuts and sidewalk culverts to the parking areas within the site. These flows are then conveyed through the site, along with flows from the site itself. 3. Portions of the site will continue to drain to the existing detention pond. As previously discussed, the total drainage area to this existing pond will be substantially decreased as a result of the development. No revised analysis is included for this existing pond, since the only proposed change is to reduce the drainage area. 4. Newly developed areas, with a portion of the existing developed area (Drainage Basin A) will flow to a new detention pond located near the southwest corner of the property. B. Specific Details -Detention 1. The drainage area to the new detention pond is 3.18 acres. The additional developed area within the site will be treated for detention and water quality by a new detention pond. The required water quality volume is 0.117 acre-feet and the required detention volume is 0.861 acre-feet, for a total pond volume of 0.978 acre-feet. This volume is provided in the proposed detention pond at elevation 4944.09'. 2. The detention pond drains to a new storm drain pipe which flows southerly and into the borrow ditch along the north side of Lincoln Avenue. This proposed pipe (storm drain A) is 15" in diameter. An off -site easement will be obtained from the owner of the property to the south to contain this new storm drain line. 3. As stated previously, the existing drainage area to the existing detention pond is being reduced by 3.18 acres. This reduction will allow the existing pond to function at a higher level of performance when compared to existing. 4. An emergency spillway is proposed to convey emergency flow from the site towards the southeast. The proposed design of the spillway is a trapezoidal channel with a bottom width of 60' and side slopes of 33:1, with a weir elevation of 4944.20'. Since the spillway discharges to natural ground, the Final Drainage Report Colorado Iron & Metal Manning's Equation was used to determine the spillway capacity. The results indicate that the spillway can convey the 100-year discharge from this drainage basin (27.1 CFS) at a normal depth of 0.28'. The flow velocity is quite low at 1.46 FPS, so the erosion potential in this area is insignificant. This area is proposed to be covered with gravel. 5. Once the emergency overflow discharge passes through the pond spillway, it generally flows towards the south and east. This emergency flow is directed by existing topography towards the existing detention pond on Lot 1, and ultimately to the borrow ditch along the west side of Lemay. C. Specific Details - Stormwater Quality 1. Water quality will be provided in accordance with Best Management Practices as presented in the Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices; Urban Drainage and Flood Control District, Denver, Colorado, September, 1999. 2. Permanent structural BMP's consists of extended detention within the proposed detention pond. D. Specific Details - Swales 1. There are no swales requiring analysis within the project site. E. Specific Details - Inlets and Storm Sewer 1. The detention pond discharges through a 15" pipe which runs through the Van Works property directly to the south. Ultimately, this pipe discharges to the existing borrow ditch along the north side of Lincoln Avenue. An off -site easement will be provided for this pipe by separate instrument. 2. The discharge through the storm drain is 0.64 CFS, which is the release discharge from the detention pond. The pipe sizing calculations are included in the appendix, and indicate that capacity in the proposed pipe is more than adequate. F. Specific Details - Curb Cuts 1. Three curb cuts are proposed along the southern flowline of Buckingham Street. These are located within sumps with very small drainage basins. Each curb cut will be 2' wide, connected to a sidewalk culvert with a 2' wide, 6" deep concrete U channel at 0.5% slope. Final Drainage Report Colorado Iron & Metal VI. SEDIMENT/EROSION CONTROL A. General Concept 1. Temporary erosion control measures will be installed with this project. These measures will include: a. Silt fence along the property lines. b. Gravel filters along the U channels between the back of walk and the site. c. Water trucks and soil terracing to address construction dust abatement. d. Vehicle tracking pad at the construction entrance. e. The detention pond will act as a sediment basin during construction. 2. Permanent sediment erosion control measures will consist of paving, concrete hardscape, and landscaping to stabilize the disturbed areas. 3. Maintenance of all sediment erosion control devices will remain the responsibility of the contractor until the project is completed. 4. An Engineer's opinion of probable cost for the erosion/sediment control measures are located in the appendix. Final Drainage Report Colorado Iron & Metal VII. CONCLUSIONS A. Compliance with standards 1. All drainage design conform to the criteria and requirements of City of Fort Collins Storm Drainage and Design Criteria and Construction Standards. 2. Proposed drainage improvements conform to the concepts and recommendations of the Dry Creek Basin master plan. 3. Proposed sediment/erosion control measures conform to the recommendations of City of Fort Collins Storm Drainage and Design Criteria and Construction Standards and generally accepted erosion control procedures. B. Drainage Concept 1. The proposed drainage plan concept for the project will be effective for the control of stormwater runoff and water quality for the proposed site and conforms to City of Fort Collins standards. VIIIAEFERENCES • City of Fort Collins Storm Drainage and Design Criteria and Construction Standards • The Dry Creek Basin Master Plan • Urban Storm Drainage Criteria Manual Volume 1; Urban Drainage and Flood Control District, Denver, Colorado, March, 1969. • Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood Control District, Denver, Colorado, March, 1969. • Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices; Urban Drainage and Flood Control District, Denver, Colorado, September, 1999. 0 Final Drainage Report Colorado Iron & Metal IX. APENDICES Appendix I - Hydrologic Calculations • Runoff Curve Number ■ Time of Concentration and Peak Discharge Appendix II - Hydraulic and Detention Calculations ■ Water Quality Calculations ■ Detention Pond Sizing Worksheet ■ Pond Stage -Storage Worksheet ■ Storm Sewer Calculations ■ Sediment and Erosion Control Opinion of Probable Cost Appendix III - Mapping and Plans ■ FEMA Firmette ■ City Floodplain Map ■ Drainage and Erosion Control Plan (24"06") 0 Final Drainage Report Colorado Iron & Metal Appendix 1 - Hydrology Area -Weighting for Runoff Coefficient Calculation Project Title: CIM Catchment ID: Basin A. 100-year Illustration Su%awa 3 s� $ Flow Dvechoa • cotcLm ®t Boundarg I nstru ct ons: For each catchment subarea, enter values br A and C. �iJill�1® 1 • surrul 4.10 j bum.1 Z.= i Area -Weighted Runoff Coefficient (sum C A -sum A) = 0.89 See sheet "Design Into" for inperviousness-based runoff coefficient values. UD Raiional -Basin A 100yr xis. Weighted C 4/20/2011 10 07 AM Final Drainage Report Colorado Iron & Metal CALCULATION OF A PEAK RUNOFF USING RATIONAL IETHOO Project THIG CM Catchment ID: Basin A, 100-year Discharge 1. Catchment Hydrologic Data Catchment ID = A Area = 3.18 Acres Percent Imperviousness= B6.00 % NRCS SoilType= BA, B, C. or j O. Rainfall Information I(IncNFr)= C1 I P11(C2• Tdr C3 �\ Design Storm Return Period, Tr= 100 years (input return period fordesign storm> C1= 2850 ( nput the valu a of C 11 C2= 10.00 (Input the Yalu a of C 2) C3= 0.793 (input the value of C 3) P1= 2.91 inches (input one-hr preapaahon—see Sheet "Design Ink" 8L Analysis of Flow Time(rimeof Concentration) fora Catchment Runoff Coefhciern, C = 0.76 Ovende Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient. C c = 0.67 _- Overide 5-yr. Runoff Coefficient. C = arter an ovende C-5 value ifdesired, or leave blank to accept calculated C-5. ) ttlustratkm rV. Rexh 1 Dsv Huh ` .1 L7 SeZiw� _ Flan- Dirrrtia. Caartuwewl anaaLes 40---S Land Hevy Tillage Shut Newt Grassed Pwmd Pressa Type frkadvv 11 �ieki Pastor. Dwe Swales Shalkw P�Swdes LLrrs Ground Ni sterwa (Shed� .roe 2 5 7 10 15-1 �Flan t— Calculations: Reach Sim" Length 5-yr NRCS Flow Flea' ID 5 L Runoff cmvey- Veksdy Tare Codl arsrs V Tf Poa It cz fm minutes input input output input output cutpui Overland 0.0200 25 0.67 0.13 3.09 1 0.0050 540 20.00 1,41 6.3E 2 3 4 5 Sum 565 C omputed Tc = 9 4c Regional Tc= 13.14 Peak Runoff Prediction using Computed Tc Kliction using Regional Tc Rainfall Intensity at Tc. 1= 7.88 in dtlltr Rainfall lntensityatTc, l= 6.87 inchhtr Peak Flovrate, Op= 19.10 cfs Peek Flovaate, Op= 16.64 cfs UD Rational- Basin A 100yr.)ds, Tc and PeakO 4202011. 10:D7 AM 0 Final Drainage Report Colorado Iron & Metal Area -Weighting for Runoff Coefficient Calculation Project Title: CIM Catchment ID: Basin SW (for emergency spillway). 100-year Illustration A ecEvD: Iow Duecuon :`atchm ent 3oui Instructions For each catchm ent subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C' CA inrut input input output Pavinq 3 02 0 96 2 90 Open 1 4? 0 50 0 74 sumd 4.49 sumd 3.63 Area -Weighted Runoff Coefficient (sum Cksum A) = 0.81 'See sheet "Design Info" for inperviousness-based runoff coefficient values. UD Rational - Basin SW 100yrx1s. Weighted C 611/2011, 10:18 AM Final Drainage Report Colorado Iron & Metal CALCULATION OF A PEAK RUNOFF U SING RATIONAL METHOD Project Title clu CatchmentIO: Basin SW,100-year Discharge 1. Catchment Hydrologic Data Catchment ID = SW Area = 4.49 Acres Percent lmper,nousrless= 72.00% NRCS Soil Type = B A. B. C. orD R. Rainfalllnformation IlincNhrl=C1'P17IC2+Tdy'C3 Design Storm Return Period, Tr= 1 DO years C 1 = 28.50 C2= 10.DD C3= 0.793 P1= 2.91 inches (input return period fordesign storm) (input the value of C 1) (input the value of C 2) (input the value of C3) (input cne-hr preciptation—see Sheet "Design Into-,, A. Analysis of Flow -rime (Time of Concentration) fora Catchment Runoff Coefficient. C = 0.^3 OterideRunoffCoef4dent. C = 0.81 ester air o:eride C :alie if desired cr leave blank tc accect calculated C 5-yr.Runoff Coefficient C-5= M1 Overide 5-yr. Runoff Coefficient. C = enterar e.eride Cti value if desired cr leave blank It accept calculated C-5.; Illustration IV. werlat Lram / Reach t1wP Reath 2 >�xctfoi Flaw Di C�121ment itrarA } Bowaaa;r lip. :S laic Heavy I n1la6s Shot Nearly Gassed Paved i7,1n Type bleadp =iNC Fa•ura� Bare S.wla 5t allaYPw l..a ,m Cm red IN aftery 5 ;She -et CdnYeyarxe 25 IF_5 -ICIF 15 I 2n C a Iculation & React, Slope Lerglh 5-yr rdRCS Flag Fla:' ID 5 L Rung( Convey- `.`Jc:,i:, Tr Coco mm Vf tolt It C-5 fps inpult inpiit output i . ut at ut a.ip�, Overland 0.0800 62 0.51 024 4.22 1 0.0D50 %5 20.00 1.41 6.66 2 3 4 5 Sum o27 Computed-c= 10.88 Regional—c= 13.48 Peak Runoff Predie6en using Computed Tc ton using Regional Tc Rainfall lrtendyffiTe, 1= 7.45 ind►Ru Rainfall Intensity at—c I = 6.79 inchlhr Peak Fbvrate. Op= 27.10 c# 7 Peak Flcveate. Op = 24.69 cfs UDRational-Basin SW 100yrxls,TcandPeakQ C.t tC t5 -hl Final Drainage Report Colorado Iron & Metal Designer: Cornpany. Date Project Location: Appendix II - Hydraulics Design Procedure Form: Extended Detention Basin (EDB) • Sedimentation Facility Sheet 1 of 3 B. Gowng APEX Engineering April 20 2011 Colorado Iron and If tml - Pond 1 Fort Collins, CO t Bas inSda0e Volrre 1,= aeoB x A) Trilm my Areas Imparviarsmesz R atio I i = Is/ 100) i = VIRF-- el Coreouag wasssheo Area Area) Ares= 118 aaa- C) Waa0ua"ty QNp eVdume(WOCV) ACCV= 037 watw.hw inure= (WOCV=10' (0B1 -C - 1.19' V -0.78' D) D) Desgn Vdurre:Vd=(WOCV112J'Aaes'l2 Vol= 0.117 aadteet 2 Outlet Worts AI Qrtlet Type 1Ched[ 010 X Qlfee Phme Perforated R 6 a - Pk other B) Depth a Outlet Above Lwvst Palwac+(H) H= 1.4e fer3 C) Required h`xirum Outlet Area W Row.(Ad A,= 010 Sc6are alhes D) Pslore6m D arersom tenth one onlyl 0 Circular perforation Darter OR D = 0 eba inches. OR T 7 HeBN Redargular PerMaon W iah W = mches E)linsbw of Cdu Im See Table e-al Fa t.oxnum) nc= 1 number F) Adpel Design Owlet Aran Per Row IA,) A. = 0.37 square aches G) Nursher of Roes (M nr = 4 r, nbw H) Hxaf Uuet ArealAJ Ay.= 1.03 square mhes Trash Rad A) Nseoeo Upen Area: Ar=U. h'(FU, ( Vetre)-A, M= 57 square acres B) Type of Chalet Open^O Iched One) X 52'Diarhaw Round 2 High RMarwular 7[ncn C) For 2, or Smaller, Rotmd Opaanim (Ref.: Figure as) y worm a [rash Hact and Cmgete Upensg Im J wan rceotfi v = ir.�s ®1 HeON of Trash Rad Screw (Hral Hv = 4a i.chft USOCIJ Shl P EDB - Pond 1, EDB 7113.2011, 4.52 PM Final Drainage Report Colorado Iron & Metal Detention Pond Sizing Worksheet Colorado Iron & Metal This is to convert % impto a C value Required detention (must inset % imp. and C pervious). ftl acre-ft 'c value 0.89 r • 1.25 1 Area 3.1 acres Release Rate 1 0.64 DETENTION POND SIZING 45734.4 08614 M od(led Modified M. FA TER D. JUDISH C. LI 995 Nov-97 Nov-98 TIME (mnst TIME cumm. (secs,) INTENSITY 100 y®r (Nhr) Q 100 (ds) Runoff Volume (ft"3) Release Cumm. total (ft"3) Required Detention (ft^3) Required Detention (ac-ft) 0 0 0 ODO 0 0.0 0.0 OD000 5 300 9950 31.64 9492.3 192.0 9300.3 02135 10 600 7720 24.55 14729.76 384.0 14345.8 03293 15 900 6S20 20.73 18660.24 576.0 180841 0.4152 20 1200 5,600 17.81 21369.6 768.0 20601.6 0.4729 25 1500 4.980 15.84 23754.6 960.0 22794.6 0.5233 30 1800 4520 14.37 25872.48 1152.0 24720.5 05675 35 2100 4D80 12-97 27246.24 1344.0 259022 05946 40 2400 3740 11.89 28543.68 153&0 27007.7 0b200 45 2700 3.460 11.00 29707.56 1728.0 27979.6 06423 50 3000 3230 10.27 308142 1920.0 288942 Ob633 55 3300 31130 9b4 31796.82 2112.0 29684.8 0.6815 60 3600 21160 909 32741.28 2304.0 30437.3 06987 65 3900 2720 8.65 3373344 2496.0 31737.4 07171 70 4200 2590 824 3459104 2688.0 31904.0 07324 75 4500 2480 7.89 35488.8 2880.0 32608.8 0.7486 80 4800 2330 757 36328.32 3072.0 33256.3 07635 85 5100 2290 728 3713922 3264.0 338752 07777 90 5400 2210 7D3 37950.12 3456.0 34494.1 07919 95 5700 2.130 677 38608.38 3648.0 34960.4 OB026 100 6000 2D60 655 39304.8 3840.0 35464Z OB 142 105 6300 2.000 636 40068 4032.0 36036.0 OB273 110 6600 1.940 6.17 40716.72 4224.0 36492.7 08378 115 6900 1B90 6111 41470.38 4416.0 37054.4 OB507 120 T200 IS40 5.85 42128.64 4608-0 37520.6 OB614 Apex Engineering Confidential dl2012011 Page Final Drainage Report Colorado Iron & Metal Pond Stage -Storage Worksheet Colorado Iron and Metal Pond ID: Detention Pbnd I Input: Detention Volume Required = 0.861 acre-ft WQCV Required = 0.117 acre4t Total Pond Volume Required = 0.978 acre-ft Where: Volume = I/3(d)(A+B+A Y10.5) d = elevation - elevation, , A = area of elevation,, contour B = area of elevation„ contour Results. 100-year WSEL = 42.46 WQ WSB. = 44.09 Calculations: Cumulative Bev. Area Area Storage Storage (feet) (S17 (acre) (acre-ft) (acre-feet) 41.00 0 0.000 0.000 0.000 42.00 3,445 0.079 0.026 0.026 43.00 14,959 0.343 0.196 0.222 44.00 45,199 1.038 0.659 0.881 44.20 51,078 1.173 0.221 1.102 Final Drainage Report Colorado Iron & Metal Circular Pipe Flow C Project: CIM Pipe ID: Storm A - 1003rear Aim / ti i t) Invert Slope So = 0.0030 ftft Manning's navalue n = 0 0130 Diameter D = 15 00 inches gn discharge 0 = 0.6 cfs 1-flow area Af = 1.23 sq ft 1-flow wetted perimeter Pf = 3.93 ft If Central Angle Theta = 3.14 rad 11-flow capacity Qf = 3.6 cfs Central angle (0<Theta<3 14) Theta = 1.13 rad m area An = 029 sq It fled perimeter Pn = 1A2 ft N depth Yn = 0 36 ft n; velocity Vn = 2 19 fps charge On = 0.6 cfs ilf Central Angle (0<Theta-c<3 14) Theta-c = 1 05 rad rtical flow area Ac = 0.24 sq ft ttical top width Tc = 1,08 ft itical flow depth Yc= 0 31 ft itical flow v elocity Vc = 2.67 fps oudenumber Fr— 1.00 UD-Culvert v1 01 STORM AXIS Pipe X20i2011 10 17 ANI Final Drainage Report Colorado Iron & Metal H w w G 3 z 0 H w Q U 3 J J_ d h z w W E w w Final Drainage Report Colorado Iron & Metal EROSION CONTROL COST ESTIMATE Prgect: Colorado Iron and Metal P repsred By: BG Daft W t2011 CITY RE SEE DING CO ST Unit Total tAtnod Quantity Unit Goat Cast Noses R esee2 51.050 S4.263.0C r•^. a S4.263 50% $2.132 —t1a t �yc EROSION CONTROL MEASURE S Unit Total Nonder IAMod Quantity Unit Cost Cast Notes 6 Gravel Inlet F.re- 7 ea $300 $2.100 8 Sit Faroe Bamer 211 LF $3 $633 38 Gravel Mulch 0.74 ac $1.350 S999 39 HayorStrawOryMuidt(1S%slope', 0.89 ac SSW S445 SuCtota S4.1 T7 Ccrt:ro_e^c% 50% $2.039 'rta 1 $6.266 Final Drainage Report Colorado Iron & Metal Appendix III - Mapping.