Loading...
HomeMy WebLinkAboutDrainage Reports - 11/10/1994oval Pewrt Ua;.ze FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE OUTBACK STEAKHOUSE SITE HARMONY MARKET FILING 8 FORT COLLINS, COLORADO Drexel Barrell T Engineers/Surveyors Incorporated Boulder, Colorado Springs 4840 Pearl East Circle Suite 114 Boulder, Colorado 80301 303 442 4338 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE OUTBACK STEAKHOUSE SITE HARMONY MARKET FILING 8 FORT COLLINS, COLORADO PREPARED FOR: OUTBACK STEAKHOUSE 550 N. REO ST. #204 TAMPA, FL 33609 (813)282-1225 (303)661-9389 PREPARED BY: DREXEL BARRELL & COMPANY 4840 PEARL EAST CIRCLE #114 BOULDER, COLORADO 80301-2475 (303)442-4338 SEPTMEBER 7, 1994 E-4520 Drexel B arrell v sT� September 7, 1994 Engineers/Surveyors Incorporated Basil Hamdan 'Mr. Boulder, City of Fort Collins Colorado Springs Utility Services Stormwater Mathews '235 4840 Pearl Fast Circle Fort Collins, Colorado 80522 Suite 114 'RE: Boulder, Colorado 80301-2475 Drainage and erosion control study 303 442 4338 for Outback Steakhouse, Harmony Market ' Dear Basil: We .are resubmitting to you, for your review and approval, this Final ' Drainage and Erosion Control Study for the Outback Steakhouse at Harmony Market. All computations within this report have been completed ' in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. ' Please call if you have any questions. Respectfully, I 1 �- � Sc c � C a � �l David L. Takeda I John Common, P.E. ' Project Engineer ' E-4520 I ' PRELIMINARY & FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE ' OUTBACK STEAKHOUSE SITE HARMONY MARKET FORT COLLINS, COLORADO ' SEPTEMBER 7, 1994 ' Location and Description The proposed Outback Steakhouse site is located midway between Boardwalk Dr. and S. ' Lemay Ave. on the south side of Harmony Rd. The site is a 1.26 acre parcel in the existing Harmony Market Shopping Center. More specifically the site is in the NE quarter of Section 11 T6N, R69W, 6th P.M., Larimer County, Colorado. Harmony Rd. borders the site on the north side. The proposed site is currently undeveloped with the exception of some minor landscaping. For ' the most part the existing ground is grass covered and slopes to the southeast at 2% to 3%. ' The only existing utilities within the proposed site is an 8" sanitary sewer line that ends in the southeast comer. At this point there is a manhole. There is an 8" water line that runs in the access drive along the south side of the site. Existing Drainage Conditions ' The proposed Outback Steakhouse site is located in Basin C and Basin A of Harmony Market Drainage Plan. Currently the site receives runoff from a small section of land south of Harmony Rd(0.34 acres). This sheet flow runs through the proposed site and continues onto either an existing entry road or an existing access road. The runoff from the site drains into detention Pond C as shown on the Overall Drainage Plan: Builder's Square, and Site Grading Plan; prepared by RBD Inc.[#386-001, May 1990]). From Pond C, the runoff enters 4 inlets and is carried to Pond D via 15" RCP. From Pond D runoff flows through a series of culverts to the outlet located under Oakridge Dr., which borders the Harmony Market on the south side. Relavent portions of the Harmony Market Drainage Report are included in this drainage ' report. ' Master Drainage Reference The Outback site is a sub -basin of the Harmony Market PUD Second Filing. Flow and ponding are in accordance with the original drainage design done by RBD Inc. For more information, see the drawings previously referenced, or the appendix of this report. 1 ' Proposed Drainage Design ' The majority of site runoff shall drain south approximately 400 feet to existing detention Pond C as planned in the RBD report. More specifically, the runoff from the proposed site exits the two eastern -most entrances of the site drains on the surface to Pond C. The runoff that exits the western entance of the site drains south approximately 100 feet to detention Pond A This is also in accordance with the RBD report. All runoff from off -site locations to the north of the proposed site drains through the Outback parking lot as shown and continues to Pond C. The runoff from the proposed Outback site travels accross the existing parking lot as shown on the RBD plans. Detention ponding for the proposed Outback site is provided by Pond C and Pond A per the original Harmony Market drainage plan. ' The runoff coefficient(C*Cr) for Basins A and C is 1.0. This number was used by RBD to calculate Q.. From these values a mass balance was performed.to determine the sizes for ' detention Ponds A and C. The runoff coefficient calculated for the Outback site is 0.59. This value is less than the value used by RBD. Therefore, the flow calculated for the Outback site is less than the flow that was used to design Ponds A and C. Thus both ponds are adequately sized. Erosion Control Design The Outback site is located within moderate rainfall and wind erodibility zones as indicated by ' City of Ft. Collins zoning maps. Potential for erosion exists as soon as construction begins and will exist until paving and landscaping is completed. Construction is planned to begin in early October, 1994. The projected opening for the restaurant is set for late Winter/early Spring 1995. Overlot grading will begin at the start of the project. Paving should be installed within six weeks of the overlot grading and permanent landscaping should follow as soon as possible after paving is complete. Prior to construction, silt fencing shall be installed on the south side of the site as shown in the Drainage and Erosion Control plan(in back pocket). Hay bales will be placed at the entry to the construction site. The hay bales must be in place while construction is not occurring. ' Materials and equipment storage areas should be located to minimize wind erosion. Areas disturbed but not addressed by paving or landscaping shall be seeded with dry land native grasses and protected initially with a hydraulic mulch. Erosion Control Security ' Temporary erosion control Measures Per Unit Measure Unit Quantiy Cost Total Silt Fences LF 355 $2.25 $800.00 ' Hay Bails EA 10 $4 $40.00 ' . Total $840.00 ' Total site revegitation: Mulching & ' seeding AC 1.26 $1,280 $1613 Use temp. measures to establish security. ' Security = $1613 x 1.5 = $2419.50 Conclusion All design and computations have been completed in compliance with the City of Fort Collins storm drainage design criteria. The site design does not substantially change the drainage patterns. All site drainage will be directed to existing detention ponds. ' Wind erosion will be minimized by equipment and supply storage placement and by wetting exposed bare ground. The project will also be scheduled to minimize the amount of time bare ground is exposed to the elements. or"I_;;„ Reviewed b Written by: Y 00 e 4p RF ' o 11956 David L. Takeda John Common, A. sT;;;SoNALEaQ�o 1 1 i vltoll.v! i i inr+r Cn 'NO SCALE 1 DREXEL BARBELL ' Project 0UTSAf� FT. COLG/aS Client uT3,�G fC ' _>�llS7-0,PIC RJN OFF AU-11 = I..60Al- C- = U1V1r7eR0v1;0 A 574- = 6,26 Z.25)Y3 ' = ZS,-7 n,N. -i-) DO LAND SURVEYORS / CIVIL ENGINEERS Job No z--7 4r20 By Date ptT 1 7 //3 ITT y �( 4� Qo = D,Z0(Z.8 '"/4.2/.606C� 4940 PEARL EAST CIRCLE, SUITE 114 j3031442-4339 .r . 11 M=M rnni 17RADO 80301 740 WOOTEN RO. #109 (7719) 591-5151 COLORADO SPRINGS. COLORADO 90915 DREXEL LAND SURVEYORS BARBELL CIVIL ENGINEERS Job No Project OUr.8AGC S72FArH0u Fr LOLL//✓C £�!SZV ' Client Orrr�« By per Dale r+JA 0,lJ5=;<vVX v � G �/./7 A-C x0.2 t /.7-7 AG )1 0.45 p, 59 Z.,qL/ a ' Te.15 "/ /2 ioo 1 4640 PEARL EAST CIRCLE. SUITE 114 1303)442-4338 740 WOOTEN RO. #109 (7191 591-5151 COLORADO SPRINGS. COLORADO 90915 Gln'4n1 EFFECTIVENESS CALCULATIONS PROJECT: OUT11ACK STiE.prr;oUtic tti NARnbuy )hARKEr (r=y52o) STANDARD FORM B COMPLETED BY: QL-7 DATE: 7/iy/5y Erosion Control C-Factor Pm -Factor Method Value Value Comment S I LT FF—N(/AIG l bQ p .5 p / �}SC bP SLU ES PAVED p pl I.UO PARKI' V6 LUT A/AT/t/F_ -4 O, 3 2 1.00 L ANOSCn PEp AREAS MAJOR PS SUB AREA BASIN BASIN (Ac) CALCULATIONS 1.60 GRASS (3Z •S%)( 1.60) = O •SL 1,60 T FErNCE Sl r = I (p, 3L )i ),SZ) UO XU.SZ) + (/ •oo� (l, Ub) = G.�O ��U,�U� l)(p.ro)�yH.r% MARCH 1991 B-15 DESIGN CRITERIA ICONSTRUCTION SEQUENCE PROJECT: OUT�,RCu s7---,AV�100,zM A-T HARNDQy tAArzi«'r (tivszo) STANDARD FORM C SJUENCE FOR 19 `7y/9,�- ONLY COMPLETED BY: DZ-T DATE: i2ficate by use of a bar line or symbols when erosion control measures will be installed. Moor modifications to an Approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR MONTH Oc+ I Nov I I Fcb I I I I I I I OfRLOT.GRADING WIND EROSION CONTROL Soil Roughening 'Perimeter Barrier Additional Barriers Vegetative Methods 'Soil Sealant Other Y INFALL EROSION CONTROL STRUCTURAL: ,. Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers ' Sand Bags Bare Soil Preparation Contour Furrows ' Terracing Asphalt/Concrete Paving Other 1 VEGETATIVE: Permanent Seed Planting 'Mulching/Sealant Temporary Seed Planting Sod Installation 'Nettings/Mate/Blankets Other ORUCTURES: INSTALLED BY MAINTAINED BY 'GETATION/MULCHING CONTRACTOR )ATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON MARCH 1991 8-16 DESIGN CRITERIA No Text APPENDIX Relevant portions of Drainage report written by RBD Inc for Harmnoy Market nginee(ng Consultants 300 South College Avenue )rt Collins, Colorado 80525 103) 226-4955 June 4, 1990 Revised August 13, 1990 City of Fort Collins Stormwater Utility 235 Mathews Street Fort Collins, CO 80522 RE: FINAL DRAINAGE REPORT - HARMONY MARKET P.U.D., SECOND FILING Dear Susan: We are pleased to submit to you this Final Drainage Report for the Harmony Market P.U.D., Second Filing. Please call if you have any questions or if we may be of further assistance. Respectfully, RBD, Inc. Cort Nickel, P.E. Project Engineer Stan Myers, P.E. Project Manager cc: 386-001-H 036-116 Other Offices: Vail, Colorado (303) 476-6340 • Colorado Springs, Colorado (719) 598-4107 9 Longmont, Colorado (303) 678-9584 INTRODUCTION Location The Harmony Market P.U.D. is located just South of Harmony Road between Boardwalk Drive and LeMay Avenue. More specifically, this site is located in the northeast corner of Section 1, Township 6 north, Range 69 west of the 6th Principal Meridian in Fort Collins, Colorado. Description The site for Harmony Market P.U.D. - first filing; Pace Warehouse; has been developed (ref: Harmony Market P.U.D. Filing One Final Drainage Report by RBD, Inc. April 24, 1989) and the remainder of the site is being used for agricultural purposes. As shown on the enclosed site grading plan, there is an existing farmhouse and outbuildings on the northwest corner of the Second Filing. The ground surface at Harmony Market slopes generally to the southeast at slightly greater than 1%. Two concrete irrigation ditches are located side by side near the north property line and just south of the Harmony Road roadside drainage swale. One of these ditches is used for onsite irrigation. This ditch is being abandoned as part of this development. The other ditch extends southeast under Lemay Avenue and into the Oakridge Area, providing irrigation to the Rule Property. As a part of development of this Filing, the developer has reached an agreement with Dick Rule for abandonment of the channel and the associated water rights. Drainage Criteria The maximum release rate for this property, as stated by City staff, is dictated by downstream restrictions or previous criteria. The maximum release rate for this site, therefore, is dictated by the Healthcare International facility downstream of the site. This development (Oakridge West P.U.D., First Filing) has a drainage release requirement of 0.2 cfs/acre as a maximum 100 year release rate. Improvements installed with this development were designed based on this requirement with provisions made to transport 100 year historic flows safely through the site. This downstream restriction will require the proposed Harmony Market P.U.D. to detain and release stormwater at a maximum (100 year design storm) release rate of 0.2 cfs/acre. It should be pointed out that downstream improvements, other than those installed with the healthcare facility, have been sized for.release rates based on the Mcclellands Basin Master Plan. Drainage Procedure The historic drainage calculations for this property resulted in the identification of two historic drainage basins (see drainage plan in pocket and calculations in the Appendix). The first basin 1 drains south adjacent to Lemay Avenue and the second, also drains south, flowing in that direction about 6501 west of Lemay Avenue. Flows from both of these basins ultimately drain into the McClellands Basin major drainageway. The historic flow pattern is generally the same for this site when fully developed. One exception to this is a small portion of.property at the northeast corner of this site. This area when developed, is graded to drain south into the historic basin Hl, instead of north and east as it does currently. The final design for Filings 1 & 2 of this property and the preliminary design for the remainder of the site results in the creation of 9 basins with seven permanent detention and one temporary detention pond. The calculations for the detention ponds show the pond volume and maximum flow rate necessary to achieve 0.2 cfs/acre. Table 1 summarizes the results from these calculations. We) _ WIMUM IDo YR. RELEASE RATE (.e.•ft.) 100 YR. STORM POND HISTORIC HISTDRIC BASIN WIN POND A POND ! P059 C POND D MD S POND R POND C POND N POND L Hi H2 1.70 1.79 1.50 0.92 2.52 0.72 VOLUME 1 1.75 I.15 1.54 0.95 2.60 0.74 Note: Pistons flews are treater tl n developed flews. 0.51 0.2e 0.15 15.1 I7.0 0.52 0.25 0.15 •-- ..- Detained flows from developed Basins A, B, C, D and G drain to a small drainageway approximately 400'feet west of the existing Evangelical Covenant Church. These developed flows discharge through an 1811 RCP pipe under Oakridge Drive. This pipe is sized under inlet control as shown in the appendix. Erosion due to these flows is controlled by riprap placed at the pipe invert. The flows .then continue in a drainage swale constructed as a part of the First Filing; show on the Drainage Plan; until they eventually reach Rule Drive, as historic flows did. Sizing of the detention facilities for Ponds "C" and I'D" have / utilized the advantages of each basin to meet the 0.2 cfs/acre 100 ( year release rate for the combined area of Basins A, B, C, and D. The approach taken during this phase was to utilize the maximum capacity of Pond C without overtopping the emergency overflow spillway. The flow rate out of Basin C, 3.03 cfs, was determined from multiple iterations of the mass diagram method. This flow rate corresponds to the calculated required storage volume which matches the available detention volume in Pond "C". The conveyance piping between Ponds C & D was sized to pass 3.03 cfs, with both ponds at their maximum ponding elevations. Even E with a higher conveyance rate out of Basin C, Pond D has extra detention capacity, relative to the size of Basins A through D. (See calculation in Appendix). An orifice was then sized for Pond D. The sizing accounted for the inflow rates from Basins A, B, and C, and the inflow hydrograph from Basin D. To be conservative, no time lag was used on . the flows into Pond D from Basins A, B, and C. A three hour storm is considered adequate for basins of this small size. The mass diagrams for these four basins were carried out until the ponds had all emptied, and until Pond D detention had reached a peak. Basin B, First Filing, was re -analyzed to include the flows from Basins A and B in the outflow from Pond B. With the use of the mass diagram method, a slightly higher release rate from Pond B was required to avoid exceedance of the available detention volume in Pond B. The excess capacity in Pond D fully compensates for the higher release rate from Pond B. The orifice plate in Pond B was also resized to account for the backwater effect in Pond D. Once the detained water leaves Pond D, it will drain into Pond G. - Basin G, however, is undeveloped at this time. A small temporary detention pond will be built in Basin G. This temporary pond is necessary to direct flows from Basins A, B, C, and D into the 18 inch pipe under Oakridge. The temporary configuration of Pond G will not detain for the entire basin, but only for its own area. Most of Basin G will remain in historic conditions until it is .developed. When Basin G is developed, a manhole will connect the pipe from Pond D and the 18 inch pipe under Oakridge Drive. An orifice will be installed in a pipe stubbed out from this future manhole. This orifice will be sized to control the release rate from Basin G only, and not from flows from the upstream basins. As a part of this report, the detention requirements for the developed state of Basin G were also analyzed. The piping under Oakridge Drive was sized based on the 100 year release rate for Basins A through D and G. Developed flows from Basins E and F drain to a proposed pipe system connected to two existing pipes that extend under Oakridge Drive near Lemay Avenue. The flows then continue to a large drainage swale, east of the Evangelical Covenant Church, as historic flows did. This drainage swale is designed to accept 30.2 cfs based on the Storm Drainage Report for the Evangelical Covenant Church P.U.D.. Phase 1, by James H. Stewart and Associates, Inc., March 29, 1985. Developed flows from Basin H drain to the end of construction at design point H. A temporary detention pond has been constructed at this point to detain and release flows at a rate of 0.2 cfs/area. The permanent detention for this basin will be covered in the future design of adjacent development. Developed Basin I, which is part of the west half of Lemay Avenue, 3 adjacent to this site, and also the south half of Oakridge Drive, drains to design point I1. At this location the flows enter two existing 4 foot sump inlets. The flows drain undetained to this point because of the difficulty of detaining these flows on site. Future development south of this site shall provide for the detention of flows from the south half of Oakridge Drive. To insure that developed 100 year flows at this point are less than or equal to 100 year historic flows, a comparison was made between the two. The 100 year flows from developed Basins E, F. and I are slightly less than 100 year historic flows from Basin H1. A check was also made of the existing inlet capacities, during a 10 year developed storm. The capacity of these inlets was found to be adequate. The approach outlined above departs from the drainage criteria specified earlier. It should be pointed out that previous -criteria for this area allows a release rate up to 100 year historic levels if the downstream facilities can accommodate such flows. As previously mentioned, provisions were made for 100 year historic flows in. downstream developments. Based on this understanding the approach taken in handling flows draining to Design Point I1 is justified. Downstream drainage facilities along _ Lemay Avenue should be verified during final design of Basins E and F, to insure that adequate capacity exists. Offsite historic flows from the portion of Basin H2 west of this site are re-routed to proposed Boardwalk Drive and directed south. The flows then continue south and southeast to eventually reach their original historic drainage pattern. As stated earlier, the two concrete irrigation ditches near Harmony Road are to be abandoned. The larger (northern) irrigation ditch remained in operation when First Filing was constructed. Ditch flows are currently piped through the First Filing. This ditch carries some storm water from Harmony Road west of Boardwalk Drive. At the intersection of Boardwalk Drive and this ditch, a 27" RCP was installed. This pipe was sized to handle irrigation flows plus storm flows of 13 cfs from Basin J, (see calculations in Appendix). Basin J, shown on the vicinity map, is the south half of the Harmony Road R.O.W. between Boardwalk Drive and the crossing of the Larimer No. 2. As part of the abandonment of the water rights to the Rule property; discussed earlier in this text; the 15 inch ADS will be plugged at the manhole east of Boardwalk Drive. Storm flows from Basin J will flow into the 24 inch RCP and be carried in the borrow ditch downstream to the proposed site entrance to Harmony Market P.U.D. Second Filing. Storm flows from Basins J and K will be carried in a 19 inch X 30 inch RCP under the site entrance. Provisions for these flows will be incorporated into development of future filings. 0 No Text MASS DIAGRAM METHOD \..: :or . DETENTION VOLUMES PROJECT: HARMONY MARKET. - o FILING COMMENTS: .100 YEAR STORM - BASIN A MAXIMUM M ALLOWABLE RELEASE DESIGN RELEASE RATE RATION. E�IATIOR: O = CIA C+= 1 TIME OF CONCE ATIow = TIME (min) !/ 15 25 2@ 30 \ \ 45 s0 55 60 70 eo 90 !oo 110 120 130 140 1 160 170 ISO 240 300 7,60 420 480 540 600 720 | . 780 840 900 ......�,e.... . . . » 96 . ( 1020 CA 8.48 e.48 8.48 e.48 S.4G 8.46 S..48 8.48 8.48 8.49 S.4B 3.49 S.48 8.48 9.48 8.48 8.48 8.49 8.48 8.ae 8.48 8.48 8.43 B.48 I (in/hr) 9.0& 7.710 6.00 5.20 4:60 4.15 3.80 3.50 3.00 2. SO 2.60 2.30 2.05 1.35 1.70 I.55 1.45 1.32 1.24 1.19 1.13 1.09 1.05 AREA = INFLOW (cu ft) 22896 37142 45792 52915 58512 63346 67670 71232 74412 76320 73ZS53 79373 91917 83443 84715 86496 86750 G853! 87310 E8328 90821 91991 94281 96163 96163 96163 96163 9616= 96163 96163 96163 9 6,1 . 163 96163 96163 96163 961 96163 1.7 cfs 1.7 c!s 8.48 acres OUTFLOW STORAGE (cu ft) rcu ft> (ac ft) S 1.0 22386 0. 5 139 !! 1020 36122 0.829256 1530 ' 442 1.0l6113 2040 50875 1.167933 2550 55962 1.284710 \060 60286 1.38 66 3570 64100 1.471542 4080 67152 1.S41597 4590 69822 1.602B92 5100 71220 1.634966 5610 72745 1.67 6120 73253 11.681652 7140 74777 1.716639 8160 7 e3 1.728264 9180 75535 1.734049 10200 76296 1.751515 11220 75530 1.73=97r 9 12240 76291 1.751404 13260 74050 1.699955 142aO 74046 1.699900 153o0 -15521 1.733719 16320 75671 1.737168 17340 76941 1.766314 18360 77803 1.736115 244G0 71683 1.645615 7.0600 65567. 1.505119 36720 59443 1.364623N 42840 5332= 1.224127 48960 472 I,093631 55080 410e3. 94-313.5 61200 34963, &.eon fo .� 67' % 28843 662144 73440 22723 0.521648 7956o 16603 0.381152 55680 10483 0.240656 91800 4367, 0.100160 97920 -1757 -0.o4033 104040 - 877 -0.IS 83 MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: HARMONY MARKET, 2ND FILING COMMENTS: 100 YEAR STORM - BASIN c MAXIMUM ALLOWABLE RELEASE DESIGN RELEASE RATE RATIONAL EQUATION: o = CIA ! TIME of CONCENTRATION = AREA = TIME CA I. INFLOW (min) . (inzhr) <cu ft> s 7.43 9.00 20196 10 7.43 . 7.30 7,2762 . 15 7.4 . 6.0 40392 20 7.49 5.20 46.6 25 7.48 4.6o 51612 30 7.48 4.1595se76 35 7.4 3.80 59690 40 7.48 3. 50 62832 45 7.4 . 3.25 65637 50 7.48 3.00 67320 55 7.48 2. 115 60 7.48 2.60 700 70 7.432.�70 72257 80 7.48 2.05 73603 90 7.48 . 1.B5 74725 100 7.48 1.70 76296 110 7.48 1.55 7652o 120 7.48 1.45 78091 130 7.43 1.32 77014 140 7.49 1.24 77912 !so 7.48 1.19 80111 7. 48 1.13 81143 170 7.4e . 1.09 e3163 ISO 7.48 1.05 94823 240 84- 8 23 300 . .B4823 360 848^ 420 B4823 .480 84823 541) e4823 600 . 84823 660 84823 720 84823 780 84823 840 . 84823 900 . 64823 960 84823 1020 8482.3 1.5 cfs 3.03 c!s 7.4B acres OUTFLOW STORAGE • <cu ft> <cu ft> cac +t> . 909 19287 0.442768 .ISIS 30944 0.7103 2727- 37665-0.e6466 3636 473039 0.988044 4545 47067 1.0e05:09 . 5454 50422 1.157 520 6367. 53327 1.224228 7272 55560 1.275482 SIG! 57456 1.319008 9090 582,30 1.336776 9999 59116 1.357121 10908 59105 1.356659 12726 59531 1.366639 . 14544 59059 1.355BI2 16362 363-1.339834 18180 5e116 1.334159 . 19998 56522 1,297575 21816 56275 1.291900 23-634 53380 1.225438 25452 52460 1.204308 27270 52841 1,213057 29088 52055 1.l950 9-- 30906 52257 1.199647 32724 52099 I.196033 43632 41191 0,945615 54540 30283 0,6952 65448 19375 0.44478e 76356 B467 0.194375 87264 -2441 -0.05603 98172 -13349 -0.3o645 109080 4257' 0. 55686 119988 -35165 -0.80727 130896 -46 3 -1.05769 141804 -569ei -l.3oelo 152712 -678 89 -1.55851 163620 -78797 -1.80993 174528 -89705 .05934 1054 -100613 -2.30973 LEGEND I • • PROPERTY LINE PROPOSED CONTOURS EXISTING CONTOURS PROPOSED ELEVATIONS .nxs, EXISTING ELEVATIONS PROPOSED SWALE _...__... _.._. OUTFALL CURB(ALL OTHER IS CATCH CURB) — — — BASIN BOUNDARY SILT FENCE SUB BASIN DESIGNATION 2 44 DIREk TION OF FLOW I cpo jz P(VARIES) TYPICAL SWALE SECTION N T.S. CONSTRUCTION NOTES Q STANDARD HANDICAPPED RAMP (D PROPOSED 4' SIDEWALK (1) TREE SHALL BE SAVED. CONTRACTOR RESPONSIBLE FOR PRESERVING TREES DURING CONSTRUCTION (D TREE TO BE REMOVED 0 MEET EX. CURB & GUTTER 0 END OF CURB RETURNS UNDE'v Af NAMi src.un/ EX. c•GJ - - - - - - - - - - - - - - HARMONY ROAD I I I I 1 I I I I I I I I I I ,I I I L. zw I I GENERAL NOTES I. REFER TO PLANS PREPARED BY CITYSCAPE FOR FURTHER DIMENSIONS AND LANDSCAPING DETAILS 2. EXISTING FL. CURB AND GUTTER, AND EDGE OF PAVEMENT ARE SCREENED. EROSION NOTES L PAVING AND LANDSCAPING MUST COMMENCE AS SOON AS POSSIBLE. RAINFALL EROSION CONTROL IN DEPENDENT ON PAVING AND LANDSCAPING COMPLETION. 2. HAY BALES WILL BE PLACED AT CONSTRUCTION ENTRANCE. THEY MUST BE IN PLACE AS INDICATED IN THIS PLAN WHEN CONSTRUCTION IS NOT IN PROGRESS, 1— EROSION CONTROL CONSTRUCTION SEQUENCE 1994 1995 METHOD OVERLOT GRADING SOIL ROUGHENING VEGETATIVE METHODS SILT FENCE BARRIEIRS ASPHALT/CONCRETE PAVING SOD INSTALLATION DRAINAGE SUMMAR, TABLE SUB BASIN A(AC) C Qo (CFS) Oim(CFS) 1 2.44 0.59 8.18 16. 39 OUTBACK STEAKHOUSE UTILITY, GRADING, DRAINAGE, AND EROSION CONTROL PLAN