HomeMy WebLinkAboutDrainage Reports - 09/17/1997r"" OpE;R'iT OF at 10
FORr COLLINS Date i 1 9�
Final Drainage and Erosion Control Report
for
3436 SOUTH SHIELDS STREET
Ft. Collins, Colorado
PREPARED FOR:
Tom Sibbald
c/o Shields Street Corporatior
2301 Research Boulevard Suite 2
Fort Collins, Colorado 8052(
PREPARED BY:
SHEAR ENGINEERING CORPORATION
Project No: 1234-05-97
Date: June, 1997
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311
No Text
June 16, 1997
Project No: 1234-05-97
Basil Harridan / Matt Fater
City of Ft. Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: 3436 South Shields Street; Fort Collins, Colorado
Dear Basil and Matt,
This letter represents our response to your review comments concerning the Final Drainage and
Erosion Control Report and Utility Plans for 3436 South Shields Street. This response will also
address general discussion items which may not specifically associate to the plan comments.
GENERAL ITEMS:
* In a meeting on April 4, 1997 with City staff concerning this project, Glen Schlueter
indicated that a minor drainage report was adequate with project.
PROJECT COMMENT SHEET:
The following is our response to written comments provided by Matt Fater with the PROJECT
COMMENT SHEET which was dated 05/16/97.
1. The existing easements as dedicated on the The First Replat of Willow Grove Village at
Cunningham Corner P.U.D. have been added to the plan. A copy of that plat is attached
for your immediate reference. The entire parldng lot area in Willow Grove Village is
dedicated as a Access, Utility and Drainage easement.
2. A variance request statement has been added to the Final Drainage and Erosion Control
Report. Because the building is existing with an established finished floor, the 12"
freeboard requirement is impossible to achieve. Therefore, a variance request from the 12"
freeboard requirement has been made. The adjacent streets, Richmond Drive and South
Shields Street are existing, constructed to full width. Therefore, a variance request from
the requirement for detention of the adjacent half streets has been made.
3. The finished floor elevation of 5079.54 represented on the Existing Conditions Plan and the
minimum allowable opening elevations have been added to the Master Drainage and
Erosion Control Plan.
4. The allowed release rate has been revised based on the actual existing condition runoff
coefficient of 0.33.
5. The plan has been further detailed with additional spot elevations, etc at the outlet
structure. A sump condition will not be created at the outlet structure.
6. A signed copy of the agreement from the property owner to the east regarding offsite
grading has been provided.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.0311
PAGE 2
June 16, 1997
Project No: 1234-05-97
Re: 3436 South Shields Street; Fort Collins, Colorado
FINAL DRAINAGE AND EROSION CONTROL REPORT:
The following is our response to comments noted in the Final Drainage and Erosion Control
Report and the Drainage and Erosion Control Plan.
Variance requests items noted previously have been added to the report.
2. All Erosion control security deposit estimate data has been revised to apply the appropriate
$ 636.00 per acre for disturbed areas less than 1.00 acre.
3. The emergency overflow weir is sized for the developed peak 100-year flow.
If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334.
Sincerely
ZG
Brian W. Shear, P. E.
Shear Engineering Corporation
BWS / meo
cc: Tom Sibbald
June 16, 1997
Project No: 1234-05-97
Basil Hamdan
City of Fort Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: 3436 South Shields Street; Fort Collins, Colorado
Dear Basil,
This letter and the attached calculations serve as the the Final Drainage and Erosion Control
Report for 3436 South Shields Street. The hydrology data and the hydraulic analysis presented
in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria
Manual; dated March, 1984, and the Erosion Control Reference Manual.
The site is located at the northeast corner of the intersection of Richmond Drive and South
Shields Street (see vicinity Map attached). The site is located in the Southwest Quarter of
Section 26, T7N, R69W of the 6th P.M., City of Fort Collins (Latimer County), Colorado. The
site is bounded on the north and east by Willow Grove Village, on the west by South Shields
Street and on the south by Richmond Drive.
Development of the site will consist of construction of a parking lot and an addition to the
existing house on the property. The net area of the site is approximately 18,202 square feet. The
site is fully serviced by all utilities, except sanitary sewer, which are stubbed to the site at various
locations around the perimeter of the site. The sanitary sewer will be brought into the site from a
manhole on Richmond Drive. Refer to plans for Rosetree Village for more information
regarding this service.
The site is a part of the Foothills Basin according to the City of Fort Collins Stormwater Basin
map. The existing site is divided into 2 sub -basins, designated le and lw which contribute
runoff to South Shields' Street and Willow Grove Village respectively. The western sub -basin
(lw) will be reduced in size by this project.
The following table summarizes the land cover and the appropriate percent imperviousness on
the existing site.
Area
Impervious
Runoff Coefficient
(sf)
%
„C„
Lawn
----------
14484
-------------
0.00
----------------------
0.20
Roof
1694
100.00
0.95
Concrete
1247
100.00
0.95
Gravel
777
13.00
0.50
Total 18202
The imperviousness of the existing site is 18.3%. This does not include the 1/2 ROW adjacent to
the property. The imperviousness percentages are taken from Table 3-1 in the Urban Storm
Drainage Criteria Manual - Volume 1. The Runoff Coefficient is taken from the City of Fort
Collins Drainage Criteria Manual.
4836 S. Collegc, Suitc 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.0311
PAGE 2
June 16, 1997
Project No: 1234-05-97
The following table summarizes the land cover and the appropriate imperviousness on the
developed site:
Area Impervious Runoff Coefficient
Lawn
11155
0.00
0.20
Roof
3305
100.00
0.95
Concrete/Asphalt
3743
100.00
0.95
Gravel
0
100.00
0.95
Total 0.63
The resultant imperviousness of the developed site is 38.7. This does not include the 1/2 ROW
adjacent to the property. The imperviousness percentages are taken from Table 3-1 in the Urban
Storm Drainage Criteria Manual - Volume I. The Runoff Coefficient is taken from the City of
Fort Collins Drainage Criteria Manual.
The western sub -basin (lw) has an existing area of 6,561 sf. The developed basin area is 6,411
sf. The total impervious area has been increased from 2,077 sf. to 2,333 sf. The total increase in
impervious area is 256 sf. Detention is not required in sub -basin lw because this increase in
impervious area is less than 350 sf.
Detention is required in the northeast portion of the site. The detention area will consist of both
grassed and paved areas. The outlet structure consists of an orifice plate with a 3 3/8" diameter
orifice and an 8" ADS N-12 outlet pipe. The pipe outfalls to a 2' wide curbed channel.
Calculations for the pond and the outlet structure can be found on pages 6-8 in Appendix I. The
pond will release into the parking area of the Willow Grove Village complex. The parking area
was designated an Access, Utility, and Drainage Easement with The First Replat of Willow
Grove Village at C inningharn Corner P.U.D.. The following table summarizes the design
parameters and the design of the pond.
Detention Pond Summa
Bottom of Pond elevation
= 76.52 feet
Top of Berm elevation
= 77.62 feet
Overflow spillway elev.
= 77.50 feet
Detention Volume Provided at elev. 77.62
= 0.04 ac-ft
(1,947 cubic feet) refer to page 7
Detention Volume Required
= 0.02 ac-ft
(845 cubic feet) refer to page 6
Required 100 year W. S. Elev.
= 77.22 feet
based on stage storage curve
Actual 100-year W. S. Elev.
= 77.35 feet
based on outlet hydraulics
Total Contributing Area
to Pond (Sub basin le)
= 0.27 acres
Maximum Allowable
100 year release rate (Historic Q2)
= 0.27 cfs Refer to page 4 in calculations
Outlet pipe
= 8" ADS N-12
Slope
= 0.005 ft/ft
Pipe Capacity
= 0.85 cfs
Channel Capacity
= 3.16 cfs
PAGE 3
June 16, 1997
Project No: 1234-05-97
A swale has been provided at the east property line to convey the runoff from sub -basin B to the
parking lot north of the existing garage. The swale consists of a 2 foot wide concrete valley pan
with slope of 0.006 ft/ft. The design flow for the channel is 0.24 cfs. The capacity of the
channel is 3.64 cfs. Refer to pages 9 and 10 in the drainage calculations for the design flow and
the channel design. The swale encroaches into an existing Access, Utility, and Drainage
Easement which was dedicated with The First Replat of Willow Grove Village at Cunningham
Corner P.U.D..
We are requesting a variance from the following City Requirements; 1) 1 foot freeboard in the
detention pond and 2) detaining the 1/2 street ROW of Richmond Drive. Site and surrounding
topography do not allow for meeting these City requirements.
We understand that permission of the owner of Willow Grove Village will be required to
perform the grading on their property. We have contacted the owner and have drafted a letter
allowing the work to be done. A signed copy of this letter is attached for your convenience.
If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334.
z
l
Brian W. Shear, P.E.
Shear Engineering Corporation
BWS / meo
cc: Tom Sibbald, Shields Street Corporation
APPENDIX I
Storm Drainage Calculations
Erosion Control Calculations
FLOW SUMMARY FOR 3436 S. SHIELDS ST. PAGE 1
DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc I2 I10 I100 Q2 Q10 Q100 DESIGN PAGE
POINT SUB 2,10 100
BASIN(S) ac. min. min iph iph iph cfe cfe efe
♦1lflf fwfYfYYYfYYf efftlflfYffYfYYYfYYYwwwwwwYwlwffffflff4wfYYYY+YYY+If YYfff flfff ww+Y+f 1fY1YYYYY YYYYYwf wfY
EXISTING CONDITIONS
A le & 2 0.33 0.33 0.33 0.42 11.00 11.00 2.46 4.31 6.92 0.27 0.47 0.95 RELEASE 4
DEVELOPED CONDITIONS
A le 0.27 0.51 0.51 0.64 11.00 11.00 2.46 4.31 6.92 0.34 0.60 1.20 REF ONLY 5
FLOWS FOR SWALE DESIGN
A 2 0.06 0.34 0.34 0.42 10.50 10.00 2.50 4.38 7.14 0.05 0.09 0.18 SWALS 9
SHEAR ENGINEERING CORPORATION
PAGE 2
SUMMARY OF SUBBASIN BREAKDOWN
PROURCT: 3436 SOUTH SHIELDS DATE: 04/20/97
FEW NO :1234-05-97 BY MHO
PILE: SIBRUN
PLATTED AREA
3436 SOUTH SHIELDS
18202 SQUARE FEET
ROW
12615 SQUARE FEET
TOTAL
30B17 SQUARE FRET
IMPERVIOUS
PERVIOUS
SUB-
GRAVEL
ASPHALT
ROOF/
LAWN
C2
C100
BASIN
CONCRETE
Cfaetor
0.50
0.95
0.95
0.20
i IMPERVIOUS
13.00%
100.00%
100.00%
0.004
SP
•rrrrrr rrrrrr rr rrrrrrrr
SP
rr rr
SP
r....e rr rr+rrr.rrrrrrrrrrrrrrrr
SP
SP
rrrrerrrrrrr
rr
EXISTING
SITE 18202
777
1247
1694
14484
0.33
0.42
le 11641
0
56
BOB
10777
0.26
0.32
lW 6561
777
1191
886
3707
0.47
0.59
DEVELOPED
SITS 18202
0
3743
3305
11155
0.49
0.61
1/2 ROW 12615
0
10928
0
1687
0.85
1.00
TOTAL 30917
0
14671
3305
12842
0.64
0.80
Iw 6411
0
1001
1132
4278
0.45
0.56
le 11791
0
2742
2173
6877
0.51
0.64
ROWIe 4012
0
3582
0
430
0.87
1.00
SUBTOTAL 15903
0
6324
2173
7307
0.60
0.75
2 2683.5
0
0
500
2183.5
0.34
0.42
le 11641
0
56
BOB
10777
0.26
0.32
SUBTOTAL 14324.5 0
r rrrrerrxrrrrr rrreerrrrrrrrrrrrrrrrrrrrrrrrrrr
56
1308
12960.5
rrrrrrrrrrrrrrrrrr»rrrrrr»rrrrrre
0.47
0.59
IMPERVIOUS
PERVIOUS
BOB-
GRAVEL
ASPHALT
ROOF/
LAWN
C2
C100
BASIN
CONCRETE
i IMPERVIOUS =
86.63i
- 1/2 ROW
ONLY
t IMPERVIOUS .
58.334
- INCLUDES
1/2 ROW AND DEVELOPED SITE
i IMPERVIOUS .
38.72%
- SITE ONLY- DEVELOPED CONDITIONS
i IMPERVIOUS .
18.29%
- SITE ONLY- EXISTING CONDITIONS
SHEAR ENGINEERING CORPORATION
EXISTING CONDITIONS PAGE J
SUB -BASIN BREAKDOWN FOR 3436 SOUTH SHIELDS STREET
PROTECT 3436 SOUTH SHIELDS STREET
PROT.NO. 1234-05-9I DATE: 04/20/97
LOCATION RICHMOND DRIVE BY: MEO
FILE SIBRUN
NOTES SITE ONLY
RUNOFF
SURFACE COEF.
CHARACTER AREA C CA t
(of) IMPERVIOUS
STREETS
ASPHALT 0 0.950 0.000 100.00% 0.00
CONCRETE 1247 0.950 1184.650 100.00% 1247.00
GRAVEL 777 0.500 388.500 SO.00t 388.50
ROOFS 1694 0.950 1609.300 100.00t 1694.00
LAWNS SANDY SOIL
FLAT c 2% 0 0.100 0.000 0.00% 0.00
AVERAGE 2 0 0.150 0.000 0.00% 0.00
STEEP > ] 0 0.200 0.000 0.00t 0.00
LAWNS HEAVY SOIL
FLAT < 2% 14484 0.200 2896.800 O.00t 0.00
AVSRAGE 2 0 0.260 0.000 O.00t 0.00
STEEP > I 0 0.350 0.000 0.00% 0.00
TOTAL ARE 18202 6079.250 3329.50
C2 CIO 0100
COMPOSITE 0.334 0.334 0.410
USE 0.33 0.34 0.42
t IMPERV 18.29% SITE ONLY
SHEAR ENGINEERING
CORPORATION
EXISTING
PAGE
FLOW TO CONCENTRATION POINT A
FROM SUBBASIN
is 6 2
PROJECT:
3436 S. SHIELDS
ST.
DATE
06/13/97
LOCATION:FORT
COLLINS
PROD.
NO.1234-05-97
FILE:
SIBRUN
BY
MEO
AREA (A)= 0.329 ACRES
RUNOFF COBF. (C)
2 YEAR 10 YEAR 100 YEAR
C 0.33 0.33 0.42
SEE SPREAD SHEET ATTACHED ON PAGE 3
TIME OF CONCENTRATION (TO
OVERLAND TRAVEL TIME (Ti)
LENGTH - 147 FEET SLOPE 1.56 k
2 YEAR 10 YEAR 100 YEAR
C . 0.20 0.20 0.25
Ti (min)= 17.62 17.62 16.64
TRAVEL TIME (It) -L/(60-V) PLOW TYPE
L (ft) .7 S (i) • 0.00 NONE V (fps) = 0.00 Tt(min)- 0.00
L (ft) .7 S M . 0.00 NONE V (fps) . 0.00 Tt(min)- 0.00
L (ft) .? S (4) . 0.00 NONE V (fps) . 0.00 Tt(min). 0.00
L (ft) .7 S (4) . 0.00 NONE V (fps) . 0.00 Tt(min)- 0.00
L (ft) .7 S (5) - 0.00 NONE V (fps) . 0.00 Tt(min)- 0.00
L (ft) _. S (t) . 0.00 NONE V (fps) = 0.00 Tt(min). 0.00
L (ft) _] S (t) . 0.00 NONE V (fps) • 0.00 Tt(min). 0.00
ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) . 0.00
TOTAL LENGTH . 147 L/180+10. 10.82 < 16.64 .Ti+Tt CHOOSE LESSER
Tc =Ti+TOTAL TRAVEL TIF4E
2 YEAR 10 YEAR 100 YEAR
Tc (min)- 10.82 10.82 10.82
USE Tc - 11 11 11
INTENSITY (I) (iph)
2 YEAR 10 YEAR 100 YEAR
I • 2.46 4.31 6.92
NOTE: INTENSITIES TAKEN FROM FIGURE 3-1
RUNOFF (Q. CIA) (cfe)
2 YEAR 10 YEAR 100 YEAR
Q 0.27 0.47 0.95
CONCLUDE:USS Q2 . 0.27 CPS AS RELEASE RATE FROM POND
4
SHEAR ENGINEERING
CORPORATION
DEVELOPED
PAGE
PLOW TO CONCENTRATION POINT A
FROM SUBBASIN
Is
PROTECT:
3436 S. SHIELDS
ST.
DATE
06/16/97
LOCATION:FORT
COLLINS
PRAT.
NO.1234-05-97
PILE:
SIBRUN
BY
HBO
AREA (A). 0.271 ACRES
RUNOFF COEF. (C)
2 YEAR
10 YEAR
100 YEAR
C . 0.51
0.51
0.64
SSE SPREAD SHEET ATTACHED ON PAGE
2
TIME OF CONCENTRATION (Tc)
OVERLAND TRAVEL TIME (Ti)
LENGTH . 60 FEET
SLOPS
1.00
2 YEAR
10 YEAR
100 YEAR
C . 0.20
0.20
0.25
Ti (min). 13.04
13.04
12.31
TRAVEL TIME (It) .L/(60+V)
PLOW TYPE
L (ft) 30 S M .
1.00
GUTTER
V (fps) .
2.00
Tt(min).
0.25
L (ft) 25 S (t) .
2.00
GUTTER
V (fps) .
2.83
Tt(min).
0.15
L (ft) 57 S (4) .
0.50
GUTTER
V (fps) .
1.50
Tt(min).
0.63
L (ft) .7 S .
0.00
NONE
V (fps) .
0.00
Tt(min).
0.00
L (ft) .? S (Y) .
0.00
NONE
V (fps) .
0.00
Tt(min).
0.00
L (ft) .7 S W .
0.00
NONE
V (fps) .
0.00
Tt(min).
0.00
L (ft) .] S (4) .
0.00
HOME
V (fps) .
0.00
Tt(min)=
0.00
ALL VELOCITIES TAKEN FROM FIGURE 3-2
TOTAL TRAVEL
TIME
(min) .
1.03
TOTAL LENGTH . 172
L/160+10.
10.96
<
13.34
.Ti+Tt CHOOSE LESSER
Tc .Ti+TOTAL TRAVEL TIME
2 YEAR
10 YEAR
100 YEAR
Tc (min)- 10.96
10.96
10.96
USE Tc . 11
11
11
INTENSITY (1) (iph)
2 YEAR
10 YEAR
100 YEAR
I . 2.46
4.31
6.92
NOTE: INTENSITIES TAKEN
FROM FIGURE
3-1
RUNOFF (Q= CIA) (cfe)
2 YEAR
10 YEAR
100 YEAR
Q = 0.34
0.60
1.20
CONCLUDS:SIZE OVERFLOW FOR 0100
5
SHEAR ENGINEERING CORPORATION
PAGE 6
DETENTION VOLUME REQUIRED FOR
3436 S. SHIELDS ST.
PROJECT: 3436 S. SHIELDS ST. DATE: 06/13/97
PROJ.NO. 1234-05-97 BY MEO
FILE: SIBPONO
CUMULATIVE RUNOFF METHOD
FOR
SIZING DETENTION PONDS
DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.64
RELEASE RATE: 0.27 CFS AREA: 0.27 ACRES
INITIAL TIME: 5 MINUTES
TIME INCREMENT: 5 MINUTES
INFLOW INFLOW RELEASE STORAGE STORAGE
TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME
min Doc iph cfe cf cf of ec-ft
r rrrrrrrrrrr♦er rr+errrrr+r+rrr+rrrrr+rr errrrrrr+rr ♦rrrrrrrrersr+rr rr rarr
5 300 9.30 1.61 482.1 91.0 401.1 0.01
10 600 7.14 1.23 740.3 162.0 578.3 0.01
35 900 6.06 1.05 942.5 243.0 699.5 0.02
20 1200 5.21 0.90 1080.3 324.0 756.3 0.02
25 1500 4.63 0.90 1200.1 405.0 795.1 0.02
30 1800 4.20 0.73 1306.4 486.0 820.4 0.02
35 2100 3.81 0.66 1382.6 567.0 $15.6 0.02
40 2400 3.60 0.62 1493.0 648.0 845.0 0.02 •r•
45 2700 3.28 0.57 1530.3 729.0 801.3 0.02
50 3000 3.02 0.52 1565.6 810.0 755.6 0.02
55 3300 2.80 0.48 1596.7 891.0 705.7 0.02
60 3600 2.60 0.45 1617.4 972.0 645.4 0.02
65 3900 2.43 0.42 1637.6 1053.0 584.6 0.01
70 4200 2.30 0.40 1669.2 1134.0 535.2 0.01
75 4500 2.17 0.37 1687.4 1215.0 472.4 0.01
80 4000 2.07 0.36 1716.9 1296.0 420.9 0.01
DETENTION VOLUME REQUIRED - 845 e£
DETENTION VOLUME REQUIRED - 0.02 me-£t
SHEAR ENGINEERING CORPORATION
PAGE 7
AVERAGE END AREA METHOD
FOR DETENTION BASIN
VOLUMES
PROJECT : 3436 S. SHIELDS ST DATE: 06/13/97
PROS. NO:1234-05-97 BY MEO
LOCATION:RICHMOND DRIVE PILE: SIBPOND
CONSTANT: 65 - 1 SQ IN. FIRST EVEN CONTOUR 77 FRET
INVERT 76.52 FEET TOP ELEV 77.62 FRET
INCREMENT 1 FOOT SCALE: 1• 10 FEET
r r.rrara aaa as u+ ++++r+++ +r.r...r rrr.r.r. ... araar aaa ra aaa au ar+++ arrrr««r
STAGE ELEV PLANI- AREA AREA VOLUME CUM. CUM. CUM.
METER (Al) (m) (V1) VOLUME VOLUME VOLUME
ft ft READING aq in 0q ft cf cf ry ac-ft
r ra aaa as ++xxrrrr rr rrrrr+ rrrrx««r a«xrxa«r «««.+a+a a++++a+a aa+ra+++ +..++r..
0.00 76.52 0.0 0.00 0 0 0 0 0.00
0.48 77.00 1020.5 15.70 1570 249 249 9 0.01
1.10 77.62 2539.5 39.07 3907 1698 1947 72 0.04
FORMULAE :Al- (PLANIMSTER READING)/CONSTANT
Ala (Al)*SCALE SQUARED
DETENTION VOLUME REQUIRED - 845 CF
ELEVATION AT WHICH REQUIRED VOLUME IS REACHED - 77.22 FT
PREBBOARD . 0.40 FT
CONCLUDE: POND VOLUME IS OR. LESS THAN I FOOT FRBBBOARD
REQUEST VARIANCE
SHEAR ENGINEERING CORPORATION
PAGE e
OUTLET STRUCTURE FOR 3436 S. SHIELDS ST
PROJECT: 3436 S. SHIELDS ST DATE: 06/13/97
PROJECT NO 1234-05-97 BY NED
PROJECT LOCATION :RICHMOND DRIVE FILE: SIBPOND
INPUT FOR OUTLET STRUCTURE
ORIFICE DIAN. (ft) = 0.28 TOP OF BERM (ft) . 77.62 DETERMINE ORIFICE
ORIFICE INV. (ft) 76.52 INIT. DELTA (ft) . 0.48 FOR MINOR STORM
ORIFICE COEF. (Cl) 0.65 DELTA HEAD (ft) 0.62 Q. CA(29H)^0.5
100 YR RELEASE RATE (Cfe). 0.27 100 YR WSSL REQUIRED (£t). 77.22 A . Q/(C(2gH)^0.5
CHANNEL WIDTH (ft) 2.00 PIPE SLOPE (ft/ft) . 0.005 H (ft) . 0.70
CHANNEL DEPTH (ft) . 0.50 PIPE DIAMETER . 0.67 C . 0.65
CHANNEL SLOPS (ft/ft) 0.005 MANNINGS n 0.012 Q (Cfe). 0.27
MANNINGS n 0.016 CONVEYANCE FACTOR . 13.091 A (0f) . 0.06
OVERFLOW WEIR LENGTH (ft) 12.00 R (ft) . 0.140
OVERFLOW WEIR INV(ft.). 77.50 D (ft) . 0.291
WEIR COEFICIENT 2.60 USE 0.28' DIAMETER
•*r**r** r*»*r*r rwr*xrxr *OUTPUT* ******** ******** xrxrr*rr ******** . 3 3/8-
CHANNEL AREA (SF) 1.00 WETTED PERIMETER . 3.00 FEET
HYD. HAD (FT) . 0.333 FEET R"2/3 0.4806
OUTLET CHANNEL CAPACITY 3.16 CPS OUTLET PIPE CAPACITY 0.93 CFS
ORIFICE AREA (A) . 0.0616 SQUARE FEET
.....w...rr.....r...............rrrrr..r*r*..**..***...*.....r..ww........................
ELBV. HEAD HEAD TOTAL
OVER ORIFICE OVER WEIR FLOW
ORIFICE FLOW WEIR FLOW
ft ft cf. ft cfe cf.
76.52 0.00 0.00 0.00 0.00 0.00
77.00 0.34 0.19 0.00 0.00 0.19
77.62 0.96 0.31 0.12 1.30 1.61
77.22 0.56 0.24 0.00 0.00 0.24
77.50 0.84 0.29 0.00 0.00 0.29
77.350 0.69 0.27 0.00 0.00 0.27
r rrrrrrr rw *rrwww wrr*rr*w r.«rr**r r*w**«.* ***vxrr♦
ORIFICE EQUATION: CA(2gH)^1/2 WEIR FLOW EQTN.
NOTE: HEAD OVER ORIFICE . HEAD OVER CENTER OF ORIFICE
APPROXIMATE W.S.EL. FOR Qrel . 0.27 CPS =
CONCLUDE:OUTLET STRUCTURE IS ADEQUATE
STAGE STORAGE
ft cf
0.00 0
0.48 249
1.10 1947
0.70 845 RSQ'D 100YR WSSL
0.98 1616 OVERFLOW WEIR
0.83 1207 ACTUAL 100YR WSSL
CWLH^3/2
77.350 OK
SHEAR ENGINEERING CORPORATION
DEVELOPED PAGE
FLOW TO CONCENTRATION POINT A
FROM SUBBASIN 2
PROJECT: 3436 S. SHIELDS ST. DATE 04/21/97
LOCATION:FORT COLLINS PROS. NO.1234-05-97
FILE: SIBRUN BY MBO
AREA (A)- 0.060 ACRES
RUNOFF COEF. (C)
2 YEAR
10 YEAR
100 YEAR
C 0.34
0.34
0.42
SEE SPREAD SHEET ATTACHED ON PAGE 2
TIME OF CONCENTRATION (Tc)
OVERLAND TRAVEL TIME (Ti)
LENGTH = 30 FEET
SLOPE = 1.00
6
2 YEAR
10 YEAR
100 YEAR
C - 0.20
0.20
0.25
Ti (min). 9.22
9.22
8.71
TRAVEL TIME (Tt)-L/(60•V)
FLOW TYPE
L (ft) - 100 S M =
0.50 GUTTER
V (fps) =
1.SD
Tt(min)-
1.11
L (ft) -7 S (4) =
0.00 NONE
V (fps) =
0.00
Tt(min)=
0.00
L (ft) _] S (4) =
0.00 NONE
V (fps) =
0.00
Tt(min)=
0.00
L (ft) -7 S (4) =
0.00 NONE
V (fps) -
0.00
Tt(min)=
0.00
L (ft) -7 S (t) -
0.00 NONE
V (fps) -
0.00
Tt(min)-
0.00
L (ft) _. S (t) =
0.00 NONE
V (fps) -
0.00
Tt(min)=
0.00
L (ft) -T S (4) =
0.00 NONE
V (fps) -
0.00
Tt(min)-
0.00
ALL VELOCITIES TAKEN FROM FIGURE
3-2
TOTAL TRAVEL TIME
(min)
1.11
TOTAL LENGTH - 130
L/180+10- 10.72
>
9.82
-Ti+Tt CHOOSE LESSER
Tc =Ti+TOTAL TRAVEL TIME
2 YEAR
10 YEAR
100 YEAR
Is (min)- 10.33
10.33
9.82
USE Is - 10.5
10.5
10
INTENSITY (I) (iph)
2 YEAR
10 YEAR
100 YEAR
I - 2.50
4.38
7.14
MOTS: INTENSITIES TAKEN
FROM FIGURE
3-1
RUNOFF (Q= CIA) (efe)
2 YEAR
10 YEAR
100 YEAR
Q - 0.05
0.09
0.18
CONCLUDS:DESIGN FLOW FOR CHANNEL
AT PROPERTY
LINE = 1.33-Q100
- 0.24 CPS
9
SHEAR ENGINEERING CORPORATION
PAGE 10
EXHIBIT A
PROTECT NAME: ROSETRBE VILLAGE DATE: 04/21/97
PROTECT NO. 1234-5-97
BY : MEO
SWALS DSSCRIPTION:VALLSY PAN AT EAST PROPERTY LIMB
PILE NAME: SINCHAN
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHARNEL
CHANNEL CONFIGURATION: TRIANGULAR
CHANNEL LINING: GRASS WITH 2'VALLY PAN
Da Db Dc Sc n W I
(ft) (ft) (ft) (4) (ft) (ft)
____ ____ ____ ___- ----- --_- ----
2.00 2.00 0.50 0.60 0.030 2.00 0.25
0.25 . LEFT BANK SLOPE
. 0.25 . RIGHT BANK SLOPE
DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V
(s.f.) (ft) (s.f.) (ft) (A/P) (cfs) (ft/sec)
_______ _____________________ _______ _______ _______ _______
0.50 6.00 2.00 6.12 0.47 O.UB 3.64 1.82
0.25 4.00 0.75 4.06 0.32 0.08 0.93 1.24
0.00 2.00 0.00 2.00 0.00 0.08 0.00 0.00
0.118 2.94 0.29 2.97 0.21 0.08 0.24 0.92
tttllfllfiffff!ltlf YY Y'YYtIYIYfY if iYMl t\flfffiY.l fYflfiYf fiiYYffYIYYYY t11t
I
APPROXIMATE PLOW DEPTH FOR Q . 0.24 CPS . 0.12 FEET
CONCLUDS:CHANNBL IS ADEQUATE
71'
a
Look,r`5 6Vo.}.�
RAINFALL PERFORMANCE STANDARD EVALUATION
PROTECT: 3436 SOUTH SHIELD STANDARD FORM A
COMPLETED BY: MARK OBERSCHMIDT DATE: 04/21/97
++r++rr•rrrrrrxrrrrrrrrr e+r+r+++++++rrr++rrer rrrff♦»ffrrr rrrrrrrrrr re rrrrrr++»rrrrrrrrrr
DEVELOPED BRODIBILITY Aeb Lob Sob Lb Sb PS
SUBBASIN ZONE (ac) (ft) (W (feet) (1) (5)
rr rer eeerrrx xrrrrrrr+rrrrrrr+rrrrrrrrrr rrrrrrrr rrrrrrrrrrr+er rx rrrrrrrrr+rrr+r rrrr rrrrr rrr
1 MO➢ERATE 0.27 172.00 1.00 46 0.27
•r rrrrrrrrrr rr r+r+rrrrrrrr er rrrrrr rr rr rrrrrrrrrr urrrrrrrrrrrrrrrrre♦r+r
0.27 172.00 1.00
LINEAR INTERPOLATION
SLOPE
LENGTH
1.00
1.00
100
74.6
74.60
172.00
75.82
200
76.3
76.30
CONCLUDE:PERFORMANCE STANDARD . 75.824
EROSION CONTROL PLAN OVERALL RFPECIIVENESS MOST EXCEED THIS
EFFECTIVENESS CALCULATIONS
STANDARD FORM B
PROJECT: 3436 SOUTH SHIELDS PROJ. NO.1234-05-97
BY: MARK OBSRSCHMIDT DATE 04/21/97
------------------------------------------------------------------------------------------
EROSION CONTROL C-FACTOR P-FACTOR COMMRNT
METHOD VALUE VALUE
------------------------------------------------------------------------------------------
ROUGHENED GROUND 1.00 0.9 ROOF AREAS ON ADDITION ONLY
SILT PENCE 1.00 0.5 NORTH AND SOUTH PROPERTY LINES
ASPHALT 0.01 1.0 PARKING AREA AND WALKS
SOD 0.01 1.0 POND AND YARD
GRAVEL INLET FILTERS 1.00 0.8
------------------------------------------------------------------------------------------
MAJOR PS SUE AREA CALCULATIONS
BASIN % BASIN acre AREA C P
ALL 75.82h le 0.24 ROOF 0.02 ACRES 1.00 0.90
SOD 0.16 ACRES 0.01 1.00
EQUATIONS ASPHALT 0.06 ACRES 0.01 1.00
C . WEIGHTED AVG OF C X AREA
P- (WEIGHTED AVG OF P X AREA) X P C. 0.0092
EFF . (1 - P X C) X 100 P . 2.0242
EFF 98.14%
------------------------------------------------------------------------------------------
r rr rrrrrrrx x+xrxxr•xxx•rxxrrrrrr•rrrrr rrrrrrrxe rrxrxxxrrrrxxxrrxxxrxrr rr rrrrrr:: rr rrrrrrrr
TOTAL AREA 0.24 ACRES
OVERALL EFFECTIVENESS - 98.14% > 75.82%
CONCLUDS:EROSION CONTROL PLAN IS EFFECTIVE
June 13, 1997
Project No: 1234-05-97
Basil Hamdan
City of Fort Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: 3436 South Shields Street; Fort Collins, Colorado
Dear Basil,
Attached is the erosion control security deposit estimate for 3436 South Shields Street
ESTIMATE 1:
175 LF of silt fence at $3.50 per LF $ 612.50
2 - Gravel Net Filter ® $150.00 each $ 300.00
TOTAL ESTIMATED COST: $ 912.50
x 1.50
$ 1,368.75
ESTIMATE 2:
re -vegetate the disturbed area of 0.27 acres at $636.00 per acre .72
TOTAL ESTIMATED COST: $ 171.72
x 1.50
S 257.58
The total required erosion control security deposit will be $ 1,368.75
If you have any questions, please call at 226-5334.
Sincerely, 04,,
Mark Oberschmidt
Shear Engineering Corporation
BWS / meo
cc: Tom Sibbald
Dave Stringer; City of Fort Collins
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311
June 13, 1997
Project No: 1234-05-93
Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS:
3436 South Shields Street; Fort Collins, Colorado
A. An erosion control security deposit is required in accordance with City of Fort Collins
policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins
Development Manual). In no instance shall the amount of the security be less than
$ 1000.00.
1. According to current City of Fort Collins policy, the erosion control security deposit
is figured based on the larger amount of 1.5 times the estimated cost of installing
the approved erosion control measures or 1.5 times the cost to re -vegetate the
anticipated area to be disturbed by construction activity.
a. The cost to install the proposed erosion control devices section location is
$ 912.50. 1.5 times this estimate is $ 1,368.75.
b. Based on current data provided by the City of Fort Collins Storm Water Utility,
and based on an actual anticipated net affected area which will be disturbed by
construction activity (approximately 0.27 acres) we estimate that the cost to re -
vegetate the disturbed area will be $ 171.72 ($ 636.00 per acre x 0.27 acres).
1.5 times the cost to re -vegetate the disturbed area is $ 257.58. The $ 636.00
per acre for re -seeding sites of less than 1 acre was quoted to us by the City of
Fort Collins Storm Water Utility staff.
CONCLUSION:
The erosion control security deposit amount required for this project will be $ 1,368.75
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282-0311
APPENDIX II
Figure 3-1; Rainfall Intensity Duration Curve
Figure 3-2; Estimate of average flow velocity for use with Rational Formula
Table 4 : circular pipe flow capacity for ADS N-12
IG
F
O
MN[ - NM
HCD O
mt-CD
O t-
at m
O
of m lD t• W
tD CV M
mN tD
N
OOHNO
O t-H
mCNCID
m
HHM
Ipn tt-S
b 7
Rr to
H
O
O LO CO N at
.-+ H M
T co O
H to O
t-
.gy m.-�
to NH
m N N
. .
C;MCD
•"1
C;OHHet
t-N N
tO V n
O O N
at N
.-i N
M tot-
H .�.•
m
O
H to at to M
.•+ M O
LO CO 0
O at CD
t- O
N r co CID
Cl) to to
VWM W
N.
O OO"N
.
O W Ln
NO
t- al CD
tv
N m
in
LO CO 0) to t-
to O tD
m ar tO
In to 1O
M O
HM to C)0
t-HO
m.-+t-
OCl) N
N
OOOON
MCOH
t-t- W
M Oa
t-c1'
N F)
In t- H
H N
H
O
v m M to LO
CD tD O
m co to
to at m
N
HN W W W
Mat m
ON to
v coH
.
0000.-+
MtOm
tD of
h•N N
mN
HNM
-e w0
.+N
H
m
Mt-O)0 m
to
m HN
co co a)N
Nm
HN at cot-
.+H N
Ot- V'
m LO
.-•
OOOOH
MLi m
if;
4 W O
RrO
.••� N Cl)
!F O m
H N
O
C)
a�tn
N to t0 V O
HNv t- (0
H M t-
mt tO
aT N N
tT 00
m N O
to tD
H
d
C)00 C>
. .
W
M H O
O rto
.•+v W
Mm
Q. [.
••+ N M
C' to W
.•+ H
Q C
O
U L'
0 to
t-. 000 TC'
IO NN
Nm O
.+CO C)
C) C)
••+ N
0 M .+ a) to
to M W
ti .•+ v
tO to t-
g
'; Nct tD a
Hv
U U
R+H
N of L-
N m t-
fs7. 40-i
Ol
P.
O O O O
co 000
.•+ .t-+
m
U
4�o
OW at W m
I-wC)
CO t-H
tO et tD
OtD
M W 0
M H to
LO
LL
H
O N Cl) �O co
OIMo
U
0000.-1
N M t-
mat
M <N
--
N
Cl) at t-
.+ .-.
QQQa
y
�7 3
Rtn
t-
Mma tDq.
tD a to
tD t-N
to co W
C W
eLK!?•-o
OD
OMO
CID co N
O < M
r00
Ot-i lN')�m
w
fO0
NM tD
m
H
U r1
a°
O O O O H
•-+ N
N cn tD
H
7
w
O
W to C o to
W M t n
t o a r M
N N m
H O
1n
CD to co N
to t` m
O H M
t- a O
O N C m
0
HN at
W N t-
M H.+
tt-OH
00000
N M to
..
to
t- N .+ C) V'
O W' d'
Cl) ID O
m m to
LO
M
to N N to t-
N ..
t- H W
W N t-
O.+N Mt-
. . .
'Ir.-+.-+
to a,
00000
" N<
O
MN t-N W
to MM
m co W
O t—H
c"m
N
at m tO t- W
ot-H
0tDC)
O W M
O O N W
O
Cl)HH
in t- 0
[O mN
co m
O O O O O
H
H H M
at tD
O
OtO W Na
1O C-3
O MIn
HLnLO
t-H
H
C7 ID o)
t- N N
CO aY' t-
to O W
a N
O 0 H H
O
OHN
Cl) LL7t-
O C N
am
OO O 00
H.•+N
M ct
to
CD -It to m
MCD tD
'rat W
Oat to
t-O
cli
0
OD
U7 ODIn
LO co at
It') m .+
M OD
H
C) O O .M•1 N
O
O
oC;
C M
t-m CD
0 0 0 0 0
H
N M
O
II
N
atmM tD LO
v to m
.•+M t-
at W N
H.•+
C)
Mtom
to et a'
t-N N
-W0
C
0000OD
0
000
H N M
d't0 C;
Ln
000 00
ti N
D
is
nN tp mH
at O W
Otn CO
Hto n
mH
.t
O
to CD M t- m
t- to m
co tD 0
In c") W
m to
co
O w
ON MtOM
N tm0
��N
p�
Opt-
77^
m to CD W
ONtn
co Hat
t-0 to
NN
Q
H H H
H N N
N M M
ar v
Ll
•
DRAINAGE CRITERIA MANUAL
RUNOFF
6141
30
h- 20
z
w
U
tY
w
n 10
z
w
a
O b
to
w
oNc 3
O
U 2
w
F
3
1
Iffm
��on
�����
����Q►
Firm
I■■ I
,■■ ; ..
• ►�■
�
i'■■�
�eeel��
■■■�
�■■■�.
.C■■■�
�■■■■�
■�■��
e■eeel9eelle��
�era��
�e■��■■■■ee�e
M.'
:�:t,:
2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING"UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 -1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
R-M-P Medium Density Planned Residential District — designation for medium density
areas planned as a unit (PUD) to provide a variation in use and building placements
with a minimum lot area of 6,000 square feet.
R-L-M Low Density Multiple Family District— areas containing low density multiple family
units or any other use in the R-L District with a minimum lot area of 6,000 square feet
for one -family or two-family dwellings and•9,000 square feet for multiple -family
dwellings.
M-L Low Density Mobile Home District — designation for areas for mobile home parks
containing independent mobile homes not exceeding 6 units per acre.
M-M Medium Density Mobile Home District — designation for areas of mobile home
parks containing independent mobile homes not exceeding 12 units per acre.
B-G General Business District — district designation for downtown business areas,
including a variety of permitted uses, with minimum lot areas equal to 112 of the total
floor area of the building.
B-P Planned Business District — designates areas planned as unit developments to
provide business services while protecting the surrounding residential areas with
minumum lot areas the same as R-M.
H-B Highway Business District — designates an area of automobile -orientated busi-
nesses with a minimum lot area equal to 1 /2 of the total floor area of the building.
B-L Limited Business District — designates areas for neighborhood convenience
centers, including a variety of community uses with minimum lot areas equal to two
times the total floor area of the building.
C Commercial District —designates areas of commercial, service and storage areas.
I-L Limited Industrial District —designates areas of light industrial uses with a minimum
area of lot equal to two times the total floor area of the building not to be less than
20,000 square feet.
I-P Industrial Park District —designates light industrial park areas containing controlled
industrial uses with minimum lot areas equal to two times the total floor area of the
building not to be less than 20,000 square feet.
I-G General Industrial District — designates areas of major industrial development.
T Transition District — designates areas which are in a transitional stage with regard
to ultimate development.
For current and more explicit definitions of land uses and zoning classifications, refer to the
Code of the City of Fort Collins, Chapters 99 and 118.
Table 3-3
RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS
Character of Surface Runoff Coefficient
Streets, Parking Lots, Drives:
Asphalt................................................................................................ 0 95
95
Concrete............................................................................................. 0.
Gravel................................................................................................. 0.50
Roofs.......................................................................................................... 0.95
Lawns, Sandy Soil: 0.10
Flat<2%............................................................................................. 0.15
Average2 to 7%.................................................................................. 0.20
Steep>7%..........................................................................................
Lawns, Heavy Soil:
Flat<2%............................................................................................. 0.20
Average2 to 7%.................................................................................. 0.25
Steep >7%......... :................................................................................
0.35
i
MAY 1984 3-4 DESIGN CRITERIA
3.1.7 Time of Concentration
In order to use the Rainfall Intensity Duration Curve, the time of concentration must be
known. This can be determined either by the following equation or the "Overland Time of
Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See
Figure 3-2).
Tc =1.87 (1.1 — CC,) D12
91,3
Where To =Time of Concentration, minutes
S = Slope of Basin, %
C = Rational Method Runoff Coefficient
D =Length of Basin, feet
Cf = Frequency Adjustment Factor
Time of concentration calculations should reflect channel and storm sewer velocities as well
as overland flow times.
3.1.8 Adjustment for Infrequent Storms
The preceding variables are based on the initial storm, that is, the two to ten year storms. For
storms with higher intensities an adjustment of the runoff coefficient is required because of
the lessening amount of infiltration, depression retention, and other losses that have a
proportionally smaller effect on storm runoff.
These frequency adjustment factors are found in Table 3-4.
Table 3-4
RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS
Storm Retum Period Frequency Factor
(years) ' Cr
2 to 10 1.00
11 to25 1.10
26 to 50 1.20
51 to 100 1.25
Note: The product of C times C, shall not exceed 1.00
3.2 Analysis Methodology
The methods presented in this section will be instituted for use in the determination and/or verification
of runoff at specific design points in the drainage system. These methods are (1), the Rational Method
and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods. such as
SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where
applicable, drainage systems proposed for construction should provide the minimum protection as
determined by the methodology so mentioned above.
3.2.1 Rational Method
For drainage basins of 200 acres or less, the runoff may be calculated by the Rational
Method, which is essentially the following equation:
Q=CfCIA
Where Q = Flow Quantity, cfs
A =Total Area of Basin, acres
Cf = Storm Frequency Adjustment Factor (See Section 3.1.8)
C = Runoff Coefficient (See Section 3.1.6)
1 = Rainfall Intensity, inches per hour (See Section 3.1.4)
3.2.2 Colorado Urban Hydrograph Procedure
For basins larger than 200 acres, the design storm runoff should be analyzed by deriving
synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph
Procedure be used for such analysis. This Procedure is detailed in the Urban Storm Drainage
Criteria Manual, Volume 1, Section 4.
MAY 1984 3-5 DESIGN CRITERIA
No Text
April 22, 1997
Project No: 1234-05-97
Glen Schlueter
City of Ft. Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: 3436 South Shields Street; Fort Collins, Colorado
Dear Glen,
It is my understanding that the development of the above mentioned site will require some
grading on my property. According to sheet 3 of the Final Utility Plans for 3436 South Shields
Street., the grading will be limited to the western property line of The First Replat Willow Grove
Village near Richmond Drive. I have reviewed a copy of the proposed grading and find no
problems with it.
Therefore, I give permission for RLS Management and their contractors to perform the necessary
grading on my property.
If you have any questions or comments, please call me at (970)-493-7900
Sincerely
Thomas Sibbald,
V.P. Shields Street Corporation, General Partner
Willow Grove Limited,
Owner Willow Grove Village
CC RLS Management
Brian Shear, PE, Shear Engineering Corporation
APPENDIX IV
(Stuffer Envelope)
Existing Conditions Plan (Historic Conditions)
Master Grading, Drainage and Erosion Control Plan
E-I
W
W
E-4
F
rn
T".53
A 50)7.30
a,
x SO7L04 x 5077.47
/ dB' OIAY.
00-Q'
TWO STOr�* FRAME
DWELL44L��NG
IMTH B EMENT
F.F.E.079S4'
I
ti
t \
5077.79 5 —
: to ,
g WOOD
I. Jim.,
Y
• vI I� ilv7e.2a
�n.dn � I
i
I ( __uGr— Wrb99
5 HIGH SHRUBS
PHONE PEDESTAL
y�
BURNED OAbpIE �• 50)b9e rL'.'`UC
•IwaD •? q x7e.
NO A
A�4D2e.02411 - • Z__-------
4 .Z A cwF2g1E cupaeir
R — 15.00' --- ------�-
L — 17.12'
6
zn.n
1
4 x
�
x5omw�
I I //g�
xSay
--7—
�[ _n )
Bar
n
I ET.DAN
5077.89
/
I �
1
x 507917 /
\
II
1 /W765
af1l
1 E
SEPTIC TANK
x 50)6.95
x 5076,42
r J /
RI 507635
Y gIAM, APPLE \ /�Yl-y, l
/1� I y n �y]).18
iT
I '� J9t \ x 5076.65
V�7134
WAIERMETEA PIT / POSSIBLE BURIED GAS PIPELINE— (LINE NOT MARKED BY LOCATE SEflNCE) _ _ _ _ _\_
/ TNIS 11NE IS DRAWN fRM POST TO POST ACTUAL PIPELINE MAY B E DI
WATER VALVE/
�A
' WATE9gNi IOC rt OENIxFp oy ETE gWAI% • • • 4 • ;
4
_4
LOCATE
RE1ED95 pole UCRn CA��IW9�� MEW 16: Book Cneaoyew s
_ 1n
RICHMOND DRIVE
4-
AD
GO
DO
I
W76.30
50764163
\ 507
\ I
076.30
t
5G7t.19
OAS nPFu[ 9rAl2A Vbr Ii
MIT MIMI& 3a)
a
rL
LEGEND:
existing ground elewtlon contour Ilnae
(conleur Interval =one foot)
(contour terval
• Found 1/2• diameter rebar with plastic cap stamped' LS 25372
R = FLOVNNE OF CURB AND GUTTER (SPOT ELEVADON)
NOTES:
1) Contour Interval one loot
2) The benchmark used for this survey is the S.W. anchor ball at
the base of a signal pole at the northeast toner of Horeelooth
1
i
Read and Sblelds Street (City of Ft Collins datum) silly. — 5080 BV
SATE 1'm0'
3) This is not a Land Survey Plot nor a Boundary survey.
4) Subject property address is 34M Saute Sbii Street
SHEAR
ENGINEERING
CORPORATION
'""
EXISTING CONDITIONS PLAN
RLS MANAGEMENT
036 SO. COLLEGE
I
AVE. SUITE 12, FORT
COLLINS, COLORADO W525
I
3500 SOUTH SHIELDS STREET
PI MITI) 226-5334 1970) 226-4451 PA%: (970) 262-0311
FORT COLUNS. COLORADO
SHEET NO, I NLE
MTMMI 5
oSION cOxMRO1.
NCH" u1IT ^`LSN" ueuvuY 1 "I'll
mµi{sDmacnon ttm nolss
�� ^E /��Jr�, dory lW.Ilulwu MIND, I)QNII IN kAp, IN
DERedok Poed Summq
)AIL, rW5
mYMbn Li'•IWIor aInpR umniln,don Avmwlb
�..yJs.be
I
w
TI,. (5y d GAS c m.Jlimy E wl
vu•IIK Notlibi bp uunsW. pmim am, ndm JvpsMll
Bymndrpl.kvvun
-7652 key
Bypoof.w 1 11" z I, Door m my
SIDS. e.pva q w A a. rw Dom yho INFLY
SANNmNrnlo
1 p.
Lor v+ tee.
T�akem rh,mw
-➢M 4n
aW i to led ul1 DA
XM 411
-1 0pkm
MR^ II{
hang
•pl'^r SIG
Towel VISMIbriMlwIRS . T.
ea 11W1wtle M)
tml�A pi Ry II AN
M. Si I By
T mp wllyrum JIJWa. Aurinp
pub,d eyurtA
-BMW It(NJatie M)
'M Ivd1e:�ea
m
pmF xMElemiorm. uadrm)un elmMrtpi
Al o- on
NeS1uN r ...•.
722key brdmuW WM••um
fire oLM;rccY
n NY^• e..
-n.11/a1 buGm wNMNYdnulo
I, Sill by W
M prow
Tel
�A n
All IT, sha be
AI to A m
�r
el
a.2l�H
opti w. W lwllatlumen poll w gdoA
of Thor
ejy
mun All ... b I
(obbIII
dl Io on
�•
IN ulelem WelN,nrk 02)
]lea, Pe(ermpp Ame6nkrblr
1
m u, ru rr WS, h aw xr
ouM No
S-ADS N"11
hou
slope
-DIGS Nit
fli 50».53
I
NIII A 'EARNANNo
Pp(Tal
-0,95 a,FL
and Cymip
r
pk
n to (nine
IS,
DRARKAGEMAINTRNANCE NOTE
Syt byy W ekxnino ym Not IT w,I,Ym
ih wwwls rcq,wwl m emwe rho mimuelme
foi v l Andetl Itiv
h Wpwho, by
n11 � n n I"y a ,.
m.• ph, m ssw, •e NPpIIII a •
%erix
No
firom
\ Nowo IpnRIRIINS ar RkhWa uibro To A`m,Qa Im Thh,
ITS
AS,
1q
\ SY
mym mmNsmro.m
m
e,.
m.. r. r
31,
wr_ we
1.11 It.
mr.y.I _
III
,a
o
..
,„
.1r
..9.
......°...`...
r
RICHMOND DRIVE
At1IDN6
Dymlwm—
„MN:eKm—
n-
cNAUWc MD. DRAINAGE, tiESLERAL nm FA
....... ............w...... _
I Au f, sn,rm,, IT Ass DAY d
PROJECT; N}ERM bh h NoW
N1. dim Nothol ALIS Idfe:liw aroort U me A.r.
d aweeb ox y 6l1 WWrrD ,bm Yool
ETANonw FORM
tl.•N.^•In dot to a: nle Wall Corn
e exper, •O rquln 1 ...vba.1 of Toy of. M Th,
SEQUG 61OR "noyi coM LEi oRI:MEOSEh Enloun C
Swm.m LFWY.
2. Or Cry as Bob JWl m b"" M. by tM
0 one, excep l.eYn6 hvN AN Dolor
ISILON, by Wx d le, him mq +nermlm a •' Ee M1J. mAl
dh "www.piv,N Vlledu1, nitaybo le sub. {. Ivv yoxibIle lw apryrel by bit III)
wSWr.
neat"low
l M ewl,rrim rN
By
.. y o I
chool Nipwm! O" WEn
AmWrd trith comeol Ali - IN, Ifforroopt
SAWS rvm n
av cvAucc "`
NOY redISIATC73PILB2.43000mirrylDoll
q,
Si
rtm
Rmum W Smm. Nine (M) - W
ym
A, m� ON
ReumFa S'mr boxy
yYW
ofty
BuN mmp 1ma UeW SIN. 1m
SECTµON A -A
ID
I 'My ILL BLINGS .ITILS7R SAN m rmlNa.
NAS
IS., Boirly,
Sill Ts.f m'Sod ... ...
oxy
?oWel
CCNxm.x.. To 10 ••• •••
voexporv[ ... ...
m oteril.WN.neT=ly III
I N[rnerA. IxSTALLi 9wp'ED "unTAINIVI OWNER
♦ MID ATNIKINL¢mvr. mynAcvn: 0%T
n.,,.1uir Nm xrs)m __n....mile n.m 4O+lP
i
7
x
z
x
J
6
z A.RtE: I'=1C
z
J
d
LEGEND:
-.JCE-- Existing Underground Electric
-SAS-- Existing Underground Gas
-war-- Exleting Underground Toephme
lemsessexxxxxx 9-8ASIN, EGL'N'AFY
loom. ass, • shome, >sp'I DaanGyc.
A BASIN rescnAnoN
.. AREA IT ACRES
- mo--E��B RUNGrE COE'TICENi
9 DESIGN I=-�I1T DEslsr:AnGI
I_' FETES
A
Dat< Di cADnax ORn SHEAR ENGINEERING CORPORATION THE VASTER GRADING, DRAINAGE AND EROSION CONTROL Pore
Feld Bylo ChoNd SW5 TOM SIBEALD 4636 SO. COLLEGE AVE. SURE 12, FORT GOWNS, COLORADO 80525 3436 SOUTH SHIELDS STREET
r - m Pi toms folm 4 (Don) R9R-44s1 FAR- (mot 491 1 FORT COUSINS. COLORADO
City of Fort Collins, Colorado
UTRITY PUN APPROVAL
RPPACVED
oNsnu by m IK
DATE
cxtclKm m
Wm a m.,TE. umum
DATE
CHECKED lff
nowrtN Jnury
vrt
CHECKED Ith
Nor W pboSATcx
DATE
CHECKED "A_DATE
CHECKED BY
DATE
PROJECT NO.
1234-05-97
I Si No,
I NO. W
SHEETS
,E
4
G
J
TaN-GINL