Loading...
HomeMy WebLinkAboutDrainage Reports - 11/18/2016Cfty offt Couft ed Plans ARP`BY Date ADDENDUM TO THE FINAL DRAINAGE REPORT FOR LEMAY AVENUE CRAFT BREWERY & SELF -STORAGE FACILITY Prepared For: FORT COLLINS SELF -STORAGE, LLC 5013 Bluestem Court Fort Collins, CO 80525 August 1,2016 Revised October 2016 Project No. 39708.02 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 313 Fort Collins, CO 80525 MW This Addendum to the Final Drainage Report for Lemay Avenue Craft Brewery & Self - Storage Facility was completed in order to reduce the amount of Pours Interlocking Concrete Pavers (PICP) on the site. Pavers were removed from the drive isle and parking lot on the north side of the site. The overall drainage pattern from the site did not change. Water quality for the area where pavers were removed will be provided with the remaining pavers and LID basins. By removing some of the pavers the requirement for treating 75% of the new impervious area is still met. In total 100% of the new impervious area that is tributary to the proposed detention pond is treated by an LID. The general concept and design of storm water drainage and detention for the site has not changed, The following report shows all revisions as well as the paver sections design and calculations. E J•R ENGINEERING Page 2 TABLE OF CONTENTS Tableof Contents...............................................................................................................................................i VicinityMap......................................................................................................................................................... General Description and Location..................................................................................................................2 Location And Existing Site Characteristics.................................................................................................2 SiteSoils...........................................................................................................................................................2 Floodplain........................................................................................................................................................2 Drainage Basins and Sub-Basins.......................................................................................................................3 MajorBasin......................................................................................................................................................3 HistoricSub-Basins........................................................................................................................................3 DevelopedSub-Basins....................................................................................................................................4 DrainageDesign Criteria..................................................................................................................................6 Regulations......................................................................................................................................................6 Low -Impact Development............................................................................................................................6 Development Criteria Reference and Constraints...................................................................................7 HydrologicCriteria........................................................................................................................................7 HydraulicCriteria..........................................................................................................................................7 Floodplain Regulation Compliance..............................................................................................................8 Modificationsof Criteria...............................................................................................................................8 DrainageFacility Design....................................................................................................................................9 GeneralConcept............................................................................................................................................9 Water Quality/ Detention Facilities............................................................................................................9 Stormwater Pollution Prevention..................................................................................................................10 Temporary Erosion Control......................................................................................................................10 Permanent Erosion Control.......................................................................................................................10 Summary& Conclusions.................................................................................................................................I References.........................................................................................................................................................12 J•R ENGINEERING Page i APPENDIX Appendix A — Site & Soil Descriptions and Characteristics Appendix B — Hydrologic Calculations Appendix C — Hydraulic Calculations Appendix D — Existing & Proposed Drainage Plans Appendix E — LID Exhibit J•R ENGINEERING Page ii Engineer's Certification Block I hereby certify that this Addendum to the Final Drainage Report for Lemay Avenue Craft Brewery & Self -Storage Facility was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. Timothy J. Halopoff, PE IF l Q 37953 Registered Professional Engineer 3r State of Colorado No. 37953_ /l-/o- IG J•R ENGINEERING Page iii IW VICINITY MAP - - - - -E MNE DR- L -'I + E VINE DR VICINITY MAP SCALE : 1 =553 Page I GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Lemay Avenue Craft Brewery & Self- Storage is located in the northeast quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Lemay Avenue Craft Brewery & Self- Storage site is a 6.35 acre property that is currently undeveloped. The site is zoned I (Industrial) and will support the proposed craft brewery and self -storage facilities. The site is surrounded by Buckingham Street to the north, Lemay Avenue to the east, and developed land to the south and west. The currently proposed uses of the site, require the parcel to be subdivided into three lots. The first lot contains the craft brewery building with 7,912 total square feet. The second lot, totaling 104,000 square feet, contains the self -storage facilities with 8 buildings. The third lot is for a future development and will be a lawn area until the lot is developed. The proposed detention pond was designed for the future development of lot 3, modeled at 60% impervious. The existing site generally slopes from the north to south with slopes ranging between 0.60% and 2.5%. The property is generally covered with sparse native grasses. The site currently drains to the southeast corner of the site where runoff is collected in an existing 30" CMP culvert and piped south in the City's Lemay Avenue Right -Of -Way. SITE SOILS The Lemay Avenue Craft Brewery & Self- Storage site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wetted. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A - I. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the I00yr floodplain, but within the 500yr floodplain. The "City of Fort Collins Floodplain Review Checklist for 50% Submittals" checklist is not applicable for this Drainage Report. Page 2 DRAINAGE BASINS AND SUB -BASINS e MAJOR BASIN The proposed Lemay Avenue Craft Brewery & Self -Storage site is located in the Dry Creek major drainage basin. The Dry Creek drainage basin is tributary to the Cache la Poudre River and extends from the Wyoming border to where it joins the river near Mulberry and Timberline. The Dry Creek basin is approximately 23 miles long and six miles wide and encompasses approximately 62 square miles. The land used in the upper and middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures. The majority of the lower portion of the basin is developed and includes commercial, industrial and residential uses. The project site is a part of the lower Dry Creek basin. HISTORIC SUB -BASINS Lemay Avenue Craft Brewery & Self -Storage is an infill development piece of property. It is governed by the City's Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle of releasing the 100-year developed condition flow rate at the same location and at a magnitude of 0.2cfs/acre as the pre -development condition. There are no offsite areas that flow across the proposed development site. Referring to the "Existing Drainage Plan", included in the Appendix, the following describes the existing condition drainage basins. Existing Onsite Sub -Basins: The site has two existing onsite drainage basins. Sub -basin EXI consists of a 1.51 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. Runoff in sub -basin EX -I collects in a roadside swale and flows south to the southeast corner, of the site where it is piped south, off -site through an existing 30" CMP culvert. Sub -basin EX2 consists of a 6.20 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub -basin EX-1. Runoff generally flows to the southeast across basin EX-2, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is piped south off -site through an existing 30" CMP culvert. Page 3 DEVELOPED SUB -BASINS The proposed developed condition sub -basins, including detention and LID facilities, have been designed to mimic the historic basins' runoff patterns. The following describes the proposed conditions on -site drainage basins. Refer to the "Proposed Drainage Plan" in the appendix for review. Proposed Onsite Sub -Basins: Sub -basin A consists of 0.98 acres on the northern portion of the subject property. Runoff from the proposed building and parking lot travels west to an LID basin in the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin B consists of 0.85 acres on the northwest corner of the subject property. Runoff from sub -basin b is collected in an LID basin on the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin C consists of 0.41 acres near the northwest corner of the subject property. Runoff from the proposed building and driveways travels west to an LID basin on the western edge of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin D consists of 0.16 acres on the western edge of the subject property. Runoff is captured in a proposed soft Swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin E consists of 0.39 acres in the western portion of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southwest corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin F consists of 0.16 acres on the east side of the subject on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Page 4 qW Sub -basin G consists of 0.77 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin H consists of 0.68 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a Swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin 1 is comprised of 0.82 acres in the center of the subject property. Runoff from the proposed lawn area is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a Swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin J is comprised of 0.19 acres at the eastern edge of the subject property. Runoff from this basin is captured in a Swale and flows south through an LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin K is comprised of 0.32 acres near the southeast corner of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southeast corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin L is comprised of 0.76 acres and contains the proposed detention pond area. Runoff from this basin is collected in the proposed detention pond on the southern edge of the property. Sub -basin M is comprised of 0.53 acres on the northern edge of the subject property. Runoff from this basin is collected in a proposed sump inlet along Buckingham Street. Captured flows are piped east to the corner of Buckingham Street and Lemay Avenue where they are release into a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off -site through and existing 30" CMP culvert. Sub -basin N is comprised of 1.48 acres on the eastern edge of the subject property. Runoff from this basin is collected in a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off -site through and existing 30" CMP culvert. Sub -basin O is comprised of 0.10 acres on the southern edge of the subject property. Runoff from this basin sheet flow south off -site. Page 5 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District's (UDFCD) Drainage Criteria Manual (USDCM) Volumes I, 2 and 3 were referenced as guidelines for this design. Low -IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management:. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low -Impact Development (LID) best management practice (BMP) ) as well as 25% of the new drive area must be treated by porous pavement, unless more that 75% of the site is being treated by an LID. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The proposed site uses porous pavers, bio-swales and LID basins for the LID/BMP design elements. In total 100% of the new impervious area is treated by an LID before reaching the proposed detention pond, thus eliminating the 25% porous pavement requirement, see the tables below for more details. Since 100% of the new impervious area is being treated by an LID, water quality is not needed in the detention pond. An illustrative LID/Surface Maps as well as sizing of the LID/BMPs is provided in Appendix E. Tablet: LID Requirements 75% On -Site Treatment by LID Requirement New Impervious Area 153,816 sq. ft. Required Minimum Impervious Area to be Treated 115,362 sq. ft. (=75% of new impervious area) Impervious Area Directly Treated by LID Treatment Methoud #1- Paver Section #1 15,717 sq. ft. Impervious Area Directly Treated by LID Treatment Methoud #2- Paver Section #2 4,442 sq. ft. Impervious Area Directly Treated by LID Treatment Methoud #3- Paver Section #3 4,605 sq.ft Impervious Area Directly Treated by LID Treatment Methoud #4- LID Basin #1 9,621 sq.ft Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #2 & Swale#1 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #6 - LID Swale #1 7,376 sq. ft. Impervious Area Directly Treated by LID Treatment Method #7 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 & Swale#2 29,713 sq. ft. Total impervious Area Treated 153,816 sq. ft. Actual % of Impervious Area Treated 100.0 % Page 6 Tablet: LID Sizing LID Measure LID Sizing Impervious Area Treated Sq. ft. Area of LID sq.ft. Ratio Paver Section #1 15,717 5,455 2.9 Paver Section #2 4,442 1,480 3.0 Paver Section #3 4,605 1,535 3.0 LID Swale #1 22,222 5,599 4.0 LID Swale #2 19,335 2,516 7.7 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS There were no previous drainage reports or master plan used in the development of this final drainage report. The developed site runoff is constrained to release 0.2 cfs per acre from the proposed detention pond. There are 6.49 acres contributing to the pond and therefore the maximum pond release is set to 1.3 cfs. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD's intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, I -hour rainfall depth of 0.82 inches and a 100-year, I- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater detention concept is able to reduce the 100-year developed condition flows to a flow rate of 0.2 cfs/ acre; thereby satisfying the City's Reasonable Use requirements. The Rational Formula -based Federal Aviation Administration (FAA) method is used to preliminarily size the detention pond in accordance with City criteria, as the tributary area is less than 20 acres in size. The ultimate Lemay Avenue Craft Brewery & Self -Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm sewer pipes, soft swales, and LID measures for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm Page 7 MW The ultimate Lemay Avenue Craft Brewery & Self -Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm sewer pipes, soft swales, and LID measures for the flows being calculated by this report Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the ponds will be held to a maximum level of one -foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. This project will eventually show that the flow rate released downstream is less than would historically be experienced, and that the sedimentation is lessened through increase infiltration. All Swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. Lid measures have been integrated into this design on higher levels than most City of Fort Collin's projects to date. In all, 100% of this project's impervious areas pass through and are treated in LID's prior to reaching the detention pond. FLOODPLAIN REGULATION COMPLIANCE The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the I00yr floodplain, but within the 500yr floodplain. The "City of Fort Collins Floodplain Review Checklist for 50% Submittals" checklist is not applicable for this Drainage Report. MODIFICATIONS OF CRITERIA There are no modifications to the Storm Drainage Criteria Manual and Construction Standards being requested. Page 8 LJ L DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Lemay Avenue Craft Brewery & Self -Storage site will result in developed condition runoff being conveyed around the proposed buildings and to the south via concrete pans and swales. Low -impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the parking lot, Lid infiltration forebay basins to treat roof and driveway drainage, and grass lined bio-swales (soft-swales) are proposed on the west and east sides of the site to improve water quality. Runoff from the site is captured in LID basins and swales located around the self -storage site and in open areas adjacent to the building. Runoff is conveyed via sheet flow, concrete pans and bio- swales in a southerly direction to the proposed detention pond at the southern end of the site. The existing drainage outfall from the site is in the southeast corner of the property. The proposed detention pond is sized to detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. Runoff collected from Buckingham Street and Lemay Avenue will combine with flows released from the proposed detention pond and will continue to flow south off -site through an existing 30" CMP culvert, similar to historic conditions. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of LID basins and swales. Detention will be provided for the site through the proposed detention pond on the southern edge of the site. The voids provided by the gravel in the permeable pavers will also be included in the provided detention volume. The proposed detention pond will detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. The 100 yr water surface elevation and the overflow weir elevation for the pond is at 4944.90. The proposed pond also has I foot of freeboard above this elevation. See Table 3, below, for detention pond sizing and release rates. Table4: Detention Pond Values Storage WQCV Volume Storage Volume Provided 100-yr Max 100-yr Volume Required (acre-ft) Including volume provided by Inflow Rate Max Required (*provided in LID basins void space in Pervious Pavers (cfs) Release (acre-ft) and swales) (acre-ft) Rate (cfs) 1.36 0.16 1.36 28.9 1.3 Page 9 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. JR will provide a detailed Storm Water Management and Erosion Control Plan at the time of the FDP submittal that will meet all requirements of the City of Fort Collins. Page 10 SUMMARY Sc CONCLUSIONS The existing conditions drainage patterns have two onsite sub -basins with the same ultimate outfall point in the southeast corner of the subject property, within Lemay Avenue right-of-way. The proposed drainage condition was designed to mimic the historic basins' runoff patterns. The existing conditions drainage patterns are maintained with the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for flooding downstream of this site. The hydrologic and detention calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City's requirements. The proposed concept for the development of the Lemay Avenue Craft Brewery & Self -Storage site involves routing developed condition flows to a proposed onsite detention pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the proposed detention pond. The site's stormwater facilities are sized to meet the City of Fort Collins "Storm Drainage Criteria Manual and Construction Standards" for both detention and water quality. Page II Iqw REFERENCES Urban Storm Drainage Criteria Manual (Volumes I, 2, and 3), Urban Drainage and Flood Control District June 2001. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins. Colorado, Updated January, 1997. 3. "Hydrologic Group Rating for Larimer County Area, Colorado", USDA -Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL:. http://websoilsurvey.nres.usda.gov. [July 21, 2010] Page 12 APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS J•R ENGINEERING LEMAY AVE. CRAFT BREWERY & SELF -STORAGE DRAINAGE REPORT E VINE DR VICINITY MAP SCALE : 1 "=500' Project No. 39708.02 FIGURE 1--VICINITY MAP LEMAY AVE. CRAFT BREWERY & SELF -STORAGE Hydrologic Soil Group—Larimer County Area, Colorado 4 353TN 4 H24-N 494950 4NM 495010 495040 495070 3 n ., Map Scale; 1:1,31i0ipn30admAlxxOat (8.5'x 11")9x+et. -- __ Me[as N 0 20 40 80 120 __ ,Feet 0 5o 100 200 30o kI`tap proyecti '. Web Maoror Cone- mowdineR@S: WG'S84 Edged¢: UTM Zone 13N WGS84 I .i 0\ Natural Resources Web Soil Survey -011111111 Conservation Service National Cooperative Soil Survey Project No. 39708.02 4%100 M 39 3TN R i R 4, d 24-N 4951M 3 m 4I8I2015 Page 1 of 3 DRAINAGE REPORT Hydrologic Soil Group—Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres In AOI Percerd of AOI 22 Caruso clay loam, 0 to 1 D 0.0 0.5% percent slope 64 Loveland clay loam, 0 to C 0.7 10.0% 1 percent slopes 76 Nunn clay loam, wet, 1 to C 6.5 89.5% 3 percent slopes Totals for Area of Interest 7.2 100.0% Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey Page 3 of 3 FIGURE 2 - SOILS MAP LEMAY AVE. CRAFT BREWERY & SELF -STORAGE 105a03'45.0" 40'35'37.5" t— to a NOTE: THIS AREA IS SHOWN S E fG FROM THE 1-PERCENT.ANN FLOOD HAZARD BY A LEVEE SYSTEM. OVI OR FAILURE OF ANY LEVEE SYSTEM IS PO FOR ADDITIONAL INFORMATION, SEETHE IN NOTES TO USERS. LL1020x 120 1455000 FT Project No. 39708.02 4b, ZONE AE 3125000 FT IS TE CITY OF FORT COLLINS 080102 LEVEE NOTE" JOINS PANEL G',IH1 �/ ZONE AE t Dry Creek (South of Canal) PROFILE BASE LINE Old Dry Creek � (Historic Channel) 4CT � n l DRAINAGE REPORT MAP SCALE 1"=500' 250 0 - 500 - 100oofEET 0 150 300 PANEL 0983H 1:411, FLOOD INSURANCE RATE MAP LARIMER COUNTY, COLORADO \\D INCORPORATED AREAS PANEL B83 OF 1420 (SEE MAP INDE)( FOR FIRM PANEL LAYOUT) CO -Um uwMmcmo,a, wat FORrt�ae,tla mF,a: om x Map NumGc, .. r �rre�pac�y'wF � a, ir.. Comvanrry ��M,mAa. -, "oma emeTae MAP NUMBER tl OBOSICOO83H g, aF MAP REVISED ,a Inc MAY 2, 2012 Federal Etttetgency Management Agency f f LARIMER COUNTY PQ" UNINCORPORATED AREAS 080101 COURTS rRSEr . •!Z. 1% ANNUAL CHANCE << �� FLOOD DISCHARGE �J CONTAINED IN CULVERT TT,s s an tea el copy o! a 0,bi, M me app a oasr t moss mmp p was matracted using F-MR OnLne Thu map tlow not rMed eM1anpea o, emendmaMs whlcn may M1ale Oe¢n made subsequent to tnm date on the O0e tleck. For mm latest produot rnlermztmn abp l Flood Insurance �' Proprem Aood maps cn¢ck tn¢ FEMA Flood S Map Storeore at at Ivmv mac fame C ov FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS COMPOSITE % IMPERVIOUS CALCULATIONS ubdivision: Project Name: Lemay Ave. Craft Brewery & Self -Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: Date: 3/9/16 paved Roads/ Drives Lawns Roof Basins Total Basin ID Total Area (ac) %Imp. Area (ac) % Imp Weighted X Imp. Area (ac) Weighted % Imp. % Imp. Area (ac) Weighted % Imp. Weighted % Imp. A 0.98 100 0.73 74.69 5 0.15 0.80 90 0.10 9.20 84.69 B 0.85 100 0.00 0.00 5 0.85 5.00 90 0.00 0.00 5.00 C 0.41 100 0.23 56.10 5 0.00 0.00 90 0.18 39.50 95.60 D 0.16 100 0.00 0.00 5 0.08 2.50 90 0.08 45.00 47.50 E 0.39 100 0.21 53.85 5 0.00 0.00 90 0.18 41.50 95.35 F 0.16 100 0.00 0.00 5 0.06 1.90 90 0.10 56.30 58.20 G 0.77 100 0.36 46.75 5 0.00 0.00 90 0.41 47.90 94.65 H 0.68 100 0.33 48.53 5 0.00 0.00 90 0.35 46.30 94.83 1 0.82 100 0.48 58.54 5 0.34 2.10 90 0.00 0.00 60.64 J 0.19 100 0.00 0.00 5 0.19 5.00 90 0.00 0.00 5.00 K 0.32 100 0.16 50.00 5 0.00 0.00 90 0.16 45.00 95.00 L 0.76 100 0.00 0.00 5 0.76 5.00 90 0.00 0.00 5.00 M 0.53 100 0.39 72.88 5 0.14 1.40 90 0.00 0.00 74.28 N 1.48 100 0.45 30.41 5 0.96 3.20 90 0.07 4.30 37.91 0 0.10 100 0.00 0.00 5 0.10 5.00 90 0.00 0.00 5.00 x:r3m0000PW I ar 13n20I6 ��ri vi vi vi vi vi vi ... vi via air v; zF� F �nmrnornoordo.a v, v�mm CA W W z Y< o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m F F m =L E' -q d r m m 0 N vi tL r N d N r_ d of m M t1 of N M T ti m_ oo r n c G U r v�v rn d a•o a.n v� m ry oOrn r r d N — — — — — - - _ - — - — N `1 W F oavoi voi voi voi voi voio voiHgmao Q- m CO oy N W m N N N F � m v,00000000 00000000 W •> — vi Al N m N N N— N N m N e� N O O N N N N N O O O O O O O O U O O O O O O O O O O O O O O O g c0 N r N O O m O m m• O\ CO O„ 1O T K O„„ r U66666666 O O 6 O 6 O 6 O O 616161616161 O r O m m d N r M mp O O O t1 Q O � W� O• Q 01 N Q OQ1 p a e F m w a v U U U U U U U U U U U U U U U a O m G mao o=M=nem Mn vmi v= z m ri N U (V •n r 0 — N 5 � o N � C m o E" 3 9 9'S�A Z — u A zzEF>F��°��° SEEMS No Text mr N N , C n N w L41C:CC�C APPENDIX C HYDRAULIC CALCULATIONS INLET IN A SUMP OR SAG LOCATION Project = Lemay Avenue craft Brewery S Sell.Storage Facility Inlet 10 = OR 9 {— Lo (C) H-Curb H-Vert Wu W Lo (a) Oeeien alrarmetleo llnputl Type of Inlet Inlet Type = Local p ,ao,oion (additional to comnuous gutter depreafram afrom'O-AdoeQ a.i- Numder of UM Inlets (Grate or Cue Openete No - Water Dopih at Fbwhre (outside of brad depression) Pending DeIM= Grate edor etion Lm,th of a Unt Grate I.a (G) Wolfe at a Urn Grate We = Area Operant) Ratio for a Grate ltypical veh se 0.150 90) A. = Cbgglrg Factor for a See Grate (typical vetue 0.50 - 0 ]0) Cr (G) = Grate Weir Coeflicami (typical vahe 2.15- 3 a0) Cw (G) _ Grate OMIce coefficient (typical Mimi 0.60 � 0.80) C. (G) _ Cure Opening Marrraeon Length of a Um Cure Opening La (C) = HaipN of Vertical Code Operg in Ini]1es H_- HeigN of Cue "" Thoal In ImJts Hn_= 11 al Throat (see USDCM Fgua ST-5) Title - 9tle Alden for Depression Pan Dypi fre gutter eMth of 2 feet) Wp= Clogging Factor far a Singh Cud Opening typical wue 0.10) Cr (C) _ Curd Opening Weir Coeffiaent typical value 2 }3.7) Cw (C)= Cure Oporrng OMice CoeOictni a Pral vela¢ 0 60 070) Co (C)= Total Inlet Interception Capacity (assumes clogged condition) "L n�.l Dreareauto= MINOR MAJOR COOT/Demer 13 Condonation 2.00 incrts 1 eo 8.0 IncN,� MINOR MAJOR ❑ — wtn, 3.00 feet 1.73 eet OA3 0.50 0 50 3.30 0.90 3.00 8.50 525 0 00 2.00 0.10 0.10 3.70 Doe MINOR MAJOR eel nctts aches legrees eel UD-Inlet_v3.14-OP 9 Idsm. Inlet In Sump 124M15. 8:55 AM Project: Inlet ID: II ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storrs) II mum Allowable Wdth for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) iing's Roughness Behind Curb (typically between 0.012 and 0.020) of Curb at Gutter Flow Line c from Curb Face to Street Crown Wolin Transverse Slope Cross Slope (typically 2 inches over 24 inches or 0.083 Ntt) Longitudinal Slope - Enter 0 for sump condition ng's Roughness for Street Section (typically between 0.012 and 0-020) Allowable Spread for Minor & Major Storm Allowable Depth at Gutter Flowline for Minor & Major Storm Flow Depth at Street Crown (leave blank for no) TRACK= 110 SSACK= 0.002 neAcK = 0.013 Hcuna= 6.00 inches Tcwowa = 24.0 It W = 2.00 It Sx = 0.02D Vft S. = 0.083 So = 0.005 Itm nsi,,,,r= 0.012 Minor Storm Major Storm Two = 24.0 24.0 tt dram - 6.0 6.0 Inches check = yes i STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm R STORM Allowable Capacity is based on Depth Criterion Orw. = 13.0 13.0 cfs stone maxallowable capacity GOOD - greater than flow given on shem'O-Peak' storm maxallowable capacity GOOD - greater than flow given on sheet'O-Peak' 1.113-Inlet_v3.14-13P 9.xlsm, O-Allow 12/812015, 8:53 AM Detention Pond Siring - Subdivision: Project Name: L.emay Ave. Craft Brewery & Self -Storage - Location: Fort Collins Project No.: 39708,02 Calculated By: BAB Checked By: Date: 3/9/16 This is to convert % imp to a C value 100-year (must insert % imp. and C pervious). Required detention W acre-ft. - 'C' value 0.64 '� 'C' 115 0.8 Area 6.49 acres Modified Modified Release Ratel 1.3 cfs M. FATER D. JUDISF C. LI 5195 Nov-97 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY D 100 Runoff Release Required Required cum 100 year Volume Cum total Detention Detention _ \ (mins) (secs) (in/hr) (afs) (W3) (W3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 9.950 51.66 15498.12 390.0 15108.1 0.3468 C10 600 7720 40.08 24049,34 780.0 23269.3 0.5342 - 15 900 6.520 33.85 30466,66 1170.0 29296.7 0.6726 20 1200 5.600 29.08 34890.24 1560.0 33330.2 0.7652 25 1500 4.980 25.86 38784.24 1950.0 36834.2 0.8456 C- 30 1800 4.520 23.47 42242.11 2340.0 39902.1 0.9160 35 2100 4-080 21.18 44485.06 2730.0 41755.1 0.9586 40 2400 3.740 19A2 46603.39 3120.0 43483.4 0.9982 45 2700 3.460 17.96 48503,66 3510.0 44993.7 1.0329 50 3000 3.230 16.77 50310,48 3900.0 46410.5 1.0654 55 3300 3.030 15.73 51914.81 4290.0 47624.8 1.0933 60 3600 2860 14.85 53456.83 4680.0 48776.8 1 A 198 65 3900 2.720 14.12 55076.74 5070.0 50006.7 1.1480 70 4200 2.590 13.45 56478.58 5460.0 51018.6 1.1712 75 4500 2.480 12.88 57942.72 5850.0 52092.7 1.1959 BO 4800 2.380 12.36 59313.41 6240.0 53073.4 1.2184 85 5100 2.290 11.89 60637,37 6630.0 54007,4 1.2398 90 5400 2.210 11.47 61961.33 7020.0 54941.3 1.2613 95 5700 2,130 11.06 63036.07 7410.0 55626.1 1.2770 - 100 6000 2060. 10.70 64173.12 7800.0 56373.1 1.2941 105 6300 2.000 10.38 65419.2 8190.0 57229.2 1.3138 110 6600 1.940 10.07 66478.37 8580.0 57898.4 1.3292 115 6900 1.890 9.81 6770&87 8970.0 58738.9 1.3485 120 7200 1.840 9.55 68783.62 9360.0 59423.6 1.3642 125 7500 1.790 9.29 69702.8 97%0 59952.6 1.3763 130 7800 1.750 9.09 70870.8 10140.0 60730.8 1.3942 C_ 135 8100 1.710 8.88 71914,39 10530.0 61384,4 1.4092 140 8400 1.670 8.67 72833.38 10920.0 619134 1.4213 145 8700 1.830 8.48 73627.75 11310.0 62317,8 1.4306 150 9000 1.600 8.31 74784.8 11700.0 63064.8 1.4478 155 9300 1.570 8.15 75808.39 12090.0 63718.4 1.4628 160 9600 1.540 8.00 76758,53 12480.0 64278.5 1.4756 165 9900 1.510 7.84 77615.21 12870.0 64745.2 1.4863 170 10200 1.480 7.68 78378,43 13260.0 651184 1.4949 175 10500 1.450 7.53 79048.2 13650.0 65398.2 1.5013 180 10800 1.420 7.37 79624.51 14040.0 65584.5 1.5056 185 11100 1.400 7.27 80683.60 14430.0 66253.7 1.5210 C 190 11400 1.380 7.16 81680.54 14820.0 66860.5 1.5349 - 195 11700 1.360 7.06 82615.1 15210.0 67405.1 1.5474 C 200 12000 1.340 6.96 83487.36 15600.0 67887.4 1.5585 205 12300 1.320 6.85 84297,31 15990.0 68307.3 1.5681 210 12600 1.300 6.75 85044.96 16380.0 68665.0 1.5763 215 12900 1.280 6.65 85730.3 16770.0 68960.3 1.5831 220 13200 1260 6.54 88353.34 17160.0 69193.3 L5885 225 13500 1.240 6.44 86914.08 17550.0 69364.1 1.5924 (- 230 13800 1.220 6.33 87412.51 17940.0 69472.5 1.5949 235 14100 1.210 6.28 88580.71 18330.0 70250.7 1.6127 240 14400 1.200 6.23 89717.76 18720.0 70997.8 1.6299 l Page 1 C 10-year Composite'C' 0.52 Area 6.49 acres Release Rate 1.3 DETENTION POND SIZING Modified Modified M. FATER D. JUDISF C. I -I 5195 Apr-98 Nov-98 TIME TIME INTENSITY Q 10 Runoff Release Required Required cum 10 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 4.870 16.44 4931 390.0 4540.6 0.1042 10 600 3.780 12.76 7654 780.0 6874.0 0.1578 15 900 3.190 10.77 9689 1170.0 8519.1 0.1956 20 1200 2.740 9.25 11096 1560.0 9536.3 0.2189 25 1500 2.440 8.23 12352 1950.0 10401.8 0.2388 30 1800 2.210 7.46 13425 2340.0 11085.0 0.2545 35 2100 2.000 6.75 14174 2730.0 11444.2 0.2627 40 2400 1.830 6.18 14822 3120.0 11702.1 0.2686 45 2700 1.690 5.70 15399 3510.0 11889.2 0.2729 50 3000 1.580 5.33 15997 3900.0 12096.6 0.2777 55 3300 1.480 4.99 16483 4290.0 12192.5 0.2799 60 3600 1.400 4.72 17009 4680.0 12329.0 0.2830 65 3900 1.320 4.45 17373 5070.0 12303.5 0.2824 70 4200 1.250 4.22 17718 5460.0 12257.7 0.2814 75 4500 1.190 4.02 18072 5850.0 12222.1 0.2806 80 4800 1.140 3.85 18467 6240.0 12226.9 0.2807 85 5100 1.090 3.68 18761 6630.0 12130.5 0.2785 90 5400 1.050 3.54 19135 7020.0 12115.1 0.2781 95 5700 1.010 3.41 19429 7410.0 12018.7 0.2759 100 6000 0.970 3.27 19641 7800.0 11841.3 0.2718 105 6300 0.940 3.17 19986 8190.0 11795.6 0.2708 110 6600 0.910 3.07 20269 8580.0 11689.0 0.2683 115 6900 0.880 2.97 20492 8970.0 11521.8 0.2645 120 7200 0.860 2.90 20897 9360.0 11536.8 0.2648 Page 1 2-year Composite'C' 0.42 Area 6.49 Modified Modified Release Rate 1.3 M. FATER D. JUDISF C. Li 5/95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 2 Runoff Release Required Required cum 2 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 2.850 7.77 2330.559 390.0 1940.6 0.0445 10 600 2.210 6.02 3614.411 780.0 2834.4 0.0651 15 900 1.870 5.10 4587.521 1170.0 3417.5 0.0785 20 1200 1.610 4.39 5266.246 1560.0 3706.2 0.0851 25 1500 1.430 3.90 5846.841 1950.0 3896.8 0.0895 30 1800 1.300 3.54 6378.372 2340.0 4038.4 0.0927 35 2100 1.170 3.19 6697.291 2730.0 3967.3 0.0911 40 2400 1.070 2.92 6999.854 3120.0 3879.9 0.0891 45 2700 0.990 2.70 7286.063 3510.0 3776.1 0.0867 50 3000 0.920 2.51 7523.208 3900.0 3623.2 0.0832 55 3300 0.870 2.37 7825.772 4290.0 3535.8 0.0812 60 3600 0.820 2.24 8046.562 4680.0 3366.6 0.0773 65 3900 0.770 2.10 8185.577 5070.0 3115.6 0.0715 70 4200 0.730 1.99 8357.303 5460.0 2897.3 0.0665 75 4500 0.690 1.88 8463.609 5850.0 2613.6 0.0600 80 4800 0.660 1.80 8635.334 6240.0 2395.3 0.0550 85 5100 0.630 1.72 8757.995 6630.0 2128.0 0.0489 90 5400 0.610 1.66 8978.785 7020.0 1958.8 0.0450 95 5700 0.580 1.58 9011.495 7410.0 1601.5 0.0368 100 6000 0.560 1.53 9158.688 7800.0 1358.7 0.0312 105 6300 0.540 1.47 9273.172 8190.0 1083.2 0.0249 110 6600 0.520 1.42 9354.946 8580.0 774.9 0.0178 115 6900 0.510 1.39 9592.09 8970.0 622.1 0.0143 120 7200 0.490 1.34 9616.622 9360.0 256.6 0.0059 Pond WCQV Sizing Subdivision: Project Name: Location: Fort Collins Project No.: Calculated By: Checked By: Date: WQCV = (0.911' - 1.191E + 0.781) • A/12 Site Basin Area % Impervious A 0.98 84.7 B 0.85 5.0 C 0.41 95.6 D 0.16 47.5 E 0.39 95.4 F 0.16 58.2 G 0.77 94.7 H 0.68 94.8 1 0.82 60.6 J 0.19 5.0 K 0.32 95.0 L 0.76 5.0 TOTAL 6.49 62.1 WQCV = 6,877 cf WQCV = 0.16 acre-ft WQCV provided in LID Basins and Swales X:397000O.a 3970802T=e11Dre'vugc\3970802Dr inap_Ucs.xis Lema Ave. Craft Brewery & Self -Storage BAB Page 1 of I 3n2016 POND VOLUME CALCULATIONS Subdivision Location Fort Collins Volume=1/3 x Depth x (A+B+(A*B)10.5) A - Upper Surface B. - Lower Surface Pond Project Name: Lemay Ave. Craft Brewery & Self-Stora; Project No. 39708.02 By: BAB Checked By: Date: 3/9/16 Stage Stage Elevation Stage Surface Area (square feet) Stage Volume (cubic feet) Cumulative Volume (cubic feet) Cumulative Volume (acre feet) WO 494L35 4,095 0 0 0.00 1.00 4942.00 5,866 3,220 3,220 0.07 2.00 4943.00 14,371 9,806 13,026 0.30 3.00 4944.00 21,341 17,742 30,768 0.71 3.90 4944.90 30,928 23,386 54,154 1.24 Pavers 1 30% of Volume of k2 rock in pavers = 0.12 acre feet see below) 1.36 Volume (acre feet) I Volume Water Surface Elevation 100-Year Detention 1.36 4944.90 Paver Volume Calculations Paver Surface area= 16,746 sq. ft. Depth of #2 rock = 1 It Volume of #2 rock = 16748 cubic ft 30% of Volume = 5,024 cubic ft or 0 12 acre ft X"9)0000 uIN9'l0g021F uallDreuugcU9'10[02nnumgc Cdcs As Pugs 1 u1`2 3,,12016 POND VOLUME CALCULATIONS Subdivision Location Volumc=1/3 x Depth x (A+B+(A•B)^0.5) A - Upper Surface B - Lower Surface WO Vnlnme in VIM Project Name: Lemay Ave. Craft Brewery & Self -Storage Project No. 39708.02 By: BAB Checked By: Date: 3/9/16 Stage Stage Elevation Stage Surface Area (square feet) Stage Volume (cubic feet) Cumulative Volume (cubic feet) Cumulative Volume (acre feet) 0.00 4943.00 500 0 0 0.00 1.00 4944.00 2,500 1,373 1,373 0.03 2.00 4945,00 2,000 2,245 3,618 0.08 3.00 4946.00 1,500 1,744 5,362 0.12 4.00 4947.00 1,300 1,399 6,761 0.16 Volume(acre feet) I Volume needed Cumulative Volume Provided Water Quality0 16 0 16 x uvmogg.•IIVffAggl:exaa�omg<urranmr vagr_Uoa Pogo I of 130O" ,. a7«/ $� \0 qa !,*4 k/f\f§* ■ $!$ \ ƒ \ � k f § � v +aa\ ry \�( :c EL «:� §f \7 _a« }{|t)o °°�`\7® %%0 } TO 2= exwl 0 d II £ )\ /u j\ JJ 2 w § § C STAGE -DISCHARGE SONG OF THE WEIRS AND ORIFICES (INLET CONTROL) Project: Lenny Ave. Craft Brewery, a Self Storage Basin ID: Current Routing Order is #3 Deslan Infamution lemvll: ClrcuWr Opening. Diameter in Inches OR Rectangular Opening Width In Feet Length (Height for Vertical) Percentage of Open Area After Trash Rack Reduction Orifice coefficient Weir Coefficient Orifice Elevation (Bottom for Vertical) Net Opening Ana (Offer Trash Rack Reduction) OPTIONAL'. User-O iande Net OperYrg Area Penmeter as Weir Length OPTIONAL User-Ovende Weir Length #1 Honz 02 Honz. #1 Vert #2 Vert Dia =1 I I inches W-1 3.D0 1 0.58 ft. Lot H=1 3.D0 1 024 X. %open=1 50 100 Co= 0.62 0.62 C,,=1 3.00 Ea = 4944 OD 4,94134 X A.= 450 014 s4 ft A.=J a ft t. = 900 L_=J Top Elevation of Vertical Orifice Opening, Top = Center Elevation of Vertical Orfice Opening, Can = ft. X. 494158 4941 46 n ft #1 horizontal opening Into #1 vertical opening. This flow will be applied to culvert sheet (#2 vertical & horizontal openings is not used). THnAzmi at culftaea Varlleet n.m=.e _alms •or .vocv V.ro, a male, Smraw WS Ekwtnr¢ (input) Water Surface Bevatian X Illnh•'fI WOCV Plate/Riser Flow cfa +!fnr ed 91 Hom #1 Honz. Weir Office Fbw Flow cfa cfa O n #2 Holz. #2 Honz Weir Orifice Flow Flew of$ cis a 111 Ven Collection Capacity c/a e #2 Vert Collection Capacity cfa Total collection Capacity ds (output) Talon! Volutes for Wacv. Minor. aMelor Storage voevrea trN to, al Seel, 4941.00 4942,00 000 0,00 1 0.00 1 0.00 000 0.00 000 0.00 0.51 000 0.00 0,00 000 051 1 000 051 i 000 0-06 000 1 1.11 4943.00 0.88 0.00 _ 0,00 _ 0.00 0,00 O.DD 0.00 0.86 1.it 4944.00 111 _ _goo 0.00 494410 23.05 23.05 2124 0.00 0.00 1.29 0.00 1 1.29 MIA _ #WA MIA MIA #N/A MIA MIA MIA #N/A 0.00 RUA M/A MIA MIA M/A M/A M/A MIA 0.00 MIA MIA MIA MIA 0.00 MIA M/A MIA MIA _ MIA _ MA M/A #N/A 0.00 MIA MIA _ #N/A #N/A _ MA 0.00 MIA MIA M/A MIA MIA MIA MA 0.00 MIA MIA M/A M/A M/A MIA M/A #NIA MIA MIA _ MIA MIA #_N/A MIA MIA MIA MIA 0.00 MIA MIA #NIA MIA MIA M/A 0.00 MIA _ MIA MIA MIA MIA MIA MIA MA MIA M/A #N/_A MIA MIA - _. _ #N/A #N/A MIA MIA 0.00 MIA gDO MIA - - - #N/A M/A - M/A M/A 0,00 #NIA MM M/A MIA #WA MIA _ O.DO 000 TWA M/A MIA MA M/A M/A #N/A #N/A 0.00 MIA MIA #N/A MIA #N/A 0.00 #WA MIA M/A 0.00 MIA MIA M/A 0.00 9WA MIA #N/A 0.00 #NIA MIA M/A D.00 MIA _ MIA MIA 11.00 Ill MIA MIA D.00 MIA 1 #N/A MIA 000 #WA #NIA MIA 000 all r MIA M/A 000 #N/A MIA M/A 000 MIA#NIA MIA MIA _ � DOD _ MIA MIA MA 0 00 #NIA MIA M/A 000 MIA #N;A _ #N/A 000 MIA #NIA M/A 000 MIA MIA MIA 000 MIAMIA MIA #N/A 000 MIA #N/A #N_/A 000 #NIA #N/A MIA 000 MIA #N/A M/A 000 1 MIA I #N/A #NIA 000 M/A MIA M/A 06 MIA #NIA MIA 060 MIA MIA MIA 000 MIA MIA M/A M/A M/A MYA MIA 9N/A all M/A MIA MIA MIA _ MIA MIA MIA MIA MIA All MIA #NIA MIA MIA MIA M!A #NIA M/A _ MIA MIA M/A MIA #NIA MIA _ MIA #NIA #NIA MIA_ _ _#WA M/A #N/A MIA _ M/A M/A MA_ M/A #N/A � M/A _ M/A M/A M/A M/A MIA-T MA MIA MA #N/A #WA MIA_ MiA M/A -I #NIA M/A #N/A MIA MIA #N/A _ MIA #N/A IA #N/A MIA #NIA MIA --� #WA MIA MIA M/A MIA MIA MIA MIA #NIA M/A _ M/A MIA MA MA _ M A #NIA MIA MIA MIA MIA MIA 3970802 UO-Detenrlion_4.35.as, Outlet 3/7/2016, 4A3 PM 11 STAGE -DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Project Lemey Ave. Craft Brewery 6 Self Storage Basin ID: STAGE -DISCHARGE CURVE FOR THE OUTLET STRUCTURE 4945.5 - - 4945 4944.5 d 4944 - - - -- - d y 4943.5 - Of A r Y' 4943 - - - I 4942.5 4942 - 4941.5 - 4941 0 0.2 0.4 0.6 0.8 1 1.2 1 4 Discharge (cfs) 3970802 UD-Detention v2.35.As, Outlet 31712016. 4 4::'. IM Project Description Solve For Input Data Cross Section for Pond Emergency Overflow Headwater Elevation Discharge 28.90 ft-/s Headwater Elevation 4945,41 ft Crest Elevation 4944,90 ft Weir Coefficient 2.61 US Crest Length 30.00 ft Cross Section Image 051 M Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.071.00] 3/812016 11:56:52 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 b S 3 7 C W O C3 >ct, C .y O Vl 1� Ol O Ol .ti O O O O O O O O O O O Il1 O O Ill O Ill O O rl Lfl Ill .ti ll1 M M M M M M M M rl rl rl rl rl rl rl ti O O O O O O O O 0 0 0 0 0 0 0 0 .-1 M V VI l0 Ol M N W � N M W N O tO0 1O7 ti kD � m OO MN O ? M Ol N N N N N M N '+ O 00 I� 00 N Ill O? rl `� Ol Ot Ot O M Gl 0 o ONO QOi 1k0 ONi I^ll c 0 v N c v v l O1 1 � O 01 01 Ol O N 7 N 0 0 0 N O OD Vf O N Ill 01 .+ M N N fV fM N I+f a c v v v v v v "rnmrnmrnrno,a+ a'vvvcvca' O O 10 W Ill 00 V .� I+f N N N rl M P'1 d d a Owl al a Owl al v It 7 R? V? V- N O 00 01 M m V1 rl O .y Ol .-1 Ill Ill of of of o+ o+ of V rn Ill N M M? M V OO CT al al Ol Val Ol Ol ? T 7 R?? v V mmmmvmm 0 0 0 0 E" 0 O O O O O O O O O 0 0 0 0 O 0 0 0 O O O M M M M O Oi OT 00 It OD .-1 O� O N rl l0 rl rl Ill N O Vl Ill 0 0 0 0 0 0 0 E abdb$000 m O N O O1 w 10 G > 'a Z zff 0C 3S >oe 0 via M ID � N M l0 N Ill O O N M? IO Vl O 0 0 o Ci 0 0 0 0 O O O O O O O O O O O 1I1 O O Ill O ll1 O O rl I!1 ll1 .� Il1 .4 .4 .4 o .+ 14 O M M M M M M M M 0 CD O O O O O O O Ci CI CI Ci 6 O 6 O 10 N w It I l0 10 O1 . V O m O v 01 01 f M N Ill I+1 f+i N N .4 ON INl1 01 n N N O n N OD ny ti N vvv-eV a w v O IO N m m Ill O O n .+ O Ill ID N oo M to OD r, ti In v, In o .. ai ri ni ai .+ v It It IT 0l 71 al a o1 o+ 01 rn c c c v v c v v o � Ill OD ? IO O o n M q OR N llf N v d v v � 01 01 QI 01 OI 01 Q1 N O1 W o n M Ill V1 rl () rl (31 rl V1 ll1 N N N N O N N v v v v v v v v v O1 O1 O1 01 61 01 T 01 Ill N 01 M v 01 � OD N N N N M N v v v 01 O1 Oi Oi 01 01 01 01 v v v IT v IT v v m M M M's o m M O O O O " O O O O O O O O O O 0 0 0 0 0 0 0 0 O O O M ri M M O .ti .ti .ti N O N rl O ISO ISO V N M n .N-i .4 Ili N O 6 Vl O O O O O O O O N N IA M (n M M .y ID IO ti O N .ti N M IO In b6880 ' ' 0 �5 0 N U m Sy E ym c (n c T Q m E c O mU 0 E m In N aaa 0 0 a a 0 Cr l C r %a&em��doN�"..mRry„�-o%PRmB��ed ��'.;Sm��R��aaaRmm���er�;:m��'�s�ox aaaaa wa"aaa aaaaSaaa Paa - ---aaa"a a"aa"aa . .. .. _ __ NSm aaa=aaPaaP"aaaa =aia aaa $dRS�:Rr_$R$R$ -$m�RR�B$$�$ PaP a3waaaaa= ..... .... aP Pa I k l n aS oRm aaN r_ 2 c r Q - wSn aaaaaa"'....aCC°"a"aa"s"sa= aaaaaaaaaa"a"aa"a"a"a"a "aaa"aa""x HY-8 Culvert Analysis Report LJ Table 1 - Culvert Summary Table: Culvert 1 Discharge Total Culvert Headwater Inlet Control Outlet Flow Normal Critical Outlet Depth Tailwater Outlet Names Discharge Discharge Elevation (ft) Depth (ft) ConVol Type Depth (ft) Depth (ft) (ft) Depth (ft) Velocity (cfs) (cfs) Depth (ft) (ft1s) 2yr 1.73 1.73 117.33 0.1 0.590 1-S2n 0.544 0.557 0.544 0.547 3.435 i OOyr 10.20 6.13 4949.27 2.630 2.750 4-FFf 1.000 0.931 1.000 1.064 7.806 0 Straight Culvert Inlet Elevation (invert): 4946.52 R, Outlet Elevation (invert): 4946.41 It Culvert Length: 22.45 It, Culvert Slope: 0.0049 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 !Isif:3. 0 4948.0 m w 4947.5 4946.5 Crossing - DP1, Design Discharge - 102 cfs Cuh-ert - Cuh-ert 1. Cuh-ert Discharge - 6 1 cfs Station (ft) W Table 2 - Culvert Summary Table: Culvert 1 Discharge Total Culvert Headwater Inlet Control Outlet Flow Normal Critical Outlet Depth Tailwater Outlet Names Discharge Discharge I Elevation (ft) Depth (ft) Control Type Depth (ft) Depth (ft) (ft) Depth (it) Velocity (cfs) (cis) Depth (ft) (f /s) 2yr 1.80 1.80 4944.25 0.687 0.415 1-S2n 0.458 0.501 0.458 0.555 3.335 100yr 8.70 8.70 4945.42 1.802 1.855 7-M2c 1.500 1.138 1 1.138 1 1.002 1 6.051 Straight Culvert Inlet Elevation (invert): 4943.56 It, Outlet Elevation (invert): 4943.42 It Culvert Length: 31.94 ft, Culvert Slope: 0.0044 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE C C C Water Surface Profile Plot for Culvert: Culvert 1 49465 49460 49455 C 0 4945 0 M 7 v uJ 4944 5 49435 7 Crossing - DP6. Design Dischamre - 8.7 CA Cuh en - Cul-,�M 1. Culvert Discharge - S_? cfs Station (ft) PIPE OUTFALL RIPRAP SIZING CALCULATIONS Subdivision: Project Name: Lemay Ave. Craft Brewery & Self -Storage Location: ort� 0 1�1 ns Project No.: Calculated By: BAB Checked By: Date: _ STORM DRAIN SYSTEM 24" RCP FES I Pond Outfall 0100 (cfs) 11.5 1.3 Flows are the greater of proposed vs future D or H (in) 24 24 W ft Sloe % 1.30 1.30 Yn in Yt (ft) Unknown Unknown If "unknown" YVD=0.4 Yuo, Yt/H 0.40 0A0 Per section MD 7.2 Supercritical No No DID A2.5, Q/WHA1.5 2.03 0.23 Q/DA1.5, Q/WHA0.5 4.07 0.46 Da, Ha in ' Da=0.5 D+Yn , Ha=0.5 H+Yn Q/DaA1.5, Q/WHaA0.5' d5o (in), Required 3.37 0,38 Required Riprap Size L L Fig, MO-21 OR MD-22 Use Riprap Size L L d5o (in) 9 9 Table MD-7 1/(2 tan 0) 4.00 4.00 Fig MD-23 OR MO-24 Erosive Soils Yes Yes At 2.09 0.24 At--Q/5.5 L 2.5 -6.8 L= 1/ 2 tan 0 AtfYt - D Min L 6.0 6.0 Min L=30 or 3H Max L 20.0 20.0 Max L=10D or 10H Length ft 6.0 6.0 Bottom Width ft 6.0 1 6.0 1Width=3D Minimum Riprap Depth in 18 18 Depth 2d5o Type II Base Depth in 6 6 Table MD-12 fine grained soils Cutoff Wall Cutoff Wall Depth ft Depth of Riprap and Base Cutoff Wall Width (ft) Notes No Type II Base to be used if Soil Riprap is specified within the plans ' For use when the flow in the culvert is supercritical (and less than full). C C C C C_ C C_ C %.U9700g0.aIIV970g02�LxceKDminageV970902nreinage Calcs.xls Page 1 °I1 3/72016 'L-J APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS EX I LEMAY AVENUE CRAFT BREWERY & SELF=STORAGE FACILITY EXISTING CONDITIONS DRAINAGE MAP UMYAVMUE - -;7//17/7TT7T111Tj7l/T/7TTTl/T/T/TT/Tl/Ti OT/T/TT/TT/>AT/JT/Ti'Tl1T/1:.Rlfi/JY>T/7T%JT/>Ti>/»T1T/T/>TT>Ti>/>TTTTT>/3TTTTT/Ti>TyTT/>i .i-. >Trr^ i- ,.. E%12 = 1 sl _. i P _ au AQ -ow- a� _„�; _„�t,..��I_ ..ai -- = - - - - _ T — i L .51 I I . I i I 011 ----'+ - --- --- - ---- 1 I ospA \may _------- ------ --Tl-rl 7 1 aBxsuaw lwlmR uc l \ I LEGEND -- ---- - - - — —d'1a — Eastman MA" CONTOUR EMSMG INTERNIMATE CMR EMUNG ssam SEWR/RC Existing Runoff Summary Table A EA! N ID A BASIN DESGNAnoN 0 Pw B c YMW A scre cm G'. Yam) Yam) lea 0 C. MIINNORIAQ STORM CCEFFICENT E%s I.n osl M lu o] 1u D: MAJ STORM C FFICENT 1 am 1 oN 1 axx 1 lxl 1 1.7 1 vd DRARIAM wscNARCL Q m DE!WN DEscx POINT 30 Ts o w Bo b EASTNG RM DIREGTON MGINAL SCALE: 1' = 30' EA"NG BASN ORMNACE AREA J T r� I � I � Know what's below. Cell before you dig. c MAY AVENUE CRAFT BREWERY k SELF STORAGE FACILITY 3970802 08/01/16 SHEET 1 OF 2 J•R ENGMEEWNG ANMMn pM /� �I B � .. � ������Mw���' ��� ���•91^�A�pa�9,�l�n- �� ��s�l� Oyu, - - - - - - - -i4- PIP I�n _ e La MAN gum INS y0 ggj II DOMINION d I. p1.36 ACRE FT i �; ■ e n 1 gwarIir j ! r L4 all � �{annrnEitr�trtrtrEi��n G Eak. it n/ • �® - - - -- - - -- - 01111 --------------- - o Im o-s 19 v3 NERCP —�---� � li 14'I¢3• NQN.' — Ew fjTB — W Z ea.o A,r M.ml 0. 1�• } a Q MMI A a4 111 00 )8 Ib 61 a Oat m DIN a06 69 03 1.0 G MI BIG OBI SA a9 ]b D alb ow aW 0.R SO 0.1 IU B 039 a m abl SA n9 10 f M16 W O aJ9 SO OS 1.0 G BOB 0DID00 10 1.) nT INm O9 ob9 020 1 S) 1 u v 1 Oat ob9 041 a1 u 9 119 BW GO 10 So al Lo R a m no To nM v G am am ns m 3 nl 9] M an am BD iui BY i xl N LY OA BUD 1 ).b 1 IA 79 0 0,10 0.5E BW 1 SO 1 0.01 0.5 30 15 0 30 60 W00 - EXISTING MA CONTOUR OnpNAL SCALE: 1' = 30' W J W EXISTING WTERMEDUIE CONTOUR m V PROPOSED MAJOR CON1WR a a Z PROPOD INTERMEDIATE CONTOUR IEl SIZ ',1' Of eslaa PROPOSED STERNA SENER/I N City OI POEE N Affmi PRColO VA O• O _ ' UTILI PLAN APPROVAL � vaDPSED SWAIE APPROVED: Y 9 9�/ /N'e U OC 00 A BASIN ID �" D.M W O W Z G Al BASIN DESIGNATION Know d E>B�OW. CHUCKED BY: .LA 7 ~ N O B. AREA N D C MINOt STORM COEFFICIENT / B D: MAaaal sronM COETF1pENT rib DNOM YOU dig. PIEPaD Br: W=L J O a W Ir a _ _ _ate --- ---_ ---- v AN D-b _ _��ppyy p __OVC' --P•• -CwU- __ryry_- -POP -_ -Oy- -- ,O --MV __P+. -Ci!✓- --0W- -M/- - #I{/- _ - - I Detenfion Pond Summary t now VIA x OCvpmvMrG' 116 are,.ale,oa a, an..•on wnu ^ Imrraarvlw,WOQwo.Mvaeh��bu voua.. »cuss w..oa,pan�B,pmu�,+wms DRAINAGE DISCHARGE 1 DESWN PONT y PROPOSFD ROW DIRECTION BASH DRMNACE AREA r PREPARED UNDER MT nuDMr "B "AlCPM COLORADO NO. 37953 FOR AND ON BENAIF STATE N DIRECT SUPER _ . P.E. OF IN ENGINEERING GLC. a Wc«EB BY: �• V) Q d m uJ J 0- •, f 5 ]953 4,:� - P.,rxn a,+m. Co. CHECKED BY N [NEfXEO BY: /Vt- A� aEGaU Bc SHEET 23 Of 35 RE.... 'C '�3NDNAG EW JOB N0. 3970802 G-3 2419 aw APPENDIX E LID EXHIBITS Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 1 of 2 Designer BAB Company: JR Engineering Date: October 6, 2016 Project: Lamay Avenue Craft Brewery & Self -Storage Location- Pavan Section fill Choose One 1 Type of Permeable Pavement Section O No Inflttratlon A) What type of section of permeable pavement is used? Q Partal Inflnraban Section (Based on the land use and activities, proximity, to adjacent sbudures and soil charadenstics J C) Full Inflltation Section Cnm a One B) What type of weanng course? QQ plop Q Commie Grld Pavement O Pervious Concrete C Porous Gavel 2 Required Storage Volume A) Effective Imperviousness of Area TnbWary to Permeable Pavement, I, I, = 68.0 B) Tributary Area's Imperviousness Ratio (I = I,I 100) 1 = 0.680 C) Tributary Watershed Area ATaa= 21,172 sq III (including area of permeable pavement system) D) Area of Permeable Pavement System Aees = 5.455 sq ft (Minimum recommended permeable pavement area = 5372 sq A) E) Impervious Tributary Ratio RT = 2.0 (Contnbutmg Imperviuus Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WOCV) Based on 12-hour Drain Time WOCV = 376 w A (WOCV=(08-(091 •i,-11g-ir+ 0. 78'OI 12)- Area) Otoose One G) Is flood contra volume being addetl? (D >� Q NO 3 Depth of Reservoir A) Minimum Dept, of Reservoir Di,„, = 60 inches (Minimum recommended depth Is 6 inches) Oiuvs, One B) Is the slope of the reservoinsubgrade interface equal to 0%? Q y Flat or SteppedIntalbtlm QQ NO. Sloped Installation C) Porosity (Porous Gravel Pavement a 0 3, Offers < 0 40) P = 020 O) Slope of the Base Course/Subgrede Interface S = 0 005 ft / fl E) Length Been Lateral Flow Bamea (max = 137 8 fl) L = 500 It F) Volume Provided Based on Depth of Base Course V = 31a w ff Flat or Stepped. V = P • ((D_1)112) • Area SlopedV = P - [(Dmm. (D,,,,n- 6-SL-1)) / 12) - Area Volume assumes uniform slope & lateral flow bamer spacing. 4 Lateral Flow Banners A) Type of Lateral Flow Bamem aurae One Q Conoco, Walk ® PVC geomembane located normal to lbw Q N/A- FlaI irLStaalbn Q other (Describe) B) Number of Permeable Pavement Cells I Cells = 5 Perimeter Barner A) Is a penmeter banner provided on all sides of the Q YES pavement system? (Recommeded for PICP, concrete grit pavement. or for any 0 No 3970802 UD-BMP v3.03- Pavers #1 xlsm, PPS 1016/2016, 10:30 AM ( I no-infftraoon section) i C 3970802 UD-SMP_0 03- Pavers #1 xtsm, PPS 1016/2016, 1030 AM Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 2 of 1 Designer. BAB ( Company: JR Engineering Data: October 6, 2016 Project: Looney Avenue CnR Boni & Self -Storage Location: Paver section01 6 Filter Material and Underdrain System Aj Is the underdrain placed belowa 6-inch thick layer of CDOT Class C filter material? Choose One Y6 O No O N/A B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) r Oiaeso one O a.,d, ® 64Mi C) Distance from the Loveoft Elevation of the Storage Volume y = it thethe bottom of the base course to the center of the oMce) Choose One - p Q NO No � Choose One Q Piaced above the aner O Owetl above and below the Ilner S Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is gap. Calculate delis individually vanere this vanes.) A) Depth of WOCV in the Reservoir Dwoov = inches (Elevation of the Flood Control Outlet) B) Diameter of Ont for 12-hour Drain Ttma Doe. = Inches (Use a minimum orifice diameter of 3/8-inches) Notes- �- 3970802 UD-BMP v3 03- Pavers #1 xlsm, PPS 10162016, 10'30 AM Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 1 of 2 Designer BAB Company: JR Engineering ( Date: October 6, 2016 Project: Lemay Awnue Craft Brewery & Self -Storage Location: Paver Section 02 1 Type of Permeable Pavement Section A) What type of section of permeable pavement Is used? (Based an the land use and acbvnies. proximity to adjacent structures and soil characteristics.) B) What type o1 wearing course? 2 Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, I, 9) Tributary Area's Impen omness Ratio (I = I,/ 100) C) Tnbutary Watershed Area (including area of permeable pavement system) D) Area of Permeable Pavement System (Minimum recommended permeable pavement area = 118a sq b) E) Impervious Tributary Race (Contributing Imperviucs Area 1 Permeable Pavement Ratio) F) Water Quality Capture Volume (WDCV) Based on 12-hour Drain Time (WDCV=(a8'(091.12-119•i2s 0. 78- i) 112)• Area) G) Is flood control volume being added? 3 Depth of Reservoir A) Minimum Depth of Reservoir (Minimum recommended depth is 6 inches) 6) Is the slope of the reservoirlsubgrade interface equal to 0%9 C) Porosity (Porous Gravel Pavement < 0 3, Others 5 040) D) Slope of the Base Course/Subgrade Interface E) Length Between Lateral Flow Samers (max = 110 Oa ft ) 9 Volume Provided Based on Depth of Base Course Flat or Stepped. V = P • ((Don,,. 1);12) • Area Sloped V = P • [(Don,,. (Om„- 6-SL-1)) 1 121- Area a Lateral Flow Samers A) Type of Lateral Flow Banners Choose Orc 0 No lon rstim 0 Panel Intimation Section 0 full lnftltmbm Section Choose Che 0 pru 0 Concrete Got Pavement 0 Pbrveus Concrete 0 poraE CwavN 1,= 50.0 % i = 0.500 Area' 5,922 sq It A,= 1480 soft Rr= 1.5 WDCV= 81 cufl Choose One �0 yes 0 NO D—z 6.0 Inches Choose One, 0 YE5- Flat or Stepped Installation 0 NO Sloped Installation P= 020 S= O005 ft/II L= 500 ft V= Be 0. If Volume assumes uniform slope 8 lateral flow banner spacing. Calculate the volume of each cell individually when this vanes. Chose One 0 Concrete Walk 0 PVC geomembrane Installed normal W flow 0 N/A -fee lmtallatlon 0 Other(Descnbe): B) Number of Permeable Pavement Cells I Calls = 5 Perimeter Berner chic a One /- A) Is a perimeter banner provided on all sides of the 0 YES pavement system? IRecommeded for PICP, concrete god pavement, or for any 0 3970802 UD-BMP Y3 03- Pavers 92 xlsm, PPS 10/612016, 10:28 AM lJ CI m,ffttlabo0 sen.o ) (C 3970802 UD-BMP v3.03- Pavers 82 zlsm, PPS 10162016, 10:26 AM C / II Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 2 of 2 Designer BAB Company: JR Engineering Data: October 6, 2016 ( Project: Lemay Avenue Craft Brewery i Self -Storage Location: Penefr Secbon 92 6 Filter Maternal and Underdrain System A) is the underdram placed below a 6-inch thmh layer of Class C fiber material? Chorea One -.. YESCDOT Q NO Q N/A B) Dameler of Sloftetl Pipe (slot dimensions per Table PPs-2) r chase One - O 4-inch, 17 6-ram C) Distance from the Lowest Elevation of the Storage Volume y = ft (i. e. the bottom of the base course to the center of the office) Chofs10 One Q Q Chorea Oro Ir I Q Plated above the Ilner Q PWW above and below the Ilner S Coded (Assumes as& cell has similar area, subgrade slope, and length between lateral balers (unless subgrads Is Mt). Calculate fells individually vAers this vanes.) A) Depth of WOCV in me Reservoir Dwacv = inches (Elevation of the Flood Control Owlet) B) Diameter of Orifice for 12-hoer Drain rime D. = inches (Use a minimum edifice diameter of N&McIries) Notes' 3970802 UD-BMP_v3.03- Pavers g2.xism, PPS 10/612016. 10:28 AM Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 1 of 2 Designer: BAB Company: JR Enginesnng Data: October 6, 2016 Project Lomay Avenue Craft Brewery & Self -Storage Location: Paver Section 93 t Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent Cstructures and soil rharaclenstics ) 1 61 What type of wasting course? 2 Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, I, B) Tributary Area's Imperviousness Rabo (I = I,/ 100) C) Tributary Watershed Area (including area of permeable pavement system) D) Area of Permeable Pavement System (Minimum recommended permeable pavement area = 1754 sq R) E) Impervious Tributary Ratio (Contributing Imperviuus Area i Permeable Pavement Rabo) F) Water Quality Capture Volume (WQCV) Based an 12-hour Drain Time (WQCV=D8•(0.91-i°-1.19078'i)/12)•Area) G) Is Rood commit vaarre being added? 3. Depth of Reservoir A) Minimum Depth of Reservoir (Minimum recamrlended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface, equal to 0%7 C) Porosity (Pa.. Gravel Pavement, 0.3. Others <040) D) Sole of the Base Course/Subgrade Interface E) Length Between Literal Flow Barriers (maa= 175.1 R) F) Volume Provided Based on Depth of Base Course Flat or Stepped'. V = P - (p,a,r)/12) • Area Sloped: V = P' 1(0mw. (D-- 6•SL-i)) / 12] - Ana 4. Lateral Flow Banners A) Type of Lateral Flow Bamers B) Number of Permeable Pavement Cells Choose Cre Q No IrAlbatbn Q Penal InfiR can Sector, Q Nil In81[raem Saab, Choose One ® pirn Q rpveh rxtl Paelmlha Q PErvb6 CorlQGte Q Porous Ganef I,= 00.0 % I 0,800 AT.= 6,140 all It Arsa= 1,535 sqR R1= 2.4 WQCV= 134 cub Choose One - Q yEs O No 0,,,,,,= 6.0 inches IIr Ceose Ore Q yES. Flat or ShppM Inosixtbn 8 NO- Sbped Imtallatbn IMPERVIOUS TROU1 MY RATIO EXCEEDS 20 P = 0.20 S= 0.005 Rift L= 50o R V= 90 cuR Volume assumes uniform slope & latent flaw Earner spacing. Calculate the volume of each call Individually when this vanes. Choose One Q Comet, Walk QQ PVC g.rathrarc installed normal to Row Q hVA Fbterstfilalrn Other(Desalbe): Cells 5 Penmea, Banner r' Choose A) Is a perimeter gamer provided on all sides of the YES pavement system? (Recommeded for PICP, concrete grid pavement, or for any Q NO 3970802 UD-BMP v303- Pavers #3 AST. PPS 10/612016. 10'.32 AM ■ C �m �m ) 3970602 UD-BMP v3.03- Pavers /Ki xis , PPS 10/62016, 10.32 AM l j - I Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 2 of 2 Designer: BAB Company: JR Engineering Dab: October 6, 2016 project: Lemay Avenue Craft Brieery E SeHStonoge Location: Payer Section $3 6 Filter Material and Underdrain System A) Is the underdram placed below a 6-mch think layer of CDOT Class C fitter matenal? Choose One # O ND O WA BI Diameter of Slotted Pipe (slot dimensions per Table PPs 2) III Choose One O I-Infh ® 6.6hfof C) Distance from the Lowest Elevation of the Storage Volume y= 6 u a the bottom of Me base course to the center of Me office) r Choose One - O yEs # NO r Choose One O Placed above the her O Placed above and below Me Ilner 8 Outlet (Assumes each call has similar area, subgrade slope. and length between lateral bamars (unless subgrade is flat) Calculate cells Individually where Mis vanes.) A) Depth of WOCV in the Reservoir D., = Inches (Elevation of the Flood Control Ou6e0 B) Dismal of Orifice for 12-hour Drain Time 0.. = Inches (Use a ort emum orifice diameter of 316-inches) News: C /- 3970802 UD-BMP_v3 03- Pavers #3 xlsm, PPS 1002016, 10:32 AM Design Procedure Form: Rain Garden (RG) i Sheet 1 of 2 Designer: �- SAO Company: JR Engineering Date: October 6, 2016 Project: Affinity Fort Collins Location: LID Basin $1 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, 1. = 80.0 % (100 % d all paved and roofed areas upstream of ran garden) B) Tributary Area's Imperviousness Raba it = IJ100) = 0.800 C) Water Quality Capture Vohme (WQCV) for a 12-lour Dram Time WQCV = 0.26 watershed inches (WQCV= 0.8'(0.91' i'-1.19't'+0.78' i) D) Contributing Watershed Area (including rain garden area) Area = 11,134 sq @ E) Water Quality Capture Volume (WQCV) Design Volume Vwocv = cu ft Vol = (WQCV / 12) ' Area F) For Watersheds Outside of the Denver Region, Depth of ds = 140 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWOCV OTHER = 793.4 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv usER = W It (Only 6 a different WQCV Design Volume is desired) 2 Basin Geometry A) WQCV Depth (12-inch maximum) Dwocv = 12 in B) Rain Garden Side Slopes (Z = 4 min., hora. diet per unit vertical) Z = 4.00 ft I fl (Use'10" it rain garden has vertical walls) C) Mimimum Flat Surface Area A.,, = 528 sq it D) Actual Flat Surface Area A� = 530 sq ft E) Area at Design Depth (Top Surface Area) Arm = 1513 sq ft F) Rain Garden Total Volume Vr= 1,021 cu ft (VT= ((Arm I A, ) 12) * Depth) 3. Growing Media r Choose One Q 18' Rain Garden Growing Media O other (Explain): 4. Underdrain System Dlonse rvx 0 YES A) Are underdrains provided9 Q NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= 2.2 it Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol,, = 793 cu It iii) Oritice Diameter, 318" Minimum DO = 0.64 in 3970802 UD-BMP v3 03- Basin 01 xlsm. RG 10/6l2016, 10:34 AM C C C_ Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAS Company: JR Engineering Date: October 6, 2016 Project: Affinity Fort Collins Location: LID Basin #1 5. Impermeable Geomembran , Liner and Geotextile Separator Fabric Ownae CVw - QYES A) Is an impermeable liner provided due to proximity NO of structures or groundwater contamination? 6 Inlet I Outlet Control rneDW One Q Sheet Flow- No Energy Dissipation Required A) Inlet Comrot Q Concentrated Flow- Energy Dissipation provided Choose Me 7 Vegetation Sent (Plan for frequentol) weed contr p Plantings �O Q Sand Grown or Other High Infiltration Sod 6 Irrigation :E1 Opott oft - 0 YES A) Will the rain garden be inigatedn Q No Notes: 3970802 UD-BMP v3 03- Basin #1.xlsm, RG 1016=16, 10:34 AM Designer: Company: Date: Project: Location: Design Procedure Form: Grass Swale (GS) Sheet 1 of 1 BAB JR Engineering April 21, 2016 Larray Avenue Craft Brewery 3 Self -Storage BioSwale #2 1. Design Discharge for 2-Year Return Period Q; = 1 70 cts 2. Hydraulic Residence Time A) Length of Grass Swale Ls= 105.0 ft B) Calculated Residence Time (based on design velocity below) THR= 2.4 minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) Sava, = 0.004 ft / ft B) Design Slope So = 0.003 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) Ws = 0.00 It Choose One 5. Vegetation A) Type of Planting (seed vssod, affects vegetal retardance factor) Grass From Seed O Grass From Sod 6. Design Velocity (0.35 it / s maximum for desirable 5-minute residence time) Vz = 0.74 Us s 7. Design Flow Depth (1 foot maximum) Ds = 0.76 it A) Flow Area Ai = 2.3 sq ft B) Top Width of Swale WT = 6.1 It C) Froude Number (0.50 maximum) F = 0.21 D) Hydraulic Radius R. = 0.37 E) Velocity -Hydraulic Radius Product for Vegetal Retardance VR = 0.27 F) Manning's It (based on SCS vegetal retardance curve E for seeded grass) n = 0.057 G) Cumulative Height of Grade Control Structures Required Ho = CIAO It Choose One AN UNDERDRAIN IS S. Underdrain (Is an underdrain necessary?) 0 YES O NO REQUIRED IF THE DESIGN SLOPE <2-0% 9. Sail Preparation (Describe soil amendment) 10. Irrigation r I �) Temporary Permanent rvuhes. 3970802 UD-BMP_v3.03- Bio-Swale #2.Idsm, GS 4121/2016. 11.46 AM Design Procedure Form: Rain Garden (RG) Shear 1 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins CLocation: LID Basin 01 i. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 5.0 % (100% it all paved and roofed areas upstream of ram garden) B) Tributary Area's Imperviousness Ratio (i = l,/100) i = 0.050 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 003 watershed inches (WQCV=0.8-(0,91'i-1.19*�-0,78'i) D) Contributing Watershed Area (including rain garden area) Area = 4,097 sq it E) Water Quality Capture Volume (WQCV) Design Volume Vwocv = cu 1t Vol = (WQCV / 12) ' Area F) For Watersheds Outside of the Denver Region, Depth of tls = 1 40 In Average Ruroff producing Storm G) For Watersheds Outside of the Denver Region, VwUevoniER = 32.1 cu fl Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv uses= cult (Only 9 a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Owocv = 12 in B) Ram Garden Side Slopes (Z = 4 min., hors. dist per unit vertical) Z = 4.00 ft / ft (Use"O" if ram garden has vertical walls) C) Mimimun Flat Surface Area AN„ = 21 sq it D) Actual Flat Surface Area A, „+= 333 sq It E) Area at Design Depth (Top Surface Area) Arw = 1513 eq R F) Rain Garden Total Volume Vr= 923 cu It (Vr= ((AT. + Ax w) 12) * Depth) 3. Growing Media Q 18' Rain Garden Growing Media 0 Other (BpWIn): 4. Underdrain System A) Are urdetlrains provided? B) Underdrain system onlice diameter for 12 hour dram time i) Distance From Lowest Elevation of the Storage Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours iii) Orifice Diameter, 3/6' Minimum Choose One rQa YES 0 NO y= 2.2 1t Vol„= 32 cum Dc = 0.13 in MINIMUM DIAMErEF = 311; 3970802 UD-BMP v303- Basin #1.x1sm, RG 5/2012016, 12.03 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin #1 Choose One 5. Impermeable Geomembrans Liner and Geotextile Separator Fabric OYES A) Is an impermeable Iner provided due to proximity Q NO of structures or groundwater condemnation? Choose One 6. Inlet I Outlet Control O Sheet Flow- No Energy Dissipation Required A) Inlet Control O Concentrated Flow- Energy Dissipation Provided Ghesse one 7 Vegetation O Seed (Plan for frequent weed control) Q Plantings O Sand Grown or Other High Infiltration Sod Choose One 8. Irrigation O YES A) Will the rain garden be migatedo O NO Notes: C 3970802 UD-BMP_v3.03- Basin #1.x1sm, RG 5/20/2016, 12:03 PM r C Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 Designer: BAB Company: JR Engineering Daft: April 21, 2016 Project: Affinity Fort Collins Location: LID Bain 02 1. Basin Storage Volume A) Effective Impervousness of Tributary Area, I, 1, = 95.6 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1./100) i = 0.956 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.36 watershed inches (WQCV= 0.8' (0.91' 13- 1 19'?+0.78' i) D) Contributing Watershed Area (including rein garden area) Area = 2.925 sq ft E) Water Quality Capture Volume (WQCV) Design Volume Vwocv = cu it Vol = (WQCV / 12) ' Area F) For Watersheds Outside of the Denver Region, Depth of ds = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Deriver Region, Vwocv meea = 287.7 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv usee = cu it (Only 0 a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwocv = 12 in B) Rain Garden Side Slopes (Z = 4 min., horsdirt per unit vertical) Z = 4.00 ft / ft (Use "0" it rain garden has vertical walls) C) Mimimum Flat Surface Area Aa" = 192 sq it D) Actual Flat Surface Area Amtu = 275 sq it E) Area at Design Depth (Top Surface Area) ATE = 322 sq it F) Rain Garden Total Volume VT= 299 cu it (V,= ((A, + Arm 12) * Depth) Choose One 3. Growing Media (g 18' Rain Garden Growing Medal Q Other (Explain): 4. Underdrain System Choose One 0 YES A) Are ulderdrams provided? Q NO B) Underdram system onlice diameter for 12 how drain time i) Distance From Lowest Elevation of the Storage y = 1t Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol . = 288 wit In) Ordice Diameter, 318" Minimum D„ - 039 in 3970802 UD-BMP v3- Basin #2.xism, RG 4121/2016. 11:51 AM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin #2 Choose One 5. Impermeable Geomembrare Liner and Geotextile Separator Fabric OYES A) Is an impermeable Inver provided due to proximity O NO of structures or groundwater comamination? Choose One 6 Inlet t Gullet Comrol Q Sheet Flow- No Energy Dissipation Required A) Inlet Control Q Concentrated Flow- Energy Dissipation Provided 7 Vegetation Ghsaw Gina r0 Seed (Plan For frequent weed control) O Plantings Q Sand Grown or Other High inflitrat on Sod Choose One e Irrigation _ YES NO SPRINKLER HEADS ON FLAT SURFACF A) Will the rain garden be irigated� Q NO Notes: 3970802 UD-BMP v3- Basin #2.xlsnn RG 4/21/2016, 11:51 AM Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin #3 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 94.7 % If 00% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = IJ100) i = 0.947 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.36 watershed inches (WQCV= 0.8 - (0 91 • is - 1.19'"a 0.78' i) D) Contributing Watershed Area (including rain garden area) Area = 64,572 so ft E) Water Quality Capture Volume (WQCV) Design Volume Vwocv = cu ft Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Regan, Depth of ds = 1 40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Vwocv oTReR = 6,227.1 cu If Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwacv use. = cu If (Only d a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwocv = 12 in B) Rain Garden Side Slopes (Z = 4 min., honz dist per unit vertical) Z = 4.00 ft/ft (Use "0" 6 rain garden has vertical walls) C) Minimum Flat Surface Area A,. = 4151 sq ft D) Actual Flat Surface Area AM. = 4160 sq ft E) Area at Design Depth (Top Surface Area) ATm = 8356 sq it F) Rain Garden Total Volume Vr= 6,258 cu If (VT= ((Arm - Ao .) 12)' Depth) 3. Growing Media QQ 18" Rain Garden Growing Media O Other (6plaln): 4. Underdrain System Choose One * YES A) Are uxterdrams provided? NO B) Underdrain system orifice diameter for 12 tour drain time i) Distance From Lowest Elevation of the Storage y= 2.2 ft Volume to the Center of the Orifice ii) Volume to Dram in 12 Hours V0112 = 6.227 cu ft III) Orifice Diameter, 3/6' Minimum Do = 119 in 3970802 UD-BMP v3- Basin #3.x1sm, FIG 4121/2016, 12:02 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin #3 Choose One 5. Impermeable Geomembran , Liner and Geotextile Separator Fabric Q ves A) Is an impermeable finer provided due to proximity Q NO of structures or groundwater contamination? chooseOne 6 Inlet / Outlet Control Q Sheet Flow- No Energy Dissipation RegUred A) Inlet Control Q OonCentrated Flow- Energy Dissipation Provided Gleisse one 7 Vegetation Seed (Plan for frequent wed cl ontro 0Plantings �O Q Sand Grown or Other High Infl tratlon Sod Choose One 8 Irrigation YES NO SPRINKLER HEADS ON FIAT SURFACE A) Will the rain garden be Inigateo0 Q NO Notes: 3970802 UD-BMP v3- Basin #3.xlsm, FIG 4/2112016, 12:02 PM Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin 04 1 Basin Storage Volume A) Effective Impetuousness of Tributary Area, I, I, = 77.4 % (100 % if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1.1100) i = 0.774 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches (WQCV= 0.8 - (0.91 • 13 - 1.19' � + 0.78' i) D) Contributing Watershed Area (including rain garden area) Area = 11.452 sq ft E) Water Quality Capture Volume (WQCV) Design Volume Vwocv = cu it Vol = (WQCV / 12) 'Area F) For Watersheds Outside of the Denver Region, Depth of de = 140 in Average Runoff producing Storm G) For Watersheds Outside of the Denver Region, V,Hocv 0n = 777.5 cu it Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv user = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwocv = 12 in 8) Rain Garden Side Slopes (2 = 4 min., Foradist per unit vertical) Z = 4.00 ft 1 it (Use "0" if rain garden has vertical wells) C) Mimimum Flat Surface Area AM„ = 518 sq it D) Actual Flat Surface Area Ar,i,,. = 223 sq it ACTUAL FLAT AREA < MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) Ar_ = 562 sq it F) Rain Garden Total Volume Vr 393 cu it (VT= ((AT. + Arm,.) / 2) ' Depth) choose One 3. Growing Media ® ia" Rain Garden Growing Media O Other (rnlaln): 4. Underdrain System Olcose One YES A) Are u derdrains provided? Q NO B) Underdrain system orifice diameter for 12 hour dram time i) Distance From Lowest Elevation of the Storage y = 2.2 ft Volume to the Center of the Orifice I) Volume to Drain in 12 Hours Vol,, = 777 cu it III) Orifice Diameter, 3/8" Minimum De = 0.63 in 3970802 UD-BMP_v3.03- Basin #4.xlsm, RG I 5/20/2016, 12:03 PM w Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin #4 Choose One 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric O YES A) Is an impermeable liter provided due to proximity 0 NO of structures or groundwater contamination? Choose One 6. Inlet / Outlet Control 0 Sheet Flow- No Energy Dissipation Requred A) Inlet Control p Concentrated Flow- Energy Dissipation Provided Choose one 7. Vegetation O Seed (Plan for frequent weed contml) pi plantings Q Sand Grown or Omer High Infiltration Sod Choose One 8 Irrigation 0 Y6 NO SPRINKLER HEADS ON FLAT SURFACE A) Will the min garden be irrigated? Q NO Notes 3970802 UD-BMP_v3 03- Basin #4.x1sm, RG 512012016, 12:03 PM lHA\Y AYBMIE �1 1 J I A I n ./� LD BASIN H IS UNDERIAZI —~ LD SCALE R PROwEDS EXTRA wIWLE ID SCALE 02 ' BAsIIi a a tie `BT O eA IN EJ-+ ti uD eA9N A<�.. ` IDE & LID BASIN I 1._ ^ _ _7 _ 1 r I n VA FA j Cm BA9N11$ TREATED BY t. LID BASIN H. uD SYNE f; B>sN H IS IREA'EJ ev e LID BASIN u u0 BASN xa. I BASIN 4 Is TREATED BY LID BASIN 43 J RIDGELINE 1 1 RUXLH JE I � II o saALL <., k JD BASIN_J__. 1 / BASIN c Is TREATED BY — LID BASIN 03 IV t t BARN C 13 llm By LID ED& (1 34S `: E S -RE 3v I ID BNNf JR. R L9 BASIN A} a: YDo BASIN In L _ 1 D I. LID BASN N2 I �F6J .'rj e N D IsTRFAIED BY'-'_ LE #I.. LDD BIBLE -- ��_�_ ! "�_�_�e45IN F IS HEATED BTs — a E) eViLE p - ID SWAI E e LD BASIN 03 Y U ox Wml� V�Wz 0, Ui mk'� o'6F NoYYCsa >�m aooa' n � N d O m GO 0 Z EL) Orr Fq 0 n E W U CE K Ulm d y CC?o 6 I mom r Of a N O LL LEGEND �100— MAJOR CONTOUR INDMRMEDATE CONTOUR ///I S L PROPOSED REMINDED POND PROPOSED BEGAN BOWER Blo-swAlE/ BICRETENTION BASIN k m o PERMEABLE INTERLOCKING CONCRETE PAYFRS t m GRASS BUFFER IMPERAOUS AREA NOT TREATED IMPERNWS AREA TREATED BY L.I.D. BMPS PROPOSED ROW DIRECDON D A AGE AREA -- PAYER TREATMENT AREA DEBNEAPCN 40 20 0 40 SO ORIGINAL SCALE: I' - 40' FIN CHECKING CHEaED �1400' ���ll cxECrcEO PREPARED UNDER MT pIRECT SJPER 0 ICHECrcN tt-(i'IL cxEaED TIMOTHY JAMES HALOPOFF. P.E. - CHECKED NO. 37953 FOR AND ON BEHALF OF JR ENGINEERING. LLC o WW a m m • V x a z O m w U r K Z Know whars below. 3 a Call before you dig. w a mQ H 11 Q 1 Z in ColliDr, Colorado Q w Q PLAN A.PPFRROOVAL U Q 0! -taLriX..+ - O i! LY O DM wO VA — Z CO U p.n 1) ]J of LRmeTYe D.rt >_ N N 0.M < ad In W J XmW PMm TB.M J SHEET 21 OF 35 0.M JOB No. 3970802