HomeMy WebLinkAboutDrainage Reports - 11/05/1991Final Approved ReP►r
Date 4�
DRAINAGE REPORT
FOR DELLENPACH CHEVROLL-T
BUILDING EXPANSION AND
PARKING LOT PAVING
RESOURCE CON ULTINNTS INC
DRAINAGE REPORT
FOR DELLENBACH CHEVROLET
BUILDING EXPANSION AND
PARKING LOT PALING
Prepared for
Dellenbach Chevrolet
by
Paul R. Barker, PE
Resource Consultants, Inc.
402 West Mountain Avenue
P.O. Box Q
Fort Collins, CO 80522
October 1991
Ref: 91-600.17
' DRAINAGE REPORT FOR DELLENBACH CHEVROLET
' BUILDING EXPANSION AND PARKING LOT PAVING
Introduction
This report summarizes the drainage investigations for the building expansion
and paving of a parking lot at Dellenbach Chevrolet, located in the southwest corner of
' Section 26, Township 7 North, Range 69 West of the 6th PM, Fort Collins, Colorado.
The site is along the frontage road of South College Avenue between Foothills Parkway.
and Swallow Road (see Figure 1). This report consists of four parts: existing drainage
' conditions, proposed drainage conditions, floodplain encroachment, and summary.
IExisting Drainage Conditions
The existing drainage pattern of the site is shown on Figure 2. The majority of
the site drains to the low area at the southwest corner of the property. The outlet for the
low area is a sump inlet with an 8" pipe which drains into the existing 48" storm drain
along the southern boundary of the site, as shown in Figure 3. The storage capacity of
this low area is 2,600 cubic feet which will detain approximately 0.16 inches of runoff
from the site. This amount of storage is insignificant for detention purposes. When the
sump inlet capacity is exceeded, drainage water overflows onto the Frontage Road at the
south street entrance to the site. The lowest point of the Frontage Road between
Swallow Road and Foothills Parkway is at the storm drain inlet to the 48" pipe. When
' the storm drain inlet capacity is exceeded, water ponds in the frontage road and backs
onto the Dellenbach site.
The newly paved parking lot, located along the west boundary of the property
' (see Figure 2), was historically a gravel surfaced parking lot used to store cars and
trucks. The drainage from the parking lot (area = 0.78 acre) flows from north to south
and is diverted to the east along the south boundary of the site toward the existing low
area at the southeastern portion of the site. Peak runoff was computed for the parking
lot at concentration point 1 using the rational method for the prepaved condition. Using
' C = 0.5 (gravel parking lot) and slope = 0.5%, the runoff for a 10-year storm event is
1.17 cfs, and a 100-year storm event is 2.28 cfs.
I
I
I
I
Since the low area is very small and will overflow in a minor rainstorm event, the
local watershed was investigated to determine the ponding elevation from runoff at the
site. The local drainage for this area is shown on Figure 4. Drainage from Steele's
Market was not included since its drainage flows into the storm drain south and west of
the site. Also, the abandoned detention pond was not included since it would store the
runoff without overflowing. Peak runoff was computed at concentration point 2 using
the rational method. Using C = 0.88 and Area = 13.47 acres, the peak runoff for a 10-
year storm event is 32.5 cfs and a 100-year storm event is 68.7 cfs. The volume of water
ponding in the street and onto the Dellenbach site was estimated using the
RESOURCE CON ULTWTS IMC
1
I
Sr.
Rd
.. w 'Lake -•-..-..It
........
St' ."
E.Lok*'''
.. ::-'.
St et
i
-
- -CI
1 Ded
...
.
N
rCt
Prot
ect
Rd
°
'
JBol
eoT n. E
w
•
D
yq�
O O
ro'nti� Juni er Ln.
J
^
Birk PL. _
Parker
S t
Alps
4
vdt
Ct. ; —
r\}r'1
.F
Sheet Dr, ui'
``
4vea
x
W. O e•, i ¢I
E F Stuo
Reri
i 4
y�r�
N l�
'S'
Wine Johnson
T , /\
non bi
e
cr N.
IYrry r.ne
SeMe lr n9
Cie. nl� ...
pr. Geeebe tC RA 1�. 2I 'N Art
lluf.._
Or
Ct. CMt.00e O 4t'
E
O ell e
� ryNre
¢
a ru •� til
Rut ert v 4
S-101
2
Yale o orn
t
r
Yale Wo
e
I 2I
Ci . ° O t
11 N
Pri neeton
`
0<
m' Prince
pn Rd Baylor SI
N
W. Dra a Rd,
N w
N
tttxJ
C
b+ or a'
h
o•iero irWte$tlT
e�
Dr,
I- T
f Dr.
`o �""n• Dr. W.
7r, E. o
$t.
.n
.
ttEn
- u
S
(o4e ti o8..
SL
V
0
• i V
V
o
��
U
i U
s• a
0 \`IE,w _
'I
Ceder
.
c V U
S
e r ntler e 3p
Sl.`
4
5 ar1
i 4
Ct _ i
N
Or.
¢
E U by
ryµ�ntNwk Y
Dr
i3
II
p
R
c
n
o
Z�
Ju O c
J�SWalbw
':
tc _
o a
G
f
Ct. c
�'
¢
V
Sw Rd ¢
C swum RS
'Bo olink
a d" un ,r I
SITE
OCATIO
%s
Parkvrc^
e
ri�o°�
ee`c
�oeo
e C .Robin Ct.
�
•�\15
kw y.
1
�i
CXdI Ct.
II
��
u
c
ey
HO
le
3
'
i
are. Cp ao_
O Bluelaird
CFtr
C,:dt
ti
n
iG
Justice Or
"
Boltz Dr
It
J' a yea
C b
woe s..
p,.
N,ansfiel
Or.
AlFrmed
Ct
Yr .............
f. JP
E
S
Dr. ri v
i. "� lirdin tM°od
Arbor' "z I Sot, �o ; Drd� e• i s
Dr rve u c BonNo Ave. z - Q ;
a,
d Ave. Jtarnart ► . I �� S > uoF Co
Figure 1: VICINITY MAP
2
z
O
co
o
Q
n
w z
0
�o
O
Q F-
W ~
c
(U
zziu
z
z_
; _
W
a
cr0E
00
O
u
o u o
U o..
pp »-
m
0+�
-
`_ o
°°
lXJ 3 OD
—4 �j rrrr r
--
_ IICP
E [ti I I I I I I I N I I� X
a�lllllll
gooCL
II�I�II- `II
O4-
- :...
0 v
n `v
v
V�-- z0000'— I
M?miiiiiiiiii
0 0
t J
a o,
a •-
3
a, o
za
f
w
a.- Po`Wn
LLJ U
z
r
N
3
w
H
2
U
Q
GO
z
w
J
J
w
G
LL
O
x
w
z
m
O
U
w
F-
a
a
w
a
z
c
z
O
cl
a) -
LM
o�
LL
4
0
0
N
L
-
O
i-
5
z
m
w
Q
a
w
O
Q
z
a
�c
0
J
Q
U
O
J
d'
4)
L
IL
cumulative runoff method. It was assumed that the 48" storm drain would not restrict
flow of water into the inlets. Using an outflow rate of 10.2 cfs for the 10-year event and
' 12.8 cfs for the 100-year event, a maximum volume of 36,210 and 81,989 cubic feet for
the 10-year and 100-year storm events was calculated. These volumes correspond to a
ponding elevation of 5,023.54 and 5,024.50 respectively, or 1.94 and 2.90 feet ponding
' depth at the sump inlet.
' Proposed Drainage
' The proposed building expansion is shown in Figure 2. The expansion to the
building will include an atrium to the main building, additional office space and a
showroom. Also, they will be constructing an outdoor display patio. All of these areas
' were historically part of the asphalt parking lot and display areas. There will be no
change in runoff from these areas since they were impervious before the building
expansion and will continue to be impervious in the proposed building expansion plan.
' The newly paved parking lot's slope and drainage patterns remained the same as
the prepaved parking lot. Peak runoff was computed at concentration point 1 using the
' same parameters as before, except for C = 0.95. The runoff for the 10-year storm event
is 4.00 cfs and the 100-year storm event is 6.42 cfs. The increase in peak flowrate for the
10-year storm event is 2.83 cfs, and for the 100-year storm event it is 4.14 cfs.
Peak runoff was also computed at concentration point 2 using the same
parameters as before, except C = 0.90. The runoff for the 10-year storm event is 54.8 cfs
and the 100-year storm is 106.4 cfs. The increase in peak flowrate for the 10-year storm
is 22.3 cfs and for the 100-year storm the increase is 37.7 cfs.
The volume of water ponding was estimated using the same method and
parameters as before except composite C = 0.90. The maximum volume of water
' ponded was 36,947 and 81,989 cubic feet for the 10-year and 100-year storm events.
These pond volumes correspond to ponding elevations 5,023.56 and 5,024.50,
respectively or 1.96 and 2.90 feet ponding depth at the sump inlet. From prepaved to
postpaved conditions the ponded water increased in volume by 737 cubic feet and
increased in elevation by 0.02 feet for the 10-year storm event. For the 100-year storm
event the volume did not increase.
F000dplain Encroachment
The floodplain for this area was established in the Foothills Basin (Basin G)
Drainage Master Plan, prepared by Resource Consultants, Inc. in February 1981. The
' 100-year flood elevation for the project site is 5025.0. This floodplain elevation is for
fully developed conditions with the proposed drainage improvements. This is a higher
flood elevation than -computed for the local runoff of the site described above. The
' RESOURCE CONSULTANTS INC
6
I
' floodplain limits for the project site from the above report are shown on Figure 4.
' The proposed expansion to the building will be at the same floor elevation of the
existing building, elevation 5028.7. This will be 3.7 feet above the floodplain elevation.
The building expansion will encroach into the floodplain limits shown. This will not
have an adverse impact on the floodplain since this area is ponded water behind College
Avenue.
' Summary
' The building expansion will not increase the runoff of this site; however, the
paving of the parking lot will increase the runoff. The runoff will only increase the
' depth of water over the inlet by 0.02 feet (from 1.94 to 1.96 feet deep) during a 10-year
storm event, which is not a significant impact. For the 100-year storm event there will be
no additional runoff. The finished floor elevation of the building expansion will be 3.7
' feet above the floodplain elevation. This expansion will encroach slightly into the
floodplain, but will not significantly impact the floodplain.
I
1
1..
' 7 RESOURCE CONSULTANTS INC
1
I
1
i
I
t
1
1
t
APPENDIX
Drainage Calculations
RESOURCE by La
CONUTNNTs, chkd. br
INC. subject
Fort Collins, Colorado
r i
' ' . �rra��.a� C ✓-�t.vEs U.sEEo :__:__ f�svyA�7 ' -►- � 9s . � �7 xq
Co�)
(ivsw.�rZ�a cw�y) 5 As./ooS.
Tv=
' Quo _ O,Si3ra XU• 79) _ /. /7 eFs
' Oro:,_ c•8s S.✓�/!�t CTc=
78� = 2;28 CF5
' > a �s
r
i
©-o = (0.gSt S74/oror78) = S!oo cFS
i
1
l
RESOURCE by .. 4 ! date sheet 0, of S
CONSULTANTS, chkd. by date job no. - (oOO-
' INC. subject Q:)q en�oac\N SAct bdu(6,-152
Fort Collins, Colorado
-- — t
}
lQMb�u(�
_ G.o tnn. C�.- C • C
n�D_
•
' p0�83 e_zn --- . a 2d
(0 2 C = I,o CCU = b.b?)
pp
3�s
0
0
C\j�
-
--
o
c
o
Cl)
0
0
c
u
u)
o
0
�Q
a�U
4) 'o w
0.2 a 02 c c
�.�= �mcc
O MJmM k,
O.` CfUfa�
LL ` d
*a C O 00
c`3c°�u LLc0
2Qf
V
�I
Z
X
W
Q
a
w
0
a
z
a
cc
0
a
U
O
J
m
rn
i%
E
RESOURCE by� date sheet of
COOUTMTS, chkd. by date job no. -GCO° t7
INC. b v a u�
Fort Collins, Colorado
1 RESOURCE by TO 'Jve�� date sheet S of ZS
CONUTanT5, chkd. by date job no. 91-600,1I
1 INC. subject
Fort Collins, Colorado
1 f
vy�
VVJ
_
Tcio=��,SC��3.15=`t�IyHyy
�; u
DELLENBACH - DRAINAGE CALCULATIONS
Rainfall Intensity Duration Frequency
10 year, 1-hour rainfall from Figure 3-1
100 year, 1-hour rainfall from Figure 3-1
- 10 - year - -
100 - year
Time
Rainfall
Intensity Rainfall
Intensity
5.00
0.47
5.64
0.75
9.00
10.00
0.73
4.38
1.17
7.02
15.00
0.92
3.68
1.48
5.92
20.00
1.10
3.30
1.73
5.19
25.00
1.20
2.88
1.91
4.58
30.00
1.28
2.56
2.05
4.10
35.00
1.35
2.31
2.18
3.74
40.00
1.41
2.11
2.30
3.45
45.00
1.47
1.96
2.40
3.20
50.00
1.52
1.82
2.48
2.98
55.00
1.57
1.71
2.55
2.78
60.00
1.62
1.62
2.60
2.60
1.62
2.60
I
u
n
Ponding Volume Calculations - Dellenbach Site
Existing Conditions
Area = 13.47
10-year
CCf` =
0.88
Time
Intensity
Inflow
Outflow
Difference
(Min)
(in/hr)
(cu.ft.)
(cu.ft.)
Volume
5.00
5.64
20056
3068
16988
10.00
4.38
31151
6137
25014
15.00
3.68
39259
9205
30054
20.00
3.30
46940
12274
34666
25.00
2.88
51208
15342
35865
30.00
2.56
54621
19411
36210
35.00
2.31
57608
21479
36129
40.00
2.11
60169
24548
35621
45.00
1.96
62729
27616
35113
50.00
1.82
64863
30685
34178
55.00
1.71
66997
33753
33243
60.00
1.62
69130
36822
32308
Max. Storage 36210
Estimated outflow
ORFICE FLOW Q = 10.23 cfs
Q=C*A*SQRT(2*G*H)
C=.5
A=1.9 SF
H=1.8'
Stage Volume information
100-year
CCf = 1.00
Intensity Inflow Outflow Difference
(in/hr) (cu.ft.) (cu.ft.) Volume
9.00 36369 3827 32542
7.02 56736 7654 49081
5.92 71768 11481 60287
5.19 83891 15308 68583
4.58 92620 19135 73484
4.10 99409 22962 76446
3.74 105713 26790 78923
3.45 111532 30617 80915
3.20 116381 34444 81937
2.98 120260 38271 81989
2.78 123655 42098 81557
2.60 126079 45925 80154
Max. Storage 81989
Estimated outflow
ORFICE FLOW Q = 12.76 cfs
Q=C*A*SQRT(2*G*H)
C=.5
A=1.9 SF
H=2.8'
10 YEAR 00 YEAR
Elev. Area Volume
Storage
ELEV
ELEV
5021.6 0.0 0.0
0.0
'
5022 962.5 128.3
128.3
5023 24750.0 10197.8
10326.1
5024 75050.0 47632.9
57958.9
5023.54
- ponding elev 10 year event
5025 ??? ???
???
__>
5024.50 -Approx. ponding elev.(extrapolated) 100 year event
some water may flow out of the basin along
Frontage Road and onto College Avenue
Sump Inlet Elevation
5021.60
10 year pond elev. at inlet =
5023.54
10 year pond depth at inlet =
1.94
'
100 year pond elev. at inlet =
5024.50
100 year pond depth at inlet =
2.90
1
I
' Ponding Volume Calculations - Dellenbach Site
Post -paved Conditions
t
Area =
13.47
10-year
c =
0.90
Time
Intensity
Inflow
Outflow
Difference
'
(Min)
(in/hr)
(cu.ft.)
(cu.ft.)
Volume
5.00
5.64
20512
3153
17360
10.00
4.38
31859
6305
25554
15.00
3.68
40151
%58
30694
20.00
3.30
48007
12610
35397
25.00
2.88
52371
15763
36609
'
30.00
2.56
55863
18915
36947
35.00
2.31
58918
22068
36850
'
40.00
45.00
2.11
1.96
61536
64155
25221
28373
36316
35782
50.00
1.82
66337
31526
34811
55.00
1.71
68519
34678
33941
'
60.00
1.62
70701
37831
32871
Max. Storage
36947
Estimated outflow
'
ORFICE FLOW
Q =
10.51
cis
Q=C*A*SQRT(2*G*H)
C=.S
A=1.9 SF
H=1.9'
' Stage Volume information
100-year
C =
1.00
Intensity
Inflow
Outflow
Difference
(in/hr)
(cu.ft.)
(cu.ft.)
Volume
9.00
36369
3827
32542
7.02
56736
7654
49081
5.92
71768
11481
60287
5.19
83891
15308
68583
4.58
92620
19135
73494
4.10
99409
22962
76446
3.74
105713
26790
78923
3.45
111532
30617
80915
3.20
116381
34444
81937
2.98
120260
38271
81989
2.78
123655
42098
81557
2.60
126079
45925
80154
Max. Storage 81989
Estimated outflow
ORFICE FLOW Q = 12.76 cfs
Q=C*A*SQRT(2*G*H)
C=.S
A=1.9 SF
H=2.8'
'
Elev. Area Volume
Storage
10 YEAR 00 YEAR
ELEV ELEV
5021.6 0.0 0.0
0.0
5022 962.5 128.3
128.3
5023 24750.0 10197.8
10326.1
5024 75050.0 47632.9
57958.9
5023.56
- ponding elev 10 year event
5025 ??? ???
???
__>
5024.50 - Approx. ponding elev.(extrapolated) 100 year event
some water may flow out of the basin along
Frontage Road and onto College Avenue
Sump Inlet Elevation
5021.60
10 year pond elev. at inlet =
5023.56
10 year pond depth at inlet =
1.96
'
100 year pond elev. at inlet =
5024.50
100 year pond depth at inlet =
2.90