SEAR -BROWN
April 9, 2003
Mr. Basil Hamdan
City of Ft. Collins
Stormwater Utility Department
700 Wood Street
Ft. Collins, Colorado 80521
ARCHITE URI-
FNGINEFUNF
PLANNING
CONSTRUCTION
209 South Meldwrn
FOR Collin;CO 8OS21
970.4825922 phone
970.482,6368 fax
www.searbrownxom
RE: Addendum to Final Drainage & Erosion Control Report for the City of Ft. Collins
Service Center Warehouse Storage Area, Ft. Collins, Colorado
Dear Basil:
We are pleased to submit for your review and approval this letter addendum. This
addendum regards the design and construction of a new meter shop building at the City of
Fort Collins Ufility Service Center campus as an element of a Minor Amendment submittal
to the City. All computations within the original report have been completed in accordance
with the City of Ft. Collins Storm Drainage Design Criteria Manual. There is no material
change in the hydrologic or hydraulic design for the currently proposed improvements, and
this addendum describes these improvements in more detail.
We appreciate your time and consideration in reviewing this submittal. Feel free to call if
you have questions regarding the findings of this addendum or the original study.
' Respectfully,
The Sear -Brown Group
Prepared by:
Michael T. Carr, P.E.
Project Manager
1
1
1
I
ADDENDUM TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT
' City of Fort Collins, Service Center Warehouse Storage Area Improvements,
Fort Collins, Colorado
April, 2003
'
I. INTRODUCTION
This letter report is an Addendum to the Final Drainage Report for City of Fort
Collins, Service Center Warehouse Storage Area Improvements dated August, 2002
by Sear -Brown (SB).
This addendum is intended to address changes to the proposed drainage
improvements represented in the approved construction plans for the City of Fort
Collins, Service Center Warehouse Storage Area Improvements as represented in
'
the construction plans for Fort Collins Utilities Facility Meter Shop Improvements.
The project is located in the City of Fort Collins Service Center P.U.D., north of
'
Elm Street, east of Wood Street in Ft. Collins, and west of Lee Martinez Park. The
current project area is located in the northwestern corner of the Utilities Service
Center campus. The site location can also be described as situated in the Northwest
'
1/4 of Section 11 and the Southwest '/< of Section 2, Township 7 North, Range 69
West of the 6th P.M., City of Fort Collins, Latimer County, Colorado. The
project
site is shown on the attached vicinity map.
II. GENERAL PROJECT DESCRIPTION
'
The current project consists of the removal of the existing meter shop buildings to
the north of existing building B, the construction of a new meter shop building near
the west property line and south of the north entrance off of Wood Street, and
'
construction of asphalt parking areas where the meter shop buildings currently
stand. The area where the proposed new building will be located is currently a
paved parking area. A copy of the original Storm Drainage Plan showing the
'
current study area is included for reference.
' The area comprised of demolition and removals and proposed building area is
currently completely impervious, covered by existing buildings or paved
parking/storage areas. The proposed improvements will create a small addition of
' permeable ground surface, approximately 0.13 acres or about 2% of the sub -basin
17.1 in which this area lies, thereby slightly reducing the amount of runoff. No
significant changes to site topography or drainage patterns are proposed with this
' project.
1
' Page I of 3
All previously approved and constructed improvements on this site have been in
'
conformance with applicable regulations, hydrologic and hydraulic criteria, and
appear to be in good condition, functioning as intended.
'
III. DRAINAGE FACILITY DESIGN ASSOCIATED WITH METER SHOP
IMPROVEMENTS
The majority of runoff from this site of proposed improvements currently flows
overland in a northeasterly direction where it is intercepted at a curb inlet and
in
'
conveyed the storm drainage system to the east and north and subsequently
discharged to the Poudre River. This drainage regime will not be substantially
changed with the proposed improvements. The area where existing buildings are
'
located will be graded to match the paved parking areas to the north and east, and
runoff will flow to the northeast to the existing curb inlet. An exhibit drawing,
showing existing features and storm drainage piping and proposed improvements, is
included with this Addendum for reference.
'
A 15-inch HDPE storm drain pipe currently conveys runoff from the southwestern
portion of sub -basin 17.1 through the new building. This be
proposed piping will
reconfigured to circumvent the proposed building. This reconfiguration does not
t
materially affect the function of the existing storm drainage system. A drawing,
showing proposed storm drain plan and profile, is included with this Addendum for
reference.
'
IV. EROSION CONTROL
'
The great majority of the area of proposed improvements will be covered by either
the building or pavement, with the small remainder, approximately 0.13 acres,
landscaped primarily with landscaping rock and shrubbery. Following
'
construction, there will be no more potential for erosion than that which currently
exists, which is virtually nil.
'
During construction, erosion controls measures including vehicle tracking control
pads, inlet filters and silt fencing will be utilized to minimize erosion. Soils
exposed during construction surrounding the new building will be covered with'/4"
'
to 1" washed gravel to a minimum depth of 1-1/2 inches.
' All construction activities must comply with the State of Colorado permitting
process for Stormwater Discharge Associated with Construction Activity. If any
dewatering is required during construction, a construction dewatering permit issued
' by the Colorado Department of Public Health and Environment will be required.
1
' - Page 2 of 3
I
1
1
1
1
1
1
1
1
VI.
2.
0
CONCLUSION
The design presented in this report and shown on the Drainage and Erosion Control
Plan are in compliance with the City of Fort Collins drainage criteria and is
adequate to address the stormwater management needs of the project area.
REFERENCES
Final Drainage & Erosion Control Report City of Fort Collins, Service Center
Warehouse Storage Area Improvements, Ft. Collins, Colorado, August 2002
Update to: Final Drainage & Erosion Control Study, Ft. Collins Utility Center,
PUD, 5 h Filing, Ft. Collins, Colorado, Sept. 1997 (Rev. Jan. 2000).
Final Drainage & Erosion Control Study, Ft. Collins Utility Center, PUD, 51s
Filing, Ft. Collins, Colorado, September 1997.
Flood Insurance Rate Map Panel No. 080102-0001, FEMA, February 1984.
Flood Insurance Study, City of Ft. Collins, Larimer County, FEMA, February 1984.
Page 3 of 3
RAINFALL PERFORMANCE STANDARD EVALUATION
183053
Project: Fort Collins Meter Shop Utility Bldg. STANDARD FORM A
Calculated By: AGW Date: 4/81200:>
DEVELOPED
ERODIBILITY
Asp
Lab
Ssb
Lb
Sip
PS
SUBBASIN
ZONE
(ac)
(ft)
(%)
(ft)
(%)
(%)
1
Moderate
0.67
240
2,63
240.0
2.6
Total
0.67
240.00
2.63
80.9
EXAMPLE CALCULATIONS
Lb = sum(AiLi)/sunn(Al) = (0.10 x 10 + 0.46 x 200 + 0.13 x 230)/ 0.68
= 240.0 n
Sb = sum(AiSp/sum(Ai) = (0.10 x 2.00 + 0.46 x 1.10 + 0.13 x 2.00)/ 0.68
= 2.63 %
PS (during construction) = 80.9 (from Table 8A)
PS (after construction) - 80.9 /0.85 = 95.1
' 183053 EFFECTIVENESS CALCULATIONS
1
1
1
1
1
1
1
1
Project: Fort Collins Meter Shop Utility Bldg. STANDARD FORM B
Calculated By. AGW Date: 4/82003
Erosion Control
C-Factor
P-Factor
Comment
Number Method
Value
Value
3 Bare Soil - Rough Irregular Surface
1
0.9
5 Gravel Filter
1
0.8
8 Silt Fence Barrier
1
0.5
38 Gravel Mulch
0.05
1
SUB
PS
AREA
BASIN
(%)
(ac)
Site
80.86
0.67
SUB
SUB
AREA
Practice C"A P'A Remarks
BASIN
AREA
(ac)
DURING CONSTRUCTION
1
Pervious
0.27
3 0.27 0.24 Bare Soil - Rough Irregular Surface
1
Pervious
0.40
38 0.02 0.40 Gravel Mulch
Cnet = 10.06x0.03+„ +0.06x0.13]/0.68
Cnet
= 0.43
Pnet = [1.00x0.03+...+I.00x0.13110.68
Pnet
= 0.39
EFF = (1-C-P)l00
EFF
= 83.2
> 80.9 PS Before
1
I
1
' EFFECTIVENESS CALCULATIONS
183053
1
1
1
1
1
1
Project Fort Collins Meter Shop Utility Bldg. STANDARD FORM B
Calculated By: AGW Date: 4/a/2003
Erosion Control
C-Factor
P-Factor
Comment
Number Method
Value
Value
6 Gravel Filter
1
0.8
8 Silt Fence Barrier
1
0.5
9 Asphalt/Concrete Pavement
0.01
1
20 Sod Grass
0.01
1
SUB
PS
AREA
BASIN
(%)
(ac)
Site
95.13
0.67
SUB
SUB
AREA
Practice C.A P'A Remarks
BASIN
AREA
(ac)
AFTER CONSTRUCTION
1
Impervious
0.54
9 0.0054 0.54 Asphalt/Concrete Pavement
1
Pervious
0.13
20 0.0013 0.13 Sod Grass
Cnet = [0.06x0.03+...+0.06x0.13]10.68
Cnet
= 0.01
Pnet = [1.00x0.03+...+1.00x.13Y0.68
Pnet
= 0.43
EFF = (1-C-P)l00
EFF
= 99.6
> 95.1 PS After
1
I
1
1
1
1
1
1
1
EROSION CONTROL COST ESTIMATE
Project:
Fort Collins Meter Shop Utility Bldg.
183053
Prepared By:
AGW
Date:
4/8/2003
CITY RESEEDING COST
Unit
Total
Method
Quantity
Unit
Cost
Cost
Notes
Reseed/mulch
0.67
ac
$655
$436.89
See Note 1.
Subtotal
$437
Contingency
50%
$218
Total
$655
Notes: 1. Ar_5 ac=$655lac; A>5 ac=$615/ac.
EROSION CONTROL MEASURES
Unit
Total
Number Method
Quantity
Unit
Cost
Cost
Notes
6 Gravel Filter
2
ea
$400
$800
8 Silt Fence Barrier
250
LF
$3
$750
20 Sod Grass
0.13
ac
$0
$0
38 Gravel Mulch
0.54
ac
$1,350
$729
Subtotal
$2.279
Contingency
50%
$1,140
Total
$3,419
Total Security
$3,419
1
EROSION CONTROL CONSTRUCTION SEQUENCE
STANDARDFORMIC
Whimsy AGW
IENCE FOR 2003 ONLY
to by use of a bar line or symbols when erosion Control measures will be installed
modifications to an approved schedule may require submitting a new schedule for
dal by the City Engineer.
YEAR 1 20W
WIND EROSION CONTROL
Straw Mulch
Penmetor Bamer
Additional Samers
Vege1a0ve Methods
Soil Sealant
Oyler
RAINFALL EROSION CONTROL
STRUCTURAL'.
Sediment Trap/Basin
Inlet Filters
Straw Banters
Sit[ Fence Bamer.
Sand Bags
Bare Boll Preparation
Contour Furrows,
Terraang
A.PhaIVCoovela Paving
Omer
- VEGETATIVE
Permanent Seed Planting
MulchinglSealant
Temporary Seed Planlmg
Sod Installation
N rmargallaalslBlarakel.
Other
STRUCTURES. INSTALLED BY
VEGETATIONIMULCHING CONTRACTOR
DATE SUBMITTED
20"
N I D I J I F
MAINTAINED BY
APPROVED BY CITY OF FORT COLLINS ON
q