FINAL STORM DRAINAGE REPORT
FOR
CETACEAN MINOR SUBDIVISION
PREPARED FOR
THOMAS D. MURPHY, JR.
DECEMBER 14,1995
STEWART & ASSOCIATES, INC.
103 SOUTH MELDRUM STREET
FORT COLLINS, COLORADO 80521
970/482-9331
1
STEWART&kSSOCIATES
Consulting Engineers and Surveyors
December 14, 1995
Mr. Basil Hamdan
Stormwater Utility
City of Fort Collins
'
P.O. Box 580
Fort Coll
ins, CO 80522
' Dear Basil:
This is the final drainage report for Cetacean Minor Subdivision, which is a one lot in -fill
' subdivision on the South side of Harvard Street between South College Avenue and McClelland
Drive. The one lot contains 20,000 square feet. It is bounded on the North by Harvard Street, on
the East by an existing car wash, on the South by an undeveloped lot and on the West by an
' existing office building and its parking lot. The site drains from Southwest to Northeast at an
approximate slope of 1.0%. \_/
I
1
The owner proposes to construct a retail building containing 7,000 square feet and a
parking lot for eleven cars. The difference between the two year frequency historic storm runoff
and the 100 year frequency developed storm runoff will be detained in the landscaped area and
parking lot area at the North end of the lot. The historic discharge will be metered out through a
pipe into the Harvard Street south gutter.
The outlet pipes from the detention pond on the adjacent parking lot to the West simply
daylight onto the site midway along the West property line. The two four inch diameter pipes will
be extended to Harvard Street. The historic runoff from the undeveloped lot to the South of the
site will be allowed to continue to sheet flow through the site to Harvard Street. The detention
pond will not be sized to detain the offsite flows. The runoff from the South half of Harvard
Street will not discharge into the detention pond, but the detention pond was sized to include that
runoff
EROSION CONTROL: The site is in a moderate rainfall zone and a moderate wind zone.
The site will be rough graded and the detention pond will be used as a sediment trap. A silt fence
will be placed along the East property Tine and along the North line of the two segments of the
detention pond. The foundation will be constructed immediately after the grading is completed.
The landscaping and the paving will be done when the building is nearing completion. The gravel
sediment trap will be placed in the pond as soon as the pond is graded.
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
I
t
1
Final Storm Drainage Report
Cetacean Minor Subdivision
Page 2
The runoff calculations and the detention pond mass diagram as well as the grading,
drainage and erosion control plan are enclosed as a part of this report.
This drainage report and the design of the drainage system are in compliance with the City
of Fort Collins Storm Drainage specifications and criteria to the best of my knowledge.
If you have any questions regarding this report and drainage plan, please call.
' Sincerely,
Richard A Rutherford, P.E. & L.S.
President
rsc
enclosures
u,,,
.�'�p A• RUTy,,
CT 00,
• FC'.��:
*� 5028
STEWART&JkSSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521
Consulting Engineers and Surveyors PH. 482-9331 FAX 482-9382
By: P- AA2 Date: 1A tl p - 6 /19 / 7,T Client: 7 P>y ;z J g-, Sheet No. .9 of_
Project: C7 4q -r A c E* A v So B p / y 1-r
Subject: -- -rn p— m UJ A A c- C U r/O,,,) r
77
t
2-0 50 hiw
T-
7
4
L V
174
L
)18
Js
A awA
x! -'7S
-7
21"
L—L
TT-
7-7-71
I 1-1, 1 1 1 1 1 i i it I I I
E
I
STEWAKr&ASSOCIATES
Consulting Engineers and Surveyors
103 S. MELDRUM, FORT COLLINS, CO 80521
PH. 482-9331 FAX 482-9382
By: %7— Ye Date: A / /T -T Client: T, J'�) . /W z v f v Sheet No. __'17- of _
Project: (- F -T- A ('_ E A A) , f ,) go n) v r. r I n A-)
Subject: S Z n 2 M w A- TE %lam u Al 0 F F � A,' !' J I A-r/!2 AY f
x i
f _•_ ! _ AL.e.r_='i9�
1
z���e O 8 /�-x-_3. D _ X-O. s Z ./ Zv c, F J. _ ' _
,
'Q-1.00 yR ;=i l!_4!t-X.__0_8/ ,/K T z_ i X O iS.Z ,: — 3
O e l_C:7CG.B i_C 4G CrJL.4 Tio:y'-_-�� ? — _-- P-�LEgtE �4TE FROM SoLA,OA. qc, ro 4oc
0,
! — Vz_9. h—E—
_V 17,3--
! a i I ! Q i _ D• �7i Fr � ! ! -,-- z 1 1 !'3_Z2�..vTZ
'30_
! ! _IL
_ ! V 6 U I
STEWART&,SSOCIATES 103 S. M 3DRUM,FAX FORT gOLLINS, CO 80521
Consulting Engineers and Surveyors
By: R ,Q Date:AJJClient: 7", t7. AA yz r-,,# y bra. Sheet No. Hof_
Project: C�=- T A GP--- a A/ . f it T-� f v Is / o A-1
Subject: l) c T E N T/ n Al Po AJ r,> - NI A -Ts D 1 A n P.A M
oi_IUHic.L,i� j i i ._.._.._...—..
I
lop
i
3ct)o
s:
I
u
1-7
i
21
4�_M ! r_.. __-!_8 tp ! __._3370
i
I38,91
�
1
i
r
i
f i
,
1
� ,
1
17
p
10
Zo
3o
SG
(
70
B6
q0
RAINFALL PERFORMANCE STANDARD EVALUATION
------------------------.----------------------------------------
----
PROJECT: GET.gGEAA; fVl3Pivii,'oV STANDARD FORM A
COMPLETED BY: _ A e DATE: g 2¢
-----------------------------------------------------
DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb I PS
SUBBASIN ZONE—(ac)--— —
--(%)—_ (feet) M I (a)
--
To FAL MODe.CA7G 6.4-LA, Z30 0,70% Z30 0•1% 17Glgo
I
mI
----- -------------------------------------------------------------
in
1
1
1
1
1
1
1
1
A
1
1
1
1
1
1
1
C�)
EFFECTIVENESS CALCULATIONS
-------------------------------------------------
PROJECT: C ETACEA,U Su9WV'fJ10AoI
COMPLETED BY:
---------------------
..STANDARD FORM B
DATE: Z y
1
I
Erosion Control
C-Factor
P-Factor
Method
-
Value '
Value Comment
--- _----------
B -
/}2b OgovND
/.GG
/•00 042--Ac
F6UVDAr/OA)
0 0/•
%," O.IbAc.
S I4-T FCAic 6 '
h"
.O-$0
SEDIMEU7-7-)2AP
/,00
DSO
ST.24w'5 RLEJ' .
/.v-v
0.30
Ex -r,aa, r,0A.C!
0,0�
/.rro �•04 Ac.
---------------
MAJORI
----------------------------
PS SUB AREA
-------------------------
BASIN
(%)
BASIN
(Ac)
CALCULATIONS
T07,L
7G 1 0
-----
O—A—.--
4a A4
-----------------------------
---------------
SITS
UJTC C
0.0})
WTD P = D,SO x0.80 = 0.4-0
GFF, = — (DS8kD4o��X/00 = 76.8Y
0 /r > 7 c l 7e
--------- ---------------------------- ------------------ ---------------�
DI/SF-8:1989
CONSTRUCTION SEQUENCE
PROJECT:
C TAcgA
U Miuera-.fo8.
STANDARD FOR%
'
SEQUENCE.
FOR 19 1L
ONLY COMPLETED BY: •Q,A-9
DATE: /z /
Indicate
by use of a
bar line or symbols when erosion control measures will be install
'
Major modifications to an approved schedule may require submitting
a new schedule for
approval
by the City
Engineer.
YEAR
MONTH
----------------------------
OVERLOT GRADING
WIND EROSION CONTROL
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
1
VEGETATIVE:
Permanent Seed Planting
'
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
Other
'
----------------------------
STRUCTURES• INSTALLED BY
.1
1
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED
HOI/SF-C:1989
APPROVED BY CITY OF FORT COLLINS ON
1 JANUARY 1991 1 8-20
DESIGN CRITERI.
i
1
1
1
i
1
1
1
1
1
1
1
1
1
1
1
i
1
September 21, 1982
Mr. Phil Waite
Engineering Services
City.of Fort Collins
P.O. Box 580
Fort Collins, Colorado
80522
Project No.: 206-5
Dear Phil:
P( �f -, jgz
We wish to submit the attached calculations for the drainage design
at the Solar 1 Subdivision. Located at the intersection of
McClelland Drive and Harvard Street, the subdivision is one acre in
size and zoned Highway Business.
On July 23, 1982, you informed me that you were not aware of any
Special Improvement District proposed along that area of College
Avenue. We know of no other mitigating circumstances that would
justify a variance request from normal detention requirements.
The drainage design calls for parking lot detention with overland
discharge to the east. Discharge continues overland 100 feet or so
to the Executive Car Wash on Harvard. The runoff water enters a
storm sewer system, identified in the Foothill Basin Study, feeding
Sherwood Reservoir.
There is no flow crossing the site from upstream areas. The flow in
the street on the north and west sides of the subdivision consists
only of precipitation falling on the street. Thus no curb
overtopping is expected.
This is a small site in a heavily developed area that has a minor
storm system substantially in place. With on site detention it would
appear that runoff from Solar One would not adversely affect that
minor system.
Respectfully,
ENGINEERING PROFESSIONALS, INC.'
William H. Blackwell, P.E.
WHB/psh
ENC.
i
So\ck\r Octie 1:4rc�isnage
C.,t_s� �w.vrr=vcia(- o mice
11K�Wpt�V�ol FZ�uno a�T IC�cV�1
k,o
aI,sc t O ,°(S
R-----------------
�q,oL �c--ct^--' 10 v� C Pam✓ 1�In� ( ltil . �7�3/ 2
Inc :(Kc4J o'er` ,no �ropoS�o�
tino�k� wo u� � b � ccc us � rro r
G faVa_` a^�- ,Jar r •nC� )
-� "SuVAC Ko VA✓lchG e'
�- < 2•c kcs. ccs�- Tri�c�cJ`„ �(cti u�---tL&oo� _
off- �IM_tAJko•r.. Vol• c�<<c�. ;�1'id�
Ti IM c `� �� CO VNG cv�tY0.t 1 O tl�
D �v�1aP �c� — use l0 VKiW�+�i kninixtkw\ .
TJ
T — I,S7 Cl.I
244 �., , •-i-y
T.
1..1. N 1,8 n/(.r
Z) ;dnavq
Ll
� I.G
4I C 'r A-
7.0 cCg5;
o,'f
I L
J,
w II
_ 33
_ r
57
,
_.` .. J
I ,
«. n /�i_.i; f �CA'V � W 11nwk-
ago
�.. T r�
ooe
J.Tk
.. ..T Y77 _Q�a,. .... .. _ -,i ...s.. ' a• c:-1� 3s� �k��i^-3, � t} f�j� 3ii J� .
- VO 1 '^.. � C '�k � _ ._Q � 1 � .... �... �0 . _.... ..1.. jJ fy 3?tl� :1� uµ{ �' • t t�ah y,d
y o T o
/ L 7 /ems Zc5 6 — 5
jo`q✓ Ov�� 'DVa1�AgC
c� cc.45 G rod- G • �} G�5
(tiS o ri �cicC E-4VAjCX, ,
i4- = o,e63
ia................•........, --------,------ -- 'Gi.... �...4 .
HARVARD STREET
f' t-er- y W64 M14 AsPO4 A4
g g�
" 4xbiHF�I Nq 51. ttVE 6 EK. MN
oxe... g„ •�, myn 1; b. N1111 G"ghiE VALV6 a' mn>: cur
n Y
________4[_- _.'_IX__W_C. 41>.0 IP0. ... uvl cwD 6Y"rn.
xmr N
R p
sox G
t.Lso.s rips
d 9
p I zr e r ; re ei.
g A59INLr la_ Mi Iff
1 iA T' • _ _ +' a
_r h
I nI
JIff
$$$[
I v e I
:°°mn.nhrmbnngwl PROPOSED s
BUILDING
{ 16.
f I p
I � N
8 I
•p I �W Wr
6r a owrcnh mfa," 1
$ I
I
- �lo p¶UdY EAiEM6N{' mm�r nee•rm,,o
N UTILITY PLAN
SCALEI "= 20'
I
r _— i - - - —
i
P a
HARVARD STREET
sa8(n 6" •afar mein 1 . M4 g P[Lli 1pp ry{ q/p[r
�'.`� A.•ta,5 *-Mau FK14K LYNV
nL. an:�nw yn xvvnn "x'rr»w.+wr. x_ _--------------- ___F_______ P N Z
._�• _. --OZ O
,_. ._ —
%IMI I ISI SIAIS ID IMID •• .. U
4n MAIM
°' - I wpa.iax {�µ_ ar+r e•ye L Ixv.tuoicxrrw r
ullws1 e✓pA" X INVr469e xx srxlY BNfT 41
••llf�w ii: " ' I tt v.e9Aa Oe7„U
N W KtlI L
Irlk
k sazs
w27 K
la O
. I _ 1
Yyy'�""r• ` ----- I J t MWL •215 ti d
I
LEGEND: a
.__ r1r,»
- _.— 1
EXIST. CONTOURS
oK_
L:r
_
I ^� PROP. CONTOURS
Im •�26.1e rI x .ew EX SPOT ELEV, W p�
y..»n y,molo. ra.Inw ev, y $ I.r �m PROP. SPOT REV. a0 �' Ld
r
x` { BASIN LINE
LetP PROPOSED f a ROW ARROW O 5
„ Q min s' tv,lxv' BUILDING i sirFENCE e
0
STRAW BALES N of
Dare NTI✓ VOWwe Qaa aeo . 39Pa.,.
F` 1 FIN. RR. 29.00
�I0w VPwna PRow,oCD • Sazi..+ � Ilq I � SEDIMENT TRAP Q
I�10�I.✓4iE4 E _— L-<5 y � x'J I 1 t7 O
COO U
¢
i.
I o O
� p 6
: ozxlw¢exewua U o �
w
- av _ _ _ _
wlo
d
6,M1e,
S6
�
25
'•
... zI
GRADING &
DRAINAGE
PLAN
y
yy
OEtAf,4 y011ft f4lslE
SCALE 1"= 20•
21
GoNiouK
AKEA AVyAREA VeWME
0 1 v a 4 5 6
Prora Af SIr PV6 Fim
B Alb: N • 1"' to
v' I"• 2'
,
25.90
0
491 51`
295
2 6r.50
g815f
94165E
SOB rf'
21.00
585040
72455'
9GL2 ({'
2.1.50
86406K
llirtAL —56L5 rie
sacr nlrlew
4 � 5