Loading...
HomeMy WebLinkAboutDrainage Reports - 02/22/1996 (2)FZ10MA'ry OF FORT g UTUrrM FINAL STORM DRAINAGE REPORT FOR CETACEAN MINOR SUBDIVISION PREPARED FOR THOMAS D. MURPHY, JR. DECEMBER 14,1995 STEWART & ASSOCIATES, INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 970/482-9331 1 STEWART&kSSOCIATES Consulting Engineers and Surveyors December 14, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins ' P.O. Box 580 Fort Coll ins, CO 80522 ' Dear Basil: This is the final drainage report for Cetacean Minor Subdivision, which is a one lot in -fill ' subdivision on the South side of Harvard Street between South College Avenue and McClelland Drive. The one lot contains 20,000 square feet. It is bounded on the North by Harvard Street, on the East by an existing car wash, on the South by an undeveloped lot and on the West by an ' existing office building and its parking lot. The site drains from Southwest to Northeast at an approximate slope of 1.0%. \_/ I 1 The owner proposes to construct a retail building containing 7,000 square feet and a parking lot for eleven cars. The difference between the two year frequency historic storm runoff and the 100 year frequency developed storm runoff will be detained in the landscaped area and parking lot area at the North end of the lot. The historic discharge will be metered out through a pipe into the Harvard Street south gutter. The outlet pipes from the detention pond on the adjacent parking lot to the West simply daylight onto the site midway along the West property line. The two four inch diameter pipes will be extended to Harvard Street. The historic runoff from the undeveloped lot to the South of the site will be allowed to continue to sheet flow through the site to Harvard Street. The detention pond will not be sized to detain the offsite flows. The runoff from the South half of Harvard Street will not discharge into the detention pond, but the detention pond was sized to include that runoff EROSION CONTROL: The site is in a moderate rainfall zone and a moderate wind zone. The site will be rough graded and the detention pond will be used as a sediment trap. A silt fence will be placed along the East property Tine and along the North line of the two segments of the detention pond. The foundation will be constructed immediately after the grading is completed. The landscaping and the paving will be done when the building is nearing completion. The gravel sediment trap will be placed in the pond as soon as the pond is graded. James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 I t 1 Final Storm Drainage Report Cetacean Minor Subdivision Page 2 The runoff calculations and the detention pond mass diagram as well as the grading, drainage and erosion control plan are enclosed as a part of this report. This drainage report and the design of the drainage system are in compliance with the City of Fort Collins Storm Drainage specifications and criteria to the best of my knowledge. If you have any questions regarding this report and drainage plan, please call. ' Sincerely, Richard A Rutherford, P.E. & L.S. President rsc enclosures u,,, .�'�p A• RUTy,, CT 00, • FC'.��: *� 5028 STEWART&JkSSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521 Consulting Engineers and Surveyors PH. 482-9331 FAX 482-9382 By: P- AA2 Date: 1A tl p - 6 /19 / 7,T Client: 7 P>y ;z J g-, Sheet No. .9 of_ Project: C7 4q -r A c E* A v So B p / y 1-r Subject: -- -rn p— m UJ A A c- C U r/O,,,) r 77 t 2-0 50 hiw T- 7 4 L V 174 L )18 Js A awA x! -'7S -7 21" L—L TT- 7-7-71 I 1-1, 1 1 1 1 1 i i it I I I E I STEWAKr&ASSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: %7— Ye Date: A / /T -T Client: T, J'�) . /W z v f v Sheet No. __'17- of _ Project: (- F -T- A ('_ E A A) , f ,) go n) v r. r I n A-) Subject: S Z n 2 M w A- TE %lam u Al 0 F F � A,' !' J I A-r/!2 AY f x i f _•_ ! _ AL.e.r_='i9� 1 z���e O 8 /�-x-_3. D _ X-O. s Z ./ Zv c, F J. _ ' _ , 'Q-1.00 yR ;=i l!_4!t-X.__0_8/ ,/K T z_ i X O iS.Z ,: — 3 O e l_C:7CG.B i_C 4G CrJL.4 Tio:y'-_-�� ? — _-- P-�LEgtE �4TE FROM SoLA,OA. qc, ro 4oc 0, ! — Vz_9. h—E— _V 17,3-- ! a i I ! Q i _ D• �7i Fr � ! ! -,-- z 1 1 !'3_Z2�..vTZ '30_ ! ! _IL _ ! V 6 U I STEWART&,SSOCIATES 103 S. M 3DRUM,FAX FORT gOLLINS, CO 80521 Consulting Engineers and Surveyors By: R ,Q Date:AJJClient: 7", t7. AA yz r-,,# y bra. Sheet No. Hof_ Project: C�=- T A GP--- a A/ . f it T-� f v Is / o A-1 Subject: l) c T E N T/ n Al Po AJ r,> - NI A -Ts D 1 A n P.A M oi_IUHic.L,i� j i i ._.._.._...—.. I lop i 3ct)o s: I u 1-7 i 21 4�_M ! r_.. __-!_8 tp ! __._3370 i I38,91 � 1 i r i f i , 1 � , 1 17 p 10 Zo 3o SG ( 70 B6 q0 RAINFALL PERFORMANCE STANDARD EVALUATION ------------------------.---------------------------------------- ---- PROJECT: GET.gGEAA; fVl3Pivii,'oV STANDARD FORM A COMPLETED BY: _ A e DATE: g 2¢ ----------------------------------------------------- DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb I PS SUBBASIN ZONE—(ac)--— — --(%)—_ (feet) M I (a) -- To FAL MODe.CA7G 6.4-LA, Z30 0,70% Z30 0•1% 17Glgo I mI ----- ------------------------------------------------------------- in 1 1 1 1 1 1 1 1 A 1 1 1 1 1 1 1 C�) EFFECTIVENESS CALCULATIONS ------------------------------------------------- PROJECT: C ETACEA,U Su9WV'fJ10AoI COMPLETED BY: --------------------- ..STANDARD FORM B DATE: Z y 1 I Erosion Control C-Factor P-Factor Method - Value ' Value Comment --- _---------- B - /}2b OgovND /.GG /•00 042--Ac F6UVDAr/OA) 0 0/• %," O.IbAc. S I4-T FCAic 6 ' h" .O-$0 SEDIMEU7-7-)2AP /,00 DSO ST.24w'5 RLEJ' . /.v-v 0.30 Ex -r,aa, r,0A.C! 0,0� /.rro �•04 Ac. --------------- MAJORI ---------------------------- PS SUB AREA ------------------------- BASIN (%) BASIN (Ac) CALCULATIONS T07,L 7G 1 0 ----- O—A—.-- 4a A4 ----------------------------- --------------- SITS UJTC C 0.0}) WTD P = D,SO x0.80 = 0.4-0 GFF, = — (DS8kD4o��X/00 = 76.8Y 0 /r > 7 c l 7e --------- ---------------------------- ------------------ ---------------� DI/SF-8:1989 CONSTRUCTION SEQUENCE PROJECT: C TAcgA U Miuera-.fo8. STANDARD FOR% ' SEQUENCE. FOR 19 1L ONLY COMPLETED BY: •Q,A-9 DATE: /z / Indicate by use of a bar line or symbols when erosion control measures will be install ' Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR MONTH ---------------------------- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other 1 VEGETATIVE: Permanent Seed Planting ' Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other ' ---------------------------- STRUCTURES• INSTALLED BY .1 1 VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HOI/SF-C:1989 APPROVED BY CITY OF FORT COLLINS ON 1 JANUARY 1991 1 8-20 DESIGN CRITERI. i 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 i 1 September 21, 1982 Mr. Phil Waite Engineering Services City.of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Project No.: 206-5 Dear Phil: P( �f -, jgz We wish to submit the attached calculations for the drainage design at the Solar 1 Subdivision. Located at the intersection of McClelland Drive and Harvard Street, the subdivision is one acre in size and zoned Highway Business. On July 23, 1982, you informed me that you were not aware of any Special Improvement District proposed along that area of College Avenue. We know of no other mitigating circumstances that would justify a variance request from normal detention requirements. The drainage design calls for parking lot detention with overland discharge to the east. Discharge continues overland 100 feet or so to the Executive Car Wash on Harvard. The runoff water enters a storm sewer system, identified in the Foothill Basin Study, feeding Sherwood Reservoir. There is no flow crossing the site from upstream areas. The flow in the street on the north and west sides of the subdivision consists only of precipitation falling on the street. Thus no curb overtopping is expected. This is a small site in a heavily developed area that has a minor storm system substantially in place. With on site detention it would appear that runoff from Solar One would not adversely affect that minor system. Respectfully, ENGINEERING PROFESSIONALS, INC.' William H. Blackwell, P.E. WHB/psh ENC. i So\ck\r Octie 1:4rc�isnage C.,t_s� �w.vrr=vcia(- o mice 11K�Wpt�V�ol FZ�uno a�T IC�cV�1 k,o aI,sc t O ,°(S R----------------- �q,oL �c--ct^--' 10 v� C Pam✓ 1�In� ( ltil . �7�3/ 2 Inc :(Kc4J o'er` ,no �ropoS�o� tino�k� wo u� � b � ccc us � rro r G faVa_` a^�- ,Jar r •nC� ) -� "SuVAC Ko VA✓lchG e' �- < 2•c kcs. ccs�- Tri�c�cJ`„ �(cti u�---tL&oo� _ off- �IM_tAJko•r.. Vol• c�<<c�. ;�1'id� Ti IM c `� �� CO VNG cv�tY0.t 1 O tl� D �v�1aP �c� — use l0 VKiW�+�i kninixtkw\ . TJ T — I,S7 Cl.I 244 �., , •-i-y T. 1..1. N 1,8 n/(.r Z) ;dnavq Ll � I.G 4I C 'r A- 7.0 cCg5; o,'f I L J, w II _ 33 _ r 57 , _.` .. J I , «. n /�i_.i; f �CA'V � W 11nwk- ago �.. T r� ooe J.Tk .. ..T Y77 _Q�a,. .... .. _ -,i ...s.. ' a• c:-1� 3s� �k��i^-3, � t} f�j� 3ii J� . - VO 1 '^.. � C '�k � _ ._Q � 1 � .... �... �0 . _.... ..1.. jJ fy 3?tl� :1� uµ{ �' • t t�ah y,d y o T o / L 7 /ems Zc5 6 — 5 jo`q✓ Ov�� 'DVa1�AgC c� cc.45 G rod- G • �} G�5 (tiS o ri �cicC E-4VAjCX, , i4- = o,e63 ia................•........, --------,------ -- 'Gi.... �...4 . HARVARD STREET f' t-er- y W64 M14 AsPO4 A4 g g� " 4xbiHF�I Nq 51. ttVE 6 EK. MN oxe... g„ •�, myn 1; b. N1111 G"ghiE VALV6 a' mn>: cur n Y ________4[_- _.'_IX__W_C. 41>.0 IP0. ... uvl cwD 6Y"rn. xmr N R p sox G t.Lso.s rips d 9 p I zr e r ; re ei. g A59INLr la_ Mi Iff 1 iA T' • _ _ +' a _r h I nI JIff $$$[ I v e I :°°mn.nhrmbnngwl PROPOSED s BUILDING { 16. f I p I � N 8 I •p I �W Wr 6r a owrcnh mfa," 1 $ I I - �lo p¶UdY EAiEM6N{' mm�r nee•rm,,o N UTILITY PLAN SCALEI "= 20' I r _— i - - - — i P a HARVARD STREET sa8(n 6" •afar mein 1 . M4 g P[Lli 1pp ry{ q/p[r �'.`� A.•ta,5 *-Mau FK14K LYNV nL. an:�nw yn xvvnn "x'rr»w.+wr. x_ _--------------- ___F_______ P N Z ._�• _. --OZ O ,_. ._ — %IMI I ISI SIAIS ID IMID •• .. U 4n MAIM °' - I wpa.iax {�µ_ ar+r e•ye L Ixv.tuoicxrrw r ullws1 e✓pA" X INVr469e xx srxlY BNfT 41 ••llf�w ii: " ' I tt v.e9Aa Oe7„U N W KtlI L Irlk k sazs w27 K la O . I _ 1 Yyy'�""r• ` ----- I J t MWL •215 ti d I LEGEND: a .__ r1r,» - _.— 1 EXIST. CONTOURS oK_ L:r _ I ^� PROP. CONTOURS Im •�26.1e rI x .ew EX SPOT ELEV, W p� y..»n y,molo. ra.Inw ev, y $ I.r �m PROP. SPOT REV. a0 �' Ld r x` { BASIN LINE LetP PROPOSED f a ROW ARROW O 5 „ Q min s' tv,lxv' BUILDING i sirFENCE e 0 STRAW BALES N of Dare NTI✓ VOWwe Qaa aeo . 39Pa.,. F` 1 FIN. RR. 29.00 �I0w VPwna PRow,oCD • Sazi..+ � Ilq I � SEDIMENT TRAP Q I�10�I.✓4iE4 E _— L-<5 y � x'J I 1 t7 O COO U ¢ i. I o O � p 6 : ozxlw¢exewua U o � w - av _ _ _ _ wlo d 6,M1e, S6 � 25 '• ... zI GRADING & DRAINAGE PLAN y yy OEtAf,4 y011ft f4lslE SCALE 1"= 20• 21 GoNiouK AKEA AVyAREA VeWME 0 1 v a 4 5 6 Prora Af SIr PV6 Fim B Alb: N • 1"' to v' I"• 2' , 25.90 0 491 51` 295 2 6r.50 g815f 94165E SOB rf' 21.00 585040 72455' 9GL2 ({' 2.1.50 86406K llirtAL —56L5 rie sacr nlrlew 4 � 5