Loading...
HomeMy WebLinkAboutDrainage Reports - 06/05/1989TMING Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 May 26, 1989 Ms. Susan Hayes Stormwater Utility Dept. City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 RE: CENTRE FOR ADVANCED.TECHNOLOGY - SECOND FILING MINOR SUBDIVISION REVISIONS Dear Susan: Please find attached a copy of the grading and drainage plan for the above referenced project. For your convenience I have also enclosed copies of the previous preliminary and final drainage reports completed in February of 1987. The minor subdivision revisions shown on the new grading plan consist principally of changes in the geometric layout of the site and therefore have virtually no effect on the previous ap- proved drainage approach. I trust the attached information ad- dresses any concerns you'may have. Sincerely, RBD�In�c. n Stan A Myers, P.E. cc: Tom Livingston, Everitt Companies 035-087 Other Offices: Vail, Colorado 3031476-6340 • Colorado Springs, Colorado (719) 598-4107 RMINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 February 25, 1987 Mr. Bob Smith Storm Drainage Department City of Fort Collins P.O. Box 570 Fort Collins, Colorado 80522 RE: FINAL DRAINAGE REPORT FOR THE CENTRE FOR ADVANCED TECHNOLOGY SECOND FILING Dear Bob: Please find attached a copy of the Preliminary Drainage Report for the Centre for Advanced Technology Second Filing. No sig- nificant changes have occurred in the design approach and analysis since this submittal. A more detailed final drainage and grading plan is attached. Please contact our office if fur- ther information is required. Sincerely, RBD, Inc. Stan A. Myers, P.E. cc: File 035-019 Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598.4107 T3DINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 February 5, 1987 Mr. Tom Gathmann City of Fort Collins P.O. Box 570 Fort Collins, CO 80522 RE: PRELIMINARY DRAINAGE REPORT FOR THE CENTRE FOR ADVANCED TECHNOLOGY SECOND FILING Dear Tom: This second filing of the Centre for Advanced Technology is lo- cated in the northeast corner of the future intersection of Cen- ter Avenue and Shields Street. The north boundary of this site is the New Mercer Ditch. The property is located in the South- west Quarter of Section 23, Township 7 North, Range 69 West of the 6th Principal Meridian. The site currently is covered with natural Colorado field gras- ses which slopes to the northeast at about 1%. Along with the New Mercer Ditch that borders to the north, a small irrigation ditch meanders through the property. When fully developed this property will consist of business/office buildings, parking areas and landscaped areas (see plan). Using the most current City of Fort Collins criteria, and the ra- tional formula a 2 year historic maximum release rate was calcu- lated to be 1.14 cfs. With this release rate, a required pond volume of 0.64 acre-feet was determined (see Supplementary Cal- culation sheet). The pond and preliminary site grading are shown on the attached drainage plan. The pond grading shown may be modified for final submittal. The pond will temporarily dis- charge into an overland swale which will direct flows into the Center Avenue storm drain proposed in the Centre for Advanced Technology Special Improvement District. Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598-4107 When this site drainage and grading plan and design is implemented, drainage flows will pass through the streets and parking areas to the pond in a safe and controlled manner. Sincerely, RBD�Inc�., Engineering Consultants Stan A. Myers, P.E. Project Manager Brian H. Cole Project Engineer - •`'' DATE: PROJECT: C A T -BUSINESS PARK . JOB NUMBER: DESIGN ENGINEER: BC BASIN DESIGNATION = TOTAL SITE DETERMINE EXISTING Q FOR 2 YEAR STORM HISTORIC RUNOFF COEFFICIENT ,2 BASIN SLOPE: 1.5 PERCENT BASIN LENGTH 500 FEET ... AREA: 4.01 ACRES HIST TC = 1.87*(1.1-( 1. ,2 -. ))*SORROOT 500 ))/.. 1.5 ^ " = 312.87992 MINUTES - HISTORIC RAINFALL INTENSITY:. 1.421601 INCHES/HOUR HISTORIC OUTFALL: 1.140174 CUBIC FEET PER SECOND DETERMINATION OF DETENTION FOND VOLUME FOR DEVELOPED CONDITIONS DEVELOPED STORM-. 100 YEAR.STORM . DEVELOPED RUNOFF COEFFICIENT .67 CCFAC = .67 1.25 3 .._+58.375 DURATION GROSS VOL. OUTFLOW VOL. DETENTION VOL. MIN CU. FT. CU. FT. CU. FT 5 9188.5.14 342.0372 8846.478 1 t] 1.414.5. 48 624. 0745 13461.4 ' 15 18014.32 1026.112 16988.21 rr -0 2490..�.71. 2032:223 22853.49 45 29923.12 3078.335 26844.79 60 315 S.29 4104.44.7 274.5t].85 90 34094.22 6156.67 27937.55 120 3481.9.63 8202.894 26610.74 ISO-7721.27 12313.34 25407.93 "_`60 42073.73 24626..68" 17447.04 REQUIRED DETENTION VOLUME IS 27937.55 CU. FT. OR .641359 ACF;E FEET