Loading...
HomeMy WebLinkAboutDrainage Reports - 01/31/200371,ump", IVE111 n 11 PROPERTY OF Final Drainage and Erosion Control Report For CHEROKEE FLYING HEIGHTS Replat of Lots 1 and 2, except the north 51 feet of the east 125 feet of said lot 2, M. and G. Subdivision Fort Collins, Colorado 0 Prepared for: Mike Jensen 1212 South College Avenue Ft. Collins, Colorado 80524 Prepared by: Shear Engineering Corporation Project No: 1760-01-00 Date: July, 2002 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 s TABLE OF CONTENTS I. INTRODUCTION: ..................................................................................................................................... 3 II. GENERAL LOCATION AND DESCRIPTION: ..................................................................................... 3 A. LOCATION.................................................................................................................................................3 B. DESCRIPTION OF PROPERTY......................................................................................................................3 III. DRAINAGE BASINS AND SUB -BASINS: .................................................. ; ........................................... 4 A. MAJOR BASIN DESCRIPTION.....................................................................................................................4 B. SUB -BASIN DESCRIPTION..........................................................................................................................4 IV. DRAINAGE DESIGN CRITERIA: .......................................................................................................... 4 A. REGULATIONS...........................................................................................................................................4 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS........................................................................ 5 C. HYDROLOGICAL CRITERIA........................................................................................................................5 D. HYDRAULIC CRITERIA...............................................................................................................................5 V. DRAINAGE FACILITY DESIGN: ........................................................................................................... 6 A. GENERALCONCEPT..................................................................................................................................6 B. SPECIFIC DETAILS - SWALES.........................................................................................,..........................6 C. SPECIFIC DETAILS - STREET CAPACITY..................................................................................................... 6 D. SPECIFIC DETAILS -DETENTION ...............................................................................................................6 VI. EROSION CONTROL AND WATER.QUALITY:.................................................................................7 A. GENERAL CONCEPT..................................................................................................................................7 B. SPECIFIC DETAILS - WATER QUALITY ................................. :.................................................................... 8 C. SPECIFIC DETAILS - EROSION CONTROL......................................:............................................................ 8 D. EROSION CONTROL SECURITY DEPOSIT....................................................................................................9 VII. VARIANCE REQUESTS FROM CITY STANDARDS: ........................................................................ 9 A. VARIANCE FROM THE CITY OF FORT COLLINS REQUIREMENTS: ................................................................. 9 VIII. CONCLUSIONS: ...................................................................................................................................... 10 A. COMPLIANCE WITH STANDARDS........................................................................................I.................... 10 B. DRAINAGE CONCEPT .................................................... :........................................................................... 10 IN. REFERENCES: ........................................................................................................................................ 10 APPENDIX I — Drainage Calculations APPENDIX II — Erosion Control APPENDIX III —Pump Specifications APPENDIX IV — Charts and Figures APPENDIX V — Sheffer Envelope Page 2 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 I. INTRODUCTION: 1. The site is an infill development within the City limits. 2. Development of the site will consist of replatting a portion of the existing two lots of M. and G. Subdivision into a single lot. The existing single-family residence will not be a part of the replat. The replat is for proposed townhouses. II. GENERAL LOCATION AND DESCRIPTION: A. LOCATION 1. Cherokee Flying Heights is located in the southeast quarter of section 9, Township 7 North, Range 69 West of the 6th P.M., Fort Collins, Colorado. 2. More specifically, it is located approximately 1375 feet (1/4 mile) north of the intersection of Mulberry Street and Taft Hill Road on the west side of North Taft Hill Road. 3. This site was previously platted as M. and G. Subdivision. 4. The site is bounded on the south and north by unplatted properties. It is bounded on the west by Tenth Green Second Filing. North Taft Hill Road bounds the site on the east. B. DESCRIPTION OF PROPERTY 1. Development of the site will consist of the construction of four multi -family buildings with varying numbers of units in each building and three carriage house units. 2. The site has a net area of approximately 1.97 acres. Existing foundations on the site will be removed as part of the development. 3. There is an existing residence on the property in the northeast corner. This lot is excepted from this replat. The multi -family units will be constructed on the remainder of the property. The area outside the limits of the building envelopes will be dedicated as a Public Access, Utility and Drainage Easement. 4. Public right-of-way will be dedicated in the middle of the property to accommodate a future local collector street connection. Page 3 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00. III. DRAINAGE BASINS AND SUB -BASINS: A. MAJOR BASIN DESCRIPTION 1. The site is located within the West Vine Drainage Basin as defined on the City of Fort Collins Master Stormwater Basin Map. The City is currently in the process of updating the master plan for this basin. 2. The basin fee rate for this basin is $7,004 per gross acre according to the development fee section of the City of Fort Collins Development Manual. B. SUB -BASIN DESCRIPTION The site slopes from west to east. There is approximately 6 feet of fall from the west property line to Taft Hill Road. 2. Historically, stormwater runoff from the site flows overland to the east into Taft Hill Road and then north in Taft Hill Road. 3. Development of the site has divided the site into 3 sub -basins (1 -3). a. Sub -basin 1 contributes to the proposed water quality pond. b. Sub -basin 2 consists of the portion of the property with the existing residence. c. Sub -basin 3 consists of the one half (1/2) ROW for Taft Hill Road along the frontage of the entire site. IV. DRAINAGE DESIGN CRITERIA: A. REGULATIONS 1. Design Criteria from the City of Fort Collins Storm Drainage Design Criteria Manual and options for storm drainage improvements discussed with the City of Fort Collins Stormwater personnel were considered. 2. Erosion Control Criteria from the City of Fort Collins Criteria Manual was used. Page 4 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS I. The site is completely developed on all sides, creating grading constraints for the entire perimeter of the project. 2: Water quality provisions are required for this subdivision. Water quantity detention is also required within the limits of the site. 3. Additional right-of-way for Taft Hill Road is dedicated along the frontage of Cherokee Flying Heights with this replat. A 15' utility easement is also provided along the frontage of the common open space. C. HYDROLOGICAL CRITERIA The Rainfall -Intensity -Duration curves for the City of Fort Collins were used (Figure 3-1, attached for reference), in conjunction with the "Rational Method" for determining peak flows at various concentration points. The revised Figure 3.1, which was recently adopted by the City with Ordinance No. 42, was utilized. A look up table with values taken from Figures 3-la and 3-lb were used in the runoff calculations. A copy of these tables are included in Appendix IV. 2. The two (2) and one hundred (100) year storms were analyzed in accordance with Table 3-1 of the City of Fort Collins Storm Drainage Design Criteria Manual for residential sites. D. HYDRAULIC CRITERIA 1. Storm sewer and drainage channel capacities are based on the Manning's Equation. The Manning's coefficients are in accordance with the City of Fort Collins Storm Drainage Criteria Manual. 2. Theoretical street capacities were determined using Haestads Flowmaster software. The appropriate reduction factor was then applied to determine the allowable capacity. Page 5 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 V. DRAINAGE FACILITY DESIGN: A. GENERAL CONCEPT The historic flow patterns will be maintained with the development of this site. 2. A water quality/detention pond will be provided in the southeast corner of the site. 3. Stormwater will be conveyed through the site via a combination of overland flow, swales and gutters. B. SPECIFIC DETAILS- SWALES Concrete channels are provided along the north and south property lines to convey the rooftop runoff east to the street and the water quality/detention pond. 2. The curbed channel along the north side is designed to convey 133% of the Q100 that reaches the end of the curbed channel (Design Point In). 3. The valley pan along the south property line is located in portions of the detention pond and therefore is only in place for nuisance flows. A tall curb and retaining walls are provided along the south property line to ensure that on site runoff does not leave the site except through the pond outlet. C. SPECIFIC DETAILS- STREET CAPACITY 1. The theoretical 100-year street capacity at the low point was determined to be 40.61 cfs using Haestads Flowmaster software. A reduction factor taken from Figure 4-2 was applied to the theoretical capacity to obtain an allowable capacity of 32.49 cfs. The peak flow to the low point is 10.68 cfs. 2. A speed bump is specified at the high point in the private drive to insure that the street is not overtopped during the 100-year event. D. SPECIFIC DETAILS -DETENTION 1. Approximately 18,088 cf of storage is required for detention based on the 100- year storm and releasing at the historic 2-year rate. This volume includes a WQCV of 1864 cf plus the detention requirement of 16,224 cf. Page 6 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 2. The water quality/detention pond located in the southeast comer of the site has approximately 17,990 cubic feet of storage up to the invert of the emergency overflow weir. This is close enough to the required volume based on a historic 2-year release rate.. a. Over -excavation of the pond to elevations lower than the outfall have been provided to achieve the required detention volumes. b. A sump pit consisting of a standard area inlet and a sump pump will be installed at the outfall point. Additional detail regarding the sump pump is located in Appendix III of this report. - c. Maintenance of the sump pit and pump will be the responsibility of the owner until such time that the homeowners association assumes control of the maintenance of the property. 3. The release rate from the pond is restricted to 0.79 cfs by a 4 %2" diameter orifice. The top of the retaining wall is set at an elevation of 5072.00 feet. The outlet pipe from the pond is a 15-inch diameter ADS N-12 pipe. It has a slope of 0.005 ft./ft. The capacity of the pipe is 5.94cfs. a. The 15" pipe may be removed in the future to accommodate Taft Hill Road widening to current arterial standards. 4. A portion of the retaining wall located along the east side of the water quality/detention pond will act as a 37.66 foot emergency overflow weir to pass the developed peak flows to the pond during the 100-year storm event. The elevation of the emergency overflow weir is set at 5071.80 feet. VI. EROSION CONTROL AND WATER QUALITY: A. GENERAL CONCEPT 1. Erosion control measures are specified on the Drainage and Erosion Control Plan. 2. Maintenance of erosion control devices will remain the responsibility of the contractor and the owner until the project is complete. 3. A water quality pond will be constructed in the southeast corner of the site. Page 7 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 B. SPECIFIC DETAILS- WATER QUALITY 1. The water quality pond is created by constructing a short retaining wall in the southeast comer of the site. The required volume for the. water quality pond is 1,864 cubic feet and is in addition to any water quantity requirement. This is based on a resultant imperviousness in sub -basin 1 of 78.11 percent. 2. The pond will be created by constructing a short retaining wall rather than a berm due to the limited amount of space available. The top of the water quality pond is at an elevation of 5068.33 feet. The invert of the pond is at an elevation of 5067.32 feet. 3. The volume provided in the water quality pond is 18,088 cubic feet up to the top of the pond. The required WSEL to obtain the necessary WQCV is 5068.33 feet. 4. A 24" by 36" (inside dimensions) water quality outlet device is specified on the plan set. A detail is provided on the drainage and erosion control sheet as well as on the drainage and erosion control detail sheet. This detail also includes well -screen type trash rack specifications. Sizing specifications for the well -screen are found in Appendix I. Refer to . the water quality calculations for additional detail. 5. A sump pump will be required to transport nuisance flows from the water quality box structure to the upper orifice. The only requirement for the sump pump is to pump the 2-yr historic release rate. Therefore, the pump must transport 0.79 cfs or approximately 355 gpm. The pump specified for this project is a 4" submersible pump designated AFP 1041, 6 Pole from ABS. The pump can transport water at approximately 355 gpm with heads ranging from 5.5' to 7.5'. This particular pump is priced around S4000.00 and an automated control panel would cost another $1500.00. The pump specifications discussed were provided by Falcon Supply Company, Inc. Specifications and a rating curve for this pump are attached to this report in Appendix III. C. SPECIFIC DETAILS- EROSIONCONTROL 1. The following temporary erosion control measures are specified on the Drainage and Erosion Control plan: a. A gravel inlet filter at curb opening at the low point in the street. b. Haybales in the swales. Page 8 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 c. Silt fence on the downstream property lines, specifically the east property line. d. A wheel cleaning station is specified at the entrance to the site. 2. The following permanent erosion control measures are specified on the Drainage and Erosion Control Plan. a. Buried riprap along the downstream side of the emergency overflow structure. b. A riprap apron at the outfall from the private drive into the pond. 3. A water quality device will be installed at the outfall from the water quality/detention pond. Maintenance of the device. will be the responsibility of the owner until such time that the homeowners association assumes control of the maintenance of the property. 4. The site's overall performance and effectiveness standards have been determined. The site's effectiveness and performance is 83.60% and 79.61% respectively. Since the overall effectiveness is greater than the overall performance, the erosion control plan for this site is effective. These calculations are found in Appendix H of this report. D. EROSION CONTROL SECURITY DEPOSIT 1. An erosion control security deposit is required in accordance with City of Fort Collins policy. In no instance shall the amount of the security be less than $1000.00. 2. See the Erosion Control Security Deposit Requirements document located in Appendix R. 3. The erosion control security deposit is reimbursable. VII. VARIANCE REQUESTS FROM CITY STANDARDS: A. VARIANCE FROM THE CITY OF FORT COLLINS REQUIREMENTS: 1. The water quality/detention pond at the southeast end of the site has a maximum WSEL of 5071.80, which allows for only 0.20 feet of freeboard to the top of the retaining wall. This is much less than the required 1.0 feet of freeboard according to section 9.2 of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual. Since all land Page 9 Final Drainage and Erosion Control Report for Cherokee Flying Heights Project No. 1760-01-00 surrounding the site is developed, there are grading constraints around the perimeter of the site. Due to these constraints, it is impossible to provide the minimum of 1.0 feet of freeboard required for detention ponds. Therefore, a variance from the City of Fort Collins requirements is requested. VIII. CONCLUSIONS: A. COMPLIANCE WITH STANDARDS 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual. 2. Proposed drainage improvements generally conform to the recommendations of the City of Fort Collins Master Drainage Plan. 3. Proposed erosion control measures conform to the recommendations of the City of Fort Collins standards. B. DRAINAGE CONCEPT 1. The proposed drainage design for Cherokee Flying Heights is effective for the control of storm runoff with a considerable reduction in potential downstream effects. 2. The proposed drainage design for Cherokee Flying Heights will have no effect on City of Fort Collins Master Drainage Plan recommendations. IX. REFERENCES: 1. City of Fort Collins "Storm Drainage Design Criteria and Construction Standards"; March 1997 2. City of Fort Collins "Erosion Control Reference Manual"; January 1991 Page 10 Project No: 1760-01-00 Shear Engineering Corporation 1760-run-new By: DAH 12/20/2001 RUNOFF O r N p Nr r c O f0 N O L d N o= U rn Of C c •T G7 LL d @ c d c O W N Co L (U L U) O M V C% O c0 O 00 n d V C% GIs ^ N1 C1 M ll C\ I� h rq O, V O O N O O O O N N N N l- h h 00 M p OO OO V n O\ C\ M O O q �o �o b r- O\ C\ coo 00 kn W% O -+ y 91. ' N N N N N Op O O O O O O O O .�, O C to u O 'n 00 O\ >, w o p O O O 0 o 0 0 U CN O M m O\ b 01 O O O p o 0 0 0 0 U N N 1- h r- co 00 G1 `.0 60 006 600 I- C\ O\ ON 01 . • R V cilC% �o O N M M u u .-- O O 0 0^ O a. .N r ^ 06 C h ur O U � E C o •_ b r ,O a O N fn U c M o @ tin C G m N > C Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:15 AM Existinq Site Breakdown Sub Area C2,10 C100 Asphalt Gravel Concrete Lawn Roof Check basin acres 0.95 0.50 0.95 0.20 0.95 1 1.97 0.26 0.32 0.06 0.00 0.06 1.82 0.03 1.97 lsite 1.69 0.24 0.30 0.00 0.10 0.05 1.54 0.00 1.69 Developed Site Breakdown Sub Area C2,10 C100 Asphalt Gravel Concrete Lawn Roof lCheck basin acres 0.95 0.50 0.95 0.20 0.95 1 1.69 0.78 0.98 0.61 0.06 0.35 0.34 0.33 1.69 2. 0.19 0.56 0.69 0.05 0.00 0.01 0.10 0.03 0.19 3 0.09 0.78 0.98 0.06 0.00 0.01 0.02 0.00 0.09 Total 1.97 0.76 0.95 0.72 0.06 0.37 0.46 0.36 .1.97 Minor Basins In 0.34 0.80 1.00 0.00 0.03 0.11 0.05 0.15 0.34 Is 0.21 0.85 1.00 0.00 0.03 0.07 0.01 0.10 0.21 lc 1.00 0.84 1.00 0.61 0.00 0.17 0.13 0.08 0.99 IP 0.14 0.21 0.27 0.00 0.00 0.00 0.15 0.00 0.15 1.69 0.61 0.06 0.35 0.34 0.33 1.54 Notes Developed sub -basin 1 contributes Developed sub -basin 2 includes tho to remain runoff to the pond existing single family residence Developed sub=basin 3 is the 1/2 Row in Existing basin 1 includes the 1/2 ROW Ex. Sub -basin isite is for establishing DP Minor Area C2, C100 Basin£ac C10 lc Iin, lc 1 1.34 10.90 1.00 front of the site the release rate 1760-run-new Coefficient Page 2 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:14 AM EXISTING CONDITIONS Flow to Design Point From Sub -basin AREA (A)= 1.970 ACRES - includes 1/2 ROW RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.26 0.26 0.32 1 1 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L�0.5)/S"0.33 LENGTH = 500.00 FEET SLOPE = 1.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= .37.63 37.63 35.54 TRAVEL TIME (TO=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 120.00 1.00 Lawn 0.70 2.86 TOTAL TRAVEL TIME (min) = 2.86 LENGTH = 620.00 L/180+10 = 13.44 < 38.40 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 13.44 13.44 13.44 USE Tc = 13.50 13.50 13.50 INTENSITY (I) (ipiINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I = 1.95 3.34 6.82 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.99 1.69 4.31 CONCLUDE:Total historic flow leaving site onto North Taft Hill 1760-run-new Runoff Page 3 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:14 AM EXISTING CONDITIONS Flow to Design Point 1 From Sub -basin. lsite AREA (A)= 1.690 ACRES - includes 1/2 ROW RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.24 0.24 0.30 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L�0.5)/SA0.33 LENGTH = 500.00 FEET SLOPE = 1.00 96 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 37.63 37.63 35.54 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 120.00 1.00 Lawn 0.70 2.86 TOTAL TRAVEL TIME (min) = 2.86 LENGTH = 620.00 L/180+10 = 13.44 < 38.40 Tc=Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 13.44 13.44 13.44 USE Tc = 13.50 13.50 13.50 INTENSITY (I) (ipiINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I = 1.95 3.34 6.82 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.79 1.35 3.45 CONCLUDE:Historic flow from portion of site to be developed 1760-run-new Runoff Page 4 of 11 No Text Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:24 AM Developed Conditions Flow to Design Point 1 From Sub -basin 1 AREA (A)= 1.690 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.78 0.78 0.98 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*LA0.5)/SA0.33 LENGTH = 147.00 FEET SLOPE = 1.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 20.41 20.41 19.27 TRAVEL TIME (Tt) =L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 526.00 0.50 gutter 1.50 5.84 67.00 0.50 gutter 1.50 0.74 58.00 1.00 Lawn 0.70 1.38 ? 0.00 none 0.00 0.00 ? 0.00 none 0.00 0.00 TOTAL TRAVEL TIME (min) = 7.97 LENGTH = 798.00 L/180+10 = 14.43 < 27.24 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 14.43 14.43 14.43 USE Tc = 14.50 14.50 14.50 INTENSITY (i) (iptINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I = 1.90 3.24 6.62 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 2.51 4.29 10.94 CONCLUDE:Flow to Water Quality Pond Provide Water Quality device 1760-run-new Runoff Page 5 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:24 AM Developed Conditions Flow to Design Point From Sub -basin AREA (A)= 0.190 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.56 0_56 0.69 2 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L"0.5)/S"0.33 LENGTH = 120.00 FEET SLOPE = 1.00 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 18.44 18.44 17.41 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 0.00 0.00 0.00 0.00 0.00 TOTAL TRAVEL TIME (min) 0.00 LENGTH = 120.00 L/180+10 = 10.67 < 17.41 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min) 10.67 10.67 10.67 USE Tc = 10.50 10.50 10.50 INTENSITY (I) (1p11NTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I = 2.17 3.71 7.57 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.23 0.39 1.00 CONCLUDE: Flow from the lot with the existing single family residence 1760-run-new Runoff Page 6 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:25 AM Developed Conditions Flow to Design Point From Sub -basin AREA (A)= 0.090 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.78 0.78 0.98 3 3 TIME OF CONCENTRATION (TC) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L�0.5)/S�0.33 LENGTH 10.00 FEET SLOPE = 1.00 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 5.32 5.32 5.03 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 123.00 0.50 gutter 1.50 1.37 TOTAL TRAVEL TIME (min) = 1.37 LENGTH = 133.00 L/180+10 = 10.74 > 6.39 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min) 5.32 5.32 5.03 USE Tc = 5.50 5.50 5.00 INTENSITY (I) (iptINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I = 2.76 4.72 9.95 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q 0.19 0.33 0.88 CONCLUDE: Flow in the street from the ROW 1760-run-new Runoff Page 7 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:25 AM Developed Conditions Flow to Design Point From Minor Basin AREA (A)= 0.340 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.80 0.80 1.00 In In TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L"0.5)/5A0.33 LENGTH = 147.00 FEET SLOPE = 1.00 %. 2 YEAR 10 YEAR 100 YEAR C z 0.95 0.95 1.00 Ti (min)= 3.40 3.40 2.27 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 526.00 0.50 gutter 1.50 5..84 TOTAL TRAVEL TIME (min) = 5.84. LENGTH = 673.00 L/180+10 = 13.74 > 8.11 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min) 9.25 9.25 8.11 USE Tc = 9.00 9.00 8.00 INTENSITY (I) (iptIntensities from Fig. 3-1 2 YEAR 10 YEAR 100 YEAR I = 2.30 3.93 8.38 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.63 1.07 2.85 CONCLUDE: Install curbed channel along north property line to convey runoff east -design for 1.33 * Q100 n = n ni'i ..... f-c n o ire. ..a.. Width Depth Area Perim Slope Icapacity ft ft I sf ft ft/ft I cfs 2.00 0.50 1 1.00 3.00 0.0050 1 3.89 uetermine water surface rise @ 90 degree bend See swale spreadsheet 1760-run-new Runoff Page 8 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:25 AM Developed Conditions Flow to Design Point From Minor Basin AREA (A)= 0.210 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.80 0.80 1.00 is is TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L"0.5)/S�0.33 LENGTH = 21.00 FEET SLOPE = 1.00 % 2 YEAR 10 YEAR 100 YEAR C 0.95 0.95 1.00 Ti (min)= 1.29 1.29 0.86 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 351.00 0.50 gutter 1.50 3.90 TOTAL TRAVEL TIME (min) - 3.90 LENGTH = 372.00 L/180+10 = 12.07 > 4.76 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min) 5.19 5.19 4.76 USE Tc = 5.00 5.00 5.00 INTENSITY (I) (ipkINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I 2.85 4.87 9.95 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.48 0.82 2.09 CONCLUDE: Install valley pan along south property line to convey nuisance flows - no capacity check required since it is in the pond 1760-run-new Runoff Page 9 of 11 Job No. 1760-01-00 Shear En gin eering.Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 10:27 AM Developed Conditions Flow to Design Point lc From Minor Basin lc & In AREA (A)= 1.340 ACRES RUNOFF COEF. (C) 2 .YEAR 10 YEAR 100 YEAR C = 0.90 0.90 1.00 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*L�0.5)/S"0.33 LENGTH = 147.00 FEET SLOPE = 1.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.95 0.95 1.00 Ti (min)= 3.40 3.40 2.27 TRAVEL TIME (Tt)=L/(60*V)ALL VELOCITIES TAKEN FROM FIGURE 3-2 Length Slope Flow Type Velocity 526.00 0.50 gutter 1.50 5.84 67.00 0.50 gutter 1.50 0.74 TOTAL TRAVEL TIME (min) - 6.59 LENGTH = 673.00 L/180+10 = 13.74 > 8.86 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min) 9.99 9.99 8.86 USE Tc = 10.00 10.00 9.00 INTENSITY (I) (iptINTENSITIES TAKEN FROM FIGURE 3-1 2 YEAR 10 YEAR 100 YEAR I 2.21 3.78 8.03 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 2.67 4.56 10.76 CONCLUDE: Theoretical Street Capacity @ lowpoint = 40.61 cfs Slope into lowpoint 0.012 ft/ft Reduction factor from figure 4-2 0.80 Allowable capacity 32.49 cfs Allowable capacity is adequate Theoretical Street Capacity obtained using Haestads Flcwmaster Check capacity of pan and street up to high point in street Qcapacity = 8.11 cfs WSEL will exceed the highpoint by 0.02 feet See Haestads Printout Place speedbump all the way across the street O HP Top of speedbump = 72.25 ft Centerline Line elevation @ HP 72.01 ft Bump Height 0.24 ft Flowline elevation @ HP 71.75 ft Bump Height 0.50 ft 1760-run-new Runoff Page 10 of 11 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: DAH Cherokee Flying Heights 10:28 AM Concrete Curbed channel on North Property Line Q100 = 2.85 cfs Q100 to DP 1n Qdesign= 3.79 cfs 133% of.Q100 Channel Geometry Width 2.00 ft Depth 0.50 ft - minimum depth Slope 0.0050 ft/ft n 0.0130 Area = 1.00 sf Perim = 3.00 ft R = 0.33 Qcap = 3.89 cfs Determine Flow Depth in straight channel. Adjust Y until Qdelta = 0 Y A P R Qd Qdelta Val. ft sf ft cfs cfs fps 0.49 0.98 2.98 0.33 3.79 0.00 3.86 Determine rise in depth @ 90 degree bend Rectangular channel, Assume - rapid flow, simple circular C = 1.00 from table 7-1 V = 3.86 fps W = 2.00 ft g = 32.20 ft/sec^2 r 90.00 degrees y = C'V^2W/gr y = 0.010 Expected Depth (d) = Y+y d = 0.50 1 ft equals minimum depth of channel Conclude: Pan depth of 0.50 ft is adequate 1760-run-new Swale Page 11 of 11 Longitudinal Street Section @ Low Point Worksheet for Irregular Channel Project Description Project File d:\haestad\fmw\cherokee.fm2 Worksheet Valley pan and street Flow Element Irregular Channel Method Manning's Formula Solve For Water Elevation Input Data Channel Slope 0.005000 ft/ft Elevation range: 71.71 ft to 72.01 ft. Station (ft) Elevation (ft) Start Station End Station Roughness 0.00 72.01 0.00 39.88 0.016 18.70 71.78 21.70 71.71 24.70 71.78 26.70 71.84 31.70 71.94 36.70 72.00 39.88 72.01 Discharge 8.11 cfs Results Wtd. Mannings Coefficient 0.016 Water Surface Elevation 72.01 ft Flow Area 4.96 ft2 Wetted Perimeter 39.88 ft Top Width 39.88 ft Height 0.30 ft Critical Depth 71.99 ft Critical Slope 0.007525 ft/ft Velocity 1.64 ft/s Velocity Head 0.04 ft Specific Energy 72.05 ft Froude Number 0.82 Flow is subcritical. Notes: WSEL exceeds HP by 0.02 feet - negligible 12/2oro1 FlowMaster v5.13 10:37:49 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Depth vs Discharge Rating Table for Irregular Channel Project Description Project File d:\haestad\fmw\cherokee.fm2 Worksheet Valley pan and street Flow Element Irregular Channel Method Manning's Formula Salve For Water Elevation Constant Data Channel Slope 0.005000 ft/ft Input Data Minimum Maximum Increment Discharge 5.00 10.68 0.50 cfs Table Water Surface Wetted Discharge Wtd. Mannings Elevation Flow Area Top Width Perimeter Velocity (cfs) Coefficient (ft) (ft') (ft) (ft) (ft/s) 5.00 0.016 71.96. 3.28 29.34 29.35 5.50 0.016 71.97 3.54 30.76 30.77 6.00 0.016 71.98 3.79 32.09 32.09 6.50 0.016 71.98 4.04 33.34 33:34 7.00 0.016 71.99 4.28 34.51 34.52 7.50 0.016 72.00 4.52 35.63 35.64 8.00 0.016 72.01 4.88 39.09 39.10 8.50 0.016 72.01 5.10 39.88 39.89 9.00 0.016 72.02 5.28 39.88 39.90 9.50 0.016 72.02 5.45 39.88 39.91 10.00 0.016 72.03 5.62 39.88 39.92 10.50 0.016 72.03 5.79 39.88 39.93 12/20/01 10:37:16 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 1.52 1.55 1.58 1.61 1.63 1.66 1.64 1.67 1.70 1.74 1.78 1.81 FlowMaster v5.13 Page 1 of 1 Longitudinal Street Section @ Lowpoint Cross Section for Irregular Channel Project Description Project File d:\haestad\fmw\cherokee.fm2 Worksheet Valley pan and street Flow Element Irregular Channel Method Manning's Formula Solve For Discharge Section Data Wtd. Mannings Coefficient 0.016 Channel Slope 0.005000 ft/ft Water Surface Elevation 72.03 ft Discharge 10.39 cfs 72.05 72.0 71.95 w 71.9 c 0 CO W 71.85 71.E 71.75 71.7" 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 Station (ft) ULIKIJ 1212oro1 FlowMasler v5.13 10:39:22 AM Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Job No. 1760-01-00 Shear Engineering Corporation Designer: DAH Cherokee Flying Heights 12/20/2001 10:40 AM xx+++xx'xx+++++ix+PROFILE INPUT+x xxx++++�x*xxxxx�xx+++xxi+++xxxxx DESIGN FOR CENTERLINE Crest CURVE PVI STA. (sta) = 0.9700 ELEV. @ PVI STA. = 5072.23 INIT SLOPE (G1) () = 2.93 PVC STA. (sta) = 0.8200 END SLOPE (G2) -3.00 PVT STA. (sta) = 1.1200 LENGTH (sta) = 0.3000 r = -19.77 INIT STA. (sta) = 0.8500 STA. INTERVAL (: = 0.05 DIST. TCLOW POINT (sta) = 0.1482 Kmin 30.00 Lmin = 177.90 FEET Kdes 30.00 Ldes = 177.90 FEET kdesign 5.06 NOTES STATION DISTANCE CENTER ALONG LINE CL Elev. (sta) (sta) (ft) sta ft PVC 0.8200 0.0000 5071.79 0.5470 54.70 0.8500 0.0300 5071.87 0.5170 51.70 0.9000 0.0800 5071.96 0.4670 46.70 0.9500 0.1300 5072.00 0.4170 41.70 1.0000 0.1800 5072.00 0.3670 36.70 1.0500 0.2300 5071.94 0.3170 31.70 1.1000 0.2800 5071.84 0.2670 26.70 PVT 1.1200 0.3000 5071.78 0.2470 24.70 HP 0.9682 0.1482 5072.01 0.3988 39.88 1760-run-new street Page 1 of 1 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: DAH Cherokee Flying Heights 10:43 AM Design Concrete sidewalk chase to convey stormwater from private drive to pond - DP I Q100 = 10.76 cfs Chase acts like orifice Determine Required orifice area Q = CA(2gH)^1/2 C = 0.65 A = Q/C(2gH)A0.5 2g = 64.40 ft/sec"2 Maximum H = 1.00 ft - above flowline Required Area 2.06 sf Orifice Opening 0.50 ft Orifice Width 2.00 ft 3.00 openings @ 2.00 ft each . Actual area = 3.00 sf Required Width 8.0 ft - 3 openings with 1' wide supports Center opening to line up with flowline of 6' pan. 1760-run-new sidewalk chase Page 1 of 1 0 Project No: 1760-01-00 Shear Engineering Corporation 12/20/2001 By: DAH 10:45 AM Water Quality Volume Calculations Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: DAH Cherokee Flying Heights 11:12 AM DETERMINATION OF WATER QUALITY CAPTURE VOLUME FOR POND AREA = 1.69. acres Area (ac) Impervious A*I Asphalt Concrete Roof Gravel Lawn 0.61 1 100.00 61.00 0.35 100.00. 35.00 0.33 100.00 33.00 0.06 50.00 3.00 0.34 0.00 0.00 Total 1.69 132.00 OVERALL PERCENT IMPERVIOUS: 78.11 PERCENT TYPE OF POND (RETENTION OR DETENTION DETENTION SELECT 40.00 HOUR BRIM FULL VOLUME DRAIN TIME USES 40 HOUR FOR DETENTION PONDS USES 12 HOUR FOR RETENTION PONDS FROM FIGURE 5-1 REQUIRED STORAGE WATERSHED INCHES OF RUNOFF= 0.3039 WATER QUALITY CAPTURE VOLUME (REQUIRED STORAGE/12)*AREA WATER QUALITY CAPTURE VOLUME (WQCV) = 0.04 AF 1864 cf Conclude Design pond to have at this least 1864 cf of storage Install water quality outlet structure 1760-WQCV-new WQCV Page 1 of 4 Job No. 1760-01-00 Shear Engineering Corporation 3/25/2002 Designer: dah Cherokee Flying Heights 2:33 PM Average Area End Method for Determining Volumes Pond 1 Pond located at east property line Invert 67.32 ft Increment 0.2.0 ft First Even Contour 67.40 ft Tnn of hprm PIPV 77 nn ff Volume = 1/3d(A+B+sgrt(AB) d = E2-El Elev. ft Stage Depth Area Volume Cum. Cum. d Volume Volume ft ft sq ft cf cf ac-ft 100-yr 2-year Vol regIeVol req'd cf w/WQCV cf 67.32 0.00 0 0 0 0 0 9107 18088 67.40 0.08 0.08 68 2 2 0.00 9107 18088 67.60 0.28 0.20 696 76 78 0.00 9107 18088 67.80 0.48 0.20 1841 254 332 0.01 9107 18088 68.00 0.68 0.20 2647 449 781 0.02 9107 18088 68.20 0.88 0.20 3262 591 1372 0.03 9107 18088 68.40 1.08 0.20 4106 737 2109 0.05 9107 18088 68.60 1.28 0.20 4164 827 2936 0.07 9107 18088 68.80 1.48 0.20 4215 838 3773 0.09 9107 18088 69.00 1.68 0.20 4292 851 4624 0.11 9107 18088 70.00 2.68 1.00 4373 4333 8957 0.21 9107 18088 71.00 3.68 1.00 5111 4742 13699 0.31 9107 18088 11.20 3.88 0.20 5271 1038 14737 0.34 9107 18088 71.40 4.08 0.20 5413 1068 15805 0.36 9107 18088 71.60 4.28 0.20 5471 1088 16894 0.39 9107 18088 71.80 4.48 0.20 5494 1097 17990 0.41 9107 18088 72.00 4.68 0.20 5587 1108 19098 0.44 9107 18088 68.33 1.01 -3.67 3827 -17256 1843 0.04 9107 18088 Determine WSEL for WQCV Req'd Volume 1864 cf WSEL is below 68.40 ft- Req'd WSEL = 68.33 ft Elev Cum Freeboard 3.67 ft Volume Error Messages ft cf Pond Ok 68.40 2109 Freeboard ok 68.20 1372 Volume Required = tention Volume Required = tal Volume = Conclude: 1864 16224 cf 18088 cf vs 17990 cf provided 1760-WQCV-new Page 2 of 4 Stage Storage Job No. 1760-01-00 Shear Engineering Corporation 3/25/2002 Designer: dah Cherokee Flying Heights 2:33 PM Quality Outlet Structure wuuv = Required WSEL = Top of Pond Invert = Head (Dwq) _ Required Area per Row (A) A=WQCV/ ( 0.04 AF 68.33 ft 72.00 ft 67.32 ft 1.01 ft 0.013 ' Dwq^2+ 0.22 Dwq- A = 0.31 sq inches per row 0.10 ) From Figure 5 UDFCD - Drainage Criteria Manual - (V.3) Use 2 rows 7/16 inch diameter holes 1 columns Area provided = 0.15 per row Area Total 0.30 <- This area must be slightly less than -> 0.35 Good Need to Drain 1,864 cf in 40 hours = .0129 cfs Orifice Equation: A = Q/(C(2gH)^.5) A = 0.00246 C = 0.65 = 32.20 H = 1.01 Q = 0.0129 This is the maximum area that is allowed with all orifice areas added together. ft^2 = 0.35 inA2 Notes: ft/SA 2 Minimum Spacing between columns is 3 inches. ft Minimum Spacing between rows is 4 inches. cfs 1760-WQCV-new WQoutlet Page 3 of 4 Project No: 1760-01-00 Shear Engineering Coporation 12/20/2001 By: DAH Cherokee Flying Heights 11:23 AM Well -Screen Type Trash Rack Specifications ' From Table 6a-1 Urban Storm Drainage Criteria Manual (BMP) From Table 6a-2 Urban Storm Drainage Criteria Manual (BMP) Performation Diameter Width of Concrete Opening Height of Concrete Opening Width of Trash Rack Height of Trash Rack From Table 6a-2: Max. Width Opening Less Than 9" Screen #93 VEE Wire Slot Opening Support Rod Type #156 VEE 7/16 inches 3 inches 6 inches 3 inches 8 inches 0.139" inches Support Rod, O.C. Spacing 0.75 inches Total Screen Thickness 0.31 feet Carbon Steel Frame Type 3/8" x 1.0" flat bar 1760-W QCV-new Well -Screen Page 4 of 4 Project No: 1760-01-00 Shear Engineering Corporation 12/20/2001 By: DAH 11;26 AM DETENTION POND Job No. 1760-01-00 Shear Engineering Corporation 1/16/2003 Designer: dah Cherokee Flying Heights 11:50 AM Rating Curve for Detention Pond Elevation Stage Storage ft ft cf Release cfs Notes 67.32 0.00 0 0.00 68.00 0.68 781 0.79 68.33 1.01 2049 0.79 68.33 = WQSEL 69.00 1.68 4624 0.79 69.72 2.40 7744 0.79 70.00 2.68 8957 0.97 70.50 3.18 8957 1.23 71.00 3.68 13699 1.39 71.50 4.18 15805 1.52 71.80 4.48 17990 0.79 100- r WSEL 72.02 4.70 19098 10.94 Top Of Bearm 1760-CUHP-new.xls Rating Curve Page 1 of 8 Job No. 1760-01-00 Shear Engineering Corporation Designer: dah Cherokee Flying Heights Cumulative Runoff Method for Sizing.Detention Ponds Pond 1 Design Storm 100 year Release Rate 0.79 cfs release @ 2-year historic Area 1.69 ac Total contributing area to Pond Runoff Coefficient 0.98 Inflow Inflow Release Storage Storage Time Intensity Rate Volume Volume Volume Volume min iph cfs cf cf cf ac-ft Max Storage 5 9.95 16.46 4938 237 4701 0.11 10 7.72 12.77 7663 474 7189 0.17 15 6.52 10.79 9708 712 8996 0.21 20 5.60 9.26 11117 949 10169 0.23 25 4.98 8.24 1 12358 1186 11172 1 0.26 30 4.52 7.48 13460 1423 12037 0.28 35 4.08 6.75 14175 1661 12514 0.29 40 3.74 6.19 14850 1898 12952 0.30 45 3.46 5.72 15455 2135 13320 0.31 50 3.23 5.34. 16031 2372 13659 1 0.31 55 3.03 5.01 16542 2609 13933 0.32 60 2.86 4.73 17033 2847 14187 0.33 65 2.72 4.50 17550 3084 14466 0.33 70 2.59 4.28 17996 3321 14675 0.34 75 2.48 4.10 18463 3558 14905 0.34 80 2.38 3.94 18900 3795 15104 0.35 85 2.29 3.79 19321 4033 15289 0.35 90 2.21 3.66 19743 4270 15473 0.36 95 2.13 3.52 1 20086 4507 15579 0.36 100 2.06 3.41 20448 4744 15704 0.36 105 2.00 3.31 20845 4982 15864 0.36 110 1.94 3.21 21183 5219 15964 0.37 115 1.89 3.13 21575 5456 16119 0.37 120 1.84 1 3.04 21917 5693 16224 0.37 **** Detention Volume Required : 16224 cf Detention Volume Required: 0.37 ac-ft Conclude Check the volume requirement using a 100-year release 1760-CUHP-new Cuhp Page 2 of 8 12/20/2001 11:33 AM Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 11:34 AM Cumulative Runoff Method for Sizing Detention Ponds Pond 1 Design Storm 100 year Release Rate 3.45 cfs release @ 100-year historic Area 1.69 ac Total contributing area to Pond Runoff Coefficient 0.98 Inflow Inflow Release Storage Storage Max Time Intensity Rate Volume Volume Volume Volume Storage min iph cfs cf cf cf ac-ft 5 9.95 16.46 4938 1036 3902 0.09 **** 10 7.72 12.77 7663 2073 5590 0.13 15 6.52 10.79 9708 3109 6599 0.15 20 5.60 9.26 11117 4145 6972 0.16 25 4.98 8.24 1 12358 5182 7177 0.16 30 4.52 7.48 13460 6218 7242 0.17 35 4.08 6.75 14175 7254. 6921 0.16 40 3.74 6.19 14850 8290 6559 0.15 45 3.46 5.72 15455 9327 6128 0.14 50 3.23 5.34 16031 10363 5668 0.13 55 3.03 5.01 16542 11399 5143 1 0.12 60 2.86 4.73 17033 12436 4598 0.11 65 2.72 4.50 17550 13472 4078 0.09 70 2.59 4.28 17996 14508 3488 0.08 75 2.48 4.10 18463 15545 2918 0.07 80 2.38 3.94 18900 16581 2319 0.05 85 2.29 3.79 19321 17617 1704 0.04 90 2.21 3.66 19743 18654 1090 0.03 95 2.13 3.52 20086 19690 396 0.01 100 2.06 3.41 20448 20726 -278 -0.01 105 2.00 3.31 20845 21762 -917 -0.02. 110 1.94 3.21 21183 22799 -1616 -0.04 115 1.89 3.13 21575 2383 i -2260 -0.05 120 1.84 1 3.04 21917 24871 -2954 -0.07 Detention Detention Volume Volume Required: Required: 7242 0.17 cf ac-fl Conclude: Use this release since the releases are into street & street capacity will not be exceeded 1760-CUHP-new Cuhp Page 3 of 8 Job No. 1760-01-00 Shear Engineering Corporation 3/25/2002 Designer: dah Cherokee Flying Heights 2:38 PM Average Area End Method for Determining Volumes Pond 1 Pond located at east property line Invert 67.32 ft Increment 0.20 ft First Even Contour 67.40 ft Top of berm elev. 72.00 ft Volume = 1/3d(A+B+s rt(A d = E2-El Elev. Stage Depth Area Volume Cum. Cum. 100-yr 2-year d Volume Volume Vol req'<Vol req'd ft ft ft an ft rf rf ar-ft of w/Wnru rf 67.32 0.00 0 0 0 0 0 9107 18088 67.40 0.08 0.08 68 2 2 0.00 9107 18088 67.60 0.28 0.20 696 76 78 0.00 9107 18088 67.80 0.48 0.20 1841 254 332 0.01 9107 18088 68.00 0.68 0.20 2647 449 781 0.02 9107 18088 68.20 0.88 0.20 3262 591 1372 0.03 9107 18088 68.40 1.08 0.20 4106 737 2109 0.05 9107 18088 68.60 1.28 0.20 4164 827 2936 0.07 9107 18088 68.80 1.48 0.20 4215 838 3773 0.09 9107 18088 69.00 1.68 0.20 4292 851 4624 0.11 9107 18088 70.00 2.68 1.00 4373 4333 8957 0.21 9107 18088 71.00 3.68 1.00 5111 4742 13699 0.31 9107 18088 71.20 3.88 0.20 5271 1038 14737 0.34 9107 18088 71.40 4.08 0.20 5413 1068 15805 0.36 9107 18088 71.60 4.28 0.20 5471 1088 16894 0.39 9107 18088 71.80 4.48 0.20 5494 1097 17990 0.41 9107 18088 72.00 4.68 0.20 5587 1108 19098 0.44 9107 18088 71.82 4.56 -0.18 5498 -1010 18088 0.42 9107 18088 )etermine WSEL to: 2.00 - yr release = 0.79 cfs :eq'd Volume 18088 cf - 0.42 ac-ft TSEL is below 72.00 ft - Req'd WSEL 71.82 ft Elev Cum Freeboard 0.18 ft Volume Error Messages ft cf Pond Ok 72.00 19098 Not enough freeboard 71.80 17990 Determine WSEL for 100 - yr release 3.45 cfs Req'd Volume 9107 cf WSEL is below 71.00 ft - Req'd WSEL = 70.03 ft Elev Cum Freeboard 1.97 ft Volume Error Messages ft cf Pond Ok 71.00 13699 Freeboard ok 70.00 8957 1760-CUHP-new Stage Storage Page 4 of 8 Job No. 1760-01-00 Shear Engineering Corporation 3/25/2002 Designer: dah Cherokee Flying Heights 2:36 PM Determine WSEL for WQCV Req'd Volume 1864 'cf WSEL is below 68.40 ft - Req'd WSEL = 68.33 ft Elev Cum Freeboard 3.67 ft Volume Error Messages ft cf. Pond Ok 68.40 2109 Freeboard ok 68.20 1372 WQ Volume Required = Detention Volume Required = Total Volume = ude: 1864 cf -part of the detention volume 16224 cf 18088 cf vs 17990 cf provided Stage Storage 73.00 �� • M ¢°n 51 i? if Y'.��i' ii iAL'.t}Y +�t4:..S'sl:SS1G t1� i 72.00 ��� vm ass "r- •Zlxt. R. 71.00 _3sr;"+:`s �.'�3.>.i,d �' c a"11'1`,�e r� x�I �"�V,•, � a�i.V ta�+ r^�" k�`in.} '"�,4ikj�+� ;-f' Kif"Y ..Y4'Akst'k e3'�.n"�y�-•. .� 70.00 �Y'r� fiyay,y it}?.i�,)rNty K4�i'iri•a^I.'�w4't3Y': R 69.00 68.00 F. rr - '.. .,•.�. "y ;,p, w a. v� rtrw t x ,. -.. iu 43}.F2�` r• tp mod,., R.yr n`+4 'v a. < ..l'r 3, 'tP j.N fi. .y. 66.00 S 5?i;r G+ pt Nr Y7h is rk' x x5n{S, r"',ii��Ca 65.00 s v r#w Fr�Yu fa ttril Sih C T3P' A r�y'�. T i" � ... [i���j.rd � tS;•,r,y 6 Ou � { (i„ ._ .� .. ;. �._,�• � d�. tom`:. r (� Nc§ Storage (cf) —+— Volume 100-yr WSEL --*-- 2-yr WSEL 1760-CUHP-new Stage Storage Page 5 of 8 Job No. 1760-01-00 Shear Engineering Corporation Designer: dah Cherokee Flying Heights INPUT FOR OUTLET STRUCTURE DETERMINE ORIFICE SIZE Release @ 2-yr Historic Q= CA(2gH)"0.5 A = Q/(C(2gH)A0.5 WSEL(ft)= 71.82 H (ft) = 2.60 C = 0.65 Q (cfs)= 0.79 A (sf) = 0.11 R (ft) = 0.185 D (ft) = 0.370 Use 0.375 ft diam.orifice 4.50 inches LOWER ORIFICE DIAM. (ft) 0.38 TOP OF BERM (ft) 72.00 LOWER ORIFICE INV. (ft) 69.72 INIT. DELTA (ft) 0.04 LOWER ORIFICE COEF. (Cl) 0.65 DELTA HEAD (ft) 0.25 Top of Lower Orifice (ft, 70.10 Top of Pipe (ft) 70.97 UPPER ORIFICE DIAM.(ft) UPPER ORIFICE INV.. (ft) UPPER ORIFICE COEF. (Cu) OVER FLOW yes Top of Upper Orifice (ft; 0.00 WEIR LENGTH (ft) 40.00 Pipe Diameter (ft) 1.25 WEIR INVERT (ft) 71.80 PIPE SLOPE (ft/ft) 0.0050 WEIR COEF. (Cwo) 2.60 MANNINGS n 0.013 Q100 (cfs)= 10.94 Pipe conveyance factor- (64.600 Req'd Head (ft) 0.2229 C = 1.486ARA2/3/n Max WSEL (ft) = 72.02 12/20/2001 11:37 AM 1760-CUHP-new Outlet Page 6 of 8 Job No. 1760-01-00 Shear Engineering Corporation 3/25/2002 Designer: dah Cherokee Flying Heights 2:41 PM *OUTPUT* Pipe Area (sf) 1.23 P 3.93 ft HYD. RAD (FT) = 0.313 ft R"2/3 = 0.4603 OUTLET PIPE CAPACITY = 4.57 cfs LOWER ORIFICE AREA (A) = 0.1104 sf UPPER ORIFICE AREA (A) = 0.0000 sf ORIFICE EQtN: CA(2gH)"1/2 WEIR FLOW EQTN. CwLH�3/2 NOTE: HEAD OVER ORIFICE = HEAD OVER CENTER OF ORIFICE LOWER ORIFICE UPPER ORIFICE OVERFLOW WEIR HEAD HEAD HEAD SUB ELEV. OVER LOWER OVER UPPER OVER WEIR TOTAL LOWER ORIFICE UPPER ORIFICE WEIR FLOW FLOW ORIFICE FLOW ORIFICE _FLOW ft ft cfs ft cfs ft cfs cfs 67.32 0.00 0.79 0.00 0.00 0.00 0.00 0.79 68.00 0.00 0.79 0.00 0.00 0.00 0.00 0.79 69.00 0.00 0.79 0.00 0.00 0.00 0.00 0.79 69.72 0.00 0.79 0.00 0.00 0.00 0.00 0.79 70.00 0.09 0.97 0.00 0.00 0.00 0.00 0.97 70.25 0.34 1.13 0.00 0.00 0.00 0.00 1.13 70.50 0.59 1.23 0.00 0.00 0.00 0.00 1 1.23 70.75 0.84 1.32 0.00 0.00 0.00 0.00 1.32 71.00 1.09 1.39 0.00 0.00 0.00 0.00 1.39 71.50 1.59 1.52 0.00 0.00 0.00 0.00 1.52 71.80 1.89 1.58 0.00 0.00 0.00 0.00 1.58 72.02 2.12 0.00 0.00 0.00 0.22 10.94 10.94 Determine Qrelease For 100-yr WSEL Qdesign 1.58 cfs Qrelease 1.58 cfs Qdelta 0.00 cfs WSEL = 71.80 ft Determine WSEL for Q100 - worst case Q100 = 10.94 cfs Qrelease 10.94 cfs Qdelta 0.00 cfs WSEL = 72.02 ft Worst case is defined as both orifices clogged and WSEL up to weir Weir is sized to pass Q100 without benefit of orifice 1760-CUHP-new Outlet Page 7 of 8 Job No. 1760-01-00 Shear Engineering Corporation 12/20/2001 Designer: dah Cherokee Flying Heights 11:38 AM low Weir from WQ Pond Required WSEL = 71.82 ft - from stage storage Q100 to pond 10.94 cfs - from slow summary Weir Coefficient 2.60 Top of Wall 72.00 ft - from stage storage Set Weir elev @ 71.80 ft - from.stage storage Head = 0.20 ft - top of wall - weir elev BROADCRESTED WEIR FLOW EQUATI(Q = CwLHA3/2 L = Q/CwH^3/2 Length (L) 47.06ft Set length @ 37.66 ft <-- Maximum Length due to rounded up to nearest 10.00 ft Space Limitations H = (Q/Cw*L)�(2/3) Max Head (Hmax) Hmax = 0.23 ft Max WSEL = 72.03 Lowest Opening Elevation = Max WSEL + 1.50 ft Lowest Opening Elevation = 73.53 ft Conclude - Overflow Weir will be adequate Pipe size from Outlet to Street Diameter 1.25 ft/ft n 0.013 Slope 0.0050 ft/ft C 64.60 - from Mannings Equation Capacity 4.57 cfs - C*S"0.5 Q10 4.29 cfs 1760-W QCV-new Weir Page 8 of 8 APPENDIX II .Erosion Control Calculations Erosion Control Cost Estimate Erosion Control Security Document October 3, 2000 Project No: 1760-01-00 Basil Harridan City of Fort Collins Stormwater Utility. P.O. Box 580 Ft. Collins, Colorado 80522 Re: Cherokee Flying Heights, Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Cherokee Flying Heights ESTIMATE 1: Erosion Control Cost/unit Unit 80 LF of silt fence rr S 3.00 LF 2 Gravel Inlet filter @ $150.00 Each 5 Haybales barriers @ S 75.00 Each TOTAL ESTIMATED COST: ESTIMATE 2: Revegetate disturbed area 1.74 acres @ S 655.00 $655.00 per acre for areas up to 5 acres. TOTAL ESTIMATED COST: Cost $240.00 S300.00 $375.00 $915.00 x 1.5 $1,372.50 S 1,139.70 x 1.5 S 1,709.55 In no instance shall the amount of the security be less than S 1,000.00. Therefore, the total required erosion control security deposit for Cherokee Flying Heights will be S12709.55 If you have any questions, please call me at 226-5334. Sincerely, Mark Oberschmidt Shear Engineering Corporation MEO / nleo cc: Mike Jensen City of Fort Collins Stormwater Utility - Erosion Control Department 4836 S. College, Suite 12 Ft. Collins, CO S0525 •(970) 226,5334 Fax (970) 282.0311 ).N-%v%r.shcarenginecring.cotn October 3, 2000 Project No: 1760-01-00 Re: EROSION CONTROL SECURITY DEPOSIT REQUIREM-N''TS: Cherokee Flying Heights; Fort Collins, Colorado An erosion control security deposit is required in accordance with City of Fort Coliins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development lAanual). In no instance shall the amount of the security be less than $1,000.00. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. The cost to install the proposed erosion control measures is Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is Net disturbed area due to construction activity will be Cost to revegetate the disturbed area = 1.5 times the cost to re -vegetate the disturbed area is CONCLUSION: The erosiop control security deposit amount required for Cherokee Flying Heights; Fort Collins, Colorado will be $1,709.55 $915.00 $1,372.50 1.74 acres. $ 1,139.70 $ 1,709.55 SHEAR 4836 S. College, Suite 12 1't. Collins, CO 80525 (970) 226.533.1 Fax (970) 282-0311 �� �� ��tshrirengincering.com G:\Clicnu1J-Clicnts\Jcnsen, Mike\1760-01-00; Cherokee Flying Heights\Documents\Erosion Control\Sequence.doc CONSTRUCTION SEQUENCE PROJECT: CHEROKEE FLYING HEIGHTS STANDARD FORM C SEQUENCE FOR 2002 ONLY COMPLETED BY:MEO/SHEAR ENGINEERING CORP. INDICATE BY USE OF A BAR LINE OR SYMBOLS WHEN EROSION CONTROL MEASURES WILL BE INSTALLED. MAJOR NIODIFICATIONS TO AN APPROVED SCHEDULE MAY REQUIRE SUBMITTING A NEW SCHEDULE FOR APPROVAL BY THE CITY ENGINEER. YEAR 2002 MONTH A M J J A S O N D OVERLOT GRADING **+ WIND EROSION CONTROL SOIL ROUGHENING *** PERIMETER BARRIER ADDITIONAL BARRIERS VEGETATIVE METHODS SOIL SEALANT OTHER RAINFALL EROSION CONTROL STRUCTURAL: SEDIMENT TRAP/BASIN INLET FILTERS STRAW BARRIERS *** SILT FENCE BARRIERS *** SAND BAGS BARE SOIL PREPARATION CONTOUR FURROWS TERRACING ASPHALT/CONCRETE PAVING OTHER - GRAVEL INLET FILTER VEGETATIVE: PERMANENT SEED PLANTING MULCHING/SEALANT TEMPORARY SEED PLANTING SOD INSTALLATION NEfTJ NGS/MATSBLANKETS OTHER STRUCTURES: INSTALLED BY: OWNER MAINTAINED BY: OWNER VEGETATION/MULCHING CONTRACTOR: OWNER DATE PREPARED: 02/10/2001 DATE SUBMITTED: 02/14/2001 APPROVED BY THE CITY OF FORT COLLINS ON: Job No. 1760-01-00 Shear Engineering Corporation Designer: meo Cherokee Flying Heights RAINFALL PERFORMANCE STANDARD EVALUATION 10/2/2000 3:16 Pit PROJECT: Cherokee Flying Heights STANDARD FORM A DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb SUBBASIN ZONE (ac) (ft) M (feet) ('s) 1 rwunewrt 1.by belu.uu l.uu 513 1.69 Totals 1.69 540.00 1.00 LINEAR INTERPOLATION SLOPE LENGTH 0.50 1.00 2.00 500 79.1, 79.50 80.3 540.00 79.61 600 79.4 79.77 :80.5 CONCLUDE: PERFORMAfICE STANDARD 79.61'% EROSION CONTROL PLAN OVERALL EFFECTIVENESS MUST EXCEED THIS EC-Calcs.xls Performance Page 1 of 2 Job No. 1760-01-00 Shear Engineering Corporation Designer: meo Cherokee Flying Heights EFFECTIVENESS CALCULATIONS STANDARD FORM B PROJECT: Cherokee Flying Heights PROJ. NO. 1760-01-00 BY: MARK OBERSCHMIDT DATE 10/2/2000 C-FACTOR P-FACTOR COMMENT METHOD VALUE VALUE ROUGHENED GROUND 1.00 0.90 ROOF AREAS HAYBALES 1.00 0.80 ASPHALT/CONCRETE 0.01 1.00 SOD 0.01 1.00 MAJOR PS SUB AREA BASIN k BASIN acre ALL 79.61% 1 1.69 CALCULATIONS AREA C P ROOF 0.34 ACRES 1.00 0.90 SOD 0.39 ACRES 0.01 1.00 ASPHALT 0.96 ACRES 0.01 1.00 CHECK 1.69 C = 0.2092 P = 0.7839 EFF 83.60% TOTAL AREA = 1.69 ACRES OVERALL EFFECTIVENESS 83.60% > CONCLUDE: EROSION CONTROL PLAN IS EFFECTIVE EQUATIONS C = WEIGHTED AVG OF C X AREA P= (WEIGHTED AVG OF P X AREA) X P EFF = (1 - P X C) X 100. 79.61% 10/2/2000 3:16 PM EC-Calcs.xls Effectiveness Page 2 of 2 APPENDIX.III Pump Specifications 2v. 2!2 2: ��? Fk CON JUF'f' t' A*%6]ER! COST-EFFBCT1Va ru)4pj9G AFP 1041 60 Hz - TOWOO tans MAP) roatax t�s�o� 14 �. Z1. I 70 40 I"' i 2 - i - p 1 --I---�—so — • e e u T 1 a tew ` om ONS I ' I 1 c 4 i i ot+t t :tG I { p ont: Y I Wet well stationary with pedestal stationary with pedestal Dlmenslons [inch) A B C - D E I F G N J K 71/1a 3% 14% 071, 10,40 21 1031. d'/1 7'/- 1 6'/1a T T/t0 8'/� w t'/ts X 6'alta a 9'/1e b 1 c IV/14 d 87/10 e Olta 1 't/1a DN1 DN2 DN 3 VAG 310/to -T ..__.___..___._.,...�_.._.,'___"--- -.._ -.-"' .-,......,,... w�w�. ,o. we vscw idamatlw ow"4t 0ln tAla soSwue. A 0.. v. L r [ ( :. ! i , vi AS 10 COSY-Ei►LCTIVN PCMPING IFA!CO,Y S'J"PLY Pump performance curves AFP 1041 60 Hz Curie number Reference curve wee .. .. . cr.• • ..�..�...-`.��.. WN ®FK . ., . .- _ AU EL 1 C t =0-1246 InrOMStiOn CQiWinvd in tF4a edMare, APPENDIX IV Charts & Figures Table 3-3 RATIOMMAL Z•r_THOD RUNOFF COEFFICIENTS FOR COMPOSITE ;QZA.YSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt ...................................... 0.95 Concrete ..................................... 0.95 Gravel ....................................... 0.50 Roofs .......................................... 0.95 Lawns, Sandy Soil: ' Flat<2%..................................... 0.10 Average 2 to 7%.............................. 0.15 Steep>7% .................................... 6.20 Lawns, Heavy Soil: Flat<2%..................................... 0.20 Average 2 to 7%.............. ......... .. 0.25 Steep>7%......................:.............. 0.35 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration .Curve, the time of concentration must be known. The time. of concentration, T,, represents the time for water to'. flow from the -most remote part of the drainage basin under - consideration to the design point under .consideration. 'Thee time of concentration can be represented by the following equation. T. = t,v + tt Where: T, - Time of Concentration, minutes t,,,= overland flow time, minutes tt= travel time in the gutter, Swale, or storm sewer, minutes 'The overland flow time, t,;.:,can•be.determined •either.by the:'following.equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). 1.87(/.1_CC)g12 Tov= Sl/3 Where: T,v= Overland Flow Time of Concentration, minutes S - Slope, % C = Rational Method Runoff Coefficient D = Length of Overland Flow, feet (500' maximum) Ct = Frequency Adjustment Factor The travel time, t,, in the gutter, swale, or storm sewer can be estimated with the help of Figure 3-3. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff' coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller. effect on storm runoff. These frequency adjustment factors are found in Table 3-4. May 1984 Revised January 1997 Design Criteria 3-5 City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1 a uran tio 2 year 10-year 100 year inutes) Intensity Intensity Intensity in/hr in/hr in/hr 5.00 k 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 8.03 ---- 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 1.98 3.39 6.92 0 1.92 3.29 6.71 013.00 0 1.87 3.19 6.52 0 1.81 3.08 6.300 1.75 2.99 6.10 0 1.70 2.90 5.92 19:00 1.65 2.82 5.75 20.00 1.61 2.74 5.60 21.00 ' 1.56 2.67 5.46 22.00 1.53 2.61 5.32 23.00 1.49 2.55 5.20 24.00 1.46 2.49 5.09 25.00 1.43 2.44 4.9 26.00 1.40 `2_.39 4.8 2.7.00 1.37 2.34rIE4.78EI 28.00 1.34 2.29 4.69 2.9.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (31 minutes - 60 minutes) Figure 3-1b Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/h� 31.00 1.27 2.16 4.42 32.00 1.24 2.12 4.33 33.00 1.22 2.08 4.24 34.00 1.19 2.04 4.16 35.00 1.17 2.00 4.08 36.00 1.15 1.96 4.01 37.00 1.13 1.93 3.93 38.00 1.11 1.89 3.87 39.00 1.09 1 1.86 3.80 40.00 1.07 1.83V.3.62 4 41.00 1.05 1.808 42.00 1.04 1.77 43.00 1.02 1.746 44.00 1.01 1.721 45.00 0.99 1.69 3.46 46.00 0.98 1.67 3.41 47.00 0.96 1.64 3.36 48.00 0.95 1.62 3.31 49.00 0.94 1.60 3.27 50.00 0.92 1.58 3.23 51.00 0.91 1.56 3.18 52.00 0.90 1.54 3.14 53.00 0.89 1.52 3.10 54.00 0.88 1.50 3.07 55.00 0.87 1.48 3.03 56.00 0.86 1.47 2.99 57.00 0.85 1.45 2.96 58.00 0.84. 1.43 2.92 59.00 0.83 1.42• 2.89 60.00 0.82 1.40 2.86 Bus 9 .8 .7 u, o .6 V Q 4 ... Z s :. O V W tq 1 s:06 F: 0.8 I S : F:0.5 0.4 I I I I' I BELOW 4LLOW4BLE STREET f MINIMOM GR IoE I .0 0 2 4 6 8 10 12 14 SLOPE OF GUTTER (%) Figure 4-2 REDUCTION FACTOR FOR ALLOWABLE GUTTER CAPACITY Apply reduction factor for applicable slope to the theoretical gutter capacity to obtain allowable gutter capacity. (From: U.S. Dept. of Commerce, Bureau of Public Roads, 1965) MAY 1984 4-4 DESIGN CRITERIA SECTION 7. OPEN CHANNELS nnels should be designed such that flows at critical depth of surer critical flows are ,ided. All open channels shall be designed to carry the major storm runoff (100-year recurrence interval). Lined channels shall be utilized when flow hydraulics, topography, or right of way limitations govern. 7.1 Lined Channels Where conditions for unlined channels cannot be met, open channels shall be lined. If •supercritical flow is unavoidable, all concrete channel sections shall be continuously reinforced, both longitudinally and laterally. A r..inimum of one foot of freeboard shall be incorporated into major channels. Small channels shall have either one foot of freeboard or additional capacity of approximately one-third (1/3) of the design flow. The design of lined channels on bends or curves shall take into consideration the centrifugal and gravitational forces on the flow within the channel section. Use the following equation to -determine- the water surface rise: 2 YW y=c _ gr Where y - Rise in water surface between a theoretical level water surface at the center line and outside water surface elevation (superelevation) C - Coefficient (see following tabulation) V Mean channel velocity W Channel width at elevation of center line water surface g Acceleration of gravity r Radius of channel center line curvature tArmy Corps of Engineers' publication Hydraulic Dosign of Flood Control Channels, 1.July 1970 Use of the coefficient "C" in the above equation allows 'for the computation of the total rise in water surface due to superelevation and standing waves for the conditions listed in Table•7-1. Table 7-1 SUPERELEVATION FOMAMA COEFFICIENTS Flow Typo Channol Cross Section Typo of Curve Value of C Tranquil Rectangular Simple circular 0.5 Tranquil Trapezoidal Simple circular 0.5 Rapid Rectangular Simple circular 1.0 Rapid Trapezoidal Simple circular 1.0 Rapid Rectangular Spiral transitions 0.5 Rapid Trapezoidal Spiral transitions 1.0 Rapid Rectangular Spiral banked 0.5 All lined channels shall be protected from hydrostatic uplift forces by the use of either drain piping, weep holes, or appropriate footings. Flow at the Froude number • near 1.0 is unstable and should be avoided. The concrete shall be finished, as close as possible, to the degree of roughness used in the design channel. Lined channels must have the bottom sloped so that the flow is channelized towards the center line of the channel. May 1909 Revised January 1997 Design Criteria 7-1 APPENDIX V Stuffer Envelope Master Drainage and Erosion Control Plan (Sheet 6 of 14) Drainage and Erosion Control Details (Sheet 14 of 14) :i IF GRADING AND OF AINI (£NERAL NOTES ERD9M rAXImA WIIS1NUi %AN Nam I. All Storm ag t 1 t0 of pM co moll y life d S1marN a Specifications1 w Me dal W cNotWclm. My a of w My Th Ca f fast Win Communist MII Rpebn Call Inepedor must anotion 1 at 91 Y - g IM1 pea olle Me l Note o/ Mn Fed NY h P t Y acn W f M ter. Pm9WH' use a a Eta Contra 9epw1 Sal muse q re<eenmtkn of me Plans by the Slarmrotr ON ty lans by All -required - tx u I hol be 4elauea to an d refusing r l p poor y m r t atugroa^9other ewem cmdol measures sM1oll be -^slotted o1 Me ( p'mA 2 Me City of FM COIIFs eAoa not k responsible Irc the m^InMma d time In t se FpoPMte tlme in Me control eryumm m mdleglea in tbesoppmrM pmpd a[h Wle, omeprop alarm J age 1 I! I tM P' 1 properly corstratuar pappal. and ermon Contring must. I. All construction l' t' 1 pIY IA IM1 State fdaaaq P ed t rMr t t mail AS projected d handled M m R M or `e9 Pr P permitting p lu 5! Woo D Ting to rNM1 d ( 1 9 m9 IN Ndl b Im tetl 1 IM1 required t ed 1 Wc14n a W A I tr Fiat information.tr t t Wmeb e a P Y a t M eA Idol practical p W two Department 43MD t MOM, Not Quality Control o' 22-IM 9z AJm Dairy c if DriverEnfrc Mom. W p me Blind a t N paper d All i W a m9 y(stockpiling. 'pV A 9 a 9 trty' t llal , mez3-ISJ0. Allmfm- P 1 d Enforcement Cray' Pone (39J) 693-359D. Sing 1) mail a kept northbound condition qp 9 tl 9 0l 9 1 d 1 ell run Ira Kg r Ma eCm t m 1 dinstalled.No [ee%LI l If g) to be utttl to Lorton tbm o Slate for .Inton e street team d mY eM1^II remain ummW rm Iona g. sem ng lm, to Ira more thanetc) Mlrly d id Eay hefty ( pmmonmt mndd (e.g. seed/mulch, lanaangmg, plc) Is dAtllel, aelMs lemrwise wtmq ibis oriented I Dtions y rg W chnne, D golan Permit a ywit tln e N d eta o stmn n cM1 d ' q I� e'IM, w any stem of the Un 1eE 91dn a Sum undo otherwise gposetl by IM1 St otm Olt ly. p S. Fair cortficuturris mall be panel to the Sperninfir Daily by a - Me pro y Ad be mto d mall at all times durnis Construction palpatedin W ff t wine aauW a'- At Imo parallel ti1' Adl b m i toy d' 1' M ohm c otmamd an 9' licensed theState t Call pm alY of RNmxm 1` t 1 1 (2) N p 1 I W fi 1 f ! miles dual mprcla ate ry t properties belonged by theCity f Fort WhenEngineering o panty or any adabuyind building prommus far this dojoI) borrowing De Fa mt M1 b installed thesubstantiala Mol storrmo all improvements utility cmctions ac me aIYmW don tr Alma and that Me drainage arm All Im wooy (sWaWral) peon cmlyd measures mail be monitored and roared m mwmHnbcted NncLma omaremq m Ne o-oFa9e engn intent oidi y after LOM tworrl ammo In order m nears Car pvlummre of their unman luncllan. All remFea aeainmis, pmxwlWY those m barctl rmMgy mrlam, anal be rmmW 6, All recommendations of Me end Oroaa9e and Erman Gnlyd Report and disposed o/ he a mmna and lomlin so as not to twin their reuse into any dminagemy for Cherokee I Neyhle by 4iw Enamel Grpaalin and be No Sad slttYpile Odl maM too (10) feet In height. All sea at FALL Aoll be protected Moo consiEered o port of man 9smd notes and g ifimtims and arm be formed dung constr im. Contri and TI wkmdMps and yymmt dmmai by wbdAbr raghmm% watering, and pameb sll formal My sag slrckple restaurant after W Wye must be seMM and muIMM min___�__� llf�iFxiliER3� sa famAianm Mmadm with at raanmmWLma prantd in Me drama¢ and mm'pl wrord npml 1p Ihn mile. City Wagner prolfilt the VWnA dropping, or dyM ing of dogs or any coma material rate CAAINAI.E MAINTENANCE NOTE City strings by a hen^ my aside. Any ^otlwtmt demailM mix ermll anal be demand Nelm to (to]Ng %on Ira iminkinataftly by the contractor Chmgm n .all nekfla ma I. sermlc montmance and de^mng of the mom waotr M<mm0ma All d4Wme1 mesa m6Me of Me rmamy Including Me amnegewnys, to bg labmzea 'im o gnu uN feria by Me owner is toward to mere IM1N Me structure mixture a son. Gm and Refund to M maintain wheat gross She tl lure to nduds 70S We am tenet Nbwabl<lpmFg mastrfactors cebeproperty. It is recommended fact this Omi qma 15% hard Pme�S IRS Cerebral Rlegme, end 5% Ke lucky Rue area ElepWn 41,W feel - — -. mould by be done r o h storm antal . me orinw plate Nand npne mww Ounce m appr eyat Seedn rate to M dada tlnt used n fide g Mwla M dmnM ofla eM atmn met ( 9 p'men . maw ram NSFL'n MmNm MJd m hay to be qm] oM mmptl aMhe eeMM arm of o radio of ISA' -3O]p ymGa / we, p Iz � so n 44 ryhJrl.rc�gr OAK STREET ART ��I�F1��6'iIS'd31s'd17�td'i'i�ttiliSA7t'II':!t'df1lS7 i1�f69'it'd{�S'S17�i6'i�fid:'1�G11sii1new i7 an.... �S'SSIe'14�5'S:7�t:9El'17�lli�d�lt�r7F ��t'Li1e5.1�6:l1.41EII:71.':lEitla'tA1�S1 W��S'S:IfS.1�J�8'71SSL�2' :ILJa'S:!{'a':1 Ift,♦1A��CiittiJ�LJfL'S'i7iSi7rYl1L4J�+11iLti7 41n2 Come b Mn I �:Si�i16 eL1�R�� rtl— d� raw is RIM Arsop Ira Me M b Mamma dome pmtl I Pnd wortel M eel p y IM nM i it bnenmt OA it may Dee b]m n Decrease 12111 - - - - xel-t Mar !B) a. Erl Den e Slate n Bate a n Nm N MJNne n Dort Mora d den vma a-ft fail M rude n 21 M redo w d 67M am a a 0 a a So IBA 474 am m 2 z am old? Imes a]ia an am m5 m ]6 am Arm Imes 62.m Dart am Idol 2% 3m am no] am am am am may w ]n ¢ nor lR ram am am m w Ira am not RUE may in am elm ]Sl 21M am no 1!® ram Ira am alga my AY soy SIR film mM leg as 1 BE) m] am no] ILLS ram Ira am afl 61 4624 an Tor Imm ]nor 2m Ira Am BID may an 907 elm ]I.m am f. 5111 au 1E99 ail me form T.m Sm am m lam WAS 0.M 91m IBmd P,m Am am U13 DIM amp ON nor Ia6d P,m All am mi lma l0 ¢m nor Imes P.m 441 020 Spa Ira] FM] Q41 nor 1 ]2q1 era am YJ] ludo I Hoot aN n01 1w PdY Ira -n1B Sled -1m0 I im I Due nor ISm MemM FIlb Asia Moe IiL'n Hbe fed am Y me n d Rm IMS All lM 300 IM Rm -}Idea. of - Be fl - bard 9l • FnlPaa Form Wrap am Nit m iedmd an o-R Pd2 ale A n n WAS JDLY 2001 Drawn. FMB CMde A M J J A 9 a N 0 ne wo Ph we we we em mvT waT nxR - sh we nT Pew we H IHwin we ISly EIIIISAMnIiWlm KmICA.93 MSiN n. 4TFA N/YA WIInACNf aRu SALIE wrt ROAm mA2/mm woo 9Aw9mo mAtrym MAr]IIDwmB nfmlmamm LVA51EEL Mina Ull In- Lh WRET PIPE KYg10 rnm w, If s(iwI /CRInCE PLATTE\ OKI PPE WE MRMC re f/rf STEEL a T (M. e) �41Reveal Table 11.2 R60YYpDCD 9PEC16 PO TWO'O0. MUAMIN ARE / OR MM CROPS GRAPHIC SCALE. SPECW9 56ASON DRIIJBD MMS/ AM Ad L o m m ep Mewl RJepeee Cool ED ab I m 1m -wn Cei Rye Cml 40 not Nleky Cou1 40 ftBmlay STmN Coal IS EDD YDIet fad ea M brtd Slam Nmm IS seghum Norm 10 Coat MMM 6 mere thetr maim graeld m Me ryrlry, line memo grmeee mph {II1I-n1E,■■■� Most major gr IN We In Me lair muning and mmmm. Table 11 { IdODUm plm4og deb lm permviel and temp rm /ever poppy Came Table ILA PIARTLYG DAME MR PRR&YNIAL AM T616VNUlY / COVER MR GMMS DAM PEIIENM.W T OW/W GRASSES CHOP G9A5985 berm cool germ pool Job DI — m26 Yee Yam No No LEGEND awn 01 - may 15 this Yn No Yea May 16 - May 91 Yee No Ye No ENSING ICMT R im 01 - 1W 91 No No YM No Mg Of - Aug 91 No Ym No yes — ""NO S CRIipN gap of - pep W No No NO Yes Oat 01 - Dee 91 yin Yes No Na fmvosED 1 WHTWR MdpbhN shell be and W seen an We establishment of Melm0om We an mom of We PRwdsEO 5' caxraR foOalMg mulches Ad brouad do a moral dqy gram a miilure, or e � � BASH BOUNDARY . temporary aegeWYao r voteMIN YWch AmyMm le AppxnOoo Rork ME aB-BASH BWHD.wv Dote of Use MMOMMM MIHIF RASH BnIMOARY 94mr m Nat in of - Hay 2 91 toe/ease dra Nywic good or 15 - Wy IS 2 om n pee ermtmn emwl ImeG 6lmhelel in 3m or or 01 -Dec 91 Not .pWnNe A A - BASIAREA INMom B - AREA ACRES �y or straw mulch shell M nee d voAime weedy and at lead 50g d the Mbx ram he 10 ea C - CONP091E S(100 eCEmmann (Imo w. EYFNT) mW m0a greero, bay (r®e mlin gram u s hn or comer an eWgtmiw arpgmtM mdehWg evaileNe. QO D - N P DE9PIAMNI M stgYeMoo b used , hydnotic mdphe may be eppDetl from Yenh 15 them* Se rpPI®hen m. Q LHpMN£L xuHuM My by 91rew Yuk-0 n.svm eNi9 FLOW Trion RI 1, Rey m Ham we markets wDl he mpharm to We NO by me of We follmwg meW Ws —T F SIT FENCE e, A wisdom which mil crWp We mar low ioehee or dome mlo We sot1. Al lent 5" d yiRAsr BALE Diego fiber slid be 10 Toot m mom in ]"W, b. Ymwec4ved mWph oet4og iaeleped doer We hat or stray a rdim In mmOod ere gjah MAWL al FRITER Wlemtlma, c hcHhen apnyM m the mweh 0 We m fact s ravmmepdetiop. ® 2mn50' WHEM CLEAVING VAnw 2. AD Mw m hey must he free of early woman A a nave emu. WRAP APRM B M o BE an.ma-aw_Ir PUTLE m mom. as MAL error A w — mmlre rerlgo am N-12 ecru RAN Es's1 Mwv FRAME. -••�•a hY aRRa�-• 13R s ]l�or worm SECTION A -A LL DETAIL $Ff REi. WALL. CETAY XE/➢WAl1 ,y tea'- 8) 4£ .WALL LNL Qtli1Q plglE 50 SECONDARY ORIFICE PLATE/14WEl l DISTAL G la Rate InsM (dnR Plpe Tm mi pbG plate R OidII 0mn Nfl Ndght Hoot NO Bar, A D C ft non 691 I.BB I FP* Masi r� LL Q ftnmityr4q % 14 Iggiv.6omde Oppose wpm UpWris W q Boo San %ate Rule InM nwt (Both) pcBmat Ro HootOperring NtlM mm He19AP Efne. 1) (I) fl nee nmers ii 67. ] N00 9, I. See dead m short 1e for Wlgliond =an Om SECTION S-B