HomeMy WebLinkAboutDrainage Reports - 01/21/2016City offt .,Collins rov Plans P►PProved BY Date January 20, 2016 Wes Lemarque City of Fort Collins — Stormwater Utility 700 Wood Street Fort Collins, CO 80522 RE: FMC — Fort Collins - Drainage Letter JVA Job No. 2456c Dear Mr. Lemarque: JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 Ph: 970.225.9099 Fax: 970.225.6923 Toll Free: 877.444.1951 Web site: www.jvajva.com E-mail: info@jvajva.com This letter has been prepared to summarize the proposed drainage design, comparison to the Timberline Center Master Plan and changes in impervious area associated with the site improvements for the FMC — Fort Collins Dialysis Center project located at 2107 South Timberline Road, Fort Collins, Colorado. This letter represents a second addendum to the Timberline Center Final Drainage and Erosion Control Report, revision date April 12, 2006, prepared by North Star Design. Overview The existing site (Lot 9) is a vacant lot approximately 0.8 acres which is part of the Timberline Center Subdivision, see Figure 1 for a site location map. In general, all major storm sewer infrastructure has been installed prior to the development of the subdivision. Site drainage will connect to existing pipes to direct water to regional detention ponds offsite. Proposed site improvement include construction of a medical facility (approximately 7,600 square feet), drive access, and parking lot with a total of 31 stalls. The referenced Final Drainage Report for the project accounted for the anticipated development of the site and the design of the regional detention ponds included the required volume to handle runoff from the 10-year and 100-year storm events for the site's full buildout condition. This letter will serve to supplement the original report and demonstrate that the development of the FMC — Fort Collins Dialysis Center complies with the approved stormwater drainage plan designed by North Star Design. Existing Drainage Design Based on the referenced Final Drainage Report, the predeveloped site historically drained overland in three directions. Basin H1 includes the southwest portion of the site. This area flows to a sump inlet and is conveyed to Regional Detention Pond A, north of the site along Joseph Allen Drive. Basin H2 includes the center and southeast portion of the site. This basin drains to an existing inlet and is piped to Regional Detention Pond B. Pond B is located east of Lot 10 along Timberline Road. Basin H3 includes the northern portion of the site and flows overland into Bear Mountain Drive which drains to a sump inlet and into Regional Detention Pond B. Figure 2 illustrates the historic drainage. Proposed Drainage Design The drainage characteristics for the development of Lot 9 deviate slightly from the original Timberline Center drainage report. The site was divided into five sub basins. Sub basin OS 1 directs flow from the western portion of the site and flow from the southwest quarter of the building to the existing inlet constructed on Lot 8. This inlet outfalls to Pond A located north along Joseph Allen Drive. The 100 year flow for this sub basin is 1.07 cubic feet per second (cfs). BOULDER I FORT COLLINS I WINTER PARK FMC — Fort Collins January20, 2016 2of3 Sub basin OS2 includes the existing parking area, half of the access road to the east of the site, and half of the road along the southern property line. Flow from OS2 is directed to the existing inlet along the eastern access road and outfall to Pond B. The 100 year flow rate for this sub basin is 1.22 cfs. Sub basin Al includes the other three quarters of the building roof. Flow from the roof will be directed via gutters and downspouts from the building to an earthen swale along the north side of the building to a proposed 12 inch area inlet which is piped to Pond B. Flow from the southeastern quarter of the roof will be directed via downspouts to the proposed storm sewer pipe. The 100 year flow for sub basin Al is 1.38 cfs. Sub basin B1 includes a portion of the access and drop-off area. Flow from sub basin B 1 will be directed to a rain garden in the landscape area. The rain garden will be constructed with an underdrain system that will direct captured flow directed into the proposed storm sewer pipe. The 100 year flow for sub basin B 1 is 0.82 cfs. Sub basin CI includes the parking area and permeable pavers. Flow from the asphalt paving will be directed to the permeable pavers. An underdrain system will be constructed as part of the permeable paver system. Flow entering the underdrain will enter the proposed storm sewer pipe. The 100 year flow for sub basin C 1 is 0.99 cfs. Figure 3 in the attachment shows the developed drainage map. Once flow has entered the storm sewer pipe from sub basins Al, B1, and C1 the storm sewer will connect to the existing storm sewer pipe along at the existing inlet located on the eastern access road. Although the develop drainage basins differ from the original report, the proposed flow is ultimately directed to the designated ponds as specified in the Timberline Center drainage report. Rational calculations are included in the attachments. Sub basins Al, Bl, C1, and OS2 make up a portion of sub basin 12 from the original Timberline Center report. The combined 100 year peak flow for these sub basins A1, B1, C1, and OS2 is 4.42 cfs which is only 17% of the proposed 25.9 cfs for sub basin 12 calculated the Timberline Center drainage report. Based on the Timberline drainage report sub basin Al was supposed to be part of the original sub basin 13. Flow from this area was to be directed off site and ultimately flow into Pond B. Due to site grading restraints this flow is captured but continues to be directed to Pond B. Sub basin OS 1 is part of sub basin 11 in the Timberline Center drainage report. The 100 year flow for this basin is 1.07 csf, which is 5.4% of the overall flow for sub basin 11 in the original report. LID Requirements and Design Low impact development (LID) has been incorporated into the site design and will treat a portion of the onsite runoff using a rain garden and pervious pavers. The rain garden was designed using Urban Drainage Best Management Practice spreadsheet version 3.03. A print out of the spreadsheet is included in this letter. The 406cf rain garden will treat runoff flow from 5,553 square feet of the site. Of this area 4,369 square feet is impervious. Flow will be directed into the rain garden by a curb cut with a rip rap blanket acting as a flow dissipater prior to entering the rain garden. The required area of pervious pavers was calculated using 25% of the total new impervious pavement area. This area included both asphalt and concrete pavement. The pervious pavers will treat a total area of 8,430 square feet which includes the pervious paver area. Utilizing the rain garden and pervious pavers a total of 51% of the impervious area on the site will be treated. The LID Compliance Table and Urban Drainage spreadsheets for the rain garden and permeable pavers are included in the attachment documents. BOULDER I FORT COLLINS I WINTER PARK FMC — Fort Collins January20, 2016 3 of 3 Erosion and Sediment Control During construction, temporary erosion and sediment control practices will be used to limit soil erosion and sediment discharge off the site. An erosion and sediment control plan with stormwater management plan and details will be provided in the utility plans for construction. Please feel free to contact me to discuss any questions you may have. Sincerely, NA, INCORPORATED By: Erik T. Nakos, P.E. Project Manager ByCIIIIIII,�� Charles R. Hager, P.E. Vice President B•y�c9`�o 7146 ?0/2016'C_:h* •••••••••G���\ AaAI Enclosed: Figure 1 Site Map Figure 2 Historical Drainage Map Figure 3 Developed Drainage Map Rational Calculations Urban Drainage Permeable Pave Calculations Urban Drainage Rain Garden Calculations LID Compliance Table BOULDER I FORT COLLINS I WINTER PARK !'` ' f' 7 �gJ —atr'd aft itAW PROJECT LOCATION �I 'ify NOT TO SCALE a `a s a 9 w Z J U O Q Q � z 50 O w � � Q � U U 2i O w } w _ L LL lL SHUTNC FIGURE 1 BEAR MOUNTAIN DRIVE MEDICAL CENTER l Tt:> H 1 Q 0.31 0.11 t H3 O.J1 0.1� I LEGEND A A HISTORIC RUNOFF TABLE BASIN DESIGN AREA 10 YR 100 YR POINT (ACRES) RUNOFF PEAK (CFS) (CFS) H1 1 0.11 0.09 0.23 H2 2 0.8 0.36 0.91 H3 3 0.19 0.16 0.40 TOTAL 0.80 0.61 1.55 HISTORIC DRAINAGE BASIN BOUNDARY (SUB BASIN) DIRECTION OF FLOW (HISTORIC) BASIN DESIGN POINT DRAINAGE BASIN IDENTIFICATION BUBBLE A = DEVELOPED BASIN DESIGNATION .5 = 100-YR RUNOFF COEFFICIENT 1.0 = AREA ACRES w? a J U OJ U w Q U F- (� Q o O Z Q U0 U Q ZLLU w} Ff U) �- O Lu U L uY< _ 30 0 30 60 SCALE IN FEET FT'. - FIGURE 2 —So SD SD 1G, — - — - — - — - — _ — BEABJM011UM DRIVE — W W W W W W — ri vw W—� W— w SDI s A------ a -w—w — s r----------- I I I I RUNOFF TABLE BASIN DESIGN POINT AREA (ACRES) 10 YR RUNOFF (CFS) 100 YR PEAK (CFS) Al 1 0.16 0.63 1.38 B1 2 0.13 0.38 0.82 C1 3 0.24 0.53 1.16 OS1 4 0.13 0.50 1.07 OS2 5 18 0.56 1.22 TOTAL E83 2.52 5.49 LEGEND ■ ■ IN I HISTORIC DRAINAGE BASIN BOUNDARY (SUB BASIN) fl DIRECTION OF FLOW (HISTORIC) Al BASIN DESIGN POINT A DRAINAGE BASIN IDENTIFICATION BUBBL 5 1.0 A = DEVELOPED BASIN DESIGNATION .5 = 100-YR RUNOFF COEFFICIENT 1.0 = AREA ACRES -0 30 0 30 60 SCALE IN FEET _zd _ ?sa3 w z a J Q U 2 U W Q U 0O Z w LL :E 0 U �2 Lu — LL W w } o U ~ w W J La w LL FIGURE 31 JVA Incorpanwd 25 Old Town Square Fart Collins, CO 80524 Ph: 970.225,9099 Fax 970 225.6923 FMC - Fort Collins Historic Runoff Coefficient & Time of Concentration Calculations Location: Fort Collins Minor Design Stonn: 10 Major Design Storm: 100 Soil Type. CID Job Name: FMC - Fort Collins Job Number'. 2456c Date, 10/19115 By: DSF 1% C2 C5 C70 C700 Streets Paved 100% 0.95 0.00 0,95 1,00 Concrete DrlveslWalks 90% 0.95 0.00 0.95 1,00 Roof 90% 0.95 0,00 0.95 1.00 Gravel 40% 0,50 0.00 0,50 0.63 Landscaping IS sell) 0% 0,15 0.00 0.15 0,19 Landscaping (CID sail) 0Y. 0.25 0.00 0.25 0.31 Playground 10% 0.11 0,00 0.11 0.14 ArdOcial Turn 25% 0.20 0,00 0.20 0.25 Basin Des l n Data I (%) = 100 % 90% 90% 40% 10 % 25% U% 0%. 11%) Runoff CoeRs Initial Overland Time I%) Travel Time IQ 4=Lenglh/(Veladly x 1, Comp tc Urbanlznd Check I,60)OFF Final Basin Design Am..v A,mrc A„a Axvx Ay19,a Am. wr Avroan A,A.w.'W ATulal ATaa Imp Un'pvr i osl Sara t Length Slops Velocity 4 Time of Tow t�-(Ulllfj Name Point •I"'I' °"` (sf) (sf) (so (at) .wl .a1 (SO (ac) M) C2 CS C70 C100 L."If, (%i (min) Mir I%l Type of Land Surface C, (cps) (min) 04nc4 L 101min.) Min ls0 (af) (so (sf) do t (�� Al 1 4,619 4.619 0.lt 0.0% 0.25 0.00 0.25 0,31 54 1.5% 12.9 Tillage/leld 5 too 08 129 54 NIA 12.9 H2 2 21.962 21,962 0.50 0.0% 0.25 0.00 0.25 0,31 1362 2.0% 18.7 Short Pasture and 7 0.0 0.0 18.7 136.2 NIA 187 awns H3 3 8,321 8,321 0.19 0.0% 0.25 0:00 0.25 0.31 47 5 1.0% 13.9 Short Pasture and 7 0.0 0.0 139 47.5 N/A 13.9 awns 0 0.00 Paved areas 8 shallow 20 0 NIA 10 Paved swalea 0 0.00 Paved areas 8 shallow 20 0 1 N/A aved swat TOTAL SITE 0 0 0 0 0 34,901 34,901 080 0.0% 0.25 0.00 0.25 0.31 Coeffs Rainfall Intensities Inlhr Area Flow Rates cfs) Basin Name Design Point Time o Conic (tc)Hi S C10 5 10 100 ATwx (so(ac)02OS010 ATaa 0100 1 12.900 JRunoff 0.25 0.00 340 6,94 4.619 0.11 0.06 0.00 0.09 0,23 H2 2 18.700 0,25 JT311.67 0.00 2.84 5.80 21,962 0.50 0.21 0.00 0.36 0.91 H3 3 13200 0.25 0.00 3.30 673 8,321 0.19 (L09 0.00 0.16 040 0 a 0 0.00 0 0 0 0.00 TOTAL SITE 34,901 Oil) 10.35 0.00 0.61 1.55 2456c - Rational Galas. xlsx Historic Page 1 of 5 JVA Incorporated 25 Old Town Square Fort Collins, CO 80524 Ph: 970.225A099 Fax: 970.225.6923 FMC - Fort Collins Composite Runoff Coefficient Calculations Location: Fort Collins Minor Design Storm: 10 Major Design Storm 1 100 Soil Type: I CID Job Name: FMC - Fort Collins 1% C2 C5 C10 C100 Jab Number: 2456c spears Paved 100% 0.95 a.0a 0.95 1.00 Dale: 10/19/15 Concrete OdvesMalks 90% (.95 0.00 0.95 1,00 By: DSF Roof 90% 0.95 0.00 0.95 1,00 Gravel 40% 0.50 0.00 0.50 0.63 Landscaping a soil) 0% 0.15 0.00 0.15 0,19 Landscaping (CID soip 0% 0,25 0.00 025 0.31 Playground 10% 0,11 0.00 (.11 0.14 Artificial Turf 25% 0,20 0.00 0.20 0,25 Basin Desi n Data I(%)= 1J0 .. _.. 990N 40% 11)% 25% 01„ 0% 1(%) Runoff CoefPs Basin Name Design Point Apaved sneers (sf) Adnvesic ana (si) ^root (sf) e Agravel (sf) p • plygnd (sO Aan turl (sf) m ApereaNe Pavers (SO Ascape (CIO soil) (so ATotal (5f) ATotal (ac) Imp (%) C2 C5 C10 C100 A l 1 5.577 1.186 7,062 0.16 71.1 % 0.80 0.00 0.80 0.86 61 2 2.678 1,692 1,183 5,553 0.13 75.6% 0.80 0.00 0.80 0.85 Cl 3 4,901 788 1.556 1,033 10,278 0.24 54.6% 0.60 0.00 0.60 0.65 OS1 4 1,705 1,264 1,913 822 5,704 0.13 80-0% 0.85 0.00 0.85 0.90 OS2 5 4.763 1.556 1.360 7,678 0.18 80.3% 0.83 0.00 0.83 0.88 0 0.00 0 0.00 0 0.00 TOTAL SITE 14.047 5,300 7,490 0 0 0 3,556 5.883 36,275 0,83 70.5% 0.76 1 0.00 1 0.76 0.81 2456c - Rational Calcs.xlsx Developed C Page 2 of 5 JVA Incorporated 25 Old Town Square Fort Collins, CO 80524 Ph: 970.225.9099 Fax: 970.225.6923 FMC - Fort Collins Time of Concentration Calculations Location Fort Collins Minor Design Storm:P110,1-1 Major Design Stonn:Soil Type- Job Name: FMC - Fort Collins Job Number. 2456c Date: 10/19/15 By: DSF Sub -basin Data Initial Overland Time (t) Travel Time (4) tc Comp tc Urbanized Check I. 4=length/(Velocity x 60) ON Final Upper Time of Total Basin Design AT dy most Slope 4 Length Velocity y 4 k=(IJ180)* Name Point (ac) CB Lencm"Ln (min) (rt) Slope (%) Type of Land Surface C' (fps) (min) Conic Length 10 (min) Min Al 1 0.16 0.00 t u J% 2.5 90.t 2,0% Paved areas & shallow 20 2.8 0.5 3.0 97.6 10.5 5.0 paved swales B1 2 0.13 0.00 50.4 2.0% 11.4 44.6 2,0 % Paved areas & shallow 20 2.8 0.3 11.6 95 10.5 10.5 paved swales CI 3 0.24 0.00 54.5 2.5% 11.0 30.1 2.0% Paved areas & shallow 20 2.8 0.2 11.1 94.6 10.5 10.5 paved swales OSi 4 0.13 0.00 19 2.8% 6.2 173 1.0 % Paved areas 8 shallow 20 2.0 0.1 6.4 36.3 10.2 6.4 aved swales OS2 5 0.18 0.00 283 2 0% 8.5 161 5 2.0 % Paved areas 8 shallow 20 2.8 1.0 9.5 189.8 11.1 9.5 avetl swales 0 D O.IHI Paved areas 8 shallow 20 D 10.0 pavedswales 0 0 0.00 Paved areas & shallow 20 0 10.0 paved swales D D 0.00 Paved areas & shallow 20 D 10.0 aved swales 2456c - Rational Calcs.xlsx Developed Tc Page 3 of 5 JVA Incorporated 25 Old Town Square Job Name: Job Number: FMC - Fort Collins 2456c •�.,"„`"' Fort Collins. CO B0524 Date: 10/19/15 Ph: 970,225,9099 By: DSF Fax: 970.225.6923 FMC - Fort Collins Developed Storm Runoff Calculations Design Storm : 100 Year Point Hour Rainfall (P,) 2.81 -_-�®�m®_____ --______ --______ ____-_-__----___ _- _________- 2456c - Rational Calcs.xlsx Q100 Page 4 of 5 � � JVA Incorporated 25 Old Town Square Job Name: Job Number: FMC - Fort Collins 2456c `11111N`, Fort Collins, CO 0524 Ph: 970.225.9 99 Date: By: 9/15 DSF Fax: 970.225.6923 FMC - Fort Collins Developed Storm Runoff Calculations Design Storm : 10 Year Point Hour Rainfall (P,) : 1.75 2456c - Rational Calcs.xlsx O Minor Page 5 of 5 Design Procedure Form: Permeable Pavement Systems (PPS) Sheet 1 of 2 Designer: DSF Company: JVA, Inc. Dale: October 19, 2015 Project: 2456c FMC - Fort Collins Location: Bear Mountain Drive, Fort Collins Choose One 1. Type of Permeable Pavement Section Q No tnflltration A) What type of section of permeable pavement is used? ® Partial Infiltration Section (Based on the land use and activities, proximity to adjacent O Full Infiltration Section structures and soil characteristics.) B) What type of wearing course? Choose One ® PICP O Concrete God Pavement Q Pervious Concrete O Porous Gravel 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, I, I, = 65.1 % B) Tributary Area's Imperviousness Ratio (I = I,) 100) 1 = 0.661 C) Tributary Watershed Area Aral = 8,892 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System Avvs = 5,602 sq ft (Minimum recommended permeable pavement area = 2184 sq ft) E) Impervious Tributary Ratio Rr= 0.4 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 151 cu R (WQCV=(0.8'(0.91'ia-1.19'io 0,78' i)/12)' Area) Choose One G) Is good control volume being added? Q YES NO 3. Depth of Reservoir A) Minimum Depth of Reservoir D.,, = a.0 inches (Minimum recommended deplh is 6 inches) Qioose One B) is the slope of the reservoir/subgmde interface equal to 0%? ® YFS Fla[ or Stepped instillation Q N6 Sloped Instillation C) Porosity (Porous Gravel Pavement < 0.3, Others < 0 40) P = 0.30 F) Volume Provided Based on Depth of Base Course V = no cu R Flat or Stepped: V = P • ((D„m,)/12)' Area Sloped: V = P - i(Q,,,,- (O,a„- 6-SL-1)) / 121 Area 4 Lateral Flow Barriers Otoase One A) Type of Lateral Flow Banners Q Concrete Walls O PVC geomembrane installed normal to Flow ® N/A- Flat inatallation O Other(Descobe): B) Number of Permeable Pavement Calls Celle e 5. Perimeter Banner Chaise One - A) Is a perimeter barren provided on all sides of the O YES pavement system? 106NO (Recommeded for PICP, concrete grid pavement, or for any no -infiltration section ) do-BMP v3.03.xism, PPS 10119/2015, 4:17 PM Design Procedure Form: Permeable Pavement Systems (PPS) Sheaf 2 of 2 Designer: DSF Company: JVA, Inc. Data: October 19. 2015 Protect: 2456c FMC - Fort Collins Location. Bear Mountain Drive, Fort Collins Fdler Material and Underdmin System A) Is the underdrain placed below a Cinch thick layer o! COOT Class C fitter material? oseOne 1) ES Y YES ONO �� O N/A B) Diameter of Slatted Pipe (slat dimensions per Table PPs-2) Choose One - 0 4-Inch O 6-inch C) Distance from the Lowest Elevation of the Storage Volume y = 1.3 ft (i.e. the bottom of the base course to me center of the odfice) r Choc a One - I Q YES ® NO Choose One O Raced above me liner O Raced above and below the liner 8 Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat) Calculate cells individually where this vanes.I A) Depth of WOCV in the Reservoir Dwucv = 1.08 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time De,lsr, = inches (Use a minimum chl diameter of 3/8-Inches) Notes UD-BMP v3.03.xlsm, PPS 10/19/2015, 4:17 PM Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 Designer: OSF Company: JVA, Inc. Date: October 19, 2015 Project: 2456c FMC - Fort Collins Location: Bear Mountain Drive, Fort Collins 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area. I, I, = 71.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1.1100) i = 0.710 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.22 watershed inches (WQCV= 0.8' (0.91• i3- 1.19' it+ 0.78, i) D) Contributing Watershed Area (including rain garden area) Area = 5,553 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VwoU = cu It Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of ds = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VW0V0n1rR = 103.5 cu it Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VwacvuseR = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwocv = 12 in B) Rain Garden Side Slopes (Z = 4 min., honz. dist per unit vertical) Z = 0.00 1t / ft (Use "0" N rain garden has vertical walls) C) Mimimum Flat Surface Area AM,., = 69 sq it D) Actual Flat Surface Area A,,,x„ y = 259 sq it E) Area at Design Depth (Top Surface Area) AT,,,, = 552 sq it F) Rain Garden Total Volume VT= 406 cu it (Vr ((Arm+ Ate) 12) * Depth) 3. Growing Media r Choose One Q 18" Rain Garden Growing Media Q Other (Explain): 4. Underdrain System Choose One I* YES A) Are underdrains provided? Q NO B) Underdrain system once diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= 1.8 it Volume to the Center of the Once ii) Volume to Drain in 12 Hours Vol,z= 104 cu ft III) Orifice Diameter. 3/8" Minimum Do = 0.24 in MINIMUM DIAMETER = 3!8" UD-BMP_v3.03.xlsm, RG 1011912015, 4:11 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: DSF Company: JVA, Inc. Date: October 19, 2015 Project: 2456c FMC - Fort Collins Location: Bear Mountain Drive, Fort Collins 5, Impermeable Geomembrane Liner and Geotextile Separator Fabric Choose One - p YES A) Is an impermeable liner provided due to proximity ONO of structures or groundwater contamination? 6. Inlet / Outlet Control r Choose One Q Sheet Flow- No Energy Dissipation Required A) Inlet Control Concentrated Flow- Energy Dissipation Provided Choose One 7. Vegetation p Seed (Plan for frequent weed control) QQ Plantings Q Sand Grown or Other High Inftuatlon Sod 6. Irrigation r Choose One - Q YES NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Q NO Notes: UD-BMP v3.03.xlsm, RG 10119/2015, 4:11 PM LID COMPLIANCE TABLE 50% On -Site Treatment by LID Requirement New Impervious Area 0.574 acre Paver Area 0.082 acre Traditional Asphalt Pavement Area 0.195 acre Other Impervious Surface Area (Roofs, Concrete Walks, etc.) 0.298 acre Required Minimum Impervious Area to be Treated 0.287 acre Paver LID Treatment (Flow Area to LID) Paver Area 0.194 acre Rain Garden Treatment Rain Garden Area 260 ft2 Roof Area 0.000 Run-on area for Rain Garden 0.127 acre Impervious Area Treated by Rain Gardens 0.100 acre Total Impervious Area Treated 0.295 acre Percent of Impervious Area Treated 51% 25% Permeable Pavement Requirement New Pavement Area (Paver Area Not Included)* 14,004 ft2 Required Minimum Area of Permeable Pavement 3,501 ft2 Total Permeable Pavement Area 3,556 ft2 Actual Percent of Permeable Pavement Provided 25% *The pavement area includes concrete and asphalt.