Loading...
HomeMy WebLinkAboutDrainage Reports - 09/14/19880 /—_1Ai Z, 7�02i 9/y/foo STEWART&ASSOCIATES Consulting Engineers and Surveyors STORM DRAINAGE REPORT PARCEL A5, FOSSIL CREEK COMMERCIAL PLAZA The Fossil Creek Commercial Plaza is in the McClellands —'Mail Creek Drainage Basin. At the time the McClelland Drive storm drain interceptor line was constructed, it was determined that the maximum allowable run— off into it would be restricted to 0.5 cfs per acre. The gross area of Parcel A5 and the south 37 feet of Parcel A6 is 0.96 acres, including the west half of South Mason Street., There is no off —site flow onto this site. The site is located at a high point on Mason Street, and the railroad along the west side is below the site. Run—off from the site will run into the west flow line of Mason Street. It then flows south to Troutman, then east across Mason in a drain pan and then on east to an inlet into the McClelland Interceptor storm drain. Sheets 2 and 3 of this report show detention pond and out —flow pipe calculations. Sheet 4 shows the proposed site construction of grading, drainage and utility service lines. r. James H. Stewart and Associates, Inc. 214 N. Howes Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 l of 4 6/,/)Qe I COMPUTATIONS STEWART&S�JCIATES Consu](4y .3 Engineers and Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: PIFS Date Z B8 Client: VVilkir7 5;ukl (f 0 17 -5 Sheet No. 2 of 4- Chkd By: -Date Project: Eca Y-(f e- I A 51 37 r o -F Fo fir i relo ' Subject > To r r-1 L-/r-ca / r7 a e Adop. i GOHPOsi N; I 71 9 <-J U� 4 5 0 F_ (IJ( (f IV'5 , 1� 6 J4 C liq :7- S1. ro Cp48 7r OX G' city 7V 2 0 I /95S 7,. 4F,1 0.: 78 5_� oil i i i I I I 1.406 3). C j 0 A 02?-3 6000 i I ! I ' I .i...I !...� � I I U�� o � i I . �. �� � � I l i l i' i I I I I I i ( I I I I I( � I � I�! ; 0o I I ;M �I I I I '00 000 7- 0� & C.0 J 2 3 100 COMPUTATIONS STEWART&406_20CIATES. ConsultinS EnSineers and Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: Date Z)?-(;)6(5 Client: 'v%ldh 1'hscl-) — Cclr7S4-, —Sheet No. 3 of_- 4- Chkd By: Date— Project: Fbr­e-e,) A-5 -5, 37 of A- 6 FOSS d Cr-e(-4 rc t'c, I Subject re't i r) a i. pio P 4-1 L F� e-. A a ► 4502 F _J Ral PERSPECTIVE VIEW SECTION AA Vow. AA Nny..a M NEW DRIVEWAY APPROACH DETAILS VERTICAL CIIAB ANO GUTTER Q Z 0 �— 0 I. AREA of SITE: Co. 94 ocrsl (6mE) Z ALLOV^3LE RuN-OCC a 3. VOLUME 0E7ENTION !REQUIRED: 7437 cu. P. 0. VOLUME DETEN7101.1 PROVIDED • 7S4,0 cy, 4. S. MArIMVr POn D DEPT1/ a 1.6 44,.1 CuTLLLT PIPE G No" V.11 Tfrt LINE ELEV^710N= 494/.10 7. OVTF4UN PIPE c 4' cJP VOL UME o< DF_TENTION POND Ca)VT4Vrt PaCN VOLV.MC TOTAL VOL.Mo 39. 7 0 Y40 Zoo Z40 GIGO 1780 zoEO ++.I IZZSD 55zo 7540 P 0 O