Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
July 1, 1987
Ms. Susan Hayes
City of Fort Collins
P.O. Box 570
Fort Collins, Colorado 80522
RE: AMENDED FINAL DRAINAGE REPORT FOR THE CENTRE FOR ADVANCED
TECHNOLOGY, THIRD FILING
Dear Susan:
This third filing of the Centre for Advanced Technology is lo-
cated in the Southwest corner of the future intersection of Cen-
ter Avenue and Meadowlark Avenue. The west boundary of this site
is the New Mercer Ditch. The property is located in the South-
west Quarter of Section 23, Township 7 North, Range 69 West of
the 6th Principal Meridian.
The site currently is covered with natural Colorado field grasses
and slopes to the southeast at less than 2%. A field road
meanders along the New Mercer Ditch that runs along the West side
of the site. When fully developed this property will consist of
business/office buildings, parking areas and landscaped areas
(see plan).
Using the most current City of Fort Collins criteria, and the ra-
tional formula a 2 year historic release rate was calculated to
be 0.51 cfs. With this release rate, a required pond volume of
0.34 acre-feet was determined (see Supplementary Calculation
sheet). The pond and site grading are shown on the attached
drainage plan. The pond will temporarily discharge into an over-
land swale which will direct flows into the Meadowlark Avenue
storm drain some + 410 feet South of proposed in the Centre for -
Advanced Technology Special Improvement District.
Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado 3031574-3504
When this site drainage and grading plan and design is
implemented, drainage flows will pass through the streets and
parking areas to the pond in a safe and controlled manner.
Sincerely,
RBD, Inc.
1 `\\eumxmexuuu�,,, .
�1�—�� • ,.�`` OQBEGI.
Stan A. Myers, P.E. p p
Project Manager � 18060
cc: 035-028A
11
oae eG
PRtea C. a &
JOB r I 5
SISN ENGezm:
BASIN DE2+vLm=
mm2m
WICKEL
®Loll
R,E m NE E09lm o FOR 2 YEAR sa,
HISTORIC Rm»rCOEFFICIENT . .2
BASIN SLOPE-, ,x PERCENTmgNEm n 4 FEET
AREA 2.q7 Amy
ee, TC = R -u.wc ! .2
o,mmm! 470 W .,
,n - 45.V5958 MINUTES
HISTORIC RAINFALL mr mlw= 1.238889 INCHES/HOUR
HISTORIC a »«A .5096791 CUBIC FEET R SECOND
DETERMINATION 7 DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED SPOa: . a@
DEVELOPED P#Ir COEFFICIENT
REk =
2.057`
2^
DURAIJuN
m,
10
45
{,
R
+
s
!w
ICU
1.712452
GROSS VOL.
m. FT.
46B5.27
2.85
9185.595
12699.55
15257.95
16090.2
,7A4.82
lwq.2
19234.27
21453.6
YEAR STORM
.666
ci ,
OUTFLOW VOL.
CU.rs
Iv.9q>
303.8074
456.7111
917.4222
1376.133
1pteq.
2752.267
km.m,
5504.513
em&r
REmmEon mwo m VULUME I , 14602.55
.11,9171 ACRE FEET
RR@!m VOL.
CU. q
4532.366
6907.042
8726.684
Raa 2
13881.82
14255.36
14632.55
14085.02
13729.73
t0444.54
CU. FT. OR
%r■ I�NC
Engineering Consultants
CLIENT
VeW/Tim�-'
_nn
JOB NO.
O3✓ _UZft
PROJECT
AALr
`!T / 3RpJ�1L CALCIILATIONSFOR
��z% oP/F/cE
MADE BY—
DATE CHECKED BY— DATE
SHEET
OF
YEALP d4>7AA4G .PA7L=CFktDc(
i
O•Sl - O G/ a �Z4�i•a's�