Loading...
HomeMy WebLinkAboutDrainage Reports - 07/06/2010I I I I i 1 11 11 J 1 I I 1 1 City of Ft. Collins Awro d Plans Approved By Date -77 - In FINAL DRAINAGE AND EROSION CONTROL REPORT Evergreen Park Fourth Filing Kaufman & Robinson, Inc. Fort Collins, Colorado Prepared for: Basis Architecture, PC 1692 Big Thompson Avenue, Suite 100 Estes Park, Colorado 80517 Phone: 970.586.9140 Prepared by: Troy W. Campbell, PE Ridgeline Consultants, Inc. 16911 Potts Place Mead, Colorado 80542 Phone: 970.535.0419 Fax: 720.247.9043 RCI Project Number: 0114 23-March-2010 1 16911 Potts Place Mead, CO 80542 970 T .535.0419 phone RIDGELINE970.535.0429fax www.ridgelineconsultants.com Consultants, Inc. March 23, 2010 Mr. Glen Schlueter City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Final Drainage and Erosion Control Report for Evergreen Park Fourth Filing- Kaufman & Robinson, Inc., Fort Collins, Colorado Dear Mr. Schlueter: We are pleased to present this Final Drainage and Erosion Control Report for Evergreen Park Fourth Filing - Kaufman & Robinson, Inc., for your review and approval. This report has been prepared in accordance with the City of Fort Collins .Storm Drainage Design Criteria (Revised January 1997). The proposed project is located north of Conifer St., south of Willox Lane and east of College Ave. We look forward to your favorable review of this project and report. Please do not hesitate to contact our office if you have any questions. ' Sincerely, Ridgeline Consultants, Inc. O Prepared by: r p`hQ; PEG r: .' 411 9 ' 43Troy Project W. Campbell, PE �Ffs/ANAL ENGINEER'S CERTIFICATION I hereby certify that this report for the final drainage design of Evergreen Park Fourth Filing - Kaufman & Robinson, Inc., was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria for the owners thereof. i Registered Professional Engineer State of Colorado No. 41 159 D IL ULLIN L Consu[tants, Inc. Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 2 Final Drainage and Erosion Control Report Evergreen Park Fourth Filing — Kau&nan & Robinson, Inc. Located within the northwest quarter of Section 1, Township 7 North, Range 69 West of the 6`h P.M. City of Fort Collins, County of Latimer. State of Colorado ' TABLE OF CONTENTS Page 1. GENERAL LOCATION AND DESCRIPTION 3 A. Site Location B. Site Description I C. Proposed Project Description D. Flood Hazard and Relevant Drainage Studies II. HISTORIC DRAINAGE SYSTEM 4 A. Major Basin B. Sub -basin and Site Drainage III. PROPOSED (DEVELOPED) DRAINAGE SYSTEM 5 A. Criteria B. Runoff C. Detention D. Open Channel Flow E. Inlets ' F. Storm Sewers IV. STORMWATER QUALITY AND SEDIMENT/EROSION CONTROL 7 ' A. Stormwater Quality B. Sediment/Erosion Control V. CONCLUSIONS 8 A. Impact of Improvement VI. B. State Compliance with Applicable Criteria REFERENCES 9 ' VIL APPENDICIES 10 I � lDivELi��E Cottsultrrnts, Inc. I I I r I 1 I Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 3 I. GENERAL LOCATION AND DESCRIPTION A. Site Location: The proposed development is located in the northwest quarter of Section 1, Township 7 North, Range 69 West, of the 6`h Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. Furthermore, the site is located within Evergreen Park, Block 5, which is north of Conifer Street, south of Willox Lane and east of College Avenue. More particularly, the proposed site is located at the northeast corner of the intersection of Blue Spruce Drive and Red Cedar Circle. B. Site Description: The Kaufman & Robinson, Inc. site consists of approximately 1.75 acres and is currently vacant land. The site has been overlot graded, generally according to the approved construction drawings for Evergreen Park. The existing on -site slopes range from approximately 0.5% to 2%. Existing ground cover on the lot consists of moderate vegetation, including weeds and grasses. According to the SCS soils map, the native soil in this area is Nunn Clay Loam. Nunn Clay Loam is a Type C soil and according to the SCS, this soil type is classified as well -drained. Existing drainage facilities near and adjacent to the site include existing concrete curb & gutter, concrete pan and swales. Furthermore, the adjacent property to the north contains an existing detention pond on the east side of that site. This pond was constructed as part of the improvements for Lots 1 &2, Block 5, Replat (No. 1) of Evergreen Park. The existing Evergreen West pond is located east of the proposed site. The existing high water elevation for this pond is approximately 4962.5. C. Proposed Project Description: The proposed first phase of development will consist of one building, landscaping, sidewalks and associated parking and drive areas. The subsequent phase of construction will consist of a building addition. The detention pond has been sized based on these two phases of construction. The detention pond will need to be expanded and additional calculations provided in the future if further development on the site is to occur. The lots immediately to the north and south have been developed. Each site consists of multiple buildings, landscaping, sidewalks and associated parking and drive areas. l�TnrF* JNT1Q ♦11ruLIL L4L Consu[tnrtts, InC. I I I I 11 I L I I I I I I t I Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 4 D. Flood Hazard and Relevant Drainage Studies: The proposed site is not located within a FEMA delineated floodplain. The site was removed from the floodplain with the Dry Creek Diversion project improvements. Relevant drainage studies for this area include the Greenbriar-Evergreen Master Drainage Plan, prepared by Engineering Professionals, Inc. as well as the Final Drainage and Erosion Control Report for Lots I & 2, Block 5, Replat (No. 1) of Evergreen Park, dated January 1999, prepared by Shear Engineering Corporation. II. HISTORIC DRAINAGE SYSTEM A. Major Basin: This site is located within the Dry Creek Drainage Basin as shown on the City of Fort Collins Drainage Basin Master Plan, approved by the City Council in June 2004. Furthermore, this area has been analyzed in the reports listed in I.D. above. The basis for the drainage design for this site is the City of Fort Collins Drainage Basin Master Plan conclusions and recommendations. B. Sub -basin and Site Drainage: The proposed site was overlot graded as part of the development of Evergreen Park. The runoff from this site (in the undeveloped condition) currently flows from the west/northwest portion of the site to the eastern side of the site. The runoff from this site currently drains into the existing Evergreen West pond, located east of the site. Virtually no off -site runoff enters the proposed site. The lots to the north and south have existing development and conveyances for their site runoff. The drainage patterns proposed with the development of the Kaufman & Robinson site are generally consistent with the drainage patterns described in previous studies for the proposed site. p1LbLLINL Consultants, Inc. Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 IIII. PROPOSED (DEVELOPED) DRAINAGE SYSTEM A. Criteria: Drainage design is in accordance with the City of Fort Collins Storm Drainage Design Criteria as well as the Urban Drainage and Flood Control District Criteria Manual. There are no deviations from the criteria in this report. The design storms for this project are the 10-year and the 100-year recurrence intervals. ' Runoff is calculated using the rational method since all basins are smaller than 160 acres. The rational method calculations are computed by the following: Q = CfciA where: Q Runoff in cubic feet per second Cf Rational Method frequency adjustment factor c = Calculated runoff coefficient for design event ' i = Storm intensity in inches/hour A = Basin area in acres I I 1 I I 11 I Cfis 1.0 for the 10-year storm and 1.25 for the I00-year storm. Furthermore, the product of c times Cfshall not exceed 1.0. Hydrological calculations have been prepared in accordance with the City of Fort Collins Storm Drainage Design Criteria as well as the Urban Drainage and Flood Control District Criteria Manual. B. Runoff: This proposed development is part of the Evergreen Park development. The approved Evergreen Park Drainage Plan & Report, dated June 11, 1973, prepared by VTN Colorado as well as the Final Drainage and Erosion Control Report for Lots I & 2, Block 5, Replat (No. 1) of Evergreen Park, dated January 1999, prepared by Shear Engineering Corporation, have been reviewed as part of the analysis of the drainage for this site and the recommendations have been incorporated where feasible. Runoff calculations for this site have been completed in accordance with the City of Fort Collins criteria and are included in the Appendix of this report. Runoff will be conveyed via sheet flow, concrete pan, curb & gutter and grass swale to the proposed detention pond (Pond A). The runoff for the site was determined using the rational method, as detailed above. The proposed site will have three (3) drainage basins and zero (0) off -site basins. The basins have been created to direct runoff to the proposed detention pond and to limit site disturbance to the extent practicable. 1 AsLIVULLINE Curl>ultnnis, Inc. I Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 6 Basin A: This basin is located in the northwest/central portion of the site. Basin A includes the proposed building, sidewalks, parking, the access roadway and landscaping. Runoff from this basin will be conveyed to the proposed detention pond (Pond A) via curb & gutter, ' concrete pan and sheet flow. Basin B: This basin is located along the northern property line of the site. Basin B includes a concrete pan and landscape area and drains to the proposed detention pond (Pond A). Runoff will be conveyed via the concrete pan. Basin C: This basin is located in the southern/eastern part of the site and contains more than ' half of the site area. Basin C includes the future building addition, Pond A, landscaping and undisturbed area. This basin has been designed to drain to the detention pond via sheet flow and grass swale. The following table shows the expected runoff from the proposed basins, based on the current site layout. Table 1: Runoff Summary Basin ID Area ac. io cfs Qinn cfs A 0.56 2.34 5.55 B 1.11 0.09 0.24 ' C 0.08 1.07 2.72 C. Detention: Detention for this site will be provided in Pond A, which is to be located on the eastern portion of the site. The detention pond was designed to have a maximum release rate of 0.35 cfs and provide 0.276 ac-ft of storage (including WQCV). The release rate is based on 0.2 cfs/acre, as allowed in the Dry Creek Basin. The release from the pond will be controlled by an outlet structure and have a single -stage release (100-year). ' The volume of Pond A is based on the 2-hour, 100-year design storm. The invert of the pond is 4966.38 and the 100-year water surface elevation will be 4967.73. Furthermore, the detention pond will have 1.0 foot of freeboard and an emergency overflow spillway, with height of 0.5'. ' The pond will release into the existing Evergreen West pond, which has an existing high water elevation of 4962.5. The 100-year water surface elevation of the pond is 4965.2 and the maximum water surface elevation is 4966.0. D. Oven Channel Flow: Several concrete pans (2' and 4') are being proposed in the parking area and drive areas. A ' concrete pan is also proposed along the northeast corner of the building as well as in the bottom of the detention pond. Also, a 1' concrete channel is proposed along the north side of the building. Furthermore, a grass -lined swale with minimum 8:1 slopes is proposed east of the parking area to convey runoff to the detention pond. These conveyances will see relatively low to moderate flows and drain to proposed storm drainage improvements. Consultants, hrc. Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 7 E. Inlets: There are no storm drainage inlets proposed with the improvements on this site. F. Storm Sewer: The proposed on -site storm sewer consists of the outfall pipe from the detention pond. The proposed pipe is designed as an 12" ADS. The invert out of the pipe will have a flared -end section and a 3'X3'X12" Type "L" riprap pad to control velocity as the storm water flows to the Evergreen West pond. IV. STORMWATER QUALITY AND SEDIMENT/EROSION CONTROL A. Stormwater Ouality: The proposed detention pond will contain a stormwater quality component as part of the facility. The detention pond design and volume will include 0.028 ac-ft of water quality capture volume. The release from the outlet structure will be controlled by a water quality plate and orifice plate. the water quality holes shall be 0.5" diameter. The water quality component has been designed for roughly 1.75 acres tributary to the detention pond. A grass -lined swale is proposed in the middle portion of the site. This swale has been sized to accept the 100-year flow from Basin A. This swale has been designed to have 8:1 side slopes and should provide a level of water quality for runoff from the parking and drive areas that flow to Pond A. B. Sediment/Erosion Control: This area was initially overlot graded during the construction of Evergreen Park. The site grading for the proposed project will occur during the initial phase of construction. Several sediment and erosion control measures will be incorporated into this initial phase of construction. The initial sediment and erosion control measures to be installed shall include silt fence around the majority of the site, as well as vehicle tracking control at the entrance from the west side of the site. Furthermore, additional measures for sediment and erosion control shall consist of providing straw wattles at low points in the curb & gutter as well as wattle dikes in the proposed grass - ' lined swale. Also, there is an area near the west property line designated for a concrete washout area. Additionally, any area that has been disturbed by construction activities and left exposed for more than thirty (30) days, shall receive drilled seeding and straw mulch at 2 tons/acre, until ' permanent landscaping or ground cover has been provided. All stormwater quality and sediment/erosion control measures shall be regularly inspected and maintained during and after the completion of construction for the site. Furthermore, sufficient care shall be taken by the contractor with materials handling and storage. LIE Consultants, Inc. I Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23. 20 10 Page 8 The proposed measures for sediment and erosion control shall be updated as necessary during construction, and as warranted by site conditions. iV. CONCLUSIONS ' A. Impact of Improvement: The drainage design for Kaufman & Robinson, Inc., Evergreen Park — Replat of Lots 3 & 4, ' Block 5 is in general accordance with the City of Fort Collins Storm Drainage Design Criteria and the Urban Drainage and Flood Control District Criteria Manual. The drainage design also utilizes recommendations from the City of Fort Collins Drainage Basin ' Master Plan. Furthermore, site disturbance is minimized to the extent practicable. 1 I I The runoff from this site will be controlled by proposed storm drainage facilities and improvements, including the proposed detention pond. The drainage design for this project should not negatively impact adjacent properties or the existing storm drainage system. B. State Compliance with Applicable Criteria: The Kaufman & Robinson, Inc., Evergreen Park — Replat of Lots 3 & 4, Block 5 drainage design is in general compliance with the City of Fort Collins criteria. The Urban Drainage and Flood Control District Criteria Manual has also been utilized in the completion of the drainage design for this site. AM ULLIN L Consultants, Inc. Final Drainage and Erosion Control Report ' Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 9 ' VLREFERENCES 1. City of Fort Collins Storm Drainage Design Criteria and Construction Standards, revised January 1997. ' 2. Urban Drainage and Flood Control District, Drainage Criteria Manual Volumes 1 and 2, prepared by Wright- McLaughlin Engineers, dated March 1969 (updated June 2001), and the Volume 3 prepared by Wright -McLaughlin Engineers, dated September 1992 and revised July 1999. 3. Evergreen Park Drainage Plan & Report, prepared by VTN Colorado, dated June 11, 1973. ' 4. Master Storm Drainage and Detention Plan for Evergreen Park, prepared by Cornell Consulting Company, no date. 5. Final Drainage and Erosion Control Report./or Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park, prepared by Shear Engineering Corporation, dated January 1999. 1 1] DltniviL CIE Consultants, Inc. IuxLSs aTNTFM.E xorz9. Au cavrmurnw sxw. aE w AccaroAxcE MTx THEY A1Axs. SFSIdVY£� mA9ReCG aaislttfrwA¢norW1 rSoFat Mq WIN2 CpI51HUCMAv wW MS ..FA _IIRB_NI - _ - - - _ / ' RI DMEAGD,LODLB1WNR h LOT f, BLOCK 5, REPEAT NO. 1) —consultantsmulls N Ax. aaS.0.0 sTAx9AaTHE T"c COLDRmARTDT aHIcNwrs sTA0A° 16911 OTILACERo.6 C.SrzlSOrzG�L E%SnI Know whatY 6010W. a Miii�wµi G W is ADs I I CallWomyoudig. da Ax ovan.m.,rrx. e E]OSIINC % REPLAT OF RED Ir swlE FLgWN[ BUILDING /, EXISTING COACHLIGHTPLAJA C THFm. 1. DETENTION IN s 41 i 59 o: tao-M a[N Prtl aA9' r BUILDING POND BW n SECTION A -A rrF f4G oxAL fi NTS " I. //_ /// - /// _ .. /// i%//� /l/_ _�%/l /1/• l/1-21//////�///G/U111_ ll/�' DEVELOP PROPOSED STING .. ,.r / ..... U I LOT 2, BLO K 5, REPLAT (NO. 1) I I l SIDEWALK OF EVERGREEN PARK UISTING n DEVELOPMENT II J i' CONCRETE DEVELOPMENT - Z N EXISTING-- EXISTING CURB k CHANNEL 8 PROPERTY I'-za' W p 1 e CONCRETE GUTTER (CATCH) UNE r, EXISTING EVERGREEN I io 0 2a +o N ENTRANCE EXISTING 5' WEST POND HIGH III a.os o.29 SLOPE EASEMENT WATER UNE sr. r ITET = o i..-. - ELEV. - 49625' I Q W O 47 O 1] zz .� 3 Q PROPOSED 4.5' = i'. \ - - - - - - - - - - - - - - - - - - - - - - - - - - - Ka- u- Z E SIDEWALKn " CONCRETE HI EXISTING 16' a- w 100-YEAR UTILITY ANDGE w .� a v�xi p DRAINAG { WSQ EASEMENT ii PROPOSED FFE - 4971.50 V, m ' I 2' CONCRETE - ^ I GU LL Z Z 2 LOT 1, BLOCK 3 1 C I PROPOSED A _ r mnsr., REPLAT (NO. i) I 1 1 Gu liner, BUILDING po m 1 BUIIDINC NNRE I I Lj = p 0 OFEVERGREEN t III 9 . rr- seoA. POND A T I C K m PARK I i ra9 Q p i `. C '^ �4. •L WATER LLO 3 PROPOSED y z u A w ill X10ASE• - _ IIWIALITY y a W¢¢ UTILITY EMENT tY ADS '�"�•• I� Y • '. .-. .•. .. .. 1 PROPOSED ) PROPOSEDII LU L O PROPOSED 4' • • 2' CONCRETE 12 FE5a U ! 1 1 CONCRETE PAN PRIVATE DRIVE - // PAN ROPOSED ,.� T TOPE 'L' RIPRAP W I_ ... �• i - PROPOSED I'. OUTLET LU _ ; , / STR 86.38 PROPOSED - � T mi PROPOSED g CONCRETE PAN SEE DRAWNG 708 I. T RECEPTION NO.: —'A I 95061614 I DRAINAGE O •ilia`Y EASEMENT rJ I i I 2 _ ._ - _ -�' ) • •1 PROPOSED CURB CUT ` \ \ / Ili t POND A � RED .,I . ti EMERGENCY I I^ CEDAR . I EXISTING 6' C PROPOSED GRASS \ y.� / OVER I 1 CIRCLE I;I ~UTUtt EASEMENT r.'t o.� SWAIE O 1.7x -,/I \ EXISTING EVERGREEN l�tit I¢ WEST POND HIGH E%PENCESTING / WATER UNE CE], FENCE I E4982.5 RW LINE CONCRETE SIDEWALK go ✓♦OPE C is in iii-'-AT TI::-_.:n-�yi ' -. -•,c- �'�w ' j� as BE ��e .�a�_ ��— .�. NEO I qr �.c----w. EXrsTINc B e - � A , r__ �... pro•----- i /17'77T'-'7 GUTTER (CAT) I EXISTING �I[j ,II Hn �I SIDEWALK EXISTING EXISTINGI` j / LOT5, BLOCK 5, REPLAT(NO. 1) BUILDING BUILDING I i DOSTINe CURB e o IEVE DEVELOPMENT OF EVERGREEN PARK i GUTTER (CATCH) BASIN RUNOFF SUMMARY V LEGEND OF SYMBOLS DIRECT CUMULATIVE DETAINED rD EanNG BASIN DESIGN AREA Y 0w 0. Q. ONSRE CRY of Fart Calms, Cawaft r N PT («> (ch) (eh) (a.) (a.) (y/a) DESCRIPTION UTILITY PLAN APPROVAL 3 NOTES: ...r..- WATER UNES „w "........_ ... _- A 1 0.58 2.34 3.55 - - Y BASIN A TO PROPOSED SWALE ase aM B 2 0.08 0.09 M24 - - Y BASIN B TO DETENTION POND � � � E THE nW OP FOUNDADON E!£ ;iav I SHORN n INE NINMUM EUECSANIIC SEWER �w—:rs � C J 1.11 1.07 2.72 - - Y BASIN C TO DETENTION POND EIEYAROV REOIRRm FLOP PRO)EC11LW fRdl ME IOD-YEAR S1APAt ELECTRIC .. ..mr. wn.,mr uwm �TIt^ LYWJ• MG Da.r B'C 2. REFER TO THE NOTES DN SHEET C-02. CON57RUCROV SHALL BE GFdd JB 1B IN ACCORDANCE MN ALL GTY OF FORT COLUNS STATE AND GAS DESIGN PgNT Qt DETENTION SUMMARY FEDERAL STANOAROS AND REGULATIONS. OVERHEAD w...wo. V. v2 xi 'A""°"'^•" �- ArN AWL" 3. CONMACTCV( SHALL VERIFY LOCH BONS OF EJ05RNC URURfS ar. ..�.: ®. p � �100 ' ) =0 (-%- a C-N, 0Ly (ate Af Ra WII PRIOR TO COVSNUCnOV, TELEPHONE _ PROPOSED ASPHALT AMPn., M14C A I.Ti ..B&N a.02B W...75 a.2). ♦B.])J O.JS �- 0- BN41 A CONTRACTOR SHALL CCLWDINATE ALL WORK MNIN PUBLIC STORM DRAIN -� PROPOSED CONCRETE - °w°'m "-.v.c v:.m -I.Tr SPIFFY RIpIT-CF-WAY W W NE CITY OF FORT COWNS AND THE AA APPROPRIATE URUTY COIAPANIES oEminax rox0 A ,{R,{ EXISTING ASPHALT F�I EXISTING CONTOURS (1') ns) v. C.Os EXISTING CONCRETE ao-m w1ttOw p5) uu aoronccn rnumvvc IrT� . n Final Drainage and Erosion Control Report Evergreen Park Fourth Filing - Kaufman & Robinson, Inc. March 23, 2010 Page 10 VILAPPENDICIES ❑ Vicinity Map ❑ Existing Soil Information ❑ Hydrologic Calculations ❑ Hydraulic Calculations ' ❑ Detention Calculations ❑ Water Quality Calculations ❑ Erosion Control Calculations ❑ Excerpts from Previous Report ❑ Charts and Figures 1 r i I I I I I i 11 psL1LuLLiji i Consultants, Inc. I t ' Vicinity Map Ll I I 1 I r I I I 1 11 I RIDGELI i Consultants, Inc. I A-1 o!_Il ® WLLOXI LANE Li GREENBRIAR PARK W > SITE;Q W LLI N cl W J H U D_ of U N O W m I FTREET 0 0� oQ• ° VICINITY MAP SCALE: I" = 7 000' VICINITY MAP PRE. BASIS ARCHITECTURE PC aap.�'ct rro� 01 14 P.'II2hLIr�i KAUFMAN & ROBINSON, INC. m+7e 03/23/2010 Consultants, InC•EVERGREEN PARK — REPLAT OF LOTS 3 AND 4, mKsEo — 1611POR5PLACE, MEAD, COROSf2 BLOCK S FORT COLLINS, CO P. mosm 3s.om9 F: �2a7.9ai SHEET: 1 OF 1 I 1 i 1 1 Existing Soil Information I 1 1 1 1 1 i 1 1 1 1 1 1 1 RIlnvFLINE Consultants, Lic. I' 1 I 1 I Gig 1 w G, ss ?1 1 ))) !{ ) �/! ��� \ / ! 0 m( z E g /). \j \ {E E )� E L) ° \� E0 | {|F / - ® z:) _ Z §y\! 00 £!! k2 0 7 kmME -f$§ �\ & ®!2[ k$k \) //ƒE k) /{/\ )/) /k } \-- _k !. /\OEoU) §)\!k\,c�_` ° !! § e-§«:•7|gg-O\21/!)2} ! § -i < \_ )f!� B ) ./»e,x•e*4ae_>+ , ! Soil Map—Ladmer County Area, Colorado Map Unit Legend r Kaufman & Robinson, Inc. Larimer County Area, Colorado (CO6") Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 73 Totals for Area of Interest (AOI) 1 1 0A Natural Resources ' Conservation Service Nunn clay loam, 0 to 1 percent slope Web Soil Survey 2.0 National Cooperative Soil Survey 1.7 1.7 100.0% 100.0% 11 /10/2008 Page 3 of 3 I I I I I 1 I I I I I I i Hydrologic Calculations 1 Colsilltnrlts, Ini. Runoff Coeffecients ' Sub -Basins Project: Kaufman & Robinson. Inc. Location: Blue Spruce Drive/Red Cedar Circle T FT G- EL T Fort Collins. Colorado 1 jl r L ' Crnt�ttltattts, Ll[. Project Number: 0114 Date: Mar-10 All calculations presented are based upon the criteria set forth in the City of Fort Collins Storm Drninaee Design Criteria and Construction Standards llav 1984 (Revised March 1991 & January 1997) ' Basin .4 Design Point Surface Improvement Area Area C I Comments I %of site area ' Lawns. Sandy soil (Flat <2%) 0.07 3058.9 0.20 0.00 12.61/o Curb & gutter and walks 0.05 2178.0 0.95 96.00 9.00/0 Paved Parking & Drives 0.22 9565.2 0.95 100.00 39.4% Roofs 0.22 9500.0 0.95 90.00 39.1% ' Avg. 0.86 83.15 100.0% Total Area 0.56 0.86 83.15 Basin B (ac) (sq.fl) (%) ' Design Point 2 Surface Improvement Area Area C I Comments % of site area Lawns, Sandy soil (flat <2%) 0.07 3119.6 0.20 0.00 88.1% Curb & gutter and walks 0.01 421.8 0.95 96.00 11.9% Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0% ' Roofs 0.00 0.0 0.95 90.00 0.0% Avg. 0.29 11.43 100.00/6 ' fotal Area 0.08 0.29 11.43 Basin C (ac) (sq.R) (%) Design Point Surface Improvement Area Area C I Comments ' 1 % of site area Lawns. Sandy soil (flat Q%) 1.00 43556.7 0.20 0.00 89.90/6 Curb & gutter and walks 0.00 0.0 0.95 96.00 0.0°/a ' Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0% Roofs 0.11. 4876.9 0.95 90.00 10.1% Avg. 0.28 9.06 100.0% ' Total Area 0.28 9.06 1.11 Overall Site (ac) (sq.R) (°/n) Design Point Surface Improvement Area Area C I Comments 3 % of site area Lawns, Sandy soil ( flat <2%) 1.14 49735.2 0.20 0.00 65.2% Curb & gutter and walks 0.06 2599.8 0.95 96.00 3.4% ' Paved Parking & Drives 0.22 9565.2 0.95 100.00 12.5% Roofs 0.33 14376.9 0.95 90.00 18.8% Avg_ 0.46 32.78 100,0% ' Total Area 1.75 0.46 32.78 C-1 ' 0114 runoff coeff. xis\Sub-Basins 3/1912010 L � = E n E c N y. _ vl P n F F �— C � h J — F U v � C] a o o. ru � N F t C N G bq e _ O G _ yy O o C _ u O O O ry� cO N N z N Q Q Q C7 Y V 4 o 140 1 1 1 L c c � E E O of N N :L vi ee N N 1 II II II 11 ? u a ' ¢ o 1 wIN :L .E M-• N N O �j � IT r •.. M •E `^ w e ry ry r > �" o• c � F o II z u' v o� O0 n [O « ut F y v _ ►y K Q G y p Q 1 '` 1 C-3 Project: Kaufman & Robinson, Inc. Location: Blue Spruce Drive/Red Cedar Circle Fort Collins, Colorado Project Number: 0114 Date: Mar-10 Rational Method Direct Runoff- 10-YR C-4 p1"U�1�iTrL Consultants, Inc. Rational Method: Q = CiCIA Q: Q: Runoff in cfs (peak) Q C: Runoff Coefficient Cr: Ce. Frequency Adjustment Factor I: I: Rainfall Intensity (in/hr) for design event A: A: Basin Area (acres) 10-YEAR Design Point Basin ID Area C Cfc t� I Q10 I A 0.56 0.86 0.86 5.0 4.90 2.34 4.2 cfs/acre 2 B 0.08 0.29 0.29 9.1 3.90 0.09 1.1 cfs/acre 3 C 1.11 0.28 0.28 12.2 3.50 1.07 1 0 crs/acre F9tidgelineTrojects l NAm mgc\0114 rationalAs 3/192010 Project: Kaufman & Robinson. Inc Location: Blue Spruce Drive/Red Cedar Circle Fort Collins. Colorado Project Number: 0114 Date: Mar-10 Rational Method Direct Runoff- 100-YR C-5 p 11j V ELx,L L Consultants, Inc. Rational Method: Q=CICIA Q: Q: Runoff' in cfs(peak) C: C: Runofl'Coetticient Cr: Cr: Frequency Adjustment Factor 1: I: Rainfall Intensity (in/hr) fordesign event A: A: Basin Area (acres) 100-YEAR Design Point Basin 1D Area C CrC 4 1 Qtao 1 A 0.56 0.86 1.00 5.0 9.95 5.55 10.0 cfs/acre 2 B 0.08 0.29 0.36 8.5 8.20 0.24 3.0 cfs/acre 3 C 1.11 0.28 0.34 12.2 7.10 2.72 2 4 cfs/acre 3 ALL 1.75 0.46 0.58 12.2 7.10 7.16 41 cfs/acm F iRidgeline\Projects\0114\drainage%0114 mtional.zls 3/19/2010 I 1 I I I I I I I I I I I Hvdraulic Calculations consullnnts, lnr. I 11 i r i I I I Worksheet for Grass -Lined Swale (100-YR) Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0,030 Channel Slope 1,70 % Left Side Slope 8.00 tuft (H:V) Right Side Slope 8.00 ft/ft (H:V) Discharge 5.55 W/s Results Normal Depth 0,52 it Flow Area 2.13 ft' Wetted Perimeter 8,32 it Top Width 8.26 ft Critical Depth 0.50 ft Critical Slope 0.02110 Wit Velocity 2.60 ft/s Velocity Head 0.11 ft Specific Energy 0.62 ft Froude Number 0.90 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 It Length 0.00 It Number Of Steps 0 GVF Output Data Upstream Depth 0.00 it Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.52 ft Critical Depth 0.50 ft Channel Slope 1.70 % Critical Slope 0.02110 Wft Ridgeline Consultants, Inc. 1 3118120108:26:11 AM Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00) 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA .1-203-755-1666 Page 1 of 1 F C Cross Section for Grass -Lined Swale (100-YR) Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 1.70 % Normal Depth 0.52 ft Left Side Slope 8.00 ft/ft (H:V) Right Side Slope 8.00 ft/ft (H::V) Discharge 5.55 ft-/s Cross Section Image V t N H 1 Ridgeline Consultants, Inc. Bentley Systems, Inc. Haestao Methods Solution Center Bentley FlowMaster 108.D1.066.00] 31812010 8:28:13 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 1 Worksheet for North 1' Channel (100-YR) Project Description Friction Method Solve For Input Data Channel Slope Discharge Section Definitions Station (ft) Roughness Segment Definitions Start Station Results Normal Depth Elevation Range Flow Area Wetted Perimeter Top Width Normal Depth Critical Depth Critical Slope Velocity Ridgellne Consultants, Inc. Manning Formula Normal Depth Elevation (ft) 050 i 0.24 ft'ls -0+11 4971.00 -0+01 4970.55 -0+01 4970.11 0+00 4970.05 0+01 4970.11 0+01 4970.55 0+04 4970.60 (-0+11, 4971.00) (-0+01, 4970.55) (0+01, 4970.55) Ending Station 4970.05 to 4971.00 It (-0+01, 4970.55) (0+01, 4970.55) (0+04, 4970.60) 0.11 ft 0.16 ft' 2.11 ft 2.00 ft 0.11 It 0.11 ft 0.00618 ft/ft 1.47 ft/s Roughness Coefficient 0 030 0 013 0 030 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 3/18/2010 8:29:27 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203.756.1666 Page 1 of 2 Worksheet for North 1' Chanel (100-YR) Results Velocity Head 0.03 ft Specific Energy 0.15 it Froude Number DA1 Flow Type Subcrifical GVF Input Data Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description 1 Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.11 It Critical Depth 0.11 ft Channel Slope 0.00500 fttft Critical Slope 0.00618 ft/ft i 1 Ridgeline consultants, Inc. Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001 3/1812010 8:29:27 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-200455-1666 Page 2 of 2 I I Cross Section for North 1' Channel (100-YR) Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Channel Slope 0.50 Normal Depth 0.11 fl Discharge 0 24 M'/s Cross Section Image 4971.20 4971.10 4971.00 497D.90 4970.80 4970.70 0 4970.60 4970.60 4970.40 497D.3D 4970.10 497D.00 4969.90. 4969.80 -0+10 -0+D5 D400 Station Ridgellne Consultants, Inc. Bentley Systems, Inc. Haestad Methods Solution Center Bentley Flow Master [08.01,066.001 3/18/2010 8:30:16 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for North Concrete Pan (100-YR) Project Description Friction Method Solve For Input Data Channel Slope Discharge Section Definitions Station (ft) Roughness Segment Definitions Results Start Station Manning Formula Normal Depth -0+09 -0+01 0+00 0+01 0+06 (-0+09, 4971.00) (-0+01, 4970.63) (0+01, 4970.63) 0.50 0.24 ft'/s Elevation (ft) 4971.00 4970.63 4970.55 4970.63 4970.75 Ending Station (-0+01, 4970,63) (0+01, 4970,63) (0+06, 4970.75) Normal Depth 0.15 ft Elevation Range 4970.55 to 4971.00 ft Flow Area 0.39 ft' Wetted Perimeter 6.60 ft Top Width 6.59 ft Normal Depth 0.15 ft Critical Depth 0.12 ft Critical Slope 0,02771 f ift Velocity 0.61 f /S Velocity Head 0.01 ft Specific Energy 0,16 ft Ridgellne Consultants, Inc. Roughness Coefficient 0,030 0.013 0,030 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster 108.01.066.00] 3118/2010 8:31:02 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203.755-1666 Page 1 of 2 Worksheet for North Concrete Pan (100-YR) Results Froude Number 0.44 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 R Downstream Velocity Infinity ft/s Upstream Velocity Infinity Ws Normal Depth 0.15 ft Critical Depth 0.12 ft Channel Slope 0.00500 ft/ft Critical Slope 0.02771 ft/ft Ridgeline Consultants, Inc. Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 3/18/2010 8:31:02 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA .1-203-755-1666 Page 2 of 2 PJ i Cross Section for North Concrete Pan (100-YR) Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Channel Slope 0.50 % Normal Depth 0.15 ft Discharge 0.24 ft'/s Cross Section Image 4971.20 4971.10 4971.00 4970.90 tg 4970.80 m w 4970.70 4970,60 4970.50 4970.40 4970.30 -0+Ub 0+U0 Station Ridgeline Consultants, Inc. 3n 812010 8:31:47 AM M Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 1 Worksheet for Detention Pond Outlet Pipe Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.012 Channel Slope 0.50 % Diameter 1.00 ft Discharge 0.35 ft3ls Results Normal Depth 0.24 ft Flow Area 0.15 113 Wetted Perimeter 1.03 It Top Width 0.86 ft Critical Depth 0.24 ft Percent Full 24.2 % Critical Slope 0.00481 ft/ft Velocity 2.39 ft/s Velocity Head 0.09 ft Specific Energy 0.33 ft Froude Number 1.02 Maximum Discharge 2.94 ft'/s Discharge Full 2.73 ft3/s Slope Full 0.00008 ft/ft Flow Type SuperCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 24.19 % Downstream Velocity Infinity f /s Upstream Velocity Infinity fUs Ridgellne Consultants, Inc Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 3/1812010 8:32:69 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA t1-203.755.1666 Page 1 of 2 I ' GVF Output Data Normal Depth Critical Depth ` Channel Slope Critical Slope I I P, r I r U A IA aRidgeline Consultants, Inc. I 3/18/2010 8:32:59 AM Worksheet for Detention Pond Outlet Piae 0.24 ft 0.24 it 050 0,00481 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-756-1666 Page 2 of 2 I Cross Section for Detention Pond Outlet Pipe Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.012 Channel Slope 0.50 % Normal Depth 0.24 ft Diameter 1.00 ff Discharge 0.35 ft-/s Cross Section Image 1 oa e T 24 t' Ridgellne Consultants, Inc. Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001 3/18/2010 8:33:28 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 I I 11 I i 11 1 1 1 1 t 1 1 I 1 1 F Detention Calculations p1DGAL A •ii C017SUNm0h, InC. n L I 1 I! Project Kaufman & Robinson. Inc Location: Blue Spruce Drive/Red Cedar Circle Fort Collins, Colorado Project Num 01 14 Data Mar-10 'C'value 0.4E 'C' • 1,25 0,575 Area 1.75 acres Release Rate 1 035 DETENTION POND SIZING (IMYear) 100 Year Volume 3/19/2010 E-1 p1LViF.LINNL Consultants, Inc. Required detention 0' acre-0 10810.8 1 0.2,182 TIME TIME S Q 100 Rul Release Required Required cum 100 ear Volume Cum total Detention Detention (miss) (sins) (in/hr) (cfs) (d^3) (0^3) (8^3) (ac-8) 0 0 0 0,00 0 0.0 0.0 0.0000 5 300 9.950 10.01 3003,636 105.0 2898.7 0.0665 10 600 7,720 7.77 4660.95 210.0 4451.0 0.1022 I5 900 6320 656 5904,675 315.0 5589.7 0.1283 20 1200 5.600 5.64 6762 4200 6342.0 0. 145E 25 1500 4.980 5.01 7516.688 525.0 6991.7 0.1605 30 1800 4.520 4.55 8186.85 530.0 7556.9 0.1735 35 2100 4.080 4.11 8621.55 735.0 7886.6 0,1811 40 2400 3.74t1 3.76 9032A 840.0 8192.1 0.1881 45 2700 3,460 3,48 9400.388 945.0 8455.4 0.1941 50 3000 3.230 325 9750.563 1050.0 8700.6 0,1997 55 3300 3,030 3.05 10061.49 1155.0 8906.5 0.2045 60 3600 2,860 2.88 10360.35 1260.0 9100.4 0.2 889 65 3900 2.720 2,74 10674.3 1365.0 9309.3 0.2137 70 4200 2.590 2,61 10945.99 1470.0 9476.0 0.2175 75 4500 2.480 2.50 11229.75 1575.0 9654.8 0,2216 80 4800 2.380 2.39 11495 4 1680.0 9815A 01253 85 5100 2.290 2.30 11751.99 1785.0 9967.0 0,2288 90 5400 2210 2.22 12008.59 1890.0 10118 6 0-2323 95 5700 2.130 2.14 12216.98 1995.0 102219 0.2347 100 6000 2.060 2.07 12437.25 2100.0 10337.3 0.2373 105 6300 2000. 2.01 12678.75 2205.0 10473.8 0.2404 110 6600 1940 195 MUM 2310.0 10574.0 0.2427 115 6900 1.890 1.90 13122.51 24150 10707.5 0,2458 120 7200 1,840 1.85 13330.8 2520.0 10810.8 0.2482 125 7500 1,790 1.80 13508.911 262501 10883.9 0.2499 130 7800 1.750 1.76 13735.31 27300 11005.3 0.2526 135 8100 1710 1.72 13937,57 2835.0 111026 0.2549 140 8400 1.670 1.68 14115,68 2940.0 11175.7 0.2566 145 8700 1.630 1.64 14269.63 3045.0 11224.6 0,2577 150 9000 1.600 161 14490 3150.0 11340o 0.2603 I55 9300 1.570 1.58 14692.26 3255.0 11437.3 0.2626 160 9600 1.540 1.55 14976.4 3360.0 11516.4 0.2644 165 9900 1.510 L52 15042.43 3465.0 115774 0.2658 170 10200 1.480 1.49 15190.35 3570.0 11620A 0.2668 175 10500 1450 1.46 15320.1E 3675.0 11645-2 0.2673 180 10800 1420 1,43 15431.95 3780.0 116519 0.2675 185 11100 1.400 1.41 15637.13 3895.0 11752A 0.2698 190 11400 1.380 1.39 15830.33 3990.0 11840.3 0.2718 195 11700 L360 1,37 16011.45 4095.0 11916.5 0.2736 200 120W L340 1.35 16180.5 4200.0 11980.5 0.2750 205 12300 L320 1.33 1633748 4305.0 12032.5 0.2762 210 12600 1.300 1,31 16482.38 4410.0 12072.4 0,2771 215 12900 1.280 121) 16615.2 4515.0 12100.2 0.2778 2201 132U0 1.2601 127 16735,95 46200 12116.0 0.2791 2251 11500 1.240 125 1684 E 47250 12119.E 02782 230 13800 1.220 1.23 16941.23 4830.0 121112 02780 2351 141001 L2101 1.221 17167,63 4935.01 12232.6 0.2908 2401 1440DI 1.2001 1.21 173981 5040.01 12348.0 0.2835 100-Year Volume Page 1 E-2 11 STAGE -STORAGE FOR IRREGULAR GEOMETRY Project: Kaufman & Robinson, Inc. Basin ID: Detention Pond (Pond A) 3/23/2010 Design Information (Input): From the pond site grading plan, enter water surface elevations and measured contour areas in ascending order. Water Surface Elevation ft (input) Eq-elev. Contour Area square feet (input) Volume above Datum acre-ft (output) 4966.3 1 0.000 4966.50 992 0,001 4966.75 8,210 0,028 4967.00 10,7991 0.082 4967.50 11,924 0.213 4967.73 12,500 0,277 4968.001 13,294 0.357 4968.23 14,030 0,429 4968.5 14,745 0,519 4968.73 15,340 0,598 00 00 00 DO OD 00 00 00 WQSEL 100-yr WSEL Spillway Elev. Top of Pond KRI pond volume 2010-03-23.xis, Irregular 3119/2010, 7:16 AM II i I II E-3 Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Designer: T. Campbell Company: Ridgeline Consultants, Inc. Date: March 19, 2010 Project: Kaufman 8 Robinson, Inc. Location: Fort Collins, CO 1. Basin Storage Volume I, = 32.78 % A) Tributary Area's Imperviousness Ratio (i = 1,/ 100) i = 0.33 B) Contributing Watershed Area (Area) Area = 1.750 acres C) Water Quality Capture Volume (WOCV) WOCV = 0.16 watershed inches (WQCV=1.0-(0.91'1'- 1.19Ist 0.78' 0) D) Design Volume: Vol = (VVOCV / 12)' Area' 1.2 Vol = 0.0280 acre-feet 2. Outlet Works A) Outlet Type (Check One) x Orifice Plate Perforated Riser Pipe Other B) Depth at Outlet Above Lowest Perforation (H) H = 0.50 feel C) Recommended Maximum Outlet Area per Row, (A,) A. = 0.2 square inches D) Perforation Dimensions i) Circular Perforation Diameter or D = 0,500 Inches ii) W dth of 2" High Rectangular Perforations W = Inches E) Number of Columns Inc. See Table 6a-1 For Maximum) nc = 1 number F) Actual Design Outlet Area per Row (A,) A, = 0.2 square inches G) Number of Rows (nr) nr = 2 number H) Total Outlet Area (Aa) A„ = 0.3 square inches 3. Trash Rack A) Needed Open Area: A, = 0.5' (Figure 7 Value)' A„ A, = 11 square inches B) Type of Outlet Opening (Check One) x < 7' Diameter Round 2" High Rectangular Other'. C) For 2", or Smaller, Round Opening (Ref: Figure 6a): I) Width of Trash Rack and Concrete Opening (W. r) from Table 6a-1 Wron= = 3 Inches ii) Height of Trash Rack Screen (Hra) HT. = 36 inches 0114 03-10-10 UD-BMP V2 08.xls, EDB 3119/2010, 7:17 AM f 1 I - 4- LS,7:?-.5Z. 11 SoI�R �o, a : 4D.aC'. t C� r� t � r� (k I I I, II N" - I',1' v -- <,-;� i ) . 0- 4 -� /s r- -S I 1 J 1 Water Quality Calculations 1 1 C] L� 1 i 1 1 7 1 1 L RYIDGELINE Cousultmnts, 111c. STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV( OUTLET Na mf: Reufinenb Robin.m.lrle. F-1 Balm ID'. Entln Site (1.]6 atnsl W V o«Ion Vapmp frown: cemn«mimwmmwa.a.t• n]o wrtl«r mwraa ama«.o• oeo nmelo wwn me apm=�npXm CNenmpnr Fr«,R IxIO eva NuriMr Nndea Mrgv Nv Waler Owillly C aprure Vdume fttn.9ek[re01.0. OevP al A2lL V nuXM a0wn iownpl perlprppw, X • 1 m Iles 28 Nwr 0.Nnw1 vomem mau,e. LnlwM�rp...n• aoB maa ns, NLv ] Xgplr pl tlol,N• a�rra ar.nmy Pwnwem.4• oe5 wMpl.w. w• n O fatl o 0 o pl.l. pa mun ompa 1prorma wwmwn', p a p o 0 0 o m f plea wam ou4ry C. vtlumen 0•1.a1 •ry - I 18'I1•p1e'In vAev• om+irM.mrpna 6blan Vqulrw lwtlCVlix'am'I,aI Va• Oo}a aprnMl Re<amm..wa me.n.wwM...l.••w le®awrr.ro-a.R.wvYl,owal. Ap• ol]w.re..n.a ioW ope«p In<sa]rmn Wseem Wenmgn tlwe m• ox05wve mNw o o n o 0 eQ�e aDo 4' iMY tglmanBO«Ur N✓nYepmuM.mpN aEwem• OOOl swwelM p O crvwl.ew alcalwwXcwarrv: o I= Cron ElereRn WR e1In 91po Rprl RGw$ How] Nawa Rw5 RowB flw_$_ Rw! RuwY Rw 10 pw11 R Ra. ix Rw IJ_ Rw 10 flw'15 Rox 18 Rv.'I) Hary to L b 1 09 '. aXO BB a60]JO T� flow Ira 1 - cpMlbn bw[Iry rorfaeh RawalRa«orals 4We BWO oao 00o eW x] 000$ nW - noo I WBe 00 J noon11 ]oo - 1.1-­­ S. BJ nnrn 1 91 ....- ..... -._ ••..•-• O.Uo 1BO709 0.1 1 O. UooJ r01J _ 1 I_ n.01 near-] o u ow undo � ............. 1 -. 1 -i..__ -- aeBx JJ aooa Unw onol J— ___ .t _-_ 001 O.of aeeas] Door 000•, Dom 0 4wz. w Unw ao. v.oz _ aeev] ocor IBarra BBOtl OUm .05 aBez a] oPoe owx onn -aooF o.ox -- a5nm nam ooa -� o.ox aBlw 1] Bgrm BanX now ,_ -_ _ � I oox 1 BB9 0010 _ 0009 UMa OnJ 4ne a9 0010 - aeaa0 Dora- 0009 nfi00 4Don nm0 on0s �.-„ �_ 0m —�� 003 --'i 4n891 Don Dom owB 4WB.W Onn O1A n XN rn tlNIA A bxlA /w wA ram T — 9NIn bwA 4 J _ I... tlHIP N In �. tlNA uNn DNA bN lll n ZA _ bNIA _ uJn vNNA _ _ tlNIP pNn &VA bNn I..T tlNIP .lAnN A M/n .Wl /NA . T - NIA vwn aNrn wA bNP tlNP -- NIA eNn XNn •_ vNIP 1 :NIP _ _ -` .a,._... 0114 wec ^ NAcV vlll'l'f, '. , nN STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Pmj. t Kaufman&Robinson. Inc. FO Mtln Im En0n Slh (1J5...1 STAGE -DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 0.00 0.01 oat 0.02 0,02 0.0 0.00 0.M Discharge (cfs) vimmle l m.rr I 1 1 1 1 1 p 1 1 1 [1 C 1 1 1 i i� i Erosion Control Calculations RIDGE,LUX N E consultants, Inc. G-1 Project: Kaufman & Robinson. Inc. Location: Blue Spruce Drive/Red Cedar Circle ^ ji/ �llil �Tr it Fort Collins, Colorado AIJ �1 VLL Completed by: twc Project Number: 0114 Consultants, Inc. Date: Mar-10 Standard Form A All calculations presented are based upon the criteria set forth in the City ofPort Collins Storm Drainaee Desien Criteria and Construction Standards Mav 1984 (Revised March 1991 & January 1997) RAINFALL PERFORMANCE STANDARD EVALUATION Area 1 (to Detention Pond A) Developed Subbasin Erodibility Zone Alb (ac) L,b (R) S„b M A, � l., A, x S, Lr, (h) Sb (%) PS (%) A Moderate 0.56 255.0 0.76 142.26 0.42 B Moderate 0.08 240.0 0.69 19.51 0.06 C Moderate 1.11 400.0 0.50 444.75 0.56 TOTAL 1.75 60653 1.04 346.37 0.59 73.3 A,b= Subbasin Area L,b= Subbasin Flow Path Length S,b= Subbasin Slope Lb= Average Flow Path Length (Sum A; x Li/Sum A) Sb= Average Slope (Sum A, x S/Sum A) PS is taken from Table 5.1 (through interpolation) 0114 ec calcs.xlstRainfall Performance 3119/2010 G -Z `] r u I 1 n O ll'1 C G c 11 O h I c c L7 1 I cc c co W g W 1 1 I I I ccc cc cc=cc 00 co i 1 g d d C q q d d W q I i 1 I W 61 Gl C� C'• CI C� C1 C� C1 CI Ci C O C I I ccc cc cccc cc c c[1 f u': I I W g co co CCd g d co cc co cc cc co q I 1 hGC co CN Ql C1 o+cn C%GN m mm C+C1m Cl T CI I I c c c c C c c c c c c c c c c c c c c c 1 I d co W g q q q d q co q cc g co q co q q q q I 1 1 I C M c U9 lD tL` .O t0 f� h h h h h , n co g q q q q I I c c c c c c c c c c c c c c c c c c C c c c C c c c 1 I W co d co g co q co q g C q W W d q q q W W q q q q q co l I t I C N ch C U"1 II') tCl ID ID t0 ID .D l0 h 1� h h h h 1\ h h h q CG W 1 I cog W Go Go cc co co co co cc co co co co co co co co cod q CD cc co coI I I lOONMC'G'L"1Y]ll')lfl lC tD��.0 lO IlJ tD �O 1p 1�(�hhhh 1 . I 1 (")Cc c cc ccccc cC' cI'Cccc'ctccof 1 d g W q C• g C q q q d d q q d q W q q W W q MMWW 1 I C' ll - N 7 U9 I.t) ta7 L9 L9 u'I L: If] t!: i0 iC to . 1 M M c c c c C c c c c c c c c c c c C c c c c c c c co co cc OD co ccC fL d CO cc co co coq q C q q co coq co co coI C I D W O. -.. -- I N N M M M M c c c C c C C C 1 I. . t ['. . a O l. 1 • 1 co M M c c C C c c c c c c c C c c c c c c c c c c c I W C co g W q q q q q co cc d g co q q q W q co q W q q W I 1 I t. . . C. . . . . c ccc I • I (V M cM M c• : ) c c c c c c ccc c c c c c c c c c c c I q' co co cc coW q co W g q d C 4 q q q q d q q q d W q q 1 . -+ qp i C C C C O I N N M[ `") M M M M M M M M M M M (' 7 M M M M M c c c c c I g d W W W q W q W W W W q q q W cC g W W d W q W q W 1 i C N W co r. N M c C 11'1 t f l t I l. D 1 p I p. p c C h h h h g d q O `. m 1 I r-�N NM MtO MMM C7 MM MMMMMMMMMMMMM M 1 CO CC CCggW CO CO ggqqqqdq W CO CO CO Wggqq CO 1 qCln In .O CD ID I�I� 1 I cc NNNNMMM M C� M M C� C� C9 co M M CY M M M M 1 M M g d ccq cod cc cc co co W co d q coW W q co q q W W q co q co 1 I M N C O g C� C. -+ N N M M M c c c C c c L r! U9 t f 1 L9 1 C� 9 � 9 19 1 G .-• r+r+ . N NNNN N NNNNN NNN NNN NNN 1 d g W q q W G d w w m = W g W q q W q m W W d W W g I I N L7 C+ (V M c I17 .O h h h g W C O T C rnC� T C! O t C 0 0 0 0 0 I 1 o 0 0 c .co . -.co coca cc .- Mw. .-- .--..- w NNNNNM 1 h C.^ W C.J W q q 0.'` W q q W W g q q q q q q S q C q q a C 1 1 C It] C M L'S .O q q rnOC O.--I '+.r .-+N NNNNNM MMM I 1 h h g W co q co q q q q q q q W q CC g co q q q q W q W � Q co" W C OHO ONMM MMM 1 .. I lD q q Oi O� Ol Cf CI 04O;O�co o0 o 00000 GC 0000 1'1 h h h h h h h h h h h coW co co co co W W W q cc co co W 1 0 1 lOMO C1� Ol O •-�NMMCCII'l ltf lc"f U'l ap ap tD c0hhc0 t0 t0�� g q W q q q q q M q W q q q M M d M M W I I 1 1 1 ta7 I OHO C'cO h W d.-+QI cO 1 1 . 1 1 I O I C�N N N C� NNN NNNNNNNNNNNN.--� ti.�-�.-.00 [ d In C 0 0 0 O C O O O O O C O O O C O 0 0 0 0 0 0 0 0 1 I O CD H 1 0 C C O C O O CD O O C� C�O O C� CD C CD C� CD O C CD C� CD I L' l a O I co p i O r. N M C- 1!: 1 D 1 co G` O 1 f. O L7 C � O 1 1 J I I r* PAGE 23 b 0 1 \A '1l\/ V� `I V Q v l 1 V I �. ' TABLE 5.1 G-3 Project: Kaufman & Robinson, Inc. T T T ` T Location: Blue Spruce Drive/Red Cedar Circle 1 n Fort Collins, Coloradc IUV V L,la114 L Completed by: twe Consultants, Inc Project Number: 0114 Date: Mar-10 Standard Form B All calculations presented are based upon the criteria set forth in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards May 1984 (Revised March 1991 & January 1997) EFFECTIVENESS CALCULATIONS Treatment C-Fart r P-Factor Comments Bare Soil trouxhened condition) 1.00 090 Ba¢ 1.00 0,80 Wattle Filter Silt Fence Sorrier 1.00 0.50 Asphalt/Concrete 0.01 1.00 G rase. 006 too Area 1 (to Detention Pond A) Ass Lrosion Control Methods Developed Subbasin (ac) A 0.56 Bare Soil (Roughened Condition) Asphalt/Concrete 0.22 0.27 Grass 0,07 Gravel Filter, Sand Bag x Silt Fence x Net C-Factor 0,41 Net P-Factor 0.73 EB' I(I -C X P) X 1001= 70.5 B 0.08 Bare Soil (Roughened Condition) Asphalt/Concrete 0,01 0.01 Grass 0.06 Gravel Filter, Sand Bag x Net C-Factor 0,17 Net P-Factor 0.40 ED' I( I -C X P) X 1001= 93.3 C I I I Bare Sod (Roughened ( ondmon) Asphalt/Concrete 0.11 0 Grass 1 0 Gravel Filter, Sand Bag x Silt Fence x Net C-Factor o.15 Net P-Factor 1.45 ED'((I-CX P)X tool = 77.9 Total Area 1.75 Required PS 73.30% 'Total Effectiveness 76.26 % The Proposed Plan is OK 0114 ac calcs.els\EC Effectiveness 3/19/2010 Project: Kaufman & Robinson, Inc. Location: Blue Spruce Drive/Red Cedar Circh Fort Collins, Colorado Completed by: twc Project Number: 0114 Date: Mar-10 EROSION CONTROL OPINION OF COST RIV L1LIAL Consultants, Inc. G-4 Work Item Unit Item Description Units Quanti Price Total EROSION CONTROL ECI Silt Fence If 1125 $ 4.00 $ EC2 Wattle Filter ea 2 $ 350.00 $ EC3 Wattle Dike ea 3 $ 250.00 $ EC4 Vehicle Tracking Contro ea I $ 650.00 $ EC5 Concrete Washout Ares ea 1 $ 500.00 $ CITY RESEEDING COST FOR SITE AREA RSI Reseed/Mulch (all disturbed area) REQUIRED DEPOSIT FOR EROSION CONTROL Total $ acre 1.3 $ 80o.00 $ Total $ Erosion Control $ Total with Factor (1.5) $ 4,500.00 700.00 750.00 650.00 500.00 1,040.00 1,040.00 7,100.00 10,650.00 0114 ec calcs.xls\Estimate 3/ 1912010 ' Excerpts from Previous Report 1 171 1 1 1 I J 1 11 1 RIDGELINE Cvnsultanrs, InC. Al=%,Reportfe Z 3t SHEAR ENGINEERING f CORPORATION Final Drainage and Erosion Control Report For LOTS 1 & 2, BLOCK 5, REPLAT (NO. 1) OF EVERGREEN PARK Fort Collins, Colorado Prepared for: Premier Custom Builders, Inc. 401A South Link Lane Ft. Collins, Colorado 80524 Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1466-14-96 DATE:.January, 1999 PRINT DATE JAN 2 2 1999 SHEAR ENGINEERING CORP 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282.031 I Vj T U II 9 r u O N �•'F N1 G1 Vl O C. V u 0 30 o O Vt O O G O N ¢ � V ? 3] T o• � G �� 41 .7. N N t� Ni l� U o0 � E tr � m 3> In w �- > o to: W Sri W >¢' w C, 0 O j a. M m m � a U SQ-3 o Q Rr- U � tit W a m j w A N Lis O' O Q j Q � a U 3 z w a u w c [ 3 3° 0 c j _.: w V O_. C7 w Yr G � v o c u -- V Q1 G] m m o y C N �eoo� c o v - w W •C .= c G C e� 3 CI N N N O o F E .? .o II I ' Charts and F I I I 11 I I I I I j I 1 RIDGELAINE consnitmlts, Inc. 0 o N o� ry I I I 1 oes C) N T' w• o O N o O o O O o o O o o O O o O O O O C. O o 0 0 o O <- O r T O) O r (6 6 4 M N O (a4/Ui) AI!SUD;UI lop I L I 1 1 1 -- City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1a Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/hr 5.00 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 8.03 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 13.00 1.98 3.39 6.92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 16.00 1.31 3.08 6.30 17.00 1.75 2.99 6.10 18.00 1.70 2.90 5.92 19.00 1.65 2.82 5.75 20.00 1.61 2.74 5.60 21.00 1.56 2.67 5.46 22.00 1.53 2.61 5.32 23.00 1 1.49 2.55 5.20 24.00 1.46 2.49 5.09 25.00 1.43 2.44 4.98 26.00 1.40 2.39 4.87 27.00 1.37 2.34 4.78 28.00 1 1.34 2.29 4.69 29.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 1 Table 3-3 ' RATIONAL METHOD RUNOFF COEFFICIENTS FOR CCHPOSITE ANALTSIS character of surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt ...................................... 0.95 Concrete ..................................... 0.95 Gravel ....................................... 0.50 ' Roofs .......................................... 0.95 Lawns, Sandy Soil: ' Flat<28..................................... 0.10 Average 2 to 7%.............................. 0.15 Steep>78.................................... 0.20 ' Lawns, Heavy Soil: Flat<29..................................... 0.20 Average 2 to 7%.............................. 0.25 Steep>78..................................... 0.35 1 3.1.7 Time of Concentration - In order to use the Rainfall intensity Duration Curve, the time of ' concentration must be known. The time of concentration, T., represents the time for water to flow from the most remote part of the drainage basin under consideration to the design point under consideration. The time of concentration can be represented by the following equation. ' T. = t,v + tt Where: T, = Time of Concentration, minutes t,. = overland flow time, minutes t,= travel time in the gutter, Swale, or storm sewer, minutes ' The overland flow time, t," ,can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). ' Tov LB7(LI-CCf)912 S113 ' Where: T,,,= Overland Flow Time of Concentration, minutes S = Slope, % C = Rational Method Runoff Coefficient D = Length of Overland Flow, feet'(500' maximum) ' C, = Frequency Adjustment Factor The travel time, t,, in the gutter, Swale, or storm sewer can be estimated with the help of Figure 3-3. The preceding variables are based on the initial storm, that is, the two to ten ' year storms_ For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. ' May 1984 Design Criteria Revised January 1997 ' 3-5 DRAINAGE CRITERIA MANUAL So 30 1— 20 Z w U Q ua rL 10 Z w a � 5 Cn w c _3 7 O U 2 C LL7 1— Q 1 111 + I RUNOFF f II Z i I I" o I DTI r T T I I I I I I I P 4T . 40 QTW I 1 1 I 1 I I I I I I 1 1 1 1 I I I I I I I I I I I I I I 1 I I I I I I 1 I I I I I 1 1 1 1 I I I I v I yl I I I I I I I I I I Figure 3-3 .2 .3 .5 1 1 j 15 2 3 5 10 20 VELOCITY IN FEET PER SECOND ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACESTN TFIE-DENVER-REGIO-N. REFERENCE:: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5-1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT GONSTRUGTION REFERENCE I I • MWca OTHERWSE NDTED. AM OOMSm OON SHALL M IN AWORDANU Wm THEM PUNS' nE LOT 1, BLOCK 5, REPEAT (NO. 1) CITY OF PONT CODM9 DESIGN AND ttNs)RUL)NN STANDARD% ME LAR,MER C NTY Ji AaA STREET STAAOAJi TM STATE EE DOLOD00 DEPARTMENT 0, HISPNAn sTNnARD _ OFEVERGREEN PARK I SPCMCAnMS RF RDAD AAO IIII 004 n CnM AND THE STE GEORCNMCAL REPgiT PaowRn __ _____ -- SMILE R I 1 I I 115* ADS I '�—I Cd bdM you y, EwrnNc (j I�` II III iCOACH�GHTPLAdA Simms ROwAc BUILQNG AMSNEDw r aIDRc li I' 1 I III � III ao-ra DEvne O.0 {( A SECTION A —A �<7 LOT BLOCKS, REPLAT(NO. 1J�I 6 NTS i hf I EWETING _ _ a' I I I. soSwALx EXSTNG OF EVERGREEN PARK r i ] Y 1 N DEVELOPMENT I �I x P� 6. PROPOSED /,�) 1 I �I F I �I v CONCRETE N� FASTING CURB 8 I JrURETE B PROPERTY DEVELOPMENT E%' I ' CONCRETE Q)TTER (CATCH) UNE /�fAEi(NG EVERGREEN 2n 0 w I. ENTRANCE _ IIIEST OND HIGH I EW -'- -�� �� _ T AOPEE�EFl1ENi ''/,, WTO V� EIEV. A98 PROPOEED 4.5' ] / CONCRETE SIDEWALK E%ISTNG 16' 100-UTILITY AND �R I' DRAINAGE I SED I _ PROPOFEE 49]1.50 EASEMENT j �{ 2' COIICREIE LOT 1, BLOCK 3, REPLAT(NO.1) \. m. x _ PAN ��1 ➢MOD APROPOSED FUTURE \BUILDING I / OF EVERGREEN j ,�i A �, ems BmuANc / PprD A ] PARK 1 1 \ ITOP I • m a l \ \ WATLI 14 PROPOSED lo. 1 m'x10' \r'9�D \ \ \ I IIISEL I I.A EASEMENT \ PROPOYD cI s ( JP �� 2' CONCRETE I PROPOSED I PROP05ED 4' f/ PAN 12• FES _ W/ 3'%J'%IY CONCRETE PAN PRIVATE DRIVE_ ftIPRAP PROPOSED I I 9 .3i�•• ^ % / -- '\ EIRUCIURE / ] ys MN PROPOSED _ N� CONCRETE PAN N - ) • P SEE MEANING )afi ) I iT— E'�� E 1 � !— � '_ � • )p, RECEPTION NO.: 11tioW__--�5063614 II PROPOSED N� 'J U CURB CUT S V / POND A RED \ EMEacENcr o CEDAR IIII ' s 1 - EXISTING 8 / C PROPOSED GRASS \ ` OVERFLOW II 1 m All U11lliY EASEMENT EWALE O IJS \ CIRCLE 1 ' • I 1� EA TING NEST PONDHIIa�1 A - N I A•I R. tip, EWSDN6 �� ��\ WAMR LINE P r rPMT'I _ A m PROPOSED A5' t_ PROPERTY �. J o CONCRETE SIDEWNX _ 9625 _ _ uNE L I EXISTING�__-- I < GUTTER (TOH) I EXISTING SIOEWAIR EIOSDNG - - EXISTING j EUSLHG LOT 5, BLOCK 5, REPLAT (NO. 1) aeLDWiG BUILDING I CASTINGWRBa aEYELOF4NT OFEVERGREENPARK - j —� I I WITTER (CATCH) BASIL RUNOFF SUMMARY G LEGEND OISSYMBOLS 6" DIRECT CUMULATIVE CUMULATIVE DETAINED EASIING BAID SIN OEpS1GN AREA ONSIDE III ! r ` (A(c1•) (cOe) (b DESCRIPTION NOTES: WATER LINES �. yT __.-� A p 1 0.56 PROPOSED SWALE 2.34 5.55 - - y BASIN A TO F 1. ME TOP OF NDASOIY ELEVATION SHOWN IS ME MINIMUM SANITARY SEMER —ass D.M D.N B Y 0.08 D.09 0.24 - - y M5161 B TO DETENTION POND ELEVATION REQUIRED FOR PRO)ECRON FROM RIE IM-YEAR STORM. AREA Ac. C J 1.11 1.07 2.72 - - y BASIN C TO DETENTION POND RC _L 2 REFER TO )1n: NOTES QI SHEETC-02. CQVSMUWRA SNAIL BE IN MM ALL CLIP OF FORT CQt/A'S STA)£ AND GAS 9W "A`A c.,� SANOFTAND FEDERAL STANDARDS AND RECQADONS FEDERAL OVERHEAD DESIGN PANT 1 DETENTION SOMNARY ox uon.--o--w, 1 L MACRM SHALL 4ERIFY COCA ROWS OF EXISRNG UMIRES =� H1A91 o Ppn n Avu FVMD �L wL D PRIOR TD CfAYSMUC"M TELEPHONE ) PROPOSED ASPHALT :�7t L. Lw) pty ION ARC A L)5 49RO.b D.om A9.6]5 ane 995).)J .Js TOP SNARL COOQCNAIE ALL N MMUN PUBLIC 4 COY)RA AY MM ME CITY OF FOPT COLLINS AND ME STORM DRAIN PRWOSED CONCRETE MWT-�- APPROWR/A um"CTIwPAN FASTING ASPHALT EXISTING CONTOURS (1) % \� -+•JD 1ro-ra xrTUA 00-1R WRLOW;Fs)( FASTING CONCRETE PROPOSED CONTOURS IWNIP077 FLAca (0. 2 2 ygygy �d Z B O o Q• U 96 O 2 Yj F° a OM Z i a D w ¢D¢ a iY zz OZ oO J 2 o= Q J � y � LL le a �p o_ z W W E0.TIcr U W W city Of Fort Conine. Coi UTILITY PLAN APPROVAL vnm -nf Lb➢x TIC Ro., 1 v. wln.m uNn. -sr w.wu� -6N- Q.olA1.fB a p#e AK{mA0 An Ah 014 B� 6P 0//41 SHEET C-06 aP 12 SM£1B 0