FINAL DRAINAGE REPORT
for
FAIRBROOKE TRACT "A"
City of Fort Collins, Colorado
December 14, 1994
prepared for:
Wheeler Realty of Fort Collins
prepared by:
Northern Engineering Services, Inc.
420 S. Howes, Suite 202
Fort Collins, Colorado 80521
(303)221-4158
Project Number: 9435.00
Northern Engineering Services, Inc.
December 14, 1994
Mr. Basil Hamdan
Stormwater Utility
City of Fort Collins
235 Mathews
P.O. Box 580
Fort Collins, Colorado 80521
RE: FAIRBROOKE TRACT "A"
City of Fort Collins, Colorado
Project No. 9435.00
Dear Basil:
Northern Engineering is pleased to re -submit this Final
Drainage Report for your review. We have addressed your comments
contained in the red -lined, drainage report dated November 1, 1994,
and Utility Plans.
This report was prepared in compliance with technical criteria
set forth in the, City of Fort Collins, Storm Drainage Design
Criteria and Construction Standards manual.
If you should have any questions or comments as you review
this report, please feel free to contact me at your earliest
convenience.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Mary B . i
Project ]
;/Z4
Michael
420 S. Howes • Suite 202 • Fort Collins, Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159
\7
Ito
0
II PROSPECT it STREET I
VICINITY MAP
N.T.S
NORTHERN ENGINEERING SERVICES, INC. 1
420 S. Now", Suit* 202. Fort COMM Cdomdo FAIRBROOKE TRACT "A"
(303)221-4158
Final Drainage Report
for
FAIRBROOKE TRACT "A"
City of Fort Collins, Colorado
December 14, 1994
I. GENERAL LOCATION AND SITE DESCRIPTION
W General Location
This report summarizes the results of a -storm drainage
investigation for the proposed Fairbrooke Tract "A" P.U.D. located
in west Fort Collins, Colorado. The project occupies approximately
19.90 acres in the north half of Section 21, Township 7 North,
Range 69 West of the 6th Principal Meridian Larimer County,
Colorado.
Site Description
The site is bounded by Prospect Road on the north, Cedarwood
Drive on the east, Somerville Drive to the southeast and Larch
Street on the west and, is currently vegetated with natural grass
and weeds. It is divided into a western and an eastern half by the
relocated Pleasant Valley and Lake Canal which flows from north to
south. The existing soil has been classified as fill and topsoil
overlaying sandy silty clay. The site is adjacent to Somerville
P.U.D. First Replat and, Fairbrooke Fourth, Fifth, Sixth and
Seventh Filings.
II. HISTORIC DRAINAGE
Major Basin Description
The project site is located in the Canal Importation Basin.
I
'i Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 2
Historic Drainage Patterns
The existing drainage pattern of the western half of the site
is from west to east towards the canal at slopes ranging from 0.83%
to 2.5%. The eastern half slopes away from the canal, and is
divided into a northern and southern section. The northern section
drains to the northeast to Prospect Road then east down Prospect to
a regional detention pond at the southwest corner of Prospect and
Taft Hill. The southern section drains southeast at slopes ranging
from 0.9% to 3.3% toward the intersection of Cedarwood Drive and
Somerville Drive, then south down Cedarwood approximately 770' to
an existing curb inlet in Cedarwood Drive approximately 75'
southeast of Etton Drive. The existing developed runoff tributary
to the curb inlet is 4.9 and 17.5 cfs for the two (2) and one -
hundred (100)-year storms respectively (See calculations, Existing
Drainage).
III. DEVELOPED DRAINAGE
Developed Conditions
The project site is identified in the Final Drainage Report
For Fairbrooke S.I.D. (FDRSID) as Tract A. (See References) The
development of the site would consist of single-family homes with
new local streets and on -site retention and detention. The project
will be constructed in three phases.
Design Criteria and References
Methods outlined in the City of Fort Collin's Storm Drainage
1. Design Criteria and Construction Standards (SDDCCS) along with
methods presented in the Storm Drainage Criteria Manual by the
Urban Drainage and Flood Control District were used in the
calculations for the stormwater runoff portion of this study.
Storm Drainage Reports' for Fairbrooke First Filing and Final
Drainage Report for Fairbrooke S.I.D. were also referred to.
Addendum to Report of a Geotechnical Investigation for Fairbrooke
S.I.D. provided the existing soil types at the proposed site.
Hydrologic Criteria
Due to the relatively small basin size (19.90 acres), and in
keeping with criteria set forth in the SDDCCS, the rational method
was used to estimate peak stormwater runoff flows from the project
site. Calculations made as part of this investigation along with
■, other supporting material, are contained in the appendix to this
�J report. A design storm frequency interval of 2-years was used for
the initial storm and a frequency interval of 100-years for the
major storm.
A
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 3
Hydraulic Criteria
All calculations contained in this study have been prepared in
accordance with the City of Fort Collins Storm Drainage Criteria.
General Drainage Concept
Developed runoff will follow nearly the same drainage pattern
as historical flows. The west half of the site will flow into
two(2) proposed detention/retention ponds. These ponds will
discharge into the relocated Pleasant Valley and Lake Canal, at a
combined historical 2-year rate and 100-year historic volume, and
continue south. The retention portion of the ponds will be
temporary, until such time as the master drainage plan (Diversion
of Stormwater Runoff through Irrigation Canals from Mullberry
Street to Spring Creek, Fort Collins, Colorado) can be implemented
and a stormwater canal constructed by the City of Fort Collins.
Once the master plan is implemented and constructed, the retention
ponds will no longer be necessary, the detention ponds will
discharge into the city's drainage swale and irrigation flows will
be conveyed in a concrete pipe through Fairbrooke Tract "A" and
Somerville.
The Pleasant Valley and Lake Canal is proposed to be relocated
as part of Phase III of Fairbrooke Tract "A". The relocation will
include construction of the irrigation ditch only(no concrete pipe
at this time), and will not involve construction of the stormwater
canal, proposed as part of the city's master plan. At some future
point in time, as the City of Fort Collins shall dictate, the
proposed master drainage plan shall be implemented which will
include a concrete pipe to convey irrigation flows and an open
channel to convey stormwater (See report, "Proposed Channel Design
Through The Fairbrooke Tract "A" and Somerville/Charleston
Subdivisions").
Runoff from the northern section of the east half will be
conveyed from the proposed site, north to Prospect Road, then, east
across Cedarwood Drive to a proposed curb inlet in Prospect Road.
The proposed storm sewer (yet to be constructed) as part of the
Prospect Road S.I.D. will convey runoff to an existing regional
detention pond located at the corner of Taft Hill and Prospect Road
where capacity has been provided for this site. (See Volumes I & II
- Preliminary Design Report. Diversion of Stormwater Runoff Through
Irrigation Canals from Mulberry Street to Spring Creek Fort
Collins. Colorado, by Resource Consultants, Inc., July 1980.)
Construction of the Prospect Road S.I.D. improvements shall be
included as part of Phase III of Fairbrooke Tract "A". Phase I of
the project shall include those lots which drain directly into
ieither Somerville or Cedarwood Drives. Phase II of the project
I!
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 4
General Drainage Concept, con't
will drain into the proposed detention Pond D5.
The southern section of the
Detention Pond D5 which will
Somerville Drive. This flow will
then south down Cedarwood past
inlet in the south flowline of
pond.
Specific Details
east half will drain to proposed
release stormwater runoff to
continue east to Cedarwood Drive
Etton Drive to an existing curb
Cedarwood, then to the regional
Storm sewers will not be necessary for the proposed
development due to the ability of the streets to convey runoff
within allowable limitations.
Stormwater will be conveyed overland, in pans, swales and in
curb and gutter to four separate discharge points. Runoff from
Basin D2 will be directed to the proposed Detention/Retention Pond
D2. This pond will release 17,399 c.f. to the realigned Pleasant
Valley and Lake Canal, the remainder of the stormwater generated in
a major storm will be retained. The total amount of runoff
generated under developed conditions for the 100-year storm is
29,520 c.f.. The total amount to be retained will be difference
between the amount generated and amount to be released, or 12,121
c.f..
Runoff from Basin D3 will be directed to proposed
Detention/Retention Pond D3. This pond will release 12,079 c.f. to
the realigned Pleasant Valley and Lake Canal. The total amount of
runoff generated under developed conditions for the 100-year storm
is 21,820 c.f.. The total amount to be retained is 9,741 c.f..
The 2-yr historic runoff at design point H1 is 6.3 cfs, which
includes both Basins D2 and D3. Under developed conditions, on -
site runoff generated from these basins will be released at a
combined rate which is less than the 2-year historic rate and, off -
site flows will be routed through the detention ponds. Pond D2
will have a maximum 100-year release rate of 5.47 cfs. The
allowable release rate for Pond D2 is 4.5 cfs(on-site) + 1.9
cfs(off-site) = 6.4 cfs.
Pond D3 will have a maximum 100-year release rate of 2.91 cfs.
The allowable release rate for Pond D3 is 1.8 cfs(on-site) + 1.7
cfs(off-site) = 3.5 cfs. Both ponds D2 and D3 will discharge into
the relocated Pleasant Valley and Lake Canal through a 15" diameter
RCP equipped with a control orifice.
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 5
Specific Details, con't
The third stormwater discharge point is located at Somerville
Drive. Runoff from Basin D5 will be discharged into Somerville
Drive from Detention Pond D5. Stormwater will then flow east to
Cedarwood then south down Cedarwood to an existing (4)-4' curb
inlet. This pond will release at the rate of 0.6 cfs, which is the
maximum rate allowable, in order not to exceed a total flow of 8.0
cfs at Design Point 9 (See Overall Drainage Plan).
Developed runoff of 2.2 and 8.1 cfs for the 2-year and 100-
year storms respectively, from Basin D1, will be undetained and
conveyed in existing curb and gutter to an existing (4)- 4'curb
inlet in Cedarwood Drive. From the inlet, stormwater will be
conveyed to the regional detention pond by way of storm sewer and
open channel flow.
Under existing conditions, flow at the existing (4)-4' curb
inlet is 4.9 and 17.5 cfs for the 2-year and 100-year storms
respectively with a tributary area of 11.56 acres. This tributary
area includes existing Basins SOM, FB6, FB1, and H2 (see Overall
Drainage Plan). Upon development of FAIRBROOKE Tract "A", the
maximum flow at the inlet will be 8.0 cfs as was anticipated in the
First Filing.
The existing (4)-4' curb inlet was designed and built as part
of Fairbrooke First Filing. The anticipated runoff at the inlet,
as per the Fairbrooke First Filing Drainage Report at Design Point
9, is 8.0 and 32.2 cfs for the 2 and 100-year storms respectively
with a tributary area
of 11.09 acres and a runoff coefficient
of
0.50. This tributary
area includes Basins F-3A, F-3B, F-7A and
F-
7B (see Page 68 of the
Appendix). This information is identical
to
that which is contained
Fairbrooke S.I.D. (See
in the "Final Drainage Report
Appendix, section Final Drainage Report
for
for
Fairbrooke S.I.D.).
The fourth and final discharge point is into Prospect Road
from Basin D4. Developed runoff from this basin will be undetained
and will flow to a proposed 15' Type-R inlet located at the
southeast corner of the intersection of Prospect and Cedarwood.
Developed flows at Design Point D4 are 3.5 and 12.6 for the 2 and
100-year storms respectively. These discharges are below those
estimated in the "Final Drainage Report for Fairbrooke S.I.D." at
Design Point 3 of 4.1 and 13.1 cfs for the same storms. Discharges
are also below anticipated flows given in the "Final Drainage
Report for Prospect Road S.I.D.". Those flows are 4.1 and 13.3 cfs
for the 2 and 100-year storms respectively (See Appendix).
Stormwater will be conveyed from the inlet to the regional
detention pond by way of the proposed storm sewer as part of
Prospect Road S.I.D..
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 6
As was stated previously, stormwater from this basin will not be
discharged into prospect Road until the storm sewer system is
constructed as part of Phase III.
Water Quality
To ensure that water quality of the Pleasant Valley and Lake
Canal will not be adversely affected by stormwater contributions
from the Fairbrooke Tract A site, water quality control measures
have been implemented. Storm runoff from Holly Way to detention
Pond D2 will be conveyed via grass swale that will be underlain by
a gravel subdrain. The slope of the grass -lined swale is 0.83%,
which will reduce the velocity of runoff and increase the
infiltration of stormwater into the subdrain and allow sediments to
deposit. It has been determined by calculation that particles
larger than a very fine sand will be deposited in the swale. The
proposed grass swale is expected to be effective in depositing
sediments from small discharge flows (nuisance flows) and from the
first flush of any storm. The first flush from a storm is expected
to have the most adverse water quality. Detention Pond D5 will
also have a similar grass -lined swale with gravel sub -drain.
During a major storm, runoff is conveyed from the streets to
the detention/retention ponds where it is detained from 0.70 hrs to
4.2 hours thereby increasing infiltration and sedimentation. In
addition, retention ponds will treat 100 percent of stormwater
runoff.
IV. EROSION CONTROL
Temporary erosion and sediment control will consist of soil
roughening, a gravel filter, silt fence and straw bale dikes. Silt
fencing shall be erected prior to the commencement of overlot
grading during Phase III. Soil roughening shall be done upon
completion of the overlot grading of all phases and the gravel
filter upon completion of the sidewalk culvert at the end of
Charleston Way. Straw bale dikes will provide inlet protection at
the flared end sections of the outlet pipes in all three of the
proposed detention ponds.
Permanent vegetative erosion control will be used in
conjunction with landscaping and will include sod grass and
established native grass is to be installed when final grading is
completed. The proposed detention ponds shall be landscaped in
accordance with Section 11 of the Construction Standards.
Permanent revegetation of areas disturbed by construction will be
the responsibility of the contractor.
i
r
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 7
V. CONCLUSIONS
Compliance With Standards
All drainage analyses have been performed pursuant to the City
of Fort Collins Storm Drainage Design Criteria and Urban Drainage
and Flood Control District's Drainage Criteria Manual.
Summary of Drainage Concept
,{ Measures have been taken to ensure adequate drainage
f facilities have been provided for Fairbrooke Tract "A" P.U.D. with
attention given to both existing and future adjacent developments.
Street capacity for both the initial and major storms have
been analyzed and are within allowable limits. All available
reports pertinent to the design and analysis of the proposed
drainage system for Fairbrooke Tract "A" have been referenced.
Maintenance of the proposed detention ponds and swales will be
the responsibility of the property owners association.
A variance is requested for midblock cross pans located on
Charleston Way and Holly Way. Due to the proposed grades, storm
inlets are not feasible in either location. The width of these
pans coincides with the 100-year flow spread calculated at Design
Points D2A and DSA. The mid -block pans also enable stormwater
runoff to be conveyed to the gravel sub -drains for water quality
purposes, which was a concern of the Pleasant Valley and Lake Canal
Company.
j The Pleasant Valley and Lake Canal Company has agreed with the
ditch realignment concept through Fairbrooke Tract "A" and
Somerville with certain contingencies. A final agreement will be
executed for the proposed alignment subsequent to final approval of
construction plans by the City of Fort Collins(See Pg. 83-84 in
Appendix).
[l
I
I
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 8
REFERENCES
1.
Storm Drainage Design Criteria and Construction
Standards, City of Fort Collins, Colorado, May 1984,
revised March 1991.
2.
Erosion Control Reference Manual for Construction
Sites, City of Fort Collins, Colorado, January, 1991.
I
3.
Final Drainage Report for Fairbrooke S.I.D., Parsons &
Associates Consulting Engineers, November, 1983.
4.
Drainage Criteria Manual, Volumes 1 thru 3, Urban
Drainage and Flood Control District, September 1978.
5.
Proposed Channel Design Through The Fairbrooke Tract "A"
and Somerville/Charleston Subdivisions, Northern
Engineering Services, Inc., September, 1994.
6.
Final Drainage Report for Prospect Road S.I.D., The
Engineering Company.
Fairbrooke Tract A December 14, 1994
Final Drainage Report Page 9
APPENDIX
PAGE
Historical Drainage .......................... 1-3
Developed Drainage ....................... 4-16
Existing Drainage ......................... 17-25
Street Capacity Calculations .............. 26-40
Detention Pond Design ..................... 41-60
Design of Swales ......................... 61-63
Erosion and Sediment Control Calculations .. 64-67
Soils Report ............................... 68-73
Final Drainage Report For Fairbrooke S.I.D ... 74-76
Pan and Culvert Capacity ..................... 77-82
Letter from Pleasant Valley and Lake Canal ... 83-84
Calculations from Final Drainage Report
for Prospect Road S.I.D. .................... 85-87
I
I
I
I
I
F
I
L
I
t
I
HISTORICAL DRAINAGE
I
I
I
I
1
I
I
L
I
0
I
I
I
I
u
I
I
11
I
fJ
1
o.as- (1 _J3' 1J
G1
i
I
0
off' , iaL.L, �jaFF
Z �
.7 j �l TY>
�-IaD
ids
ice= r✓�j1 ct _ �. � s.,,,_.I
z-
_ G5 `O. 20) 4.eis i ti/:./ �. 4'� s�.. j = 7Z S G; S
lDu J
I
I
FJ
I
I
I
1
i
DEVELOPED DRAINAGE
00
Cq
ca OD
.. ......
a
,"WT7
....... .... .. ....
..........
s
.......
,`...................
. ..........
.......
Z
.. ...
LO
a
wo
...
1.9
En
...................
0-4
......... ..
.
..........
cf)
..............
... ...............
..... ..............
V)
....... ......
.....
C-4
.............
............ *.-.*:,
. ............. ...... .
.
..............
..........
. . .......... . ... . . . ......
a4
<
14
pq
w
w
0
0
<
Z:
00
A
z (n
0
Northem Engineering. CLIENT -
Services, Inc.PROJECT
' MADE BY
JOB NO.
CALCULATIONS FOR
DATE CHECKED BY DATE SHEET OF
Northern Engineering, CL'ENT-
SerVICPS, Inc. PROJECT
MADE BY,
JOB NO. v
CALCULATK7NS FOR
DATE CHECKED BY DATE SHEET OF
No Text
ONorthern Engineering CLIENT JOB NO.
Services, Inc. PROJECT CALCULATIONS FOR
MADE BY DATE- CHECKED BY DATE- SHEET- OF
L.-47 Pe I.:> I -�j "M"4;'t
- - ----- ---
�v^
G4-7 ae,
2.�
4 } 0,
48
V-J
21 'r
3. ZG'
1,,1
4-1 ZI
I 4�j L
j
�el Ae, b-I
J� 2— 4- %
------ 7-7�
--7-7
+
f
-Fi
--- - --- --- - ------ --- -- --
4-a
----- - - --- -- ------
a
Northern Engineering. CUENT-
Services, Inc. PROJECT
MADE By,
ul
JOB No,
CALCULATIONS FOR
DATECHECKEDBY DATE- SHEET- OF
No Text
Northern Engineering.
CLIENT JOB NO.
Services. Inc.
PROJECT .. CALCULATIONS FOR
MADE BY DATE- CHECKED By DATE- SHEET- OF
V BEEL-�=
17 '>),o, c-
&I L,4j r::)-r
i t
2-1 a,.;$
10
14-.1
+ 14--
Kn
it ice. 3> I
T
4'1-1 �Jr-
2- `q4-
/V),I� e. 2-
1N
5
--- - ----- -- --- -----------
. ..... - - - - - - .... ......
L
> in/
C,
t
, TD 1345
Lr i.rr�t'rA'! - C' 7� C r M)z. til
d L►�c,r-t fi-r,,1i'rL_ t=Pon-�
I�cstu J ioor ,� r �3I S
prl�s of L��N t Lam-,., 0.l==r... = O. fv `'-t L .•.0
G c o.gs(o.lzt�4> +- o.zv Co. L
Lc SO' t�L = l.91 ( I• - O. zo(I.o)) OO' c / l.�I w+r,J
z,o
G= O.LO �Lren = I - On l_I-o.Za(r-LS)l �J
a Z 7l
�rua
02- = 0. 31 ( 1.0) 2. 3� (O . of 4�+c) _ O 6.0 �+s
Quo = 0.9I ( I. ( o. 6r 4 r� 1 = Z. Z cis
/-�r: rsrzrcA.c�t_Y G?L = 1..3 IFS Isrc w for ,T F}�
�+Cvp
U• vo 4(�Fs « L.I � r ✓p K
Z. Z LTJ G G L Z. a L -i -' - W,
No Text
Northem Engineering
Services, Inc.
CLIENT -
PROJECT
MADE By
DATE- CHECKED BY
JOB NO.
CALCULATIONS FOR
- DATE_ SHEET- OF
Z
0 ;35_�I•
---- ----------- --- -
--T - - - - - -
No Text
No Text
DRAINAGE CRITERIA MANUAL
RUNOFF
5C
30
I- 20
z
W
U
W
IL 10
Z
W
a
0 5
to
W
w 3
0
U 2
W
l�
3
1
am
milli
�I"=►I
MI/■I,■�,�/����■■■■IIIIIINIIIIIIIII
.2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING "UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 -1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
I
1
1
1
1
1
1
1
l l
1
1
1
1
L!
1
EXISTING DRAINAGE
1
No Text
Northern Engineering_ CLIENT JOB NO.
PROJECT CALCULATIONS FOR
Services, Inc.
MADE BY DATE CHECKED BY DATE SHEET OF
No Text
I
U
-10
'I
I
I
I
1
1
G
m
o�
s u
3
n
n
a
e�
3 =
C
c
L
o
�o&zy Inc`,
�
�
F• C S
OMO
L Q O.
Z D Etl+
CU
yCy
0 B „
d U
Q Z
2 F% Z
y
u `v z
(lsX1
n O < sf N O O+
OJ N Ot N O1 N M I '-
M Y < N O
O] p �O tp N O Ol
M ^ O O
11
1
11
t0
N
y
U U
via
m
pa
{7r a w
�
N
II
A
u
II
C
O
w
_
Q�[V
y ` 2
w 2
n `
3
0 0 <<^ G
o A i
z p a
cya 0 e a
e n h
0 u]
u U
I fJ
a z e" o
`u z
U
z F z
y y u
4 0.
[L
t21 V1
Ui O O
�oo
I
b\.
W O O y 0 y 0 0 t0
.-
�t
i
1
40
� w
O
N
U U
,
o
O ! 1 Uy
N
0
�
u)
O
U�
II
a
A
r u
9 a0 ..
e it
3�
L g
Cm
QQ
C a
6
n
G
j
>o
O 9 ti
:P 3
Fp.^.FFn`e^G
L Q C �
Q] LaL.
y6y
�G S z'
p
a a
yp--
r�G w
b
00 O f0 t0 N M
M O
23
o 0
M �
V W
a
No Text
--r
DEPTH OF FLOW (y) IN FEET
..., nn nc nc no in 9
,4 .5 .6 .8 1.0
M(o)
41,
Di4cho'rge Per Foot of
Length of Curb Opening
OAF
6 of Gutter Flow
MOMMEXI50200
MMA
01111APIN?i
mmommaAmmommom
J
Rotio for Inlets of
Lengths Less Thon L'
F
F"
p
0,,,e
03.06 .08 .10
1.0
I.B
.6
.5
.4
.3
.2
Qo
Lo
.10
.08
.06
.05
.04
.03
.02
lei
1.0
Qa
= Total gutter flow at
8
design point
.6
y
= depth of flow in gutter
.5
a
= depression at inlet
q
L
= length of inlet
0 L
= length of inlet requirE
.3
po a
to intercept 100% of Qa
(Qa-Qa/La)
Q
= Qa X (Q/Qa)
.2
Qa.Q
■ flow carried over to nE
design point
.10
.2 .3 .4 .5 .6 .8 1.0
L/Lo
CAPACITY OF CURB OPENING INLETS ON
CONTINUOUS GRADE.
I
L
I
I
I
I
[1
.I
I
STREET CAPACITY
No Text
Northern Engineering. CLIENT
JOB NO.
Services, Inc.PROJECT
CALCULATIONS FOR
MADE BY DATE
CHECKEDBY DATE_ SHEET_
OF
7- rz- =ff 77
j S- I '-j 1?,::, 0 -1-J-77
_ --:
De I �j R,;:, i_ - --
-
I'j
An
D��= T-;4
C�!
C4
0.4v3
j-
- -- - - - -
-- -- - ------ - - -
----------- ----- - - -------- ---- --
I
i
i
I
1
M
I
I
G
w
a�
3
t..
�
Y
G C
Q
O
A
rC
� O
0
a
ar
WCa
o
A
w
� t
'O
0
F
O
�vl�
p b 3
4)
a
g
00
r
saSZ(;5
o o
A a
pao
aivVi
wa
p��
0 z E
NUl
N z N fV
F z
W V]
cCr7
O O a 0 d
a`a`W
4rnA
D
IL
d
z
a°
a o v ? 't 0 Cl),
O cV 9i �j 8i �j P"f�r
GND, p CR I Ma 9 N g N
<o cCyc06M�oo
0
3, M R )p to P
N N N N N N m T
.-
Q
a
U
J
U
W
2
W
H
N
I
r
I
I
@
I
I
:
�
I
I
I
.I
�
11
k
§
�}
;J
(
7/
2
/)
�
|�-
02�■.!
)
)2(
/k§
�0,
/})�
/
$\f\\
(§k
Z/
�V)A
cu
\%� _ OD
f . ,
( a
§ kkk§§CD ci
°
# ycoCd 0 6 @ \ k
) k cc
31
\ � �
){{a4800 E $
\ « « E § 2
M
G 2cc .@
0 LZ
§/\
® k )
\ 2 / ai § (
U) » «
LL
\�0606,,06
0 CL CL / ƒ f )
;G,7,22--)
!,§-§`)))2
�k`� °7#)f
�g2q
ea«2e2.CC
) $\\\\\\\ff
RNkgkNNN0{
k
k
I
3
I
I
11
l�
�
A
I
O �
U U
�_
a
°
O
a
i
II
UC7a
��
O
.ate
1
o
�
o
F
a
� u
Q
0
a 2
P0.
V o
o,
0 3
_•
F
CA v`
_
ip O
0 0.
° tea
o a A
c y y
p 0
AZ ego
�w�
1
W
a gqgac2ig�
U
a
U
OR
O
LL
4
I
1
I
F
I
Q
� p Q
a o V -t 11' iQO
j Pisi�jei(ycg�s
co 00 m�� s CmC 1n°
fC O �y O C6 g G O
r
3 N N N N N N N N 71
i
a
a
U
co CD
C ci
w
N
4 fl`
Q
2
11
0 Y
J Q
4
O W
4q
Q 7
7
0 W
Q �J
O LL
ED
m �
LL
z
U
p U
W Q
IZ
LL
r
I
L
r
I
I
I
I
R
I
r
I
I
e�
3
e
t II
00
'o n
Y �
a .5
0
A
a s
z
•a€
o E
Q
O
u
Y
[Ll iy
A
O ;
'
o
As
6
II
Z N a C
N m O u
A
o d
o
A a
00E-
e�`n
y rn
� xa
U
Az,nM
��F� z
�zSNwN
G N
r O O
a o a N o v
O N 01 W !9 r
CR cgsIR SC4 aN07
Ictoct'i06r7'0
r
1=
LL
@
@
�
@
F
@
F]
I
I
I
I
I
I
.\
}\
7J
))
§0
m
2\
z
/
y
§-0
f)\
)k§
CZ CZ
a�A
2dk
§ ]
£
� .
■/)00;=LOa_
�(
[ )
"2 �L626 d 6 d
\)
<
ƒZQ�°
)k
A
Ir
�
$ (
Ir
2
\}� a48f/33
oo
#UJ
§
)
E
§
)
\
Q«
o
04)
§ƒ<
L<L
@
S )
/
% §
§ ejai ai
V)
c «
11
]°) ) 8 to :cr) Lf?
LL
k
t 0 k{
f iA
``)7k��
$AA�f2
a,=2CD2FA-FA
�»»2»»22[E
z
ii.,i,,.-�
»=gNNNNN0\
b
)
A
(B
I
\
\
/.
�\�
6#§ \
Q
§
= `
//k
\
©
k
em<
<
2
co
}]]
«
ƒ
®�u
Lr)
%
\U�
\
>E
�}
�
}a)
\k
��k
ƒk\
2
«
#
m ,
oo w
�77§\
)off
o
,
) k)6ca
LL
E
\c &
#66
2k
®k):■
�2)B
A z
uj
f iq�\
ci
�&Cme
ILCLLL
�OoD
kk)
�\kuj
§
4
k
cr
§
§
k
\
§
<
4
U
Bo
�
O
m
�a
g
� U
�
Q U
T
m
.LO.
vU
a �
c
o
;
U U
II
O
p
£ d
�Wa
�°�
v
D
� n
c m
= c
c
O
N tD
0
<_
`m o I
1
o
ink �o=
ar,� o;
it
G
O
y «
¢ goat cC
?
LL
aUB
U rc�tiv'u
C
O F
CL q
`g
ca
otz¢
V L i
a? W
0 a:
�* g
oZE 4
~z Ilz .
6DvZ' C04,,
'wtn80
. . x
F-
�1 r
�1..CO0
u
!I U
e
m�
3
--
Y
3 a
_
0 0© O
D
11 II ;
a
m
N LV
r
0 0
x
N
11
U
11
C
1
I
I
a
i
cn
zoo
N
Lr
iQr
T
'
]
N
'
OdU
wUW�
�
a
O
Q
O
�
�
O
U
q
i
I
�
a �
G
Q S°
t II
w O
a�
m
0
0
o
°0
F-
0.
p O II
Q
qq
u
°
z Szv)
eo
tga
F...
� .-.
rr�
�M3
WW
e uwi
O E-F
rd
MZ E
.0
`�wz
� �jzNN
�7W C7
a 8$"'iqa8�
O fV 01NNM C
N ssf{
fC p C �rj C r N!
co 4 O
d
a a x
o 0 � 5
0 0 008.0—°° 0o m
N N 0 U N N N E
d
>16
> o o
JID
C? mli 8 :9 CID,vO ro
E U 0) m cm m & -Mv
0111, ---
0 rl
II II
N N N N N N N T
O
N
I
q
@
I
@
1]
L\
I
I
@
I
I
I
@
.I
@
I
Q
G�
}7
;J
))
� §c
_
}
y
w
2CA
kE7
§\ƒƒ.
(¥_eqff�
\kk
�C)
9
ff(
�5
U\m
w/
2##
LO 2
\
•§"c UJ
£\\�m�.00 �i t
° a
} j 7 /
k7£ `� o
�f�acy as «« < \
\ ƒ) �cc 0
k )k� \ ] §
\£k
§I\
§ §�k3k§§d § 2
}
cri \C\6j�§k
\
i f
2 fCL
k!
/ A [ COL s .2 (coID„ a,b ---(
a§§%§9 ow
226-
dtistt\§k§
e0�2£
% f\\\\\\\-m
- a=�gNgeN.>,
9
}
a:
/
k
2
t[f r N
O O 3
r
3
(oV mco�r¢¢LL
II Q II c700i cfiNAYS
C G W W W
m a
3 d 3
o
LL N U
3 a
CDn
5 �L a00S300
mm
v
j U) II II
O p b'
U
F
y
d
3 I
S
00
� II
4 �
d
E 0
E c
o
A
c
a a
z
-10
Q
It.
o II
Oc,o3
h
05Zv�
aC7
ova
° a
os'
JD
0Z E
°^nw�
`'Fz
ezSN
ay
w`a`w
4vFiA
LL
U
a
U
I
I
I
$
I
@
I
@
kR% rl
//§
\\§
<
\
\\§
�
« co
\§o
j
@
��§
I
I
I
I
I
k
)7
22
))
|+
/
tg
(
}�
j
E
(o§
2 Os
o
Ei
(
.4
f
§\ƒI|
ZAP
m§k
k}§
#2?o
�u■
¢�=
a�A
5
�
G
�
R8§
LLI f0k0k§8a
§
0)
§a777#G8/§
R-So
E
k
S
k
�
§
§ §
�7D
�e§
(L<
(/9
�
> a
| 2
k
\
k
U
.9
.8
.7
IL
Cr .6
I—
LA-
Q
Z
0 .5
r`-
U
O
D: w .4
.3
.2
M
s=0.6 °/
F a 0.8
I N
s=0.4%
F=0.5
I
I BELOW MINIMUM
ALLOWABLE
I STREET GRADE
y
0 2 4 6 8 10 12 14
SLOPE OF GUTTER (%)
Figure 4-2
REDUCTION FACTOR FOR ALLOWABLE GUTTER CAPACITY
Apply reduction factor for applicable slope to the theoretical gutter capacity to obtain
allowable gutter capacity.
(From: U.S. Dept. of Commerce, Bureau of Public Roads, 1965)
4-4
DESIGN CRITERIA
I
1
1]
11
DETENTION POND DESIGN
1
' 41
l2-E7 - •(T-row
' Tv-�'st„_ f'rnnc�l�•�JT vh- lZv,,.�or=-7= 3 r3� :mac; �°•rr��rj Shl�i_L
^rU�e:l�j 7-I -rt ✓o _ n r� C o,-
' lZ�+�of�F �C rJG"?� /ZT `.� InNr�C-%L J%L✓E�or�;�:i Ca.rr;) 1Trcz.-JS
A-7,JJ T)t� tcoCo-.i,Z l-{'7:7v!�-rC. 1�oc►��.,` o;- 12.�...r rr-.
' — I2LeG-Cx►SC 2^+-I'CS
!✓�A.r r>n �., ,v�
1 vo - �,, P- r�E✓Et�or�Lii i2c :.. �-> %(� FZt Sl�'"�"u_
'
+ � `CS S Tt'*��I
v 2- C CJ c^ ��.► TLo Tl'i•L Z - `r�iZ /-h :''s ,� L
J
'
�►� �CizlZ �"I S T-17i� i L l~7/i iJ0 r7-' rya /1/� !3KiJ I r..J 1-4
1V I p x + N, �., �/1
l o o - Y�Y ,Zec-C�s� 12--r�rt t=,=-•�, ••�
!moo 1�)2-
= 4•� �fr f��=r�u�, r �+ Z3�oo=cam �.,�r "mac''
t;/ LT1 i�l�'Oi✓1 jYt�l:.fil�•c>J}!C r�-Ae�T ^ ..
AvrH.�
r -i-cam* s C _ Z. I crams S= PIC . 48
' — t-+f r L jc%. > — —A— ✓,L,✓. , C pr— 1 FT 'vI l T'i•tiv. hK,:il 1-.-•+Z
1—�YJIa.OUP-wa ��—F Pk _ 42- 1 = zcY CIJGj
lOU - ✓z /cnS� =
l—I/
3 `�7� �� 3 ( �� . �}7,
'
r� r-� ` �E ✓✓ .a�:�7 �Et. c` S _
? c 7/
41,5
' 4L
Northern Engineering. "'E"' '°a NO.
Northern Engineering
Services, hic.
CLIENT_
PROJECTMADE BY.
DATE- CHECKED BY
JOB NO 61
CALCULATIONS FOR
- DATE- SHEET
I T
7-,
----- ------
OF
V;
liL:
�il
a
----- - --------
U
Northem Engineering CLIENT
JOB No.
Services, Inc. PROJECT
CALCULATIONS FOR
'
Fort Collins, Colorado 80521 MADE BT DATE
CNECKED er DATE 9NEET OF
'CTCnITloi.i
T 1��1
--
Imo JZ•
i
--
'
I •
I�LrCnr�o,.l ✓oc.._I.ie.,C `I
`/✓Ii•xin�vin�
v 1'�1_ S 3 � Sc� �Pc,. 4G� � _-
�L �1131. ¢o
I
i
—
I
,
I
I
� I
I
i
�
I
I - �; 1'�`L� 1.1=✓i�
t i l� ^T`
t Z. �I � GTT• I
i i I
100 2_ G.IJ SIEC.__ S', 112 1
1 i
i I
1 I
-77
! i
'
i I
i I
i 1
1
I
I
I 1
I I I I
I ! I
47
I
1
1
1
1
1
1
- N a vi �Y' ad of ad ad r �o v� vi m N
-1 $ n 4 ^
O$p $ o$
' O v I C C C C 0 N R N N� b C 0 OO V O OO OO OO O OO 6 OO CO 6 6 OO OO
^ ^ GG
m a
e�^�8888$��a�m$oe888888$8888888888
WW1, Q O� o o e o e v r P m o m o e e e o e e o e e e c o e e o o e
3
E; 3 i
ycE' � 88888� $a 5�?b^.8888 88888888888888
• Z O� v � O C C G O N O P P o0 vi O C C C O C O G C C O C O C C C C C C
Y "V ae0 N 00 00 ti VI ^ V O N N of r $ $ $ $ $ $ $ 8 8 $ 8
rvt�3, 8 Po $ 8 8 $ $ 8 8 g $ $ $ S
`L O V v j O N Nl < O vi of vi N Vt vi Q O T m m to O C O 0 6 6 6 0 0 6 6 0
y _y W I
p m aD O N M m n n e+
m-. m �i
.m.. .m. .m+m+ .C4.
Itl
I
Z
�
g $ $ g $ $ $ g g $ $ $
d $ $ $
m .~. v o $ n. dS g
C4 .i N rr N N O N f i m ff N
Q �
I
•
v
Q N C
Z= I
O^ H ,^ cG N C O O C G G G C O C C O G C C C C C
a
`4
N^,
a Z E
w
8
o cd od ri ... wi m i'v a < r.�i $ e n a 8 o^ A A
U
0
i
1
q5a
I
I
I
t
I
1
I
a
0
n
0
I
I
�
0
r.
Y
0
a
ri
'
Y
I
N
O
Y
O
O
G
n
0
m
M
O
n
x
a
v
n
0
ri
0
O
n
0
m �
m
N[
x
N�
a
N
�z
N
aA-4iO
�A
t
off
z
n
z
�0
NA
O 1�1
O
N
O
m
opm
O
t
rT�
dry
m
z
a
A
t
I
N
z
i
I
ri
^O
F+�
o
0
o
0
i
cn
0
0
o
(
0
ti
0
ri
0
0
a
0
(Sao) 33ounu xdaA-oot
I
11
H
I
F
I
I
F
1
1
i
I
H
M
{
m
s
�
t
�
n
m
�
f
v
x
i
U
W
I
I
i
I
0
Oz
�U
Ocn
ry
n
m
z
i
'
m
N
n
m
0
0
0 0 0 0 0 0 0 0 0 0 a
a ry o m �o a ry o m �o
(13) NOUVA919 9Db3Hns 1191vtA
I
11
0
I
I
1
I
I
I
I
1
I
I
I
I
I
�
P
V
1
W
E I
U
z
� I
N
�
I
w
0O
Q"
;
1x
I
W
W
�
A
�
a
O
!
C4
3
I
I
a
�
i
I
s
0
m
Vl h VI v1 h h V1 h V1
uolsdn9-19 90VAWIs xaidnn
1
0
1
1
1
1
1
1
1
1
1
1
1
a)�
E E C
O N M c0 cD
M 7 U
0 0,, M
N v
O O O O O
N �
N r.
00 to In
E E
Cl n(,6 (11
=3 2
. O 00 CV
V) 0
O Ln 00 CO
O
.1 cD u7
'-t N M
N .-.
00 r� cO
^ U7 I-� 00
O O -t M r�
>
00
� L
N
O O CD O
r
CD00 CD N 00
o(D 0
C)
M v
N
�
.
O ^ O O
ZQ
CD N tO N 't
_
l
O to 00 L
W
L �
0 0 0 0 0
N
O
N O O N O
A z
0
CV M Kl 4
AU
w
. - I I
O
a
1
1
1
i
1
1
i
1
1
1
1
1
1
1
E
E vim--
CDIl M I, O M
�
7 V
CD CDr r N N
N
o
0 0 0 0 0 0
v
N
0') M CO I`- In
`�
O c0 O CD 'ct M
O
M — 00 Ln O
N
j
O r c0 <t CO 00
M Lr rl 00 O7
cV r M
E
00
M fl I, cD O
OO
v
o r � 00 M �
_ _ rn
M N
S N
L
O
fl- 2
0
0 0 0 0 O O
Q r r r r r
M
U
0
00 op
O M It
Z
Q
4)
Q
M (V CV •- r
F
z
w
L
�
o
0 0 0 0
CD CD
N
O
o w
0 0 0 0 0 0
Q
Z
O
N
M N r 0 a) CO
U
WO
r r r r
a
I
I
p I
N
8 S ram+ N
V- V V
4 —
I
p
v vi ri e i
I
p p p p p 49
®
NeP
1'1 N
3
pp
C pp pp VV�� fy q pp p p p p p p p p p p p p p
Q O� I
O C O O O N r ap V h e O C O O O O O O O O O O C C C C G C
[aw
m I+
� LS �' I
O �p �D SI N V N e -• `O � V� O N R! N VO1 �j O O N? ? 8 0 0 0 8 0 0 m
^
a I
a
W��888888888
I
O O tV ni tf CI N ({ f.{ tV eV eJ
O Q O
N eV N fV fV r^ C O C C O O O O O G
ti g3 �
O
v�J I
o i
N CI N (V N N N N fV IV N fV N fV PI O O O O O O O O O O
O O N CD P P T P P aQG m y .9 b V V b `^O� 'G b V �D �O
v
^^ ^
Z
W
z
�
$g8t2N9 2 9$�����88888888$888888
Q
i
W
C iS
Qq p tt�� Vvj� �n+ pp ryry QQ. p� Q p Q Qg Q p pc 9 g pOp p.
R N? ry 0 e rI P b ry N �j o$ g$$ 40 8 O O RO O O
O4
O
��F8��0^�$=��$o^h$58888888888888888
°�3�
@%
0< '^ d
Q O� .5
z, � •�+ 1
e ,. ,:: � od g
U �
a
F O
v amp
d
M
n
a
CCA
'
spa
shun
�czp
0 � a
Y_ lu O
` a_
0 0 3
MW Y
F F F
a<a
G C O
U
I
I J
1
1
I
t
1
I
I
I
1
I
1
I
OI
i
i
I
h
0
v
�
�I
i
(
o
of
v
CIO
i
Qo
O
I
a
Am
x
I
o 0
�A
z
OI A
O
N
i
rl
i
O
O L
w
z
1
N
A
o
I
a
a
o
I I
I
N
1
I o
0
ry a m �o a ry o ry
(S33) AAONn2I UV9,k-ooi
1
I
11
[1
i
I
1
i
I
11
I
ri
a
m
N
O
N
U
b
z
A
"w
W
q
�
rx
O
�x
az
�o
u
A
rA
Uu
m
w
O
ry n
�fl
m
e
0
0
0
1p
Vf
b
Y1
NOI.LVAR19
♦,
N
9DVA
ry
VI
I11S Ugj
ry
VM
yp
YI
b
h
I
CJ
I
I
I
I
I
I
I
r
r
I
I
s
0
I
a
N
N
m
m
O
16
N
I
N
z"
aA
e�
3z
.�
OC)
U
W
N
O
O
fV
�
s
W
3
N
r
bO
N
pO
^1
O
O
O
y�
O N 00
vi N r{ e4 ci
NOI.LVA919 3Dd32If1S Hg LVtA
O
U
�
.r
x
Q�
U
O
�
Aa
M
O
t".
,
M
rTQrT
O
CIO
O
ca
0
3
�
age
M
G
O
.V
�
�
v
caz
p o6 v
a°°o
7
U
o
V
'o
z
U)
� � U
> �Oi
N I
E
M D
O
�
0 w
�
N
Z
Q �
z�-
z
w
A
L O
0 O
M
O = l
Q
Z
>
z
UW04
LA p
0 0
O O 0
0
O r In r u)
O O O r r
66666
t0 O N
dtoMr�
O 00 d CO 00
O (14 d U)
O r cr) d
N d CO
N M (V
d r� n d
00 N
O N cD t� r
Ln ^ ul
.- N r
O O O O
O 00 Lr) In N
6666
CO 0) 0) to
O 00 O) O 00
O rn 04
O N O N a)
" d r� r�
O O O O O
N O to O N
r r
E
E
Orn00-It
I
O O — N
N�
0
O O O O
N O M
a) �_
h 00
E
O M 0
00 M O
cn
0
0 r� CO Ln
v
� ^ O
N � h
E
O rM h O
00 dF Co
oC7
0
�
O h 00 m
M M N
L
=
O O O C7
3
0
00000
o u,
o"
0 0
m
�
-tLnLn0)
M 00 -4 U-)
47
CO 4 00 N
0_
L
d' N 00 Ln
?
Q
N
rM r ) to
z
v
F.
rTrz�
r
w
a
�
15
U
0 0 0 0
M 7)
0
^
00 O O O
Q Z
0
a)
N N _ O
U
W
O
a
CITY OF FORT COLLINS
RATIONAL METHOD MASS DIAGRAM
PROJECT:
FAIRBROOKE TRACT A
PROJECT NUMBER: 9435.00
TITLE: DETENTION POND D5
RUN DATE:
02-Jul-94
02:47:20 AM
Q100
C
Cf
AREA
RELEASE
(ac)
(cfe)
0.43
1.25
2.23
0.60
volume
Storage
Time
i
Q
volume
outflow
volume
(min)
-----------
(in/hr)
----------- ---------
(cfs)
-------------
(cu ft)
------------
(cu ft)
----------------
(cu ft)
0.00
0.00
0.00
0.00
6.00
7.00
8.39
3,020.54
216:00
2,804.54
12.00
6.70
8.03
5,782.17
432.00
5,350.17
18.00
5.50
6.59
7,119.83
648.00
6,471.83
24.00
4.70
5.63
8,112.29
864.00
7,248.29
30,00
4,17
5.00
6,996.88
11080.00
7,916.88
36.00
3.72
4.46
9,631.19
1,296.00
8,335.19
42.00
3.40
4.08
10,269.82
1,512.00
8,757.82
48.00
3.10
3.72
10,701.32
1,728.00
8,973.32
54.00
_.. 2.82
3.38
10,951.60
1,944.00
9,007.60
60.00
2.60
3;,12 ,
11,21913
2,160.00
9,059.i3iREQUIRED STORAGE
66.00
2.40
2.88
11,391.73
2,376.00
9,015.73
72.00
2.22
2.66
12,495.29
2,592.00
8,903.29
78.00
2.10
2.52
11,780.09
2,808.00
8,972.09
84.00
1.97
2.36
11,900.91
3,024.00
8,876.91
90.00
1.88
2.25
12,168.44
3,240.00
8,928.44
96.00
1.75
2.10
12,082.14
3,456.00
8,626.14
102.00
1.68
2.01
12,323.78
3,672.00
8,651.78
108.00
1.60
1.92
12,427.34
3,888.00
8,539.34
114.00
1.50
1.80
12,297.89
4,104.00
8,193.89
120.00
1.43
1.71
12,341.04
4,320.00
8,021.04
�=3
0
L
U')(0
O N
66
(N
r") O
'ct 00
�o-4
O M
moroZ
0 0 0
O O O
O
00 O
(V
O N tf)
O N
O Ol Lr,
u
C� C) C)
C) C:) C)
t� CIO CY)
0 0 0
LO un LO
Northern Engineering. CLIENT -
PROJECT
Services, Inc.
MADE By
iZ
JOB NO
CALCULATIONS FOR
DATE CHECKED BYDATE SHEET- OF
lei
EMERGENCY POND OVERFLOW WEIR
Project Description: Fairbrooke Tract "A" P.U.D.
File Description: Detention/Retention Pond D2
Project Number: 9435.00
File Number: FBF-WEIR.WQ1
Date: 31-Oct-94
Time: 02:48 PM
WEIR EQUATION: Q= CLH ^ 1.5 + CZH ^ 2.5
WEIR COEFFICIENT = C = 2.7
LENGTH OF NOTCH = L = 10
HEAD = H = VARIES
SIDE SLOPES = Z = 4
TRAPEZOIDAL BROAD -CRESTED WEIR
TYPICAL SECTION
ELEVATION
DISCHARGE
(FEET)
(CFS)
5113.40
0.0
5113.50
0.9
5113.60
2.6
5113.70
5.0
5113.80
7.9
5113.90
11.5
5114.00
15.6
5114.10
20.2
5114.20
25.5
5114.30
31.4
5114.40
37.8
STATION ELEVATION
0.00
5114.40
4.00
5113.40
14.00
5113.40
18.00
5114.40
01 k.\
northern enaineerina services, inc.
1
1
1
r
1
1
1
1
1
1
1
1
1
0
EMERGENCY POND OVERFLOW WEIR
Project Description: Fairbrooke Tract "A" P.U.D.
File Description: Detention/Retention Pond D3
Project Number: 9435.00
File Number: FBF-WEIR.WQ1
Date: 31-Oct-94
Time: 02:57 PM
WEIR EQUATION: Q= CLH ^ 1.5 + CZH ^ 2.5
WEIR COEFFICIENT = C = 2.7
LENGTH OF NOTCH = L = 10
HEAD = H = VARIES
SIDE SLOPES = Z = 4
TRAPEZOIDAL BROAD -CRESTED WEIR
STATION
ELEVATION
TYPICAL SECTION
0.00
5114.00
4.00
5113.00
14.00
5113.00
18.00
5114.00
ELEVATION DISCHARGE
(FEET) (CFS)
1
i
5113.00 0.0
d
5113.10 0.9 0
0
o 0
5113.20 2.6--
5113.30 5.0
5113.40 7.9
5113.50 11.5
5113.60 15.6
5113.70 20.2
5113.80 25.5
5113.90 31.4
5114.00 37.8
northern enaineerina services. inc.
U
EMERGENCY POND OVERFLOW WEIR
1
Project Description: Fairbrooke Tract "A" P.U.D.
' File Description: Detention Pond D5
Project Number: 9435.00
' File Number: FBF-WEIR.WQI
Date: 04-Jul-94
Time: 05:49 PM
' WEIR EQUATION: Q= CLH � 1.5 + CZH � 2.5
WEIR COEFFICIENT = C = 2.7
LENGTH OF NOTCH = L = 10
HEAD = H= VARIES
' SIDE SLOPES = Z = 4
TRAPEZOIDAL BROAD -CRESTED WEIR STATION ELEVATION
' TYPICAL SECTION 0.00 51c .70
4.00 510,!k 70
14.00 51 a,i.70
18.00 510-'kM
' ELEVATION DISCHARGE
(FEET) (CF$)-
5108.70 0.0
' 5108.80 0.9
5108.90 2.6
' 5109.00 5.0 i
5109.10 7.9
5109.20 11.5
' 5109.30 15.6
5109.40 20.2 Z
�=4
' 5109.50 25.5
5109.60 31.4 d
5109.70 37.8 o
t7
TABLE 21-15 Values of C in Q = CLHIO for Broad -Crested Weirs
mom'
Breadth of crest of weir, ft
ured
head
H.ft
0.50
0.75
1.00
1.50
2,00
2.50
3.00
4.00
5.00
10.00
15.00
0.2
2.80
2.75
2.69
2.62
2.54
2.48
2.44
2.38
2.34
2.49
2.68
0.4
2.92
2.80
2.72
2.64
2.61
2.60
2.58
2.54
2.50
2.56
2.70
0.6
3.08
2.89
2.75
2.64
2.61
2.60
2.68
2.69
2.70
2.70
2.70
0.8
3.30
3.04
2.85
2.68
2.60
2.60
2.67
2.68
2.68
2.69
2.64
1.0
3.32
3.14
2.98
2.75
2.66
2.61
2.65
2.67
2.68
2.68
2.63
1.2
3.32
3.20
3.08
2.86
2.70
2.65
2.64
2.67
2.66
2.69
2.64
1.4
3.32
3.26
3.20
2.92
2.77
2.68
2.64
2.65
2.65
_ 2.67
2.61
1.6
3.32
3.29
3.28
3.07
2.89
2.75
2.68 '
2.66
2.65
2.64
2.63
- 1.8
3.32
3.32
3.31
3.07
2.88
2.74
2.68
2.66
' 2.65
2.64
2.63
2.0
3.32
3.31
3.30
3.03
2.85
2.76
. 2.72
2.68.'
2.65
2.64
2.63
2.5
3.32
3.32
3.31
3.28
.3.07
2.89
2.81
2.72
2.67
2.64
2.63
3.0
3.32
-3.32
-3.32
3.32
3.20
3.M
2.92
2.73
2.66
2.64
3.5
3.32
3.32
3.32
3.32
- 3.32
3.19
2.97
2.76
2.68
2.64
2.63
4.0
3.32
3.32
3.32
3.32
3.32
3.32
-3.07
2.79
2.70
.2.64
2.63
4.5
3.32
3.32
3.32
3.32
3.32
3.32
3.32
1.88
2.74
2.64 .
2.63 ,
5.0
3.32
3.32
3.32
3.32
3.32
3.32
3.32
3.07
2.79
2.64
- 2.63
5.5
3.32
3.32
3.32
3.32
. 3.32
3.32 ...
3.32
3.32
2.88
- 2.64
-2.63
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Pond D2 Trickle Pan Capacity 1% of Q100
Solve For Depth
Given Input Data:
Left Side Slope..
13.71:1 (H:V)
Right Side Slope.
13.71:1 (H:V)
Manning's n......
0.013
Channel Slope....
0.0050 ft/ft
Discharge........
0.20 cfs
Computed Results:
Depth............
0.11 ft
Velocity.........
1.18 fps
Flow Area........
0.17 sf
Flow Top Width...
3.05 ft
Wetted Perimeter.
3.06 ft
Critical Depth...
0.11 ft
Critical Slope...
0.0066 ft/ft
Froude Number....
0.88 (flow is Subcritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
I
U
i
L]
1
1
1
1
i
1
1
1
[1
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Pond D3 Trickle Pan Capacity 1% of Q100
Solve For Depth
Given Input Data:
Left Side Slope..
Right Side Slope.
Manning's n......
Channel Slope....
Discharge........
Computed Results:
Depth............
Velocity.........
Flow Area........
Flow Top Width...
Wetted Perimeter.
Critical Depth...
Critical Slope...
Froude Number....
13.71:1 (H:V)
13.71:1 (H:V)
0.013
0.0221 ft/ft
0.13 cfs
0.07
ft
1.84
fps
0.07
sf
1.97
ft
1.97
ft
0.09
ft
0.0070 ft/ft
1.72
(flow is Supercritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
� U
Triangular Channel Analysis & Design
' Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Pond D5 Trickle Pan Capacity 1% of Q100
Solve For Depth
Given Input Data:
Left Side Slope..
Right Side Slope.
13.71:1 (H:V)
13.71:1 (H:V)
Manning's n......
0.013
Channel Slope....
0.0040 ft/ft
'
Discharge........
0.06 cfs
Computed Results:
Depth............
Velocity..
0.07 ft
0.80 fps
Flow Area........
0.07 sf
'
Flow Top Width...
Wetted Perimeter.
2.03 ft
2.03 ft
Critical Depth...
0.07 ft
Critical Slope...
0.0077 ft/ft
'
Froude Number....
0.73 (flow is Subcritical)
1
' Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct_ 06708
u
[J
I
I
1
r.
[I
i
DESIGN OF SWALES
I
&I
Northern Engineering CUENT JOB Na
I
1
1
1
1
1
Trapezoidal Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Swale to Detention Pond D2: Q100= 24.1 cfs
Solve For Depth
Given Input Data:
Bottom Width.....
2.00 ft
Left Side Slope..
3.50:1 (H:V)
Right Side Slope.
3.50:1 (H:V)
Manning'$ n......
0.035
Channel Slope....
0.0083 ft/ft
Discharge........
24.10 cfs
Computed Results:
Depth............
1.24 ft
Velocity.........
3.08 fps
Flow Area........
7.82 sf
Flow Top Width...
10.65 ft
Wetted Perimeter.
11.00 ft
Critical Depth...
0.99 ft
Critical Slope...
0.0220 ft/ft
Froude Number....
0.63 (flow is Subcritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
I
I
1
1
1
1
I
I
1
Trapezoidal Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Swale to Detention Pond D5; Q100= 6.4 cfs
Solve For Depth
Given Input Data:
Bottom Width.....
Left Side Slope..
Right Side Slope.
Manning's n......
Channel Slope....
Discharge........
Computed Results:
Depth............
Velocity.........
Flow Area........
Flow Top Width...
Wetted Perimeter.
Critical Depth...
Critical Slope...
Froude Number....
2.00 ft
4.00:1 (H:V)
4.00:1 (H:V)
0.035
0.0037 ft/ft
6.40 cfs
0.79
ft
1.58
fps
4.06
sf
8.30
ft
8.49
ft
0.49
ft
0.0266 ft/ft
0.40
(flow is Subcritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
I
i
G:�
1
I
i
i
i
1'
11
n
11
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Capacity of Proposed Cobble Swale D.P. 4A
Solve For Depth
Given Input Data:
Left Side Slope..
Right Side Slope.
Manning's n......
Channel Slope....
Discharge........
Computed Results:
Depth............
Velocity.........
Flow Area........
Flow Top Width...
Wetted Perimeter.
Critical Depth...
Critical Slope...
Froude Number....
3.00:1 (H:V)
3.00:1 (H:V)
0.050
0.0143 ft/ft
6. 70 cfs - I.33
1.01 ft
2.18 fps
3.07 sf
6.07 ft
6.40 ft
0.79 ft
0.0533 ft/ft
0.54 (flow is Subcritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
I
I
11
I
r
11
f!
I
I
11
1
EROSION AND SEDIMENT CONTROL
FA
l�c>—Yi'L- 1 pTfYl�.
I - so I. S Z
Dz
�:� 4•�3 1.s6 3.07
•D`l 3,
1 1S3
�z ._ ovwlu.�. = lq8 �vt-h•v- =453` �� - Zoe -�k�� _ '�6 r
zs7�
T \'
�Z - gYeo11la�ti = �o.S% Ta•4l%/`%n= `'d
3.Z9 �j �J �t�-lr V�� I�h� ( � �.1�% v.�.�+�C .h...`
�r
4 G� �, a mJ��-� v = � .�- a: �oi ..' `O ,S 5 �� • • „Sc.._, i vet•-
Tom- 4A-vo:r,-,A 6jO AlZrA SoJ A2e)+ /Jom yr (5a ms5 A,2*g-
/.15Z /•5Z b
7�z 5.79 3•4S� Ot3
3.07 2,1�9 Ot 36
rA 2.110 2./&, v
�-5 /,S¢ 4 2-7 0.27
11
RAINFALL PERFORMANCE STANDARD EVALUATION
PROJECT: FAIRBROOKE TRACT "A"
COMPLETED BY: Mary B. Wohnrade
STANDARD FORM A
DATE: August 15, 1994
Developed Erodibility Asb Lsb Ssb Lb Sb PS
Sub -Basin zone (ac) (ft) (%) (ft)
D7
Moderate
2.82
1153
1.29
79.3
r
D2
Moderate
5.95
806
1.73
80.21
Z)
�-
D3
Moderate
4.63
937
1.05
78.3
D4
Moderate
3.79
742
0.82
76.2=
D5
Moderate
2.23
560
0.93
77.9
Lb = sum (Lsb x Asb) / sum Asb
Sb = sum (Ssb x Asb) / sum Asb
Performance Standard (PS) = See Table 5.1
C:\WF15\DRA1NAGE\STNDFRMB.ERS
I
U
.a
'
I
I
11
t
I
i
/t
EFFECTIVENESS CALCULATIONS
PROJECT: FAIRBROOKE TRACT "A"
COMPLETED BY: Mary B. Wohnrade
STANDARD FORM B
DATE: August 15, 1994
Erosion Control Method
C-Factor
P-Factor
Comment
Roughened Ground
1.00
0.90
All Basins
Hay Mulch
0.06
1.00
All Basins
Roads/Walks
0.01
1.00
All Basins
Gravel Filters
1.00
0.80
Basin D4
Straw Barriers
1.00
0.80
Basins D2, D3, D5
Silt Fence Barrier
1.00
0.50
Basin D3 rest
Dryland Grass
0.08
1.00
All Detention Ponds I=rt�J= ad 7
Major Performance Sub -Basin
Area Calculations
Basin Standard (%)
(Ac)
131 79.3 2.82 Roads/Walks = 0.795 ac
Mulched Area = 2.02 ac
Net C Factor = 0.795(0.01)+2.02(0.06)/2.82 = 0.0458
Net P Factor =
0.90(2.02)/2.02 = 6.90
EFF = (1-(0.0458 x 0.90))/100= 95.91/6
D2 80.2
5.95 Roads/Walks = 1.20 ac
Mulched Area = 4.45 ac
Dryland Grass = 0.30 ac
Net C Factor = 1.20(0.01)+4.45(0.06)+0.30(0.08)/5.95 = 0509
Net P Factor = (0.90(4.45)/4.45)x0.80 = 0.72
EFF = (1-(0.0509 x 0.72))/100= 96.3%
133 78.3
4.63 Roads/Walks = 0.874 ac
Mulched Area = 3.38 ac
Dryland Grass = 0.38 ac
Net C Factor = 0.874(0.01)+3.38(0.06)+0.38(0.08)/4.63
=0.0523
Net P Factor = (0.90(3.38)/3.38)x 0.80x 0.50 = 0.36
EFF = (1-(0.0523 x 0.36))/100= 98.1%
D4 76.2
3.79 Roads/Walks = 1.17 ac
Mulched Area = 2.62 ac
Net C Factor = 1.17(0.01)+2.62(0.06)/3.79 = 0.0446
Net P Factor = (0.90(2.62)/2.62)x 0.80 = 0.72
EFF = (1-(0.0446 x 0.72))/100= 96.8%
D5 77.9
2.23 Roads/Walks = 0.355 ac
Mulched Area = 1.61 ac
Dryland Grass = 0.27 ac
Net C Factor = 0.355(0.01)+1.61(0.06)+0.27(0.08)/2.23 =
0.0546
Net P Factor = (0.90(1.61)/1.61)x 0.80 = 0.72
EFF = (1-(0.0546 x 0.72))/100= 96.1%
C:1WP5\DRAINAGE\STNDFRMB.ERS
C
Q
c
"
O
J
O
U
1.
11
11
1Z
S
Q N f)
0
0
LO
C
C
C
C
C
M
0
0
N
O
O
rl
O
O)
O
q
O
n
O
tO
.�. Ln
u
LO
M
0
M
Ln
N
O
N
Lo
O
.-1
LO
O
1 3
I OC-0E- I
I .J Z LI_ I
I UL LLJ I
J
(r0)OOC 1
1
v v Lo to 1
q q co q coq 1
Cn Cn 0) O) C C C O C C
I
C CCCt.o Lf)tf`. to LO Lo 1
g q q q q q q q q q I
q O m43N 0) 0) C) 0) 0) 0) m O C O C i
1
C
ggqq4^qqqqOCqqqqq I
nggq0)0)0)0)qm0)C)mmC,0)0)O0)O 1
I
c cr cr�c�cct �'C'C'vcvvC'vcc� I
g q q q q q C q q q q OC q q q q q q q q 1
1
C M C Lo tD t0 t0 tD n n n n n n n 1�- n n n n g q q q q q 1
I
ggq00qqqqqqqqCqqqqqqqqqqq,qq 1
1
q NMCL1)lfi Lf) lD to lD tO tD tOnnnnnnnnnnggq 1
M c C C c C c C c v v c c C c c c c c C C C c C C c 00 00 Ci L` 00 0000 00 CO 00 CO 00 CO CO 00 00 CO 00 00 00 00 00 CO 00 CO 00 001 1
I
tD ONMmil CLo LO to LO t0 t0 t0 tD t0 t0 t0 to t0 to n n n n n n I
M C C C C C C C
I
C C) rI N M M C C d' C Lo Lf) U') Lo.L0 Lo to Lo U) 10 tO tO tO tO t0 n 1
M M C C C C C C C C C C C C C ct C C C C C C C C C C 1
q q q q q q q q C0 g q q q q C q q q q q q q q q q q I
C C C cal C C C Ln Lo to Lo t0 tD I
I
f M M C' •) C C CCC C C C C C C C C C C C C C C C C C C I
q q q q q q q q OC 00 g q q q q q q 00 q 00 00 co q co q q 1
Ln N LO n q 0) O 0. --) 1- I N N N N N M M M M M C C C C C
N M Cl) M M f 7 C C C C• C C` C C C C C C C C C C C C C C
qqqq qq p g q q p q cc CC) q q q q q 0000 q co q 00 co
.--i CO 4 M -Zr Ln to tD tO n n n Co 00 q 00 q Co 0)MM0 q=000
N N M co M P•) f`•) M f)') M fn fn M M f; M fM ( •) M M M C CCC C
q q q q 00 q co 00 OC q q q q00 q q q q qq co 00 co cc q 00
lO Lo 00 0 r N Cl) C C Lf) L) LO to to %0 t0 tO n n n n g q q M 0)
. N N M M M M M M M M M M M M M M M M Cl) M M M M M M
00 q OC q q q q q q q q 00 00 co q q q q co co q q q q 0000
.--I�L.o ngOC r+ N N M M M CC C C C LO LO LO t0 tO tO nn
r+ N N N N M M M M M M M M M f'M M (M M M M M M M C4 M M
co co ccq 0000 q q q 00 q q 00 00 co 00 00 00 cc co 00 co q q q q
M N tD co 0) C�q N N M M M C C C C C C Lo Lo Lf) tt) to t0 t0 t0
N N N N N N N N N N N N N N N N N N N N N
q C' g q q q C q q q q q q q q q q 00 q q q q q q q q
Lo Ln OT N (n I U) t0 n n n g q q O O) 0) 0) 0) O C O O O O O
0) O O N N N N N N
n g q 00 OD g 00 q 00 g q q q q q q q q 00 q q q q q q q
C Ln O M Ln to g q 0)'0 CD C) 14 --I .-I .--I N N N N M M M M Cl) M
q 0) O O O O C O O r� .r r; .r 1:.+ ..+ . ; 1r1 .--1 .•-I r 4 1:.-4 vI .-
n n co 00 00 00 00 co o0 q 00 g 00 q 00 g q q 00 q q q 00 00 00 00
q Nq.--1C Lo n n q 0) 0) O ON NNMm MMM
. . . . . . . . . . . . . . . . . . . : . . . . . .
t0 qq 0) 0)O) Cp.C) 0) O 0) O O O O O O O O O O O O O O O
nnnnllnnnnnnggqqqqq00qqqqqqq
t0 M O C n O) O ra N M M C C Ln Lo Lo Lo t0 tO t0 t0 n n tO t0 t0
C g n n n n q q 0Y q q q 00q 00 q q q q q qq CO q q
n n n n n n n n n n n n n n n n n n n n n n n n n n
(71 O C to I,, q q n n n tD t0 tD Lo CCMCV) NN O)t0 C.- Mt0
O N N N N N N N N N N N N N N N N N N N.+r4 1I14 O O
n n n n n n n n n n n n n n n n n n n n n n n n n
O O O O O O C O O O O O O O coca O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O C O O O
rI N Cl) C Lo tO n 00 0) O ri N M C Ln tD n q 0) O Lf) O Ln O to O
r-1 11 r r .•-1 r1 .--I r r r N N M M <iT t'f Lo
TABLE 5.1
PAGE 23
0
0 o
0
0U')
cnc6
° a
�'
F
-b4 -b4
WE
rn
r
N
ia4
x
:Ln
U
Z
Z
w
2
M
0
O
w
U
Q
w
rr
Ln
N
0
w
0
w
Ln
N
O
(V
n
N
rn
n
� N
w
n
<
o L
a
: II w
0
U
LJ
U
�
w U
O
O a a 0
>
-
w
U
v~i
O O O
m
O
Q
o O
o 0
0 0
0 Ln
C-�—
torn
A P3
N
F a.
if> H>
.rya
�y3.1
w
Q
0
U
c
c
O
z' e
c
o u
CYr
O C
O <
w
U W
Q Y
L�
N J
O m
0 a
cr Q�
L, Ln
W Ln
x
:Ln
Z
O
N 11
0 }
w I--
J CY
J
HW
V) N
Z la
O
z
O m
U Q
Cl
0
v
N tR
N N
W
I I
<
w
I I
r
O
tn
w
CD
w
11
C7
v W
W
U7 tN CD
N U1
w Li Li
U
Of
U
Ld O
o a a O
>
W
H N
U
000
O
2
3 a
V 11
O O O O
00
0 0 0 0
O Lo
O M* O (D
Ll� N
U') LO N N
to M
N m
N 00
N M
O O O O
O O O O
.�
E ¢+
uu9 in
O (14
N
a
O
W
a
Q J W
Duo
e
s
z
z
o
z
O
z
z
p
�2
a
a` fz,
W
()
Z
Li
Z
w
x
O
Li w
J Q Y
o
w V) w
Z O U Q
w Z M
J W
w O w
KJ
0 VI
W.
N
M
Ln
N
1.4
Ln
I
N
O
M O
L
W
U
Q II
O N
O Q
I I w
N fN U'
w w >
o a a O
J J
a a v)
O O OU
FI
I
i
I
1)
1,
11
I
.1
11
i
SOILS REPORT
I
ADDENDUM TO REPORT
OF A
GEOTECHNICAL INVESTIGATION
FOR
FAIRBROOKE S.I.D.
FORT COLLINS, COLORADO
PARSONS AND ASSOCIATES
FORT COLLINS, COLORADO
PROJECT NO. 5238-2-83
BY
EMPIRE LABORATORIES, INC.
214 NORTH HOWES STREET
FORT COLLINS, COLORADO 80521
J•'
!■
V1
[1
I'
I
I
l
Empire Laboratories, Inc.
MATERIALS AND FOUNDATION ENGINEERS
214 No. Howes Fort Collins, Colorado 80522.
P.O. Box 429 (3031484-0359
November 8, 1983
Parsons and Associates
432 Link Lane Plaza
Fort Collins, Colorado 80524
Attention: Mr. Ken Rabbers
Gentlemen:
Branch Offit:�
1242 Bramw000 Place
Longmont, Colorado 80501
P.O. Box 1135
13031 7763921
3151 Nation Way
Cheyenne, Wyoming 82001:
P.O. Box 10076
(307) 632-9224
We are pleased to submit an addendum to our Report of a Geotechnical
Investigation prepared for the proposed Fairbrooke S.I.D. located
southeast of Fort Collins, Colorado.
Based upon our findings in the subsurface, we . feel that the site is
suitable for the proposed construction, providing the design criteria
and recommendations set -forth in this report are met. The accompanying
report presents our findings in the subsurface and our recommendations
based upon these findings.
Very truly yours,'
EMPIRE LABORATORIES, INC. r�`•,�`"t<s
NeA herrod
Senior Engineering Geologist �'le'c4r'�
"s.
Reviewed by: `
v`jtiQ'�GiSTEgFO .y s
Chester C. Smith, P.E. e
President
CIC
btd•�ee
�.• °oosoee• �.
MEMBER OF CONSULTING ENGINEERS COUNCIL ii
I
l
* do I
o tlo. i
I
TEST GORING LOCATION PLAN
f'IZOf'O�I�I� CAJA%ll
goTiEl2vIL�.>; ti�v!✓ �11,......t'1-;J' "
IA4 4AQA L
t � �No.l3 lJo.5
Jo. ro
I
Nol
10 �
Fia3
No. ®�0 3 _..
9
ocALi�, i%ko LIZ
IXM75 liter i?OAi7
rlo.l
�o�IEJ� .DKI�,1-�poB-o9=s�
t3o(�1 1 C� Imo, LL F t2 oq 15.65 �. Z
5 k IN �lcn�
EMPIRE LABORATORIES, INC.
r—
KEY TO BORING LOGS
TOPSOIL
•�� GRAVEL
..
1
®
FILL'
! �• �.l
SAND & GRAVEL
SILT
' ��
.• i � SILTY SAND &GRAVEL
7
CLAYEY SILT
op COBBLES
i •
'i. •i
SANDY SILT
;�^ SAND, GRAVEL &COBBLES
®
CLAY
WEATHERED BEDROCK
SILTY CLAY
SILTSTONE BEDROCK
SANDY CLAY
® CLAYSTONE BEDROCK
SAND
SANDSTONE BEDROCK
SILTY.SAND
LIMESTONE
'
CLAYEY SAND
***
* * GRANITE
f * *
SANDY SILTY
CLAY ❑
r
SHELBY TUBE SAMPLE
8
STANDARD PENETRATION DRIVE SAMPLER
WATER TABLE
9 DAYS AFTER DRILLING
T
HOLE CAVED
5/12 Indicates that 5 blows of a 140 pound harnmer falling 30 inches was required to penetrate 12 inches.
A-3
EMPIRE LAOORATORrES. WC.
S
I
LOG OF BORINGS
'1L
1
I
I
I
I
i.
1
�1
A=4
EMPIRE LABORATORIES, INC
LOG OF BORINGS 13
125
120
115
110
105
100
90
�s
3
Ns
A
ff VA
WAA
r '
�
r
r
A-5
EMPIRE LABORATORIES, INC
I
I
1
1
1
1
I
I
Mni, nRrmvncE err
FAIRBROOKE S.I.D.
M
1
FINAL DRALNAGE REPORT
FOR
FAIRBROOI:"' S.I.D.
CITY OF FORT COLLINS
COUNTY OF LARIMER
STATE OF COLORADO
November,,lg83
Prepared by:
Parsons 8< Associates Consulting Engineers
432 Link Lane Plaza
Fort Collins, Colorado 80524
Project Number 83.48 WOR
. IB
L
i
14
Rail
1`
a
• � t
s m arc
: m
_�i 1 I.1 j J+�
cr-
j°Y L
0000 t i
I � - u' r
/ 1
IQ
Y / /
u�su ,6in
u
/�' r "•..
� '' •' zr Lzi`,I
e ; f� ! it
In
:t
zN / LL B }eyl i I
N ON '.�� 2a . �' s i • i II
• iia� aN
t
Is
no
mN
fn
its 1 IL 4
• Y 'F', �
i•1 r NNgo
U.
fi t gt
M
ti
91111111111111111
�
11111111111111111
i
�9111111111111111111111111111111�1111
�61111f11��0111111�i��111111B�1L��111
�91111111111111111EIEIIIIIIIIIIIIIIII
�61f1i1111�111111111111111111111�1111
"
:
�911111111�IIIIIIIIIIIIIIIIIIIII�Ili1
�BIIIIIIII�IIIIIIIIIIIIIIIIIIIIIEIIII
sill
111111011e
OCCUR
119-1
IMMUNE
�INIIIIII��111
HIIIIIIEHIIIIIms
NWHON
�CWIRRHON
111011lllllllllllillllllllllllllll
IIIIIIEHIM
�II����EEEE����E��@E61111��
ItUtt
SLOW-
�O�I�I�I�I�IEI�Ii1�lE1E161ElelElEl81�
I
I
I
I
11
i
I
I
I
I
i
I
I
I
i
i
I
1
1
1
1
1
1
I
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROORE TRACT A
Description: Cap. of Cross -Pan Design Pt D2A; Q100= 18.1
Solve For Depth
Given Constant Data;
Z-Left............. 69.00 (1.45%)
Z-Right............ 75.19 (1.33%)
Mannings 'n........ 0.014
Channel Slope...... 0.0060
Channel Discharge.. 18.10 (Q100)
Z-Left Z-Right Mannings Channel
Channel
Channel Velocity
(H:V) (H:V) 'n' Slope
Depth
Discharge (fps)
ft/ft
ft
cfs
69.00 75.19 0.014 0.0060
0.32
18.10 2.43
FLOW SPREAD = (0.32 ft/ 0.0145 ft/ft) + (0.32 ft/ 0.0133
ft/ft) = 46.13 ft
CROSS -PAN WIDTH = 48 ft
I
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT A
Description: Cap. of Cross -Pan Design Pt DSA; Q100= 4.8
Solve For Depth
Given Constant Data;
Z-Left............. 66.67 (1.5%)
Z-Right............ 66.67 (1.5%)
Mannings 'n........ 0.014
Channel Slope...... 0.0060
Channel Discharge.. 4.80 (Q100)
Z-Left Z-Right Mannings Channel
Channel
Channel Velocity
(H:V) (H:V) 'nSlope
Depth
Discharge (fps)
ft/ft
ft
cfs
66.67 66.67 0.014 0.0060
0.20
4.80 1.78
FLOW SPREAD = 2(0.20 ft/ 0.015 ft/ft) = 26.7 ft
CROSS -PAN WIDTH = 28'
1
I
1
I
LJ
I
I
I
I
I
I
I
I
I
Rectangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT "A"
Comment: Cap. of Sidewalk Clvrt: Des -Pt. D2A; Q2=5.0
Solve For Depth
Given Input Data:
Bottom Width..... 4.00 ft
Manning's n...... 0.014
Channel Slope.... 0.0100 ft/ft
Discharge........ 5.00 cfs
Computed Results:
Depth............
Velocity.........
Flow Area........
Flow Top Width...
Wetted Perimeter.
Critical Depth...
Critical Slope...
Froude Number....
0.29 ft < 6-5 'c'c
4.27
fps
1.17
sf
4.00
ft
4.59
ft
0.36
ft
0.0050 ft/ft
1.39
(flow is Supercritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
rl
I
I
I
I
i
I
I
i
1
1
I
I
I
Rectangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT A
Comment: Cap. of Sidewalk Clvrt; Des.Pt. D3A; Q2=2.9
Solve For Depth
Given Input Data:
Bottom Width.....
4.00
ft
Manning's n......
0.014
Channel Slope....
0.0100
ft/ft
Discharge........
2.90
cfs
Computed Results:
Depth............
0.21
ft
Velocity.........
3.49
fps
Flow Area........
0.83
sf
Flow Top Width...
4.00
ft
Wetted Perimeter.
4.42
ft
Critical Depth...
0.25
ft
Critical Slope...
0.0053
ft/ft
Froude Number....
1.35
(flow is Supercritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
81
Rectangular Channel
Analysis & Design
Open Channel
- Uniform flow
Worksheet Name: FAIRBROOKE
Comment: Cap. of Sidewalk
TRACT A
Clvrt; Des.Pt. D4A; Q2=1.4
'
Solve For Depth
Given Input Data:
Bottom Width.....
2.00 ft
Manning's n......
0.014
Channel Slope....
0.0100 ft/ft
'
Discharge........
1.40 cfs
Computed Results:
'
Depth............
Velocity..
0.21 ft
3.31 fps
Flow Area... ....
0.42 sf
'
Flow Top Width...
Wetted Perimeter.
2.00 ft
2.42 ft
Critical Depth...
0.25 ft
Critical Slope...
0.0061 ft/ft
Froude Number....
1.27 (flow is Supercritical)
r
Fl
I
Open Channel Flow Module, Version 3.42 (c) 1991
' Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
I
r
I
r
C
I
I
1
Rectangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: FAIRBROOKE TRACT A
Comment: Cap. of Sidewalk Clvrt; Des.Pt. DSA; Q2=1.3
Solve For Depth
Given Input Data:
Bottom Width.....
2.00
ft
Manning's n......
0.014
Channel Slope....
0.0100
ft/ft
Discharge........
1.30
cfs
Computed Results:
Depth............
0.20
ft
Velocity.........
3.23
fps
Flow Area........
0.40
sf
Flow Top Width...
2.00
ft
Wetted Perimeter.
2.40
ft
Critical Depth...
0.24
ft
Critical Slope...
0.0061
ft/ft
Froude Number....
1.27
(flow is Supercritical)
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
' PLEASANT VALLEY AND LAKE CANAL COMPANY
First Tower, 10th Floor
' 215 West Oak Street
P. O. Drawer J
Fort Collins, Colorado 80522
' (303)482-1056
' September 8, 1994
Mr. Michael F. Jones
Ms. Cairole Bernstein
Northern Engineering Services
420 South Howes, Suite 202
Fort Collins, CO 80521 -
Re: Conceptual Change to the City of Fort Collins Masterplan
' Relating to the Pleasant Valley and Lake Canal Ditch
Dear Mr. Jones and Ms. Bernstein:
Thank you for attending the Company's Board meeting on
August 30, 1994 and for presenting the plans for storm drainage
which affect the Pleasant Valley and Lake Canal Company ditch.
' The Company's understanding based upon the information you
presented at the Board meeting is that you have been hired by
Wheeler Realty to prepare plans for a development at Fairbrooke
Tract A in Fort Collins. The problem you have encountered is
that the City of Fort Collins' masterplan developed in 1980
requires a 110-125 foot right-of-way and your client requires a
variance in the right-of-way width to a 60 foot configuration in
order for the streets, etc. to line up properly due to prior
construction. You specifically want the Company's acceptance of
the realignment of the ditch in accordance with the plans and
information presented to the Company in your letter dated
August 25, 1994. The City of Fcirt:.,Cullins heeds the Company's
approval of the realignment and new configuration which would
result -in the Company's ditch being contained in a pipeline (for
this development only), if and when the masterplan is completed.
' The Company's Board of Directors passed a motion agreeing to
the concept you presented on August 31, 1994 for realignment of
the Pleasant Valley and Lake Canal Ditch but subject to approval
' by the Board of Directors of the final engineering plans. Final
approval would also be contingent upon the following conditions:
1. The ditch must be properly lined with clay or other
appropriate material to prevent leakage.
2. The elevation of the ditch must remain the same.
JOO--O�
0
' Mr. Michael Jones and
Ms. Cariole Berstein
' September 8, 1994
Page 2
3. The Company would agree to the ditch being contained in
a pipe only as outlined for this development and if it entered
into an agreement for this project it would in no way be giving
its approval for the ditch to be contained in a pipe at any other
location.
' 4. Any pipe installed for carrying the ditch water must
accommodate at least 40 c.f.s of water.
' 5. The developer or the City of Fort Collins must maintain
any pipeline and structures installed for keeping the pipeline
clear of debris, etc.
6. The reconfiguration must allow for overflow from the
Company's ditch in an appropriate manner.
7. The Company would charge its regular fee for accepting
storm drainage and would expect reasonable compensation for
giving up it right-of-way under the plan. The City must agree to
' maintain any storm drainage ditch which is installed.
S. The Company must have a recorded legal description of
any new location of the ditch and a recorded easement reflecting
' the Company's right to access the ditch for maintenance, etc.
9. Any construction and reconfiguration must be completed
' prior to April 15th of each year, unless written consent by the
Company is granted.
10. The Company's ditch superintendent would monitor all
construction.
11. The Company and the developer or the City (or all
three)••would.enter into a realignment agreement.
If you have any questions, please call.,
' Very truly yours,
PLEASANT VALLEY AND LAKE CANAL
CQMTANY
Willis Smith -
President
WS:jm
' 1w f1pv111CC Jones2.1tr
8
cc.nscri �'p� ct0 - ca`+ram c*;5y ?F: U17
r Wi.t - i l .
_'r,, i j� 1 T� S. _ :TnGM I
r'!cw Time
,
i
lriet
I:71e oz
^i r,�1
_.
�'ther
;
71E
3
Nr_et Pace
Calc.
oef
!'
Area
I^�tr:cff
)hnoff
Furoff
Point
(ft")
'far,.)
fait-) (oin.)
(ain.)
"Ca
(3.^,rhr) lures)
(cfs)
(cis)
(cfs) l
(1 -FN rarai
A
2920
20.91
20.17
41.07
0.60
!.20
50.18
36.1
'6- Y Canal N.
6
!m
'8.82
8.33
27"15
0.65
1.70
2.6
3.1
„
.-Y . xJar+oed c
2:.70
1.l1
2a.61
u.65
!.6a
3
3.2
-.!o
6.: ;
_-Aaraocd
F-2
500
27.61
0.00
27.61
0.50
1.71
4.BE-
4.1
5.00
9.1 f
8+00
F
10G'0
31.60
5.F6
37.16
0-N,
1.27
15. 8
9.7
BY=a
F
IM-
23.70
5.56
29.26
0.65
!.50
3
4-�shire
0
9n0
31.60
3.o
74.63
! .3
? ^
5
7.s?
ic.1
`: S,uth ?aft
E
14tiA
V.Wi
11.67
11.61
0.-K
J
�
:.4i,
1.7
1.7
.:
.9
,
z,
,94 : *aft
6
,95-0
;6.23
12.06
-,0.31
M5
1.-r
tn_5
0 7
1
1
1
1
1
PROSPECT ROAD SID - DRAINAGE STUDY JOB: 85-017
MARCH 1988
TABLE - V
HYDROLOGY CALCULATIONS - STORM FLOWS ( 100 - YEAR )
Flow Time
I
i
Inlet
Time of
Direct
Other
Sur I
I
Tire
Street Pipe
Conc.
Coeff.
'I'
Area
Runoff
Runoff
Runoff I
I - Point-
I
(ft.)
(sin.)
(mim.) (min.)
(min.)
'C'
(in/hr)
(acres)
(cfs)
(cfs)
(cfs) I
11-PV CANAL S.
A
2920
20.91
20.17
41.07
0.75
3.45
50.18
129.8
I
129.8 1
I6-PV Canal N.
B
1500
18.82
8.33
27.15
0.81
4.40
2.8
10.0
10.0 1
17-N. Cedarwood C
600
23.70
1.11
24.81
0.81
4.55
3
11.1
109.00
120.1 1
12-Cedarwood
F-2
500
27.61
0.00
27.61
0.63
4.40
4.85
13.3
120.09
133.4 1
13-Sta 28+00
F-5
1000
31.60
5.56
37.16
0.63
3.70
15.28
35.3
133.43
168.8 1
18-Fuqua
F
1000
23.70
5.56 -
29.26
0.81
4.20
3
10.2
168.76
179.0 1
14-Hampshire
D
900
31.60
3.03
34.63
0.63
3.80
4.8
11.4
179.00
190.4 I
15-South Taft
E
1400
0.00
11.67
11.67
1.00
7.00
1.7
11.9
190.40
202.3 1
19-North Taft
1
6
1950
18.23
12.08
30.31
0.81
4.16
10.5
35.5
202.30
237.8 1
1
U
I
NOTES:
BASINS ADJACENT TO PROSPECT RM INCX
FLOW COMNBLMONS AM PROSPECT' RD.
P.�V & L .
50.8 ac. CANAL
F
3.0 sc.
B 40 MHB-7
..
�'1 LOt
�6
10.5 sc.
,.M.011sm =WW.
i- .
FvivrL
.Tnref -'�Vm
-•L-4
•
mist 3
Fs—Z
4
•�.�..�..�.�. �.�..,
�-J
ODER $CHO
'
M H 8-i
"
$ J
1.7 ac.
BASIN F-2
B 1 -5
B D
T 4.85 ac.
.15.25 ac.
4.8
FAIRBROOKE
1pmo�
DETENTION POND
. 34,s4eaS
I
I �
I
MAIN DRAINAGE CHANNBL$
1� DRAINAGE DESIGN POINT
EXHIBITA
PROSPECT ROAD DRAINAGE. MAP
rEr,
III I Ell
III 1 111
1
xe] z a .. �xa� xze L .. _
LFP
® a33 �I
y 32 SF.QLN- gal xu e9 le.t le.
Zp ?I.E.:. 20.9 r I/�1 i
NEINE
i25 tv //a9I :fxp® / 1Enable
6.9
r.�Eu`r r 13r
TMCT E
O_i / -t yEIEV ; llE.i 16.J 1.f EtN
4 I le-r-- a. ICIT IF'"
le Bp I I
LfELLV
m�Qy - .tiv t rs Euv u.B � Iv
I rsl?E° rv�E luv 6/ ale
I No, //, 79
T:L30Exty
19A
a .. 7 1
, ® 'Ire na r'i4ne a Ti¢dE.Ev 4
q,M
\ u [uENr
i 1
J i'.FIF
90
9
i GEIEV ..f F1£` E]E9 if F15 \/ el
7 8� `2, 1at
9�_V
II _iie illy - 1
al Zee ana >i x 4
� m 'xw-- _ / ntf� crew ® II
o.a lee e . MAE--:�;y-r-F.. .' ® cr r.nTFIFLEFf
6
Tom TEAM,
un _ _ _ —1
-I.
ao�arvue � 1 . "',-
\\\\\
OVERLOT GRADING NOTES
. IF I"IMM uc BE I \+ EB x5
wE LOTB . E (FeLLD WET A WHAUM', L or os IN THE MOST 10 u„ rtcu
W YVLL eE #. Me EW9Rp BANNf ,0 ME Lwe31 EYM1fYm M M ,w,wid I F\ 1
a veT)BEV uHE %M[IPEI,EME Md56 By Shd5 oen u„rt e\\ \ \
.M6�E. >all 6 w+owelb) R tt4X ,O ,K MRCne sw[S ,5 ,wu ,S `b' \
e ne MrN rO,NpE �En� ME .e"m HcemNM� eE e \ 5 A `F
SLVEe 0E e, 9MM, . e To M,NM I 4 \ r:.ELEv :` PFIAB
ME „ a eE,c By.°N.a B:.°,'!`pp°f.."wE xp N e :s .n, •
byeavo
.,EN carry "°i°`ERL EM.i Puanrv. s ar a ON cbe sIN mwFN l IN
� Byte nnE,ccp.ww __I I `\ N%
° Y�,E'{"^, z<NoY By" ,Ms :,�,,, a ,nN.w NM , ".,...»„ son M ,. ,o ME -' '._---- _ ♦ \ ♦ are. 20
o Me MOUNT M MOUNT EP�,W[AT M m IN WIFE Ovo v�,uwY M AFWMI [mAEME awn, I - - . F \ \\ EI£V
THE ce or MmW 7pNV ' on , YNYpG AII E 114;fY6 m \ Q\ PI
su,VNIN YWioM OYIe..
ars uo, eu,xur ENHOWME ONEWHIC& BAN Mn OFm55NK "xWQPP SSA � MN I ___ a\.N T EO
_ n
23
N \ a¢
11 I -!0
BE 5Fp
�A
�I� Imv,r METZ IF
\ E0
,A T.F.EI£V
fOFTE ONAM calIMF
I FAf01001F P 6IX Al1O
TYPE " OA " LOT TYPE " OB " LOT
TYPICAL LOT GRADING
NTS
NORTHERN ENGINEERING SERVICES
EOx L�,6.,95 420 SOxITR ROLES SI1flE 202. Pr COUINS, COIARADO O0521
I
(303) 221-4158
5
14
''
»
5,
Ei"E"
n.0
v.ELEv
/ ` s
e
TIEL
r.E�nEv
xA
J 0.5
BIT9EA
10
o]
II7
20
/
i➢.F1EV
a -e
06
2e
e©
—29-- 0 1
M.
THIN
♦♦♦� F1119g01E P11D. 7R1 FIIIB
A
\\��i/
1 I
I I''
II I�
I
I
II I'
ORTH
GRAPHIC SCALE
I I IB 50 My) o
I � c.—a—� Hof..,
ems
I I11 � -_ 644E
j I- -- 5 G E E by NOrmOFc Lfl-
gmebmg 5 Ine .
I to Inc, HMd (or am type of
banst Gton eey a Registeredrs sugnE
I
tarot Engineer nUN:of employ t
annem Fnot 5«vkn.
CTTY OF FORT COLLINS, COLORADO
UTNTY PLAN APPROVAL
Eff6wm: M—
,aFnan en. ,,, M` I,.,r DOTE
(Aural er: ,.:,M..,,..,,,.,,, N—
CHIECKED BY
MEta..,ay, me
nt Date: FAIRHROOKE TRACT "A"
UJll GRADING AND EROSION
D $Y APJ CONTROL PLAN
Sheet
LOl`
eLFFE._feS- - �.I n.=:$u. mti I ,nYol.._I
P00I.�WEST I '
_e. 1._.. !&II
� Nor"— GERI
1
� � FENCING RISINGW
iERVI '
/0 50VTH LEE
LINE JOE Wi 15 NU 21
1 1IIREV 1]) — tSFEV "tUr M,+IM LOf tMF Oi L03 9 I¢ /!L ¢.—
`° 81 -s.z ! `0 , I -lee ��ae p i � SF)
® I ®e I 30INI iY 6 F , ELfv
S,R , -'e011 '®° Fm �I, _ 1B ems, ,ss ' 1 I � WUAFF IST
6T _0E, �I IFULI _ IN' T�®FEY ! ® qZw Imo_ I tl� 1 F1
o /� \, B
16
.gam Z. ... �5
TRACT E 't E Y
WAY �1.
` 22 ins ... u
ite .. TE ,.� / ✓ 1
e
i y , L;. 1 V
_ za 11
D 6 _,B]
y ^` Ti F1N .. • 1
¢¢z 311t `. ® f 1 /
`� 1 IX 'N
35
Ir, /, r, Y
FILL
a et` �' ie --ROILY WAY s, ®R -®
iA
ID
30
�.
® ) i _ 6
SR le! 2 r/ 1
4 a
I' ,Ts
' 6 B 1FEE IT SR)
PHASE 3 1 ns . I`• 1 i
.., - �i —x...
NC — STB E�X . KT x4t /' /' 1 A���ie
t I / 1S 6 R �5� U 1 INN, NINE,
Ia
E' I tits .20t 1
,IT
—T
, i !, aIP�
1-1 I j • w.. 1 `_, m '; -- ...; ,., /m. ' r\ ilk
SR
.Ecewo
Ia,o PHASE 2 ` }b V 'm O H •. EXISTING SOONER SEWER
t <. `__ ��It -i=/� J 8 �! i,�y� 1 ( 22 1 I PROPOSED STORM FFFFI
s
SR — _, Eq Y 6
1 I �— EpSTING STORM DRAINAGE ,NLf
Of♦r/E (' 1 ` 'IR�� — — 1 I I PROPOSED STORM DRAINAGEMLf'
„ 1
swuF w/ TRIcxLE PAN
0 '-
I t
oo
gt x xa PROPOSED CONTOUR
FAINTING CONTOUR
J / I
` \ , ` }I n5 PO D CONTOUR
ROAD 5..
90AQiV11 F RUO � � ". t _ _ _ _
— .� .� PROPOSED rLONUNN
40
`' •� /� SR o I 1 s �D
T 1^ T] t I PROPOSED ESPE T A SOS IiIDNING
q5 PER PROSPECT ROAD SIp
It ''-® /
� n'Oi I1I �ws:E
CUNSTRLCI O.N "22
3u 13 I
��I pgsE '' ,a �of SONS*RUCT,NEROSION aNU SEI11EN(OVROL NOIILAcic, 179 v
sPROTEF•IDN
.zx � I � � �P, sE of cpes*RucnpN "H�
, ELF,. 0I FOUNDATION ELEFIEF
X� roe
\ \
/ j\; PHA 2 Re FEE 26 ,R 2T 1 15. 1 I �I �I .'O.ORT—H
IF,
1 GRAPHIC SCALE
♦. . iii �� +STB'I _ / I Ill
s4 _ - 1J 1 E I'
1 `!I
ICJ �; <W /
.-Im CITY OF RT FOCOLT INS. COLOHADO
X` A A y i W __UTILITY PUN pPPHOVAI.
-
.,..,m�i F� PALL. STH FLW ♦` r FAFBROOKE PLD. TTH FLNO
TyPF 'OA LOT TYPE "OB LOT ♦ \ `e I6XEo-Eo yA -. .,__—
DETAIL „A^ LxECTm
"TYPICAL LOT GRADING � �
NTS —. - INFECTED 6
I
Hy ! G .e NORTHERN ENGINEERING SERVICES ° pj Act 94 j Dot EAIRDRooxE TRACT "A" Sheet
SCALE. _.1"=50' GRADING
r7T AND EROSION i n
420 SOUTH HOWES SUITE 202, IT COLLINS, COLORADO 80521 DESIGNER'G5CHOCa. (CHECKED HY _MP; CONTROL R,OL PLAN �3
(303) 221- 4158 RAGE, MAN G SCI+nC✓ RRFI'AREC 02/F:}` Sheets
I.0
HISTORIC DRAINAGE BASINS
SCALE: 1 = 200'
....`...
........ .............
L.
I:
.. • -M......m.......um
m-m
pl
f.7
�'Dl
DEVELOPED DRAINAGE BASINS
SCALE: 1" = 200'
NOTE.
SHADED AREAS = SUB -BASINS
TABLE A
STORMFATER RUNOFF
BASH
oESIENTCN/IYFE a RM
NF/.
pge/PEl
ONRp
pµyMyllEp
OR
01
--
EXIST lNaT tNCfl 9 )0/UNDETNNED
(�)
3e2
c
0.20
l s
() I (JU
62 07
z -w L 5
() (fit x)
23A 2$ 35
9
(Io.)'(.)
33
it
1 ]$
L
l I
z
m
v
(190
it ta^
(. I (;)
b6
kIW
$9.
2 nW
•5 ♦S]
c
0.5•
w
$.2
DI00
2
CETCMON PoN $ uNEO
595
0,25
•0
0.
9.6
3
1.
205
1 M
19
1
1
0.4
6
1 2.3
D
0 NMN POND 03 O-X-N
.62
025.
litol
3N
111
121
2 0.
B
a
0
2 9
$0.9
I15
06
•B
}$
II.
wamt-rinuTuN uN
0
p Exi Dx pEinx
2
Z7=47t
y9.
1
1
_
T
R EMrox P xD D$/ DEIUNEO
•
9.6
♦
2 1
1
5.
.1
D
DEiEN1px POND 03/ DElux[D
JO6
0.25
»
1
z.
anz O.
•
6.z
1
0]
6
5.1
0.5•
2.9
.Loa
D36
uNOEiuNED 10 w 6 LV(E UNN
D61
0.20
W
20
9
13
1.3
2J
m
031
OW
2.2
OM
PROSPECTM LNOTmwxD
I
0.20
92
202
]
J9
250
0.0
•
}.0
69
9
5.000.51
IA
5.0
OS♦
0z DR-$liE
0 it-
DE]FMMM RAND DS DUNNED
D ENDDN POND Dz/ UNDEmxED
W P ) VNC N
725
OOn
1035
0]0
D3s
II
IDS
9Y
••6I
]3
5.
12.1
I .J
IO]
la
tl]
0. •
n•0
•I
L♦
1
1.•
$.2
5.•
112
95
OM
1
5224
165
0.3
>
1
S]I
9
4.90
0.5•
o.x
OW
LJ
0.5
0.
♦.6
19
a
FOD us REST
RESIDENNL
G
SOMERVILLE P.U.D.�l
v��
PLEASANT
a
f
Y�
)0+
04
py ��
Cpp„_ESO
N SEDUTPoA
DA'
_��A ,ROSp,irTt
EXISTING STORM SEWER
15" R.C.P.
(4)- 4' EXISTING CURB INLETS
NORTHERN ENGINEERING SERVICES
420 SOUPH HDIIES SUITE 202, FT. COLLINS, COLORADO 80621
(303) 221-4258
FNRBROOKE P.U.D. 5TH FILING
J/
WILDW00 NG 5T
FIL
WILDWOOD 3RD
FILING
DS
J •, - I rROFOsrn e• goss-vrN
P
FG 15 TYPE-R IM£,
RbYECT ROAD SG
RJ` FAIRBROOKE P.U.D. nH RUING LEGEND
fM611RG SroRu SEWER
S PbRORD SnNN SEWER
EtlSING v(XSd qW WGE wtP
BROOKE P.U.D. xi 4 vecwsrn SroRN DR.ux•c"E INLET
~- vsw RUN♦GE BASIN
6TH Fl11NG Z D
n'•R��� gpR,D,Rr
DEIIICM FlC NE
A_ �ot DEF-= pwwcE ASINS
111IJRI1m CprtWR
7� - - LT611RD CMfWR
(� O� IMINp�y FB6
NFOR CONSTRUCTION - 5 A1G IMKS
Qp9D'x 1pNl
FROM FINK DRAINAGE REPORT FOR FAIRBROOKE S.I D., NOV. 1983. enoW cul1E 9unB1
0100 It 9 3 2e ct5
(&ISMS INCLUDED - F 3A, F 3B F 7A, F TB; AREA . 11.09 AC
SEE PAGE 68 OF APPENDIX IN FNRBROOKE TRACT'A' DRAINAGE
REPORT, AUGUST 15. 1994 BY NORTHERN ENGINEERING SERVICES.
ORTH
PROPOSED DEVELOPED FLOW INCLUDING FNRBROOKE TRACT 'A" PUD
Q 02=B.D0 GRAPHIC SCALE
( 9 0100 GIs
(BASINS INCLUDED =SOAP, FB1, FB6 AND Dt; 100 0 1W zpD 3w
TOTAL AREA 10.58 AC)
SCM£: I'-1CD'
oject: Print Date: ]sALE:
9435.00 FEBz3 LL.FAIRBROOKE TRACT "A" P.U.D. 1"=100'
MFJ
SIGNER : IBW CHECKED B11 01/OVERALLDRAINAGE PLANAFTSLIAN:ACAD PREPARE0:11 01 94
I
IT
INS CFCTI°R FOR REINFORCED CO NTC
CIRCULAR FIFE
H!\�
T C's""n
i
m NINE
Oil
TYPT
L =rFil- IND SECTION FOX REINFORCED
END SECTION FOR MRINF ED CONCRrtE ARON Foe
CONCRETE ELLIPTICAL PIPE
.e.en.. e.es.. CONCRETE END EECTNENS
•. ..mev •noon en ue a e, en CITY OF FORT COLLINS. COLORADO
to
BeM
L EawWY v..n
1'Mnnnn MS
SANL
°i V Sl
Nw
N.Dy
3LwIPAI^I Fem3 FP`P"N`6.1
4rt
Y
cW 4ETOMVIEW
DIKE
STRAW BALE
"a pe 140
GENERAL INSTALLATI
CITY OF FORT COLLINS, COLD
e iolen, e¢n
STORMWATER UTILITY
TO NOR RE REEKNEVERENTE
LEON
AND
Ct:TPn
WI�II�
IT
L
-tvZ4-
-
S
1\
FUN VIEW
or
SECTIONAA
t ..
oft
SECTION 64
e7
.u..n.".:�^ss.
Tewwi'..'a-Z wa li�'sm
i
DRAIcr
CUT SQUARE HOLE IN THAI WALL IY UI NEFF IN 5111 DO
PIPE 00. CAST PPE ; WON RED CONCRETE
BLOCK ° ENWTH FLUSH 0 CHANNEL SURFACE, PRO D 5- RC
PoND ONIFT vOE
PROPOSED CONCRETE PRCPoYD
U DP OF Rwx
PROPOSED DITCH
C R J
RL-ulcxuExl
SIT
PT %D EA51
CHANNEL S,Nx p MINIMUM
SECTION In
IN
PROPOSED CONCRETE J"" PLAN VIEW
AROON
STORM SEWER OUTLET PIPE APRON DETAIL
RETAIL 'A'
T1
vecaox A -A
+ZIP. ---I
iII sT
nm r
SECRON C-c '—'
L".. MY CONCRETE SIDEWALK CULVERT
N. F FOR DRIVFOVER CURS.
.'.e SOFTER AND WALK
CITY OF FORT COLLINS. COLORADO
"Al 11
NOTH092"I IN TOP @I" VI AN
STATE
DETAL RBR
CURB FACE ASSEMBLY
PLACE ENTIRE ASSEMBLY BEFORE
POURING CONCRETE
SCALE, fPPl 1/Y
EMERGENCY OVERFLOW WEIR
OF
EIL
Do
51M.7
SIDE.?
510674
DEspN
POIM
0$
(p�
°i
cm
1aD
(LT])
° '
(
A.M
ELFMIION
iNMAAT
EIFIAn
FIO NE
ElF•,1U11
9
M
••
D.SV
12e
D=
ULW
pa3
12T
I.m
D]L
x.0
a]A
1D.e
am
uv
Iz ve
IaW
LR.
IMEORETc4 DFnN
WrE:
SOL CRY Or iCRf fMlE4 9EIEWNA CUL1£RT DETLL
IN]IE MR e1RUCNPIL MRigCEKW
-P V y F
R
x cONDRRTE PoND W\CW PIS SKTOM
TYPICAL SECTION
SWALE TO DETENTION POND D5
N.T&
TYPICAL SECTION
SWALE TO DETENTION POND D2
NT3.
POND
ORIFICE ow
'd
DJ
!TS
m
y.zs
D 11C STEEL Mrz
ORIFICE PLATE
N.T.S.
w LYSiW/Y DsiM GSM tIlip
AT dM PWO CNLfl
DETAIL
511♦ ' — mmill�� Slw W POT=
�^ Wxl �— 0.5
5113 41 A� 5113 �1 1r 2> IRµylpll— O.0>b
5110 WIN, / MOODY
ISOMETRIC
Snp �
SIDE 51W
POND D3 & NA CROSS TION POND D2 & CANAL CROSS SECTION mNrnnE 41RNNN CLrc or FORD CmEARE. OIASEro
m EPI '�^ ^- .N �. --.'" COLwN PRELIMINARY REDIi'Y PIMN,PPp A
NOT FOR CONSTRUCTION
s.H��.. v.we.e'er IN �an
� T
SIDEWALK CULVERT TRANSITION TO V—PAN N Mn, SAfo D^ N ,
w E.O ve �^B r r'N a"
N.T.S. mfUPTfle'e �4 "On1 nRK" m-^ a •4�.---
EN,n«,nD s�N..: Inc xmxNN
�NrwMDETUNR1RNs.DEC
oN5 _ ate- Date NORTHERN ENGINEERING SERVICES Pr °ject:n ^ Z5.00 Print `c
JYJ IIIII FAIRBROOKE TRACT "A' P.U.D.
-- 420 SOUTH HOWF3 SUITE 202, FT. COLLINS, COLORADO B05E1 SCALE: NA DRAINAGE & EROSION
-- — (303) , Fr. R
IF DER6108MMMLyCAMa C�rR )10 CONTROL nFTA1I,S
ALnr cno PAAIRTGI ICTInN
SIDEWALK CULVERT/SWALE D2 TRANSITION DETAIL
SECTION B—B
FORNOTEG WNCKTIE AND Rnu
SIOEW4N LNLARTS. SEE SHELF NO I M.
SIDEWALK CULVERT/SWALE D5 TRANSITION DETAIL
NES
sw
Loz 6
sy
Lo1 M
SWALE
D2
AND
SUB -DRAIN DETAIL
�(
PL PpE
NR
5Tl I.NpJ
�2 -V PAN
at ten`
L e
PLAN VIEW 6 A b
TYPICAL SUB —DRAIN sraE TOP OF sLonr 1
3' CCHc 2rt sGEWNM CULAM
FUJI
OUTLET DETAIL X OPss uNm sI nowt,xr - � � `nR SMI LF E""�. ""'rR
8 S - //% 2 3 µo :oE.kx.
FEES — e zs / :TOP Snit u ^ C
Js� 6 ✓�—!
—_—�`
I If
I
J/( STONE
CUT PIPE FLUSH
PLOWLINE OF /WRPEO FREE
2 V PAN k NORTYL
Ypp INRI or
EQUAL FILTER
`D'AC116
P.E. SKIT
EI.WC
I
CAP
Ow CAP
U' ELL
—�
e11 r e 0041 CO ADS
S FORI.TEO PCLOETHYLENE
TIMING GUA9O SCREEN.
SWALE D5 AND SUB -DRAIN DETAIL_
Ins
—
Y
NORTHERN ENGINEERING SERVICES
420 SOUTH HOWLS SUITE 202, FT. COLLLHLS, COLORADO 00521
(303) 221-4150
PRELIMIDIM
NOT FOR CONSTRUCTION
PRELIMINARY
NOT FOR CONSTRUCTION
Their I Ile Ivabumente M
Se,Hce pm
Enginx,inq MS type
It IS bbean e Slid a eepned :M
stamped by unRapstau i P.olemml
Fnginw mpyy It NmIMm
Epimninq Servcee, Im
CRT OF PORT colIMS, COL.ORILD0
[RILITT PLAN APPROVAL
Mu6 T;R1rsT9M�— �
Print Dote:
435.00 FEB 23u FAIRBROOKE TRACT "A" P.U.D.
K% ICHECKED BY: AIFI GENERAL DETAILS
`\ I 1111 �I
335 ?S2
'--* e.o . ] I .. a*a �• Imo„ I�-J�atltlflV♦I. 1 11 Ij I} I
INS W See ANNINNINS AS
"..3rElB1N ♦ +u
_
!p�y r ral�n- ISO 116
x.1azY, l ® Ir♦3 . 1.rs.tuv 11e
]°.° i.el I _ RI a9 ta9 IL _ ?®7
PY
x
Tins IS AU UfmaaaI e
rii°ev 1 r: �ruv I x/r �, Is
W I
6PADw6 CLUFIe.L1QAT[v.l n'® I/
(ce;MIr r '® nn I ® es t® -® _ n5 \ II
TG). AT DNECLOr , _ y, ` - na 1\
.AU. VPaD1U6 LL Bs 1e. r 1 1 _ _ EL
EF
20IJ74111 DU- TRACT E
Is, r ccaav •
Puns6 I - WG WILL Gfir +e.xI i Ixe.s r,F,pav
p j l
dN OFCSITG boaD W b - x IT. 123
I A I +• -f8. —___ - . ✓ 1 _ x-., -
�y I r.ila9v SAW.1v it ® \ — _ — . _ _ I [nap
TY ® iS+�o� i .tY - e , Il/I I :.. 6C ®, eo ,i% ♦ ® h.\9i I �ne j I lu PLANT. °wo
II 1 A= / r: ® /i ®�° ee IF d ir4pEvI_].a e i /
21.
SIGHT MANCE-�
\
I
\\ it.E� r. tlty n,iM' TI RIYI 1 1 Ita ..o w l.�' x I ] r 3 /
SIT 11 �e I ®_ -♦ I�
Vy
ni. \�VVVV
"I r. - .9 �los I
--� .fiIN, Age RAN,lea o s .• _... _T "` //'nC` ? �® ® r.i
-- ce num O9 a _ r.+e+ __riirrov aw
TANANT _ I 1 .\
1
ISea )/ �/ \ \ !a YAFA
� 'J Lr.EIfY b 1
OVEALOT QRADM NOTES v� �1('� I At/ v ® vv`�v nr uv ® ♦ II_e
vmr OFIF I3A I R
.a... cwtm•w.rc IF
mSIRSTAR All
evu .waxoert WAwpe M«VeaRclM SSe STIn AS wto Ac W \ _ r' _
Rental COVER 6 MNT�
ae uTO C a ONOCCURS
TAR TO wIDE ne L I `\ \ \ \ '
7 TOO pnG IS vwI oro.°L".:"`o:m w40Fwz'....cr I 1xm�usa *.rs LOT ( e \ V r:9clr_v ++\ PFiA Q loMININos 1
eal MILLI �c FILL$ TO era I e \ \ w + \\ .133 i.t. 9: � as r �v 1 f ORTH
van MA SmEr 706 lwmrn �. «p.p."r
' I ,` It FAIL E,NA, a 1AT,.,LEn n A w M OF an m THE _ \\ \. • 25 :;°a ® 1 I; GRAPHIC SCALE
r10 '".` _ w. AT n'.E IFRI I I \\ \ �(9. ID s.♦ ®_ _ ___ 1 so ° 100 Iw reel
I TOE FINTINATIA, GRANT AND M e� i..iw vo — e• \ -1za _ • These
, o.
—_—\\\\\i ® e le' + 4 9 e InsWments of
3. eon's all re....rro� ova x s OF in°�wc �wrr°`o.°Iwl'.rc.'�i n.a.."" E o _ \ \\ \ 4F 2♦ry i r ; -� — 1 _—_ —_ 5 e e.e y uo mem one"I'Ll OF, CIO In and [.
= 1 ei——
rat I L, LOFT far any type of
0 SO
ITS a♦ v �7 S, ® e. 29 . ��4' - ��n�c..>a�-� II 1 p e by TOn arRegisterede Pro69-
1 I ♦ �V uELJV /� ��� _ANASSINNeAS
I I E 9 r In 9 e employ or
©i % % >! N rt E g�neenn Semcea Inc_
M3 it MSfG \ /.
I ♦ / CITY OF FORT LAN A$ COIARADO
�� ❑ A ] ❑ C I • \�`ra\i° j� e/ / 1 UTILITY PLAN APPROVAL
990
wmx o,Ex c I S r.F.Ersv •epsvm: rena a o....o. o-rz --
♦ FAFOAO)O E P amFLMO ♦ . ` �'� /�.9/ FAIBIOOIOi PLQ F1lIS
IT TYPE" LOT TYPEOB " LOT � `.\ 4 0� clv a°er..�Wp y.. N,,.. TAX
AS 60 ° cIa°Ian n.
TYPICAL LOT GRADING -- °" " " DAN
nwan m.
SITS / o,.,., .r,.«.�a dR
ITAS No. Revisions B Date Project: Print, Dote:
"""H TO 14�14TION °�° °' NORTHERN ENGINEERING SERVICES FAIRRROOKE TRACT e,A_ Im
le SENSE r.r. vsEaEx,s 9435.00
W MYIS — --- - — - s�ALE: ,-=5D GRADING AND EROSION - _ _ _" _ a20 SOUTH H011E9 SUM 202. PT. COLLINS, COLORADO 80521 DESIONER:JDD CHECKED BY:ufJ CONTROL PLAN (303) 221-a150 RAFTSMAN:JDD PREPARED.09 05 95
' I 1 I pn-sIrt I y I • i n i y _ _ -, O'srtE • n5muen n/u •\ . (: /
.. / 0.772 I • n �' . 87 v�" ) NOTE:
�•• __"-- per_ M _S_._ y pF �'¢ EF��pwS •• ••�' �'•�' •�••�• ? / BE THE
N ON -SITE DRAINAGE FACILITIES SHALL
Ox- O.ELFS ` Oj CFS BE THE RESPONSIBILITY OF THE PROPERTY OWNERS,
Fa Ads __ mI00: tJ Cr5 /
y 27 y f 19 .
' "„ 14 / ` J 1 cmss - 51 zm IrN
36v Y I I'MIAA (SEF Sm. will
/
,. .09
39 .Stxo--�• - i .` 15 P Nx°n ! ;R°a�_10ua00idl l�
y P - + -_ mmrR RE Rxu w - ].1 Cis
3E 30 y 2l Ax y 02� 2.9 CF5
3/ 28 i 15 a 0700= 10.6 CFS laEy as j
25 ley D3 '° ®ozoo:'? t sSCFs
3.82
0t
a ADEWAP.Dt R 1 1\ IS' e.F.S.
3j 11 W iRW CURB /� 'w N. 511130
__ 28 • •R Y ME9rt 111
IAxirwArI D3A y aMnax
�/ (EMERGENCYMETAWFNiLGW
I y. /' fv n \ (SEE OErAx SxER ly
3a 3.06 17 / 1 31 Ja LEO.M. IS' PCP ; TOPS011.
It D2A \' D2- S.O CFS 2' MEIN BUM f�LP 5'N 150 -{I_ nor .-5TIfm
35 �` 2 0100= 18.1 CF5 23 y cU�ar / >EA MPRAP uwEx MIRIFl 140N
o I n 4 97 4.55 a . ,� of wme MPsm. �� d "�� OR EQUAL
FEVEMATE u F'LTER FABRIC
o i ~e\ \ / 1p = i •x. 4' PERF.
�/ •e' Pw i' 1 ,5\ ,/' \� I I roa CUw EXTENSION - P.E. PIPE
• x
0 35 " / p- i (sEE wIOSPEn PDAO
z A / „-T' ceREffFsiOEWSx"cTrZTRT-' �e - i .h\ s.m. vuxs. uacx lase) 3/4' STONE
wE sxETr q NplY WAY g ,
10 j . coxcRErt um»x
x
` / • A (SEE DETAIL Sxr IA) 7
D2 02= 0.6 CFS \e !
PHASE 3 Sp ��N�
m � `' 5.95 U "'�' 4 5 3 0100. 2.2 n !
.........' A Ae 3 / 02- 5 j'; / i./ GRAVEL SUB -DRAIN
« s.fi CFS y �i
PHASE T ., i / °�*GtooAL z0.3 CFS
« P D3B y
I J:\ACAD\DEi\GRVlSBDR.OwG
43 y42 y 41 0 1\ Coal 00.75%' W, SR _" - s v / / A y h"�' x LEGEND
D1 `S®02. 1.4 CFS ----__--
2.32 02- 81 CFS '-'- I i S EXISTING STORM SEWER
Ew * Z 5 0100- 5.0 CFS
f y y -" / ' / 7 Ii iiw v q PROPOSED STORM SEWER
5
fFF ' p
"ALL
. .. �.. ..�.. �. ..�.. � \ -� + 1 0100- 22.8 CF5 siOEWun�
x aD. \� xc 2 cuE.cPr j O EXISTING STORM DRAINAGEDRAINAGE
INLET
scPE 0.'
z, w n ' •` 1 I PROPOSED STORM DRPINAGE INLET
-_-_.- --.- E•imr;ace _-.-_ I -I�VLLL _ y 1 5 0?00. 4.B FCFS D.25 '• ` - _ sFDvi".II`I'reR II • ICE•, SWALE W/ TRICKLE PAN
ff c xcRFrz ,\7cx
�. l OCTAL SNT ILA) 51w.I I 4 W
'\ ��"------ / Sr101- CIA DESIGN DRAINAGE BASIN
DEiErrtmx/PF+fMM)N roam ex •\ • R0 / 0 - ee.E 1 l cn BOUNDARY
_ DRu°xwE 1 i O
1aD-w Rs¢ - Sllaw •�'. (SEE `onu It p+' .� DEVELOPED FLOWUNE
ERVILLE P.U.D. R�w-STIE 0100. I•lato at\ •I •, `z4 CROSS PAR 8 / F•r Ven 15A
Im+R RELEASE ReELL &47 x m x Ee R D4A
CHARLOPM _ _ ;. �i l DEVELOPED DRAINAGE PATTERN
44 % �u` Wrrx WAGE oRUN R 1 .38 II �I [ y 84- PROPOSED CONTOUR
V / •\ 17 �\\ ( E DIET EFr NA �iII„10 :� •\ +' li I Icy 84 EXISTING CONTOUR
�' 1 15 I D' rP.• 1 60. R 11 IO 11
\ 4 + > l2 T II� 1 BASIN DESIGNATOR
o
2.23 ,� rr I• i
\ 15 j <fr' )° i 0.21 AREA IN ACRES
m rtaw4rx y Rnenw °'W,n' z ` \ x 3s'6 �' DErEx+wx PaxD m !
-- "' - -- -' O • '
VDL�Wll rsFi %soDESIGN PINT
n » a0 xv 03I I yI \ •` - °S', •y�6 ie z•
^xx
BS az a+ m w mxn m zx xe Is u n Sex It: +So' _ _ 1m-n RELEASE - 05 cFS y INFLOW CURB h GUTTER
°°'Ait
I •,e5 az °••' +e .-• i
m` \ i lY '� ------------ PROPOSED CONTOUR
DSAS •" \\`d le 27 I i ' AS PER PROSPECT ROAD S.LC.
95 nm m °SAS ran aInET U \ •� C 4 °o 29 • D4
1 - _._ . '\• \\: • :. 3 m'e ®02= CFS 3.79 1 �0?003.526 CF5
z w ♦ y a - 03 10 I _ 20 i°w= ssozw r° �= 0a CFS • y 1
Dx ESE DEEM SW, IIV - a 11 ®NORTH
ai •` SEC DETAIL SM IIIJ _
'49 Ce " •0 S a osA e a \ 4 21 2a \ ./.. GRAPHIC .SCALE
01 Fan a z5 « µ5' FES. y 7 x
\ 510681 1/' _-_---____. ESISTws R' CROSS Pw SO O m ISO 150 Fast
V .� �.�- i B AwM+wxE nx mwc
m rlmewSN a xs 15 Dan •\ • ID' DvwxvcE 23.,a IS' RcP /" DRIVE ___ p Ix ! RORCMD 15'r.PE-R 14n WALUI I'LL50'
m 1 FAIRBROOKE P.U.D. a esas - - + °
m xe 10 Accass r/ SBS CEO eExD / �.•- •� -- (ProSPEn ROAD s.i 0.) ro aE wxsmucrEc oumxc =wsE ,n
•+ '�" a ul 'S 04 at r50wAm STH RUNG •� '•�rwsEUExr /, - �•• ••�
•\ A. • TABLE A
�.'• ' m °° n •\ T< -7pm I w a I•w r «IAnRIrI
' uur sp�yy� a
a six
DEVELOPED DRAINAGE BASINS \••� - PRWDSEU Rw FUCAN I CULVERT y Ir) ' A) m m AL) r.: I` m ,..I IM) I.. )
SCALE: 1- . 200 R » n r ETA' I \prw ••\• 22 /
ex l sv •'
GFS
SHADED AREAS SUB-BASINSto 1 0E= 22 CFS \\ \ FAIRBROOKE P.U.D. "RH FILING
Dann NW Bm.ai EXILING CROSS -PAN • \ P LI M I N' RY
/ NOT CONST UCTION
Revl B; pnB B Date NORTHERN EN INEERING SERVICES T0)Oct:
943 .oVF'FE82 ate IM
FAIRBROOKE TRACT "A" P.U.D.SCALE: 1.-50• 420 30VTH }p11EB 3[2TE 202, FT. COLLINS, COLORADO 80521 DESIGNER : MBW CHECKED BY: MFJ P �(303) 221-a158 DRAFTSMAN: ACAD PREPARED:01 11 p5 DRAINAGE PLAN