Loading...
HomeMy WebLinkAboutDrainage Reports - 10/16/1997DRAINAGE IIWESTIGATION I 1 A PROPOSED'AAMCO' TRANSMSSION SHOP TO BE LOCATED ON LOT 1% CREGER PLAZA SECOND REPLAT FORT COUPrN COLORADO Prepared for Cottier Construction, Inc. P. O. Bog 1051 Fort Collin., Colorado, 80522 June 1994 (Revised July 1994) Project No. PLA 140.94 PREPARED BY. MESSNER Engineering associates 150 East 29th Street, Suite 225 Loveland, Cobrado 80538 ' . Telephone: (303) 663-2221 Civil and Environmental Engineering Consultants Project No. PIA-140-94 June 3,1994 Revised July 12,1994 Mr. Pete Cottier Cottier Construction, Inc. P.O. Bog 1051 Fort Collins, Colorado 80522 Dear Mr. Cottier, The enclosed report represents the results of the drainage investigation for the proposed "AAMCO Transmission" facility to be located on Lot 10 of the Creger Plaza - 2nd Replat in the City of Fort Collins, Larimer County, Colorado. The report and the related grading and drainage plan have been revised to comply with the City of Fort Collins' Stormwater Utility's staff review comments. This investigation was based upon the proposed site development plan; proposed site grading plan; on -site observations; and available topographic information. The investigation was performed in accordance with the criteria established in the City of Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards" manual. We sincerely appreciate the opportunity to be of service to you. If you should have any questions, please feel free to contact this office. Respectfully Submitted, cee zti Dennis R. Messner, P.E. MESSNER Engineering Associates DRWmkm lly-V Enclosures Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221 -W*)-AXQ ZMYZM_ . Letter of Transmittal Table of Contents Scope Site Description Existing Conditions Proposed Development Erosion Control Measures Conclusions and Recommendations n 1 2 2 3 Vicinity Map Existing Conditions Exhibit Proposed Conditions Exhibit Calculations Drainage Summary n The following report represents the results of a drainage investigation for a proposed "AAMCO" transmission repair shop to be located on a parcel of land situated in the Northeast Quarter of Section 35, Township 7 North, Range 69 West of the Sixth P.M., Larimer County, Colorado. The site description is: Lot 10 of Creger Plaza Second Replat in the City of Fort Collins. The investigation was performed for the project contractor, Cottier Construction, Inc. The purpose of this investigation is to determine the effects of the proposed development on the area's existing drainage conditions and to determine the improvements, if any, and the appropriate sizing for proposed improvements so that it may be incorporated with the construction of the project. The conclusions and recommendations presented in this report are based upon the proposed site development plan; proposed site development construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" manual. The site is rectangular and contains approximately 0.73 acres, including the adjacent South Mason Street right-of-way. The site's East-West dimension, including the westerly half of the Mason Street right-of-way, is approximately 320 feet and its North -South dimension is 100 feet. The site abuts the easterly right-of-way of the Burlington Northern Railroad and the westerly right-of-way of South Mason Street. The site is located on the drainage basin boundary between the FOOTHILLS BASIN and the MAIL CREEK BASIN. Surface run-off from the site will flow southerly along South Mason Street and therefore the site is considered to be in the MAIL CREEK BASIN. The site is presently vacant. The ground surface has been roughly graded and native vegetation is sparse to moderate across the site. The site has been used to dispose of excess excavated material from the nearby construction sites. Due to the dumping of material on the site, a ridge has been created in the middle of the lot. Run-off on the west side of the ridge flows toward the southwest to a drainage course that is situated along the Burlington Northern Railroad. The run-off that is generated on the east side of the ridge flows toward the southeast and into a depression located at the west side of South Mason Street. The "historic" direction that the site slopes is from Northwest to Southeast. The slopes range in rates varying from 0.5% to 5%. The site does receive a minor amount of run-off from the property to the North. The run-off from the north will be retained on the adjacent site after the development of the site has been completed. The run-off generated on the adjacent railroad right-of-way flows southerly along the railroad right-of-way. The existing curb and gutter along the west side of Mason Street is constructed with a grade break located at the center of the common driveway for Lots 10 and 11. The flow in the gutter to the north of this point is northerly toward Horsetooth Road. The flow in the gutter to the south of this point is southerly toward an existing storm drain inlet. The run-off which is directed southerly along the curb and gutter ultimately flows into the Mail Creek Basin outfall system. The proposed development of the site is to consist of constructing a commercial structure to be located on the eastern third of the site. The structure is to contain a total building "foot -print" of 5,060 square feet. A paved parking area is to be provided for 16 vehicles and will be located between the structure and South Mason Street. Access to the site is to be provided through a shared driveway to be located at the northeast corner of the site. The proposed site plan indicates that the western portion of the site is to be used for the storage of vehicles and to provide an emergency access. The western vehicle storage area is to have a paved surface. The current City policies require that the difference between the historic rate of run-off and the developed rate of run-off be detained onsite. The release rate is to be no greater than the 2 Year Storm historic rate. According to the City's Stormwater Utility staff the site has previously been included in a Special Improvement District that established a peak rate of discharge of 0.5 c.f.s. per acre as the controlling factor in determining the size of detention facilities onsite. The City's policies normally require that the adjacent street flows be incorporated with the onsite detention requirements. This policy applies most efficiently when the street construction and onsite detention are developed concurrently. In this instance, it is not physically feasible to combine the two flows since the flow generated on the street would have to be intercepted and directed onto the site at its lowest point. Consideration is being given to the volume of run-off that is generated within the street right-of-way by providing the detention volume onsite for the adjacent portion of South Mason Street. It is intended that this will reduce the net discharge to the area system. Erosion control considerations have been made based upon the short term, activities occurring during construction and the long term, measures considered through the life of the facility. The long term measures incorporated to eliminate erosion are the proposed methods and materials to be used to provide surface treatments for the structure and associated driveways, parking areas, walkways and the landscaped open areas. The landscape materials and plantings in the open areas will provide a combination of living and inert ground covers to deter erosion. The recommended short term erosion control methods to be incorporated with the construction activities are: the placement of a "Gravel Filter' at the proposed inlet; and placing a "Silt Fence" along the southern boundary of the site in order to control and contain mud and debris onsite. The proposed construction site is exempt from providing wind erosion measures since its area is less than one acre. The schedule for construction activities is anticipated to be: August 15 - August 30, perform site grading and access related construction; September 1- January 1, structure construction; November 1- November 20, construct parking and drives, and install landscaping and signage. 2 1. The proposed development will retain the "historic" drainage patterns. 2. The site is located in the MAIL CREEK BASIN. The site is not located within a defined floodway or flood plain. 3. All development is to be performed in accordance with City of Fort Collins criteria. A variance to the City's policies is requested for detention of adjacent street flows due to physical impracticality. 4. Onsite detention of stormwater is required by the City of Fort Collins. The volume of run-off to be detained is estimated to be 5,519 cu. ft. The detention volume has been determined based upon the calculated volume of run-off from a 100 Year Storm with the site considered at the proposed conditions being released at a controlled rate of 0.37 c.f.s. The release rate of 0.37 c.f.s. has been based upon discharging the detained flow at a maximum rate of 0.50 c.f.s. per acre of developed site. 5. The City of Fort Collins Standards for temporary erosion control measures are to be incorporated with the construction activities. 3 No Text No Text 0r-� O U / / OI II�\ II I I � II III r 0 I I / II / \ r I /OHslte Arad 0 13 cc. 49 .2 .07 III / III / I / io ao O 20 40 V - 20' �� I�b \ • d � I � I - — "Karate West" I I I 4F Existing Building I I i 1 1 Q) 1 q.ft 4994 sI I I Existin Lot 77 I I Parking I _ I 'AAMCO Transmla ion" /Onsite Area "A" I Proposed Bui11 ng I 5060 sq.ft. 0.36 cc. \ I Lot to I. L .6 .7 / / I t' / �I Onsite Area "B" I a� 0.30 ac. 11 � .5 .1 / 41 .a Typically Indicates Basin t1mHa J Lot 9 (Vacant) III I cryypplcally Indicates / III Existing Ground Contour 5 o u n P 1n Y 6 N U W C `e b E Q Ny O 'S iV 0 o W g 0 Q c O � C U N `o m O N C ,J a, O c � m U of a z z Uo o2 0q rn z m 0 aV) dam E� z a ZQ m�U za 0E F U o O w� F� A o U 0 a SG '. ♦S NmED DRAWN: M.S.R. SHEET 1 Of 1 1. I I pia ➢ "Karate West" Existing Building I 3 4994 sq.ft. p Lot 11 ➢ - - _---I ➢ ---- -37 ---- -- —� - -➢_ TAsphalt Pavement IVY (Parsingg and Access Drive)—— I 60' / _ A Gate Y e 0.20 oc.� p Jsc- --_ .25 0.9' #1 m b Inlet w} �Orifice iPlate 36.6 5 7 1 I r 1 Plastic �Pipel �. _Gate \ Gate I X n 1 "AAMCO Transmission" Proposed Building d 5060 sq.ft. F.F. =38.00 Lot >O M _ \ 00 28.9 - -rm.._ 0.9 3.4 411411 Pla61sti- 8 0 � Pipe ( Required STD Curb Inlet Filter) c Opening for Vert Curb & Gutter equired Manhole — Install Orifice Plate 0 Outlet Pipe Requf'red- Provide Curb Inlet Filter Until 44'- 15'0RCP Pavement is in Place Lot 9 (Vacant) I Existing 18"0 Inv. -32.4f 1 Proposed 15" 0 Inv.=33.0 Rim =36.6t (Match Fsbt. MnrA. Surface) z I U 0 Y E za 0H o o ao zzO RV O q a 21'. DA so = 20' � in 0 N O �D o4U �� aaz Ul W Typically Indicates Proposed Curb & Gutter ',Z1 w OF OF a + 9.5 Typically Indicates Proposed Finished Surface Spot Elevations U O W ri a C) G F --s'.°- Typically Indicates -Ground Su -ace ontour E -y 37.0--+-- Typically Indicates Proposed Finished Surface Contour O Ja5 U F U a� Typically Indicates Drainage Flow Direction w w p' a ---- Typically Indicates Drainage Basin Limit N ,,,�. ,,",I,,,,,, scus: 1"-20- Concentration Point Identifer DRAWN: Y.S.R. 2 aHECNEO: D.R.Y Area of Basin in Acres Q.46 OC. Pmfec! No. Q1Da-100 Year Runoff Rate PtA-140-94 0.9 3.4 SHEET % -2 Year Runoff Rate of v L �A FA IXh6� dk 64U r I 9WEI 11 Client: Cottier Construction, Inc. By. DRM Project No. PLA-140-94 June 3, 1994 Revised July 12,1994 Calculations for Drainage Investigation for Lot 10 of Creger Plaza - 2nd Replat located in the NE 114 of Section 35, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, Larimer County, Colorado Total On -Site and Off -Site Areas = 0.843 t acres (including South Mason Street right-of-way and BN Railroad Right-of-way) The proposed development of the site is to consist of the construction of a commercial structure together with the associated parking and access drives. The area of the site excluding the railroad right-of-way is: Net Site Area = 31,737 sq.ft. = 0.729 t acres Rational "Coo Factor = 0.20 for Lawns and Landscaped Areas to = 0.95 for Roofs, Decks, Patios, etc. it it = 0.95 for Asphalt and Concrete Streets, Drives, and Parking to of to = 0.50 for Gravel Drive and Parking it 11 = 0.20 for Unimproved and Open Areas of to " = 0.20 for Railroad Right -of -Way "C"avg (Undeveloped) All area considered to be "Unimproved" "C" avg = 0.20 Time of Concentration overland from grade break point onsite to Railroad swale: Time of Concentration across undeveloped area Considered as: Toverland =1.8 (1.1- C) qL + S^1/3 OS=2.8% L=90ft. C=0.20 T=1.8( 1.1-0.20)490f.2.8^1/3=10.9min. Tswale = L(ft.) + [Vel. (ftlsec.) x 60 minJsec.] per Fig. 3-2 0 S = 1.5% & L = 110 ft. Vel. = 1.3 Wsec. T=110+[1.3x601=1.4min. Therefore, Tc =10.9 + 1.4 =12.3 min. USE 10 minutes as Time of Concentration 12 010 min. = 2.50 inJhr. Iwo 0 10min. a 7.25 Whr. Page 1 Client: Cottier Construction, Inc. By: DRM Run-off,Q=CxIxARCif Cf at 2 year Storm =1.0 Project No. PIA-140-94 June 3,1994 Revised July 12, 1994 Cf at 100 Year Storm =1.25 The "Western Area" contains approximately 0.36 acres onsite plus 0.13 acre contributing from the adjacent BN Railroad r-o-w Offsite Area ® Railroad (Does not drain onto site) Onsite Area "A" (Drains onto Railroad) Q2 = 0.20 x 2.50 x 0.13 x 1.00 = 0.07 c.£s. Qioo = 0.20 x 7.25 x 0.13 x 1.25 = 0.24 c.£s. Q2 = 0.20x2.50x0.36x1.00=0.18c.£s. Qioo = 0.20 x 7.25 x 0.36 x 1.25 = 0.65 c.is. The "Eastern Area" contains approximately 0.30 acres that drains toward Mason Street. Onsite Area'B" Q2 = 0.20x2.50x0.30x1.00=0.15c.£s. Qioo = 0.20 x 7.25 x 0.30 x 1.25 = 0.54 cl.& The proposed grading plan is designed to direct run-off to two (2) separate points of concentration. The "Western Area - #1" is to concentrate at an inlet with an orifice control plate that is to be located in the middle of the storage area on the west side of the building. The "Eastern Area - #2" is to concentrate at an inlet that is to be located approximately 50 feet west of the Southeast corner of the parking lot. The flow out of the inlet will be restricted by an orifice plate. The run-off will flow from Inlet #1 to Inlet #2 and then be piped to the 18" RCP City storm drain located in Mason Street. #1- West "C"avg: Lawns and Landscaped Areas Roofs, Decks, Patios, etc. Streets, Drives, and Parking Gravel Drive and Parking Unimproved and Open Area Railroad Right -of -Way Total Area #2 - East "C"avg: Lawns and Landscaped Areas Roofs, Decks, Patios, etc. Streets, Drives, and Parking Gravel Drive and Parking Unimproved and Open Area Railroad Right -of -Way Total Area 0 sq.ft.f 0 sq.ft.f = 7,720 sq.ftt 0 sq.ft.t 1,000 sq.fta = 0 sa.ft.t 8,720 sq.ft.t "Cavg = 0.86 3,850 sq.ft.t 5,060 sq.ft.t = 14,107 sq.ft.t (including Mason St.) 0 sq.ft.t 0 sq.ft.t 0 sg,ft.+ 23,017 sq.fta lice 8vg = 0.82 Page 2 Client: Cottier Construction, Inc. Project No. PIA-140-94 By: DRM June 3, .., Revised July 12, ••, RUN-OFF FROM _ Y Y AT PROPOSED • 11 _ • , _ WffHOUT DETENTION 11 • N Consider that the Time of Concentration to remain as the undeveloped Tc. USE 10 minutes as Time of Concentration 12 0 10 min. = 2.50 inJhr. Iioo 010 min. = 7.25 inJhr. Western Area #1 Q2 = 0.86 x 2.50 x 0.20 x 1.00 = 0.43 c.£s. Qioo =1.00 x 7.25 x 0.20 =1.45 c.fs. (CCf > 1.00 therefore, 1.00 used) Eastern Area #2 Q2 = 0.82 x 2.50 x 0.53 x 1.00 =1.09 c.£s. Qioo =1.00 x 7.25 x 0.53 = 3.84 c.£s. (CCf > 1.00 therefore, 1.00 used) Determine Release Rate ,Q, at 0.50 c.f.s./acre: Qrelease = 0.50 x 0.73 = 0.37 c.f.s. = Maximum rate of Total of flow released. Western Area #1- Q released = 0.20 x 0.50 = 0.10 c.fs. Eastern Area #2 - Q released = Total Site = 0.73 x 0.50 = 0.37 c.£s. The calculations to determine the detention storage volumes for the two separate detention areas are shown on the following pages. Page 3 Client: Cottier Construction, Inc. By: DRM Proj. No.: PLA-140-94 Date: June 3,1994 Rev.July 12,1994 DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD" Detention Volume determination for the Eastern portion of the site. Time (min.) Q100 Prop. (c.f.s.) Vol. ® Q100 (cu.ft.) Q dis. 0 2 Yr. (c.f.s.) Vol. dis. (cu.ft.) Vol. Diff. (cu.ft.) 10 3.94 2,366 0.37 219 29147 15 3.28 2,952 0.37 329 2,624 20 2.86 3,427 0.37 438 2,989 25 2.54 3,807 0.37 548 3,260 30 2.30 4,139 0.37 657 3,482 40 1.96 4,692 0.37 876 3,816 50 1.69 5,070 0.37 1,095 3,975 60 1.48 5,321 0.37 1,314 41007 70 1.32 5,540 0.37 1,533 49,007 80 1.19 5,695 0.37 11752 3,943 90 1.08 5,835 0.37 1,971 3,864 100 1.00 6,006 0.37 29190 3,816 110 0.92 6,082 0.37 2,409 3,673 120 0.87 1 6,253 0.37 2,628 3,625 Q = CIACf QRelease = 0.5 x Area = 0.5 x 0.73 = 0.37 c.f.s. At Q100 Proposed =1.00 x I x 0.53 = 0.53 x I Therefore, a minimum of 4,007 cu. ft. of Detention Storage Volume is desired for the Eastern portion of the site that is to discharge to the existing storm drain. Note that the Q inflow is considered for the area oonoentrating at the Eastern Inlet but that the discharge rate is that determined for the entire site since the western Area is being released at a controlled rate thru the Eastern Inlet. Page 4 Client: Cottier Construction, Inc. By: DRM Proj. No.: PIA-140-94 Date: June 3,1994 Rev. July 12,1994 DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD" Detention Volume determination for the Western portion of the site. Time (min.) Q100 Prop. (c.f.s.) Vol. ® Q100 (cu.ft.) Q dis. ® 2 Yr. (c.f.s.) Vol. dis. (cu.ft.) Vol. Diff. (cu.ft.) 10 1.45 870 0.10 60 810 15 1.20 1,080 0.10 90 990 20 1.04 1,248 0.10 120 1,128 25 0.92 1,380 0.10 150 1,230 30 0.83 11494 0.10 180 1,314 40 0.70 1680 0.10 240 1440 50 0.60 1,800 0.10 300 1,500 60 0.52 1,872 0.10 360 1512 70 0.46 1,932 0.10 420 1,512 80 0.41 1,968 0.10 480 1,488 90 0.37 1,998 0.10 540 1,458 100 0.34 2 040 0.10 600 1440 110 0.31 2,046 0.10 660 1,386 120 0.29 1 2,088 1 0.10 1 720 1 1,368 Q = CIACf QRelease = 0.5 x Area = 0.5 x 0.20 = 0.10 c.f.s. At Q100 Proposed =1.00 x I x 0.20 = 0.20 x I Therefore, a minimum of 1,512 cu. ft. of Detention Storage Volume is desired for the Western portion of the site. Page 5 Client: Cottier Construction, Inc. Proj. No.: PLA-140-94 By: DRM Date: June 3,1994 Rev. July 12,199z. DETENTION VOLUME CHECK OF PROPOSED DETENTION IN PARKNG LOT (EASTERN AREA #2) Elevation Area ( .Ft.) Avg. Area (S .Ft.) Elevation Diff. (Ft.) Volume (Cu.Ft.) Sum of Volume (Cu.Ft.) (Outlet) 35.50 25 275 0.5 138 138 36.00 525 1,253 0.25 313 451 36.25 1,980 2 660 0.25 665 1,116 36.50 3,340 4,508 0.25 1,127 2,243 36.75 5,675 6,625 0.25 1,656 3,899 37.00 71575 3,899 - 4,007 Therefore, sufficient volume is available in the ponded parking lot area at a depth of 1.5 feet with High Water Elevation ® 37.0 DETENTION VOLUME CHECK OF PROPOSED DETENTION IN PARKING LOT (WESTERN AREA #1) Elevation Area ( .Ft.) Avg. Area (S .Ft.) Elevation Diff. (Ft.) Volume (Cu.Ft.) Sum of Volume (Cu.Ft.) (Outlet) 35.75 50 440 0.25 110 110 36.00 830 1,720 0.25 430 540 36.25 2,610 3,930 0.25 983 11523 36.50 5,250 1,523 -1,512 Therefore, sufficient volume is available in the ponded storage area at a depth of 0.75 feet with High Water Elevation ® 36.5 Page 6 Client: Cottier Construction, Inc. By. DRM Project No. PIA-140-94 June 3,1994 Revised July 12,1994 Calculations to determine orifice opening size to control the rate of outflow from the two detention areas: Orifice Equation, Q = CA42gh A = Q + C42gh At East Area #2 Q = 0.37 c.f.s. (See Page 3) h = 37.0 - 33.9 = 3.1 ft. Coefficient "C" = 0.65 g = 32.2 ftJsec.^2 A = 0.37 + [0.65 x A 2 x 32.2 x 3.1)] = 0.040sq. ft. A=w*2 w=CIA w = 40.040 = 0.2 ft. = 2.4 inches Therefore, Use 2-3/8" x 2-3/8" as Maximum Orifice Opening At West Area #1 Q = 0.10 h=36.5-34.75=1.75 A=0.10+[0.65x4(2x32.2x1.75)]=0.014 A=40.014 w = 0.12 ft. = 1.4 inches Therefore, Use 1.3/8" x 1.3✓8" as Maximum Orifice Opening A = n Rad.^2 Rad. = 4A/x = 40.014/x = 0.07 ft. Rad. = 0.80 inches Diameter = 1-1/2 inches Use 1-1/2" dia. pipe as orifice as alternate to square orifice plate. Page 7 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: Lot 10 Creger Plaza second Replat STANDARD FORM A COMPLETED BY: Dennis Messner, Messner Engr. Assoc. DATE: June 3, 1994 DEVELOPED ERODIBILI Y Asb Lsb Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) ($) (feet) M M Moderate 0.66 150 2.25 79.5 MARCH 1991 8.14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: :__Lot .10 Creger Plaza Second Replat STANDARD FORM B COMPLETED BY: Dennis Messner, Messner Engr. Assoc. DATE: June 3, 1994 Erosion Control C-Factor P-Factor Method Value Value Cominent Bare Soil 1.00 1.00 Graded Lot Building Foundation 0.01 1.00 Silt Fence 1.00 0.50 Inlet filter 1.00 0.80 MAJOR PS SUB AREA BASIN (t) BASIN (AC) CALCULATIONS 79.5 0.66 Bare Soil = 0.54 ac. Building = 0.12 ac. Wtd. "C" - Factor = [(0.54 x 1.00) + (0.12 x 0.01) =0.82 Wtd. "P" -'Factor = 1.Oxl.OxO.5xO.8 = 0.40 Eff. _ [1 - (0.,82 x 0.40)] x 100 = 67.2 > 79.5 OK MARCH 1991 8.15 DESIGN CRITERIA CONSTRUCTION SEQUENCE PROJECT: Lot j 0 CrPPA p1A7A SP41and RPplat STANDARD FORM C SEQUENCE FOR 19 94 ONLY COMPLETED BY: Dennis Messner DATE: June 3, 1994 V. Indicate.. by use of a bar line- or e e �6 s ailed0 74/ ��(" y symbols when erosion control measures wi 1 be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 1 1114 MONTH Aug. Sept Oct.l Nova Dec. OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURALs Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other (Foundation) VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettinge/Mate/Blankets Other NOT APPLICABLE STRUCTURESs INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON MARCH 1991 8.16 DESIGN CRITERIA STORMWATER DETENTION SUMMARY SITE DRAINS TO MAIL CREEK BASIN GROSS SITE AREA = 31,737 SO.FT. = 0.73 ACRES t NET SITE AREA EXCLUDING SOUTH MASON STREET R-O-W - 28,724 SOFT. - 0.66 ACRES t HISTORIC "C" = 0.20 DEVELOPED "C" = 0.82 CRITERIA BASED DETENTION VOLUME - 5,519 cU.ft. PLAN DETENTION VOLUME - 5,422 cu.ft. MAXIMUM DEPTH OF DETAINED WATER =1.2 ft. PEAK DISCHARGE, O = 0.33tc.f.s. June 3,1994 Project No. PIA-140-94 Mr. Glen D. Schlueter Stormwater Utility City of Fort Collins 235 Mathews P. O. Bog 580 Fort Collins, Colorado 80522 - 0580 Re: Lot 10 Creger Plaza - 2nd Replat, Fort Collins, Colorado Dear Mr. Schlueter, The subject project's estimated erosion control security amount has been determined to be the minimum amount required by the City of Fort Collins. Therefore, the amount of $1,000.00 should be included for the erosion control guarantee along with any other surety requirements that are to be a part of the City's "Developers Agreement." If you should have any questions or desire additional information, please feel free to contact this office. Respectfully Submitted, MESSNER Engineering Associates Dennis R. Messner, P.E. DRM/mkm cc: Mr. Pete Cottier, Cottier Construction, Inc. Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 - Telephone: (303) 663-2221