HomeMy WebLinkAboutDrainage Reports - 08/03/2001� l,� ' TT of anal A r��jld Rap ' ..�,1.1-.- Filrc'..�, +� Date a of FINAL DRAINAGE, EROSION CONTROL, AND WATER QUALITY REPORT FOR SETTLER'S GREEN PROJECT DEVELOPMENT PLAN :� Re -plat of Lots 8-15 and Tract 1, Rigden Farm Filing 1, a Part of Section 29, Township 7 North, Range 68 West of the 6"' P.M., City of Fort Collins, County of Larimer, State of Colorado by ADVANCED PROFESSIONAL ENGINEERING INC. P.O. Box 1391 Fort Collins, CO 80522 Phone(970)-484-0533 Fax(970)-484-5086 March 26, 2001 Project # 68-7N-29-3 ' ADVANCED PROFESSIONAL ENGINEERING INC. ' Registered Professional Engineers in Colorado, Arizona, New Mexico & Wyoming P.O. Box 1391, 212 West Magnolia Street, Fort Collins, CO 80522-1391 IAffffl - Phone 970-484-0533 Fax 970-484-5086 E-mail: apeinc@frii.com Web Site: advancedpe.com March 26, 2001 1 Glen D. Schleuter, Storm Drainage Division ' City of Fort Collins Utilities Department 700 Wood Street Fort Collins, Colorado, 80521 RE: DRAINAGE, EROSION CONTROL & WATER QUALITY REPORT FOR ' SETTLER'S GREEN PROJECT DEVELOPMENT PLAN Dear Glen, Enclosed is the report for the subject development. The hydrology data and hydraulics analysis ' presented here meet the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, dated April 29, 1997. t The original drainage report for Rigden Farm Filing lwas performed by Amber Reed, JR Engineefring, LTD., on May 30, 1999, and this site is covered by that report. The Master Plan study for Rigden Farm is the "Foothills Basin (Basin G) Master Drainage Plan" by Resource ' Consultants, Inc., 1981, and lies within Reach 2 of the Foothills Basin. Other drainage reports were used by Ms. Reed, as stated in his report. ' The major portion of the site, called Tract I, was originally assumed to become 100% multifamily development in the JR Engineering report. The site was composed of sub -basins 116b and 116c ' and a portion of sub -basin 117a (see site map attached). The original site was calculated to have an overall imperviousness of 68%. The new development, which is primarily single family with a park area, has an overall imperviousness less than 68%. Therefore, the new site development ' would have a calculated runoff less than that calculated in the original drainage study. Therefore, no detention and no additional water quality facilities are required by this development. Also, ' GIS-GPS & MAPPING SERVICES -LAND DEVELOPMENT IN URBAN PLANNING -GROUND WATER MODELING LANDSCAPE ARCF&MCTURE-FOUNDATION DESIGN & INSPECTIONS -STRUCTURAL DESIGN -EROSION CONTROL ' DRAINAGE & GRADING DESIGN -ENVIRONMENTAL -CONSTRUCTED WETLAND & SEPrIC SYSTEM DESIGN ' 3 ' water quality was addressed in the original report, and is handled by facilities already constructed. ' Some changes in the flow direction will be necessary with this project, and is discussed here. Backup calculations are enclosed, to include a reiteration of the erosion control measures to be followed by the developer of this project. ' If you have any questions or need further information please feel free to call me at 970-484-0533. Sincerely, David J. Sneesby Professional Engineer Colorado Reg. P.E. 30067 3 a TABLE OF CONTENTS Title COVER SHEET LETTER OF TRANSMITTAL TABLE OF CONTENTS LOCATION MAP INTRODUCTION SITE LOCATION AND CONDITIONS TABLE 1: REVISED 2-YR STORM CONDITIONS GROUNDWATER ORIGINAL DRAINAGE BASIN MAP NEW DRAINAGE BASIN MAP PROPOSED CONSTRUCTION PROPOSED DEVELOPMENT DRAINAGE CONDITIONS TABLE 2: NEW C FACTORS (IMPERVIOUSNESS) TABLE 3: PEAK RUNOFF: DEVELOPED CONDITIONS DRAINAGE FACILITIES EROSION CONTROL STANDARD FORMS FOR EROSION CONTROL (3) TABLE 4: EROSION CONTROL COST ESTIMATE WATER QUALITY CONCLUSION ATTACHMENTS: A. FLOWMASTER WORKSHEETS FOR FACILITIES B. GRATE INLET CAPACITY DATA SHEET 4 Page 1 2 4 6 7 7 8 8 9 10 10 11 11 13 14 16 18 21 22 22 93 ' C. STREET CROSS-SECTION CAPACITY DATA SHEET D. PIPE SUMMARY TABLES FROM RIGDEN FARM DR. STUDY ' E. DATA SUMMARIES FROM RIGDEN FARM DR. STUDY F. DESCRIPTION OF NEW AREA DRAIN GRATE G. ENGINEER'S CALCULATIONS 5 L. Ct Stan I id Dr xdt 0gpMy Ct Ct Or st &a,, Ct a Sao,b ar o" Or Ck CMQWwd god. Yucca V3 Ct ct @ shar, a Crv" e LAKE SHERWOOD is Bmtf&d ct w Wtfrd Lp Cabuldo •tch akbm ackjou Dr �Ct aim Ct" < 0 Darchostai C "Ct =..—Mqtc-t ptar R' quo-pt r 2 ea XatNYYt 32 Ai 0 Df LU ry w M a LOCATION MAP L !� DRAKE ROAI lotsIM =I Iowa Site 5: rL r- HORSETOOTH ROAY pn, Rana F MOM Rd ft 7X�ad %Wtow Pi kd A Mean IN w RIVER 10 I N INTRODUCTION This drainage report provides hydrology analysis using City of Fort Collins rainfall data and hydraulic investigation to decide the method to drain the storm water from the property to storm drainage facilities. The project is located in Section 29, Township 7 North, Range 68 West of the 6`h P.M., City of Fort Collins, Larimer County, Colorado. The site lies east of Rigden Parkway between Des Moines Drive and Custer Drive. The drainage report is prepared and compiled from the following references: 1- Volume 3, Urban Storm Drainage Criteria Manual; Urban Drainage and Flood Control District; Denver, Colorado 2- City of Fort Collins Storm Drainage Design Criteria and Construction Standards 3- Topographic map prepared by Frederick Land Surveying, Loveland, Colorado. 4- Soils and Geotechnical Report by Earth Engineering Consultants, Fort Collins. 5- Drainage Study for Rigden Farm Filing One P.D.P, May 1999, by JR Engineering, Fort Collins This drainage report will present and discuss how this project relates to the approved Rigden Faun Filing 1 Drainage Study. That development was a combination of single-family residential lots and large tracts to be sold to developers for complete development. Tract I, which is the majority of this project, was assumed by the original drainage study to be multi -family; however, only three multifamily buildings are proposed now, with most of the new lots to be single-family with studio -homes constructed above separated garages. SITE LOCATION AND CONDITIONS The site is located at the northeast corner of Rigden Parkway and Custer Drive. The surrounding streets are totally developed, and utilities have been run to the eight single-family lots previously platted. The project site is 4.54 acres, and the drainage area is 4.85 acres. See the attached General Location and Existing Drainage map on the previous pages. The soils are lean clay and sand, and alluvial sand with gravel where significant cutting of the grades was done. Drainage is primarily toward the east -north-east, except at the southern 1/5th of the site, which drains east -south-east. See the original drainage report for detention, treatment, and ultimate discharge details. 7 8 Table 1 REVISED* 2-YEAR STORM CONDITIONS (PREDEVELOPMENT) Basin Area Length Tc 1(2) for Tc Sub -basin C (acres) (ft) (undev.) (in/hr) Q (2) T1 0.25 1.76 430 24.5 1.43 0.63 T2 0.25 0.94 290 22.5 1.51 0.35 R1 0.25 0.59 357 34 1.19 0.18 C1 0.25 0.19 180 19.5 1.63 0.08 C2 0.25 0.62 285 20 1.61 0.25 C3 0.25 0.75 285 19 1.65 0.31 Total 4.85 1.80 *Originally art of Ri den Farm #1 GROUNDWATER In July 1997, extensive groundwater and groundwater pollutant studies were done by Stewart Environmental Consultants for the CSU Research Foundation. Groundwater was found at elevation 4907 in the area of this project on that date. On September 30 of the same year, groundwater was found at elevation 4905 east of this site by Terracon during a Geotechnical investigation for Rigden Farm Filing One. However, during utility trenching in August and September, 2000, no groundwater was found as low as elevation 4895 just east of Settler's Green. During construction of Rigden Farm, the project manager had no groundwater problems, and it was assumed that the groundwater discovered in 1997 was a perched lens related to agricultural irrigation infiltration; and that the extensive utility trenching had drained this perched groundwater. 8 8 Table 1 REVISED' 2-YEAR STORM CONDITIONS (PREDEVELOPMENT) Sub -basin C Area Basin Tc 1(2) for Tc Q (2) (acres) Length (undev.) (in/hr) (ft) T1 0.25 1.76 430 24.5 1.43 0.63 T2 0.25 1.05 290 22.5 1.51 0.40 R1 0.25 0.48 357 34 1.19 0.14 C1 0.25 0.19 180 19.5 1.63 0.08 C2 0.25 0.62 285 20 1.61 0.25 C3 0.25 0.75 285 19 1.65 0.31 Total 4.85 1.80 *Originally part of Rigden Farm #1 GROUNDWATER In July 1997, extensive groundwater and groundwater pollutant studies were done by Stewart Environmental Consultants for the CSU Research Foundation. Groundwater was found at elevation 4907 in the area of this project on that date. On September 30 of the same year, groundwater was found at elevation 4905 east of this site by Terracon during a Geotechnical investigation for Rigden Farm Filing One. However, during utility trenching in August and September, 2000, no groundwater was found as low as elevation 4895 just east of Settler's Green. During construction of Rigden Farm, the project manager had no groundwater problems, and it was assumed that the groundwater discovered in 1997 was a perched lens related to agricultural irrigation infiltration; and that the extensive utility trenching had drained this perched groundwater. 8 No Text NEW DRAINAGE BASINS iA 11 PROPOSED CONSTRUCTION The proposed construction will be traditional residential single-family and condominium -style multifamily housing. Utilities are installed to the site. Imperviousness will be reduced from that assumed in the original drainage study for Rigden Farm Filing One. Therefore, no detention basins are anticipated. A catch basin has been installed for drainage from Tract I, and will be used for approximately 20 per cent of the total storm water drainage. This project will use all existing development and utility service lines, and will add a narrow street and alleys in conformance with the new Fort Collins "Narrow Street and Alley Standard." A five-plex is planned at the Corner of Rigden Parkway and Custer Drive. The direction of runoff flow has been changed from the original drainage study, and this report will show that the drainage facilities installed by the developer of Rigden Farm Filing One are adequate to handle these changes. PROPOSED DEVELOPMENT DRAINAGE CONDITIONS The C factor in the Rational Formula, which is the degree of imperviousness, is reduced by this project in relation to the original drainage study. This is due to a change from heavily multifamily to single-family lots. Following is the results of the new C factor calculations: Table 2 NEW C FACTORS C 0.95 0.95 0.1 0.15 Sub- Area Basin Roof Concrete/Asphalt Parkland Lawns Comp - basin (acres) Length Area Area Area osite C (ft) factor T1 1.76 450 0.389 0.405 0.041 1.025 0.52 T2 1.05 375 0.157 0.24 0.184 0.465 0.44 R1 0.48 216 0.151 0.19 0 0.139 0.72 C1 0.19 172 0.09 0.06 0 0.04 0.78 C2 0.62 322 0.118 0.386 0 0.116 0.80 C3 0.75 487 0.245 0.257 0 0.247 0.69 Total 4.85 11 12 2-YEAR STORM (DEVELOPED CONDITIONS) Table 3 shows the two-year storm rainfall intensities and discharges, given the above C-factors. The only drainage off the property that does not immediately drain to underground storm drains is from basins Cl, C2, and C3. Drainage to Custer flows within the roadway to a curb drain at Chase Drive and Custer Drive. The revised drainage basins results in a discharge from Settler's Green onto Custer Drive of 2.35 cfs. This corresponds to a runoff to Custer Drive from the original Rigden Farm drainage study of 1.53 cfs (the proportional share of DB-117a in the original study). Therefore, the net increase from Settler's Green is 2.35-1.53=0.81 cfs. The original 2-year flow to be carried by the north side of Custer Drive was 5.49 cfs (see the 2- year Rational Method Peak Runoff chart from the Rigden Farm Study, attached). The revised 2- year flow is 5.49+0.81=6.30 cfs. Using "UDINLET" software, the capacity of Custer Drive above the catch hasin at ('.hale Drive, is 6.62 cfs when a 10' driving lane is -free of storm flow (see the UDINLET analysis for a minor storm in the appendix). 100-YEAR STORM (DEVELOPED CONDITIONS) The new subdivision" narrow street" named Sitting Bull Way and the southwest alley will drain the storm water toward Rigden Parkway and Custer Drive, instead of toward the area drain and Des Moines Drive, as proposed in the Rigden Farm Filing One drainage study. Drainage to Rigden Parkway flows north to an existing catch basin at DP-r2. From there the flow is to Water Quality Pond 218 and then to the regional channel at the south end of Rigden Parkway The proposed 100-year flow toward the underground drainage system in Topeka Lane is reduced from 37.4 cfs as proposed by the Rigden Farm development to 10.58 cfs with Settler's Green (see Table RF-1, attached). To determine the difference in 100-year runoff from the Settler's Green development and the Rigdon Farm calculation, the following calculation was performed using 7R Engineering's C factor (CCf = 0.93) on the original contributing area (part of DB 117a): Q=CIA, where the area is 0.78 acres, the original contributing area up to Design Point c3. Using a minimum 5 minutes for the time of concentration, Q = (0.93) x (9.95"/hr) x (0.78 acres) = 7 23 cfc Difference in runoff = 12.64 cfs (Settler's Green) — 7.23 cfs = 5 41 cfs Table 3 on the following page shows the changes to the original drainage study for Rigden Farm Filing One. 12 t36 n n aAaQ aA U y m z�z d� y ev zw u u � u a ^od o r ao �ry voi °� e�en e e-i nhh � � N 0 8 � U Q fe n �i en ti vi vi 14 b OO R ^ ap m OD 0 wi r 0 0 0 0 0 e m G ot C N V b aa a r OOa � N N aMD r a n O N 0' T N p� A OR N N h b er7 f� N N N N `D w a � u u o F 0 N oa C V a N O S U N R V3 ti b T+ Q7 ' 7 co y = v N O o C cmN _ R N t T C _ N M N U) e n e o C U C F�" N N M^ N O M \f f7 f7 0 R8. cn H a d =� U N y en r n en oe v oo roo o c o0NO000 Q 0 0 O O O w J u 4 yyG, O m a r h CPI e N en gyp 'op N (1(7 O o C }VJ + PA U V } .o y (� 9 N N t� W W O C) W e0 w O N e N Vf H 14 Design Point 16b The net decrease in flow to the underground drainage system at Topeka Drive is = 22.63 cfs. Table 3 shows the original and proposed capacities of the drainage facilities serving Settler' s Green. As long as the net increase in flow is smaller than the available napn(ity the existing facilities are adequate to handle the Settler's Green changes. Design Point r2 Rigden Farm's Design Point 12 for the 100-year storm is a 24" RCP with an available capacity of 5.98 cfs (see Pipe Summary Table B) , so the 4.57 cfs additional flow is handled. The inlet is in a sump condition, and is more than adequate. The original flow to this inlet is 6.3 cfs (see Table RF-2); the new flow with Settler's Green flow is 10.9 cfs, and the capacity of the inlet is 37.0 cfs (see Attachment I-2). RF Design Point 11 flows to a 42" RCP with an available capacity of 7.35 cfs, so the 4.57 cfs additional flow is handled. Downstream of the 42" RCP is Storm Manhole 6 and a 42' RCP, with an available capacity of 6.81 cfs before the flow reaches Pond 218. See the attached Pipe Summary Table from the Rigden Farm Drainage Study. Design Point 0 For the additional flow on Custer Drive of 5.41 cfs, the design flow at the triple curb inlet at Custer and Chase is increased from 23.9 cfs to 29.31 cfs. Using the same clogging factors as used in the Rigden Farm Drainage Study, the curb inlet will take an increase from 14.00 cfs to 15.95 cfs, leaving 13.36 cfs as the new carry-over to Custer Drive below the curb inlet. A computer Street Capacity Analysis was performed (attached) on the total 53.51 cfs (48.1 cfs in the Rigden report plus 5.41 cfs) to Design Point 17; this analysis shows the depth of flow to be 6-1/2" deep in Custer east of Chase Drive. This is less than the 18" above the gutter that is the major storm depth allowed. See Table RF-1, attached, from the Rigden Study and Attachment S-2. The above is conservative since a 50% reduction factor was applied to the curb inlet/catch basin. Attachment S-1 shows the minor storm depth of flow to be less than 6" deep. The 21" pipe below the curb inlet at Chase and Custer has a capacity of 24.17 cfs, which flows to RF Phase II, where the inlet capacity is only 15.95 cfs. DRAINAGE FACILITIES Cross pans Drainage from the alleys and Sitting Bull Way go to Rigden Parkway and Custer Drive. Standard City 6'-wide cross -pans will be used to match the original Rigden Parkway engineering plans. 14 ' 15 ' Replacement of Existing Area Inlet in East Alley ' The existing inlet is a typical 3'x 3-1/2' area grate which is unsuitable for pedestrian or bicycle traffic, and will be replaced with an HS-20 street grate. See the drainage plan and details sheet. The existing box will be modified to carry a highway/pedestrian grate. The 10-year flow of the new sub -basin 16c is: ' Iio= 6.2"/hr with tc = 16.4 minutes A = 1.05 ac CCf = 0.56 ' Therefore, Qio = CIA = 3.66 cfs. A large grate which is safe for bicycles must be selected to handle 3.66 cfs. ' A Neenah R-1879-139G iron Catch Basin Grate was selected for the area drain. ' Using the orifice equation, Q=.61 A(2gh)'/2 where h is the head to the top of the overflow (curb) of .28', Q= 8.15 cfs. Using the weir equation, Q= 3.3P(h)1/2 where P = the grate perimeter of 11.6' ' Q= 5.8 cfs. These calculations give the inlet capacity of the selected grate. Using the lower figure, 5.8 cfs>3.66 cfs (1.6 safety factor). ' If the drain becomes blocked by debris, the flow will be over a curb -cut and down the common area to the large catch basin on the west side of Des Moines Drive. A swale one foot deep will be graded and landscaped with a walkway, cobbles, and grass. The one -foot deep V-ditch Swale, ' with 10:1 side -slopes, will carry the 100-year storm water at a depth of 5". See the attached Flowmaster calculation entitled " 100-yr flow depth if area drain plugged." No property will be flooded if the drain becomes blocked. See also the Landscaping Plan and Drainage Details for the swale details. ' Private Sidewalk Drain To transfer the storm water in the upper part of the common area to across the sidewalk in the ' upper common area park, an 8" ADS Nyloplast drain basin and a 6"PVC pipe was selected. Using a 1% slope across the sidewalk, a 6" pipe will drain 0.62 cfs. The 100-year flow is: 15 ' 16 ' Given the Area = 5,000 sf, or 0.11 acres I = 9.95"/hr for Tc of 5 minutes ' C= 0.1 Therefore, the actual Q = CIA = 0.1*9.95*0.11 = 0.11 cfs, so the sidewalk drain is more than ' adequate. The Flowmaster worksheet showing the capacity of the drain is included in the appendix. II EROSION CONTROL ' Rigden Farm development is a combination of single-family residential lots and large tracts to be sold to developers for complete development. Tract I, which is the majority of this project, was assumed by the original drainage study to be multi -family; however, only three multifamily ' buildings are proposed now, with most of the new lots to be single-family with studio -homes constructed above separated garages. This erosion control report covers Tract I and Lots 8-15, Rigden Farm, I" Filing, which is also called Settler's Green at Rigden Farm. Settler's Green ' drainage plan and basin layout has changed from the original Rigden Farm plans. Table #2 shows Rigden Farm and Settler's Green old and new basin layout respectively. ' Total area of Settler's Green Subdivision is 4.54 acres. Settler's Green is surrounded by Rigden Parkway, Custer Drive and Des Moines paved streets. There are 7 existing trees, and 3 of them will be saved (see Landscape Plan). Three existing dwellings and a small garage will be removed. t Erosion control means presented here will discuss wind and rainfall erosion during construction and after construction. The wind and rainfall credibility zone for the site is moderate. ' a- During Construction Erosion will be controlled on site by using silt fencing, inlet filters, straw bale barriers and ' gravel construction access. Over 2 acres must be mulched (with seed) to replace the mulching and seeding previously done by the Rigden Farm developers, since significant re- grading is required with this development ' b- After Construction ' Erosion will be controlled permanently after the construction period by means of vegetation consisting of tress, grass, bushes and shrubs. ' Standard Forms A, B, C and a cost estimate are enclosed. Erosion control effectiveness calculations and cost estimate are presented in these forms. The critical time for erosion and ' sedimentation is during construction of the development itself. Wind and rainfall erosion will be contained by silt fences on the south and east sides of the development. Prior to construction the 16 17 developer will have the contractor (per plans) place straw bales where storm drainage would collect; the straw will filter the storm water before exiting the development. Since primary construction access will be on the north, silt fencing will run across proposed access roads until the roads are constructed; after roads are constructed, straw bale filters will be put at the flow lines of the new streets. The BMP"s in the original drainage plan will be followed by this project (see attached measures at the end of this report). Also see the erosion control details on the drainage plan sheet. 17 ' tv ' RAINFALL PERFORMANCE STANDARD EVALUATION STANDARD FORM A PROJECT: Settlers Green COMPLETED BY: DATE: 12/4/00 DEVELOPED ERODIBILTY Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE (ac) (ft) N (feet) N M T1 Moderate 1.76 440 2.67 T2 Moderate 0.94 342 1.87 R1 Moderate 0.59 395 1.39 C1 Moderate 0.19 210 1.74 C2 Moderate 0.62 360 2.95 C3 IModerate 0.75 285 2.26 4.85 372.33 2.30 80.68 From Table 8-A HDI/SF-B:1989 EFFECTIVENESS CALCULATIONS r 1 STANDARD FORM B PROJECT: Settlers Green COMPLETED BY DJS APEInc. DATE: March 26, '01 Erosion Control C-Factor P-Factor Method Value Value Comment Bare Soil 1 1 smooth condition Roughened Ground 1 1 Roads /Walks 0.01 1 Gravel 1 0.8 Silt Fence 1 0.5 Straw Mulch 0.06 1 Temporary Vegetation 0.45 1 Straw Barriers 1 0.8 EFF = (1-C*P)*100 MAJOR PS SUB AREA BASIN (%) BASIN (Ac) CALCULATIONS A 82.1 T1 1.76 Roads/Walks 0.405 Ac. Straw Mulch 1 Ac. Temp. Vegetation 0.3 Ac. Net C-Factor-[(0.01x0.405)+(0.06x1)+(.45x0.35)]/1.76 = 0.09 Net P-Factor=[(1.Ox0.405)+(1.Ox1.0)+(1x0.35)]/1.76 = 1 1.00 EFF = (1-C*P)*100 91.0% T2 0.94 Roads/Walks 0.2 Ac. Straw Mulch 0.4 Bare Soil 0.1 Ac. Temp. Vegetation 0.24 Ac. Net C-Factor=[(0.01x0.20)+(0.06x0.4)+(1.Ox0.1)+(.45x.24)]/I 0.25 Net P-Factor = 1.00 EFF = (1-C*P)*100 75.1% R1 0.59 Roads/Walks 0.22 Ac. Straw Mulch 0.18 Ac. Temp. Vegetation 0.19 Ac. NetC-Factor=[(0.01*0.22)+(0.06*0.18)+(.45*0.19)]/0.59= 0.17 Net P-Factor-1 1.00 EFF = (1-C*P)*100 83.3% C1 0.19 Roads/Walks 0.06 Ac. Straw Mulch 0.13 Ac. Net C-Factor=[(0.01x0.06)+(0.06x0.13)/0.19= 0.04 Net P-Factor-[(1.0x0.12)+(1.0x0.11)+(0.8x0.01)]/0.24= 1.00 EFF = (1-C*P)*100 96.0% C2 0.62 Roads/Walks 0.386 Ac. Straw Mulch 0.15 Ac. Temp. Vegetation 0.08 Ac. Net C-Factor=[(0.01x0.386)+(0.06x0.15)+(.45x0.08)]/0.62= 0.08 Net P-Factor=l 1.00 EFF = (1-C*P)*100 92.0% C3 0.75 Roads/Walks 0.257 Ac. Straw Mulch 0.3 Ac. Temp. Vegetation 0.19 Ac. Net C-Factor =[(0.01 x0.257)+(0.06x0.3)+(0.45x0.1 9)]/0.75= 0.14 Net P-Factor-1 1.00 EFF = (1-C*P)*100 86.0% Total area = 4.85 Ac. Total EFF = 86.5% Required PS = 80.68% Since 86.5% > 80.68%, then the proposed plan is O.K. Zo CONSTRUCTION SEQUENCE STANDARD FORM C PROJECT: Settler's Green ' SEQUENCE FOR 2001 COMPLETED BY: DJS@APEInc. DATE 12/12/00 Indicate by use of a bar line or symbols when erosion control measure will be installed. Major modifications ' to an approval schedule may require resubmitting a new schedule for approval by the City Engineer 2001 Month J F M 1A IM IJ IJ 1A IS 10 1 N ID 'Demolition Grading Wind Erosion Control: Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other 'Rainfall Erosion Control Structural: Sediment Trap/Basin 'Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing ' Asphalt/Concrete Paving Other ' Vegetative Permanent Seed After homes are built Planning Mulching/ Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other Home Construction ' STRUCTURES INSTALLED BY: TBD MAINTAINED BY: TBD 'VEGETATION/MULCHING CONTRACTOR: TO BE DETERMINED BY BID DATE SUBMITTED 03/26/01 APPROVED BY CITY OF FORT COLLINS ON: ZI 1 1 1 1 1 1 1 Table#4 SETTLER'S GREEN @ RIGDEN FARM EROSION CONTROL COST ESTIMATE Erosion Cnntrnl Measures Item Description Units Unit Cost Quantity Total cost 1 Silt Fence LF $3.00 1200 $ 3,600.00 2 Gravel Construction Access Each $600.00 1 $ 600.00 3 Inlet Protection Each $250.00 1 $ 260.00 4 Straw Bales LF $3.25 80 $ 260.00 5 Seeded/Mulch lAc. 1$615.00 1 2.12 $1,303.80 Total $5,913.80 Note: Temporary vegetation (shown on previous page) exists on portion of development previously done by Rigden Farm Filing One developer. :ity Reseeding Cost for Total Site Area tern IDescriptidn jUnits jUnitCostjQuantity IToal cost 1 Seed/Mulch Ac. $ 615.00 4.54 $2,792.1( IREQUIRED EROSION CONTROL SECURITY DEPOSIT WITH 1.5 FACTOR $8.870.70 1 22 WATER QUALITY Water quality was addressed and constructed in the Rigden Farm Filing One drainage study and development (see introductory letter). CONCLUSION The findings and recommendations of this report have been obtained according to the documents listed in this report and accepted common engineering practices. No other warranty is given or implied. e 22 23 ATTACHMENT A: FLOWMASTER WORKSHEETS FOR FACILITIES 23 Worksheet ' Worksheet for Triangular Channel Project Description ' Project File c:\fmw\set-gm.fm2 Worksheet Depth of Flow at Upper Swale Flow Element Triangular Channel ' Method Manning's Formula Solve For Channel Depth tInput Data Mannings Coefficient 0.060 ' Channel Slope 0.062500 ft/ft Left Side Slope 10.00, H : V Right Side Slope 10.00 H : V Discharge 0.62 ft3/s �� 41 X 1's) Results ' Depth 0.21 ft Flow Area 0.45 ftz Wetted Perimeter 4.26 ft ' Top Width 4.24 ft Critical Depth 0.19 ft Critical Slope 0.115996 ft/ft Velocity 1.38 ft/s Velocity Head 0.03 ft Specific Energy 0.24 ft Froude Number 0.75 Flow is subcritical. 1 Jan 22, 2001 ADVANCED PROFESSIONAL ENGINEERING INC. FlowMaster v4.1c 14:48:49 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06706 (203) 755-1666 Pagel of 1 100-yr flow depth if area drain plugged Worksheet for Triangular Channel Project Description t Project File c:\fmw\set-gm.fm2 Worksheet Lower Channel Capacity Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth ' Input Data Mannings Coefficient 0.060 Channel Slope 0.064000 ft/ft Left Side Slope 10.00 H : V Right Side Slope 10.00 H : V Discharge 3.28 ft 1s ' L S3Q :il:3d - $i-:it (las CaDaG:�� Results ' Depth 0.39 ft (L ) 1 Flow Area 1.55 ftz Wetted Perimeter 7,92 ft ' Top Width 7.88 ft Critical Depth 0.37 ft Critical Slope 0.092902 ft/ft ' Velocity 2.11 ft/s Velocity Head 0.07 ft Specific Energy 0,46 ft ' Froude Number 0.84 Flow is subcritical. ' Mar 23, 2001 ADVANCED PROFESSIONAL ENGINEERING INC. _ FlowMaster v4.1c 13:47:01 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06706 (203) 755.1666 Page 1 of 1 10-year flow depth if area drain plugged ' Worksheet for Triangular Channel Project Description Project File c:\fmw\set-gm.fm2 Worksheet 10-yr flow if area drain is plugged Flow Element Triangular Channel ' Method Manning's Formula Solve For Channel Depth - ' Input Data Mannings Coefficient 0.060 ' Channel Slope 0.064000 ft/ft Left Side Slope 10.00 H : V Right Side Slope 10.00 H : V Discharge 1.91 fN/s Results ' Depth 0.32 ft Flow Area 1.03 ft2 Wetted Perimeter 6.46 ft ' Top Width 6.43 ft Critical Depth 0.30 ft Critical Slope 0.099838 ft/ft ' Velocity 1.85 ft/s Velocity Head 0.05 ft Specific Energy 0.37 ft ' Froude Number 0.81 Flow is subcritical. Feb 7, 2001 ADVANCED PROFESSIONAL ENGINEERING INC. FlowMaster v4.1c 14:27:31 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 0670E (203) 755-1666 Page 1 of 1 Pipe Diameters in Minipark walkway Worksheet for Circular Channel Project Description Project File c:\fmw\set-grh.fm2 Worksheet Pipe in Minipark Flow Element Circular Channel Method Manning's Formula Solve For Channel Diameter Input Data Mannings Coefficient 0.012 Channel Slope 0.010000 ft/ft Depth 0.50 ft Discharge 0.62 ft3/s Results Diameter 0.50 ft Flow Area 0.20 ftz Wetted Perimeter 1.58 ft Top Width 0.00 ft Critical Depth 0.40 ft Percent Full 100.00 % Critical Slope 0.010642 ft1ft Velocity 3.11 fus Velocity Head 0.15 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 0.67 fta/s Full Flow Capacity 0.62 fta/s . Full Flow Slope 0.010000 ft(ft Jan 22, 2001 ADVANCED PROFESSIONAL ENGINEERING INC. FlowMaster v4.1c 18:44:13 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ll ' 24 ' ATTACHMENT B: GRATE INLET CAPACITY DATA SHEETS 24 ON'i .Z" - l -----------------------------/� I-rAcijM-- -------------------------------------------- UDINLET: INLET HYDARULICS AND SIZING ' DEVELOPED BY CIVIL ENG DEPT. U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD USER:JR ENGINEERS-DENVER CO ................................................. ON DATE 03-23-2001 AT TIME 15:50:49 '*** PROJECT TITLE: Settler's Green / OD - vr, Floes @ Cces 64.a re� *** COMBINATION INLET: GRATE INLET AND CURB OPENING: *** GRATE INLET HYDRAULICS AND SIZING: ' INLET ID NUMBER: 17 INLET HYDRAULICS: ON A GRADE. ' GIVEN INLET DESIGN INFORMATION: INLET GRATE WIDTH (ft)= 1.87 INLET GRATE LENGTH (ft)= 3.25 INLET GRATE TYPE =Type 16 Grate Inlet NUMBER OF GRATES = 3.00 ' IS THE INLET GRATE NEXT TO A CURB ?-- YES Note: Sump is the additional depth to flow depth. STREET GEOMETRIES: ' STREET LONGITUDINAL SLOPE (°s) = 3.00 STREET CROSS SLOPE M = 2.00 ' STREET MANNING N = 0.016 GUTTER DEPRESSION (inch)= 2.00 GUTTER WIDTH (ft) = 2.00 STREET FLOW HYDRAULICS: WATER SPREAD ON STREET (ft) = 20.13 ' GUTTER FLOW DEPTH (ft) = 0.57 FLOW VELOCITY ON STREET (fps)= 6.95 FLOW CROSS SECTION AREA (sq ft)= 4.22 ' GRATE CLOGGING FACTOR (g)= 50.00 CURB OPENNING CLOGGING FACTOR($)= 15.00 INLET INTERCEPTION CAPACITY: FOR 3 GRATE INLETS: DESIGN DISCHARGE (cfs)= 29.31 ' IDEAL GRATE INLET CAPACITY (cfs)= 17.88 BY FAA HEC-12 METHOD: FLOW INTERCEPTED (cfs)= 11.84 BY DENVER UDFCD METHOD: ' FLOW INTERCEPTED (cfs)= 8.94 *** CURB OPENING INLET HYDRAULICS AND SIZING: tINLET ID NUMBER: 17 ' INLET HYDRAULICS: ON A GRADE. ' GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= 10.70 ' REQUIRED CURB OPENING LENGTH (ft)= 65.71 IDEAL CURB OPENNING EFFICIENCY = 0.27 ACTURAL CURB OPENNING EFFICIENCY = 0.24 INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (cfs)= 4.78 BY FAA HEC-12 METHOD: DESIGN FLOW (cfs)= 17.47 FLOW INTERCEPTED (cfs)= 4.11 CARRY-OVER FLOW (cfs)= 13.36 BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)= 20.37 FLOW INTERCEPTED (cfs)= 4.07 CARRY-OVER FLOW (cfs)= 16.31 *** SUMMARY FOR THE COMBINATION INLET: THE TOTAL DESIGN PEAK FLOW RATE (cfs)= 29.31 BY FAA HEC-12 METHOD: FLOW INTERCEPTED BY GRATE INLET (cfs)= 11.84 FLOW INTERCEPTED BY CURB OPENING(cfs)= 4.11 TOTAL FLOW INTERCEPTED (cfs)= 15.95 CARRYOVER FLOW (cfs) = 3 .36 — Cu rr� - 6✓L BY DENVER UDFCD METHOD: 40 FLOW INTERCEPTED BY GRATE INLET (cfs)= 8.94 FLOW INTERCEPTED BY CURB OPENING (cfs)= 4.07 TOTAL FLOW INTERCEPTED (cfs)= 13.00 CARRYOVER FLOW (cfs)= 16.31 r ATPAc►VASP--T T-2- ------------------------------------------------------------------------------ ' UDINLET: INLET HYDARULICS AND SIZING DEVELOPED BY CIVIL ENG DEPT, U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD -------------------------------------------------------------------------- ON DATE 02-08-2001 AT TIME 12:15:28 '*** PROJECT TITLE: Settler's Green /O4`qc'- 56)r1g, DPAJ *** COMBINATION INLET, GRATE INLET AND CURB OPENING: FXiSTI iJC-n2- '*** GRATE INLET HYDRAULICS AND SIZING: ' INLET ID NUMBER: yf '•TJP r '- INLET HYDRAULICS: IN A SUMP. ' GIVEN INLET DESIGN INFORMATION: INLET GRATE WIDTH (ft)= 1.87 INLET GRATE LENGTH (ft)= 3.25 INLET GRATE TYPE =Type 16 Grate Inlet NUMBER OF GRATES = 2.00 SUMP DEPTH ON GRATE (ft)= 0.44 GRATE OPENING AREA RATIO M = 0.60 IS THE INLET GRATE NEXT TO A CURB ?-- YES Note: Sump is the additional depth to flow depth. STREET GEOMETRIES: STREET LONGITUDINAL SLOPE (%) = 0.10 STREET CROSS SLOPE M) = 2.00 STREET MANNING N = 0.016 GUTTER DEPRESSION (inch)= 2.00 GUTTER WIDTH (ft) = 2.00 STREET FLOW HYDRAULICS:' GUTTER FLOW DEPTH (ft) = 0.69 FLOW VELOCITY ON STREET (fps)= 1.49 FLOW CROSS SECTION AREA (sq ft)= 7.09 GRATE CLOGGING FACTOR (%-)= 50.00 CURB OPENNING CLOGGING FACTOR(%)= 15.00 INLET INTERCEPTION CAPACITY: FOR 2 GRATE INLETS: DESIGN DISCHARGE IDEAL GRATE INLET CAPACITY BY FAA HEC-12 METHOD: FLOW INTERCEPTED BY DENVER UDFCD METHOD: FLOW INTERCEPTED (cfs) = 10.50 Qeylq n �ImJ (cfs)= 37.04 -- 6-4-p0-ctt1 (c€s) = 10.50 (Zh �Gi �5 in sJ►xf Gain d� �hrn (cfs)= 10.50 *** CURB OPENING INLET HYDRAULICS AND SIZING: P-Pe ca pac, = IZ.i7cps INLET ID NUMBER: 11 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= HEIGHT'OF CURB OPENING (in)= INCLINED THROAT ANGLE (degree)= LATERAL WIDTH OF DEPRESSION (ft)= SUMP DEPTH (ft)= Note: The sump depth is additional 8.00 6.00 0.00 2.00 0.44 depth to flow depth. INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (cfs)= 22.89 BY FAA.HEC-12 METHOD: DESIGN FLOW (cfs)= FLOW INTERCEPTED (cfs)= CARRY-OVER FLOW (cfs)= BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)= FLOW INTERCEPTED (cfs)= CARRY-OVER FLOW (cfs)= ' *** SUMMARY FOR THE COMBINATION INLET: THE TOTAL DESIGN PEAK FLOW RATE (cfs)= ' BY FAA HEC-12 METHOD: FLOW INTERCEPTED BY GRATE INLET (cfs)= FLOW INTERCEPTED BY CURB OPENING(cfs)= TOTAL FLOW INTERCEPTED (cfs)= CARRYOVER FLOW (cfs)= BY DENVER UDFCD METHOD: FLOW INTERCEPTED BY GRATE INLET (cfs)= ' FLOW INTERCEPTED BY CURB OPENING (cfs)= TOTAL FLOW INTERCEPTED (cfs)= CARRYOVER FLOW (cfs)= 10.50 10.50 0.00 10.50 0.00 10.50 0.00 10.50 0.00 ' 25 ' ATTACHMENT C: STREET CROSS-SECTION CAPACITY DATA SHEETS 25 rr,4effm6w� S^l -------------------------------- -------------------------------------------- UDINLET: STREET CAPACITY ANALYSIS ' DEVELOPED BY CIVIL ENG, U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD POOL FUND STUDY ------------------------------------------------------------------------------ USER= ,;Er.,• Ir v..,, CC< .... P�-:-.ZN(: ...................................... ON DATE 03-23-2001 AT TIME 13:30:03 2-yr•, *** PROJECT TITLE: STREET FLOW '*** STREET GUTTER HYDRAULICS i MIUO(2 ST6PrA ON GVSTE2.. A50VE I►.1LC-T@ CkAS& GIVEN GUTTER GEOMETRIES: LONGITUDINAL SLOPE (°s) = 3.00 CROSS SLOPE (%) = 2.00 ' DEPRESSION AT GUTTER (inch)= 2.00 GUTTER WIDTH (feet)= 2.00 STREET MANNING ROUGHNESS N = 0.016 ' THE MAXIMUM ALLOWABLE WATER SPREAD(ft)= 16.00 CURB HEIGHT (inch)= 6.00 STREET UNDER IDEAL HYDRAULIC CONDITION: STREET CAPACITY IS DICTATED BY -- THE ALLOWABLE SPREAD PEAK RUNOFF FLOW RATE (cfs) = 16.74 30 FL.O%V% FLOW CARRIED BY GUTTER (cfs)= 6.62 FLOW CARRIED BY STREET (cfs)= 10.13 dr�Veu.b(e WATER SPREAD ON STREET (ft) = 16.00 — Leave-5 10 a� GUTTER FLOW DEPTH (in) = 5.84 AVERAGE FLOW VELOCITY (fps) = 6. 14 ( SE'C! 40 r l•ec�vv-) THE STREET CAPACITY REDUCTION FACTOR= 0.72 STREET GUTTER -FULL CAPACITY (cfs)= 18.47 STREET ALLOWABLE CAPACITY (cfs)=. 13.20 STREET UNDER ALLOWABLE HYDRAULIC CONDITION: PEAK RUNOFF FLOW RATE (cfs)= 13.20 FLOW CARRIED BY GUTTER (cfs)= 5.77 FLOW CARRIED BY STREET (cfs)= 7.43 WATER SPREAD ON STREET (ft) = 14.47 GUTTER FLOW DEPTH (in) = 5.47 AVERAGE FLOW VELOCITY (fps)= 5.84 STREET ALLOWABLE CAPACITY=SMALLER ONE BETWEEN IDEAL CAPACITY AND REDUCTION FACTOR*GUTTER-FULL CAPACITY. ' AT"'Tf-GH M E Al -r ------------------------------------------------------------------------------ ' UDINLET: STREET CAPACITY ANALYSIS DEVELOPED BY CIVIL ENG, U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD POOL FUND STUDY ------------------------------------------------------------------------------ USER=:JR ENGINEERS-DENVER CO .................................................. ON DATE 03-23-2001 AT TIME 15:14:22 *** PROJECT TITLE: Settler's Green Custer & Chase '*** STREET CROSS SECTIONAL IDEAL CAPACITY: - /00-1f%, SOvrm Qf �.�iQSe THE GIVEN STREET X-SECTIONAL GOEMETRIES: LONGITUDINAL STREET SLOPE M = 3.00 ' MANNING N = 0.016 CURB HEIGHT (in)= 6.00 MAXIMUM FLOW DEPTH (in)= 6.00 STREET ON LEFTSIDE OF CROWN: LEFTSIDE STREET WIDTH (ft)= 21.00 ' CROSS SLOPE (%;) = 2.00 DEPRESSION AT GUTTER (in)= 0.10 GUTTER WIDTH (ft)= 2.00 SIDEWALK CROSS SLOPE (1V:ZH) Z = 50.00 STREET ON RIGHTSIDE OF CROWN ' RIGHTSIDE STREET WIDTH (ft)= 21.00 CROSS SLOPE (°s) = 2.00 DEPRESSION AT GUTTER (in)= 0.10 ' GUTTER WIDTH (ft)= 2.00 SIDEWALK CROSS SLOPE (1V:ZH) Z = 50.00 '*** RATING CURVE FOR STREET IDEAL CAPACITY-FLOWRATE VS DEPTH: ---------------------------------------------------------------------- FLOW DEPTH LEFTSIDE RIGHTSIDE TOTAL AT GUTTER RATE VLCITY SPREAD RATE VLCITY SPREAD FLOW INCHES CFS FPS FT CFS FPS FT CFS ---------------------------------------------------------------------- 1.00 0.34 2.26 3.75 0.34 2.26 3.75 0.67 2.00 2.27 3.58 7.92 2.27 3.58 7.92 4.55 3.00 6.92 4.71 12.08 6.92 4.71 12.08 13.84 4.00 15.18 5.73 16.25 15.18 5.73 16.25 30.36 S 4�= 53.5-1 5.00 27.86 6.67 20.42 27.86 6.67 20.42 55.71 \,,�6.00 45.41 7.50 21.00 45.41 7.50 21.00 90.82 ------------------------------------------------ THE CURB HEIGHT IS 6 INCHES. THE STREET CAPACITY REDUCTION FACTOR FOR MINOR STORM= .715 THE STREET ---------------------------------------------------------------------- CAPACITY REDUCTION FACTOR FOR MAJOR STORM= .6 /D 0- y r. d a pth &-o' -<a w be-tk� G " 8 7" 9 OP /7. 26 u ATTACHMENT D: PIPE SUMMARY TABLES FROM RIGDEN FARM DRAINAGE STUDY 26 U) (D a � adui�oar�r�o;v > rohr'a. J .am0 N N .- x v v a o v l a a RaRaRa�(CID, Si� O O O 0 W oc�Wg 0 w w �W�m v o v a a v o v vNnt�a�O70c�i T: gmrn0)0)00 Oo p C OD 00 CD CO OD CO _ v a v l v e v a IgF2 $$ammm x a a a a a a a o OD ak-m-- g�0�s� UUWS a a m m a ao a ao v o v a v a v a �iaa�vu��nLOr' C O Ooi 0)0)0 W 0) 00) W OD 0 OD aD CD OD 7 ; V 0) CD v v v v v v v o 'u�i N a�i 0 m^ CD NNa co N V V l7 m N a W U� p oo OD b aD 0) V N V IN f+J Ol 0) co pp�OO pppp�� 0 0 0 ON 0 O C 0 0 0 0 0 0 C W « m 0 0 ID 0 m OL m app1 pm Qm pm Qpm Q QQ N M N N f7 M 0v') M mp n L OD rm aU) �U)i �,�j pippp m (7 N . d< O N N J O m � c o 'C .a- 0 c� `�=vm `.�a O O 0 0 0 0 a 0 U 0 cc ~ - le >� mk8 9 ��� /§8 § 303E �—��¥ �t�§ max« . #9m »aru« � Ci Gi 9@n $� 'CO 40 '$f §§k �j§ jo$ /§ " k§§ k� 888 co�k2 a■g qCD f£ 2§ e k �/�. BUo ) (07 kkq . W f � ■ V D � � � � ■ 7 '\ � � � � \ - q % � � , k } $ Ln k k OD P. b �J e 27 ATTACHMENT E: DRAINAGE STUDY DATA SUMMARIES FROM RIGDEN FARM 27 JRR Er*m*la LICL 2820 E Ptppett Rd. Ste. 19% Faa Co81na, CO 80525 T/t�9L.6 RF-I RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: RIGDEN FARM FILING ONE, P.D.P. PROJECT'NO: 9164.03 COMPUTATIONS BY: A. REED SUBMITTED BY: JR ENGINEERING, LTD. DATE: S!30199 J00y7atorm,Cf= 125 9 DIRECT RUNOFF CARRY OVER TOTAL REMARKS POW Ams Design- A (60 ccl IC (ora) 1 (Yvm 0(100) (da) tram D*Wpn Palm 0(100) ids) o(190)to1 ids) 14b 114b 1.91 0.85 82 6.39 13.71 13.7 CIO to DP 14C 14c 114c 0.25 0.86 6.5 9.07 1.96 141) 7.14 9.1 CAD to DP 14 15 115 2.08 0.90 6.2 9.17 17.12 14.16 19.05 36.2 15a 115a 1.48 0.91 5.0 9.95 1138 13.4 16 116 1.94 0.90 5.1 9.73 17.06 17.1 GO to Basin 115 16a 1169 0.68 0.93 5.0 9.95 1 8.32 1 18.3 161) 116b 213 0.88 5.0 9.95 18.66 12 2.00 120.7 15C IIse 2.44 0.81 8.1 8.42 16.68 1 18.7 117 2.49 0.92 5.0 9.95 2277 22.8 17 117 + 118 4.85 0.90 7.1 8.80 38.21 17a 9.90 48.1 17a 117a 2.79 0.93 6.0 9.28 23.93 23.9 CIO to DP 17 16 118 2.36 0.87 5.7 9.41 19.35 19.3 19 119 6.52 0.90 0.3 7.99 49.16 492 20 120 0.67 1.00 5.0 9.95 6.70 6.7 121 3.66 0.13 5.0 9.95 1 4.55 4.5 21 119+120+121 11.15 0.65 16.9 6.12 44.68 44.7 122 7.05 0.13 15.9 6.31 5.57 5.6 22 122+113+114+114a+i 14b+11 115+115&+118+1 16a+1 16b+ 1160+117+117a+118 34.62 0.75 20.8 5.50 142.14 1421 23 123 0.82 0.13 12.1 7.18 0.74 581 3.75 4.5 24 124 2.62 0.40 13.4 8.86 727 7.3 25 125 F80 0.45 8.0 8.45 3.07 - 3.1 28 128 3.70 0.58 13.1 8.82 14.38 14.4 POP SWMM 671-istodc 3290 0.13 44.9 3.47 1427 14.3 POP SWMM 672-N0sWt 9.80 0.13 21.7 5.38 8.59 6.6 PDP SWMM 561- Kstodc 9.60 0.13 52.5 3.13 3.75 1.8 POP SWMM 582d84 - rtistonic 9420 0.13 51.3 3.16 1358 138 O=CIA Q = Peak dischal9e (ds) C = runoff coefficient I = rainfall Intensity 0n/hr) from City of Fort Collins OF curve (4/16/99) A = drainage area (sores) 1- 84.6e2 r (10+tcf " I a pdpFLow.XLS Jl HgtwsrMp, lid. 2820E PttlapeG Rd.. BIe. 100. Fat Oollm CO 80525 TA-P L C- 2F-2- RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: RIGDEN FARM FnMG ONE, P.D.P. PROJECT NO: 9164.03 COMPUTATIONS BY: A. REED SUBMITTED BY: JR ENGINEERING, LTD. DATE: S0099 100 yr storm, Cf 125 DIRECT RUNOFF CARRY OVER TOTAL REMARKS PoYM Aron Design. A (90 CCf 1e (ffdn) 1 (WIA 0(100) (do) from Design Pobd 0000) (ds) 0000)tot Ids) 1 101 10.52 0.97 12.3 1 7.12 72.56 72.6 la 101■ 3.14 1.00 6.5 9.06 28.43 28.4 lb 101b 1.37 1.00 5.0 0.95 13.63 1To 1c loic 324 0.86 5.0 9.95 27.79 27.8 1d 101d 3.40 1.00 5.8 9.37 31.88 31.9 102 4.16 0.97 7.1 6.78 35.32 35.3 22 102a 3.95 0.91 10.6 7.59 27.25 272 2b 102b 2.57 0.88 7.3 8.70 19.74 19.7 GO to DP 3 3 103 271 0.04 8.1 921 23.43 2b 5.16 28.6 em ovedlbw to DP 4 4 104 1.35 0.95 5.0 9.95 12.72 4a 270 15.4 4m 104a 1.37 0.99 5.4 9.58 13.04 13.0 CIO to OP 4 105 4.43 0.57 11.5 7.33 18.40 18.4 5 105+104+104a+ 103+102b+111+112 18.67 0.94 19.2 5.75 00.46 90.5 SPIN 6 100 2.47 0.13 10.4 7.63 2-36 24 7 107 5.33 1.00 5.9 9.34 49.77 49.8 7a 107a 2-64 1.00 7.5 8.62 2276 22-8 CIO to OP 7b 7b 107b 1.81 1.00 5.8 9.37 16.99 7a 7.42 24.4 CIO to DP 7c 7c 107C 2.16 0.99 7.1 8.78 18.67 7b 821 26.9 CAD to DP 7d 7d 107d 3.42 0.94 10.3 7.69 24.61 7c 9.53 34.1 CIO to DP 7e 7e 1070 216 0.93 8.0 8.46 17.01 7d 12.77 29.0 CIO to DP 6 6 108 1.01 1.00 92 8.02 8.06 7e+8e 11.02 19.1 as Was 0.88 0.98 5.0 9.95 8.65 Sal 11.10 19.8 CIO to DP Sbl local 0.71 0.91 6.0 9.30 0.05 8d 5.07 11.1 CAD to DP as fib 108b 0.68 1.00 5.0 9.95 6.76 8b1 11.54 18.3 CIO b DP 8c IDSb1 0.62 0.95 5.0 9.95 5.67 as 5.67 11.5 CAO to DP 8b ac lost 1,30 0.99 5.8 0.37 12.12 6b 4.98 17.1 GOlo OP 8 ad 108d 0.51 1.00 5.0 9.95 5.07 5.1 CAD to DP fiat as lobe 224 0.81 14.0 6,71 1223 122 61 tool 1.44 0.84 12.7 7.03 SAS fie 1223 20.7 loeg 1.16 0.63 12-3 7.11 6.92 &9 89 lose-loog 4.88 0.82 17.8 5.98 23.92 23.9 109 5.46 0.81 13.9 6.73 2D.87 2D.9 9 107d+107e+108+109 1204 0.90 18.3 5.88 83.80 63.6 109a 1258 0.81 14.5 6.60 67.46 67.5 9a 1070-107C + 108a-1 + 109a 28.76 0.86 21.2 5.44 134.65 134.7 10a 110a 025 1.00 5.0 9.95 2.50 25 10b 110b 025 1.00 5.0 9.95 250 25 11 111 5.61 0.90 6.6 8.24 41.45 41.5 12 112 0.83 1.00 5.0 9.95 626 6.3 CAO to DP 16b 13 113 2.69 1.00 5.0 B.BS 28.81 26.6 14 11 1 279 1 0.96 1 5.7 9.40 25.19 14C 4.01 29.2 CAD to DP 15 14a Ilse 1.53 0.81 8.7 821 10.20 10.2 JR Engines". Ltd. 8/11/99 2820 E. Preavaa Rd., Ste. 190. Fort Cellim 00 e6626 -rAfS LE fzF -3 LOCATION: RIDDEN FARM FILING ONE, P.D.P. ITEM: CHECK OF STREET CAPACITY COMPUTATIONS BY: ALR SUBMITTFA BY: JR ENGINEERING, LTD. Note: Design Bows and oboe capacities are given for one side of the street unless otherwise Indicated G Drainage Basin Street Name Street Type Roadway Width (R) Slope (%) 2 yr Capacity (cis) Design flow 0(2) (cfs) toggle criteria? 100 yr Capacity (cis) Design Row 0(100) (cU) meets erttsrla7 102b Linn Drive Connector 42 0.6 9.02 4.09 yes 76.56 19.70 yes 103 Limon Drive Connector 42 0.6 9.02 4.81 yes 76.56 28.60 yea 104 Umonn Drive Connector 42 0.6 9.02 2.91 yes 76.56 15.40 yea 104a Lkron Drive Connector 42 0.6 9.02 2.99 yes 76.56 13.00 yes 107 Timberline Drive' Collector 60 0.8 10.41 . 12.03 no 42.98 49.80 no 107a Custer Drive CoOeclor 60 0.8 10.41 6.43 yea 60.91 22.80 yea 107b Custer Drive Collector 60 0.8 10.41 3.99 yes 60.91 24.40 yea 107C Custer Drive Collector so 0.8 10.41 3.92 yes 32.62 26.90 yes 107d Custer Drive Collector 50 0.6 10.41 4.81 yes 35.90 34.10 yes 1079 Custer Drive' Collector 50 0.8 10.41 3.44 yes 35.90 29.80 yes 108 Custer Drive Collector 50 0.8 10.41 2.19 yes 31.09 19.10 yea 108a Custer Drive Collector 60 0.8 10.41 4.30 yes 85.51 19.60 yea 100al Custer Drive -CIEs/ JCIu. Collector KM 60 0.8 2.59 2.59 yes 60.91 11.10 yes 10eb Custer Drive - Collector R IF 60 0.8 - 10.41 3.15 yes 85.51 18.30 yes 108b/ Custer Drive -45I�' (6" Collector R F 60 0.8 2.59 1.53 yes 60.91 11.50 yea toec Custer Drive Collector R JL 50 0.8 10.41 2.48 yes 35.90 17.10 Yea 107ev105a Custer Drive (two "a) Collector 60 0.8 20.82 9.81 yes 146.42 42.60 yea 107bv108b Custer Drive (two sides) Collector 60 0.8 20.82 7.14 yes 146.42 42.70 yea 1070t1080 Custer Drive (two sides) Collector so 0.8 20.82 6.40 yes 75.32 44.00 Yids 107ar10e Custer Drive (two sides)* Collector 60 0.8 20.82 5.63 yes 75.32 48.90 yea 106d Timberline Drive Collector 60 0.8 10.41 1.38 yea 42.98 5.10 Yea 110e+110b RWm Parkway(two sides) Collector 40 2.0 16.47 1.36 yea 139.78 5.00 yea Ill Rigden Parkway Collector 50 0.6 1426 7.81 yes 49.16 41.50 yea 112 Rigden Parkway CtOector so 0.6 9.02 1.70 yes 31.09 6.30 yes 113 Denver Drive Res. Local 34 6.0 14.24 6.95 yes 28.46 26.80 yes 114 Topeka Lane Res. Local 34 2.4 16.64 5.04 yes 3421 2920 Yea 114b Topeka Lane Res. Local 34 2.0 15.98 3.47 yes 32.86 13.70 yes 114c Topeka Lane Res. Locel 34 2.0 15.98 128 yes 32.86 9.10 yea 115 Topeka Lane (two sides) Res. Local 34 3.5 34.66 4.06 yea 71.08 3620 yea 116a Chase Drive Exit Res. Local 30 0.7 6.38 2.81 yea 57.87 13.40 yea 116 Topeka lane Res. Local 34 U 1728 329 yes . 35.54 17.10 yes 116a Des Moines Drive Res. Local 34 1.0 11.30 1.45 yes 2324 6.30 yes 116b Des Moines Drive Res. Local 34 1.0 11.30 3.89 'yea 2324 20.70 Yes 117 Custer Drive Connector 40 2.0 16.47 9.44 yes 139.78 46.10 yea 117a Custer Drive Connector 40 3.1 . 18.08 5.49 yes 146.69 23.90 Vag 116 Custer Drive Connector 40 2.0 16.47 4.44 yes 139.78 19.30 yea 119 Des Moines Drive Connector Local 34 2.5 16.60 10.04 yes 103.08 4920 Yea 120 Chase Drive C XUI@ for Loral 42 1.5 1426 1.56 yes 121.05 6.70 Yea NOTE: ' Flow Is coming from both sides of Inlet. . x Co Ik1�M• w/ (Yl edl awn and one e i C(A 4t Med'ka, w( el ecw l a o•¢ 9164stdW.xls 1 of 1 JR Engineetrq. LIO. seta L POWM Ra. 81s IW ion coot., c0 80545 j AOL.r. 2F-4 RA71ONAL METHOD PEAK RUNOFF Mina Storm for Residential Areas (2-YEAR) LOCA71ON: RIGDEN FARM PILING ONE, P.D.P. FROIECr NO: 9164.03 COhOWA71ONS BY: A. REED SUBMII7ED BY: IR ENGINIMIUNG, 1.7D. DA78: 8I11199 2rscam, Cfar 1.00 DIRECT RUNOFFCARRY OVER TOTAL REMARKS Parr 'raw" Stabnrn A (60 CCI Ic (min) 1 RVIA 0 (2) ids) from Delp Pam 0(2) (ds) 0(2)o1 (de) 14b 114b 1.91 0.66 6.0 2.66 3.47 3.47 CAD to DP 14C 14C 114a 025 0.69 5.1 2.79 0.48 14b 0.80 1.28 15 115 2.08 0.72 10.3 2.20 3.29 14.16 0.77 4.06 15a 115a 1.48 0.73 6.3 2.92 2.81 2.81 16 11e 1.94 0.72 0.7 235 3.29 3.29 IC40 to Basin 115 16a 11e111 0.68 0.75 5.0 2.85 1.45 1.45 16b I16b 2.13 0.71 6.5 2.59 3.89 3.89 16c 118C 2.44 0.65 11.2 2.13 3.37 3.37 117 2.49 0.73 7.7 2.45 4.49 4.49 17 117 ♦ 110 4.85 0.72 7.1 2.52 0.76 178 0.68 17s 117a 2.79 D71 &0 2.66 5.49 C5.4W2 COO to DP 17 18 116 2.36 0.70 5.7 2.70 4.41 19 119 6.82 0.72 12.3 2.04 10.04 10.04 20 120 0.87 0.81 5.0 2.95 1.56 1.56 121 3.66 0.10 5.0 2.85 1.04 1.04 21 119+120+121 11.15 0.52 16.9 1.76 10.25 10.25 122 7.05 0.10 15.9 1.81 128 128 22 122.113.114.114s.114b.11 115#115&+116+1 I&W 16b� 116w117v117N118 34.62 0.60 20.8 1.58 ^M` . 3280 3260 23 123 0.62 0.10 12.1 206 0.17 0.17 24 124 2.62 0.32 13.4 1.97 1.67 1.67 25 125 0.80 0.36 9.1 t 2.31 0.67 0.67 26 126 A70 0.45 1&1 1.98 3.30 3.30 POP SWUM 8714IIstoric 32.90 0.10 55.7 0." 264 2.84 POP SWMM 672 - Historic 9.80 0.10 13.9 1.93 1.89 1.89 POP SWUM 561 - Historic 9.60 i 0.10 $4.1 O.ae 0.64 0.84 POP SWMM 582-W - Historic 34.20 0.10 52.9 0.89 305 3.05 O-CrCIA 0 - peak discharge (cfa) C - rurlaff coefficient Cc - frequency 04uw lem factor I ■ rairdall YderroMy (WI1r1 from City of Fort Collins IDF curve (4/16199) A - drainap area (acm) I.2422I r (1M Ic;f a" k, may-Ove 13 G.3 cad Gp.F1 OFq 7f * CARDER CONCRETE PRODUCTS COMPANY 8311 W. CARDER CT. LON,C080125 Q CONCRETE (303)-791-1600 (303) 791-17 10 FAX A CO ORADSPINGS,CO80931,4oDUG,1 (AN EMPLOYEE OWNED COMPANY) h— ; •�!- 5 L . .t..... DATE PAGE '._.'- of Reinforced Concrete Sewer, Culvert & Irrigation Pipe (12" thru 144") Reinforced Concrete Elliptical Pipe (18" thru 144") Precast Inlets Precast Concrete Box Culverts :Buy It, Bury It, Never Look Back" Stormceptor• ' 28 ' ATTACHMENT F: DESCRIPTION OF NEW AREA DRAIN GRATE 28 [,51M 879 Series Frames light Duty Lids, Grates t These shallow frames are suitable for use in thin or deep con- crete slabs. All sizes of frames are reversible and can be installed with flange at base or top. Specify: ' !. Catalog number. R To be Installed with flange at base or top. ' Square Dimensions in inches Wt. LI w/ w/ Catalog Number A 8 C D_ — E F G H —lid grate Solid Lid Open Grate 87 if19-A1G 13,_x 13?4 142 12 x 12 14 z 14 18 x 18 4 I x7 I I IS I00 R•1879-A1L R 1879-A2L R-1879-A2G 18 x 18 1!4 16 x 16 18i� x 181a 22 x 22 4 Y4 x,l;b �V4 165 150 R-1879 AU R-1879-A3G 20 Is 20 M 18 x 18 20!+ x 201.E 24 x 24 4 y4 x 5 ;i 195 185 R-1879-A4L R-1879-A4G 21 Y4 x 21Y4 W, 20 x 20 22 x 22 26 x 26 4 ;Y4 x 4 ?'4 200 1135 R•1879-ASL R-1879-A5G 23'/2 x 2345 I1; 22 x 22 24 x 24 28 x 28 4 'Y4 x6!,. l:' 23S 255 R-1879-A61 R-1879-A6G 253/4x 25;: 1! . 27i'2 x 27! a 1 V4 24 x 24 26 x 26 26 x 26 28 x 28 30 x 30 32 x 32 4 4 1 x 5 y4 x 7}a 14 45 245 790 215 760 R=1879-A71 R-1879.A7G R-1879-ASL R-1879-ABG 29%x29"4 112 28 x 28 29?' x 29?. 34 x 34 4 1%x5'/, 1 340 390 W1679-A91 R-1879.A9G 31Y4x313i 1!2 30 x 30 3Y x 32 36 x 36 [4 1 x4%4 44 360 310 t-1879-AIOI' R-1879-AIOG' 37 x37 1!'2 36 x 36 37!2 x 37' 2 42 x 42 4 Al x 4 je 1 — 485 445 Rectangular _ -i - R•1879-81L. R-1879-BIG _ 14 x 20 '4 _ 12 x 11 14 , x 20!. la x 24 4 3.A5! ies ie,0 ' 2-1879-B21 R-1879-112G 13'h x 2516 1 !2 12 x 24 1334 x 25l: 18 x 30 4 34 x 02 1 165 I HO R-1879-83L R-1879-830 19V2 x 25% 1!2 18 x 24 191. x 25l� 24 x 30 4 N x 54+ - 1 210 195 R•1879-84L R-1879-B4G 1952 x 3I!' 'ix 18 x 30 20 z 32 2a x 36 4 4 x 5 1 230 215 R-1879-85L R.1879-11S10, 19l: x 37?= ' 2 18 x 36 x 38 24 x 42 4 '15 x 5 1 295 310 ' R-1879-86L R-1879-660 25l4 x 31! i !2 24 x 30 25?i x 311. 30 x 36 4 1 x 5li, !4 290 260 ' R-1879-871. R-1879-87G 251i x 37!4 !2 24 x 36 —20 — 26 x 38 30 x 42 4 1 x 5 %u b4 335 295 R-1879-B8L• 251i x 491. 1!v 24 x 48 26 x 50 30 x 54 4 44 x 518, 1 395 405 "#?9-fDll► v I879- 313/: x 37!S !2 30 x 36 32 x 38 36 x 42 4. 1 x61'2 I 400 380 ' R•1879-B10L' R- OG' 311/2 x 49!2 'i2 30 x 48 31?: x 49?: 36 x 54 4 1 x 5 1 480 425 "Cover In two pieces. ' R-1880 Serkes Manhole Frames, Lids ' For cleanouts, electrical manholes, tr former pits, etc. ' .Catalog Dimensions in inches 1215x18 /2 10x16 19x25 4 61lW-A1 R�-188�0 A2 16 x 24 1B x 30 sG s, 14 a 22 16 ■ 28 23 x 37 4 4 ■-118WA4 t-1gW-AS 21 x 33 '/s 18 x 30 27 x 39 . 4 R-18W-A6 23 x 31 s/s 21 x 2 27 x 35 4'/. 4Be"? 24 x 36 y 22 4 31 a 43 4 R-1too." 24 x 24 % Is 22 34 x 34 6 R•18WA9 24 x 25 1 22 x 23 _ 32 x 33 31'x 49 — 9 4 It-1 Be" _ 24'h x 42'h / 22 x 40 1-188"1 25!4 x 2514 1 24 Is 24 303,. x 30'6 9'.', 8-188" 26th x 29'/2 1 /6 25 x 26 35 x 38 8 1880E 33 x 39 a 36 36 x a2 6 Rr1880-F. 36 x I %. 34 a 56 - 47'1: x 691/, 6 -ua in two pieces. 64 FONORY EENMAhi Duty lbs. -- Light --- .- 115 Light 190 --- Light - -- 255 light 275 300 t 330 —I Heav 460 525 Light Medium 505 Henry 625 -_ Heavy 610 Heavy 11110 R-1879-BIG Catch Basin Grate and Frame d Light Duty R-1879 Sections ' 29 ' ATTACHMENT G: ENGINEER'S CALCULATIONS 1 29 �E-t-n.F.�� C-, r,-�.�, Zr.�v t :F D �7(L . PL/i�►J .-_S h.J'.--ram-'-�--�r 7 (//0 5a�f.�ti v yj2)� �• (y�_ . Li"r. pir� uervv7; 1 ' l � � f — 1-7ro3e G='O I O.e --�— -- �,� IS-�50 - h7 G,t//�y4 ' . �i4 `- IM ( Z- A-T-ec. = 1,05 Z4, S A 1 12A S / fj. J��} >e I?.>� + vc ; __ ► x i1 x Zo) I d o 5s = -77 u, t PC 7.� .�/.-:•�1,:t � d ! iu\�1- 'I �Z'ry : f p O "I /%,1G �Qi �'P/✓ Gibe-�/{�//ts�viiGl� i'1lC/i-'+tv�'I G, ��l.I-r. '":, ''!'ri I''�1I-Q' G Clingy cP ♦ lJ•"J.µ G �./.�--�"' 2-2 t�sVIA- 30, 17•'�� t 2 X f3p r 7.7s" �6Z — .3�5/� T36Y, 30x4•Si+ i2rLox/o/ + 6 CZ.o x 30 tit. Z5 >` 34 x t5i I IziS ;4 =: 257 1 �j;ate, �r"iJc.; 7 X Za x9 C(Ocj ' � G_+�.cvQ.i ;�. 1..,•-� .., , � S _ 7� 4'i — , 2 S 7 � � G. 2. I � , 2 2 7 AJ6 ,Zftlers 2 — �� r lj'�'[iv p.. � t.,.a��--. � IGz�vi <J c•c� - f j�z.c� � vi.� � �r'� c!.!i;f.l.c �-�-r-- I� Z.7q Ain ; Cl_Lf't : Gift - �25 r, Si x 1,06 cis Zj G to 'h I IA 2 z r- I All 4LJ PS C, c 7z q5 j,o5 it I Z Ti T-L b. 4�a 30 a, f GNV / C:'T�•f .`�i �i i lip �..� f • 7 / f' r 0 n ��iVvV VtnM�pi T y� /.�! . n-E-(, �/4'�. ji-Oy �:/�N`i'`f s- '�Y'U-'j• 1 ",.H i CIO^ f'xMn.. FIowl o ..�e-r I pIv-.D �.� ►owe �f; _ C<.'l(.-u G = Jr i'1nn.... �-�,r�... ea �l :, r' LJo s� N, • I a i�! r� Vtil a • .�ws--, 15 �hr 280/, x 21-79 0.79 a. 1 � -r2, F. z- liU_<%UDC �i%��V� ��"V7' dU-��1.(� �q , -vL '7,7,3 r_is a7g [ .Z3 ,o.53,�(�.�5��+—e��- q,gI Gas -ID4fQ-4Q.-%-U, 6 n Y SA U UOn 5 it ' a�_ j P7 C 1 1- (o-w -- ,I C� • �f \���f ?-'I oil NL?e,,�n �lo� T�,;�le C�..1, y,,Ie� = Z�.79 Cs �5,q5 PW Neer CM.:rv� Quit F v �P I'I �' 1 3,3 A �.,-!-Y►,,, �.l C.'a-r v-� oval +D � � I � — `3 . �(o 04- G4 sfe-r- 6-4— -ups <;. ' 1Yo T(2 4-�� F1� D P 7 S 3.51 c. )i! -EAJCi. 1 �j¢tll�rs C�reea� �i p V7 GJaAe- 0p&,n,,;,, IA -re -a Drr&A-O�— Fo-e Ave,.-. brO.vw ►S-1q -T3RC? J 43 f - r reu = ZSx Zia = Sonora �. CARDER CONCRETE PRODUCTS COMPANY r • -- -- 8311 W. CARDER CT. LITTLETON, CO 80125 Q CONCRET/yE (30.7)791-1600 (303) 791-17 10 FAXCR-4^-/s A w COLORAD SPRI SPRINGS, CO 80931 ^� A i (AN EA�DUG MPanv) DATE PAGE ' ) of 1. t� lE%^C•-�l.�i"•�M'4.�:%1'� + _ _ i i _ .I j } 2 -Tot- 13,3 ) ( i a 4,1 e , J-iT� v 76 44y I raj ww 2-0 ', I I IT , 11 j ' 14, A.j t {-2 i -r t Y r 1 i I _ I 3 'if9 Reinforced Concrete Sewer, Culvert & Irrigation Pipe (12" thru 144") Reinforced Concrete Elliptical Pipe (18" thru 144") Precast Inlets I c Precast Concrete Box Culverts "Buy It, Bury It, Never Look Back" Stormceptor° J' .IM6P'r'vF " �c CARDER CONCRETE PRODUCTS COMPANY +-- -� -- -- - - - • - -- - --- •-- _----- -, 8311 W. CARDER CT. O CONCRETE LITTLETON,C080125` Y'O'VS ��Gt..._y-, PtV.4l'/ /y (303)791-1600 (303) 791-17 10 FAX A � O ORADO SPRINGS. CO 80931 . pD.G.( (AN EMPEO.xvo - _..._ COMPAW) DATE 3'N��o PACE `y ( of (... i ___� 57� _C-.72 so j O 77 : ! O I _ f r i V 21,y 00�.7� �Y 99 I 1 t } 3 I } -� .,zzo ` r41 3 ' 3 r r) , i . 1 29 I i 1 l r Sib i .:Tor, .�-Fc�'-��, 3 .. 6 »,.�- ' • , ' Reinforced Concrete Sewer, Culvert & Irrigation Pipe (12" thru 144") Reinforced Concrete Elliptical Pipe (18" thru 144") Paecasl Inlets Precast Concrete Box Culverts "Buy It, Bury It, Never Look Back" Stormceptor• CARDER CONCRETE PRODUCTS COMPANY t 8311 W. CARDER CT, t i _ 7—( �— LITLETON, CO 80125 ! .�.I (�' • ` Q CONCRETE (303)791-1600 (303)791-1710FAX `!I�ys !s A 3340 EAST LAS VEGAS ST. '4onu �( COLORADO SPRINGS, CO 80931_ ' (AN EMPLO'tEE OWNED COMPA111) DATE _ ' 3 ! PAGE ,.: of IMF 1 - ` BYO I --- }}o A I 1; 4— C 1-- - . L J." 1 1 1 , i _II 1 I 1 - ^_' - 1 r _ , t� r r ' f ! v) f 1 i + F r t L ' Reinforced Concrete Sewer, Culvert & Irrigation Pipe (12" thru 144") Reinforced Concrete E!liptir.,al Pipe (18" thrii 144") Proca:a 1111ots Precast Concrete Box Culverts "Buy It, Bury It, Never Look Back" Stormceptor"