Loading...
HomeMy WebLinkAboutDrainage Reports - 06/09/1995Fin FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HORSETOOTH EAST PROFESSIONAL OFFICE BUILDING L" FORT COLLINS, COLORADO \T/VVC� ■ CL. WELSH ENGINEERING SCIENCE & TECHNOLOGY INC. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HORSETOOTH EAST PROFESSIONAL OFFICE BUILDING L dt�) FORT COLLINS, COLORADO Prepared for: The Neenan Company 2290 East Prospect P.O. Box 2127 Fort Collins, CO 80522 Prepared by: WESTEC 2629 Redwing Road, Suite 200 Fort Collins, Colorado 80526 No. 95427 ��G1STE/tF��. REVISED ,� • 16466 (� �G� Vim•' ~'� �9T '• ° :::: May 15, 1995 `�••oFOF C01p�o� ■ \1/ YY C � ■ C L. WELSH ENGINEERING SCIENCE & TECHNOLOGY, INC. ■ ■ May 15, 1995 ■ ' Mr.Glen D. Schlueter City of Fort Collins Utility Services Stormwater 235 Mathews Fort Collins, Colorado 80522 RE: HORSETOOTH EAST PROFESSIONAL OFFICE BUILDING - FINAL DRAINAGE AND EROSION CONTROL REPORT Dear Mr. Schlueter: Transmitted herewith is a revised copy of the subject report for your review and approval. All calculations for this report have been made in accordance with criteria established by . the City of Fort Collins. If you have any questions or require any modifications please call me. Thank you. Sincerely, WATER, WASTE & LAND, INC. '�" ow / Maurice H. Lutkin, P. Manger, Civil Engi eering Division I 1 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HORSETOOTH EAST PROFESSIONAL BUILDING FORT COLLINS, COLORADO DEVELOPMENT LOCATION AND DESCRIPTION Location A new, two-story office building is planned for Lot 3 of the Horsetooth East Business Park as shown on the enclosed Site Map. A site layout at a larger scale is shown on a print of the Grading and Drainage Plan appended at the end of this report. The site, containing approximately 4.4 acres within the lot lines and 4.66 drainable acres, is bounded by the Robert Shields Ditch on the south, Collindale Golf Course on the west, Public Service Facilities on the north and Automation Way on the east. The site lies in the Northeast Quarter of Section 31, Township 7 North, Range 68 West, 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. Prooertv Description The property is undeveloped. It is presently partially covered with native grasses and ' a stockpile of earth from recent construction in the area. The site slopes from the west to the east at a gradient of approximately 1 %. There is an existing detention pond along the north edge of the site that is utilized mainly by Public Service ' development although there is excess capacity that will be used for the proposed office building runoff. ' DRAINAGE BASIN IDENTIFICATION ' Description The proposed development lies in the Fox Meadows Drainage Basin. The Horsetooth ' Business Park, First Filing, Drainage Report [11, a portion of which is included in Attachment A, indicates that all development within the Horsetooth Business Park will be limited to a release rate of 0.17 cubic feet per second per acre and provides ' rationale for this restriction. Therefore, this office building site is allotted a release rate of 0.75 cfs. ' DRAINAGE DESIGN CRITERIA Regulations The City of Fort Collins Storm Drainage Design Criteria (21 is being used as the basis for this report. I 11 z m RP a m z e = z S m � z a F 7 z O V> Shepard son Ft Collins Elementary High School rp N.C.R. iP RLP P.R.P.A. bp HORSETOOTH ROAD w Public M Service RP RLP z Collindale Golf Course c B rren Park a HORSETOOTH EAST ip RLP PROFESSIONAL OFFICES RMP 2 Big orn , ?i. Or. riputomatio CBN dP Nanan. Lake Resarvoir-96 s 2 3 2 IP RIN ptr dP Kruse RP Elementary it RE IP RLV bp EP SCALE IN FEET 0 1000 2000 WATER FIGURE 1 Dote: MAR 1995 Ike i WASTE HORSETOOTH EAST PROFESSIONAL OFFICES Project: cQC LAN D SITE LOCATION MAP 95427100 rve. ' Development Criteria Constraints The constraints to developing this site are described by Stewart and Associate [1]. They include a maximum permitted release rate of 0.17 cfs per acre for all development in Horsetooth East Business Park. The release rate from 4.4 acres, the area within the lot lines of the site, equals 0.75 cubic feet per second. Hvdrolooic Criteria ' The Rational Method and the runoff from a 100-year storm were used to design the drainage system for the Horsetooth East Professional Office Building development . Calculations are included in Appendix I. ' Calculations ' All calculations for this report have been made in accordance with criteria established by the City of Fort Collins. ' Variances No variances are requested. ' DRAINAGE DESIGN ' Concept All drainage from the office building development will be conveyed to the existing ' detention pond on the north edge of the site. This pond was found to be smaller than was originally contemplated in the Horsetooth Business Park, First Filing although it is more than adequate to handle the detention requirements of Public Service's ' development of 81839 cubic feet [1]. The additional needs of the office building development was determined from a mass balance analysis and the pond will be reconstructed and ponding will be provided in the new parking area to handle the ' increased needs. Details The reconstruction of the pond will consist of deepening it to a bottom elevation of 4945.5, which is 6 inches above the original design elevation for the bottom of the pond and is the existing invert elevation of the outlet works. The pond spillway area will be regraded to actually allow high water ponding to the original design elevation of 4950.5 and the pond will be extended at the west end to create more capacity. The roof of the office building, the south end and the west side of the building and the area between the west lot line and the railroad tracks will be drained to this extended pond via a series of yard drains on the office building property. The office building parking lot runoff will be collected in one curb inlet and piped to the pond. This parking lot grading will provide additional capacity in the parking lot at times of high water ponding to elevation 4950.5. All significant runoff from the site of the proposed office building will therefore be directed to the detention pond. 1 The parking lot basin is designated Basin A and Basins B1 through B5 are the designations given to the western drainage area. These basins are delineated on the Drainage Study and Erosion Control Plan appended to the end of this report. A time of concentration of 10 minutes was calculated for Basin A at Design Point A. ' This will result in a flow at Design Point A of 9.4 cfs for a 10 year event and 19.1 cfs for a 100 year event. A curb inlet with an opening of 4 feet will handle the flow from the 10 year event with water at a depth of 18 inches (9.6 cfs). Water drains from this inlet to the main pond in a 15 inch pipe which is capable of carrying 12 cfs with water at a depth of 18 inches at the inlet. As the intensity of the storm increases beyond that of a 10 year event the parking lot pond will fill to the point where water can flow directly to the main pond to the north through the curb cut set at elevation 5050.3. Under certain conditions, both ponds will fill to an elevation of 5050.5 before flowing over the original spillway to Automation Way and Big Horn Drive. The western drainage area system consists of five ADS in -line yard drains designed to collect runoff from a 10 year event and convey it to the enlarged detention pond that ' is also part of this project. In order to design this line, Basin B was divided into five sub basins mentioned above with each sub basin containing its design point. Calculations supporting the pipe and fitting sizes shown on the drawings, are attached. ' Some product information on the ADS in -line drains is also enclosed. The two 18" diameter in -line drains receiving roof runoff are graded as shown on the drawings to pond and provide sufficient head for water to enter the drain at the appropriate rate. Runoff from events exceeding a 10 year storm will still drain to the detention pond ' over a natural gradient of about 0.5% from south to north along the common property line between the railroad and the office building. The mass balance analysis, using a composite runoff coefficient of 0.85 and a 100 year event, indicates the development of the Horsetooth East Professional Office Building will require a detention volume of 41,000 cubic feet (the volume at 2 hours ' was used per the Denver Regional COG regulations for a balance that is still increasing at that time [31). This, added to the requirements for Public Service of 81839 cubic feet, brings the total requirement to just under 123,000 cubic feet. The reconstructed pond provides 104,507 cubic feet and the pond in the parking lot, at 18 inches deep, provides an additional 19,283 cubic feet, a total of 123,790 cubic feet. The release rate from the original pond established by Stewart [11 for Public Service was 1.19 cfs. The release rate for the proposed office building is 0.75 cfs bringing the. new release rate from the reconstructed pond to 1.94 cfs. This will be accomplished by enlarging the opening in the outlet works from 21 square inches, as constructed under Horsetooth East Business Park, First Filing, to 27 square inches. ' RAINFALL EROSION ANALYSIS Site Soils ' The Larimer County, Soil Conservation Service Soils Report identifies the soils at the site as belonging the Nunn Clay Loam described as having slight rainfall erodibility. The rainfall erosion season as detailed in the City of Fort Collins, Erosion Control Reference Manual [21 (the Manual) is between May 1 and October 31. The natural drainage of the site is from the west to the east. A mixture of dryland grass and weed ' cover currently provides an estimated 50 percent cover over the entire site. The Manual details the site as having moderate wind erodibility characteristics. The ' predominant wind direction is from the west-northwest in this area. The wind erosion season as detailed in the Manual is between November 1st and May 31st. ' Construction at the site is estimated to begin Mid -May 1995 and continue through September,1995. ' Performance Standard The estimated "During Construction" and "After Construction" Performance Standard for the new office building site are 79.8 and 93.9, respectively. For the purpose of estimating the site's Performance Standard the entire site was evaluated based on final development contours. The limits of disturbance and sub -basins are shown on the Drainage Study and Erosion Control Plan. The Performance Standard for the site was estimated using the methods detailed in the Manual and the estimated, average slope length and slope for the site. Flow lengths and slopes developed for calculation of the "During Construction" Performance Standard is presented on Standard Form A in Appendix Il. The Performance Standard was taken from Table 5.1 of the Manual. The "After Construction" Performance Standard is calculated by dividing the "During Construction" Performance Standard by 0.85. Practice Factor Measures Sediment control practice measures for the office building development will consist of the construction of a silt fence, gravel filter inlet and a sediment trap in the existing detention pond to the north. The location and details of these practice measures are shown on the Drainage Study and Erosion Control drawing and the Details drawing. Practice factor measures for the site after construction will be dismantled and thus a weighted P - Factor of 1.0 was used to calculate the effectiveness. The calculations for the weighted P - Factor for each basin during and after construction are presented on Standard Form B in Appendix II. I ' Cover Factor Measures Cover factor measures for the site during construction will consist of the building floor and revegetation of the disturbed detention pond areas with dryland grasses. The building and distured pond areas were assigned C - Factor values of 0.01 and 0.06, respectively. ' Cover factor measures for the site after construction iscompleted will consist of implementation of the landscaping plan which calls for landscaping or establishment of the grass cover of at least 60 percent cover over the disturbed areas of the site. Grass will be established with the use of hay or straw mulch applied and secured at a rate of 2 tons per acre. The landscaping and mulched/revegetated areas were assigned C - Factor values of 0.06 as selected from Table 5.2 and Figure 5.1. Cover factor values for the paved areas and the undisturbed grassed areas were not changed from "During Construction" conditions. The calculations for the weighted C - Factor ' for each basin during and after construction are presented on Standard Form B in Appendix II. "During Construction" Effectiveness Evaluation The Net Effectiveness for the erosion control measures at the site during construction was calculated as 80.8 percent and exceeds the "During Construction" Performance Standard value of 79.8 percent. Calculations of the basin effectiveness value and the Net Effectiveness for the site are presented on Standard Form B in Appendix II. "After Construction" Effectiveness Evaluation The Net Effectiveness for the erosion control measures at the site after construction was calculated as 97.5 percent and exceeds the "After Construction" Performance Standard value of 93.9 percent. Calculations of the basin effectiveness value and the Net Effectiveness for the site are presented on Standard Form B in Appendix II. WIND EROSION ANALYSIS The surface soils at the new office building site are rated as moderately wind erodible. Construction at the site will begin by May, 1995 at the end of the wind season of November to May and the site does not fall under any of the exclusions available in the Manual. Construction disturbance at the site as detailed above will occur across the entire site. The limited size of the construction area and the necessary access in this area will restrict the available area for placement of a wind barrier. For this reason the wind erosion features to be constructed at the site will consist primarily of natural features at the site, water erosion controls and the features to be constructed. The wind erosion control measures which will be implemented during construction will ' include the items listed below and are detailed on the Erosion Control and Grading and Drainage Plans. • The south drainage channel along the south margin of the development. I I I 1 1 [1 11 1� J • The silt fence along the east margin of the property. • The stormwater detention pond berm to the north of the proposed building. • The railroad embankment west of the site. • The walls and structural fill of the building. • The paved parking and walk areas. Wind erosion control measures which will be implemented after construction will consist of mulching and seeding the disturbed areas. Hay or straw mulch will be applied and crimped into the soil surface at a rate of 2 tons per acre after seeding of the site. The silt fence will be removed when the mulch is applied. The remainder of the wind erosion control features will remain intact to counter soil loss during vegetative establishment. INSTALLATION SCHEDULE Construction of the new office building is proposed to start in Mid -May 1995 and continue during the summer with the floors completed by June of 1995. The approximate date of implementation of the erosion control measure during construction are shown on Standard Form C in Appendix II. As shown on Form C the sediment trap and silt fence will be constructed prior to overlot grading. Permanent vegetation will be seeded and mulched after the completion of the project during the late -summer prior to the next wind erosion season. EROSION CONTROL SECURITY The erosion control security requirement for the new office building site was estimated based on the specification of Section 2.0 of the Manual. The cost of the erosion control measures at the site as detailed above were estimated to cost $1,520 with a security requirement of $2,280. The estimated cost to revegetate the disturbed areas with a dryland grass mix according to the city's 1993 mulch and revegetation bid was $2,860 with a security requirement of $4,290. The larger amount is required prior to construction. Both cost estimates are detailed in Appendix II. 1 1 1 I REFERENCES 1. James H. Stewart & Associates, Drainage Reoort. Horsetooth Business Park, First fjaM April1991. 2. City of Fort Collins, Colorado, Storm Drainage Design Criteria and Construction Standards, May 1984, Revised January 1991. 3. Denver Regional Council of Governments, Urban Storm Drainage Criteria Manual, Volumes I and II, March, 1969, 6th Printing Vol I September 1978. F 11 ATTACHMENT A 'SUPPORTING DOCUMENTS 1 1 11 11 I I I I 1 1 LOCATION: The Horsetooth Business Park is located on the southwest corner of Horsetooth Road and Timberline Road. The property is bounded on the north ' by Horsetooth Road, on the east by Timberline Road, on the west by the Union Pacific Railroad, and on the south by Collindale Business Park. The total Hor etooth Business Park contains 32.2 acres. The Horsetooth ' Business Park First Filin is located at the northwest corner of the site, adjacen__t_t_o__tTe_lJnion Pacific Railroad, and contains a gross area of 10.38 acres to the center of adjoining streets. Horsetooth Business Park is ' IMMed iri the Foothills Drainage Basin. Portions of the site have been previously platted as South Collins Tech Center First. Second, and Third Filings. 1 EXISTING CONDITIONS: The pavement, curbs, and sidewalks 'on Horsetooth Road are completed, and portions of the pavement, curb, and sidewalk on Timberline Road are cons tru cted. Some of the utilities, pavement, curbs, and walks shown on the South Collins Tech Center First Filing plans have been installed, although a part of these improvements do not fit the present plan, and will be removed. Other than the previously_ installed streets. the i is a pasture covered with vegeta ion. There are no offsite flows onto the site. There is an irrigation ditch which flows from west to east across the south edge of .the site. This ditch belongs to Mr. Bob Shields, and delivers water from Warren Lake to sites east of Timberline Road. This ditch is open from a point on the west side of the Union Pacific Railroad to the west side of Timberline Road, and picks up historic surface flow from the railroad right—of—way, along with some run—off from the Horsetooth Business Park site. We anticipate that in the future this ditch will be put in a pipe from Timberline Road to the east side of the Union Pacific Railroad, and that it will still carry historic surface run—off from the railroad right—of—way. PROPOSED IMPROVEMENTS: The Horsetooth Business Park First Filing consists of 10.38 acres. 7.93 acres of which are to be impervious. We plan to provide stormwater e ention for the difference between tFe 2 year historic runoff and the 100 year developed runoff. This calculates to be 2.21 acre feet of detention. There will be a small detention pon ocated in the parkin o e•nort.heast..co.cnec of, the.site, and a large detention pond located ' along the south side of the site. The maximum allowable outflow from the total 32.2 acres of the Horsetoot usiness Parls_..stte_is... .5.c.f,.s,. The 5.5 c.f.s. outflow is determined 6y the available ca aP city of the existing 24 inch pie under Timberline Roa he 24 inch pipe was instaTT— in 989 as a part`oFT-he Foothills Drainage Basin major improvements, its purpose being to carry storm flows from the Collindale Business Park and from the Horsetooth Business Park. The allowable outflow pergross acre of the Horsetooth Business Park is ivided_by . , _equal•s..0_l. c. .s. per acre, therefore ' the—iotal�outflow from the 10.38 acre site is 1.16 c.f.s. Sheet 1 ' Horsetooth Business April 4, 1991 Page 2 Park, First Filing ' We pr e to use 1 inch RCP storm drains for all the pipes in the ' Horset usiness Park Sheet 12 of t is report is a pro i e o the proposed storm pipe system. Also shown on sheet 12 is the calculated hydraulic grade line. along with calculations of pipe flow velocity and capacity at critical points. We calculated all of the velocities and ' capacities in the pipe system based on the pipe outflow going into a completely filled Collindale Business Park detention pond. This is the most conservative situation, since the high water line elevation of the Collindale Business Park pond will be lower for all storms except the 100 year storm, and even during the 100 year storm, it will not reach the full level for 3 hours. The calculated ca a i Hof the outfall � pe—Aa—jt ente the Co,l,lindale Busines.s.—Eadc ppnd_is 5.3 c.c.s.. which is close enough to the 5.5 c.f.s. allowable release rate. The hydraulic grade line is a maximum_ 0.22 feet bove manhole lids,. ' which is not to o the manhole s. There is a safety valve built into the storm pipe system. w ich is that when there is more runoff entering the pipe system through street catch basins than the downstream pipes can carry, there will be backflow into the detention ponds. Detention snds constructed in the Horsetooth Business Park shall have an outflow restriction plate rich ie hin_aed., so that it will allow b4rkflow to enter the pond through a 15 inch opening. Sheet 13 of this report shows the detention ponds for this filing, along with the approximate location, size, and high water line of future ponds. The small detention pond located in the north parking lot will provide 14.594 cubic feet of the total required 96,433 cubic feet of detention volume. The outflow from the small pond is 0.57 c.f.s., of the allowed 1.76 c.f.s., therefore. the outflow from the large pond located at the south end of the site will be the difference, which is 1.19 c.f.s. The proper volume will accumulate in the north detention pond due to the fact that we have used the 0.57 c.f.s. release rate and the basin area of 1.9 acres to calculate a detention requirement of 14608 cubic feet, which is .( substantially the same as the maximum pond volume of 14594 cubic feet. I his release rate of 0.57 c.f.s. is larger than the allowable (1.9) (0.17) 0.32 c.f.s., but we have compensated for this by decreasing the release ate of the south pond from (8.48) (0.17) - 1.44 c.f.s. to 1.19 c.f.s. The large de ten tion pond located at the south end of the site ham, a proposed capacity of llD5f3 pubic foot. and a required rigfen+inn_ vp_ of 81839 cubic feet, so there is 28724 cubic feet excess capacity. The bottom of this pond is to be left flat so that it will become a wetlands, with cattails and wetlands grasses. The wetland will become an effective settling basin and will provide a better water quality into the storm drainage system. The restricted outflow of 1.19 c.f.s. will slow the flow through the pond and allow the wetland settling area to be more effective. Sheet 2 I I 1 1 1 I I L Horsetooth Business Park, First Filing April 4, 1991 Page 3 There will be additional detention ponds constru tIudb� Pnw�—+ham e. l ditionaonds will be The allowable release ra e r all of the future parcels to be developed in the Horsetooth Business Park shall be 0.17 c.f.s, per gross acre. There is an existing 18 inch storm drain running east from the manhole at the intersection of Automation Way and Elk Road. This 18 inch line flows to the east and is part of a previously proposed system which will possibly be abandoned, therefore we are plugging the 18 inch pipe in the manhole and outflowing the manhole via a new 15 inch pipe draining to the south. The attached computation sheets show how we arrived at the allowable outflow, required detention volume and volume of the detention ponds. The attached grading and drainage plan shows the proposed grades and drainage facilities. Phillip . Robinson, P.E. & L.S. to err�V ,• 450 •go 40 J - 09000, -". ;TE I ;F C�� •'' furl/luu\ Sheet 3 1 I I APPENDIX I HYDROLOGY AND HYDRAULIC CALCULATIONS 1 I 1 1 I 1 1 1 1 I 1 I I � Z ZO rr U U Q LL E- O w O Z z ' p LLI ry Z Ltl .J < < �aCLl�a. r`"C. wO,CknMr-kn "* S to et x C- N w" rr 0 iIR:r e U M V1 IRT rr o 00 "-4 ON O ON elf e N N M M 7 7 7 CL tLa (U 6 „ to tnotn0000 OM � O O N �O ON �--� �--� N N IRT kn 00 3 to v) %n W) Wn v) vl kn kn vn to p d ¢a 0 O O O C O O O O O O N 700 a'0000r to V 00 �C In In p c p p CN r- Cf) r-4 W 4 � to ON ti O�4 Nr-I �O O M x O N cs V'f CT N vi N c+i DO N O 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 is a� N x N V'1 00 l- Z ir N a U MC`d' C1knN 00 �,O � 0 0 0 0 0 0 0 0 o 0 0 U "O "C. 4 \O %O "O "D %O 'O \,O \,O O to C n--tr to .� � � 01 n � u'1 �t er M N � •.• •� Ci v C C Cn C� C G' p �Uooxxxxxxxxoox v1 lto � l/'1kn In to v1 � V'7 V1 v1 1n a 0 0 C C O C C C 0 0 C 4) C4N '6-^o x` --N N M Z 1 F" I I U Q W Q W a Q� N Q N vg' a o LLI CCo< w r-0000r0000ar �-, -zr N tr �--� Q = W M to 00 a)Q=.aU 1:4 > QU z 00 NtNknt-r� wzW I- 7 NM N kn t CDC\ C00 ww ..Mr-:Mcr� ,6 ti r-I N N �4 <aaU O Qz> W O ,kn knr r, � � � �o h aD "q r- V1 00 l� -qr , M kn 00 O W =OU > U QE. o --+M NC, Gl W 00 \0 vl r- o, 00 O C\ o0 fZ �+ -o N l� C' 00 �O rr .� N N .r WGa0U ¢U> �z v 00 O � \c 00 O w W� kn �C N N 1, O N Z� �' 00 N N a cn M-� O N W Q M rn .7 0 0 0^ O C vl O ... O O O v1 F" ((] v i � t- 0C C� CD* O ���IT to 0. w z w M N 0 0�oo0000 �C C� 'D ¢ ¢j0 U M en 00 ors z wzw ww� a a U >z> z w M D\ M 0000 M N � O\ SOU U Ar? c41 kn v1 000w 0cC\ �r kr� N W aa0U ¢U> �Z Q O O M_ %C 00 \.c O W N W- 00 �t .-y M O O O O O to O Wn E [>27 F C� C� 66 a W z I I 1 >-4 Q O z 0 � z " W N O N 1 tab ' U F'' O C, O � cN y N E O xn En xn Way Q z� Z ' U O m a Ga M M� V V O C� C G CV N d' a 30 y �+ cM O N O k0 01 O� C C (V C r4 .�4 a .y � d' � � v1 d• vi a O w 'Eli U p c..i N VN v1 V1 M �O 00 N N 00 N 0\ o ti V o c c c o c a a a 0\ 00 N [- 0\ 01 v1 O N d' d' M Q N O C C C C F. V1 cz alf�CUf�W t r to '� a. Q' �-r N M d• v� A . .... . ... �A Si � 0� CQioK ���G Lo �" 14 �00 In AJ "J .4j 40 1A 82 x C A 19- 8 1x7 Ze 2- 4=37 4,,-W L.ACT7 MJ Af 5.0 a. vas �04 h9yne Q5izoo4eyi AJ t6r Circular Channel Analysis & Desion Calved with Nanning Equation Open � Channel •-• Uniform -f I ow war;:sheet Name: CMI Comment: REAR, D^A I N 3 TO 4 •- GRAVITY Calve For Full Flow Capacity Given Input Data: Di a,meter.......... 1.00 ft Slope ............. 0.0040 ft/ft Mannino's n....... 0.012 Discharge......... 2.44 cfs Computed Results: Full Flow Capacity..... 2.44 cfs ✓� Full Flow Depth........ 1.00 ft Velocity.......... 3.11 -Fps Flow Area......... 0.79 s-f Critical Depth.... 0.67 -Ft Critical Slope.... 0.0064 ft/ft Percent Full I ...... 100. 00 :: Full Capacity..... 2.44 cfs QMAX e.94D........ 2.63 cfs Froude Num,ber..... FULL Opan Channel How Module. Version -.41 (c) 1941 i daestad Methods, Inc. x- 37 Drookside rd w Waterbury, Ct (i670'0 Circular Charnel Analysis & Desi o� � Colved with Manninp's Equation Open Channel •. Uri forr� -flow work -sheet Name- SMI Comment: REAR DRAIN - 2 TO 3 - GRAVITY Colve For Full Mow Capacity Givers Input Data: Diameter.......... 0.50 ft Slope ............. 0.0050 Ft/Ft Mannina's n....... 0.012 Discharge......... 4.43 cfs Computed Results: Full Flow Capacity..... 0.43 c•fs �^ Full Flow Depth........ 0.50 ft Velocity.......... 2.117 fps Flow Area......... 0.20 sf Critical Depth.... 0.3:, -Ft Critical Slope.... 0.00,01 Ft/ft Percent Full...... 100.00 % Full Capacity..... 0.43 c-fs G?MAX G.94D........ 0.46 c F s FrGUde Number..... FULL Open Channel Flow Module. Version 3.41 (c) 19?1 Haestad Methods, Inc. k 37 Drookside Rd k Waterbury. Ct 067013 1 1 1 1 1 1 1 1 1 l 1 1 1 1 1 1 1 1 Pressure rirye Analysis & Dasion Circular ripe Wo hs`eet Name: SMI Comimen �t : PA Ri :I NG LOT MAIN -- 6" POND Solve For Discharge Given Inprut Data - Elevation @ 1..... 4946.20 ft Pressure a 1...... 1.21 psi Elevation C 2..... 4945.70 -ft Pressure G 2...... 0.54 psi Di aaieten.......... 15.00 in Length............ 210.00 ft HaZenl''WilliaMS C.. 140.00 Computed R'ssuIts: Di scharce......... 4005.40 opm � CGS 'velocity.......... 7.27 fps Headloss.......... 2.05 -ft Energy Grade G 1.. 4749.01 ft Enaroy Grade @ 2.. 4947.77 ft Friction Slope.... 7.741 ft/1000 ft Open. Channel Flow module, Vansion 3.41 (c) 19^1 �Iaestad Methods, Inc, x• 37 Drookside fed 4 Waterbury? Ct 06700 1 1 1 1 1 1 1 1 1 1 1 Pressure rice Analysis & Desion circular ripe Workshaet Naane. CMI Comment: PARI(ING LOT DRAIN, 12" POND/ Colve For Discharge Given Input Data: Elevation @ 1..... 4^,46.20 ft Pressure 0 1 . . . . . . 1.65 psi Elevation @ 2..... 4945.70 ft Pressure C 2...... 0.54 psi, Diaamete .......... 15.00 in Length............ 210.00 ft Hazen -Williams C.. 14o.00 Computed ,Results: Discharge......... 4973.99 gpm Velocity.......... 9.04 -fps I- leadloss.......... 3.06 Ft Energy Grade @ 1.. 4951.28 ft Energy Grade @ 2.. 4940.22 -Ft Friction Slope.... 14.575 ft/1000 Ft Open Channel flow Module. Version 3.41 (c) 1^91 Ilacstad Methods. Inc. 37 Dr oakside Rd x Waterbury, Ct 06700 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Pressure Pipe Analysis Desi an Circular Pipe Wcrkshaet Name: Sr'MI Comment: PARia:ING LOT DRAIN la" f Gi.',D Solve For Discharge Givers Input Data: Elevation @ i..... 4946.20 ft r'ressure @ I...... 1.36 psi Elevation @ 2..... 4945.70 .ft Pressure @ 2...... 0.54 psi Di as,eter.......... 15.00 in Length............ 210.Oo ft Hazen ... Williasms C.. 140.00 Cc,r,outed Results: Di scharae......... 53 >. 15 apri Velocity.......... 9.79 fps Head 1osS.......... 3.55 'ft Energy Grade @ 1.. 4751.90 ft Energy Grade @ 2.. 4940.43 ft Pricticn Slope.... 16.002 ft/1000 ft Span Channel Flow Module. Version 3.41 (c) 10,^1 laestad Methods, Inc. 37 Gokside R'd x Waterbury, Ct 06708 No Text No Text 0.8 0.7 1L 0.6 IAJ Z 0.5 w > 0.4 O 2 H a 0.3 w C C7 ? 0.2 Z O a"0 EXAMPLE M 0.0 0 I 2 3 4 FLOW INTO INLET PER SO. FT. OF OPEN AREA (CFS/FT2) Figure 5-3 CAPACITY OF GRATED INLET IN SUMP (From: Wright -McLaughlin Engineers, 1969) 5 MAY 1984 5-11 DESIGN CRITERIA I 1 I I I I I WATER Project: Calculated By- %— WASTE Project No.: Checked By: & LAND Task: Q)4,a. ✓ACC' Dater 2 �c 44.¢ 4c- �, c Ac- X / � _ �, ,4- . x o. �7 = D, 7�G=s 1 2629 REDWING ROAD SUITE 200 FORT COLLINS, COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WATER Project: Calculated By: W A S T E Project No.: Checked By: & LAND Task: Date: ,U of ("= D• a_ = O. / s� = 2/ .1AJCd&-5 _ o. s - 4e- '5- _ �es,=�r-,�Zax d Q 1¢,' A T4,=- e4 9� 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLC==:O 805:8 (303) 225-3535 FAX (302) 226-6475 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WATERProject: _ Calculated By: VIC W A S T E Project No.: Checked By: & LAND Task: Date: 16P 2 , tA) . 2 •G it 2/ SQ in1. 6-W s T" 17(,a. ,4, ice. /5 n �L H c�PF �4TL 2629 REDWING ROAD SUITE _OJ FORT CCLLINS, COLt:RA00 805=6 (303) 226-35_'S F0.Y (30_') 226 -6a'S I 1 1 H 1 1 1 H 1 G' L 1 1 C 1 1 1 WATER Project: �� �— �r�/ Calculated By: zZA L VV W A S T E Project No.: 4 ' Checked By: & LAND Task: Date: _ 27 -USA" N, 5 /nN - Lr AJ5- A C ,4 c c_ (2 e 0.25 ,BA St r,J O. 22 A c A LL AC- Q.2S = �i m•.v C' 17�3 614-7/AJ 64- - o. o/. A C- c _ 0. 46 AC- e- 04 ' 4�qc _ %c, C� ^ A y12 Aa-eyi 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORAOO 80526 (303) 226-3535 FAX (303) 226-6475 1 WATER Project: Calculated By: W A S T E Project No.: Checked By: 1 & LAND Task: Date: 1 1 2629 REDWING ROAD SUITE 200 FORT COLLINS, COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 i 1 I I 1 1 11 1 1 WATER Project: Calculated By: viv W A S T E Project No.: Checked By: LAND Task: Date: o. (3 .77 TEA = 7-t .9Kx r z- x 0.3� 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 Circular Charnel Anal vai s & Desi ors Oolved with Manning's Equation Orren Channel • untiforn -flow worksheet Naa,e: OMI Comment: REAR DRAIN - 1 TO 2 - CRAVITY Colve For Full Flow Capacity Givan Input Data: ¢'r Di arlater.......... 0.-.3 'ft Slope ............. 0.0100 ft/•ft Mannino's n....... 0.012 Discharge......... 0.20 cfs Computed Results: Full Flow Capacity..... 0.20 cf-s awe` Full Flow- Depth........ 0.33 ft Velocity.......... 2.35 -fps Flow Area......... 0.09 sf Critical Depth.... 0.25 ft Critical Slope.... 0.0114 ft/ft Pei -cent rt full ...... 100.0: :: Capacity..... 0.20 cfs (F�ull JG INAX @. 94D. . . . . . . . 0.22 c'f s Froude Number..... FULL Opens Channel Flow Module. Version 3.41 ic> 1971 Ilaastad Math ods, Inc. * 37 Drookside Rd x Waterbury, Ct 06700 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Circular Channel A � �al'vsi s ": Desi on Solved with Manning's Equation Open Channel -- Uni fo rr. flow Worksheet Name; CMI Comment: REAP; D^AIN -- 1 TO 2 •- CRAVITY Solve For Full Flow Capacity Given Input Data: Di arneter........... 0. 50 f t Slope ............. 0.0050 ft/•ft Mannino's n....... 0.012 Discharge......... 0.43 cfs Computed Results: Full Flow Capacity..... 0.43 cfs �--'— Ful1 Flow Cepth........ 0.50 ft Velocity.......... 2.17 fps Flow Area......... 0.20 s-f Critical Depth.... 0.33 ft Critical Slope.... 0.0001 ft/ft Pei -cent Full....... 100.00 % Full Capacity..... 0.43 cfs QMAX G.94D........ 0.46 cfs FrGude 11:uaber..... FULL Open Channel Flow Module. Version 31.41 (c) 17^1 :taestad Methods, Inc. * __i Drcokside Rd x• Waterbury, Ct 06700 f Circular Channel Analysis & Desion Solved with Ma n i no ' s Ecuat i on Open Channel - Uni orm flow Work:sheet Naavme: CMI Comment: : REAR DRAIN -- 4 TO S Colve For Actual Discharge Given Input Data: Di asmeter.......... Slope ............. Mannino's n....... Depth ............. Computed Results: Di scharce.......... Velocity.......... Flow Area ......... Critical Depth.... Critical Slope.... Percent Full...... Full Capacity...... GMAX C.94D........ Froude.Numbei...... 1.00 ft 0.0060 ft/ft 0.012 1.00 -Ft 2.99 cfs 3.01 fps 0.79 sf 0.74 ft 0.0074 ft/ft 100.00 % _2.99 cfs _.22 c-fs FULL Open Channel flow Mcdule. 'version 3.41 (c) 1991 Haestad Methods. Inc. * -37 Brookside Rd * waterbLtrv, Ct 0 ,700 Circular Channel Analysis & Desio_n Solved with Manning's Equation Open � Channel - Uniform flow Wcrksheet Na,s;e: SMI Cos.ament: REAR D^AIN - 5 TO END Solve For Actual Discharge Given. Input Data: Diameter.......... 1.25 ft Slope ............. 0.0050 ft/ft Manrnino's n....... 0.012 Depth ............. 1.25 ft Computed Results: Di scharoe......... 4.95 c•f s Velocity.......... 4.03 fps Flow Area......... 1.23 sf Critical Depth.... 0.^:0 ft Critical Slope.... 0.0066 ft/ft Percent Full...... 100.00 Full Capacity..... 4.95 c•fs GMAX C.74D........ 5.32 cfs Froude Number..... FULL Coen Channel Flow Module. Version 3.41 (c) 1991 Haastad Methods, Inc. •x _7 Brookside Rd -xWaterbury Ct C?6700 I 1 1 1 1 11 i 1 1 1 1 1 1 1 1 1 1 1 WATER Project: Calculated By: W A S T E Project No.: Checked By: & LAND Task: Date: �)P-/ . DP 2 ANC /DP4- -- JA) u A,� -N 2 7/ 24G :. - - .. �� __-�r-� -- p.4�- Jai'• F� . _. USG. .n1 2'/BAC 6c1� ru A'L- . 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 r Inline Drains 12' OVIPIW 4'A' Aaaaw 8" Inline Drain 2708AG 8" Round Cast Iron Grate 4" or 6" Adapter for 4" or 6" Pipe .10" Inline Drain 2710AG 10" Round Cast Iron Grate 6" or 8" Adapter for 6" or 8" Pipe 12" Inline Drain 2712AG 12" Hinged Cast Iron Grate 4", 6", 8", 10", 12" Adapters for 4" - 12" Pipe 18" Inline Drain 2718AG 18" Round Cast Iron Grate 81, 10", 12", 15'; 18"Adapters for 8" - 18" Pipe I.Q44PrT p 61jfl, All Dimensions Are Nominal ADS pipe fittings N-12 Wye N-12 Elbow 450 With N-12 Branch N-12 Tee loth N-12 Branch IJ I 1 size ADS D'd dose OtOauct dimension L A a Z ' 4' x 4' 0481 AG 10.50' 2.25' 2.25' 3.00' 6' x 4' 0681 AG 13.00' 3.25' 2.25' 4.0r 6' x 6- 0682 AG 15.00' 3.25' 3.25' 4.2S' x 4' 0881 AG 17.5r 4.25' 2.25' 5.00' 8' x 6' 0882 AG 19.25' 4.25' 3.25' 5.25- '8' 8' x r 0883 AD 22.00' 4.25' 4.25' 5.25' 10'x 4' 1081 AG 20.50' 5.25' 2.25' 6.00' 1 r x 6' 1082 AG 22.00' S.25' 3.25' 6.25' 1 r x 8' 1083 AG 23.75' 5.25' 4.25' 8.50, t r x 1 r 1084 AG 27.25' S.25' 5.25' B.5r 12" x 4' 1281 AG 22.75' 6.00' 2.25' 7.25' k1 2' x r 1282 AG 24.25' 8.0r 3.25' 7.25' 2' x 8' 1253 AG 26.00-BAr TO* 7.5r 7 x 1 r 1284 AG 28.00' 6.00' 5.25' 7.75' x 12'-1285 AG 31.5r 6.Or 6.00' 7.75' 'x r 1581 AG 25.0r 6.Sr 2.75- &75- 15' x r 1 S82 AG 26.75' 6.50` 3.75" 8.75' 15' x 8' 1583 AG 28.50' 6.50' 4.50' 9.00* 1S'x 10' 1S84 AG 30.50' 8.50' S.25' 9.2S' 15'x 12' 1S85 AG 32.25' 6.50' 6.Or 9.25' 15' 1S88 AG 37.00' 6.60' 8.Sr 9.50' ',1S'x 18'x r 1881 AG 27.Or 7.Sr 2475" 11.50' 18'x r 1882AG 29.00' 7.50' 3.7S' 11.Sr 18'x 6' 1883 AG 30.50' 7.50" 4.54Y 12.0r 18'x 1 r 1894 AG 32.50' 7.50' 5.25' 12.Sr 18'x 12' 1SSSAG 18' 1886 AG 34.SO' 7.Sr B.Or 12.50' 337.5r 871301 8'x15'1887G4 7.50'.rSr 13.000 IMP N-12 Coupling A 1 1 0 1_ L a sae ADS D Cade Omauct dimenwns L A +' 047t AG 5.00' 2.25' 6' 0671 AG 7,50" 3.25' 8' 0871 AG 10.25' 4.25' 10' 1071 AG 12.50' 5.25' 12' 1271 AG t+.00' 6.00' 15' 1571 AG 15.50' 6.50' 18' 1871 AG 18.00' 7.50" n size ADS product dullemiam D'd code L A a Zt Z2 4'x 4' 0491 AG 12.75' 2.W 2.25' 4.Sr &Or rx 4' 0691 AG 15.5r 3.25' 2.25' S.OV 6.25 rx 6' 0692 AG 18.Or 3.W 3.25' 9.Sr &75' 6'x 4' 0891 AG 20.50' 4.25' 2.25' 10.75' 7.S0' r x 6' 0892 AG 22.25" 4.25' 3.25' 11.Sr &Or r x 8' 0893 AG 26.Or 4.25' 4.25' 13.Sr 8.25' 10' x 4' 1091 AG 23.5r 5.25- 2.25- 12.5r 9.25- 10' x r 1092 AG 26.Or 5.25' 3.25' 13.75' 9.54r 1rx 8' 1093 AG 27.75' 5.25' 4.25' 14.5r 9.75' 10'x 10' 1094 AG 32.00' 5.25' 5.25' 17.0r 10.25- 12'x 4' 1291 AG 25.75' 6.00' 2.25' 14.00r 10.75' 12'x 6' 1292 AG 28.25' 6.00' 3.25' 15.2S' 11.Or 12'x 8' 1293 AG 30.75' 6.0r 4.25' 16.5r 11.25- 17x1r 1294 AG 33.Or &W 5.25' 17.75' 11.75' 12* x 12' 1295 AG 37.25' B.O V 6.01r 20.01r 120r 15'x 4' 1591 AG 28.5r &ST 2.75' 16.25' 1275' 15'x 6' 1592 AG 31.0r 6.5r 3.75' 17.Sr 13.0r 1S'x 8' 1593 AG 33.Sr 640' 4.5r 18.75' 13.Sr 15' x it 1594 AG 36.5r &Sr S.2S 20.5r 14.0r 1Sx 12' 1595 AG 38.00r &Sr 6.Or 21.5r 14.25' 1S'x 15 1596 AG ".Or 6.5r 6.Sr 24.5r 19.00' trx 4' 1891 AG 29.0r 7.5r 2.75- 19.25 18.Sr 1rx r 1892 AG 32.5r 7.Sr 3.7S' 20.7S' 17.0r trx 8' 1893 AG 34.50' 7.5r 4.5r 22.25' 17.Sr 1rx 10' 1894 AG 39.0r 7.50' US' 24.00' 18.01r 1rx 12' 1895 AG 42.5r 7.Sr 6.Or 26.0r 185r 1rx 15' 1896 AG 45.Or ?.Sr 6.51r Z7.25' 19.0r trx tr 1897AG S1.Or 7.Sr 7.5r 30.50' 220r N-12 Elbow 22.50 Z ' A i sae ADS D code Wa&KI aimerlsgns A Z r +' 0422 AG 2.25' 1.25' 5.25' r 0622 AG 3.25' 1.75 7.75' 8' 0822 AG 4.25' 4.50' 12.Sr 10" 1022 AG 5.25" 5.50' 15.00" 1T 1222 AG 6.00" 6.25" 18.0r 15' 1522 AG 6.50" 7.75' 23.Or aura ADS We=dimerw= D coda A Z r 4' 044S AG 2.25' 2.25' 5.25" r 064S AG 3.25' 4.Sr 7.75' r 0845 AG 4.25' &Sr 12.5r 1r 1045 AG 5.25' tO.W 15.00' 12' 1245 AG 6.6r 12.25' 18.00' 15' 1545 AG 6.SV 14.75' 23.00' N-12 Elbow 900 size ADS D code waduct dimena" A Z r 4' 0490 AG 2.2S" 5.25' 5.25" r 0690 AG 3.25' 9.Or 7.75" Or 0890 AG 4.25' t* r7 t25r 1 r 1090 AG 5.25" 23.00' 15.00' 12' 1290 AG 6.00' 26.75' 1 &00" 15' 1590 AG 6.Sr 3200' 23.00' FOOTNOTE: Additional standard fittings are shown in the ADS fittings man- ual available from your ADS sales engineer. 1 n LJ 1 u APPENDIX II ' RAINFALL AND WIND EROSION CALCULATIONS I I n I I I I I J L� I 1] 1 0 1 1 1 1 1 1 1 1 1 1 1 1 WATER Project: -l-d�-r" iT• Calculated By: Q7r� W A S T E Project No.: gzrl Checked By: & LAND Task: : T-Date: LLVG ICKr y I N -- - --,g _- �_? �. 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 I 1 H k 1 1 1 1 1 1 [J 1 1 1 1 1 WATER Project: tly Calculated By:—:77_Af- INKW A S T E Project No.: y� AM Checked By: & LAND Task: 7Zc_e4>5K66J Date:Illo-0125 _ s-� q��a L" �Nzx-r� 2:> N�5 ZW"7�v 5. Lieu t� 11 2629 REDWING ROAD SUITE 200 FORT COLLINS, COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: /�o2,scmb-{ aAyT STANDARD FORM A COMPLETED BY: �(_ . 7TL DATE:. �O % ---------------------- DEVELOPED ----------------------------------------�--- ERODIBILITY Asb Lsb Ssb Lb I Sb PS SUBBASIN ZONE----+-(ac)__� (ft) (Z) . (feet) (NO) I (A) -- ------ -- 5 ------- ------- ------- ------- I------- �r -r4161gS3 1 5.1 1 1 1 rk r mm ----------------------------------- DI/SF-A:I989 (,DMt'r s— e = 7-Mlo I [J 1 1 1 1 [] 1 .1 1 11 1 1 WATER Project: T Calculated By: -T7 I%/ W A S T E Project No.: ` Z7 Checked By: & LAND Task: Date: 1 2629 REDWING ROAD SUITE 200 FORT COLONS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 1 1 1 1 1 1 1 1 1 1 1 1 WATER Project:Calculated By: W A S T E Project No.: Checked By: & LAND Task: 6D Date: i4zTg.>_f7�- _VUL�,E_ -AM q 3/Aczr 7g-%::;3 V_=�4�Lr�k-5.= 1 Y0toD V 0 L_ = I ` (c> 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 I 1 EFFECTIVENESSCALCULATIONS ,PROJECT: �P5F_-nbT S�-----------STANDARD FORM B 1 ,COMPLETED BY: �IJ .ST�� DATE: /0 I 1 I Erosion Control C-Factor P-Factor I Method Value Value Comment I /,p Fong'3n v5 I MAJOR, PS SUB AREA I BASIN (;) BASIN (Ac) CALCULATIONS i----- --�;-- ----- -----------------------` ---_--------------EFF s 1 I I 1 SZ . '�7o x8z3�� 1 HOI/SF-8:1989 i ICII LJ EFFECTIVENESS -CALCULATIONS ------------------- _--------------------------------� 1 PROJECT: �f�2S 7F1T STANOARO FORM B 1 / COMPLETED BY: LDS T OAT':, MAJOR BASIN 1 i i 1 1 1 I 1 1 Erosion Control C-Factor P-Factor Method Value Value Comment ---------------------------------------------------------- -------------- PS SUB I (�) IBASIN' AREA I (Ac) -----CALCULATIONS --------------- ------------------------- a:T-Iu5 = Z, 86 Qom. i I� � - C,= D, DZ5 7 = /c,C) W6r ��� "�`L✓c �ll.�sS o� �S 1) -------------------------------------- 1 HOI/SF-B:1989 1 1 1 1 O¢ z z ' a w�¢ o~ w � � w w U z o a v) o a F" Z p Z O �.. O z o cc O A ¢ U Z = � c 0 O i ? jN@j U F o O a� � .a�= ,> > c F F� ¢ ° Ua a (¢ v °� W . c _ c w Inai Z w u z O w v E O 3cnv, czvn V') >a.�cn° ' WATER Project: Calculated By: W A S T E Project No.: Z7 Checked By: 1 & LAND Task: E Zuni Date: S =�,Z9 o i 1 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 I 1 1 1-- I I I I I I 1 1 I I I WATER Project: -'mory Calculated By: W A S T E Project No.: 4JZ1 Checked By: & LAND Task: Date: 10Q �c Z) � M ai � A rJ Pc72 4c + zc1a fifes ter . Lr--1�5 T4AU Cam- ib �E1 EL4 , 2629 REDWING ROAD SUITE 200 FORT COLLINS. COLORADO 80526 (303) 226-3535 FAX (303) 226-6475 � Agyp RY 14", 1,01,1XII WIN 'c ( AIR NI AN sWIN /aE� y QCC ¢ z0 � OJ I 00 per¢ r p �I fl •� IM1 z i IN I I i� NI IEACfA MAN &r Z Sx HORSETOOTH Eil ST FISHED FLOOR LLEV - 50,50 M PUBLIC SERVICE EXISTING DETENTION BOND SAO BAD FIwAP Dv NATIONAL) 41. I � Y v 1 o 8956 }I-� FOR WORK IN IRRIGATION DITCH SEE ST_WART k ASSOCIATES UTILITY PLANS r FOR HORSETOOTH EAST BUSINESS PARK MINOR SUBDIVISION APPROVED I/30/95 CBW AUTOMATION a f N WiC2. / INV ELEV - ADs WANED END Yc INV ELEV - ARMS - HORSETOOTH EAST PROFESSIONAL OFFICES LEBEX! �+41---- INDEX CONTOURS INTERMEDIATE CONTOURS ® EXISTING ELECTRICAL MELT 'T m EXISTING TELEPHONE PEDESTAL T O EXISTING ONE HYDRANT EXPORT MANHOLE W EXISTING SHUTOFF VALVI ---SS - -- EXISTING SANITARY SEWER R -SO-- - EXISTING STORM DRAIN B I -- W - -- EXISTING w4EP LINE —44)50— NEW CONTOURS ® IHILOW CURB - ER CURB IS OUTFLOW wx» (SEE DETAIL SHET» WOMEN suLf w PETIT DETAIL A REFERENCEPOND ER- - w w o SO REFERENCE SHEET NUMBER 495050 - - - - ELEVATION O TOP E OF NEW BC) (EC) AND x na B]LidA GE NEW CURB (BC) DAMN ELEV - 49Cp FT Py BIG HORN ROAD 11 SEE SHEET s PNR TRADING AND DRAINAGE DETAILS PAT, z) SEE s«EET 5 FOR UTILITY DETAILS -�» - 5) CITY WALL NOT BE RESPONSIBLE FOR MAINTENANCE .. • - _ �- _ - Or I/II ONSIDESTOWS DRAINAGE FACILITIES NOR xv MOONWIDEPTHR5OTHE STORY DRA«AGE SYSTEM EEEMN r HINGE ID" 1 1Y k' I I GALVANIZED HINGE GALVANIZED IT' THIN CONCRETE HI THICK PLATE IS" RCP y ELEV SD45.5 �q PMn PO x �MN-� EICS ii SO INCH OPENING NEW ZZ SO INCH OPENING r :IIN r TJZp Om O O J J YmIFY EXISTING; PLATE N« F POINT NI PIT 5p KB1 n= WE � Ora ERONT VIEW SIDE VIEW of z � w 1 EXISTING DETENTION POND OUTLET DETAIL 0 a O 2 O_ C4 SCALE: 1" - I < iwFow Q05 O Obym 1 -BUILDING QO $W ELfV - 495].5 OC w EUPI D Okl¢Z I 1 u LL w s t j eovefrz SOUTH ELEV - wv o i svLA acDL d I ( I !m SOUTH ELEV - N51.a S�J.LEY. r 1 NORTH AND SOUTH 2 ROOF LEPD_ER DRAIN DETAIL C3_ sue v. I 3 a GRADING AND DRAINAGE PLAN C3 of 5 110 BEEN 2A SECTION C3 s kE 1/Z' - I' No Text