Loading...
HomeMy WebLinkAboutDrainage Reports - 06/01/2012 (2)TST 760 Whalers Way Bidg C, Suite 200 Fort Collins. CO 80525 970.226.0557 main 303.595.9103 metro 970226.0204 fax ideas@tstinc.com www.tstinc.com TST, INC. CONSULTING ENGINEERS City of Ft_ Collins prov Plans Approved By. � May 16, 2012 Date 6- 1 1 Mr Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Seven Lakes PUD Phase II Subdivision — Amended Site Plan (OCR Site) Supplemental Drainage Report PN 0978.0010.00 Dear Wes: Please find included in this revised letter report a supplemental drainage analysis for the amended site plan for the Orthopedic Center of the Rockies (OCR) site. The amended site plan includes an addition to the existing building to allow additional exam rooms and administrative space, and an expansion of the parking lot in the northwest portion of the site. This report has been updated to include the information required for the Floodplain Use Permit. This supplemental report evaluates the drainage components for the proposed changes to the existing parking lot area and drainage facilities. Documents reviewed include the Final Drainage Report for the Seven Lakes PUD Phase I I Subdivision, dated January 5, 1989; prepared by Stewart & Associates, Inc. Excerpts from that report are included here for reference. Floodplain This site lies within the FEMA 100-yr Spring Creek Floodplain as shown on the FIRM (Flood Insurance Rate Map), Panel 0983H, Map Number 08069C0983H, map revised May 2, 2012. A copy of the FIRMette is included within this report. The existing building and proposed building expansion finished floor elevations are above the base flood elevation by a minimum of 0,50'. The base flood elevation along the western edge of the building is 4901.02 and the finished floor elevation of the existing building and proposed building addition is 4901.86. An exhibit showing the base flood elevation interpolation is included in this report. Building Addition The proposed building addition is for additional exam rooms, administrative areas and the expansion of the physical therapy area. The foundation construction will consist of slab on grade construction and the elevation will match the finished floor elevation of the existing building of 4901.86. The finished floor elevation (lowest floor elevation) is above the regulatory flood protection elevation of 4901.52 and in compliance with Chapter 10 of the City Code. The table below summarizes the finished floor elevation and associated flood elevations. Description NGVD 29 NAVD 88 Proposed Finished Floor Elevation 4901.86 4904.86 FEMA BFE at upstream end of structure 4901.02 4904.02 Regulatory Flood Protection Elevation 4901.52 4904.52 Lowest Floor Elevation 4901.86 4904.86 HVAC Equipment 4909.86 4912.86 OCR Supplemental Drainage Report Page 1 A Floodplain Use Permit will be submitted at the time of the building permit application and a FEMA Elevation Certificate shall be completed and approved prior to the certificate of occupancy is issued for the building addition. Existing Drainaqe Patterns Existing basin 1 is 3.35 acres and includes the western portion of the existing parking lot and OCR building. Stormwater runoff in this basin basically sheds from the OCR roof to the west, and then to the northeast via overland flow and across the parking lot. Runoff is intercepted in two 5' type R inlets located on the eastern edge of the existing parking lot. Runoff that is not taken into the inlets overtops the sidewalk and flows toward the wetland channel in existing basin 3. (The existing basin 1 is comprised of proposed basins 1, 1.1 and 1.2.) Existing basin 3 includes the wetland channel along the northern property line and a small portion of the OCR building on its northern side. This basin is 1.10 acres. Runoff from this basin sheds from the roof and overland flow on the north side of the OCR building into the wetland channel that drains to the east. (Proposed basin 3 is a small portion at the very upstream stretch of existing basin 3.) The existing basins are illustrated on the Drainage Plan prepared by Stewart & Associates that is included with this report. Proposed Drainage Patterns The proposed parking lot addition, shown in proposed basins 1.1 and 1.2 will redirect the drainage pattern in the existing basin 1. Proposed basin 1.2 redirects stormwater runoff toward the north to a proposed rain garden. The amount of developed runoff in the 100-yr storm directed into the rain garden is 4.97 cfs. This runoff is intended to infiltrate in the rain garden. However, there is a weir overflow at the east end of the rain garden to accept and direct runoff toward the existing 8" storm pipe and wetland channel in basin 3. Runoff that does not infiltrate at the rain garden will follow the existing drainage patterns and into the wetland channel. Proposed basin 1.1 is still directing runoff toward the existing parking lot and storm inlets. The amount of area now draining to the existing lot is reduced by 0.48 acres. The amount of developed runoff (attenuated flow from basins 1 and 1.1) at design point 1 is 21.9 cfs for the 100-yr storm. This is an overall reduction of 1.4 cfs in this basin, as the existing basin 1 generated 23.3 cfs for the 100-yr storm (according to Stewart & Associates calculations). Inlets There is an existing type 13 inlet located at the western side of basin 1, and two existing 5' type R inlets located in basin 1 on the eastern edge of the existing parking lot. These inlets intercept a portion of the minor storm, while the remaining runoff flows to the east and north in the parking lot and overtops the sidewalk to follow existing drainage patterns and spill into the wetland channel located north of the building. As stated earlier, the proposed condition reduces the amount of runoff toward these inlets slightly; however, runoff will still overtop the sidewalk at design point 1. The amount of runoff anticipated to be intercepted in each of the type R inlets is 4.9 cfs in the 100-yr condition. Since this area is within the 100-yr floodplain, the amount of runoff that will overtop the curb and sidewalk at design point 1 was not calculated at this time. Storm Sewer There is an existing 8" diameter storm pipe located below the sidewalk at design point 3. This storm pipe accepts approximately 1.73 cfs. Additional runoff in this area overtops the pipe and sidewalk. Rain Garden The proposed rain garden provided at the north end of the new parking lot is intended to accept stormwater runoff for infiltration into the granular sub -base and to provide the water quality capture volume (WQCV) sufficiently sized for the basin draining to it. An emergency overflow weir will be provided at the east end of the rain garden to allow for overtopping directed toward the wetland channel in the event that infiltration in the rain garden fails. The tributary area for the rain garden is 100% impervious and approximately 21,000 sq. ft. Thus the required WQCV for a 12-hour OCR Supplemental Drainage Report Page 2 drain time is 700 cu. ft. The provided rain garden size exceeds the requirement and is approximately 1258 cu. ft. in volume. The base elevation of the rain garden is 4899.25 and the top elevation is 4900.25. A detail of the rain garden is provided in the construction drawing plan set. A Subsurface Exploration and soil percolation evaluation was completed by Earth Engineering Consultants, Inc. (EEC) for the rain garden concept and the results of this evaluation have been included in this report. The overflow weir elevation is also set at elevation 4900.25. The width of the weir is 5' with a crest length of 3'. The weir calculations show that this size of weir will sufficiently pass the 100-yr developed flow from basin 1.2 of 4.97 cfs to the downstream channel. Summary The stormwater runoff from the amended site plan at OCR has met the design requirements set forth by the City of Fort Collins and has incorporated water quality measures prior to the runoff entering the existing wetland channel, thus achieving better stormwater quality than existed prior to the building and parking lot additions. Please refer to supporting exhibits, calculations and the proposed drainage plan included in this report. TST, INC. CONSULTING ENGINEERS Sincerely, 01�/Wo AAV� Heather McDowell, P.E. Cc: Mr Brian Varella, CFC Utilities Aaf`rf-e2ne A. S Bowen, P.E. OCR Supplemental Drainage Report Page 3 CITY OF FORT COLLINS 080102 ZONE AH (EL 49041 4 i3 ZONE AE 0 D \ Spring = 20 P .t� .Spring Creek a �N ZONE AE n PROSPECT PARK LI A VNUALCHANCE DD DISCHARGE JNED IN CULVERT 9�),, 4 4>?p8 MAP SCALE 1" = 500' 50 500 00 ZONE ...0- —IGO ET a= A ; -','n�''��p'�� ;�"utmlltl01W1 �YANtL UVWH 4904 FIRM a m FLOOD INSURANCE RATE MAP LARIMER COUNTY, r 4491000m N m COLORADO E I � I ID AND INCORPORATED AREAS PAM 983 OF 1420 .d (M MAP INDEX FOR FIRM PANEL LAYOUT) O DSO CZAAMUNITY NUMBER PANEL SUFFIX tApaERfptMly Of61 14 —ZONE AE ramcauxe.cm or ow „ �t� 'D EF �FLOODING CACHE LA PO )JECT ;ATIONpl�. '. �" a IaNanT 0—v �'w wpay. MunWerrcNw.w BMrlaga0 tle oast on IIRJai%t aOWcnfwn tw fa WpCt � ",. mnegrcry rxa>w MAP NUMBER ZONE AE- ® s 08069CO983H 4900 r MAP REVISED �`axa " a as MAY 2, 2012 E Ftderat Emergtvtey Maaagtwhent Agency extreptea uemp FJ fT 0 LI— Ths map doee not ref act changes or am.hcI menb which may hat! ben made subaequem to the date an the the dock. For the latest proWtt Wormadon but Nadenal Feed Insurance Program Rood maps chock the FEMA Flood Map St" at w mec.fom..gw Leo -�-•_- \ T��/ i® No iNO.NKM 760 WhoWm Way. 9W9. C Sint 200 Fart Colkm Colorado X ` . � oar / '�•� i \ DRY ; .fj, ' \ ' oar 10 ply$ /3 �rFstlyy �� 9�7$• °m 9' cepi i D O, TWTR---'-- rIwawo rr �v -,d ,1-"rL �,� ... L ���_i� --- N SCALE: 1" = 2W � I � I l II EXHIBIT BFE DETERMINATION SEVEN LAKES PUD PHASE II AMENDED PLAN OCR BUILDING ADDITION DRAINAGE PLAN SEVEN LAKES PUD PHASE II SUBDIVISION - AMENDED SITE PLAN (OCR SITE) LEGEND �i COMTKXW A, BA910E9fN POMT —_— maPngn aASM BDIwARr \ � � � y r3• ` _ --�•y�--• �s::•�,�'�' .,a.� --- Exs,�D sTael srtw fit Il � � �/ I \ y;s..� f i e r -•��-- rLnII oExcrlw OCR lot, — —� _ J N BUILDING /•.7 / 1 I t' �_ III _ 7� .L i� `H aH!?SLILLSGLE:f.Su _ _ — _ _ _ — _ � _ y�J G n}�� — — S �a acL— �a Aso w>,aa. M. wYw 0. mb 2DD i vme m.2 ,Ioe R Dmmla.o.W10.0 o Fliniamr. K:\DJp\0010\O� W \00 f O_EnMq�. Gp N O W W 0 U w 0 d N 0 a E 0 U C .y R m c U U cq CO o N U o o o c m U a) U O O r N r M a0 CDC tf U � o 0 0 0 n a� N Q U C (D cr o 0 0 0 2 U. U m 'y �n Ln O N M O O co V Il r of K) c E O O O O O O 0 U U `c U in u] O �n O u-) O u) O O m m N O N O N m N O U O O O O O O O O O C) 0 c U N I� O O V O O V O Q V co CDO N 41 0 6 0 0 0 0 0 0 Q au a) a) a) O O O O c/) O a) o O o O o 0 > v > v > co v v a_.� ¢�. d N fl - . y O O _ N N - O O - Q y 10 Q) cc a7 m m O W w m w a) U) C m C m C m C m J J J J V R O V cc 6 M CO M d r 04 o 0 0 Q C co E n w w 0 m r 0. m C m N cu m L a Y J m CO c O N O E 0 _c C m M v O C O m E 0 cv F I`a p > U p O o F- O It E m m N N ^ N t6 _ U ~ al �' C U h Q 4 C R N —QOi O U> c c nu urn m°� L Cn o 0 0 0 U a L C v c 3 N L p — U LL 0 > d o N ~ O E i= a� > R > m F. F T m ch co c a o c d > N d � O T coa mmoo N j Cc t+J 17 Q y O O J LL J j O C g n IO r� M V m UU U N m o c 0 CO m 0 0 o m 0 C 01 N U o oN nr�m�n coo, c U o o 0 0 a Q U 0 c Ci n OD O O O o u`. C co I cc 0] W W 1 C N r M r N M co W X L.0 r m O y r N O O N ON r Q r �. O y O Ur N cc y O = y . O W � m ^O U N N (J O r o 5 C r Q) r Y cu LL y M C O Q y� r O N r p (O r O r O N y m rn rn m co m m co L O r C �> co co co C _ O M V ? -Ir mr c m y y M r n(no co co v N N N N N ca _ O 00 F- a C O (D c` Ci U O C T' O U O @ O T co E F. N N � C O O T IO O V M U � CO W Cl (D 0 o o r U o O @ 7 T O �rw(n N M O � 0 0 0 0 ;o � r Q U` C O N r M co O tf7 O LL N @ Q v C cc M r (D r a (`") @ 0] of r N X Xcc r M m W W a Cc O U � U @ U Q N O 'U C.)d O m CB a) L Z U CO U N U N N O � U5.jN 1 co m I n I of p o m d c N V v Lo N v c I S. � O co co C O M M co � I � N co a n '- co c O C6 U m Pc- - I U o d O nWs Worksheet Protected F- DESIGN PEAK FLOW FOR ONE-HALF OF STREET BY THE RATIONAL METHOD Project: OCR Inlet ID: existing - southern type R inlet Design Flow - Gutter Flow * Carry-over Flow OVERLAND $IDE OVERLAND I FLOW l 4 STREET I 4 FLOW 4, ? 11 j —GUTTER FLOW PLUS CARRY—OVER FLOV •— f GUTTER FLOW Show Details I'',. f T INLET - 1./2 OF STREET (local peak flow for tit of street, plus Dow bypassing upstream subcatchments) If you entered a value here, up the rest of this sheet and proceed to sheet Q =1 7.2 OAllow 21.9 bets FILL IN THIS SECTION R-, Geographic information: 1 Lnter am o 1 e ue cs s FILL IN THE SECTIONS SubatchmenI Area= Acres BELOW. Percent Imparviousnesa = °!e - NRCS Soil Type JA, B, C. ar D Site Type: Slope (ftf t) Length (fl) Site Is Urban Overland Flow = O Site is Non -Urban Gutter Flow = Design Sloan Realm Period, T, Retu-n Penod Design Preeipilabon, Pt C, User -Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = _ User -Defined Syr. Runoff Coefficient (leave this blank to accept a calculated value), Cs Bypass (Carry -Over) Flow from upstream Subcatchments, qs cis Total Design Peak Flow, 0 -1 7.2 1 21.8 cfs UD-Inlet_v3 01-Design Point 1.4s, Q-Peak 2/17/2012, 12.17 PM Wcs 11 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) 11 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Project: OCR Inlet ID: existing -southern type R inlet TLROWN......, ..... a�cK is W --:{'— T. Street I A Crown num Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) ring's Roughness Behind Curb : of Curb at Gutter Flow Line ce from Curb Face to Street Crown Depression Width Transverse Slope Longitudinal Slope - Enter 0 for sump condition ig's Roughness for Street Section T_K = 16.0 ft SaacK ` OA20 ft. vert. III hodz neAcx = 0.020 HOURS= i 6,00 inches TcRovm = 58.0 ft a = 2.00 inches W = 2.00 ft Sx = 0.020 ft. vert. / ft horiz So = 0.005 ft. vert ! ft. horiz nsTREET =1 0.016 Minor Storm Major Storm Max. Allowable Water Spread for Minor & Major Storm Tw x = 15.2 15.2 ft Warning 02 Max. Allowable Depth at Gutter Flow Line for Minor & Major Storm d. = 12.0 12,p inches Allow Flow Depth at Street Crown (leave blank for no) check = yes Minor Storm Major Storm Max. Allowable Gutter Capacity Based on Minimum of Q, or Q. Q,Ro�' 6.1 GAcfs WARNING: MINOR STORM max. allowable capacity is less than now given on sheet'Q-Peak' WARNING: MAJOR STORM max. allowable capacity is less than flow given on sheet'Q•Peak' Warning 02: Minor Storm is Overtopping the Curb. UD-Inlet_v3 01-Design Point 1.xis, O-Allow 2/17/2012, 12:17 PM INLET IN A SUMP OR SAG LOCATION Project = OCR Inlet ID • existing - southern type R Inlet __ __.. _ W(C) Kcurb �. WP Lo(G) Warning t of Inlet Inlet Type it Depression (additional to continuous gutter depression a' from'O-Allow'} µe.,,' fiber of Unit Inlets (Grate or Curb Opening) No Depth outside of Local Depression at Inlet Flew Depth e Information ph of a Unit Grate L. (G)' h of a Unit Grate We Opening Ratio for a Grate (typical values 0,15-0.90) A. Bing Factor for a Single Grate (typical value 0.50 - 0.70) CG (G)' e Weir Coefficient (lypcal value 2.15 - 3.60) C.. (G)' e Orifice Coefficient (typical value 0,60 - 0.80) C. (G) f Opening Information ith of a Unit Curb Opening L. (C) . ht of Vertical Curb Opening in Inches H— ht of Curb Orifice Threat in Inches H— : e of Throat (see USDCM Figure ST-5) Theis Width for Depression Pan (typically the gutter width of 2 feet) W. ging Factor for a Single Curb Opening (typical value 0, 10) Cr (C) Opening Weir Coefficient (typical value 2.3-36) C., iC)' Opening Orifice CoeKden( (typical value 0.60 - 0,70) C. (C) at Inlet Interception Capacity (assumes clogged condition) Q.. tNING: Inlet Capacity less than Q Peak for Minor and Major Storms O rcer •eauneo Warning 3: Clogging factor is not in the recommended value for Inlet type specified. MINOR MAJOR CDOT Type R Curb Opening inches incites feet feet 3.00 3.00 1 1 6.0 6.0 MINOR MAJOR NIA WA WA NIA NIA WA WA WA N/A NIA NIA NIA 5.00 5.00 6.00 6.00 6.00 6.00 63.40 63.40 2.00 2.00 0,10 3.60 3.50 0.67 0.67 MINOR MAJOR est noires nches legrees not UD-Inlet_v3 01-Dess9n Point 1 xis, Inlet In Sump 211712012, 12.17 PM ' INLET IN A SUMP OR SAG LOCATION p proms. OCR Itdait ID existing - northem type R inlet at Design Point 1 N-Cwb H-Vwit - top- Lo (o) Warning ion Information (Input) o' Inlet Inlet Type I Depression (additional ional to conenums gutter depression's' from'O-Allow) '7: fiber of Unit Intel$ (Grate or Curb Opening) No ' Depth outside of Local Depression at Inlet Flaw Depth ; a Inforration Ith of a Unit Grate 4 (G)' h of a Unit Grate W. Opening Ratio for a Grate (typical values 0.15-0.90) A,ro Bing Factor for a Single Grate (typical value 0.50 - VO) CI (G) ' a Weir Coefficient (typical value 2.15 - 3.60) C„ (G)' Orifice Coefficient (typical value 0 60 - 0 60) C, (G)' r Opening Infovnatipn th of a Unit Curb Opening L. (C)' III of Venial Curb Opening in Inches H_ ht of Curb Orifice Throat in Inches Hwm' e of Throat (sae USDCM Figure ST-5) Theta • Width for Depression Pen (typically the gutter width of 2 feet) W, - Bing Factor for a Single Curb Opening (typical value 0,10) G (C) _ Opening Weir Coefficient (typical value 2,3-3.6) C„ (q Opening Orifice Coefficient (typical value 0.60 - 0 70) C. (C)' al Inlet Interception Capacity (assumes clogged condition) Qa WING: Inlet Capacity less than O Peak for MAJOR Storm O vrwcraauneo = Warning 3: Clogging factor is not in the recommended value for inlet type specified. MINOR MAJOR CDOT Type R Curb Opening 3.00 3.00 inches 1 1 6.0 6.0 inches MAJOR WA feet WA feel NIA NIA NIA WA NIA WA WA NIA WA NIA e11Nr1R Ut 1nR 5.00 5.00 6.00 ll 6.00 6.130 63.e0 63.40 2.00 2.00 0.10 3.60 1 3.60 O.B7 0.67 MINOR MAJOR eel riches ,Chas leg—s mt UD-Inlet_Jd 014Design Point 2xis, Inlet In Sump 2/172C12, 12-19 PM Stvrn'1 Pi PV Ex. 8" Pipe Calculation at DP 3 Project Description Friction Method Manning Formula Solve For Full Flow Capacity Input Data Roughness Coefficient 0.013 Channel Slope 0.02000 fUft Normal Depth 067 ft Diameter 0.67 ft Discharge 1.73 ft'/s Results Discharge Normal Depth Flow Area Wetted Perimeter Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Average End Depth Over Rise Normal Depth Over Rise SubCritical 1.73 Wis 0.67 ft 0.35 ft' 2.10 ft 0.00 ft 0.60 ft 100.0 % 0.01759 ft/ft 4.91 ft/s 0.37 ft 1.04 ft 0.00 1.86 ft3/s 1.73 ft'/s 0.02000 Wit 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft 0.00 % 100.00 % Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster 108.01.071.00] 2/17/2012 12:12:53 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Rain 64r0►1 Designer: Company Date: Project Location: HEM TST February 16, 2012 OCR Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 100.0 % (100 % if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio It = 1,1100) i = 1 000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 040 watershed inches (WQCV= 0.8' (0.91- i'- 1.19 - i', 0.78 -i) D) Contributing Watershed Area (including rain garden area) Area = 21,000 sq ft E) Water Quality Capture Volume (WQCV) Design Volume V_" = 700 cu ;0 Vol = (WQCV 1 12)' Area fv7 F) For Watersheds Outside of the Denver Region, Depth of ds = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWaCV OniER = 00 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCy USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) D•wocv = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 3.00 It 1 ft Z < 4:1 (Use "Cr if rain garden has vertical walls) C) Mimimum Flat Surface Area A_ = 467 sq ft D) Actual Flat Surface Area Aka„ = 903 sq ft E) Area at Design Depth (Top Surface Area) A,00 = 1613 sq ft / F) Rain Garden Total Volume V,- f1258 cu ftl f f r (V,= ((A,.+ A._) ! 2) 'Depth) 3. Growing Media Choose One — * 18" Rain Garden Growing Mecla O Other (Explain): 4. Underdrain System A) Are underdrains provided? Choose One O YES * NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N!A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours V0112= N/A cu ft iii) Orifice Diameter, 3/8" Minimum Do = N/A in Copy of JD-13MP_v3_01.xIs, RG 2/1612012, 4:37 PM UVeir Project Description Solve For Input Data Headwater Elevation Crest Elevation Tailwater Elevation Crest Surface Type Crest Breadth Crest Length Results Discharge Headwater Height Above Crest Tailwater Height Above Crest Weir Coefficient Submergence Factor Adjusted Weir Coefficient Flow Area Velocity Wetted Perimeter Top Width Weir Calculation at DP 2 Discharge Gravel 4900 75 ft 4900.25 ft 4899.36 ft 300 ft 5.00 ft 5.22 ft'/s 0,50 ft -0.89 ft 2.96 US 1.00 2.96 US 2.50 ft' 2.09 Ws 6.00 ft 5.00 ft 0-1oo=111 CFS Bentley Systems, Inc, Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00] 2117/2012 12:15:24 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Bottom Width Discharge Results Normal Depth Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Upstream Depth Length Number Of Steps GVF Output Data Downstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 2/16/2012 4:42:31 PM Chanrwj Channel A -A Calculation Manning Formula Normal Depth Supercritical 0.060 0,90000 ft/ft 4.00 ft/ft (H:V) 4.00 ft/ft (H:V) 8.00 ft 28.10 ft3/s nog( 2.86 f12 10.55 ft 10.47 ft 0.65 j ft 0.06626 ft/ft p rc_<. 9.83 ft/s 1.50 ft 1.81 ft 3.32 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity f /s Infinity f /S 0.31 ft 0.65 ft 0.90000 ft/ft 0.06626 ft./ft 6l 4J Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00) 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 11 of 1 SUBJECT—SCYEIIL���L:.S_Gft��J...1G__>?:. /ff/ _SJac m_I2Ga 4c-=S1s L1=3J LsU_ SHE +o.—----- - --_------_ PROJECT B ..T ARGA= b•33 Ao G= 085 I .��IIII.Ii i' I i I TC.=IJ'����1!'(-D•$S)/OSO� = LoM/N. I I I. �D4w Li.;ayR' 0• BS x b 8,0 X 6•'S3 9.7 c.,x, 1 U•b5x 3.2 X DeV: Q.lo,yr I.25xa$Sx 5•Lx C.•C.Fs. iL J.g7(lJ'a•is)rao i QLy,2= 0,4SA L,3x /./0 = /•/4- c.•-,.7 DEvI. Q�YayR.' U,4Sxb•IX A/4 Z,03..c.r,. Dc-v`• Q ro-0y,e J•25x0.43xE,7x r./0.- JASI,', AeEA- 0.4L Ac. c<0.a0 To= J•87(1.1-0,3)seD/� i'SnM1l,,J. 0.6 QlbyQ0,30 xZ. ESxP94 Dcv. QioPw' l•LJ XO.3DxlG", c= 0,7Ic.F:f. SUBJECT CATE -Jf/' !!V v`-Laa ��e_ev tocct[cgrLas s. NO-2------ --_------ — ---. PROJECT NO. --------- - t Sx0rs'rl &!-DEVEt_OPEE, .'EVSAt LAA-EJ (OF'S"c) 'Ai E.E 13'S1A.0 rs ZoN%N(y - S P G'O•g1 • I i I..I I'j`-:d67�11.1 'Dc+; Qzyc.= 0. SS 2.1 x g.s /S•/7 G•/r I. IacJ IQio yq °' 0• BS x3.7s x 9,5 C7.01 c.i'.r IGO YK _ 1'4J + 0•SSx �„O 7 B.S 3.35 [. FS. i . i t IS ,EVEAJ .C.AkE.i'PN Aff: 2Z iCN SIrF� I. •I inP •1 A2.e;A. -i 3.35 AcC.= 0.85 i Tz O..g3 c nr Fs'r. Z•dx 3 3s - C i t biv �..Q loy,C' D•PJX 6. 2."•:�. jl -. r'S. t. �DE: V, �lX /GO ye- 'L 3.°s S. I I 7,\L_ TYP16A6 OrTa 4K055 6961109 LERM April 5, 2012 01D EARTH ENGINEERING CONSULTANTS, INC. Gateway Medical Services c/o Mr. Michael Bergerson 2500 East Prospect Road Fort Collins, Colorado 80525 Attn: Mr. Michael Bergerson (mber eg_ rson(aOrthohealth.com) Re: Subsurface Exploration — Addendum Report Proposed Rain Garden Concept Adjacent to Pavement Area Improvements Orthopaedic Center of the Rockies 2500 East Prospect Road Fort Collins, Colorado EEC Project No. 1122002 Mr. Bergerson: Enclosed, herewith, are the results of the supplemental subsurface exploration/soil percolation evaluation completed by Earth Engineering Consultants, Inc. (EEC) personnel for the rain garden concept planned along the north side of the proposed on -site pavement improvement area, (please refer to the enclosed site diagrams) at the Orthopaedic Center of Rockies (OCR) facility at 2500 East Prospect Road in Fort Collins, Colorado. For this phase of the project three (3) soil percolation borings were located and drilled within the proposed rain garden concept as shown on the enclosed site diagram, created from civil drawings provided to us by TST, Inc. — Consulting Engineers. This supplemental study was completed in general accordance with our electronic proposal dated March 27, 2012. EXPLORATION AND TESTING PROCEDURES The supplemental rain garden/soil percolation borings were located in the field by representatives of Earth Engineering Consultants, Inc. (EEC) by pacing and/or estimating locations relative to identifiable site features. The approximate boring locations are indicated on the attached boring location diagram. The locations of the borings should be considered accurate only to the degree implied by the methods used to make the field measurements. 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 www.earth-engineering.com Earth Engineering Consultants, Inc. EEC Project No. 1122002 April 5, 2012 Page 2 The borings were completed using a truck mounted, CME-45 drill rig equipped with a hydraulic head employed in drilling and sampling operations. For this study, as shown on the enclosed site diagram, soil percolation borings P-1 and P-3 were extended to depths of approximately 5-feet below existing site grades, while soil percolation boring P-2 was extended to a depth of approximately 8-feet below site grades. Upon completion of the drilling operations, the borings were filled with water, saturated for an approximate 24-hours period and in -situ infiltration/soil percolation characteristics were performed the following day at each boring location. SUBSURFACE CONDITIONS In summary, a sparse vegetated/topsoil layer was encountered at the surface of each soil percolation boring and was underlain by a zone of cohesive sandy lean clay subsoils, which was either fill of native overburden material. The cohesive zone extended to the native granular subsoils below, which were encountered at an approximate depth of 4- feet below existing site grades. The native granular fine to course silty sand with gravel and intermittent cobbles extended to the depths explored in the soil percolation borings, approximately 5 to 8-feet below site grades. Groundwater was encountered within the deeper profile boring P-2 at an approximate depth of 5-feet below site grades during the initial drilling operations. The subsurface conditions encountered within the rain garden/soil percolation borings were very similar/consistent with those described in our "Subsurface Exploration Report" completed for the site on January 17, 2012, EEC Project No. 1122002. ANALYSIS AND RECOMMENDATIONS We understand a rain garden concept is planned along the north side of the proposed on - site improvement parking area as shown herein as part of the storm water run- off/drainage plan. Based on our review of the rain garden design concepts prepared by TST, Inc. - Consulting Engineers, the existing grade in the general vicinity of the proposed rain garden is between approximate elevations 4900 to 4902. The bottom of the proposed rain garden, as shown herein will be at an approximate elevation of 4899.25. It appears as part of the rain garden concept the upper 18-inches will consist of a sand/peat Earth Engineering Consultants, Inc. EEC Project No. 1122002 April 5, 2012 Page 3 mixture of approximately 25% ASTM C33 concrete sand and approximately 75% peat mix. We also understand the current rain garden concept does not have an underdrain system or outlet structure designed. In essence the proposed rain garden concept as currently planned is a simple rain garden that will infiltrate into the underlying subsoils with no underdrain system and will have an overflow weir without an outlet structure. The review comments from the City of Fort Collins' Stormwater Department indicated the following: "The City requires underdrains and the standard urban drainage outlet structure for rain gardens/bioretention ponds. If soil sampling shows A or B soils and a high percolation rate, underdrains can be omitted from the design. " For this project, we conducted a series of three (3) soil percolation tests at approximate depths of near surface grades to about 4-feet below grades at boring locations P-1 and P- 3, and from about 3-feet to about 8-fet below site grades at the boring P-2 locations. Again, based on our review of the rain garden concepts it appears the majority of cohesive materials would be removed to establish the design grades, which would also include the upper 18-inches being replaced with a sand/peat mixture. Soil percolation testing within the proposed location of the rain garden, conducted for a period of approximately 70 minutes after an initial "24-hour soaking period", is summarized below, and a spreadsheet is also included with this report. Percolation Test Results Test Hole Depth (feet) Soil Classification Percolation Rate (minutes/inch) P-1 4 Sandy Lean Clay transitioning toward Sand with Gravel 16 P-2 8 Silty Sand with Gravel 4 P-2 4 Sandy Lean Clay transitioning toward Sand with Gravel 22 Based on the soil percolation rates presented herein for the underlying fine to course granular subsoils, (i.e., in essence less than 5 minutes per inch), the relatively shallow depth to the groundwater table in this area, which is approximately 5-feet below site grades, and the understanding that the majority of the upper cohesive subsoils will be Earth Engineering Consultants, Inc. EEC Project No. 1122002 April 5, 2012 Page 4 removed, it is our opinion an underdrain system along with an outlet structure would not be necessary for the proposed rain garden planned as part of the site improvements at the referenced site. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, onsultants, Inc. David A. Richer, P.E. Senior Geotechnical Engineer cc: Wm. T. Welch LLC — Mr. Will Welch: wwelch(d�wmtwelch.com TST, Inc. — Ms. Sharlene Shadowen, P.E.:sshadowen(&tstinc.com The Neenan Company - Mr. Bill Pigg: bill.pigg(&neenan.com Mr. Jake Coutts iake.coutts(a)neenan.com Mr. Bob Mooney: bob. mooney(a,,neenan.com -- - --- ------ - ---- ----------- ---- --- --- _ �a` � L E i \l; `` OIIAbINO bal111�G .. •�- \,•ems+'..ibtGYiY "" �'� ... � � FLOODWA TO 1161AW iYYC11T k1 NxfCH it, I T_ PAVING W L.7- TEE 4' ROOr DRAINr��xlsr e' vnc E msi. - --�.e MATCH ATCH ..... .� -n., - ANCUY ! M,1 F Ex157MK GTRF TO RQFARO -- - �..r' '� �UND AS NECESSAPY T: 1 Legend I Approximate----- - Locations for 3 Soil Percolation Borings------------------ ------- Boring-Location Diagram Orthopaedic Center of the Rockies - Proposed Addition Fort Collins, Colorado North EEC Project #: 1 122002 Date: March 2012 NM to Scale EARTH ENGINEERING CONSULTANTS, Ir` (�(� BOTTOM OF POND 4899.25 — VERTICAL CURB & GUTTER 2' CURB — OPENING PAVEMENT IN TRANSITION INTO A V—SHAPED CONCRETE RUNDOWN INTO A SECTION AT BOTTOM THAT HAS 3—INCH RIVER ROCK INBEDDED 1.5—INCHES INTO THE CONCRETE. CONCRETE PAN A POND WATER SURFACE 4900.25 OVERFLOW WIER / --TURF REINFORCEMENT MAT - - — — — — f� PROPEX GEOSYNTHETICS LANDLOK 450 OR EQUAL. 24" CURB CUT TO BE INSTALLED PER W/ V—SHAPED VERTICAL CURB MANUFACTURER'S CONCRETE & GUTTER SPECIFICATIONS. RUNDOWN ELEV. 4899.75 PLAN VIEW DRYLAND GRASSES AND WILD FLOWERS SEEDED IN ACCORDANCE WITH SECT. 5.6 OF VOL. 3. DO NOT USE SOD. REFER TO LANDSCAPE PLAN FOR PLANTINGS & LANDSCAPING B 18" SAND/PEAT LAYER f1.5—ft 25% ASTM C-33 SAND 75% PEAT MIX ALL SIDE SLOPES 2:1 OR FLATTER WRAP ALL GEOTEXTILE FABRIC AND IMPERMEABLE LINERS TO TOP OF SOIL. ATTACH ALL LINERS FIRMLY TO WALLS OR TRENCH SIDES. OVERFLOW WIER Woven geotextile fabric meeting: ASTM D4751—AOS US Std. Sieve #50 to #70, ASTM D4633 min. trapezoidal tear strength 100 x 60 Ibs, Minimum COE specified open area of 4%. SECTION A -A Orthopaedic Center of The Rockies - 2500 East Prospect Road - Fort Collins, Colorado EEC Project No. 1122002 Soil Boring No. Depth of Boring, Ft. Zone of Soil Percolation, Range in Ft. Time Difference in Time, Minutes Inches Measured Difference in Inches between readings, Minutes Soil Percolation Rate, Minutes/Inch P-1 3.5 0.0 - 5.0 0:00 17.375 --- --- 0:10 10 18.375 1 10.00 0:20 10 19.125 0.75 13.33 0:30 10 19.75 1 0.625 16.00 0:40 10 20.375 0.625 16.00 0:50 10 21.0625 0.6875 14.55 1:00 10 21.5 0.4375 22.86 1:10 10 22 0.5 20.00 Average Soil Percolation Rate minutes/inch 16.11 P-2 10 3.0 - 8.0 0:01 --- 34.625 --- --- 0:11 10 47.5 12.875 0.78 0:21 10 50.25 2.75 3.64 0:31 10 51 0.75 13.33 Refill 30.75 0:41 10 44 13.25 0.75 0:51 10 49.75 5.75 1.74 1:01 10 51 7 1.43 1:11 10 52.5 1.5 6.67 Average Soil Percolation Rate minutes/inch 4.05 P-3 3.5 0.0 - 5.0 0:02 --- 26.625 --- --- 0:12 10 27.25 0.625 16.00 0:22 10 27.75 0.5 20.00 0:32 10 28.25 0.5 20.00 0:42 10 28.75 0.5 20.00 0:52 10 29.125 0.375 26.67 1:02 10 29.5 0.375 26.67 HE 10 29.875 0.375 26.67 Average Soil Percolation Rate minutes/inch 22.29 SEC -- �' 1 ---' — _ --- =------ i - ----- - 1 � Vurking Pddipan 3r Spaces—lf 1 1 —t 1 • �---i I B-1 Bklp AddlMW / 10.640 SF B-6 01 / , B-3$ I � r — —1 I air t IV I •IOr � i Legend I $ B-1 -- -- - - / ---_ — t I II thru B-4: Approximate Locations for 4 Foundation--------- Related Borings -t- - ------------- - --- -0 B-5 & B-6 Approximate Locations for 2 Pavement Related Borings Proposed Boring Location Diagram Orthopaedic Center of the Rockies Fort Collins, Colorado North Not to Scale Date: December 201 1 EARTH ENGINEERING CONSULTANTS, INC. ORTHOPAEDIC CENTER OF THE ROCKIES EXPANSION FORT COLLINS, COLORADO PROJECT NO: 1122002 DATE: JANUARY2012 LOG OF BORING B-5 RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH FOREMAN: DG START DATE 1/12/2012 WHILE DRILLING 7.0' AUGER TYPE: 4" CFA FINISH DATE 1/1212012 AFTER DRILLING N/A SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N OU MC DD A -LIMITS -200 SWELL I LL PI PRESSURE % @ 500 PSF TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) (%,) APPARENT FILL MATERIAL: 1 Sandy Lean Clay (CL) / Clayey Sand (SC) dark brown, moist, varying amounts of gravel 2 medium stiff FCS % @'150 psf 27 9000+ 12.4 1 122.6 4000 psf 4.8 3 4 SS 5 6 22 -- 13.4 SILTY SAND with GRAVEL (SM-SW brown, gray moist to wet, 7 medium dense to dense 8 'intermittent COBBLES with increased depth 9 Ess 10 - 11 - 34 13.1 BOTTOM OF BORING DEPTH 10.5' 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Engineering Consultants ORTHOPAEDIC CENTER OF THE ROCKIES EXPANSION FORT COLLINS, COLORADO PROJECT NO: 1122002 DATE: JANUARY 2012 LOG OF BORING B-6 RIG TYPE: CME46 SHEET 1 OF 1 WATER DEPTH FOREMAN: DG START DATE 1/12/2012 WHILE DRILLING 6.5' AUGER TYPE: 4" CFA FINISH DATE 111212012 AFTER DRILLING NIA SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA SOIL DESCRIPTION D M ou MC DII A-LIMITS -200 SWELL LL PI PRESSURE Y @ 500 PSF TYPE (FEET) (BLOWSIFT) (PSF) (%) fPCF) I%) APPARENT FILL MATERIAL. 1 Sandy Lean Clay (CL) / Clayey Sand (SC) _ dark brown, moist, varying amounts of gravel 2 medium stiff 11, 50 -- 8.9 132.0 1100 1.5 3 4 SS 5 6 12 4000 27.6 SILTY SAND with GRAVEL (SM-SW) brown, gray moist to wet. 7 medium dense to dense 8 9 FF-S 10 11 10 -- 14.1 BOTTOM OF BORING DEPTH 10.5' 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Engineering Consultants