Loading...
HomeMy WebLinkAboutDrainage Reports - 05/17/2024� I NORTHERN ENGINEERIN6 FINAL DRAINAGE REPORT WORTHINGTON STORAGE MAY 1, 2024 NORTHERNENGINEERING.COM 970.221.4158 FORT COLLINS GREELEY This Drainage Report is consciously provided as a PDF. Pfease considerthe environment before printing this document in its entirety. When a hard copy is necessary, we recommend double-sided printing. May 1, 2024 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: FINAL DRAINAGE REPORT FOR WORTHINGTON STORAGE Dear Staff: Northern Engineering is pleased to submit this Final Drainage Report for your review. This report accompanies the combined Final Development Plan submittal for the proposed Worthington Storage project. This report has been prepared in accordance with the City of Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed Worthington Storage project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the manual. If you should have any questions as you review this report, please feel free to contact u s. Sincerely, NORTHERN ENGINEERING SERVICES, INC. MASON RUEBEL, PE Project Engineer NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY �P�� ���� o�o . �..�, F,ys v �,tiN �i�``'� ``�o 05 L FINAL DRAINAGE REPORT: WORTHINGTON STORAGE COVERLETTER I. I. GENERAL LOCATION AND DESCRIPTION ..........................................................1 II. II. DRAINAGE BASINS AND SUB-BASINS ...............................................................4 III. III. DRAINAGE DESIGN CRITERIA ..........................................................................4 IV. IV. DRAINAGE FACILITY DESIGN ...........................................................................7 V. V. CONCLUSIONS ..............................................................................................9 VI. VI. REFERENCES ..............................................................................................10 TABLES AND FIGURES FIGURE 1: AERIAL PHOTOGRAPH ...........................................................................................2 FIGURE 2: REGULATORY FLOODPLAINS ................................................................................3 TABLE 1: DETENTION POND SUMMARY .................................................................................9 APPENDICES APPENDIXA- HYDROLOGIC COMPUTATIONS APPENDIX B - HYDRAULIC COMPUTATIONS APPENDIX C- DETENTION POND & WATER QUALITY COMPUTATIONS APPENDIX D- EROSION CONTROL REPORT APPENDIX E- USDA SOILS REPORT APPENDIX F- EXCERPTS FROM CENTRE FOR ADVANCED TECHNOLOGY 16T" FILING APPENDIX G- STORMWATER ALTERNATIVE COMPLIANCE/VARIANCE APPLICATION MAP POCKET DR1- DRAINAGE EXHIBIT NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION A. LOCATION 1. Vicinity Map WORCR�C EON�� % � �1 CENTRE❑ROAD ��-��\ \ � I w w ¢ � � 7 � N / 1 ` O W � _ / N �,J� _ \ H 7 O N \1 O O\...,.�.;' � I I I ❑ 7 �� �OU � PROJECT:� LOCATION L � �, � \ , ��� Figure 1: Vicinty Map 2. Worthington Self Storage project is located in the Southwest Quarter of Section 23, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is bordered to the east by Worthington Circle. The rest of the site is surrounded by a private road and commercial development apart of the Centre for Advanced Technology lOtn & 19th Filing. 4. The nearest existing major streets to the project are Worthington Circle and Centre Avejust to the north of the project site. 5. A 15" storm sewer conveys stormwater from the existing project site to the north in an existing piping system along Centre Avenue outletting into Spring Creek. B. DESCRIPTION OF PROPERTY 1. The existing project site comprises of±3.2 acres. The existing site will be subdivided into two lots with the proposed development on Lot 1(1.98ac) and the existing building remaining in Lot 2 (1.22ac). NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS�GREELEY 1�11 2. The site is currently used as asphalt parking lot with an adjacent 1-story existing building. s�k� �� P � P�� ► �---'� �t�. 2� p .f, A �- � `� . � e: r +� r � � � � f�, 'c��,rLO%�tCa �� �_, �� N;��I ���� � �. ��� a '6• �� Figure 1: Aerial Photograph �y� • C �►. s���1 � ..� �! _i ,- :—: . . + � ��_i ■ �YfI4'+�,.--�� 7ib�� ���r''1 �� 3. A subsurface exploration report was completed by Triax Engineering, Inc. on June 4, 2021 (Triax Project No. D21G125). According to Triax Engineering, the site generally consists of clayey sand with groundwater at around 20-ft in depth. Underground detention chambers are proposed with this project. There will be approximately 15-ft of separation from the bottom of the system to groundwater level measured in the Soils report. Advanced Drainage Systems or Ferguson do not have a separation requirement as water is designed to flow freely between the system and adjacent soils. Groundwater levels would only affect total storage volume. The City of Fort Collins requires a minimum of 2-ft separation to groundwater. 4. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: (http://websoilsurvey.nres.usda.gov/app/WebSoilSurvey.aspx), the site consists primarily of Nunn Clay loam (Hydrologic Soil Group C) and Kim loam (Hydrologic Soil Group B). The calculations assume a Hydrologic Soil Group of C. Hydrologic Soil Group C has a slow rate of water absorption and infiltration. 5. The proposed development will consist of proposed 3-story enclosed mini-storage building and three other 1-story outdoor garage storage buildings. Other proposed improvements include asphalt drive aisles, sidewalks, and landscaping. There is no increase in impervious area with the proposed project. Existing detention facilities and conveyance methods will be modified and updated to meet the current Fort Collins requirements. This includes modifying the existing detention pond and the addition of underground chambers. -. - `��~"3" �w—+liiii� �r 1�— � � .. �� ' � �1#_ �- �� ���d ��� --�.-- — - J!�-��11 ( �.`=.iSS� /.:°;.`. . � c m � . . :'� ��! ia NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 2 � 11 'Ld'�L:1.t'�I�:t=': l'^:�Li�ti..'"1--I:<� �AiI-)-fCc�il.t2�. ^ � , . _ ...,. � � > �. �Y � � v , :�' ���� ���-'����� 6. The site is currently zoned as Employment District (E) in Fort Collins. Developments surrounding the project site are zoned as Employment as well and Neighborhood Commercial Districts to the east of Worthington Circle. The proposed uses for the project are consistent with Employment District (E). 7. Per the Centre for Advanced Technology lOt" & 16t" Filing Final Drainage and Erosion Control Study, the calculated detention volume is 1.51 ac-ft which includes runoff from C.A.T lOt" and the adjacent Worthington Circle. The detention storage volume is currently divided between a small detention pond and ponding in the adjacent parking lot through a series of area inlets. There is an existing 15" storm sewer in the northeast corner of the project site with a manhole and restrictor plate down-stream of the existing detention pond. The required release rate per the previous drainage report is 1.91 cfs (2-yr historic). The current release rate will be maintained, but the existing detention and conveyance will be updated to meet the current Fort Collins requirements. Stormwater is conveyed to the north to the storm network in Centre Avenue and is ultimately discharged into Spring Creek. 8. FLOODPLAIN The subject property is not located in a FEMA or City of Fort Collins regulatory floodplain. `"t CoU�ns FC Maps �l •� ,._ rm:u .:� :' �a � � � s �„�� �.:.o ..� f f � l . � � R„^t`� O�� � � N n° ;J g N � Uo ��� � � t� � ' L�r� L ` I� „/"'�— a � CeMm Ave .- «� oO'� � � r —I � L j � ; V i � � � / � ��°� � � ,- <� �. :ke Rd � ,,.�, I I - 1: 3.430 e Notes 572.0 0 286 00 572.0 Feet Tn:s map is a user gennateo stauc wWn hom tlie C�ry d Fort Collirvs FCMaps Ime�ret mapprtf9 srte antl �s for rekrence only. Data layers tWt appear en t�is W'GS il8e '. c hlx�-,ai r Aun��ary S�nere map may er rtay rwt ee a«wafe. curtenc, m otramiu re�a�ie Cny cf Fm Cdlins � GIS � ., .�...�,. ,,.� Legend FEMA Flootlplain . �.�9�� ��, �����. ,�.e. 1"E4N MoOerYe Ret . 100: 50] r� Ciry Fbodplains ■ Uy Nqi Ri4 � FbaQ✓ry GIl'N9+N�e4, i00Ymr ar M�aa,t rz,n . iao r,,, �� Gry L1mds NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 3 � 11 II. DRAINAGE BASINS AND SUB-BASINS A. MAJOR BASIN DESCRIPTION Worthington Self Storage is within the City of Fort Collins Spring Creek major drainage basin which is centrally located in Fort Collins. The Spring Creek drainage basin extends from Horsetooth Reservoir to the confluence with the Poudre River. It encompasses 9 square miles in central Fort Collins. The basin is dominated by residential development, but also includes open space and areas of commercial development. B. SUB-BASIN DESCRIPTION 1. The outfall for the project site is Spring Creek via the existing 15" storm sewer at the corner of Worthington Circle and the private access road. Perthe C.A.T 16th Filing drainage report the existing 15" storm sewer and restrictor plate were sized to convey the calculated 2-yr historic flow (1.91 cfs) and ultimately discharges to Spring Creek. The existing crown of Worthington Circle is the existing spillway for the detention. The existing spillway elevation and location will be maintained in Worthington Circle. The finished floor elevations ofthe existing and proposed buildings are set 1.5-ft above the crown of Worthington Circle and about 3-ft above the 100-yr WSEL in the underground storage. 2. The existing site can be defined with three (3) sub-basins. These include the drainage from the Centre for Advanced Technology (C.A.T) lOth Filing, Worthington Circle public ROW and the project site, C.A.T 16th Filing. 3. The site does receive notable surface runoff from adjacent properties and is detained and released perthe Centre forAdvanced Technology 16th Filing Final Drainage and Erosion Control Study. Flows from C.A.T lOth Filing and Worthington Circle will be conveyed through the proposed site and detention volume will be provided onsite. An existing detention volume of 1.51 acft was calculated perthe C.A.T 16th Filing report which is currently divided between an existing detention pond and ponding in the adjacent parking lot. Detention storage will be updated to current Fort Collins requirements, but the release rate will be maintained. 4. There is no increase in impervious area with the proposed project. Historic versus proposed impervious areas are documented within Appendix C. With the modification in impervious area LID and water quality treatment will be included with the drainage design. Water quality will also be designed to include Lot 2 of the project site to allow for future development of the rest of the property without additional stormwater facilities. III. DRAINAGE DESIGN CRITERIA A. OPTIONAL REVISIONS There are no optional provisions outside of the Fort Collins Stormwater Manual (FCSM) B. STORMWATER MANAGEMENT STRATEGY The overall stormwater management strategy employed with Worthington Self Storage utilizes the "Four Step Process" to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step i- Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 4 � 11 developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. Worthington Self Storage aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year storm events) by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas orthrough underground chambers. These LID practices reduce the overall amount of impervious area, while at the same time Minimizing Directly Connected Impervious Areas (MDCIA). The combined LID/MDCIA techniques will be implemented, where practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2- Implement BMPs that Provide a Water Quality Capture Volume (WQCV) with Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The primary water quality treatment will occur in underground chambers. The existing movie theater site and surrounding developments do not provide water quality treatment. With this development, WQCV will be provided for 100% for the current site and all of the surrounding properties. Step 3- Stabilize Drainageways. As stated in Section II.A, above, the site discharges into Spring Creek, however no changes to the channel are proposed with this project. While this step may not seem applicable to Worthington Self Storage, the proposed project indirectly helps achieve stabilized drainageways, nonetheless. Once again, site selection has a positive effect on stream stabilization. By developing with existing stormwater infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is reduced. Furthermore, this project will pay one- time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4- Implement Site Specific and Other Source Control BMPs. The proposed project will provide site specific source controls and improve on historic conditions. Localized trash enclosures within the development will contain and allow for the disposal of solid waste. Standard Operating procedures (SOPs) will be implemented for BMP maintenance of detention ponds, underground chambers, and associated drainage infrastructure to remove sediment accumulation regularly and prolong the design life of the BMPs. C. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 1. The subject property is part of a Master Drainage Plan for The Centre for Advanced Technology development. An Overall Development Plan (ODP) drainage study is also submitted concurrently with this project. However, stormwater from Worthington Self Storage will generally follow historic patterns and discharge into conveyance structures established as part of the Centre for Advanced Technology 16th Filing. 2. The subject property is an "in-fill" development project as the property is surrounded by currently developed properties and private access roads. 3. The existing 15-inch storm drain will function as the ultimate outfall for the project site. NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 5 � 11 D. HYDROLOGICAL CRITERIA 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure 3.4-1 of the FCSCM, serve as the source for all hydrologic computations associated with Worthington Self Storage development. Tabulated data contained in Table 3.4-1 has been utilized for Rational Method runoffcalculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables 3.2-1, 3.2-2, and 3.2-3 of the FCSCM. 3. The Rational Method will be used to estimate peak developed stormwater runoff from drainage basins within the developed site for the 2-year, 10-year, and 100-year design storms. Peak runoff discharges determined using this methodology have been used to check the street capacities, inlets, swales, and storm drain lines. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the "Minor" or "Initial" Storm with a 2-year recurrence interval. The second event considered is the "Major Storm" with a 100-year recurrence interval. E. HYDRAULIC CRITERIA 1. The hydraulic analyses of street capacities, inlets, storm drain lines, culverts, and swales are per the FCSM criteria and provided during Final Plan. The following computer programs and methods were utilized: • The storm drain lines were analyzed using Hydraflow Storm Sewer Extension for AutoCAD Civil3D. • The inlets were analyzed using the Urban Drainage Inlet and proprietary area inlet spreadsheets. • Swales and street capacities were analyzed using the Urban Drainage Channels spreadsheets. F. FLOODPLAIN REGULATIONS COMPLIANCE As previously mentioned, this project is not subject to any floodplain regulations. G. MODIFICATIONS OF CRITERIA A variance has been approved to Chapter 7.4 & Chapter 6.4.1 of the Fort Collins Stormwater Criteria Manual. Those sections state that the LID/WQCV must be added to the 100-yr detention volume. The approved variance will allow this project to include the LID/WQCV within the 100-yr detention volume. See Appendix G for additional information. H. CONFORMANCE WITH WATER QUALITY TREATMENT CRITERIA City Code requires that 100% of runoff from a project site receive some sort of water quality treatment. This project proposes to provide the entire water quality treatment with underground chambers. The chambers, when constructed per Fort Collins regulations, are considered an LID treatment method. An exhibit is provided in Appendix C detailing treatment areas and methods. I. CONFORMANCE WITH LOW IMPACT DEVELOPMENT (LID) The project site will conform with the requirement to treat a minimum of 75% of the project site using a LID technique. LID treatment will be provided by underground chambers. Please see Appendix C for LID design information, table, and exhibit(s). Due to the use of underground NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 6 � 11 detention, 100% of the onsite and offsite impervious area will be treated using the underground chamber treatment method. IV. DRAINAGE FACILITY DESIGN A. GENERALCONCEPT 1. The main objective of Worthington Storage drainage design is to maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. There are off-site flows impacting the existing property that are accounted for in the basins described below. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The project site will be divided into two detention areas and analyzed separately. The two detention areas will tie to the same 15-inch storm drain outfall, and the historic release rate will be split between the two detention areas. Detention Area 1 will be to the north of the main building and include Stormtech Basins lA & 1B and Stormtech WQ Basins 1& 2. Detention Area 2 will be to the south of the main building and include Stormtech Basins 2, 3& 4 and Stormtech WQ Basins 3 & 4. 5. Drainage for the project site has been analyzed using seven (7) drainage sub-basins. The drainage patterns anticipated for the basins are further described below. Basin Al Basin A1 is approximately 0.23 acres and consists of landscaping area and sidewalk in the northeast corner of the site. An area inlet will collect runoff from this basin. A water quality weir will be installed, and water quality treatment will be provided for 100% of Basin Al (StormTech WQ Basin 1). Detention will be provided by StormTech Basin lA & 1B and StormTech WQ Basin 1& 2 and discharged into the existing 15-inch storm drain outfall. Basin A2 Basin A2 is approximately 0.31 acres and consists of a portion of the parking lot in the northeast corner of the site and adjacent landscaping area. Offsite flow from C.A.T lOtn Filing is conveyed in a concrete pan from the north and collected in a proposed curb inlet. The inlet will discharge into underground chambers (StormTech WQ Basin 2). A water quality weir will be installed, and water quality treatment will be provided for 100% of Basin A2. Detention will be provided by StormTech Basin lA & 1B and StormTech WQ Basin 1& 2. The detention pond will discharge into the existing 15-inch storm drain outfall. Basin B1 Basin A2 is approximately 1.47 acres and consists of a portion of the proposed building and existing cinema saver building. Runoff from this basin will sheet flow to valley pans in the center of the proposed private access roads. Flow will be collected by an area inlet and discharge into underground chambers. Offsite flow from Basin OS2 is conveyed via curb & gutter and concrete pan from the west and collected in the proposed area inlet. A water quality weir will be installed, and water quality treatment will be provided for 100% of NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 7 � 11 Basin B1 (StormTech WQ Basin 4). Detention will be provided by StormTech Basin 2, 3, & 4, & StormTech WQ Basin 3& 4. Basin B2 Basin B2 is approximately 1.14 acres and consists of a portion of the proposed building and existing cinema saver building. Runoff from this basin will be collected by a proposed curb inlet along the private access road. A water quality weir will be installed, and water quality treatment will be provided for 100% of Basin B2 (StormTech Basin WQ 3). Detention will be provided by StormTech Basin 2, 3, & 4, & StormTech WQ Basin 3& 4. Basin OSl Basin OS1 is approximately 1.93 acres. This basin consists ofthe existing Centre for Advanced Technology lOth Filing development. The basin will maintain historic drainage patterns from northwest to southeast. Runoff from this basin will sheet flow from the existing structures and parking lots and collect in an existing concrete pan which will tie into Basin A2 and discharge into a proposed curb inlet. Water quality treatment will be provided for 100% of Basin OS1, and detention will be provided by the StormTech stormwater system. Basin OS2 Basin OS2 is approximately 1.57 acres and consists of the existing residential buildings along Shields St and a portion of a private access road along the west side of the site. The basin will generally maintain historic drainage patterns from the southwest to the northeast. Runoff from this basin will sheet flow and collect in a proposed area inlet in Basins B1. Water quality treatment will be provided for 100% of Basin OS2, and detention will be provided by the StormTech stormwater system. Basin OS3 Basin OS3 is approximately 0.32 acres and consists of Worthington Circle. The basin will generally maintain historic drainage patterns. Runoff from this basin will collect in the existing curb and gutter and discharge into a type R inlet at the north corner of the project site. Water quality treatment will be provided for 100% of Basin OS3, and detention will be provided by the StormTech stormwater system. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this re po rt. NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 8 � 11 B. SPECIFIC DETAILS 1. The Worthington Self Storage project will be utilizing Stormtech chambers to fullfill the detention and treatment requirements. Worthington Self Storage will be providing 100% WQCV using LID measures. Per the approved variance to the detention and water quailty volume (Appendx G), the Detention and WQCV are not additive. The detention volumes shown in table 1 include the required WQCV for each detention area. Detention Summary Design Combined Required Design Design WQCV & Detention Detention WQCV Detention Release Volume Volume Required Volume Design Rate Description (ft3) (ft3)"* WQCV (ft3) (ft3) Total (ft3)** (cfs) Detention Area 1 26,501 26,522 2,072 4,038 26,522 0.75 Detention Area 2 39,826 40,515 3,147 5,704 40,515 1.16 Totals 66,327 67,037 5,219 9,742 67,037 1.91 Existing -- -- -- -- -- 1.91 Note: **The WQVC is included within the Detention Volume, not added. The Design Combined WQVC & Detention volume will equal the Detention volume shown in the table. Table 1: Detention & WQCV Summary CONCLUSIONS C. COMPLIANCE WITH STANDARDS 1. The proposed drainage design for the Worthington Self Storage complies with the City of Fort Collins Stormwater Criteria Manual. 2. The drainage design proposed complies with the City of Fort Collins' Master Drainage Plan forthe Spring Creek Basin. 3. The proposed drainage design complies with the Master Drainage Plan for the existing Centre for Advanced Technology Development (CAT). 4. There are no regulatory floodplains associated with the development 5. The drainage plan and stormwater measurements proposed with Worthington Self Storage are compliant with all applicable State and Federal regulations. D. DRAINAGE CONCEPT 1. The drainage design proposed with this project will effectively limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development. 2. The Worthington Storage project will maintain the release rate per the CAT 16th Filing Drainage Report. The existing drainage design has been updated to current City of Fort Collins Standards. 3. This project site provides 100% water quailty treatment through underground chambers. The site meets the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 100%total impervious area beingtreated through LID treatment. NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 9 � 11 4. The drainage design will bring the project site and immediate offsite areas into compliance with the current Fort Collins water quality and LID standards. V. REFERENCES 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Final Drainage and Erosion Control Study for Cinema Savers Centre for Advanced Technology Sixteenth Filin�., RBD, Inc., Fort Collins, Colorado, March 22, 1994. 3. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 159, 2018, and referenced in Section 26-500 of the City of Fort Collins Municipal Code. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States DepartmentofAgriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised Apri12008. NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON STORAGE FORT COLLINS � GREELEY 10 � 11 NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX � NORTHERN ENGINEERING 1 • ' 1 ' • • � � • Percent Charatter of Surfate: Runoff Coefficientl Imperviousl Project: Worthington Storage Streets, Parking Lots, Roofs, Alleys, and Drives: Location: Fort Collins Asphalt, Concrete 0.95 100% Calc. By: M. Ruebel Rooftop 0.95 90% Date: March 7, 2023 Residential: High Density 0.85 90% Residential: Low Density 0.55 50% Lawns and Landscaping: Undeveloped: Greenbelts, Agriculture 0.20 2% • �� • �- LdWns, Cldyey SOII, Flat Slope < 2% 0.20 2% 2) Composite Runoff Coefficient adjusted perTable 3.2-3 of the Fort Collins USDA S01 L TYPE: C 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Stormwater Manual (FCSM). � • � . • • :. � :. � � • . • '�• •• '•• •• '- ► �� :. 1 • • •�- '� •�- '� • • • �� • 11 11 11 � � A1 10,174 0.23 0 844 844 0.02 0 0.00 9,330 0.21 10% 0.26 0.26 0.26 0.33 A2 13,706 0.31 8651 364 9015 0.21 775 0.02 3,916 0.09 71% 0.74 0.74 0.74 0.92 B1 63,888 1.47 26032 3983 30015 0.69 25,663 0.59 8,210 0.19 83% 0.85 0.85 0.85 1.00 B2 49,771 1.14 14736 3227 17963 0.41 26,543 0.61 5,265 0.12 84% 0.87 0.87 0.87 1.00 Offsite Basins OS1 84,018 1.93 46681 0 46681 1.07 10,987 0.25 26,350 0.60 68% 0.71 0.71 0.71 0.89 OS2 68,407 1.57 12776 0 12776 0.29 7,812 0.18 47,819 1.10 30% 0.43 0.43 0.43 0.53 OS3 14,104 0.32 10004 1405 11409 0.26 0 0.00 2,695 0.06 81% 0.81 0.81 0.81 1.00 Combined Basins Detention Area 1 (A1,A2,OS1, OS3) 122,002 2.80 65336 2613 67949 1.56 11,762 0.27 42,291 0.97 65% 0.69 0.69 0.69 0.86 (A2, OS1) 97,724 2.24 55332 364 55696 1.28 11,762 0.27 30,266 0.69 68% 0.72 0.72 0.72 0.90 Detention Area 2 (B1,B2,OS2) 182,065 4.18 53544 7210 60754 1.39 60,018 1.38 61,293 1.41 64% 0.70 0.70 0.70 0.87 (B1, OS2) 132,295 3.04 38808 3983 42791 0.98 33,475 0.77 56,029 1.29 56% 0.63 0.63 0.63 0.79 ALL BASINS (A1,A2,B1,B2,OS1,0 S2,OS3) 304,067 6.98 118880 9823 128703 2.95 71,780 1.65 103,584 2.38 64% 0.69 0.69 0.69 0.87 � NORTHERN ENGINEERING 1 • ' 1 • • ' � • • • � • Overland Flow, Time of Concentration: Maximum Tc: Project: Worthington Storage Location: Fort Collins 1.87(1.1 - C* Cf )� (Equation 3.3-2 per Fort Collins Tc = L+ 10 (Equation 3.3-5 per Fort Collins T� - Calculations B M. Ruebel ` S1/3 Stormwater Manual) 180 Stormwater Manual) y' Date: March 7, 2023 Channelized Flow, Velocity: Channelized Flow, Time of Concentration: 1.49 2�3 * E uation 5-4 er Fort Collins L (Equation 5-5 per Fort Collins V= n*R � ( q p ) Tt=V*60 Where: V= Velocity (ft/sec) WP = Wetted Perimeter (ft) �- n= Roughness Coefficient 1) Add 5000 to all efevations. flow. Assume a water depth of 1', fixed side slopes, and a triangufar 2) Per Fort Coflins Stormwater Manuaf, minimum Tc =5 min. swafe section for grass channelized flow. Assume a water depth of 1', 4:1 R= Hydraulic Radius (feet) 3) Assume a water depth of 6" and a typical curb and gutter per Larimer side slopes, and a 2' wide valley pan for channelized flow in a valley pan. County Urban Street Standard Detail 701 for curb and gutter channefized S = Longitudinal Slope, feet/feet Overland Flow Channelized Flow Time of Concentration �- . . . . . . . � ..- ..- �� �. - � �� • - � � � �� �, �, . al A1 20 2.00% 5.56 5.56 5.13 90 2.00% Swale (8:1) 0.04 8.00 16.12 0.50 3.30 0.45 10.61 6.02 6.02 6.02 6.02 5.58 5.58 a2 A2 35 2.00% 320 3.20 1.58 108 0.50% Valley Pan 0.02 6.00 10.25 0.59 4.92 0.37 10.79 3.56 5.00 3.56 5.00 1.95 5.00 bl B1 12 2.00% 1.27 1.27 0.51 260 0.50% Valley Pan 0.02 6.00 10.25 0.59 4.92 0.88 11.51 2.15 5.00 2.15 5.00 1.40 5.00 b2 B2 150 2•00% 4.17 4.17 1.82 76 0.50% Gutter 0.02 3.61 19.18 0.19 1.73 0.73 11.26 4.90 5.00 4.90 5.00 2.55 5.00 Offsite Basins osl OSl 160 2.00% 7.23 7.23 3.88 190 1.00% Valley Pan 0.02 6.00 10.25 0.59 6.95 0.46 11.94 7.69 7.69 7.69 7.69 4.33 5.00 os2 OS2 150 1.33% 14.04 14.04 11.83 190 3.79% Gutter 0.02 3.61 19.18 0.19 6.35 0.50 11.89 14.54 11.89 14.54 11.89 12.32 11.89 os3 OS3 2p 2.00% 1.95 1.95 0.66 340 1.00% Gutter 0.02 3.61 19.18 0.19 3.26 1.74 12.00 3.68 5.00 3.68 5.00 2.40 5.00 Combined Basins a Detention Area 1(A1,A2,OS1, OS3) 160 2.00% 7.70 7.70 4.46 190 1.00% Gutter 0.02 3.61 19.18 0.19 2.45 1.29 11.94 8.99 8.99 8.99 8.99 5.75 5.75 a2 (A2, OS1) 160 2.00% 7.18 7.18 3.81 190 0.50% Valley Pan 0.02 6.00 10.25 0.59 3.69 0.86 11.94 8.04 8.04 8.04 8.04 4.67 5.00 b Detention Area 2(B1,B2,OS2) 150 1.33% 8.38 8.38 4.75 190 3.79% Gutter 0.02 3.61 19.18 0.19 4.77 0.66 11.89 9.05 9.05 9.05 9.05 5.42 5.42 bl (B1, OS2) 150 1.33% 9.74 9.74 6.45 190 3.79% Gutter 0.02 3.61 19.18 0.19 4.77 0.66 11.89 10.40 10.40 10.40 10.40 7.11 7.11 NORTHERN ENGINEERING 2ational Equation: Q= CiA (Equation 6-1 per MHFD) Project: Worthington Storage ntensity, I, from Fig. 3.4.1 Fort Collins Stormwater Manual. Location: Fort Collins Calc. By: M. Ruebel Date: March 7, 2023 �- • Tc (Min) Runoff C Intensity (in/hr) Flow (cfs) '' � �� � �� � �� • • � • �� 31 A1 0.23 6.0 6.0 5.6 0.3 0.3 0.3 2.7 4.6 9.6 0.2 0.3 0.7 �2 A2 0.31 5.0 5.0 5.0 0.7 0.7 0.9 2.9 4.9 10.0 0.7 1.1 2.9 �1 B1 1.47 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 3.6 6.1 14.6 �2 B2 1.14 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 2.8 4.8 11.4 )ffsite Basins >sl OS1 1.93 7.7 7.7 5.0 0.7 0.7 0.9 2.5 4.2 10.0 3.4 5.8 17.1 �s2 OS2 1.57 11.9 11.9 11.9 0.4 0.4 0.5 2.1 3.6 7.3 1.4 2.4 6.1 �s3 OS3 0.32 5.0 5.0 5.0 0.8 0.8 1.0 2.9 4.9 10.0 0.7 1.3 3.2 :ombined Basins a Detention Area 1 2.80 9.0 9.0 5.8 0.7 0.7 0.9 2.4 4.0 9.6 4.5 7.8 23.3 32 (A2, OS1) 2.24 8.0 8.0 5.0 0.7 0.7 0.9 2.4 4.1 10.0 3.9 6.6 20.0 � Detention Area 2 4.18 9.0 9.0 5.4 0.7 0.7 0.9 2.3 3.9 10.0 6.7 11.5 36.3 �1 (B1, OS2) 3.04 10.4 10.4 7.1 0.6 0.6 0.8 2.2 3.8 8.8 4.2 7.3 21.1 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method Table 3.4-1. IDF Table for Rational Method Duration Intensity Intensity Intensity (min) 2'Year 10-year 100-year (in/hr) (in/hr) (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 �L t��� Duration Intensity Intensity Intensity (min) 2'Year 10-year 100-year (in/hr) (in/hr) (in/hr) 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 65 0.78 1.32 2.71 70 0.73 1.25 2.59 75 0.70 1.19 2.48 80 0.66 1.14 2.38 85 0.64 1.09 2.29 90 0.61 1.05 2.21 95 0.58 1.01 2.13 100 0.56 0.97 2.06 105 0.54 0.94 2.00 110 0.52 0.91 1.94 115 0.51 0.88 1.88 120 0.49 0.86 1.84 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method Figure 3.4-1. Rainfall IDF Curve — Fort Collins io.00 9.00 8.00 7.00 � 0 � 6.00 — N d L C �+ 5.� ' C ` Ol \ C � R ` w 4.00 � c � � \ \� 3.00 : � — � ��` � � ♦ � ♦ ��� 2.00 . _ ��` ���`` � � ��� ����� _ �� "��� _ _ �� ���� 1.00 _ ._ _._ —._. . ` �"���r������� ______�����������������. 0.00 . 0 10 20 30 40 50 60 70 80 90 100 110 120 Storm Duration (minutes) c�tyof 3.4 Intensity-Duration-Frequency Curves for Rational Method F�t� Page 9 NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX INLET CALCULATIONS NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX I • I I • Project #: 1853-001 Project Name: Worthington Storage Project Loc.: Fort Collins, Colorado . � ... 2-Year 30-Year 300-Year Inlet Basins / Design Notes Type Design Upstream Total Allowable Design Upstream Total Allowable Design Upstream Total Allowable Overflow Overflow Overflow Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Flowrate Inlet C3 Designed for Basins A2 & OSl. Triple Combination 3.90 cfs 0.00 cfs 3.90 cfs 10.50 cfs 0.00 cfs 6.60 cfs 0.00 cfs 6.60 cfs 22.20 cfs 0.00 cfs 20.00 cfs 0.00 cfs 20.00 cfs 22.20 cfs 0.00 cfs Inlet D3 Designed for Basin A1 FC Single Area Inlet 0.20 cfs 0.00 cfs 0.20 cfs 5.11 cfs 0.00 cfs 0.30 cfs 0.00 cfs 0.30 cfs 5.11 cfs 0.00 cfs 0.70 cfs 0.00 cfs 0.70 cfs 5.11 cfs 0.00 cfs Inlet D4 Designed for Basin OS3. 5' Type-R 0.70 cfs 0.00 cfs 0.70 cfs 5.40 cfs 0.00 cfs 1.30 cfs 0.00 cfs 1.30 cfs 10.70 cfs 0.00 cfs 3.20 cfs 0.00 cfs 3.20 cfs 10.70 cfs 0.00 cfs Inlet E3 Designed for Basin B2. Double Combination 2.80 cfs 0.00 cfs 2.80 cfs 5.30 cfs 0.00 cfs 4.80 cfs 0.00 cfs 4.80 cfs 15.10 cfs 0.00 cfs 11.40 cfs 0.00 cfs 11.40 cfs 15.10 cfs 0.00 cfs Inlet F2-1 Designed for Basins Bl & 052. Quad Type 13 Inlet 4.20 cfs 0.00 cfs 4.20 cfs 19.27 cfs 0.00 cfs 7.30 cfs 0.00 cfs 7.30 cfs 21.55 cfs 0.00 cfs 21.10 cfs 0.00 cfs 21.10 cfs 21.55 cfs 0.00 cfs MHFD-Inlet I/ersion 5. DI A �il 2021 � • �C �'� •' • ` • ' • � . • � (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Project: Worthington Self Storage Inlet ID: Inlet C3 � .,.. � r,m.�. i �. sTnccr CRpWN rum Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) iing's Roughness Behind Curb (typically between 0.012 and 0.020) of Curb at Gutter Flow Line �,e from Curb Face to Street Crown Width Transverse Slope Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) Longitudinal Slope - Enter 0 for sump condition ig's Roughness for Street Section (typically between 0.012 and 0.020) TBACK - IB.O R SBACK - O.OSO ft�ft �ena = 0.012 Hcuae = 6.00 inches TcaowN = 24.0 ft W = 2.00 ft Sx = 0.020 ft/ft SW = 0.083 ft/ft So = 0.000 ft/ft n�� = 0.012 Allowable Spread for Minor & Major Storm Allowable Depth at Gutter Flowline for Minor & Major Storm < boxes are not applicable in SUMP conditions INOR STORM Allowable Capacity is based on Depth Criterion NOR STORM Allowable Capaciry is based on Depth Criterion Minor Storm Major Storm TMax = 15.0 15.0 ft dMax = 6.0 12.0 inches ' r Minor Storm Major Storm Qaiio„, = SUMP SUMP cfs MHFD-Inlet v5.01.xlsm, Inlet C3 3/7/2023, 6:53 PM 1 � • � 1 • � • MHFD-Inlet, �ersion 5.01 (Ap�il ZOZi) �Lo (C)� H-Curb H-Vert — Wo Wp W � �o (G) .. _..._...__._. of Inlet CDOT Twe R Curb Openinq Depression (additional to continuous gutter depression 'a' from above) �er of Unit Inlets (Grate or Curb Opening) � Depth at Flowline (outride of local depression) :h of a Unit Grate i of a Unit Grate Opening Ratio for a Grate (typical values 0.15-0.90) iing Fador for a Single Grate (typical value 0.50 - OJO) � Weir Coefficient (typical value 2.15 - 3.60) � Orifice Coefficient (typical value 0.60 - 0.80) th of a Unit Curb Opening it of Vertical Curb Opening in Inches it of Curb Orifice Throat in Inches � of Throat (see USDCM Figure ST-5) Width for Depression Pan (typically the gutter width of 2 feet) 3ing Fador for a Single Curb Opening (typical value 0.10) Opening Weir Coefficient (typical value 23-3.7) Opening Orifice Coefficient (typical value 0.60 - OJO) Type = aio�ai = No = Ponding Depth = � ��) _ Wo = A.ano = �r iG) _ G, (�) _ � ��) _ � ��) _ H�ert = Hm,oae = Theta = Wo = �r«)= Cw (C) _ � (�) _ ifor Grate Midwidth i for Curb Opening Weir Equation �ination Inlet Performance Reduction Factor for Long Inlets Opening Performance Reduction Factor for Long Inlets �d Inlet Performance Reduction Factor for Long Inlets Inlet Interception Capaciry (assumes clogged condition) MINOR MAIOR d�,a�e = N/A N/A ft dc,,,b = 033 0.58 ft RFcomb��oae�oo = 0.57 0.85 RF��,b = 0.93 1.00 RF�,a�e = N/A N/A ���� Qa = O�.erride Depths MHFD-Inlet v5.01.xlsm, Inlet C3 3/7/2023, 6:53 PM � NORTHERN ENGINEERING nlet Name: Inlet D3 _0-Year Design Flow (cfs) 0.30 _00-Year Design Flow (cfs) 0.70 Project: 1853-001 Location: Worthington Self Stora Calc. By: M. Ruebel At low flow dephs, the inlet will act like a weir governed by the following equation: ' whereP=2(L+W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: ' where A equa(s the open area of the inlet grate ' where H corresponds to the depth of water above the centroid of the cross-sectional area (A). Q = 3.OPH1.s Q = 0.67A(2gH)o.s 12.00 10.00 N 8.00 w u � 6.00 L lC L ni 4.00 0 2.00 0.00 0.00 0.20 0.40 0.60 0.80 Stage (ft) H > 1.792 (A/Pl. then the pe of Grate: ngth of Grate (ft) dth of Grate (ft): Depth Above Inlet (ft) 0.00 0.10 0.17 0.27 0.37 0.47 0.57 0.64 0.67 0.77 0.87 0.97 tes like an orifice: otherwise it ooerates like a weir. Fort Collins Area Inlet 1.98 1.35 Elevation (ft) 5,051.53 5,051.63 5,051.70 5,051.80 5,051.90 5,052.00 5,052.10 5,052.17 5,052.20 5,052.30 5,052.40 5,052.50 Open Area of Grate (ft2) Rim Elevation (ft): Reduction Factor: Shallow Weir Orifice Flow Flow (cfs) (cfs) 0.00 0.00 0.32 2.27 0.70 2.96 1.40 3.73 2.25 4.37 3.22 4.92 4.30 5.42 5.11 5.75 5.48 5.88 6.75 6.30 8.11 6.70 9.54 7.07 1.00 _ 2.67 5,051.53 0.50 Actual Flow Notes (cfs) 0.00 0.32 10-Yea r Storm 0.70 100-Year Storm 1.40 2.25 3.22 4.30 5.11 Overflow into Street 5.48 6.75 6.70 7.07 1.20 NORTHERNENGINEERING.COM � 970.221.4158 FORTCOLLINS � GREELEY Stage - Discharge Curves MHFD-Inlet I/ersion 5. DI A �il 2021 � • �C �'� •' • ` • ' • � . • � (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Project: Worthington Self Storage Inlet ID: Inlet D4 i .,.. i t,m.�. i �. sTnccr CRpWN rum Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) iing's Roughness Behind Curb (typically between 0.012 and 0.020) of Curb at Gutter Flow Line �,e from Curb Face to Street Crown Width Transverse Slope Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) Longitudinal Slope - Enter 0 for sump condition ig's Roughness for Street Section (typically between 0.012 and 0.020) TBACK - SS.7 R SBACK - fUft �ena = 0.020 Hcuae = 6.00 inches TcaowN = 15.7 ft W = 2.00 ft Sx = 0.042 ft/ft SW = 0.083 ft/ft So = 0.000 ft/ft n�� = 0.012 Allowable Spread for Minor & Major Storm Allowable Depth at Gutter Flowline for Minor & Major Storm < boxes are not applicable in SUMP conditions INOR STORM Allowable Capacity is based on Depth Criterion NOR STORM Allowable Capaciry is based on Depth Criterion Minor Storm Major Storm TMax = 15.0 15.0 ft dMax = 6.0 12.0 inches ' r Minor Storm Major Storm Qaiio„, = SUMP SUMP cfs 1 � • � 1 • � • MHFD-Inlet, �ersion 5.01 (Ap�il ZOZi) �Lo (C)� H-Curb H-Vert — Wo Wp W � �o (G) .. _..._...__._. . of Inlet CDOT Type R Curb Opening Depression (additional to continuous gutter depression 'a' from above) �er of Unit Inlets (Grate or Curb Opening) � Depth at Flowline (outride of local depression) :h of a Unit Grate i of a Unit Grate Opening Ratio for a Grate (typical values 0.15-0.90) iing Fador for a Single Grate (typical value 0.50 - OJO) � Weir Coefficient (typical value 2.15 - 3.60) � Orifice Coefficient (typical value 0.60 - 0.80) th of a Unit Curb Opening it of Vertical Curb Opening in Inches it of Curb Orifice Throat in Inches � of Throat (see USDCM Figure ST-5) Width for Depression Pan (typically the gutter width of 2 feet) 3ing Fador for a Single Curb Opening (typical value 0.10) Opening Weir Coefficient (typical value 23-3.7) Opening Orifice Coefficient (typical value 0.60 - OJO) Type = aio�ai = No = Ponding Depth = � ��) _ Wo = A.ano = �r iG) _ G, (�) _ � ��) _ � ��) _ H�ert = Hm,oae = Theta = Wo = �r«)= Cw (C) _ � (�) _ ifor Grate Midwidth i for Curb Opening Weir Equation �ination Inlet Performance Reduction Factor for Long Inlets Opening Performance Reduction Factor for Long Inlets �d Inlet Performance Reduction Factor for Long Inlets MINOR MAIOR d�,a�e = N/A N/A ft dc,,,b = 033 0.58 ft RFcomb��oae�oo = 0.77 1.00 RF��,b = 1.00 1.00 RF�,a�e = N/A N/A Override Depths Inlet Interception Capaciry (assumes clogged condition) Qa = CaoaeiN IS GOOD for Minor and Maior Storms!>O PEAKI QaeaKaeouiaeo = MHFD-Inlet �ersion 5.01 A ril ZOZI � � � C �' � �' � � � ' � : . � • (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Project: Worthington Self Storage Inlet ID: Inlet E3 r rw , r. T„ I __" W µ�J � � srR�r a a cRowN t _ -- � 5� e �, mum Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) iing's Roughness Behind Curb (rypically between 0.012 and 0.020) of Curb at Gutter Flow Line :e from Curb Face to Street Crown Width Transverse Slope Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) Longitudinal Slope - Enter 0 for sump condition ig's Roughness for Street Sedion (typically between 0.012 and 0.020) Allowable Spread for Minor & Major Storm Allowable Depth at Gutter Flowline for Minor & Major Storm < boxes are not applicable in SUMP conditions STORM Allowable Capacity Is based on Depth Qiterion STORM Allowable Capacity is based on Depth G�iterion Tana = 13.0 ft SsacK = 0.020 ft/ft �aecK = 0.012 Hcuae = 6.00 inches TcaowN = 15.0 ft W = 2.00 ft Sx = 0.020 ft/ft Sw = 0.083 ft/ft Sa = 0.000 ft/ft �sraEEr = 0.012 Minor Storm Ma'or Storm TMax = 15.0 15.0 ft dnnx = 6.0 12.0 inches Minor Storm Ma�or Storm Qanow = SUMP SUMP cfs MHFD-Inlet v5.01.xism, Inlet E3 4/25/2023, 1023 PM . . �• . � . � MHFD-Inlet, �ersion 5.01 (April ZOZI) Lo (C) I H-Curb H-Vert - - - - - - - -- - . � _.. - - , ._ � ... Wo -- \n/P ..,..._.. �. . _ -__� _ _ W � _ _ �o �G) yof Inlet �� I CDOT/Denver 13 Combination I Depression (additional to continuous gutter depression 'a' from above) ber of Unit Inlets (Grate or Curb Opening) �r Depth at Flowline (outside of local depression) :h of a Unit Grate i of a Unit Grate Opening Ratio for a Grate (typical values 0.15-0.90) �ing Factor for a Single Grate (typical value 0.50 - 0.70) � Weir Coefficient (typical value 2.15 - 3.60) � Orifice Coefficient (typical value 0.60 - 0.80) th of a Unit Curb Opening �t of Vertical Curb Opening in Inches it of Curb Orifice Throat in Inches __ of Throat (see USDCM Figure ST-5) Width for Depression Pan (typically the gutter width of 2 feet) 3ing Fador for a Single Curb Opening ([ypical value 0.10) Opening Weir Coefficient (typical value 23-3.7) Opening Orifice Coeffcient (typical value 0.60 - OJO) � for Grate Midwidth i for Curb Opening Weir Equation �ination Inlet Performance Reduction Factor for Long Inlets Opening Performance Reduction Factor for Long Inlets �d Inlet Performance Reduction Factor for Long Inlets Inlet Interception Capacity (assumes clogged condition) Capacity IS GOOD for Minor and Major Storms(> Type = WOT/Derner 13 Combination aio�i = Z.00 inches No = 2 Ponding Depth = 6.0 9.0 inches MINOR MAJOR I� Override Depths Lq (G) = 3.00 feet Wo = 1.73 feet Ara�m = 0.43 Cf (G) = 0.50 0.50 Cn, (G) = 330 Co (G) = 0.60 MINOR MAJOR lq (C) = 3.00 feet H�ert = 6.50 inches H�„oa� = 5.25 inches Theta = 0.00 degrees WP = 2.00 feet Cf(C) = 0.10 0.10 CN, (C) = 3.70 Co (C) = 0.66 MINOR MA70R d�,a�e = 0523 0.773 ft dc��b = 033 0.58 ft RFcomnmano� = 0.71 1.00 RF�,,,b = 1.00 1.00 RF�,a�e = 0.71 1.00 Qa = RED - MINOR MAJOR MHFD-Inlet v5.01.xism, Inlet E3 4/25/2023, 1023 PM � NORTHERN ENGINEERING Inlet Name: Inlet F2-1 Project: 1853-001 10-Year Design Flow (cfs) 7.30 Location: Worthington Self Stora 100-Year Desi�n Flow (cfsl 21.10 Calc. Bv: M. Ruebel At lowflow dephs,the inlet will act like a weir governed bythe followingequation: ' whereP=2(L+W) " where H correspondsto the depth ofwater above the flowline At higherflow depths,the inletwill act like an orifice governed by the followingequation: ' where A equals the open area of the inlet grate ' where H correspondsto the depth of water above the centroid of the cross-sectional area (A). Q = 3.OPH1.s Q = 0.67A(2gH)o.s 160.00 140.00 120.00 w 100.00 � � 80.00 � � � 60.00 � � 40.00 20.00 - 0.00 0.00 0.50 �� Stage (ft) 1.50 2.00 2.50 If H> 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. � Type of Grate: Quad CDOT Type 13 Inlet Open Area of Grate (ftZ) Length of Grate (ft): 13.08 Rim Elevation (ft): Width of Grate (ft): 1.875 Reduction Factor: Depth Above Inlet (ft) 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 Stage - Discharge Curves Elevation 051.69 051.89 052.09 052.29 052.49 052.69 052.89 053.09 053.29 053.49 053.69 053.89 Shallow Weir Orifice Flow Flow (cfs) (cfs) 0.00 0.00 4.01 29.48 11.35 41.69 20.86 51.06 32.11 58.96 44.87 65.92 58.99 72.21 74.33 77.99 90.82 83.38 108.37 88.44 126.92 93.22 146.43 97.77 24.53 5,051.69 0.50 Actual Flow Notes (cfs) 0.00 4.01 2_Year Storm 11.35 20.86 100-Year Storm 32.11 44.87 58.99 74.33 83.38 88.44 93.22 97.77 NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY STORM SEWER CALCULATIONS (100-YEAR) NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(145) 1.91 15 Cir 122.240 5044.17 5044.84 0.548 5044.72 5045.39 0.21 5045.39 End Manhole 2 Pipe -(112) 1.20 15 Cir 78.010 5044.94 5045.08 0.180 5045.49 5045.63 0.03 5045.67 1 Manhole 3 Pipe -(113) 120 15 Cir 57.535 5045.08 5045.19 0.191 5045.67 5045.75 0.08 5045.83 2 Manhole 4 Pipe -(114) 1.20 15 Cir 37.205 5045.19 5045.26 0.188 5045.83 5045.86 0.06 5045.92 3 Manhole 5 Pipe -(114) (1) 120 15 Cir 40.682 5045.26 5045.33 0.173 5045.92 5045.96 0.06 5046.01 4 Manhole 6 Pipe -(115) 1.20 15 Cir 64.362 5045.33 5045.45 0.187 5046.01 5046.07 0.06 5046.13 5 Manhole 7 Pipe -(53) 0.71 15 Cir 20.130 5044.94 5044.98 0.199 5045.39 5045.41 0.06 5045.47 1 Manhole Project File: St01"I71 A, Storm B Number of lines: 7 Run Date: 2/2/2024 NOTES: Return period = 100 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 122240 0.00 0.00 0.00 0.00 0.00 0.0 4.7 0.0 1.91 5.18 3.67 15 0.55 5044.17 5044.84 5044.72 5045.39 5046.44 5052.45 Pipe -(145) 2 1 78.010 0.00 0.00 0.00 0.00 0.00 0.0 3.4 0.0 1.20 2.97 2.29 15 0.18 5044.94 5045.08 5045.49 5045.63 5052.45 5052.01 Pipe -(112) 3 2 57.535 0.00 0.00 0.00 0.00 0.00 0.0 2.4 0.0 1.20 3.06 2.19 15 0.19 5045.08 5045.19 5045.67 5045.75 5052.01 5053.29 Pipe -(113) 4 3 37.205 0.00 0.00 0.00 0.00 0.00 0.0 1.8 0.0 1.20 3.03 1.98 15 0.19 5045.19 5045.26 5045.83 5045.86 5053.29 5052.78 Pipe -(114) 5 4 40.682 0.00 0.00 0.00 0.00 0.00 0.0 1.1 0.0 1.20 2.91 1.89 15 0.17 5045.26 5045.33 5045.92 5045.96 5052.78 5052.83 Pipe -(114) (1) 6 5 64.362 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 1.20 3.02 1.87 15 0.19 5045.33 5045.45 5046.01 5046.07 5052.83 5052.42 Pipe -(115) 7 1 20.130 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.71 3.12 1.83 15 0.20 5044.94 5044.98 5045.39 5045.41 5052.45 5052.45 Pipe -(53) Project File: St01'171 A, Storm B Number of lines: 7 Run Date: 2/2/2024 NOTES:Intensity = 127.16 /(Inlet time + 17.80) ^ 0.82; Return period =Yrs. 100 ; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewer Profile Proj. file: I Storm A � � � o = �� o ��� 5 �� Elev. (ft) 5062.00 5058.00 5054.00 5050.00 5046.00 5042.00 0 10 20 30 40 50 60 70 80 HGL EGL Reach (ft) �7i7:3►�i7 5058.00 5054.00 5050.00 5046.00 5042.00 90 100 Storm Sewers Storm Sewer Profile Proj. file: Storm B � .�.+ C � � — �. Elev. (ft) 5061.00 5057.00 5053.00 5049.00 5045.00 5041.00 0 50 100 150 200 250 300 350 400 HGL EGL Reach (ft) �iZc�i � � 5057.00 5053.00 5049.00 5045.00 5041.00 450 Storm Sewers m �.n cfl � 7 N 7 7 � 7 7 7 ��„� c �_� c � n,� c �,.,� � �..,� c �,.�� Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm C.stm @ � N � 7 7 � � C C NO � � aDO .�. OD _ _ J CO . _ . _ J � _ Elev. (ft) 5058.00 5055.00 5052.00 5049.00 5046.00 5043.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5058.00 5055.00 5052.00 5049.00 5046.00 5043.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(110) 20.03 24 Cir 8.515 5046.15 5046.15 0.000 5047.76 5047.97 0.47 5048.44 End None 2 Pipe -(181) 20.03 24 Cir 8.563 5046.15 5046.19 0.468 5048.44" 5048.50" 0.63 5049.13 1 None Project File: Storm C.stm Number of lines: 2 Run Date: 1/26/2024 NOTES: Return period = 100 Yrs. ;"Surcharged (HGL above crown). Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 8.515 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 20.03 0.00 7.04 24 0.00 5046.15 5046.15 5047.76 5047.97 5052.85 5051.62 Pipe -(110) 2 1 8.563 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 20.03 16.75 6.38 24 0.47 5046.15 5046.19 5048.44 5048.50 5051.62 5051.98 Pipe -(181) Project File: Storm C.stm Number of lines: 2 Run Date: 1/26/2024 NOTES:Intensity = 127.16 /(Inlet time + 17.80) ^ 0.82; Return period =Yrs. 100 ; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm D.stm � � � � � C C �Q C .�. pp J lf] Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 N 7 J MO � . 10 20 HGL EGL 30 40 50 Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(107) 3.90 24 Cir 10.921 5046.91 5046.91 0.000 5047.60 5047.72 0.02 5047.75 End None 2 Pipe -(105) 3.20 18 Cir 25.820 5046.91 5047.04 0.503 5047.75 5047.72 0.26 5047.72 1 None Project File: Storm D.stm Number of lines: 2 Run Date: 1/26/2024 NOTES: Return period = 100 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 10.921 0.00 0.00 0.00 0.00 0.00 0.0 02 0.0 3.90 0.00 3.65 24 0.00 5046.91 5046.91 5047.60 5047.72 5051.86 5051.50 Pipe -(107) 2 1 25.820 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 3.20 8.07 3.63 18 0.50 5046.91 5047.04 5047.75 5047.72 5051.50 5051.53 Pipe -(105) Project File: Storm D.stm Number of lines: 2 Run Date: 1/26/2024 NOTES:Intensity = 127.16 /(Inlet time + 17.80) ^ 0.82; Return period =Yrs. 100 ; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm E.stm @ � N � 7 7 � ao C J oO � J�O Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(159) 11.40 24 Cir 9.118 5046.60 5046.62 0220 5047.81 5047.95 0.41 5048.36 End None 2 Pipe -(160) 11.40 24 Cir 3.926 5046.62 5046.63 0.249 5048.36 5048.37 0.24 5048.61 1 None Project File: Storm E.stm Number of lines: 2 Run Date: 1/26/2024 NOTES: Return period = 100 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 9.118 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 11.40 11.48 5.44 24 0.22 5046.60 5046.62 5047.81 5047.95 5048.88 5052.70 Pipe -(159) 2 1 3.926 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 11.40 12.22 3.93 24 0.25 5046.62 5046.63 5048.36 5048.37 5052.70 5052.15 Pipe -(160) Project File: Storm E.stm Number of lines: 2 Run Date: 1/26/2024 NOTES:Intensity = 127.16 /(Inlet time + 17.80) ^ 0.82; Return period =Yrs. 100 ; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm F.stm @ � N ('') Y .. 7 .. 7 .. 7 V 7 � m c � rn0 � � v0 � � cp0 � .. v0 .�. OD _ J 00 _ _ J � _ . _ . J f� . . � 6] . _ Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(172) 21.10 24 Cir 3.546 5046.60 5046.60 0.000 5048.24 5048.39 0.12 5048.50 End None 2 Pipe -(173) 21.10 24 Cir 9.640 5046.60 5046.62 0.208 5048.60" 5048.67" 0.58 5049.25 1 None 3 BASIN F2-3 21.10 24 Cir 8.729 5046.62 5046.64 0229 5049.25" 5049.31'` 0.39 5049.70 2 None 4 Pipe -(180) 21.10 24 Cir 7.955 5046.64 5046.65 0.123 5049.70'" 5049.76" 0.70 5050.46 3 None Project File: Storm F.stm Number of lines: 4 Run Date: 1/29/2024 NOTES: Return period = 100 Yrs. ;"Surcharged (HGL above crown). Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 3.546 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 21.10 0.00 7.38 24 0.00 5046.60 5046.60 5048.24 5048.39 5048.88 5048.89 Pipe -(172) 2 1 9.640 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 21.10 11.17 6.72 24 0.21 5046.60 5046.62 5048.60 5048.67 5048.89 5052.14 Pipe -(173) 3 2 8.729 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 21.10 11.73 6.72 24 0.23 5046.62 5046.64 5049.25 5049.31 5052.14 5051.76 BASIN F2-3 4 3 7.955 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 21.10 8.58 6.72 24 0.12 5046.64 5046.65 5049.70 5049.76 5051.76 5051.94 Pipe -(180) Project File: Storm F.stm Number of lines: 4 Run Date: 1/29/2024 NOTES:Intensity = 127.16 /(Inlet time + 17.80) ^ 0.82; Return period =Yrs. 100 ; c= cir e= ellip b= box Storm Sewers v2023.00 STORM SEWER CALCULATIONS (2-YEAR/WQ) INLET TO STORMTECH ISOLATOR ROW NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file� Storm C 2-yr.stm @ � N � 7 7 � � C C NO � � aDO .�. OD _ _ J CO . _ . _ J � _ Elev. (ft) 5058.00 5055.00 5052.00 5049.00 5046.00 5043.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5058.00 5055.00 5052.00 5049.00 5046.00 5043.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(110) 3.90 24 Cir 8.515 5046.15 5046.15 0.000 5047.76 5047.76 0.02 5047.78 End None 2 Pipe -(181) 3.90 24 Cir 8.563 5046.15 5046.19 0.468 5047.78 5046.88 0.25 5046.88 1 None Project File: Storm C 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES: Return period = 2 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 8.515 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 3.90 0.00 1.44 24 0.00 5046.15 5046.15 5047.76 5047.76 5052.85 5051.62 Pipe -(110) 2 1 8.563 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 3.90 16.75 2.73 24 0.47 5046.15 5046.19 5047.78 5046.88 5051.62 5051.98 Pipe -(181) Project File: Storm C 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES:Intensity = 69.87 /(Inlet time + 13.10) ^ 0.87; Return period =Yrs. 2; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file� Storm D 2-yr.stm � � � � � C C �Q C .�. pp J lf] Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 N 7 J MO � . 10 20 HGL EGL 30 40 50 Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(107) 0.90 24 Cir 10.921 5046.91 5046.91 0.000 5047.60 5047.60 0.00 5047.60 End None 2 Pipe -(105) 0.74 18 Cir 25.820 5046.91 5047.04 0.503 5047.60 5047.36 n/a 5047.36 1 None Project File: Storm D 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES: Return period = 2 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 10.921 0.00 0.00 0.00 0.00 0.00 0.0 1.0 0.0 0.90 0.00 0.94 24 0.00 5046.91 5046.91 5047.60 5047.60 5051.86 5051.50 Pipe -(107) 2 1 25.820 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.74 8.07 1.81 18 0.50 5046.91 5047.04 5047.60 5047.36 5051.50 5051.53 Pipe -(105) Project File: Storm D 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES:Intensity = 69.87 /(Inlet time + 13.10) ^ 0.87; Return period =Yrs. 2; c= cir e= ellip b= box Storm Sewers v2023.00 Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm E 2-yr.stm @ � N � 7 7 � ao C J oO � J�O Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(159) 2.84 24 Cir 9.118 5046.60 5046.62 0220 5047.81 5047.81 0.03 5047.85 End None 2 Pipe -(160) 2.84 24 Cir 3.926 5046.62 5046.63 0.249 5047.85 5047.85 0.03 5047.88 1 None Project File: Storm E 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES: Return period = 2 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 9.118 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 2.84 11.48 1.44 24 0.22 5046.60 5046.62 5047.81 5047.81 5048.88 5052.70 Pipe -(159) 2 1 3.926 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 2.84 12.22 1.41 24 0.25 5046.62 5046.63 5047.85 5047.85 5052.70 5052.15 Pipe -(160) Project File: Storm E 2-yr.stm Number of lines: 2 Run Date: 1/29/2024 NOTES:Intensity = 69.87 /(Inlet time + 13.10) ^ 0.87; Return period =Yrs. 2; c= cir e= ellip b= box Storm Sewers v2023.00 Hydraflow Storm Sewers Extension for Autodesk0 Civil 3D0 Plan Storm Sewer Profile Proj. file: Storm F 2-yr.stm @ � N ('') Y .. 7 .. 7 .. 7 V 7 � m c � rn0 � � v0 � � cp0 � .. v0 .�. OD _ J 00 _ _ J � _ . _ . J f� . . � 6] . _ Elev. (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 0 10 20 30 40 50 HGL EGL Reach (ft) 5059.00 5056.00 5053.00 5050.00 5047.00 5044.00 60 70 80 90 100 Storm Sewers Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 Pipe -(172) 6.70 24 Cir 3.546 5046.60 5046.60 0.000 5048.24 5048.24 0.01 5048.26 End None 2 Pipe -(173) 6.70 24 Cir 9.640 5046.60 5046.62 0.208 5048.26 5048.26 0.08 5048.34 1 None 3 BASIN F2-3 6.70 24 Cir 8.729 5046.62 5046.64 0229 5048.34 5048.34 0.05 5048.39 2 None 4 Pipe -(180) 6.70 24 Cir 7.955 5046.64 5046.65 0.123 5048.39 5048.39 0.08 5048.48 3 None Project File: Storm F 2-yr.stm Number of lines: 4 Run Date: 1/29/2024 NOTES: Return period = 2 Yrs. Storm Sewers v2023.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap el Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 3.546 0.00 0.00 0.00 0.00 0.00 0.0 02 0.0 6.70 0.00 2.43 24 0.00 5046.60 5046.60 5048.24 5048.24 5048.88 5048.89 Pipe -(172) 2 1 9.640 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 6.70 11.17 2.42 24 0.21 5046.60 5046.62 5048.26 5048.26 5048.89 5052.14 Pipe -(173) 3 2 8.729 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 6.70 11.73 2.34 24 0.23 5046.62 5046.64 5048.34 5048.34 5052.14 5051.76 BASIN F2-3 4 3 7.955 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 6.70 8.58 2.30 24 0.12 5046.64 5046.65 5048.39 5048.39 5051.76 5051.94 Pipe -(180) Project File: Storm F 2-yr.stm Number of lines: 4 Run Date: 1/29/2024 NOTES:Intensity = 69.87 /(Inlet time + 13.10) ^ 0.87; Return period =Yrs. 2; c= cir e= ellip b= box Storm Sewers v2023.00 NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX � NORTHERN ENGINEERING Project Number: Project Location: �escription Historic Site �escription Detention Area 1 Detention Area 2 Total release rate Required release rate Underground Vault Stormtech WQ Basin 1 Stormtech WQ Basin 2 Stormtech Basin lA Stormtech Basin 16 Stormtech WQ Basin 3 Stormtech WQ Basin 4 Stormtech Basin 2 Stormtech Basin 3 Stormtech Basin 4 Total of Detention Area 1 Req. Vol. of Detention Area 1 Total of Detention Area 2 Req. Vol. of Detention Area 2 1853-001 Project: Worthington Sto Fort Colins Date: May 1, 2024 Q�oo � Notes 1.91 cfs Release rate per Centre forAdvanced Technolo�v lOth & 16th. Q�oo Notes 0.75 cfs Release rate for Detention Area 1 1.16 cfs Release rate for Detention Area 2 1.91 cfs Total re(ease rate for Detention Areas 1 and 2. 1.91 cfs Release rate per Centre for Advanced Technology lOth & 16th. Volume Notes 909 cu. ft. Basin is within Detention Area 1. 3,129 cu. ft. Basin is within Detention Area 1. 20,298 cu. ft. Basin is within Detention Area 1. 2,186 cu. ft. Basin is within Detention Area 1. 2,103 cu. ft. Basin is within Detention Area 2. 3,601 cu. ft. Basin is within Detention Area 2. 7,409 cu. ft. Basin is within Detention Area 2. 18,431 cu. ft. Basin is within Detention Area 2. 8,971 cu. ft. Basin is within Detention Area 2. 26,522 cu. ft. Total design volume of Stormtech Chambers in Detention Area 1. 26,501 cu. ft. Required detention volume of Detention Area 1. 40,515 cu. ft. Total design volume of Stormtech Chambers in Detention Area 2. 39,826 cu. ft. Required detention volume of Detention Area 2. . • . .- � Chambers Underground Vault Volume Required Notes Stormtech WQ Basin 1 909 cu. ft. 3- MC 3500 Design water quality volume for Basins A1 & OS3. Req. Vol. Stormtech WQ Basin 1 340 cu. ft. Required water quality volume for Basins A1 & OS3. Stormtech WQ Basin 2 3,129 cu. ft. 14 - MC 3500 Design water quality volume for Basins A2 & OSl. Req. Vol. Stormtech WQ Basin 2 1,732 cu. ft. Required water quality volume for Basins A2 & OS1. Stormtech WQ Basin 3 2,103 cu. ft. 9- MC 3500 Design water quality volume for Basins B2. Req. Vol. Stormtech WQ Basin 3 1,175 cu. ft. Required water quality volume for Basins B2. rmtech Basin WQ 4 � 3,601 cu. ft. �17 - MC 3500 �Design water quality volume for Basin B1 & OS2. Req. Vol. Stormtech WQ Basin 4 I 1,972 cu. ft. I IRequired water quality volume for Basin Bl & OS2. Notes: 1) Detention Area 1 includes Basins Al, A2, OSl, and OS3. 2) Detention Area 2 includes Basins Bl, B2, and OS2. 1 � s" � FOR DRAINAGE REVIEW ONLY � NOT FOR CONSTRUCTION / / � / , / , / ,, / , � �, / , , , � , , �S2 1.57 ac. �� ' � � � � � � # r � � �, .. DETENTION AREA 1 � ���� �� �~ DETENTION AREA 2 � f �� 0 �� �� �14I i ��� ��� 70 0 70 Feet' � ( IN FEET ) ' 1 inch =70 ft. � � � � � I � OS1 1.93 ac. PROPOSED BASIN w/ WQ WEIR � osi STORMTECH - � �/ � � WQ BASIN 2 � �---�-J- _ a2 i� A2 '- STORMTECH t 0.31 ac. � B; siN iA � LOT 1 1 1.4B7 ac. �,... STORMTECH r. WQ BASIN 4 � l 1 � g2 t1.14 ac. ' PROPOSED BASIN - ' w/ WQ WEIR '�� STORMTECH ■ r� WQ BASIN 3 ��in.�J L�:�'ri.L't�w� �_-�-_.-°_"�-`_'.a�;ai� �;�' __ - s� ie'rY � ',e i �'�� �--- � • - _ _ ��'_� � .- -����� _� .n� � -�'• � :• " �. � - . BASIN 4 LCIII � J t 1 � ' � �OT2 1 NORTH ERN ENGINEERING FORT COLLINS: 301 North Howes Street, Suite 100, 80521 970.221.4158 GREELEY: 820 8th Street, 80631 northernengineering.com .-• - ■siii� I.■ , � �� , , , � , , , � PROPOSED BASIN j` w/WQ WEIR I � , , ,, � MTECH IN 18 _` / A1 0.23 ac. a1 I ,.� STORMTECH � WQ BASIN 1 p � OS3 STORMTECH� BASIN 1A ,/ � ���I/ � � ��o` '�C?>% � �/ ,S�O�/ % � OS3 0.33 ac. ' i 1 ' 1 r� 1 ' .f ! I.,� � ,� LEGEND: PROPOSED STORM SEWER PROPOSEDINLET PROPOSED CURB & GUTTER PROPERTY BOUNDARY DESIGN POINT DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY STORMTECH CHAMBERS STORMTECH CHAMBERS (ISOLATOR ROW) � � BASIN DESIGNA710N A 0.22 BASIN AREA (AC) � � � � � i� � Description Q100 Notes Detention Area 1 0.75 cfs Release rate for Detention Area 1 G� Detention Area 2 1.16 cfs Release rate for Detention Area 2 Total release rate 1.91 cfs Total release rate for Detention Areas 1 and 2. � Required release rate 1.91 cfs Release rate per Centre for Advanced Technology 10th & 16th. Underground Vault Volume Notes Stormtech WQ Basin 1 909 cu. ft. Basin is within Detention Area 1. Stormtech WQ Basin 2 3,129 cu. ft. Basin is within Detention Area 1. Stormtech Basin 1A 20,298 cu. ft. Basin is within Detention Area 1. Stormtech Basin 1B 2,186 cu. ft. Basin is within Detention Area 1. Stormtech WQ Basin 3 2,103 cu. ft. Basin is within Detention Area 2. Stormtech WQ Basin 4 3,601 cu. ft. Basin is within Detention Area 2. Stormtech Basin 2 7,409 cu. ft. Basin is within Detention Area 2. Stormtech Basin 3 18,431 cu. ft. Basin is within Detention Area 2. Stormtech Basin 4 8,971 cu. ft. Basin is within Detention Area 2. Total of Detention Area 1 26,522 cu. ft. Total design volume of Stormtech Chambers in Detention Area 1. Req. Vol. of Detention Area 1 26,501 cu. ft. Required detention volume of Detention Area 1. Total of Detention Area 2 40,515 cu. ft. Total design volume of Stormtech Chambers in Detentlon Area 2. Req. Vol. of Detention Area 2 39,826 cu. ft. Required detention volume of Detention Area 2. Underground Vault Volume Chambers Notes Required Stormtech WQ Basin 1 909 cu. ft. 3- MC 3500 Design water quality volume for Basins A1 & OS3. Req. Vol. Stormtech WQ Basin 340 cu. ft. Required water quality volume for Basins A1 & 1 OS3. Stormtech WQ Basin 2 3,129 cu. ft. 14 - MC 3500 Design water quality volume for Basins A2 & OS1. Req. Vol. Stormtech WQ Basin 1,732 cu. ft. Required water quality volume for Basins A2 & 2 OS1. Stormtech WQ Basin 3 2,103 cu. ft. 9- MC 3500 Design water quality volume for Basins B2. Req. Vol. Stormtech WQ Basin 1,175 cu. ft. Required water quality volume for Basins B2. 3 Stormtech Basin WQ 4 3,601 cu. ft. 17 - MC 3500 Design water quality volume for Basin B1 & 052. Req. Vol. Stormtech WQ Basin 1,972 cu. ft. Required water quality volume for Basin B1 & OS2. 4 WORTHINGTON ENCLOSED MINI-STORAGE FORT COLLINS COLORADO DETENTION AREA EXHIBIT DRAWN BY: MCR SCALE: 1" = 70' DATE: 05/1 /2024 SHEET NO: DETENTION AREA 1 NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX � NORTHERN ENGINEERING � - • ' • • • ' ' • • Project: Worthington Storage Project Location: Fort Collins, Colorado Calculations By: M. Ruebel Date: 05/01/24 Pond No.: Detention Area 1 . . Design Point 1 1Zequired Detention Volume Design Storm 100-yr WQCV 0 ft' Developed "C" = 0.86 Quantity Detention 26501 ft`� Area (A)= 2.80 acres Total Volume 26501 ft3 Max Release Rate = 0.75 cfs Total Volume �� 1: ac-ft . . � e o ..- �� � �� e� _ • _, � i - � 5 300 9.95 24.0 7188 22� 6963 10 600 7.72 18.6 11154 450 10704 15 900 6.52 15.7 14130 675 13455 20 1200 5.60 13.5 16182 900 15282 25 1500 4.98 12.0 17988 1125 16863 30 1800 4.52 10.9 19591 1350 18241 35 2100 4.08 9.8 20632 1575 19057 40 2400 3.74 9.0 21614 1800 19814 45 2700 3.46 8.3 22496 2025 20471 50 3000 323 7.8 23334 2250 21084 55 3300 3.03 7.3 24078 2475 21603 60 3600 2.86 6.9 24793 2700 22093 65 3900 2.72 6.5 25544 2925 22619 70 4200 2.59 6.2 26194 3150 23044 75 4500 2.48 6.0 26873 3375 23498 80 4800 2.38 5.7 27509 3600 23909 85 5100 2.29 5.5 28123 3825 24298 90 5400 2.21 5.3 28737 4050 24687 95 5700 2.13 5.1 29236 4275 24961 100 6000 2.06 5.0 29763 4500 25263 105 6300 2.00 4.8 30341 4725 25616 110 6600 1.94 4.7 30832 4950 25882 115 6900 1.89 4.6 31403 5175 26228 120 7200 1.84 4.4 31901 5400 26501 Detention Basin 1A Project: REVS Worthington Self Storage: B1A //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 86 Number of End Caps - 46 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 4045.99 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 6460 sf Mln. Area - 5011 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) 405,49. Provided 4051.41 4051.32 4051.24 4051.16 4051.07 4050.99 4050.91 4050.82 4050.74 4050.66 4050.57 4050 49 4050.41 4050.32 4050.24 4050.16 4050.07 4049.99 4049.91 4049.82 4049.74 4049.66 4049.57 4049.49 4049.41 4049.32 4049.24 4049.16 4049.07 4048.99 4048.91 4048.82 4048.74 4048.66 4048.57 4048.49 4048.41 4048.32 4048.24 4048.16 4048.07 4047.99 4047.91 4047.82 4047.74 4047.66 4047.57 4047.49 4047.41 4047.32 4047.24 4047.16 4047.07 4046.99 4046.91 4046.82 4046.74 4046.66 4046.57 4046.49 4046.41 4046.32 4046.24 4046.16 4046.07 uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 16.69 25.28 34.71 59.10 88.43 107.46 122.31 13529 146.82 157.25 166.65 175.51 183.58 19128 198.38 205.09 211.48 217A2 223.06 228A2 233.50 238.33 242.92 24729 251.48 255.41 259.07 262.58 266.11 26923 27225 275.15 277.88 280.48 282.96 285.34 287.59 289.70 291.76 293.65 295.58 297.36 299.17 301.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.10 1.73 237 3.11 4.06 4.93 5.81 6.64 7.49 8.36 9.22 10.04 10.81 11.52 1222 12.88 13.52 14.16 14.77 15.38 15.96 16.56 17.13 17.68 1822 18.75 1926 19.76 2026 20.74 2120 21.65 22.08 22.50 22.91 23.30 23.67 24.02 24.36 24.68 24.99 2527 25.54 27.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n o.ss 215.33 2t5.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 213.34 20822 204.53 200.50 190.45 178.34 170.38 164.08 156.56 153.61 149.09 144.98 141.11 137.58 13421 131.09 126.15 125.33 122.70 12020 117.81 115.55 113.38 111.32 109.35 107.46 105.67 104.00 102.40 100.79 99.35 97.95 96.61 95.35 94.14 92.99 91.88 90.83 89.84 88.89 88.00 87.17 86.28 85A5 83.81 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 L I J.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 218.33 226.01 231.54 237.58 252.66 270.83 282.77 292.21 300.49 307.92 314.70 320.66 326.66 331.97 337.02 341.69 346.11 350.34 354.28 358.03 361.62 365.01 368.27 371.36 374.31 377.75 379.83 382.33 384.74 387.15 389.31 391.40 393.41 395.31 397.12 398.85 400.52 402.09 403.57 405.00 406.33 407.67 408.91 410.16 412.62 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 215.33 <ULytl.Ub 20082.73 19867 40 19652.06 19436.73 19221.40 19006.06 18790.73 18575.40 18360.06 18144.73 17929 40 17714.06 17495.73 17269.72 17038.18 16800.60 16547.94 16277.11 15994.35 15702.14 15401.65 15093.73 14779.03 14458.17 14131.51 13799.54 13462.52 13120.83 12774.72 12424.38 12070.10 11712.06 11350.45 10985.44 10617.17 10245.81 9871.49 9494.34 9114.51 8732.18 8347.44 7960.29 7570.98 7179.58 6786.16 6390.85 5993.73 5594.87 5194.36 4792.27 4388.70 3983.70 3577.36 3169.69 2760.77 2350.62 1938.00 1722.67 1507.33 1292.00 1076.67 861.33 646.00 430.67 215.33 Q L�tl�de Penmete, 5ro�� i� Ca��Wazio�s ❑ Cli�k for 52ge Area Data ❑ Oick So Invert Stage Nea �ata Click Here for Metric Detention Volume Detention Basin 1 B Project: REVS Worthington Self Storage: 616 Chamber Model - Uni[s - Number of Chambers - Voids in Ihe stone (porosity) - Base of Stone Eleva[ion - Amount of Stone Above Chambers - Amount of Stone Below Chambers - SC-740 Imperial 15 40 % 504626 ft 27 in 6 //� StormTech Area of system - 844 sf Mln. Area - 507 sf min. area Q A��de Penmete, Ra�e i� G��Watlo�s ❑ Cli�k for 52ge Area Data ❑ Oick So Invert Stage Nea �ata Click Here for Metric StormTech SC-740 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremental Ch Cumulative System Chamber Total Chamber Stone 8 St Chamber Elevation (inches) (cubic feet/ (cubic /ee!) (cubic feet/ (cubic feet) (cubic leet) (feeQ G3 0.00 0.00 28.13 28.13 2185.96 5051.51 �- Provided 62 0.00 0.00 28.13 28.13 2157.82 5051.43 61 0.00 0.00 28.13 28.13 2129.69 5051.34 60 0.00 0.00 28.13 28.13 2101-56 505126 59 0.00 O.W 28.13 28.13 2073.42 5051.18 58 0.00 0.00 28.13 28.13 2045.29 5051.09 57 0.00 0.00 28.13 28.13 2017.16 5051.01 56 0.00 0.00 28.13 28.13 1989.02 5050.93 55 0.00 0.00 28.13 28.13 1960.89 5050.84 54 0.00 0.00 28.13 28.13 1932.76 5050.76 53 0.00 0.00 28.13 28.13 1904.62 5050.68 52 0.00 0.00 28.13 28.13 1876.49 5050.59 51 0.00 0.00 28.13 28.13 1848-36 5050.51 50 0.00 0.00 28.13 28.13 1820.22 5050.43 49 0.00 0.00 28.13 28.13 1792.09 5050.34 48 0.00 0.00 28.13 28.13 1763.96 505026 47 0.00 0.00 28.13 28.13 1735.82 5050.18 46 0.00 0.00 28.13 28.13 1707.69 5050.09 45 0.00 0.00 28.13 28.13 1679.56 5050.01 44 0.00 0.00 28.13 28.13 1651.42 5049.93 43 0.00 0.00 28.13 28.13 1623.29 5049.84 42 0.00 0.00 28.13 28.13 1595.16 5049.76 41 0.00 0.00 28.13 28.13 1567.02 5049.68 40 0.00 0.00 28.13 28.13 1538.89 5049.59 39 0.00 0.00 28.13 28.13 1510.76 5049.51 38 0.00 0.00 28.13 28.13 1482.62 5049.43 37 0.00 0.00 28.13 28.13 1454.49 5049.34 36 0.05 0.82 27.80 28.63 1426.36 504926 35 0.16 2.44 27.16 29.60 1397.73 5049.18 34 0.28 423 26.44 30.67 1368.73 5049.09 33 0.60 9.06 24.51 33.57 1337.46 5049.01 32 0.80 12.03 23.32 35.35 1303.89 5048.93 31 0.95 1426 22.43 36.69 1268.54 5048.84 30 1.07 16.12 21.69 37.80 1231.85 5048.76 29 1.18 17.71 21.05 38.76 1194.05 5048.68 28 1.27 18.98 20.54 39.52 1155.29 5048.59 27 1.36 20.33 20.00 40.33 1115.77 5048.51 26 1.45 21.87 19.47 4122 1075.44 5048.43 25 1.52 22.87 18.98 41.86 1034.22 5048.34 24 1.58 23.73 18.64 42.37 992.36 504826 23 1.64 24.63 18.28 42.91 949.99 5048.18 22 1.70 25.49 17.94 43.43 907.07 5048.09 21 1.75 2629 17.62 43.91 863.64 5048.01 20 1.80 27.04 17.32 44.36 819.73 5047.93 19 1.85 27.82 17.00 44.83 775.38 5047.84 18 1.89 28.40 16.77 45.17 730.55 5047.76 17 1.93 29.01 16.53 45.54 685.38 5047.68 16 1.97 29.62 16.28 45.91 639.84 5047.59 15 2.01 30.15 16.07 4622 593.93 5047.51 14 2.04 30.67 15.86 46.54 547.71 5047.43 13 2.07 31.12 15.68 46.81 501.17 5047.34 12 2.10 31.57 15.50 47.08 454.36 5047.26 11 2.13 31.98 15.34 47.32 40728 5047.18 10 2.75 32.31 15.27 47.52 359.96 5047.09 9 2.18 32.66 15.07 47.73 312.44 5047.01 8 2.20 32.98 14.94 47.92 264.72 5046.93 7 2.21 33.11 14.89 48.00 216.80 5046.84 6 0.00 0.00 28.13 28.13 168.80 5046.76 5 0.00 0.00 28.13 28.13 140.67 5046.68 4 0.00 0.00 28.13 28.13 112.53 5046.59 3 0.00 0.00 28.13 28.13 84.40 5046.51 2 0.00 0.00 28.13 28.13 56.27 5046.43 1 0.00 0.00 28.13 28.13 28.13 5046.34 Detention Volume Project: REVS Worthington Self Storage: WQ B1 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 3 Number of End Caps - 2 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 504523 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 315 sf Mln. Area - 181 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) Soso�3 �- Provided Detention Volume 5050.65 5050.56 5050 48 5050.40 5050.31 5050.23 5050.15 5050.06 5049.98 5049.90 5049.81 5049.73 5049.65 5049.56 5049.48 5049.40 5049.31 5049.23 5049.15 5049.06 5048.98 5048.90 5048.81 5048.73 5048.65 5048.56 5048.48 5048.40 5048.31 5048.23 5048.15 5048.06 5047.98 5047.90 5047.81 5047.73 5047.65 5047.56 5047.48 5047.40 5047.31 So4�.23 .� Required Water Quality Volume 5047.15 504�06 Req. WQ Volume = 340 cu.ft. 5046.98 5046.90 5046.81 5046.73 5046.65 5046.56 5046.48 5046.40 5046.31 5046.23 5046.15 5046.06 5045.98 5045.90 5045.81 5045.73 5045.65 5045.56 5045.48 5045.40 5045.31 uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 zz 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.73 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.58 0.88 121 2.06 3.08 3.75 4.27 4.72 5.12 5.49 5.81 6.12 6.40 6.67 6.92 7.15 7.38 7.58 7.78 7.97 8.15 8.31 8A7 8.63 8.77 8.91 9.04 9.16 928 9.39 9.50 9.60 9.69 9.78 9.87 9.95 10.03 10.11 10.18 10.24 10.37 10.37 10.44 10.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.08 0.10 0.14 O.IB 021 025 029 033 0.36 0.40 0.44 0.47 0.50 0.53 0.56 0.59 0.62 0.64 0.67 0.69 0.72 0.74 0.77 0.79 0.82 0.84 0.86 0.88 0.90 0.92 0.94 0.96 0.98 1.00 1.01 1.03 1.04 1.06 1.07 1.09 1.10 1.11 1.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ivau 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.43 10.25 10.12 9.97 9.62 920 6.91 8.69 8.50 8.32 8.16 8.01 7.88 7.75 7.63 7.52 7.41 7.31 722 7.13 7.05 6.96 6.89 6.81 6.74 6.67 6.61 6.55 6.49 6.43 6.38 6.33 628 624 6.19 6.15 6.11 6.08 6.04 6.01 5.97 5.94 5.91 5.88 5.82 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 i u.ou 10.50 10.50 10.50 10.50 10.50 10.50 10.50 t 0.50 10.50 10.50 10.50 10.60 10.88 11.07 1129 11.82 t2 46 12.88 1321 13.50 7377 14.01 1423 14.44 14.62 14.80 14.97 15.13 1528 15A2 15.55 15.68 15.80 15.92 16.03 16.14 1624 16.33 16A2 16.51 16.60 16.68 16.75 16.82 16.89 16.96 17.02 17.08 17.14 17.19 1724 1729 17.34 17.38 17.43 17.52 10.50 10.50 70.50 10.50 10.50 10.50 10.50 10.50 10.50 yUtl.bJ 89835 887.85 877.35 866.85 856.35 845.85 835.35 824.85 614.35 803.85 793.35 782.85 77225 761.37 750.30 739.01 727.19 714.73 701.85 688.64 675.14 661.37 647.36 633.13 618.70 604.07 58927 574.30 559.17 543.89 528.47 512.91 49723 481.43 465.51 449.48 433.34 417.10 400.77 384.34 367.83 35123 33G.56 317.81 300.98 284.09 267.13 250.11 233.03 215.89 198.70 181.46 164.17 146.83 129.45 112.02 94.50 84.00 73.50 63.00 52.50 42.00 31.50 21.00 10.50 Q A��de Penmete, Ra�e i� G��Watlo�s ❑ Cli�k for 52ge Area Data ❑ Oick So Invert Stage Nea �ata Click Here for Metric WQ Basin 1 Per the approved variance (Appendix G) the water quality volume is included within the Detention Volume Project: REV7 Worthington Self Storage: WQ B2 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 14 Number of End Caps - 4 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 504523 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 986 sf Mln. Area - 759 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) Soso�3 �- Provided Detention Volume 5050.65 5050.56 5050 48 5050.40 5050.31 5050.23 5050.15 5050.06 5049.98 5049.90 5049.81 5049.73 5049.65 5049.56 5049.48 5049.40 5049.31 5049.23 5049.15 5049.06 5048.98 5048.90 5048.81 5048.73 5048.65 5048.56 5048.48 5048.40 5048.31 5048.23 5048.15 5048.06 So4�g8.� Required Water Quality Volume 5047.90 5047.81 (Req. WQ Volume = 1,732 cu.ft.) 5047.73 5047.65 5047.56 5047.48 5047.40 5047.31 5047.23 5047. I S 5047.06 5046.98 5046.90 5046.81 5046.73 5046.65 5046.56 5046.48 5046.40 5046.31 5046.23 5046.15 5046.06 5045.98 5045.90 5045.81 5045.73 5045.65 5045.56 5045.48 5045.40 5045.31 uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.81 2.72 4.12 5.65 9.62 14.40 17.49 19.91 22.02 23.90 25.60 27.13 28.57 29.89 31.14 32.30 33.39 34.43 35.39 36.31 37.18 38.01 38.80 39.55 40.26 40.94 41.58 42.17 42.75 43.32 43.83 44.32 44.79 45.24 45.66 46.06 46.45 46.82 47.16 47.50 47.80 48.12 48.41 48.70 49.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.15 0.21 027 0.35 0 43 0.51 0.56 0.65 0.73 0.80 0.87 0.94 1.00 1.06 1.12 1.18 1.23 1.26 1.34 1.39 1.44 1.49 1.54 1.58 1.63 1.67 1.72 1.76 1.80 1.84 1.86 1.92 1.96 1.99 2.03 2.06 2.09 2.12 2.15 2.17 2.20 2.22 2.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SL b/ 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 3287 32.87 32.54 31.74 31.16 30.52 28,91 26.97 25.70 24.70 23.83 23.05 22.34 21.69 21.09 20.54 20.01 19.52 19.06 18.63 18.22 17.83 17.46 17.11 16.77 i6A5 16.15 15.86 15.58 15.33 15.08 14.83 14.61 14.40 14.20 14.00 13.82 13.64 13.48 13.32 13.17 13.02 12.89 12.75 12.62 12.50 12.29 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 SL.bI 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 33.35 34.55 35.43 36.38 38.80 41.72 43.62 45.12 46 43 47.60 48.66 49.63 50.53 51.36 52.15 52.88 53.57 5423 54.84 55A2 55.98 56.51 57.01 57.49 57.94 58.38 58.79 59.18 59.55 59.92 6025 60.56 60.87 61.16 61.44 61.70 61.95 62.19 62A2 62.63 62.84 63.04 6323 63A2 63.74 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 32.87 S ILb.bJ 3095.78 3062.92 3030.05 2997.18 2964.32 2931.45 2898.58 2865.72 2832.85 2799.98 2767.12 273425 2700.90 2666.34 2630.92 2594.53 2555.73 2514.02 2470.40 2425.28 2378.85 2331.26 2282.59 2232.97 2182.43 2131.07 2078.92 2026.04 1972.47 1918.24 1863.40 1807.97 1751.99 1695.49 1638.48 1580.99 1523.05 1464.67 1405.88 1346.70 1287.15 1227.24 1166.99 1106.43 1045.56 984.40 922.96 86126 799.31 737.12 674.70 612.07 54923 486.19 422.96 359.54 295.80 262.93 230.07 19720 164.33 131.47 98.60 65.73 32.87 pp m�wae ae��mece� so�e ��� ca¢wauo�s ❑ COck Por SWqeMea �ata ❑ er a eo moerc sezqe n�ea oaea Click Here for Metric WQ Basin 2 Per the approved variance (Appendix G) the water quality volume is included within the Detention Volume � NORTHERN ENGINEERING • � 1- � � Project Number: 1853-001 Project Name: Worthington Storage Project Location: Fort Collins Pond No: Detention Area 1 Calc. By: M. Ruebel • • �- �. . Orifice Dia (in): 3 2/8 Orifice Area (sf): 0.06 Orifice invert (ft): 5,044.98 Orifice Coefficient: 0.65 • Elevation Stage (ft) Velocity (ft/s) Flow Rate (cfs) Comments 5,044.98 0.00 0.00 0.00 5,045.48 0.50 3.69 0.21 5,045.98 1.00 5.21 0.29 5,046.48 1.50 6.39 0.36 5,046.98 2.00 7.37 0.42 5,047.48 2.50 8.24 0.47 5,047.98 3.00 9.03 0.51 5,048.48 3.50 9.75 0.55 5,048.98 4.00 10.43 0.59 5,049.48 4.50 11.06 0.63 5,049.98 5.00 11.66 0.66 5,050.48 5.50 12.23 0.69 5,050.98 6.00 12.77 0.72 5,051.51 6.53 13.32 0.75 100-Year Storm NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY SDI-Design Data v1. 00, Re%ased January 2010 Stormwater Facility Name: Worthington Storage - Detention Area 1 Facility Location & Jurisdiction: Fort Collins, CO User Inqut: Watershed Characteristics Extended Detention Basin (EDB) � EDB Watershed Area = 2.80 acres Watershed Length = 400 ft Watershed Length to Centroid = 200 ft Watershed Slope = 0.020 ft/ft Watershed Imperviousness = 65.0% perce Percentage Hydrologic Soil Group A= 0.0% perce Percentage Hydrologic Soil Group B= 0.0% perce Percentage Hydrologic Soil Groups C/D = 100.0% perce Target WQCV Drain Time = 40.0 hours Location for 1-hr Rainfall Depths (use dropdown): Userinput After providing required inputs above including 1-hour rainfall depths, click'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. After completing and printing this worksheet to a pdf, go to: https://maperture.d i4italdataservices.com/qvh/?viewer=cswd if Create a new stormwater faciliry, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = One-Hour Rainfall Depth = CUHP Runoff Volume = Inflow Hydrograph Volume = Time to Drain 97% of Inflow Volume = Time to Drain 99% of Inflow Volume = Maximum Ponding Depth = Maximum Ponded Area = Maximum Volume Stored = User Defined User Defined User Defined User Defined Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] 0.00 4,291 0.00 0.00 1.00 4,291 1.00 0.28 2.00 5,820 2.00 0.40 3.00 5,820 3.00 0.49 4.00 7,641 4.00 0.56 5.00 4,716 5.00 0.63 6.00 3,287 6.00 0.69 6.40 381 6.40 0.71 Detention 1_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 1/23/2024, 11:37 AM 14 12 10 I $ u 3 0 LL 6 4 2 0 0.1 4.5 4 3.5 3 � x � a 0 2.5 l7 2 C Z O 2 a 1.5 1 0.5 TIMfl [hr] DRAIN TIME [hr] 10 Detention 1_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 1/23/2024, 11:37 AM p _ _. _ - 0.1 1 10 100 DETENTION AREA 2 NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX � NORTHERN ENGINEERING � - • ' • • • ' ' • • Project: Worthington Storage Project Location: Fort Collins, Colorado Calculations By: M. Ruebel Date: 05/01/24 Pond No.: Detention Area 2 . . Design Point 2 1Zequired Detention Volume Design Storm 100-yr WQCV 0 ft' Developed "C" = 0.87 Quantity Detention 39826 ft`� Area (A)= 4.18 acres Total Volume 39826 ft3 Max Release Rate = 1.16 cfs Total Volume �' � ac-ft . . � e o ..- �� � �� e� _ • _, � i - � 5 300 9.95 36.2 10855 3�S 10507 10 600 7.72 28.1 16845 696 16149 15 900 6.52 23.7 21340 1044 20296 20 1200 5.60 20.4 24438 1392 23046 25 1500 4.98 18.1 27165 1740 25425 30 1800 4.52 16.4 29587 2088 27499 35 2100 4.08 14.8 31158 2436 28722 40 2400 3.74 13.6 32642 2784 29858 45 2700 3.46 12.6 33973 3132 30841 50 3000 323 11.7 35239 3480 31759 55 3300 3.03 11.0 36362 3828 32534 60 3600 2.86 10.4 37442 4176 33266 65 3900 2.72 9.9 38577 4524 34053 70 4200 2.59 9.4 39559 4872 34687 75 4500 2.48 9.0 40584 5220 35364 80 4800 2.38 8.7 41545 5568 35977 85 5100 2.29 8.3 42472 5916 36556 90 5400 2.21 8.0 43399 6264 37135 95 5700 2.13 7.7 44152 6612 37540 100 6000 2.06 7.5 44948 6960 37988 105 6300 2.00 7.3 45821 7308 38513 110 6600 1.94 7.1 46563 7656 38907 115 6900 1.89 6.9 47425 8004 39421 120 7200 1.84 6.7 48178 8352 39826 Detention Basin 2 Project: REVS Worthington Self Storage: 62 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 34 Number of End Caps - 4 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 5045.68 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 2332 sf Mln. Area - 1750 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) uo 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.97 6.60 9.99 13.72 23.36 34.96 42.48 48.36 53.49 58.04 62.17 65.88 69.39 72.58 75.62 78.43 81.08 83.67 85.96 88.19 90.31 92.31 94.22 96.04 97.77 99.42 100.98 702.42 103.81 10521 106.44 107.63 106.78 109.86 110.89 111.87 112.81 113.70 114.53 115.35 116.09 116.86 117.56 11628 119.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.15 0.21 027 0.35 0 43 0.51 0.56 0.65 0.73 0.80 0.87 0.94 1.00 1.06 1.12 1.18 1.23 1.26 1.34 1.39 1.44 1.49 1.54 1.58 1.63 1.67 1.72 1.76 1.80 1.84 1.86 1.92 1.96 1.99 2.03 2.06 2.09 2.12 2.15 2.17 2.20 2.22 2.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 is 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 76.94 75.06 73.68 72.16 68,28 63.61 60.57 58.19 56.11 54.26 52.58 51.06 49.63 48.33 47.08 45.94 44.65 43.82 42.86 41.94 41.08 40.25 39.47 38.72 38.01 37.33 36.69 36.09 35.52 34.95 34.44 33.94 33.47 33.02 32.60 32.19 31.80 31.43 31.08 30.75 30.44 30.12 29.83 29.53 29.11 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 ii.�s 77.73 77.73 77.73 77 73 77.73 77.73 77 73 77.73 77.73 77.73 77.73 78.92 81 75 83.82 86.09 91.91 98.92 103.48 107A5 110.17 112.95 115.47 117.75 119.89 121.84 123.71 125.43 127.05 128.60 130.05 131.42 132.72 133.95 135.13 136.25 137.32 138.34 139.30 140.19 141.05 141.91 142.68 143.42 144.13 144.80 145.44 146.05 146.64 147.19 147.71 148.21 148.68 149.75 149.59 150.03 150.67 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 77.73 �wua.« 7331.48 725375 7176.02 7098.28 7020.55 6942.82 6865.08 6787.35 6709.62 6631.88 6554.15 6476.42 6397.50 6315.75 6231.93 6145.84 6053.92 5955.00 5851.52 5744 47 5634.30 5521.35 5405.88 5288.13 5168.24 5046.40 4922.69 4797.26 4670.20 4541.60 4411.55 4280.14 4147.42 4013.46 3878.33 3742.08 3604.77 3466.43 3327.13 3186.94 3045.89 2903.98 2761.30 2617.68 2473.75 2328.95 2183.51 2037.46 1890.82 1743.63 1595.93 1447.72 1299.04 1149.89 1000.30 85027 699.60 621.87 54G.13 466.40 388.67 310.93 23320 155.47 77.73 owi.in 5051.10 5051.01 5050-93 5050.85 5050.76 5050.68 5050.60 5050.51 5050.43 5050.35 5050.26 5050.18 5050.10 5050.01 5049.93 5049.85 5049.76 5049.68 5049.60 5049.51 5049.43 5049.35 5049.26 5049.18 5049.10 5049.01 5048.93 5048.85 5048.76 5048.68 5048.60 5048.51 5048.43 5048.35 5048.26 5048.18 5048.70 5048.01 5047.93 5047.85 5047.76 5047.68 5047.60 5047.51 5047.43 5047.35 5047.26 5047.18 5047.10 5047.01 5046.93 5046.85 5046.76 5046.68 5046.60 5046.51 5046.43 5046.35 5046.26 5046.18 5046.70 5046.01 5045.93 5045.85 5045.76 Q A��de Penmete, Ra�e i� G��Watlo�s ❑ Cli�k for 52ge Area Data ❑ Oick So Invert Stage Nea �ata Click Here for Metric �-- Provided Detention Volume Detention Basin 3 Project: REVS Worthington Self Storage: 63 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 85 Number of End Caps - 10 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 5045.60 ft Amount of Stone Above Chambers - 25 in Amount of Stone Below Chambers - 9 Area of system - 4836 sf Mln. Area - 4376 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) /y %8 77 76 75 74 73 72 7t 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 tI.UU Q.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.88 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 U.UU �.�0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 022 023 025 0.27 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 U UU �.�Q 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.94 16.50 24.99 34.31 58.47 87.41 10621 120.89 133.72 145.11 155.42 164.71 173.47 181.45 789.06 196.08 202.71 209.02 214.89 220A7 225.76 230.78 235.56 240.10 244.41 248.55 252.44 256.06 259.53 263.01 266.10 269.08 271.95 274.64 27722 279.67 282.03 284.25 286.33 288.36 29024 292.15 293.91 295.69 297.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 U.UU �.�� 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 038 0.52 0.68 0.88 1.07 1.26 1.44 1.63 1.82 2.01 2.18 2.35 251 2.66 2.80 2.94 3.08 3.21 3.34 3.47 3.60 3.72 3.84 3.96 4.08 4.19 4.30 4.40 4.51 4.61 4.71 4.80 4.89 4.96 5.06 5.14 5.22 5.30 5.37 5.43 5.49 5.55 5.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ib I.LU �6�.2� 16120 16t20 16120 16120 16120 16120 16120 16120 16120 16120 16t20 16120 16120 16120 16120 16120 16120 16120 16120 16120 16120 16120 16120 15923 154.50 151.06 14727 137.57 125.89 11829 112.34 107.14 102.51 98.30 94.51 90.94 87.68 84.57 81.71 79.00 76.42 74.01 71.73 69.56 67.50 65.54 63.67 61.90 60.20 58.59 57.10 55.67 54.23 52.96 51.72 50.54 49.42 48.36 47.34 46.36 45.44 44.58 43.74 42.96 42.17 41.44 40.70 39.65 16120 16120 16120 16120 16120 16120 16120 16720 16120 IbI LU 16L20 161.20 i6L20 161.20 161.20 161.20 161.20 16120 161.20 161.20 161.20 16120 161.20 161.20 161.20 161.20 16120 161.20 161.20 161.20 161.20 161.20 161.20 161.20 164.16 171.24 176.42 182.10 196.65 214.17 225.57 234.49 242.30 249.24 255.54 261.23 266.59 271.48 276.14 280.44 284.50 288.38 291.98 295.41 298.67 301.75 304.70 307.49 310.15 312.71 315.11 317.35 319.49 321.65 323.56 325.41 327.20 328.87 330.47 331.99 333.45 334.84 336.13 337.40 338.56 339.75 340.84 341.94 343.53 161.20 161.20 161.20 161.20 161.20 161.20 161.20 161.20 161.20 I tl4J I.b4 18270.64 18109 44 1794824 17787.04 17625.84 17464.64 17303.44 17t4224 16981.04 16819.84 16658.64 16497 44 16336.24 16175.04 16013.84 15852.64 15691.44 1553024 15369.04 15207.84 15046.64 14885.44 1472424 14563.04 14401.84 14237.68 14066.44 13890.02 13707.92 1351127 13297.10 13071.53 12837.04 12594.74 12345.50 12089.96 11828.73 11562.14 11290.66 11014.52 10734.08 10449.58 1016120 9869.22 9573.81 9275.14 8973.39 8668.69 8361.20 8051.05 7738.34 7423.23 7105.88 6786.39 6464.74 6141.18 5815.76 5488.57 5159.70 4829.23 4497.24 4163.79 3828.95 3492.82 3155.42 2816.86 2477.11 2136.27 1794.33 1450.80 1289.60 1128.40 96720 806.00 644.80 483.60 322.40 16120 SUJL. I b 5052.10 5052.02 5051-93 5051.85 5051.77 5051.68 5051.60 5051.52 5051.43 5051.35 5051.27 5051.18 5051.10 5051.02 5050.93 5050.85 5050.77 5050.68 5050.60 5050.52 5050.43 5050.35 5050.27 5050.18 5050.10 5050.02 5049.93 5049.85 5049.77 5049.68 5049.60 5049.52 5049.43 5049.35 5049.27 5049.18 5049.70 5049.02 5048.93 5048.85 5048.77 5048.68 5048.60 5048.52 5048.43 5048.35 5048.27 5048.18 5048.10 5048.02 5047.93 5047.85 5047.77 5047.68 5047.60 5047.52 5047.43 5047.35 5047.27 5047.18 5047.70 5047.02 5046.93 5046.85 5046.77 5046.68 5046.60 5046.52 5046.43 5046.35 5046.27 5046.18 5046.10 5046.02 5045.93 5045.85 5045.77 5045.68 Q L�tl�de Penmete, 5ro�� i� Ca��Wazio�s ❑ Cli�k for 52ge Area Data ❑ Oick So Invert Stage Nea �ata Click Here for Metric �-- Provided Detention Volume Detention Basin 4 Project: REVS Worthington Self Storage: 64 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 45 Number of End Caps - 6 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 504524 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 2704 sf Mln. Area - 2328 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.61 8.73 13.23 18.16 30.92 46.27 56.23 64.00 70.79 76.82 82.28 87.20 91.84 96.06 100.09 103.81 107.31 110.66 113.77 116.72 119.52 122.18 124.71 127.11 129.40 131.59 133.64 135.56 137.40 13924 140.88 142.45 143.98 745.40 146.76 146.06 149.31 150.49 151.59 152.66 153.65 154.67 155.60 156.54 157.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.74 0.23 0.31 041 0.53 0.64 0.76 0.87 0.98 1.09 1.20 1.31 1.41 1.50 1.59 1.66 1.76 1.85 1.93 2.01 2.08 2.16 223 2.31 2.38 2.45 251 258 2.64 2.70 2.77 2.82 2.88 2.94 2.99 3.04 3.09 3.13 3.18 3.22 326 3.30 333 3.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 au. i s 90.13 90.13 90.13 90,13 90.13 90.13 90,13 90.13 90.13 90.13 90.13 89.09 86.58 84.75 82.74 77.60 71.41 67.38 64.23 61.47 59.01 56.78 54.77 52.87 51.14 49.50 47.97 46.54 45.16 43.89 42.68 41.52 40.43 39.39 38.40 37.45 36.55 35.70 34.90 34.14 33.38 32.70 32.05 31.41 30.82 30.25 29.71 29.19 28.70 28.24 27.60 27.38 26.96 26.58 26.18 25.61 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 yU.IJ 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 91 70 95.46 98.21 101.22 108.93 118.21 124.26 128.99 133.13 136.81 140.16 143.17 146.02 148.62 151.09 153.37 155.53 157.59 159.50 161.32 163.05 164.69 166.25 167.74 169.15 170.51 171.79 172.98 174.12 175.26 176.28 177.27 178.21 179.70 179.95 180.76 181.54 182.28 182.97 183.64 184.26 184.89 185.47 186.06 186.91 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 90.13 i3yl"I.LL 8881.08 8790.95 670082 8610.68 8520.55 8430.42 8340.28 8250.15 8160.02 8069.88 7979.75 7889.62 7797.91 7702.45 7604.25 7503.03 7394.10 7275.89 7151.63 7022.64 6889.51 6752.70 6612.54 6469.37 6323.35 6174.73 6023.64 5870.27 5714.74 5557.15 5397.65 5236.33 5073.28 4908.59 4742.33 4574.59 4405.44 4234.93 4063.14 3890.17 3716.05 3540.78 3364.50 3187.24 3009.02 2829.92 2649.97 2469.21 2287.66 2105.39 1922.42 1738.78 1554.53 1369.64 1184.17 998.11 81120 721.07 630.93 540.80 450.67 360.53 270.40 18027 90.13 SUJU. /4 5050.66 5050.57 5050 49 5050.41 5050.32 5050.24 5050.16 5050.07 5049.99 5049.91 5049.82 5049.74 5049.66 5049.57 5049.49 5049.41 5049.32 5049.24 5049.16 5049.07 5048.99 5048.91 5048.82 5048.74 5048.66 5048.57 5048.49 5048.41 5048.32 5048.24 5048.16 5048.07 5047.99 5047.91 5047.82 5047.74 5047.66 5047.57 5047.49 5047.41 5047.32 5047.24 5047. I6 5047.07 5046.99 5046.91 5046.82 5046.74 5046.66 5046.57 5046.49 5046.41 5046.32 5046.24 5046.16 5046.07 5045.99 5045.91 5045.82 5045.74 5045.66 5045.57 5045.49 5045.41 5045.32 pp m�wae ae��mece� so�e ��� ca¢wauo�s ❑ COck Por SWqeMea �ata ❑ er a eo moerc sezqe n�ea oaea Click Here for Metric �-- Provided Detention Volume Project: REVS Worthington Self Storage: WQ B3 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 9 Number of End Caps - 2 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 5045.68 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 678 sf Mln. Area - 4�79 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) Sos,,B �- Provided Detention Volume 5051.10 5051.01 5050-93 5050.85 5050.76 5050.68 5050.60 5050.51 5050.43 5050.35 5050.26 5050.18 5050.10 5050.01 5049.93 5049.85 5049.76 5049.68 5049.60 5049.51 5049.43 5049.35 5049.26 5049.18 5049.10 5049.01 5048.93 5048.85 5048.76 5048.68 5048.60 5048.51 So4843.� Required Water Quality Volume 5048.35 5�8z6 Req. WQ Volume = 1,175 cu.ft. 5048.18 5048.70 5048.01 5047.93 5047.85 5047.76 5047.68 5047.60 5047.51 5047.43 5047.35 5047.26 5047.18 5047.10 5047.01 5046.93 5046.85 5046.76 5046.68 5046.60 5046.51 5046.43 5046.35 5046.26 5046.18 5046.70 5046.01 5045.93 5045.85 5045.76 uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.52 1.75 2.65 3.63 6.18 925 11.25 1280 14.16 15.36 16.46 17.44 18.37 19.21 20.02 20.76 21.46 22.13 22.75 23.34 23.90 24.44 24.94 25.42 25.88 26.32 26.73 27.11 27.48 27.85 28.18 28.49 28.80 29.08 29.35 29.61 29.86 30.10 30.32 30.53 30.73 30.93 31.12 31.31 31.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.08 0.10 0.14 O.IB 021 025 029 033 0.36 0.40 0.44 0.47 0.50 0.53 0.56 0.59 0.62 0.64 0.67 0.69 0.72 0.74 0.77 0.79 0.82 0.84 0.86 0.88 0.90 0.92 0.94 0.96 0.98 1.00 1.01 1.03 1.04 1.06 1.07 1.09 1.10 1.11 1.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LL.bU 2260 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22,60 22.60 22.39 21.88 21.51 21.11 20.07 18.83 18.02 17.38 16.82 16.32 15.87 15.46 15.08 14.73 14.39 14.08 13.79 13.57 13.25 13.01 12.77 12.55 12.34 12.13 11.94 11.76 11.58 11.42 11.26 11.11 10.97 10.83 10.71 10.58 10.47 10.36 10.25 10.15 10.06 9.96 9.88 9.79 9.71 9.63 9.51 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 CL.bU 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.91 23.68 24.23 24.84 26.39 28.26 29.48 30.43 3127 32.01 32.69 33.30 33.88 34.41 34.91 35.38 35.81 3623 36.62 36.99 37.34 37.68 38.00 38.30 38.59 38.87 39.13 39.37 39.60 39.84 40.05 4025 40.44 40.62 40.80 40.96 41.12 4128 41A2 41.55 41.68 41.81 41.93 42.05 4224 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 22.60 L IUS.Lb 2080.66 2058.06 2035 46 2012.86 1990.26 1967.66 1945.06 1922.46 1899.86 187Z26 1854.66 1832.06 1809.15 1785.47 1761.24 1736.40 1710.01 1681.75 1652.27 1621.64 1590.57 1558.56 1525.87 1492.56 1458.68 1424.27 1389.36 1353.98 1318.17 1281.94 1245.31 1208.32 1170.98 1133.30 1095.30 1057.00 1018.42 979.55 940A2 901.05 861.45 621.61 781.57 741.32 700.88 66025 619.46 578.49 537.37 496.09 454.67 413.12 371.44 329.62 287.69 245.64 203.40 180.80 15820 135.60 113.00 90.40 67.80 45.20 22.60 o �����de Pe��me�e, 5�o�e �� �a����a��o�s ❑ COck Por SWqeMea �ata ❑ er a eo moerc sezqe n�ea oaea Click Here for Metric WQ Basin 3 Per the approved variance (Appendix G) the water quality volume is included within the Detention Volume Project: REVS Worthington Self Storage: WQ B4 //� Chamber Model - MC3500 Uni[s- Imperial StormTech Number of Chambers - 17 Number of End Caps - 4 Voids in Ihe stone (porosity) - 40 % Base of Stone Eleva[ion - 5045.68 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 Area of system - 1111 sf Mln. Area - 908 sf min. area StormTech MC-3500 Cumulative Storage Volumes Height of Incremen[al Single Incremental Incremen[al Incremenlal Incremen[al Incremental Ch, Cumulative System Chamber Single End Cap Chambers End Cap Stone EC and Stone System Elevation (inches) (cubic feet/ (cubic /eet) (cubic feet/ (cubic feet) (cubic leet) (cubic feet) (cubic feet) (feet) uo 6$ 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 37 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.19 0.29 0.40 0.69 1.03 1.25 1.42 1.57 1.71 1.83 1.94 2.04 2.13 2.22 2.31 2.38 2.46 2.53 2.59 2.66 2.72 2.77 2.82 2.68 2.92 2.97 3.01 3.05 3.09 3.13 3.17 3.20 3.23 3.26 3.29 3.32 3.34 3.37 3.39 3.41 3.44 3.46 3.48 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.14 0.16 0.18 020 0.22 023 025 027 028 029 0.31 0.32 0.33 0.35 0.36 0.37 0.38 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.51 0.52 0.53 0.54 0.54 0.55 0.56 0.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.99 3.30 5.00 6.86 11.68 17.48 21.24 24.18 2674 29.02 31.08 32.94 34.69 36.29 37.81 39.22 40.54 41.80 42.98 44.09 45.15 46.16 47.11 48.02 48.88 49.77 50.49 51.21 51.91 52.60 53.22 53.82 54.39 54.93 55.44 55.93 56.41 56.85 57.27 57.67 58.05 58.43 58.78 59.14 59.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 u.uu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.15 0.21 027 0.35 0 43 0.51 0.56 0.65 0.73 0.80 0.87 0.94 1.00 1.06 1.12 1.18 1.23 1.26 1.34 1.39 1.44 1.49 1.54 1.58 1.63 1.67 1.72 1.76 1.80 1.84 1.86 1.92 1.96 1.99 2.03 2.06 2.09 2.12 2.15 2.17 2.20 2.22 2.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 sr us 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 36.64 35.68 34.97 34.21 32.25 29.90 28.37 27.16 26.10 25.16 24.31 23.54 22.81 22.14 21.51 20.92 20.37 19.84 19.35 18.88 18.44 18.02 17.61 17.23 16.67 16.52 16.19 15.88 15.58 15.29 15.02 14.77 14.52 14.29 14.07 13.86 13.66 13.47 13.29 13.12 12.96 12.79 12.64 12.49 12.25 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 si.us 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.63 39.07 40.12 4127 44.20 47.73 50.04 51.84 53.43 54.84 56.12 5728 58.37 59.37 60.32 6120 62.03 62.82 63.56 6426 64.93 65.56 66.16 66.74 6729 67.81 68.30 68.77 6921 69.65 70.05 70.43 70.80 71.14 71.47 71.79 72.09 72.38 72.65 72.91 73.15 73.39 73.62 73.85 7421 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 37.03 SbU I.Jb 356452 3527 49 3490 46 3453.42 3416.39 3379.36 3342.32 3305.29 3268.26 3231.22 3194.19 3157.16 3119.53 3080.46 3040.34 2999.06 2954.86 2907.12 2857.09 2805.25 2751.82 2696.98 2640.66 2583.58 2525.21 2465.84 2405.52 2344.32 2282.29 2219.47 2155.91 2091.65 2026.72 1961.16 1894.99 1828.25 1760.97 1693.16 1624.65 1556.09 1486.88 1417.23 1347.18 1276.75 1205.96 1134.81 1063.34 991.55 919.46 847.08 774.43 701.53 628.38 554.98 481.36 407.51 333.30 29627 25923 22220 185.17 148.13 111.10 74.07 37.03 Q Atl�de Penme�e, 5�a�e i� Ca��Wa�io�s ❑ Cllck Por SWqeMea Data ❑ Oick So Invert Stage Area �ata Click Here for Metric WQ Basin 4 Per the approved variance (Appendix G) the water quality volume is included within the Detention Volume 5�,,,� �- Provided Detention Volume 5051.10 5051.01 5050-93 5050.85 5050.76 5050.68 5050.60 5050.51 5050.43 5050.35 5050.26 5050.18 5050.10 5050.01 5049.93 5049.85 5049.76 5049.68 5049.60 5049.51 5049.43 5049.35 5049.26 5049.18 5049.10 5049.01 5048.93 5048.85 5048.76 5048.68 5048.60 5048.51 So4843.; Required Water Quality Volume 5048.35 5�8z6 Req. WQ Volume = 1,972 cu.ft. 5048.18 5048.70 5048.01 5047.93 5047.85 5047.76 5047.68 5047.60 5047.51 5047.43 5047.35 5047.26 5047.18 5047.10 5047.01 5046.93 5046.85 5046.76 5046.68 5046.60 5046.51 5046.43 5046.35 5046.26 5046.18 5046.70 5046.01 5045.93 5045.85 5045.76 � NORTHERN ENGINEERING � . . , . 1- • � Project Number: 1853-001 Project Name: Worthington Storage Project Location: Fort Collins Pond No: Detention Area 2 Calc. By: M. Ruebel • - �- �. . Orifice Dia (in): 3 15/16 Orifice Area (s�: 0.09 Orifice invert (ft): 5,045.45 Orifice Coefficient: 0.65 • Elevation Stage (ft) V�locity (ft/s) Flow Rate (cfs) Comments 5,045.45 0.00 0.00 0.00 5,045.95 0.50 3.69 0.32 5,046.45 1.00 5.21 0.45 5,046.95 1.50 6.39 0.55 5,047.45 2.00 7.37 0.63 5,047.95 2.50 8.24 0.71 5,048.45 3.00 9.03 0.77 5,048.95 3.50 9.75 0.83 5,049.45 4.00 10.43 0.89 5,049.95 4.50 11.06 0.95 5,050.45 5.00 11.66 1.00 5,050.95 5.50 12.23 1.05 5,051.26 5.81 12.57 1.07 5,051.57 6.12 12.90 1.10 5,051.88 6.43 13.22 1.13 5,052.18 6.73 13.53 1.16 100-Year Storm NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY SDI-Design Data v1. 00, Re%ased January 2010 Stormwater Facility Name: Worthington Storage - Detention Area 2 Facility Location & Jurisdiction: Fort Collins, CO User Inqut: Watershed Characteristics Extended Detention Basin (EDB) � EDB Watershed Area = 4.18 acres Watershed Length = 550 ft Watershed Length to Centroid = 200 ft Watershed Slope = 0.020 ft/ft Watershed Imperviousness = 63.0% perce Percentage Hydrologic Soil Group A= 0.0% perce Percentage Hydrologic Soil Group B= 0.0% perce Percentage Hydrologic Soil Groups C/D = 100.0% perce Target WQCV Drain Time = 40.0 hours Location for 1-hr Rainfall Depths (use dropdown): Userinput After providing required inputs above including 1-hour rainfall depths, click'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. After completing and printing this worksheet to a pdf, go to: https://maperture.d i4italdataservices.com/qvh/?viewer=cswd if Create a new stormwater faciliry, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = One-Hour Rainfall Depth = CUHP Runoff Volume = Inflow Hydrograph Volume = Time to Drain 97% of Inflow Volume = Time to Drain 99% of Inflow Volume = Maximum Ponding Depth = Maximum Ponded Area = Maximum Volume Stored = User Defined User Defined User Defined User Defined Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] 0.00 5,161 0.00 0.00 1.00 5,161 1.00 0.50 2.00 8,521 2.00 0.71 3.00 9,024 3.00 0.87 4.00 9,024 4.00 1.00 5.00 10,541 5.00 1.12 5.80 11,180 5.80 1.20 Detention 2_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 1/26/2024, 2:11 PM zo is 16 14 12 3 io 0 J 8 6 4 2 0 0.1 4.5 ; 4 3.5 3 � x � a 0 2.5 l7 2 C Z O 2 a 1.5 1 0.5 DRAIN TIME [hr] Detention 2_SDI_Design_Data_v2.00 (State Compliance Time).xlsm, Design Data 1/26/2024, 2:11 PM TIMfl [hr] 10 0 — _ _,. 0.1 1 10 100 LID CALCULATIONS NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX 0 EXISTING 0 �I � �� O �� � NI / ; Y ��� v I +� 0 O ❑ C n `\� �� � `:-��ti \ .. — G �;�..�,."- - . / ( .� , ;, � ; � � � , / i s/ r�, /U � ) / �O 2 ' �2 . O � ', � _, � i � I I I � SURFACE � IMPERV. IMPERV. AREA (SF) AREA (SF) ROOFTOP 19,220 100 % 19,220 CONCRETE 7,179 100% 7,179 ASPHALT 86,223 100 % 86,223 GRAVEL 0 40% 0 LANDSCAPING 27,023 0% 0 PROPOSED r— . , .�, � ,�, .� � F. r �� � �� , � �. � � : — -- � - I I; i "�—. � _ NORTHERN ENGINEERING FORT COLLINS: 301 North Howes Street, Suite 100, 80521 970221.4158 GREELEY: 820 8th Street, 80631 northernengineering.com TOTAL= 112,622 I 2525 WORTHINGTON MINI-STORAGE FORT COLLINS COLORADO � P.r- � � 60 0 60 ( IN FEET ) 1 INCH = 60 FEET TOTAL= 111,306 EXISTING VS PROPOSED IMPERVIOUS AREA DRAWN BY: MCR SHEET NO: SCALE: 1" = 60� I M P 1 DATE: 5/18/2022 FOR DRAINAGE REVIEW ONLY / NOT FOR CONSTRUCTION / \ / � , / , / � / , / , / I, / , . , / , , , � ,' OS1 1.93 ac. � � � , , , � , , , � PROPOSED BASIN j w/ WQ WEIR , , , , ATECH� ,,� N 1B � `. , .� � LEGEND: 70 0 70 Feet ( IN FEET ) 1 inch =70 ft. PROPOSED STORM SEWER PROPOSEDINLET PROPOSED CURB & GUTTER PROPERTY BOUNDARY DESIGN POINT DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY MC-3500 STORMTECH CHAMBERS (ISOLATOR ROW) STORMTECH CHAMBERS � � BASIN DESIGNAl10N A 0.22 BASIN AREA (AC) � � � � � LID Site Summary - Onsite Total Site Total On-Site Area 137,606 ft2 Total On-Site Impervious Area 105,773 ft2 Total Onsite Impervious Area without LID Treatment 0 ft2 Total Onsite Treated Area 105,773 ft2 Percent On-site Impervious Treated by LID 100.00% �����■` . # ���� 1, r �". �. � ��il� � , 1 1 � � � � , , � � NORTHERN ENGINEERING FORT COLLINS: 301 North Howes Street, Suite 100, 80521 970221.4158 GREELEY: 820 8th Street, 80631 northernengineering.com Detention Summary Basin Volume (cu-ft) StormTech WQ Basin 1 909 StormTech WQ Basin 2 3,129 StormTech Basin lA 20,298 StormTech Basin 1B 2,186 StormTech WQ Basin 3 2,103 StormTech WQ Basin 4 3,601 StormTech Basin 2 7,409 StormTech Basin 3 18,431 StormTech Basin 4 g�9�1 Total 67,037 Water Quality Treatment Summary Basin WQCV(ft3) Summary A1 & OS3 340 3- MC-3500 (Stormtech WQ Basin 1) A2 & OS1 1,732 14 - MC-3500 (Stormtech EW Basin 2) B2 1,175 9- MC-3500 (Stormtech WQ Basin 3) B1 & OS2 1,972 17 - MC-3500 (Stormtech WQ Basin 4) NOTE: WQCV VOLUMES ARE NOT ADDITIVE TO THE DETENTION VOLUMES. THE ABOVE REQUIRED VOLUMES ARE ALREADY INCLUDED WITHIN THE VOLUMES SHOWN IN THE DETENTION SUMMARY TABLE ABOVE. WORTHINGTON ENCLOSED MINI-STORAGE FORT COLLINS COLORADO WQ EXHIBIT DRAWN BY: MCR SCALE: 1" = 70' DATE: 5/1 /2024 SHEET NO: LID 1 WQ BASIN 1 � NORTHERN ENGINEERING Chamber Configuration Summary Required Storage Total Total Installed Storege Provided Installed Required Flow, Chamber Release Chamber Chamber w/ Total Release Volume by Mimimum provided Provided within the System WQ Volume WQ Chamber Ratea Volumeb Aggregate` Minimum No. Rate` FAA Method No, of Number of Release Rate Chambersg Volumeh Vault ID (cf) (cfs) Type �`�� (cf) (cf) of Chambers° (cfs) (cf) Chambersf Chambers (cfs) (cf) (cf) Isolator Row A1 & 053 340 0.45 MC-3500 0.038 109.90 175.00 2 0.08 269 3 3 0.11 330 525 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. Q=0.0022(cfs/sf)*(Floor Area of Chamber) *Flow rate based on 1/2 of Nov 07 QMqx in Figure 17 of UNH Testing Report b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. P:\1853-001\Drainage\UD\Final\1853-001 Chamber Summary_A1_053.x1sx WQ BASIN 1 � N 0 RT H E R N ADORESE: PHOHE: J01 N. Mowss Etr��t, awa +o0 9�o.u�.4�se yyEBSITE: EN 0 I N E E R I N 0 `"" `""`"', `° •°°:, FAX. �w•^QRhwnonginao�is�g.com 970.221.4159 Project Title Worthington Storage Date: January 23, 2024 Project Number 1853-001 Calcs By: A. Boese City Fort Collins Basins A1 & OS3 WQCV = a 0.91i3 —1.19i� +0.78i Drain Time 12 hr �_� a = 0.8 WQCV = Watershed inches of Runoff (inches) i= 51% a = Runoff Volume Reduction (constant) i= Total imperviousness Ratio (i = Iwq/100) WQCV = 0.167 in Water Quality Capture Volume 0.5 0.45 v 0.4 s � 0.35 a 0.3 L y �.25 Y 3 0.2 > 0.15 v 3 0.1 0.05 0 0 0 0 0 0 0 0 0 0 o N i-� iv w A in o� v oo i� Total Imperviousness Ratio (i = Iwq/100) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event hr � n, ,n� �_� wQCV � A A= 0.56 ac * 12 V= 0.0078 ac-ft 340 cu. ft. V= Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) �a�nr�r—.,(n oi;' _i io;' �n �Q;l � NORTHERN ENGINEERING WQ BASIN 1 DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1853-001 Project Name : Worthington Storage Project Location : Fort Collins, Colorado Pond No Isolator Row A1 & OS3 Input Variables Results Design Point A1 &OS3 Design Storm WQ Required Detention Volume C = 0.58 Tc = 5.00 min 269 ft3 A= 0.56 acres 0.01 aC-ft Max Release Rate = 0.11 cfs Ft Collins Inflow Outflow W(� QWQ Outflow Volume Storage Volume Time (min) Volume Adjustment 3 3 Intensity �fts� Factor (cfs) (ft ) (ft ) (in/hr) 5 1.425 139 1.00 0.11 33 106 10 1.105 215 1.00 0.11 66 149 15 0.935 273 0.67 0.07 66 207 20 0.805 314 0.63 0.07 83 231 25 0.715 348 0.60 0.07 99 249 30 0.650 380 0.58 0.06 116 265 35 0.585 399 0.57 0.06 132 267 40 0.535 417 0.56 0.06 149 269 45 0.495 434 0.56 0.06 165 269 50 0.460 448 0.55 0.06 182 267 55 0.435 466 0.55 0.06 198 268 60 0.410 479 0.54 0.06 215 265 65 0.385 488 0.54 0.06 231 257 70 0.365 498 0.54 0.06 248 250 75 0.345 504 0.53 0.06 264 240 80 0.330 514 0.53 0.06 281 234 85 0.315 522 0.53 0.06 297 225 90 0.305 535 0.53 0.06 314 221 95 0.290 537 0.53 0.06 330 207 100 0.280 546 0.53 0.06 347 199 105 0.270 552 0.52 0.06 363 189 110 0.260 557 0.52 0.06 380 178 115 0.255 571 0.52 0.06 396 175 120 0.245 573 0.52 0.06 413 160 *Note: Using the method described in FCSCM Chapter 6 Section 2.3 1853-001 Chamber Summary_A1_OS3.xlsx Page 2 of 3 � NORTHERN ENGINEERING ect Number: 1853-001 ect Name: Worthington Storage ect Location: Fort Collins, Colorado Pond No: �Stormtech WQ Basin 1 Calc. By: A. Boese his equation can be used to derive the stage-discharge relationship for a sharp crested weir where the depth of flow is �nall compared to the length of weir. Reference 1) Hydrologic Analysis and Design, Richard H McCuen, Prentice Hall, a89. Pg.549. =3.3 L H l.s * where Q is flow rate in CFS '` where L is the crest length of the weir (FT) '` where H is the height of flow over the crest (FT) gth (L)= 4.00 r Elev. = 5,048.23 th Above Crest - H (ft) 0.00 0.15 0.30 0.45 0.60 0.72 0.75 0.90 1.00 1.10 1.20 1.30 3.65 Year Storm = 4.0 cfs Elevation (ft) 5,048.23 5,048.38 5,048.53 5,048.98 5,049.13 5,049.23 5,049.33 5,049.43 5,049.53 5,051.88 ft ft Freeboard (ft) 3.65 3.50 3.35 3.20 3.05 2.93 2.90 2.75 2.65 2.55 2.45 2.35 0.00 -� � � �� , � L �� / SHARF-CRESTED W/EIP, Basin Rim Elev. _ Basin Invert Elev. _ Flow (cfs) 0.00 0.77 2.17 3.98 6.13 8.06 8.57 11.27 13.20 15.23 17.35 19.57 92.05 5,051.88 ft 5,046.89 ft 100-Year Storm Rim of Basin Notes NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY WQ BASIN 2 � NORTHERN ENGINEERING Chamber Configuration Summary Required Storage Total Total Installed Storege Provided Installed Required Flow, Chamber Release Chamber Chamber w/ Total Release Volume by Mimimum provided Provided within the System WQ Volume WQ Chamber Ratea Volumeb Aggregate` Minimum No. Rate` FAA Method No, of Number of Release Rate Chambersg Volumeh Vault ID (cf) (cfs) Type �`�� (cf) (cf) of Chambers° (cfs) (cf) Chambersf Chambers (cfs) (cf) (cf) Isolator Row A2 & OSl 1732 0.35 MC-3500 0.038 109.90 175.00 10 0.38 1361 13 14 0.53 1539 2450 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. Q=0.0022(cfs/sf)*(Floor Area of Chamber) *Flow rate based on 1/2 of Nov 07 QMqx in Figure 17 of UNH Testing Report b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. P:\1853-001\Drainage\UD\Final\1853-001 Chamber Summary_A2_OSl.xlsx WQ BASIN 2 � N 0 RT H E R N ADORESE: PHOHE: J01 N. Mowss Etr��t, awa +o0 9�o.u�.4�se yyEBSITE: EN 0 I N E E R I N 0 `"" `""`"', `° •°°:, FAX. �w.^QRhwnonginao�is�g.com 970.221.4159 Project Title Worthington Storage Date: March 7, 2023 Project Number 1853-001 Calcs By: M. Ruebel City Fort Collins Basins A2&OS1 WQCV = a 0.91i3 —1.19i� +0.78i WQCV = Watershed inches of Runoff (inches) a = Runoff Volume Reduction (constant) i= Total imperviousness Ratio (i = Iwq/100) Drain Time 12 hr F_� a = 0.8 i = 68% WQCV = 0.213 in Water Quality Capture Volume 0.5 0.45 v 0.4 s � 0.35 a 0.3 L y �.25 Y 3 0.2 > 0.15 v 3 0.1 0.05 0 0 0 0 0 0 0 0 0 0 o N i-� iv w A in oi v oo i� Total Imperviousness Ratio (i = Iwq/100) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event WQCV A = 2.24 ac * hr � n, ,n� V = � �� � A V= 0.0398 ac-ft 1732 cu. ft. V= Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) �a�nr�r—.,(n oi;' _i io;' �n �Q;l � NORTHERN ENGINEERING WQ BASIN 2 DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1853-001 Project Name : Worthington Storage Project Location : Fort Collins, Colorado Pond No Isolator Row A280S1 Input Variables Results Design Point A2&OS1 Design Storm WQ Required Detention Volume C = 0.72 Tc = 5.00 min 1361 ft3 A= 2.24 acres 0.03 aC-ft Max Release Rate = 0.53 cfs Ft Collins Inflow Outflow W(� QWQ Outflow Volume Storage Volume Time (min) Volume Adjustment 3 3 Intensity �fts� Factor (cfs) (ft ) (ft ) (in/hr) 5 1.425 689 1.00 0.53 159 530 10 1.105 1069 1.00 0.53 318 751 15 0.935 1357 0.67 0.35 318 1039 20 0.805 1558 0.63 0.33 398 1160 25 0.715 1730 0.60 0.32 477 1253 30 0.650 1887 0.58 0.31 557 1330 35 0.585 1981 0.57 0.30 636 1345 40 0.535 2071 0.56 0.30 716 1355 45 0.495 2156 0.56 0.29 795 1361 50 0.460 2226 0.55 0.29 875 1351 55 0.435 2315 0.55 0.29 954 1361 60 0.410 2380 0.54 0.29 1034 1347 65 0.385 2422 0.54 0.29 1113 1309 70 0.365 2472 0.54 0.28 1193 1280 75 0.345 2504 0.53 0.28 1272 1232 80 0.330 2555 0.53 0.28 1352 1203 85 0.315 2591 0.53 0.28 1431 1160 90 0.305 2656 0.53 0.28 1511 1146 95 0.290 2666 0.53 0.28 1590 1076 100 0.280 2710 0.53 0.28 1670 1040 105 0.270 2743 0.52 0.28 1749 994 110 0.260 2768 0.52 0.28 1829 939 115 0.255 2838 0.52 0.28 1908 930 120 0.245 2845 0.52 0.28 1988 857 *Note: Using the method described in FCSCM Chapter 6 Section 2.3 1853-001 Chamber Summary_A2_OS1.xlsx Page 2 of 3 � NORTHERN ENGINEERING ect Number: 1853-001 ect Name: Worthington Storage ect Location: Fort Collins, Colorado Pond No: �Stormtech WQ Basin 2 Calc. By: A. Boese his equation can be used to derive the stage-discharge relationship for a sharp crested weir where the depth of flow is �nall compared to the length of weir. Reference 1) Hydrologic Analysis and Design, Richard H McCuen, Prentice Hall, a89. Pg.549. =3.3 L H l.s * where Q is flow rate in CFS '` where L is the crest length of the weir (FT) '` where H is the height of flow over the crest (FT) gth (L)= 4.00 r Elev. = 5,048.85 th Above Crest - Elevation H (ft) (ft) 0.00 5,048.85 0.25 5,049.10 0.50 5,049.35 0.75 5,049.60 1.00 5,049.85 1.25 5,050.10 1.50 5,050.35 1.75 5,050.60 2.00 5,050.85 2.10 5,050.95 2.20 5,051.05 2.30 5,051.15 3.48 5,052.33 Year Storm = 20.0 cfs ft ft Freeboard (ft) 3.48 3.23 2.98 2.73 2.48 2.23 1.98 1.73 1.48 1.38 1.28 1.18 0.00 -� � � �� , � L �� / SHARF-CRESTED W/EIP, Basin Rim Elev. _ Basin Invert Elev. _ Flow (cfs) 0.00 1.65 4.67 8.57 13.20 18.45 24.25 30.56 37.34 40.17 43.07 46.04 85.69 5,052.33 ft 5,046.65 ft 100-Year Storm Rim of Basin Notes NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY WQ BASIN 3 � NORTHERN ENGINEERING Chamber Configuration Summary Required Storage Total Total Installed Storege Provided Installed Required Flow, Chamber Release Chamber Chamber w/ Total Release Volume by Mimimum provided Provided within the System WQ Volume WQ Chamber Ratea Volumeb Aggregate` Minimum No. Rate` FAA Method No, of Number of Release Rate Chambersg Volumeh Vault ID (cf) (cfs) Type �`�� (cf) (cf) of Chambers° (cfs) (cf) Chambersf Chambers (cfs) (cf) (cf) Isolator Row B2 1175 0.45 MC-3500 0.038 109.90 175.00 7 0.26 816 8 9 0.34 989 1575 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. Q=0.0022(cfs/sf)*(Floor Area of Chamber) *Flow rate based on 1/2 of Nov 07 QMqx in Figure 17 of UNH Testing Report b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. P:\1553-001\Drainage\LID\Final\1853-001 Chamber Summary_82.xlsx WQ BASIN 3 � NORTHERN PH�NE: ADDRESS: 970.221.4158 701 N. Mowss Str�H, sw�. +oo WEBSITE: E N 0 I N E E R I N a `°" `°"`"`. `° tO6:, F�, www.�°Khort�anginaering.com 970.227.4159 Project Title Worthington Storage Date: March 7, 2023 Project Number 1853-001 Calcs By: M. Ruebel City Fort Collins Basins 82 WQCV = a 0.91i3 —1.19i� +0.78i Drain Time 12 hr �_� a = 0.8 WQCV = Watershed inches of Runoff (inches) i= 84% a = Runoff Volume Reduction (constant) i= Total imperviousness Ratio (i = Iwq/100) WQCV = 0.284 in Water Quality Capture Volume 0.5 0.45 v 0.4 s � 0.35 a 0.3 L y �.25 Y 3 0.2 > 0.15 v 3 0.1 0.05 0 0 0 0 0 0 0 0 0 0 o N i-� iv w A in o� v oo i� Total Imperviousness Ratio (i = Iwq/100) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event hr � n, ,n� �_� wQCV � A A= 1.14 ac * 12 V= 0.0270 ac-ft 1175 cu. ft. V= Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) �a�nr�r—.,(n oi;' _i io;' �n �Q;l � NORTHERN ENGINEERING WQ BASIN 3 DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1853-001 Project Name : Worthington Storage Project Location : Fort Collins, Colorado Pond No Isolator Row B2 Input Variables Results Design Point B2 Design Storm WQ Required Detention Volume C = 0.87 Tc = 5.00 min 816 ft3 A= 1.14 acres 0.02 aC-ft Max Release Rate = 0.34 cfs Ft Collins Inflow Outflow W(� QWQ Outflow Volume Storage Volume Time (min) Volume Adjustment 3 3 Intensity �fts� Factor (cfs) (ft ) (ft ) (in/hr) 5 1.425 424 1.00 0.34 102 322 10 1.105 658 1.00 0.34 204 454 15 0.935 835 0.67 0.23 204 631 20 0.805 958 0.63 0.21 255 703 25 0.715 1064 0.60 0.20 306 758 30 0.650 1160 0.58 0.20 357 803 35 0.585 1218 0.57 0.19 408 810 40 0.535 1273 0.56 0.19 459 814 45 0.495 1326 0.56 0.19 510 816 50 0.460 1369 0.55 0.19 561 808 55 0.435 1424 0.55 0.19 612 812 60 0.410 1464 0.54 0.18 663 801 65 0.385 1489 0.54 0.18 714 775 70 0.365 1520 0.54 0.18 765 755 75 0.345 1540 0.53 0.18 816 724 80 0.330 1571 0.53 0.18 867 704 85 0.315 1593 0.53 0.18 918 675 90 0.305 1633 0.53 0.18 969 664 95 0.290 1639 0.53 0.18 1020 619 100 0.280 1666 0.53 0.18 1071 595 105 0.270 1687 0.52 0.18 1122 565 110 0.260 1702 0.52 0.18 1173 529 115 0.255 1745 0.52 0.18 1224 521 120 0.245 1750 0.52 0.18 1275 475 *Note: Using the method described in FCSCM Chapter 6 Section 2.3 1853-001 Chamber Summary_B2.xlsx Page 2 of 3 � NORTHERN ENGINEERING ect Number: 1853-001 ect Name: Worthington Storage ect Location: Fort Collins, Colorado Pond No: �Stormtech WQ Basin 3 Calc. By: A. Boese his equation can be used to derive the stage-discharge relationship for a sharp crested weir where the depth of flow is �nall compared to the length of weir. Reference 1) Hydrologic Analysis and Design, Richard H McCuen, Prentice Hall, a89. Pg.549. =3.3 L H l.s * where Q is flow rate in CFS '` where L is the crest length of the weir (FT) '` where H is the height of flow over the crest (FT) gth (L)= 4.00 r Elev. = 5,048.97 th Above Crest - Elevation H (ft) (ft) 0.00 5,048.97 0.25 5,049.22 0.50 5,049.47 0.75 5,049.72 1.00 5,049.97 1.25 5,050.22 1.44 5,050.41 1.50 5,050.47 1.75 5,050.72 2.00 5,050.97 2.15 5,051.12 2.30 5,051.27 3.36 5,052.33 Year Storm =11.4 cfs ft ft Freeboard (ft) 3.36 3.11 2.86 2.61 2.36 2.11 1.92 1.86 1.61 1.36 1.21 1.06 0.00 -� � � �� , � L �� / SHARF-CRESTED W/EIP, Basin Rim Elev. _ Basin Invert Elev. _ Flow (cfs) 0.00 1.65 4.67 8.57 13.20 18.45 22.81 24.25 30.56 37.34 41.61 46.04 81.30 5,052.33 ft 5,046.65 ft 100-Year Storm Rim of Basin Notes NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY WQ BASIN 4 � NORTHERN ENGINEERING Chamber Configuration Summary Required Storage Total Total Installed Storege Provided Installed Required Flow, Chamber Release Chamber Chamber w/ Total Release Volume by Mimimum provided Provided within the System WQ Volume WQ Chamber Ratea Volumeb Aggregate` Minimum No. Rate` FAA Method No, of Number of Release Rate Chambersg Volumeh Vault ID (cf) (cfs) Type �`�� (cf) (cf) of Chambers° (cfs) (cf) Chambersf Chambers (cfs) (cf) (cf) IsolatorRow B1&052 1972 2.50 M C-3500 0.038 109.90 175.00 12 0.45 1600 15 17 0.64 1868 2975 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. Q=0.0022(cfs/sf)*(Floor Area of Chamber) *Flow rate based on 1/2 of Nov 07 QMqx in Figure 17 of UNH Testing Report b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. P:\1853-001\Drainage\LID\Final\1853-001 Chamber Summary_B1_OS2.xlsx WQ BASIN 4 � N 0 RT H E R N ADORESE: PHOHE: J01 N. Mowss Etr��t, awa +o0 9�o.u�.4�se yyEBSITE: EN 0 I N E E R I N 0 `"" `""`"', `° •°°:, FAX. �w.^QRhwnonginao�is�g.com 970.221.4159 Project Title Worthington Storage Date: March 7, 2023 Project Number 1853-001 Calcs By: M. Ruebel City Fort Collins Basins 81 & OS2 WQCV = a 0.91i3 —1.19i� +0.78i Drain Time 12 hr �_� a = 0.8 WQCV = Watershed inches of Runoff (inches) i= 56% a = Runoff Volume Reduction (constant) i= Total imperviousness Ratio (i = Iwq/100) WQCV = 0.179 in Water Quality Capture Volume 0.5 0.45 v 0.4 s � 0.35 a 0.3 L y �.25 Y 3 0.2 > 0.15 v 3 0.1 0.05 0 0 0 0 0 0 0 0 0 0 o N i-� iv w A in o� v oo i� Total Imperviousness Ratio (i = Iwq/100) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event hr � n, ,n� �_� wQCV � A A= 3.04 ac * 12 V= 0.0453 ac-ft 1972 cu. ft. V= Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) �a�nr�r—.,(n oi;' _i io;' �n �Q;l � NORTHERN ENGINEERING WQ BASIN 4 DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1853-001 Project Name : Worthington Storage Project Location : Fort Collins, Colorado Pond No Isolator Row B180S2 Input Variables Results Design Point B1&OS2 Design Storm WQ Required Detention Volume C = 0.63 Tc = 5.00 min 1600 ft3 A= 3.04 acres 0.04 aC-ft Max Release Rate = 0.64 cfs Ft Collins Inflow Outflow W(� QWQ Outflow Volume Storage Volume Time (min) Volume Adjustment 3 3 Intensity �fts� Factor (cfs) (ft ) (ft ) (in/hr) 5 1.425 819 1.00 0.64 192 627 10 1.105 1270 1.00 0.64 384 886 15 0.935 1612 0.67 0.43 384 1228 20 0.805 1850 0.63 0.40 480 1370 25 0.715 2054 0.60 0.38 576 1478 30 0.650 2241 0.58 0.37 672 1569 35 0.585 2353 0.57 0.37 768 1585 40 0.535 2459 0.56 0.36 864 1595 45 0.495 2560 0.56 0.36 960 1600 50 0.460 2643 0.55 0.35 1056 1587 55 0.435 2749 0.55 0.35 1152 1597 60 0.410 2827 0.54 0.35 1248 1579 65 0.385 2876 0.54 0.34 1344 1532 70 0.365 2936 0.54 0.34 1440 1496 75 0.345 2973 0.53 0.34 1536 1437 80 0.330 3034 0.53 0.34 1632 1402 85 0.315 3077 0.53 0.34 1728 1349 90 0.305 3154 0.53 0.34 1824 1330 95 0.290 3166 0.53 0.34 1920 1246 100 0.280 3218 0.53 0.34 2016 1202 105 0.270 3258 0.52 0.34 2112 1146 110 0.260 3286 0.52 0.33 2208 1078 115 0.255 3370 0.52 0.33 2304 1066 120 0.245 3378 0.52 0.33 2400 978 *Note: Using the method described in FCSCM Chapter 6 Section 2.3 1853-001 Chamber Summary_B1_OS2.xlsx Page 2 of 3 � NORTHERN ENGINEERING ect Number: 1853-001 ect Name: Worthington Storage ect Location: Fort Collins, Colorado Pond No: �Stormtech WQ Basin 4 Calc. By: A. Boese his equation can be used to derive the stage-discharge relationship for a sharp crested weir where the depth of flow is �nall compared to the length of weir. Reference 1) Hydrologic Analysis and Design, Richard H McCuen, Prentice Hall, a89. Pg.549. =3.3 L H l.s * where Q is flow rate in CFS '` where L is the crest length of the weir (FT) '` where H is the height of flow over the crest (FT) gth (L)= 5.00 r Elev. = 5,049.05 th Above Crest - Elevation H (ft) (ft) 0.00 5,049.05 0.10 5,049.15 0.20 5,049.25 0.30 5,049.35 0.40 5,049.45 0.50 5,049.55 0.60 5,049.65 0.70 5,049.75 0.80 5,049.85 0.90 5,049.95 1.00 5,050.05 1.25 5,050.30 1.50 5,050.55 2.89 5,051.94 Year Storm = 20.7 cfs ft ft Freeboard (ft) 2.89 2.79 2.69 2.59 2.49 2.39 2.29 2.19 2.09 1.99 1.89 1.64 1.39 0.00 -� � � �� , � L �� / SHARF-CRESTED W/EIP, Basin Rim Elev. _ Basin Invert Elev. _ Flow (cfs) 0.00 0.52 1.48 2.71 4.17 5.83 7.67 9.66 11.81 14.09 16.50 23.06 30.31 81.06 5,051.94 ft 5,046.65 ft 100-Year Storm Rim of Basin Notes NORTHERNENGINEERING.COM � 970.221.4158 FORT COLLINS � GREELEY NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY APPENDIX EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted; however, any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities havingjurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed, or modified in conjunction with construction activities. It is imperative to appropriately reflectthe current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7- Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at existing and proposed storm in�ets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division - Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive Storm Water Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: WORTHINGTON SELF STORAGE FORT COLLINS � GREELEY EROSION CONTROL REPORT NNORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX �JSp,� United States A productofthe National Custom Soil Resource � Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for n I��� States Department of I V Agriculture and other La ri m e r C o u n ty Federal agencies, State Natural agencies including the Resources Agricultural Experiment A re a, C o I o ra d o Conservation Stations, and local Service participants Worthington Storage i . ,� �� � +, � �`:� � '� � �► ' �` :^�� _� .� ��} ' � ' '' � �'� , , � ,�� ' ° � � M � � � \, ' � � �.:� � -� . � �^.� . _ ;� � � '� �� 'r , � , � i� . . _ . t .� � ( 1 r � • � � ,�, � ,� �.� � , �. � � � � . ,. �� � � �� - � � � - � � � �t�� - �. ,. �� � ,� •a `� � ��� �' � r.' '' '� � ,► - � ti � �` _. � ~ ' 1 . . _ � ,, r . � -• �, • ,,�" � I � � ; .�`'�� � ' - �`� t � � �� � � I 1 `, ^' • . �� � �+� � J . /�,[' � � � '1 . d. . l ., G �� , .. �� ; � . ..� .r�� ^ � _ �� � � � � . February 17, 2022 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made ..................................................................................5 SoilMap .................................................................................................................. 8 SoilMap ................................................................................................................9 Legend................................................................................................................10 MapUnit Legend ................................................................................................ 11 MapUnit Descriptions .........................................................................................11 Larimer County Area, Colorado ...................................................................... 13 73—Nunn clay loam, 0 to 1 percent slopes .................................................13 74—Nunn clay loam, 1 to 3 percent slopes .................................................14 References............................................................................................................16 :� How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surFace down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of ineasurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and C� Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. E:3 Custom Soil Resource Report � Soil Map M 0 491910 491930 491950 491970 491990 492010 492030 49'ZCL50 40° 33'18"N I �I �h_ I ` � ,. I s_ • �..` 40° 33'18"N �_ � �_�—.—.1.: ' e I ` l� � � , � � � �� ' ��� 4 .,1~ � .. y'h-_. t: _ � ,:, . �� ' �� ~ � • �� , ,� � � — � -��K'� . �� �wF i � �, • __ — . � � ��f^� _ .— \ � �r�'� � .�=.�` �= �a , � '�•�.�r�-� �•y� - ' ^� i. c � � ,� 4 �,, � ' '�� a' �-,, � ��,� 1� ' �,� °_� �. ��. ; _ ,, ^ - , ,�^ , ; � c ,, � + :,c ''"' '"� b � o� � �i � � .— � �r;>.;Y � �, � �' ��: ^ � �� ,� c� " �,', . � \ ., � _. _ �j�1 � . � �S ' �'a r�. r \\ -. � \ �� � '�`� � �� � � . � ^, � ,c. . � � r � A � ,�� • �.� I �� � � ^ :� n �!^* �`a M• � y�' .. ..• � � � � 'J' � , I� 4 ��ti_�`-`� � . ���.\ \ � �. � `� �,� �' �: . !'� .< .l ,'1 � `- . v � .i, � ' � •4 � + , � � 1 � ��\ � � � �� � �,��� �� w�r � �� 1�-�� - � t., K � j i, r. —� i�� � /�.� - � —� � �- �; �� � �,'°' * :, � r� ` •� � r - � �� `�r' /�. '�t �,y+�, � ; ��; � , x �� � .� � .. �� � � � ����.., � �. ��: . ,�� - � �� , „� � � �'� . � _ �� � "� � �_. ` ,• _ � tl �a y.�� .` � � `�"' � . � 1 " _ � 4 ^ , �/ � � � :� \ � �� . - ` � "; � � � Soi�I�Map may not �e v�lid at this sca,le-. �`\\\\� � ,� 40° 33' 11" N ..I • I I ` '� - I � I ��- I � ' 40° 33' 11" N 491910 491930 491950 491970 491930 492010 492030 49'1(YO 3 3 � Map Scale: 1:1,070 if pnnted on A porhait (8.5" x ll") sheet. - ° N Meters ° � 0 15 30 60 90 � � � 0 50 100 200 300 Map projectlon: Web Mercator Comer coordinates: WGS84 Edge dcs: UTM Zone 13N WGS84 9 Custom Soil Resource Report MAPLEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons s:,� Soil Map Unit Lines � Soil Map Unit Points Special Point Features U Blowout Borrow Pit p� Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow _ Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot = Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other . Special Line Features Water Features Streams and Canals Transportation �..�. Rails ti Interstate Highways US Routes Major Roads Local Roads Background � Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) Iisted below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 16, Sep 2, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent 0.0 1.1 % slopes 74 Nunn clay loam, 1 to 3 percent 3.1 98.9% slopes Totals for Area of Interest Map Unit Descriptions 3.1 100.0% The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, 11 Custom Soil Resource Report onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Larimer County Area, Colorado 73—Nunn clay loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: 2ting Elevation: 4,100 to 5,700 feet Mean annual precipitation: 14 to 15 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period: 135 to 152 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 6 inches: clay loam Bt1 - 6 to 10 inches: clay loam Bt2 - 10 to 26 inches: clay loam Btk - 26 to 31 inches: clay loam Bk1 - 31 to 47 inches: loam Bk2 - 47 to 80 inches: loam Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff c/ass: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum content.• 7 percent Maximum salinity: Nonsaline (0.1 to 1.0 mmhos/cm) Sodium adsorption ratio, maximum: 0.5 Available water supply, 0 to 60 inches: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: R0676Y042C0 - Clayey Plains Hydric soil rating: No 13 Custom Soil Resource Report Minor Components Heldt Percent of map unit.• 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: R067BY042C0 - Clayey Plains Hydric soil rating: No Wages Percent of map unit.• 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-s/ope shape: Linear Ecological site: R067BY002C0 - Loamy Plains Hydric soil rating: No 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlpl Elevation: 3,900 to 5,840 feet Mean annual precipitation: 13 to 17 inches Mean annual air temperature: 50 to 54 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 9 inches: clay loam Bt - 9 to 13 inches: clay loam Btk - 13 to 25 inches: clay loam Bk1 - 25 to 38 inches: clay loam Bk2 - 38 to 80 inches: clay loam 14 Custom Soil Resource Report Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff c/ass: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum content.• 7 percent Maximum salinity: Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Sodium adsorption ratio, maximum: 0.5 Available water supply, 0 to 60 inches: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: R0676Y042C0 - Clayey Plains Hydric soil rating: No Minor Components Heldt Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: R067BY042C0 - Clayey Plains Hydric soil rating: No Satanta Percent of map unit: 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: R067BY002C0 - Loamy Plains Hydric soil rating: No 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/nationaUsoils/?cid=nres142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres 142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 i[^.' Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nres.usda.gov/I nternet/FSE_DOCUMENTS/nres142p2_052290. pdf 17 NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX 1 � U N U U � m 0 0 � n � �� N � w � x 0 w _ U a � Q � a N 0 0 � � � lii � Q z � 7 NPDES PERMIT NOTES 1. SITE DESCRIP110N o. Building constructian including atreets, woter, sewe�, ond atorm aewer uttlity construction i� plonned on the site. b. 7he mojor octivities ore planned in tha fdlowing aequence: Overlot groding, utflity installation, street instollotion, and bullding construction. c. The site contolns 3.71 acres of whfch oll the area Is to undergo clearing, excovotion or groding. d. Rotionol "C" = 0.20 before construction, Rationd "C" = 0.89 ofter construction. The site wlthin the Moderote Ralnfall Erodiblltty Zone and Moderote Wind Erodibility Zone per the City of Fort Collfns zone mop9. �th the exiating site slopea of opproximotely 1.OX, the new improvements will be subJecled to both wlnd and roinfoll eroston. e. No other potential pollution sources are located near the site. f. The downstream rece(ving water fa Sprtng Craek. Runoff from the s(te will ultimotely enter Spring Creek after first entering either o storm aewer system, gross swole, or delention pond. All devices eventually discharge into Spring Creek, which drolna into the Coche La Poudre River. 2. SITE MAP o. See Oroinoge and Eroslon Control Plon (this sheel) 3. BMP'S FOR STORMWATER POLLUTION PREVENTION a. Erasion ond Sediment Controls See Erosion Control Notes ond Sequence Toble this sheet. b. IAateriols Handling and Spfll Prev�ntion Meosures should be undertaken to control bullding materiois ond waste, ond dispose of excess aspholt ond concrete to ensure these materiols do not leove the site ond enter the detention pond which eventuolly outlets to Mail Creek. Aspholt, concrete, building moteriols, waste, ond cleonup by products should not be dfschorged tnto the on-site drainage swales and ditches nor should they enter the detention pond. In the event ot a spill from the site into an on-site drainage swole or ditch, oppropriate measures should be undertaken Immediotely to remove the spitled materials and prevent future spills from occurring. 4. FINAL STABILIZATION AND LONG-TERM STORMWATER AAANAGEMENT o. See Erosion Control notes on thie aheet for final stobilizotion meosur�s to control pollutants in stormwoter discharges. Finol sto6ilization of the soils on individuol lots will be reoched upon the closing sole of eoch individuol lot. Until the cloeing of each individuol lot, interim measurea should be undertoken to control pollutonts per this sheet. 5. OTHER CONTROLS o. Meosures should be undertoken to remove excess waste products from the slte ond dispose of these waste moteriols off-sfte In on oppropriate monner. In oddition, meosures ahould be undertaken to limit off-site soil trocking of mud ond debris spilloge trom vehicles leoving the site. Mud ond debris should not be trocked olong roodways ond ollowed to enter non-protected droinagewoys which dischorge eventually into the Cache La Poudre River. 6. INSPECTION AND MAINTENANCE o. Inspection ond maintenance should be undertaken on o regulor basis os outlined In Sectlon 6 of the Terms ond Conditfons of the COPS General Permit. Table 11.2. ecfes Annual Ryegrasa oats Cereal Rye Wheat - Winter Wheat - Spring ea��y AA ill et Hybrid Sudon Sorg h u m Recommended Species ond Application Rotee of Seeds for Temporory Vegetation and�or Caver Crops. Season 1 Drilled Pounds/Acre Cool 20 Cool 70 co� 40 Cool 40 Cool 60 co� so wa�m 30 Warm 15 wo�m �o Cool season grasses moke their major growth in the spring. Warm aeason grassea make their mojor growth in late apring ond summer. Toble 11 4 identifies planling doles for perennial and temporary/cover crop grosses. Toble 11.4. Plonting Datea for Perennial ond Temporory/Cover Crop Graseee. pA� PERENNIAL TEMPORARY/COVER GRASSES CROP GRASSES Warm Cool Warm Cod Jon Ot - Feb 2B Ye� Yee No No Mor Ol - Moy 15 Yea Yea No Yea Mpy 16 - MQy 31 Ye� No Yes No Jun 01 - Jul 31 No No Yes No Aug 01 - Aug 31 No Yes No Yes Sep O1 - Sep 30 No No No Yes Oct O1 - Dec 31 Yes Yes No No Mulching sholl be u�ed to asaist In estoblishment of vagetotion. One or more of the following mulches sholl be used with a perenniol dryland grass seed mi�ture, or o temporory vegetation or cover crop. Adulch Acceptable Applicotion Rate Daies of uee Straw or Hoy Jan 01 - Dec 31 2 tons/ocre Hydroulic (wood or paper) �lar 15 -- May 15 2 tona/ocra Erosion control (mats or blonkets) Jon 01 - Dec J1 Not applicoble Hay or etrow mulch ehall be free of noxlous weede and at leaet 50X of the flber sholl be 10 inches or more in length. 1Mhen seeding with notive grosses hay from o notive �ra�ss is a suggested mulching materiol, if avoiloble. 7 If irrigation is used, hydraulic mulches may be applied from March 15 through September 30. Hay or Straw Mulch i. Hay or strow mulch will be onchored to the soll by one of ihe ro��owing methods: TEMP. (o) A crimper which will crimp the fiber four inches or DRAINAGE more into the soil. At least 50�: of the fiber EASEMENT � � ' TEMF�ORARY RETENTION BASIN ; VOLIJME PROVIDED = 0.26 ac- ft `� WSEI. = 48.15 ARE�i=0.15 AC. O EL. 48.15 FREE�OARD = 1.0' �', �-----�--------------� shall be 10 Inches or more In length. � (b) Monufoctured mulch netting inatolled over the hoy � or straw according to manufociurers' instructions. � ' (�� TpGklfierg gprayed on thg miilch to thQ 'rJ� p�PR�SS�p I monufacturer's recommendot�on. CURB OPENING t 2. All strow or hay must be free of noxioua weeds. � CONSTRUCTION SEQUENCE PROJECT: C�NEMA SAVERS STANDARD FORM C SEQUENCE FOR 199{_ ONLY COMPLETED BY: T� DATE: 9-»-93 Indicote by uee of a bar line or symbols when eroaion control meaaures will be instolled. MoJor modifcottona to on opproved echedule moy require submitting o new ochedule (or opproval by the Clty Engineer. YEAR MONni S ID �11 DIJ I F;MI A I I OVERLOi GRADING NAND EROSION CONTROL Soll Rouqfiening Perimeter Borrier Addillonal Barrfers Vegetative 1Aethoda Soil Seolont Other RAINFALI EROSION CONiROL STRUCTURAL: Sedlment 7rop/Boaln Inlet Filten Straw Borriers Sllt Fenca Barrlere Sond Bage Bare Soll Preparatlon Contour furrowa Terrocin Aspholl�Concrote Poving Other: Gravet Mulch vECErnnvE: Permonenl Seed Planting Mulching/Sealont Temporary Seed Planting Sod Installation Nettinga/Mata/Blonketa Other .r.......w� .i....e.w.e....r � STRUCTURES: INSTALLED BY MAINTAINEO BY VEGETA710N/AIULCIIING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT C(xLINS ON ui � � � Z U I� I � � �� 1 1�� 1 1�Il� 1 1� 1 1 �. � � �. �- �� .��... � � . . ._ � � A:� . . �f; ::;' t � � I ; � , ., EROSION CONTROL NOTES AFTER COMPLETION OF OVERLOT GRADING, ALL PAVED AREAS SHALL HAVE THE BASE COURSE APPLIED PER THE SPECIFICATIONS IN THIS SET, AND ALL OPEN SPACES SHALL HAVE A PERENNIAL GRASS SEED APPLIED. AFTER SEEDING, A HAY OR STRAW MULCH SHALL BE APPLIED OVER THE SEED AT A RATE OF 2 TONS/ACRE MINIMUM, AND THE MULCH SHOULD BE ADEQUATELY ANCHORED, TACKED OR CRIMPED INTO THE SOIL. AFTER THE UTII_ITIES HAVE BEEN �NSTALLED, SURFACES SHOULD RECEIVE THE ASPHALT PAVEMENT. TNE INLET FILTERS AND STRAW BALE BARRIERS SHOULD BE iNSTALI.ED IN CONJUNCTION WITH THE OVERLOT GRADING PROCESS. AFTER INSTALLATION OF THE CURB INLETS, THE INLETS SHALL BE FILTERED WITH A COMBINATION OF CONCRETE Bl_OCKS, 1/2 INCH WIRE SCREEN, AND A 3/4 INCH COURSE GRAVEL. EXISTING SITE HYDROLOGY Totol Disturbed Area - 3.71 acres Rational "C'� - 0.2� �EXISTING BASIN LINE ��� - - - --� FOR BASINS B-1 �C B-6 , OF AMENDED MASTER ~�� � , � � DRAINAGE PLAN �� : _. � , �,�-.:� ,c�.. �� --. .. y^ , . i I't...._._ _..i (��;;:: i ;...�.: Gross Platted Area - 3.64 acres Gross Area "C" - 0.89 Net Platted Area - 3,64 acres Net Area ��C" - 0.89 DRAINAGE BASIN STATISTICS DEVELOPED SITE HYDROIOGY DESIGN BASIN AREA "C" Q,o Q,� POINT (ac) (cfs) (cfs) 1 1 4.$3 0.82 19.8 43.5 2 2 0.39 0.95 2.1 3.5 --3-- -3 0.34 0.95 1.8 3.1 _ ------�. � --�-�� SCALE 1'=40' 0 10 BO I20 160 LEGEND O EXISTING MANHOLE �Q EXISTING FIRE HYDRANi -- -- �'`'� �--�- EXISTING CONTOUR ee � PROPOSED CONTOUR � DIRECTION OF FLOW 1� OESiGN POINT � \ � �Lfs. � ' `� � � �� CAT �� � � � � TENTH � �� i \ FILINC�i � � i �; � I � � ` / � � �� i .� � � �� � � � / �' �� � \�� � � � � � � � � � �� �\�i i � � � � � � � � , , i `' � � �� I� r`� '. � i; i � � � �� ; ,: , I, , . ,- _ '� ,. �j : ; ' . �� ; '_ f 1 i , i i , i r i i , ; , � . � � , � - - -- ♦ ', `r �♦ ,; ,♦ � I i :. ;� i � � / � � D�� � `' ` , i / , � � 1,. � � � � / � cf1�` � / t�� � � 1 ; 4.83 AC �, FUTURE �"� INDU3TRIAL __.. _ ., ;' �'� � � - �.. �i �i`-'E.� � , ♦ i � r . . r���4: ) . .. . � ,,, .�:�,1. , . ,.. . . .. _. �,., '�"� ' ' �� DRAINAGE BASIN j BASIN NUMB€R 1.44 AC BASIN AREA � STRAW BALE CHECK DAM PROPOSED STORM SEWER � EROSION CONTROL CURB INLET GRAVEL FILTER ................ ............... 100 YEAR WSEL , � �� �� � � , �, _\ � i `�, � r I `� �` ' ' . ; I � � i ^ �i � � � � � � v � I � � < i� � �/ i �'� � I � \ ( //� � � / , ,'/ I � � , ;' � - , � �`... NOTE: �-------- ���'��` '� � � '� �' - '; RESIDENTIAL '�, ; � CITY SHALL NOT BE RESPONSIBLE FOR MAINTENANCE OF ONSITE , -- I �\ , ��.' // ��� . ; , ' . ', STORM DRAINAGE FACIUTIES, OR THE OFFSITE RETENTION ROND ( � �-��� i ' SHOWN ON THESE PLANS. DEVELOPER WILL BE RESPONSIBLE FOR \ ' i MAINTENANCE OF THE RETENTION POND. �� � - \ ; �` � ; � , - � :� � . _ �. , � ✓ '� \ .._.._._"."_._ ........... . ..__.... ..-.__._._ - '� : . . _. -. ._ .. _ _... -. - _ _ _. _. _. . _ .' � , � ' .... _ i C � � .,._.. .�__._. __...,__ . � ._...., t� � 1 1 � 1 1 �# � �!�l11f 1 f�r 1 1 1�!'I�IR ! 1� 1 1�A 1 1� 1 1 _ _... _... _.. _.__.... _�_....__..._ � _ - -. _ , _ _... _ ___. _. _.. � _-_ __ l � -- - .. _. __...._ . . __ . ' �"" .. __...__.. .._ _ _.. ._ - -..... ... _.__ . , ... : __ _.. _ __ , . .. _ . _ _ ---- -_. _.. . _ ._ .. _ _ -� ._ _ : - - . _. .. _ _ _. _ .. _ � - - __ __... ;. .� � _ .. ,.. � . .. . - .. ..� ,- ._ ---- . , _ _ _. . . _ . .- -_ _ - - - - ; , . - .._ . ._._ __ _ . . . . _ _.. - - - • _ - . _ __-..... .. ._ .. _ -. . _ .. - , . _ . ,- .. _ _ �__._.. . ... ,. . , , . . .. _. � , .. . . ___ - . - - - - - � : �__ ._ _ - _ , _. ` ; ; - - ._.._ _-- � ,,, . .. ,.._-- �-,` ' ; , ,. - ,: _. . . 1 '' ,. � --_._�-- __...__._ . � 3HIELD3 3T. . .- , � , , . ; , - _.... , , . � _ � . . .. . - .. , � _. , __ ._ .. .... . � - . .. �� _ _ ` ��<_;; ; , � �,` 1` r ` ' , ,., ,, • �; ,,�, •`<;;. l�,} Y E VI MPM TJB DRAWN DFSIGNED . .�, „�� ' � � . ��� �,��cT. � CIIECKED 1 r Inc ilii'is;' �r���rac1 a�2 ����� Engin�ering Consultants ye <,,' ' ; :��4t�C�,.;w , ����i ;�ye , „'��i�f� ,4b, „��r1c� � ' ��� /:;�i;�� � CENTRE FOR ADVANCED TECHNOLOGY " �"" SIXTEENTH FILING DETENTI4N AREA VOLUME REQ'D = 1.51 ac-ft 100 YEAR WSEL = 49.13 100 YEAR RELEASE RATE = 1.91 cfs AREA AT ELEV. 49.13 = 1.6Q acres ,� ,� i r� , � City of F'ort Collins, Colorado UTILITY PLAN PR VAL APPROVED: _ irector o! Engineering D t CHECKED BY: ��. llater dc llastewater Utility Date CHECKED BY: � �/���C� Stormwater ili y ate CHECKED BY: /i/!� Parks dc Recreation Date CHECKED BY: Dete CHECKED BY: Date SI IE E-T � SI If E T DRAINAGE AND ER4SICJN CONTROL PLAN i � NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX Stormwater Alternative ComplianceNariance Application City of Fort Collins Water Utilities Engineering Engineer Name Mason Ruebel Phone �970) 488-3902 Street Address 301 N. Howes St., Suite 100 City Fort Collins Owner Name Alan Westfall Street Address 18435 W. Colfax Ave City Golden State CO State CO Zip $0401 Project Name Worthington Storage Project/Application Number from Development Review (i.e. FDP123456) FDP220016 Legal description and/or address of property Being a replat of Lot 1, Centre for advanced Technology P.U.D. 16th Filing Description of Project Plan to establish and develop an enclosed mini-storage use Existing Use (check one): � residential ��� non-residential �' mixed-use �' vacant ground Proposed Use (check one): �'' residential � non-residential � mixed-use �' other If non-residential or mixed use, describe in detail Enclosed mini-storage with both interior conditioned and drive-up storage units. State the requirement from which alternative compliance/variance is sought. (Please include applicable Drainage Criteria Manual volume, chapter and section.) FCSCM Chapter 7 Section 4.0 Water Quality Detention - 100-yr volume must be added to WQCV What hardship prevents this site from meeting the requirement? See the attached pdf. What alternative is proposed for the site? See the attached pdf. Attach separate sheet if necessary Z i p $0521 Phone �303) 725-1466 Attach separate sheet if necessary What hardshi�prevents this site from meeting the requirement? The proposed site is a 3.16-acre infill development with an existing regional detention facility in place. Historically the on-site pond acts as the regional detention pond for itself as well as 3.82 acres of offsite property with no water treatment volume. This includes 5 adjacent commercial and residential parcels as well as public and shared private roads, which is more than double the area of the proposed site. Underground chambers will replace the existing detention facility and because the regional pond was designed from previous regulations, the new redevelopment requires an increase in detention and water quality treatment (LID/WQ) volume. The sizing of the new detention area will have to take into account the increased detention and 100% LID/WQ volume required from notjust the proposed site, but all adjacent parcels and roads that impact the site as well. What alternative is proposed for the site? This project proposes to treat 100% of the contributing drainage basin including offsite parcels and public and private roads via underground StormTech Isolator Rows. Detention will be provided by the StormTech chambers and aggregate void space within the system. The alternative requested is to Chapter 7.4 & Chapter 6.4.1 for the LID/WQCV to also be included within the 100-yr detention volume. This requested alternative addresses the hardship of providing regional detention and water treatment for offsite lots and public infrastructure on this privately owned urban infill site. NORTHERNENGINEERING.COM � 970.221.4158 VARIANCE LETTER: WORTHINGTON STORAGE FORT COLLINS � GREELEY 1 � 1 page 2 The owner agrees to comply with the provisions of the zoning ordinance, building code and all other applicable sections of the City Code, Land Use Code, City Plan and all other laws and ordinances affecting the construction and occupancy of the proposed building that are not directly approved by this variance. The owner understands that if this variance is approved, the structure and its occupants may be more susceptible to flood or runoff damage as well as other adverse drainage issues. Signature of owner: �� w Date:04/02/2024 The engineer hereby certifies that the above information, along with the reference plans and project descriptions is correct. Signature of engineer: � � . ��, , � � ��� � � � ��r��✓� J �, �``,�v �� �.-•••.......•- �� ei , .,t�i`�:�d`VA1�;s�- , PE STAMP Date complete application submitted: 4/21/2024 Date of approval/denial: 4/23/2024 Variance Staffjustification/notes/conditions: �ate: 04/1 /2024 � approved � denied This variance allows the WQCV to be included in the detention volume due to the treatment of a large amount of offsite area. Aj��JCOVeCj �Jy: NeidiHansen "�" ` Entered in UtilityFile Database? Qyes ❑no NORTHERNENGINEERING.COM � 970.221.4158 FINAL DRAINAGE REPORT: TIMBER LARK RESIDENTIAL FORT COLLINS � GREELEY APPENDIX T U O C 9�� U d � C O -p C � U — -p ' N � d — (a i � N � U (6 � � tn N N� 7 �' U� ��b1I O U � O�� C� C z i 3��� o� ca W o N � @ � cw o a � o ao �� � � � c o � �.� Q � cn a � o_._ �n � � �'> a� �' � v� a� � a> � � O C @ N O � � ~� fl. bD -6 C N d�� W tv � C @ � W � � � a Z � J � X �r N � Z� � z W � = w w � z OC - O � z Z w �� �o U � p0 ry C N � N � O .� n � �� � � s � 0 N W 0 0 � � � � � � N � °' m o � S � � _ o°' z �' ,� N O s m� cri o Z N J � O w U � �.- W � W 0 � Li (.7 � N W N � � O � Q W N � z � 4J Q �N Q II �Q Q N U= O .— UJ � � � � m r � O � N 0] 0 U O W � L w � z � Z � � � � � � � � � (� Q a00 0� oc� W V Q � 0 �- � � J W � Z 0 � c� z _ � 1� 0 � 1 W 1 X w w c� Q z - Q � 0 U � � � � z Sheet . .� 26 of 27 J F � �, � m � �� � u �� r � o � � ; U _ E � 6 O C �� a a r 0 N p O ` O � �: � a: � w a a ° Z � �. o° 5 � �,� '� � � � �� �I � � � I � � � � I I � / 1 � � � / � � I / I;' / I I I I . � � \ ' \ �\\ \ -_- -- \ =-__ ------ � � � � - � � -� � �� � �` �� �- � � � \ �� � �� CENTRE AVENUE /' \ � � � � � � � �� \ / � ----�� _- � � � � ` � .-�� - � / _�� ----- --�-��' � /j/ � / ����- �� � �� � _ - / � � �� i � - � � -i _-/ �/ / �- �� _ i �' i / -i � - _ ` \ -- � ` �J_ ��//� �// ��--- `---_ - --------------------�\ ������������: -- ______________� ,_----�� � � � ' � ' � \ � ` `� 1 � � ♦ � � � � � � � � � � � � � � � r y ��- _,, ;;_�___\\��_ ,�-�,_-_, -- � ,� i � J � � � ' • � / / �� � \ � � / � � � �' / � i ' 1 � � � ' / / � � �I SITE OUTFALL PIPE � / � ��' \ \ � � / 1 � ' � � � � �� / � � � 15" RCP � � � � � � � � � � � � � \ � � ( I \ � / ' t , ,, � � 4 � %/ / � / `� � ' / � / i � OWNER: TALL DENTIST LLC ,� � � � OWNER: COLUMBINE MEDICAL ��� � � � -- � � / 1001 CENT E A E � � / \ / / / REAL ESTATE LLC / - � � � � \ / � / - � \ / / � 915 CENTRE AVE / ' I � f / , � / / � ✓ � DODSANITY LLC � � � � � � � � ' ,� / I // (EMPLOYMENTDISTRICT) OS� �� i � / / I ' ' 1.93 ac. / � � � ` \ / � � � � . I � PROPOSED MANHOLE CONNECTION � � � i � '� I 7 � TO EXISTING 15" STORM �� , � I / � � , � \ � 1 � , � � \ I __ I � ✓ r' ,� r II \� �-\ � � \� � � / � ��I � r � �✓J � ����- --- � O ; , � , -- I ; � � � � I � � �� � � o � ' 1 � � . \ � \ J SFzOP � � � � '` � � � � PGG�S - � �. \ \ l \ \�P�� '�j EXISTING EMERGENCY SPILLWAY �' � � � � � � � QFz r.a .. I � � _ ; _ II I � . OS"I / // 'i CROWN OF WORTHINGTON CIRCLE ' I � -� \ i i- STORMTECH � i� r / 1 / �� � \ .��/ � A1 s��N�B,` �" �, a1 � os3 � � �i \�_ T -�� ■ � 0.23 ac. , / �/ OWNER: ROBERT WILSON � � PROPOSED CURB INLET � � � / / 2526 WORTHINGTON CIRCLE _ - � � � � / a2 E EN ION AREA 1 / '�, � � / ! � � � _ � / / (STORMTECH BASINS 1A & 1 B & � PROPOSED AREA � / � � � �:,. STORMTECH WQ BASINS 1 & 2) � - WLET � � � ' � OWN� : KA`�SCH24 LLC \ � / � / / I 1007 CENTRE AVE \, / ,�, A2 m\ S ORMTECH � `�ySTORM_TECH ' \ � / I l / � � ^�, / ,���' `L 0.31 ac. � \� BASIN 1A � � � WQ BASIN 1 \� � / ` � � � / � / � ��� ��PS��- / �� � �\. \/ /� ���\ � \\ ! . � / � � , _ / `' �a /� , � � . �� �t �`, � \ ``. / \ \ � 1 � ;' I \ � , ��\ `% � � � � � GARAGE � . � ���� » \ \ Al \\ �/ / \ \ I IV � � f ����� ' \ \ � ; � � � � � ��� ��� ���"1� �� � � � � � � � �� I � ��\\ ` j/ / : . � �-� � ' / �� � ,�-\�\ �/ /� \ 1 f ;<� � PROPOSED// GARAGE �/ PROPOSED j / . � BUILDING / ' BZ i I / 1 '� ' ' � 'ti'� � � 1.14 ac. �� I 1� �. / ' PROPOSED CURB I � , � p �: i ' W LET Q \ i ;+'�' II}' /.� ♦ b2 �1/ I � � ;- I i � �� � � ' � ,. �} f Q I:% B1 � i w � � I W OWNER: AWEIDA PROPERTIES INC � �'� �� 1.47 ac. ' STORMTECH � ` � 2500 S SHIELDS ST � I� I:% ' WQ BASIN 3 �� I I a � I '� ' ,; �o � ��� � , . � ,� � � , � W I �, � � +\ ' � I � 1 � ' ) I: � cn _ -, � � J' � I -' �� � J I STORMTECH �/ � ,I- � BA; - � • � �� �' � � � '� �� STORMTECH � � i � � � ; 1 �. WQ BASIN 4 � � � I � � I, \ ' � � PROPOSED \ �� / � � \ � GARAGE \ � (, � � � / � ( I 1 \\\ .. \ \ � � \ / �/- � 1 �. � PROPOSED AREA \ b1 / I/ / I 1 Q1 INLET + ; �- � 1 � \ � � � � � (STORMTECH WQ BASIN 3, 4, & STORMI � I � I �\ �\�\ � / 2,3,�> � � I � �� � � � \ \ �� ' I / I 1� �\ � � � � � � \ \ \ � / � ' � � � , � ► i i ` ' � � ` ` ` � ` ` �; ,' f�� , � � V '�- - ��, � � A \ V A V - ��� , � J � � i / � , \ � � / \ � �,� � . �"� � � � i � � � �� � � ��` V ���' ��� EXISTING I/ � � \ � OS2 � � � � � �� \ o Bui��in,� I � oS2 � � �' / ' 1.57 ac. \ � � � o � � � i�\i'� \ \,- . � , , � � � ��, � � / ���.., �\ � � � �OWNER: AWEIDA � � � � i y` PROPERTIES INC � � \ I "� /S,T , � /, 2514 S SHIELDS ST ,� � � . �' eO,p \ I I � � ,9c y�, 2i�.� � �� \ � . � � - ti � � . �� i� , I \ � . � � �ss�ti �, I �j 1 � � . �'o � �. . �O y � �_ � � \ � � ��-��, � � �� ♦ � . � , � � � �� ! / � \ / �� � � I � � . � � '( � , � � � ; �� �� _� ♦ ,\ � � ` � � � � � �'� � - \ � '� � � , � � � �� � � i ��` � � � - _ � I �/ � Y � � \ � \�. MARKET CENTRE RETAIL \ � I '' . / � -� �� � ASSOCIATION � I - . � ' / \\\� � � �/, ' � �i / / �� �\ \ � � � �� � I � / � �� ���� \ � \ �`__, -�� ` � � V �� �� , � � � \ �. � � � 1 � �\ � � \ I , � � ,� / � I �� OWNER: WARPAL LLC / J� � J -�� I �\ I 1 � 1044� D\ KE RD ��// /� �`, ' p �� / ' �� I /._ i - � � � '-� � / P \\� � ' ,� � � '� � ��' °� / � � � � � � �,,'�.� � � � ,� �_ \\ ) � 1� � � � �� \�� ��� � �� � � �� / \ \ � ( / / \ I / � \ \ \ \ . � ���_ � , i � � � � ��. / \ � /// r� �_ � � /� � ` � � \ , � \ �` _ /� �/ �� � . % \ 0. i \ 1 � � � � / \ � \ �� � � �-/ � � V��� � � �� . ��� .� OS3 ��, �� � �� � 0.32 ac. � � \ � 1 \ � �� � / , � � i •� �,� . ' I :'- �s � ♦ / � . �r � � ;�. ��� - � ,. �qp�I�V�p�IIIVI�� ���� / �, � I� IIIIII � I,� �� �►�► ♦; ��, � �� � ►���`� ��� � I '� • - L � - ,,,����� '� \'' �\\�•j �\•� • � ����ia��V . �. ���r� � /; � � H BASIN �,� ��' � / � � � �� . % �-. � ,�_ �� ��� � � � �\ :/ � \ ' �" 1 1 � ' � � //I � I` � � �� � i� �� �� �� � . � � �ti� � � � � /� � � � �_/ ` OWNER: TWO PAULS LLC 932 W DRAKE RD i �� � � / /� Qescription Q100 Notes Historic Site 1.91 cfs Release rate per Centre for Advanced Technology 10th & 16ih. Description Q100 Notes Detention Area 1 0.75 cfs Release rate for Detentlon Area 1 Detention Area 2 1.16 cfs Release rate for Detentlon Area 2 Total release rate 1.91 cfs Total release rate for Detention Areas 1 and 2. Required release rate 1.91 cfs Release rate per Centre for Advanced Technology 10th & 16th. Underground Vault Volume Notes Stormtech WQ Basin 1 909 cu. ft. Basin is within Detention Area 1. Stormtech WQ Basin 2 3,129 cu. ft. Basin is within Detention Area 1. Stormtech Basin 1A 20,298 cu. ft. Basin is within Detention Area 1. Stormtech Basin 1B 2,186 cu. ft. Basin is within Detention Area 1. Stormtech WQ Basin 3 2,103 cu. ft. Basin is within Detention Area 2. Stormtech WQ Basin 4 3,601 cu. ft. Basin is within Detention Area 2. Stormtech Basin 2 7,409 cu. ft. Basin is within Detention Area 2. Stormtech Basin 3 18,431 cu. ft. Basin is within detention Area 2. Stormtech Basin 4 8,971 cu. ft. Basin is withln Detention Area 2. Total of Detention Area 1 26,522 cu. ft. Total design volume of Stormtech Chambers in Detention Area 1. Req. Vol. of Detention 26,501 cu. ft. Required detention volume of Detention Area 1. Area 1 Total of Detention Area 40,515 cu. ft. Total design volume of Stormtech Chambers in Detention Area 2. 2 Req. Vol. of Detention 39,826 cu. ft. Required detention volume of Detention Area 2. Area 2 Underground Vault Volume Chambers Notes Required Stormtech WQ Basin 1 909 cu. ft. 3500MC Design water quality volume For Basins A1 & OS3. Req. Vol. Stormtech WQ 340 cu. ft. Requlred water quality volume for Basins A1 & 053. Stormlech WQ Basin 2 3,129 cu. ft. 3500 Design water quality volume for Basins A2 & OS1. Req. Vol, Stormtech WQ �,�32 cu. ft. Requlred water quallty volume for Basins A2 & OS1. Stormtech WQ Basin 3 2,103 cu. ft. 3500 Design water quality volume for Basins B2. Req. Vol. Stormtech WQ 1,175 cu. ft. Requlred water quallty volume for Basins B2. \ Stormtech Basin WQ 4 3,601 cu. ft. 3500 Design water quality volume for Basin B1 & OS2. Req. Vol. Stormtech WQ 1,972 cu. ft. Requlred water quallty volume for Basin B1 & OS2. � > � : � � '' �� /. / // �) // �/ � � � � / � \. DEVELOPED DRAINAGE SUMMARY Total Design Area 2-Yr Tc 100-Yr Q2 Q100 Point Basin ID �acres C2 C100 �min� Tc (min� (cfs) (cfs) � a1 A1 0.234 0.26 0.33 6.02 6.02 0.16 0.74 a2 A2 0.315 0.74 0.92 5.00 5.00 0.66 2.88 b1 B1 1.467 0.85 1.00 5.00 5.00 3.57 14.59 b2 B2 1.143 0.87 1.00 5.00 5.00 284 11.37 OFFSITE BASINS os1 OS1 1.929 0.71 0.89 7.69 7.69 3.39 17.15 os2 OS2 1.570 0.43 0.53 11.89 11.89 1.40 6.09 os3 OS3 0.324 0.81 1.00 5.00 5.00 0.74 3.22 NORTH 40 0 40 80 120 ( IN FEET ) 1 INCH = 40 FEET LEGEND: PROPOSED STORM SEWER PROPOSEDINLET PROPOSED CONTOUR EXISTING CONTOUR PROPOSED SWALE PROPOSED CURB & GUTTER PROPERTY BOUNDARY DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION PROPOSED 100-YR WSEL � 93 - - -- 4953 = _- - - � � BASIN DESIGNA7I�N A 0.22 BASIN AREA (AC) � s � _ � : : .............. NOTES: 1. REFER TO THE FINAL DRAINAGE REPORT, DATED MAY 1, 2024 FOR ADDITIONAL INFORMATION. FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION CALL UTILITY NOTIFICATION CENTER OF COLORADO 1 � Know whaYs �1��QW. Call before you dig. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. ai � � 0 >, m � C O .� .� N � 0 Z � _-��... � _����� -- ---���t _►,. � � � ����I► . • • •� � • :� �% ' '%%' � "�IDNA�'�`� Z � �� � o U z � °" � � ~ C N � N � � W � � °° rn = � E W °' Z � � W � � z I..L - ` � N O t�� � O z °° 0 0 Zw � � � � � � �� 3m o � _� � �_ r � o � z N o= m� cri o Z N J � J } � w U � �w � w � O � �� � � 3 N N � Z � �O Q II �Y 0o v�i� �� � m o� m� �o w� n � � � = 3 = o� �� Q� a00 0� o� W ti.J Q � 0 1 V1 Z 0 � � Z _ �N L.L 0 � 1 W z X W W V Q Z Q � 0 Sheet DR1 38 of 38