HomeMy WebLinkAboutDrainage Reports - 02/06/2024City of Fort Collins Approved Plans Approved by: Date: Dan Mogen 02/06/2024 South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 i Table of Contents 1.0 Introduction ........................................................................................................................ 1 1.1 Background .............................................................................................................. 1 1.2 Purpose and Scope .................................................................................................. 1 1.3 Previous Reports ...................................................................................................... 1 2.0 Hydrology .......................................................................................................................... 3 2.1 Model History ........................................................................................................... 3 2.2 Rainfall ..................................................................................................................... 3 3.0 Existing Conditions ............................................................................................................ 5 3.1 Effective Model ......................................................................................................... 5 3.2 Existing Conditions Model ........................................................................................ 6 3.3 Existing Detention Requirements ............................................................................. 9 4.0 Proposed Conditions ....................................................................................................... 12 4.1 Basin Description ....................................................................................................12 4.2 Detention Basin Alternative .....................................................................................14 4.2.1 Off-Line Detention Alternative ..........................................................................14 4.2.2 On-Line Detention Alternative ..........................................................................16 4.3 Water Quality Alternative .........................................................................................17 5.0 Recommendations ........................................................................................................... 19 List of Tables Table 1: Fort Collins Intensity Duration Frequency Curves for Use with SWMM ......................... 4 Table 2: MODSWMM & EPA SWMM Peak Flow Comparison .................................................... 6 Table 3: Changes to Existing Condition...................................................................................... 8 Table 4: Converted Effective Model & Updated Existing Model Peak Flow Comparison ............ 9 Table 5: Required Onsite 100-Year Release Rates ...................................................................10 Table 6 Allowable Release Rate Pond Summary .....................................................................10 Table 7: Detention Pond Requirements Compared to Constructed Facilities ............................10 Table 8: Changes to Proposed Condition ..................................................................................14 Table 9: Required Water Quality and Detention Requirements .................................................15 Table 10: Off-Line Detention Alternative Estimated Cost ...........................................................16 Table 11: On-Line Detention Alternative Estimated Cost ...........................................................17 Table 12: Water Quality Requirements .....................................................................................18 Table 13: Water Quality Alternative Estimated Cost ..................................................................18 List of Figures Exhibit 1: Study Area.................................................................................................................. 2 South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 ii List of Appendices Appendix A Existing Conditions Analysis Exhibit 2: Existing Conditions Basin Map Exhibit 3: Existing Conditions SWMM Schematic Appendix B Master Plan Exhibit 4: Master Plan Basin Map Exhibits 5A-5C: Master Plan SWMM Schematics Exhibit 6: Off-line Detention Pond Alternative Exhibit 7: On-line Detention Pond Alternative Exhibit 8: Water Quality Pond Alternative Appendix C Water Quality Calculations Appendix D EPA SWMM Water Quality Model EPA SWMM Input Files EPA SWMM Output Files South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 1 1.0 INTRODUCTION 1.1 Background This report addresses the stormwater master plan improvements to the Colorado State University (CSU) South Campus. The master plan study encompasses the area north of Drake Road, west of the Burlington Northern Railroad, east of Research Boulevard and Centre Avenue, and south of the Natural Resources Research Center. A vicinity map for this study area is shown in Exhibit 1. 1.2 Purpose and Scope Olsson Associates was retained to complete this Colorado State University South Campus Stormwater Master Plan study, which was authorized by CSU. The purpose of this study was to document the existing and future conditions, update the hydrology for existing conditions, develop drainage alternatives and update hydrology for the future campus layout, and provide a recommendation for drainage improvements. 1.3 Previous Reports The following studies were reviewed as part of this project for comparison of developed hydrology in similar areas:  CSU South Campus/ Veterinary Teaching Hospital Drainage Evaluation (Anderson Consulting Engineer, Inc., 2001)  Tennis Court Parking Lot Final Drainage Report (Olsson Associates, 2015) 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard STUDY AREA 1 LEGEND South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 3 2.0 HYDROLOGY The study area was included in the Spring Creek Basin As-built model, which was prepared by Anderson Consulting Engineers in 2008 using MODSWMM. For this study, the effective MODSWMM model was updated to EPA SWMM 5.1.007 and the CSU drainage basins were updated with more detailed existing conditions information. As part of the analysis, the existing detention ponds at CSU were evaluated and the results were compared to the City of Fort Collins criteria. Following the existing conditions analysis, Olsson Associates evaluated the effects of proposed improvements on peak flows at CSU and recommend necessary drainage improvements. 2.1 Model History The City of Fort Collins provided the effective Spring Creek Basin As-built MODSWMM model. This model represents master planning conditions in the basin, including the Physical Map Revision (PMR) improvements at Rolland Moore Park, Taft Hill, and Spring Canyon Park. This model was used as the basis for this study. The existing conditions model development process is detailed in Section 3.0. 2.2 Rainfall The 2- and 100-year precipitation values in the effective model were verified using the Rainfall Intensity-Duration-Frequency Table in the Fort Collins Stormwater Criteria manual. The rainfall values used in the effective model were found to be acceptable and were not changed for this study. Only the 2- and 100-year rainfall events were required for this study. The table of rainfall intensities can be found in Table 1. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 4 Table 1: Fort Collins Intensity Duration Frequency Curves for Use with SWMM Duration 2-Year lntensity 5-Year lntensity 10-Year lntensity 25-Year lntensity 50-Year lntensity 100-Year lntensity (min) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2. 19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 5 3.0 EXISTING CONDITIONS As a baseline to determine necessary master plan improvements, an existing conditions model was developed. To develop an existing conditions model, the effective as-built model was first converted to EPA SWMM 5.1.007. The peak flows from the EPA SWMM 5.1.007 model were then compared to the effective peak flows to see if calibration was warranted. Following this analysis, the existing subbasin boundaries and percent impervious values were checked and updated as needed to reflect existing conditions. A detailed description of the existing conditions analysis is included herein. 3.1 Effective Model To prepare the baseline existing model, the effective as-built MODSWMM model for the Spring Creek Basin was first converted to EPA SWMM 5.1.007. The input file for the MODSWMM model was modified to match the same format as a UDSWMMM 2000 model. Only minor modifications to the input file were necessary to convert the model to a UDSWMM 2000 model. The UDSWMM 2000 model was then converted to an EPA SWMM model using the Urban Drainage and Flood Control District (UDFCD) CUHP SWMM Converter. The EPA SWMM 5.1.007 model was spot checked to verify input parameters were properly converted. Minor corrections to the model were required at nodes where flooding was occurring. Primarily, corrections were made at detention ponds and a few nodes where downstream conveyance elements were inadequate for the flows received. For detention ponds, the rating curves for the pond outlets were extrapolated out in order to replicate the higher release rates typically seen when ponded depth increases on an orifice outlet. In cases where nodes were flooding and not freely releasing flows, additional conveyance was added to ensure no inadvertent detention was being modeled. The peak flows from the EPA SWMM 5.1.007 model were then compared to the effective MODSWMM peak flows in the study area, to see if calibration was necessary. The EPA SWMM 5.1.007 100-year peak flows compared well to the effective 100-year peak flows, with average differences of – 2.0% to 3.2% in the study area. Because the peak flows from the EPA SWMM 5.1.007 model only had small percent differences as compared to the effective MODSWMM model, no calibration was warranted. The effective MODSWMM peak flows, EPA SWMM 5.1.007 peak flows, and percent differences are shown in Table 2. An existing conditions subbasin map and SWMM schematic is included as Exhibit 2 and Exhibit 3, in Appendix A. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 6 Table 2: MODSWMM & EPA SWMM Peak Flow Comparison Design Point Notes MODSWMM Peak Flow (cfs) EPA SWMM 5.1.007 Peak Flow (cfs) % Change (MODSWMM to EPA SWMM 5.1 Peak Flow) Q100 Q100 Q100 JUNCT_327 Spring Creek 2930.00 2961.38 1.1% JUNCT_727 Spring Creek 3085.20 3129.67 1.4% JUNCT_27 Spring Creek 3175.40 3220.46 1.4% JUNCT_703 Spring Creek 3789.30 3849.31 1.6% OUTLET_303 Detention Pond/ Spring Creek 1972.10 1957.75 -0.7% JUNCT_321 Spring Creek 1972.70 1958.38 -0.7% JUNCT_726 Area within BNRR Pond 663.30 668.51 0.8% JUNCT_260 Bay Farm Rd. Ditch at swale 552.20 569.65 3.2% JUNCT_261 Bay Farm Rd. Ditch at Spring Creek 570.20 588.71 3.2% OUTLET_50 Detention Pond at CSU Veterinary Teaching Hospital 512.40 527.58 3.0% OUTLET_362 Detention Pond south of the Tennis Courts along Drake Rd. 1.50 1.47 -2.0% OUTLET_289 CSU Tennis Courts Detention Pond 4.50 4.46 -0.9% 3.2 Existing Conditions Model The EPA SWMM 5.1.007 model was checked to see if it correctly reflected the existing conditions in accordance with the standards and guidelines of the City of Fort Collins Storm Drainage Manual. LiDAR production, completed by Ayers Associates in 2013 for the City of Fort Collins, was used to verify and update basin boundaries. The LiDAR data includes one-foot contours on the NAVD 88 datum. The evaluation of the model centered on CSU’s south campus. Subbasins in the effective model outside of this area were not checked. The following modifications were made to the CSU subbasins for the existing conditions model.  The subbasin boundaries of 61, 62, 65, 66, 67, 68, 89, and 125 did not reflect existing conditions. The subbasin boundaries and EPA SWMM 5.1.007 subbasin parameters were updated using the May 2013 topography provided by Fort Collins. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 7  Basin 126 was split into two subbasins, 126 and 126B, to match the study area boundary. The subbasin parameters were modified accordingly.  The percent impervious values for subbasins 62, 66, 68, 89, 125, 126, and 126 B did not reflect existing conditions. The existing percent impervious values were updated using aerial imagery.  Subbasins 61, 89 and Pond 289 were updated with the design information from the Tennis Court Parking Lot Final Drainage Report, prepared by Olsson Associates in 2015. The improvements were constructed by CSU in the summer of 2015. Pond 362 was removed from the EPA SWMM 5.1.007 model because it did not reflect the current existing conditions of the CSU South Campus study area. As a result of removing Pond 362 from the model, the outflow value of Pond 50 increased, which also increased the inflow values for nodes 261 and 260. A summary of the changes in area and percent imperviousness is included in Table 3. A comparison of the EPA SWMM 5.1.007 model before and after updating the existing conditions can be found in Table 4. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 8 Table 3: Changes to Existing Condition Basin Property Original Value (as of 2008) Corrected Value** (as of 2008) Changed Value*** (as of 2013) 61 Area (acres) 20.4 21.4 21.9 % Impervious 90% 90% 90% 62 Area (acres) 5.9 6.0 4.2 % Impervious 70% 70% 2% 65 Area (acres) 6.5 6.7 6.7 % Impervious 8% 8% 8% 66 Area (acres) 17.8 16.8 22.7 % Impervious 55% 55% 65% 67* Area (acres) 29.2 28.2 25.6 % Impervious 55% 55% 55% 68* Area (acres) 11.5 11.1 16.0 % Impervious 55% 55% 30% 89 Area (acres) 25.4 24.7 16.0 % Impervious 90% 90% 61% 125 Area (acres) 22.6 22.5 23.1 % Impervious 51% 51% 65% 126 Area (acres) 72.6 78.7 51.7 % Impervious 25% 25% 19% 126B Area (acres) N/A N/A 26.9 % Impervious N/A N/A 81% Ditch Area (acres) 1.7 2.4 3.6 *The percent impervious value was not affected by the change in area. **The areas in the effective model did not match the electronic files of the effective subbasins. Because the electronic files were used as a basis for the existing conditions, the total area of the electronic files and the existing conditions match. ***Changed Value refers to the conditions of the subbasin in 2013 as documented in the aerial imagery from LiDAR production by Ayers Associates in 2013. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 9 Table 4: Converted Effective Model & Updated Existing Model Peak Flow Comparison Design Point Notes Converted Effective Peak Flow (cfs) Updated Existing Peak Flow (cfs) % Change Q100 Q100 Q100 JUNCT_327 Spring Creek 2,961.38 2,961.90 0.0% JUNCT_727 Spring Creek 3,129.67 3,146.53 0.5% JUNCT_27 Spring Creek 3,220.46 3,218.72 -0.1% JUNCT_703 Spring Creek 3,849.31 3,846.60 -0.1% OUTLET_303 Detention Pond/ Spring Creek 1,957.75 1,927.99 -1.5% JUNCT_321 Spring Creek 1,958.38 1,928.68 -1.5% JUNCT_726 Area within BNRR Pond 668.51 659.62 -1.3% JUNCT_260 Bay Farm Rd. Ditch at swale 569.65 594.33 4.3% JUNCT_261 Bay Farm Rd. Ditch at Spring Creek 588.71 613.41 4.2% OUTLET_50 Detention Pond at CSU Veterinary Teaching Hospital 527.58 555.94 5.4% OUTLET_289 Tennis Courts Detention Pond 4.46 0.89 -80.0% 3.3 Existing Detention Requirements Pond 303 and Pond 50 provide additional detention beyond what is required for CSU’s property alone. To help determine master plan improvements, the existing detention volumes and release rates were compared to the required detention volumes and release rates. Pond 303, identified in Exhibit 2, in Appendix A, is predominantly inundated by the Spring Creek 100-year storm event. This area provides detention for a large area upstream, not just for CSU south campus. In addition, Pond 50 also provides detention storage for offsite basins. To determine what portion of the pond volumes are used for detention for the study area versus offsite areas, the required onsite detention was determined by modifying the existing conditions model to disconnect all off-site areas. Next, the 2-year undeveloped flow from the study area was developed to determine a 100-year release rate for the developed basin based on City of Fort Collins criteria. The undeveloped 2-year flow was determined by changing all of the subbasins to a 2% imperviousness and converting all of the existing ponds to nodes so no storage would be modeled. The required 100-year release rates, or the CSU 2-year historic (undeveloped) peak flows, at each pond location is shown in Table 5. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 10 Table 5: Required Onsite 100-Year Release Rates Pond CSU Tributary Area (ac) Required 100-Year Release Rate (cfs) 50 33.6 1.98 289 16.0 0.96 303 166.0 5.65 To determine the detention required for the study area, per Fort Collins criteria, the existing conditions model was modified to allow the offsite flows to pass through Ponds 50 and 303, while detaining the developed 100-year flows to release at the 2-year historic flowrates. Pond 289 does not intercept any offsite basins so the release rate from Pond 289 is driven solely by the historic 2-year flow. A summary of the 2-year historic flow, 100-year offsite flow, and total allowable release rate at each pond is provided in Table 6. Table 6 Allowable Release Rate Pond Summary Pond A: Historic 2- year Flow Rate (cfs) B: Intercepted 100- year Offsite Developed Flows (cfs) Allowable Release Rate (A + B) (cfs) 50 1.98 702.91 704.89 289 0.96 0.00 0.96 303* 5.65 3,946.83 3,952.48 *The historic flows, intercepted flows, and allowable release rate for Pond 303 reported in Table 6 include the onsite and offsite flows from Pond 50 and Pond 289, as these ponds are tributary to Pond 303. The offsite flows for Pond 303 also include flows from a portion of the CSU Stadium project on the main campus, hydrographs 297, 298, 299, accounting for approximately 180.83 cubic feet per second (cfs)) of the total 3,946.83 cfs in offsite flows. Table 7 summarizes the required release rates and detention volumes versus the as- constructed condition release rates and detention volumes at each pond. Pond 50 and Pond 303 provide substantial excess detention that benefits the community as a whole. Table 7: Detention Pond Requirements Compared to Constructed Facilities Pond Allowable Release Rate (cfs) Required Detention (ac-ft) Existing Release Rate (cfs) Provided Detention (ac-ft) 50 704.89 5.48 549.72 21.96 289 0.96 3.90 0.89 3.91 303 3,952.48 13.84 1,956.85 337.1 South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 11 The area south of the New Mercer Ditch, which lies just north of the Natural Resource Research Center, is currently undeveloped. Fort Collins stormwater criteria requires the developed 100- year storm event flows be released at a 2-year historic flowrate, even if the site is entirely pervious, which results in required detention to any property, developed or undeveloped. Removing this area, which lies in Subbasin 126, from the onsite analysis reduces the overall detention required in Pond 303 from 13.84 acre-feet (ac-ft) to 9.69 ac-ft. Ponds 50 and 289 would not be effected. Total detention required for the area south of New Mercer Ditch would be 19.07 ac-ft, as compared to the 23.22 ac-ft required for the entire study area identified in Exhibit 1. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 12 4.0 PROPOSED CONDITIONS The “Medical Campus: Master Plan” (Master Plan), in Appendix B, shows the proposed site layout for CSU’s South Campus. The Master Plan includes additional buildings, animal pens, parking lots, and rearrangement of paved and landscaped areas. To evaluate future drainage improvements with the Master Plan site layout, new drainage basins were delineated, as shown in Exhibit 4, in Appendix B. The master plan SWMM schematics are included as Exhibits 5A-5C, in Appendix B. The Anderson South Campus Master Plan used 2-foot contours, as opposed to the one-foot contours used for this study. The Master Plan subbasins, including existing facilities to remain, are described in Section 4.1 The analysis for the western portion of the campus, including the new tennis courts, provides water quality for the southern portion of the campus west of the Larimer County Canal (LCC) No. 2 and detention for the northern portion of the area west of the LCC No. 2. This condition remains consistent whereas alternatives are proposed for the area east of the LCC No. 2. Three drainage alternatives were then evaluated for the area east of LCC No. 2. The first alternative includes three additional off-line detention ponds: Ponds 52, 53, and 54. These ponds would collect runoff from tributary basins and discharge flows into the existing stormwater channel. The second alternative includes the same detention ponds, but the ponds would be constructed on-line (along the existing channel). The proposed detention ponds for both detention alternatives would provide water quality storage and detain developed on-site flows resulting from the Master Plan improvements, releasing flows at the 2-year historic flow rates. The third alternative includes rerouting the existing channel into a meandering swale and construction of three water quality ponds along the relocated channel. This alternative would not provide any additional detention of onsite flows, although it would provide enhanced water quality and a more aesthetically pleasing environment. 4.1 Basin Description Subbasin 62 will consist of a parking lot, a proposed building, Pond 362, and landscaped areas. The future percent imperviousness for this subbasin is 46%. Stormwater drains to the southeast to Pond 362, which outlets into in a small swale to Pond 50, which is located in Subbasin 66. Subbasin 65 will consist of paved streets, a proposed parking lot, animal pens, the portion of Pond 50 that is north of the paved road, and landscaped areas. The future percent imperviousness for this subbasin is 36%. Stormwater drains to the east along the paved road to Pond 50 which outlets into a swale that flows to the north. Subbasin 65A will consist of paved streets, a portion of the proposed sheep barn, proposed animal pens, and landscaped areas. The future percent imperviousness for this subbasin is 63%. Stormwater drains to the east along Booth Road to Pond 52, which is located in Subbasin 65C. Subbasin 65C will consist of a portion of the proposed sheep barn and small animal barn, the existing hay barn, proposed animal pens, paved areas, Pond 52, and landscaped areas. The South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 13 future percent imperviousness for this subbasin is 28%. Stormwater drains to the east to Pond 52 which outlets into a swale that flows to the north. Subbasin 66 will consist of parking lots, existing and proposed buildings, the portion of Pond 50 that is south of the paved road, and landscaped areas. The future percent imperviousness for this subbasin is 67%. Stormwater drains to the south along Gillette Drive, until it reaches a curb cut that directs flows into Pond 50 which outlets into a swale that flows to the north. Subbasin 67 will consist of a paved roadway, existing and proposed buildings, proposed animal pens, and landscaped areas. The future percent imperviousness for this subbasin is 68%. Stormwater drains east along Niswender Road to a swale that flows to the north. Subbasin 67A will consist of a paved roadway, a parking lot, existing and proposed buildings, proposed animal pens, Pond 53, and landscaped areas. The future percent imperviousness for this subbasin is 43%. Stormwater drains to the east to Pond 53 which outlets into a swale that flows to the north. Subbasin 67B will consist of a paved roadway, existing, and proposed buildings. The future percent imperviousness for this subbasin is 97%. Stormwater will drain east in a proposed 30- inch RCP to Pond 53, which is located in Subbasin 67A. Subbasin 67C will consist of a parking lot, existing and proposed buildings, and landscaped areas. The future percent imperviousness for this subbasin is 44%. Stormwater will drain to the west toward Gillette Drive, which is located in Subbasin 66. Subbasin 68 will consist of a paved roadway, a parking lot, existing and proposed buildings, Pond 54, and landscaped areas. The future percent imperviousness for this subbasin is 63%. Stormwater will drain to the east along a paved road to Pond 54 which outlets into a swale that flows to the north to a 78-inch reinforced concrete pipe (RCP) that discharges to Spring Creek. Subbasin 89 will consist of the CSU tennis courts, Detention Pond 289, parking lots, and landscaped areas. The future percent impervious for this subbasin is 61%, which was calculated based off of the Tennis Court Parking Lot Final Drainage Report, prepared by Olsson Associates in 2015. Stormwater outlets Pond 289 to the east in an 18-inch RCP to Pond 54, which is located in Subbasin 68. A summary of the Master Plan subbasin areas and percent impervious compared to existing conditions is shown in Table 8. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 14 Table 8: Changes to Proposed Condition Basin Property Existing Conditions Proposed Conditions 62 Area (acres) 4.2 4.2 % Impervious 2% 46% 65 Area (acres) 6.7 5.7 % Impervious 8% 36% 65A Area (acres) --- 3.0 % Impervious --- 63% 65C Area (acres) --- 3.5 % Impervious --- 28% 66 Area (acres) 22.7 25.3 % Impervious 65% 67% 67 Area (acres) 25.6 5.3 % Impervious 55% 98% 67A Area (acres) --- 5.8 % Impervious --- 43% 67B Area (acres) --- 2.4 % Impervious --- 97% 67C Area (acres) --- 4.8 % Impervious --- 44% 68* Area (acres) 16.0 15.2 % Impervious 30% 63% 89 Area (acres) 16.0 16.0 % Impervious 61% 61% 4.2 Detention Basin Alternative 4.2.1 Off-Line Detention Alternative The existing swale located on the east side of the project area drains stormwater from Pond 50 at the southeast corner of the South Campus north to Spring Creek. The first alternative for stormwater improvements includes adding detention ponds prior to discharging into the existing South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 15 swale, as shown in Exhibit 6, in Appendix B. Three detention ponds 52, 53, and 54, would be added as off-line detention ponds that would outlet directly into the swale. Proposed detention ponds will provide water quality capture volume. Due to the high nutrient loading of the stormwater, it is also proposed to provide additional water quality by providing a meandering bioswale to be constructed upstream of the detention ponds. This bioswale would be offset approximately 5 feet from the proposed detention ponds. When the bioswale reaches its capacity, stormwater will overflow to Detention Ponds 52, 53, and 54. A summary of the detention and water quality pond volumes can be found in Table 9. Table 9: Required Water Quality and Detention Requirements Pond Required Detention Volume (AC-FT) WQCV Required (ac-ft) Off-Line Total Required Volume (ac-ft) 52 1.31 0.15 1.46 53 3.14 0.48 3.62 54 3.47 0.48 3.95 362* 0.87 0.11 0.98 *Pond 362 will primarily be utilized for water quality with a maximum capacity of 0.38 ac-ft Proposed Pond 362 is located in basin 62, which is in the southwest portion of the South Campus. Due to site constraints, only 0.38 af-ft of volume can be achieved in Pond 362 given the current layout of the proposed south campus buildings, sidewalks, and utilities. While this volume does not provide adequate detention, it will provide water quality and limited detention. The overflow will be routed to Pond 50. The grading in the South Campus relative to elevations in the swale will cause some hydraulic issues in the ponds. Tailwater in the swale may reduce the outflow rate in the ponds. Check valves will be required to ensure flows do not back into the ponds from the swale. Should this option be selected, refined modeling of the discharge relative to the pond size is required to ensure the timing of the release enables the pond to drain appropriately during final design. The construction costs of the evaluated improvements were estimated using unit costs obtained from Urban Drainage and Flood Control District’s master planning cost estimator, UD-MP Cost, Version 2.2. The detention pond unit cost includes excavation, trickle channels, forebays, micropools, access roads, outlet structures, and revegetation. The estimated cost of this alternative is shown in Table 10. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 16 Table 10: Off-Line Detention Alternative Estimated Cost Description Quantity Unit Unit Cost Total Cost Detention/WQ Pond 52 (Complete-in-Place) 1.46 AC-FT $48,000 $70,080 Detention/WQ Pond 53 (Complete-in-Place) 3.62 AC-FT $48,000 $173,760 Detention/WQ Pond 54 (Complete-in-Place) 3.95 AC-FT $48,000 $189,600 Detention/WQ Pond 362 (Complete-in-Place) 0.38 AC-FT $48,000 $18,240 Bioswale (Complete-in-Place) 1 L.S. $24,000 $24,000 Dewatering 1 L.S. $5,000 $5,000 Mobilization (5%) 1 L.S. $23,784 $23,784 Traffic Control 1 L.S. $1,000 $1,000 Utility Coordination/Relocation 1 L.S. $5,000 $5,000 Stormwater Management/Erosion Control (5%) 1 L.S. $23,784 $23,784 Subtotal Capital Improvement Costs $534,248 Engineering (15%) 1 L.S. $80,137 $80,137 Legal/Administrative (5%) 1 L.S. $26,712 $26,712 Contract Admin/Construction Management (10%) 1 L.S. $53,425 $53,425 Contingency (25%) 1 L.S. $133,562 $133,562 Subtotal Other Costs $293,836 Total Capital Improvement Costs $828,084 4.2.2 On-Line Detention Alternative If the detention ponds included in the off-line detention alternative were instead on-line ponds along the existing swale, there would be significantly more developable land, as shown in Exhibit 7, in Appendix B. On-line detention would slightly reduce the overall peak flow in the swale; however, due to the difference in timing of the peak flow from the south campus tributary basins and the peak flow for the outfall of Pond 50, the in-line ponds would not provide much detention of the developed site and little to no water quality benefit. The net impact was a reduction in peak flows of 10 cfs, as compared to existing conditions, at the downstream end of the developed site. No water quality capture volume would be included in the ponds. Water quality would only be addressed by meandering bioswales on the upstream side of the detention ponds. The water quality and detention provided in this alternative do not justify the increased developable land and this alternative is therefore not recommended. The construction costs of the evaluated improvements were estimated using unit costs obtained from Urban Drainage and Flood Control District’s master planning cost estimator, UD-MP Cost, Version 2.2. The detention pond unit cost includes excavation, trickle channels, forebays, micropools, access roads, outlet structures, and revegetation. The estimated cost of this alternative is shown in Table 11. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 17 Table 11: On-Line Detention Alternative Estimated Cost Description Quantity Unit Unit Cost Total Cost Detention Pond 52 (Complete-in-Place) 2.20 AC-FT $48,000 $105,600 Detention Pond 53 (Complete-in-Place) 1.56 AC-FT $48,000 $74,880 Detention Pond 54 (Complete-in-Place) 4.36 AC-FT $48,000 $209,280 Detention/WQ Pond 362 (Complete-in- Place) 0.38 AC-FT $48,000 $18,240 Bioswale (Complete-in-Place) 1 L.S. $24,000 $24,000 Dewatering 1 L.S. $5,000 $5,000 Mobilization (5%) 1 L.S. $21,600 $21,600 Traffic Control 1 L.S. $1,000 $1,000 Utility Coordination/Relocation 1 L.S. $5,000 $5,000 Stormwater Management/Erosion Control (5%) 1 L.S. $21,600 $21,600 Subtotal Capital Improvement Costs $486,200 Engineering (15%) 1 L.S. $72,930 $72,930 Legal/Administrative (5%) 1 L.S. $24,310 $24,310 Contract Admin/Construction Management (10%) 1 L.S. $48,620 $48,620 Contingency (25%) 1 L.S. $121,550 $121,550 Subtotal Other Costs $267,410 Total Capital Improvement Costs $753,610 4.3 Water Quality Alternative The final alternative for stormwater improvements addresses only water quality for the proposed improvements on South Campus that lie east of LCC No. 2. The most significant impact of the South Campus plan is the increased presence of animal manure to the storm system. To help alleviate this loading, bioswales would be constructed to collect stormwater from the developed facilities and convey it to water quality ponds. The water quality ponds would be located at the same location as the proposed off-line detention pond alternative. The existing swale along the eastern border would be realigned to have a more natural, meandering, alignment. This alternative would not provide any additional detention of on-site flows; however, it would provide enhanced water quality and a more aesthetically pleasing environment. This alternative is shown on Exhibit 8, in Appendix B. A summary of the water quality storage pond volumes can be found in Table 12. It should be noted that Pond 362 will provide limited detention volume as well as water quality capture volume resulting in a total storage of 0.38 ac-ft. South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 18 Table 12: Water Quality Requirements Pond WQCV Required (ac-ft) 51 0.12 52 0.15 53 0.48 54 0.48 362 0.11 The construction costs of the evaluated improvements were estimated using unit costs obtained from Urban Drainage and Flood Control District’s master planning cost estimator, UD-MP Cost, Version 2.2. The water quality pond unit cost includes excavation, trickle channels, forebays, micropools, access roads, outlet structures, and revegetation. The estimated cost of this alternative is shown in Table 13. Table 13: Water Quality Alternative Estimated Cost Description Quantity Unit Unit Cost Total Cost Water Quality Pond 50 (Complete-in-Place) 0.12 AC-FT $48,000 $5,760 Water Quality Pond 52 (Complete-in-Place) 0.15 AC-FT $48,000 $7,200 Water Quality Pond 53 (Complete-in-Place) 0.48 AC-FT $48,000 $23,040 Water Quality Pond 54 (Complete-in-Place) 0.48 AC-FT $48,000 $23,040 Detention/WQ Pond 362 (Complete-in-Place) 0.38 AC-FT $48,000 $18,240 Swale (Complete-in-Place) 12,000 CY $20 $240,000 Bioswale (Complete-in-Place) 1 L.S. $24,000 $24,000 Dewatering 1 L.S. $5,000 $5,000 Mobilization (5%) 1 L.S. $17,064 $17,064 Traffic Control 1 L.S. $1,000 $1,000 Utility Coordination/Relocation 1 L.S. $5,000 $5,000 Stormwater Management/Erosion Control (5%) 1 L.S. $17,064 $17,064 Subtotal Capital Improvement Costs $386,408 Engineering (15%) 1 L.S. $57,961 $57,961 Legal/Administrative (5%) 1 L.S. $19,320 $19,320 Contract Admin/Construction Management (10%) 1 L.S. $38,641 $38,641 Contingency (25%) 1 L.S. $96,602 $96,602 Subtotal Other Costs $212,524 Total Capital Improvement Costs $598,932 South Campus Stormwater Master Plan Colorado State University 015-0770 December 2015 19 5.0 RECOMMENDATIONS The water quality alternative is recommended to be implemented as part of the CSU South Campus Master Plan. With the Master Plan improvements in place, the total outflow of Pond 303 would be 1,932 cfs, as compared to the effective outflow of 1,972 cfs. Pond 303 encompasses not only the Spring Creek floodplain, but also the FEMA designated floodway. The effective water surface elevation at Pond 303 is 4995.12 (NGVD29 datum), or 4988.10 (NAVD88 datum). The proposed water surface elevation will be 4994.90 (NGVD29 datum), or 4997.88 (NAVD88 datum). Because the proposed water surface elevation is lower that the effective, no CLOMR/LOMR will be required for the proposed improvements. This alternative will better serve the watershed by providing additional water quality facilities without negatively affecting the capacity of downstream infrastructure. The proposed stormwater improvements will reduce the potential for pollutants entering Spring Creek. APPENDIX A EXISTING CONDITIONS ANALYSIS Exhibit 2: Existing Conditions Basin Map Exhibit 3: Existing Conditions SWMM Schematic 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard EXISTING CONDITIONS BASIN MAP 2 LEGEND 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard EXISTING CONDITIONS SWMM SCHEMATIC 3R APPENDIX B MASTER PLAN Exhibit 4: Master Plan Basin Map Exhibits 5A-5C: Master Plan SWMM Schematics Exhibit 6: Off-line Detention Pond Alternative Exhibit 7: On-line Detention Pond Alternative Exhibit 8: Water Quality Pond Alternative CSURF-Controlled Property University-Controlled Property New/Future Buildings Existing Buildings LEGEND LEGEND CSURF-Controlled Property University-Controlled Property New/Future Buildings Existing Buildings N WEST DRAKE ROAD JENSEN ROAD CENTRE AVENUE NISWENDER ROAD BOOTH ROAD CROSS DRIVE G I L E T T E D R I V E R E S E A R C H B O U L E V A R D PHEMISTER ROAD MASONTRAIL MAX BRT MEDIC AL C AMPUS: MASTER PLAN UPDATE FEB. 2015 MEDIC AL C AMPUS: MASTER PLAN UPDATE EXISTING FACILITIES 1. Veterinar y Teaching Hospital 2. Diagnostic Medicine Center 3. Equine Orthopaedic Research Center 4. Facilities Carpentry Shop 5. Chill Plant 6. Hay Barn 7. Tennis Courts PROPOSED FACILITIES 8. Sheep Barn 9. Hay Barn 10. Small Animal Barn 11. Institute for Biological & Translational Therapies 12. Equine Hospital 13. Second Year DVM 14. Community Practice 15. Parking 16. Relocated Large Animal Program 17. Stormwater Detention/Treatment 18. Cancer Innovation Center 19. 900-Space Parking Lot (Summer 2015) 9 17 11 10 5 4 12 3 6 8 2 16 13 14 15 1 18 19 7 Facilities Management 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard MASTER PLAN BASIN MAP 4 LEGEND NOTE: FOR THE OFF-LINE DETENTION POND ALTERNATIVE BASINS 65A, 65C, 67, 67A, 67B AND 68 ARE MODELED AS 2-YEAR EXISTING TO REPLICATE THE HISTORIC FLOW RATES DISCHARGING FROM THE OFF-LINE DETENTION PONDS INTO THE EXISTING SWALE AS REQUIRED BY CITY OF FORT COLLINS CRITERIA. 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney BoulevardOFF-LINE DETENTION POND MASTER PLAN SWMM SCHEMATIC 5AR NOTE: BASINS 65A, 65C, 67, 67A, 67B AND 68 ARE MODELED AS 2-YEAR EXISTING TO REPLICATE THE HISTORIC FLOW RATES DISCHARGING FROM THE OFF-LINE DETENTION PONDS INTO THE EXISTING SWALE AS REQUIRED BY CITY OF FORT COLLINS CRITERIA. 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney BoulevardON-LINE DETENTION POND MASTER PLAN SWMM SCHEMATIC 5BR 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney BoulevardWATER QUALITY POND MASTER PLAN SWMM SCHEMATIC 5CR 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard OFF-LINE DETENTION POND ALTERNATIVE 6 LEGEND 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard ON-LINE DETENTION POND ALTERNATIVE 7 LEGEND POND 50 015-0770PROJECT NO: DRAWN BY: 12/04/2015 FJS/MKD EXHIBIT R TEL 970.461.7733 Loveland, CO 80538 Suite 160 5285 McWhinney Boulevard WATER QUALITY POND ALTERNATIVE 8 LEGEND APPENDIX C WATER QUALITY CALCUL ATIONS Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =36.0 percent Catchment Area, A =5.70 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.67 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.004 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =% Percent Soil Type B =% Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.217 watershed inches Water Quality Capture Volume (WQCV) =0.103 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =0.124 acre-feet Outlet area per row, Ao =0.42 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET WQV-POND51.xls, WQCV 12/22/2015, 4:46 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =45.4 percent Catchment Area, A =6.05 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.67 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.004 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =% Percent Soil Type B =% Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.254 watershed inches Water Quality Capture Volume (WQCV) =0.128 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =0.153 acre-feet Outlet area per row, Ao =0.51 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET WQV-POND52.xls, WQCV 12/22/2015, 4:45 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =74.2 percent Catchment Area, A =13.50 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.67 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.004 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =% Percent Soil Type B =% Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.353 watershed inches Water Quality Capture Volume (WQCV) =0.397 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =0.476 acre-feet Outlet area per row, Ao =1.50 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET WQV-POND53.xls, WQCV 12/22/2015, 4:47 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =63.0 percent Catchment Area, A =15.20 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.67 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.004 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =% Percent Soil Type B =% Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.316 watershed inches Water Quality Capture Volume (WQCV) =0.400 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =0.480 acre-feet Outlet area per row, Ao =1.52 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET WQV-POND54.xls, WQCV 12/22/2015, 4:47 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =46.0 percent Catchment Area, A =4.20 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.67 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.005 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =% Percent Soil Type B =% Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.256 watershed inches Water Quality Capture Volume (WQCV) =0.090 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =0.107 acre-feet Outlet area per row, Ao =0.36 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET WQV-POND362.xls, WQCV 12/22/2015, 4:46 PM APPENDIX D EPA SWMM WATER QUALITY MODEL INPUT AND OUTPUT FILES EPA SWMM Input EPA SWMM Output