HomeMy WebLinkAboutDrainage Reports - 11/09/2023C
� z i2 Consultants, Inc.
�
October 17, 2023
Mr. Dan Mogen
Development Review Engineer
City of Fort Collins Utilities
222 Laporte Avenue
Fort Collins, CO 80524
16911 Potts Place, Mead, CO
970.2D.9148
troy@i2-consultants.com
City of Fort Collins Approved Plans
Approved by: Dan Mogen
Date: 11/09/2023
RE: Drainage Letter for the Harmony House Building Addition
3105 E. Harmony Road, Fort Collins, CO
Dear Mr. Mogen:
We are pleased to present this Drainage Letter for the Harmony House Building Addition
for your review and approval. The subject property is located at 3105 E. Harmony Road,
Fort Collins, CO.
This report has been prepared in general accordance with the Fort Collins Stormwater
Criteria Manual, September 2018.
INTRODUCTION
The subject property is located in the Northwest Quarter of Section 4, Township 6 North,
Range 68 West, of the Sixth Principal Meridian, City of Fort Collins, County of Larimer,
State of Colorado.
The legal description of the subject property is: Lot 2, Harmony Technology Park, First
Filing. Lot 2 contains +/-0.99 acres. The studv area for this project is 0.2 acres. The
project is in general compliance with the Final Drainage and Project Development for the
Harmony Technology Park First Filing, prepared by Sear Brown, dated January 1998.
The project will consist of a building addition to the southern portion of the existing
building. A small portion of the existing building/covered patio will be removed. A concrete
patio will be added as well as a wood deck along the western side of the building addition.
Furthermore, a concrete access will be added along the eastern side of the building
addition. The improvements to the site will also include a new playground and
landscaping. The existing access and parking will not be revised or modified with this
project.
EXISTING CONDITIONS
The subject property currently contains one (1) building, three (3) sheds, concrete walks, a
playground, seating area, accesses, parking and landscaping. The accesses and parking
c
i 2
�
Drainage Letter for the Harmony House Building Addition, 3105 E. Harmony Road, Fort Collins
October 17, 2023
will not be revised or modified with this project.
According to the Drainage and Erosion Control Plan included in the Final Drainage and
Project Development for the Harmony Technology Park First Filing, the subject site is
located in Basin 6. This basin flows inward towards an existing 15' Type R inlet. Runoff is
then conveyed via 29"X45" HERCP to Pond A(existing detention pond), located in the
southeastern portion of Harmony Technology Park First Filing.
The existing subject site drains in multiple directions. Based on existing topography, the
northern portion of the site is relatively flat. The access and parking generally flow from
north to south through the existing access to the property to the south. This runoff reaches
existing curb and gutter and is conveyed to the west to an existing 15' Type R inlet
installed with the First Filing improvements. Furthermore, the southern portion of Lot 2
(generally the study area) drains from north to south and also reaches the existing curb
and gutter on the property to the south and eventually the existing 15' Type R inlet. There
is an existing 30' Drainage, Access and Utility Easement located south of the subject site
that conveys runoff for the subject property.
The existing onsite imperviousness within the study area is roughly 25%. This takes into
account a portion of the existing building, concrete areas, gravel seating areas, a
playground and existing landscaping. The calculated runoff for the study area is 0.2 cfs for
the minor (2-year) storm event and 0.92 cfs for the major (100-year) storm event.
Please refer to the Appendix for hydrologic calculations as well as an exhibit for existing
conditions.
PROPOSED CONDITIONS
The proposed improvements will include a building addition (roughly 2,500 sf), a concrete
patio and walk, playground and landscaping. The accesses and parking will not be revised
or modified with this project. The project will also include removal and replacement of
landscaping as required for the proposed improvements.
Runoff will generally continue to flow in the historic pattern. Runoff will drain from north to
south, to the existing curb and gutter located south of Lot 2. The proposed runoff will flow
through landscaping prior to reaching the existing curb and gutter.
The proposed onsite imperviousness has been calculated to be approximately 39%. The
overall impervious increase is minor considering the entire Lot 2 area. The calculated
runoff for the study area is 0.26 cfs for the minor (2-year) storm event and 1.22 cfs for the
major (100-year) storm event.
The increase in runoff between the existing and proposed conditions is 0.06 cfs for the
minor (2-year) storm event and 0.3 cfs for the major (100-year) event. The increase in
runoff will not have a significant impact on the existing curb and gutter south of the project
or the existing storm system installed with Harmony Technology Park First Filing
improvements (described above).
c 2
i 2
�
Drainage Letter for the Harmony House Building Addition, 3105 E. Harmony Road, Fort Collins
October 17, 2023
The net increase in impervious area is roughly 716 s.f. from the existing condition to the
proposed condition with this project.
Detention and water quality are not provided for this project as the net increase in
impervious area is less than 1,000 s.f. Please refer to the Appendix for additional
information. Additionally, LID (low impact development) measures have not been added to
this project as it is being processed as a Minor Amendment through the City of Fort
Collins.
CONCLUSIONS
The proposed site improvements for the study area are not expected to have a negative
impact on downstream conveyances. Furthermore, the existing drainage patterns have
been maintained with this proposed project development. Upon completion of the project,
the study area drainage will continue to flow off-site to the south in the historic pattern to
the existing improvements installed with Harmony Technology Park First Filing.
c
i 2
�
Drainage Letter for the Harmony House Building Addition, 3105 E. Harmony Road, Fort Collins
October 17, 2023
APPENDIX
This compliance letter includes the following in the Appendix:
� Existing Geotechnical Information
• Impervious/Runoff Calculations
• Drainage Plan
• Impervious Area Exhibit
� Excerpt from Addendum to the Final Drainage and Erosion Control Study for
Harmony Technology Park First Filing, prepared by Sear Brown
We look forward to your favorable review of this project and report. Please do not hesitate
to contact our office if you have any questions.
Sincerely,
i2 Consultants, Inc.
;;_:,,
' �r�� � '�ril'��
�,
Troy W. Campbell, PE
Senior Project Engineer
ENGINEER'S CERTIFICATION
I hereby certify that this report for the final drainage design of Harmony House Building Addition,
3105 E. Harmony Road, Fort Collins was prepared by me (or under my direct supervision) in
accordance with the provisions of the Fort Collins Storm Drainage Criteria Manual. I understand
that the City of Fort Collins does not and will not assume liability for drainage facilities designed by
others.
�
�, �� ���
��„ ,,:_���
� � f
,�� : �+1 1'���? : �, �
��
!� T',.�`..10/17/2023 :` ,� �
Registered Professional Engineer
State of Colorado No. 41159
(Seal)
C 4
i 2
�
APPENDIX
�
i 2
�
�
�
0
498450
40° 31' 24" N I
�
� --
�
� �i
�
�
�
�-
�
�-
�-
�
�-
498460
�
�
�
�..
�
� �
40° 31' 20" N ' I I I I -I I
498450 498460 498470 4.98480 4984.90 498500
�
�
Map S�le: 1:547 iF printed on A portait (8.5" x 11") sheet.
� N Meters
0 5 10 ZO 30
� �
0 25 50 100 150
Map projection: Web Mercator Comer coordinates: WG584 Edge dcs: UTM Zone 13N WG584
USDn Natural Resources Web Soil Survey
� Conservation Service National Cooperative Soil Survey
Soil Map—Larimer County Area, Colorado
(Harmony House Bui�ding Addition, Ft. Collins, CO)
498470 498480 498490 498500
I � � „ �
�
�
o A-1
498510 498520 4.98530
I .I 40° 31' 24" N
�
0{u:LLJL'LI'/�•�•.� — �
� �
_ ■
_� �i
. III
�
�� a
�
_ �
�
�\ �r♦
� : �
� -�
„ �
��
�' �.
�
_�
0
�� �
r. �
- - �
� -�
�
�
�
� �
499510 498520
I- 40° 31' 20" N
498530
3
iv
0
4/10/2023
Page 1 of 3
Soil Map—Larimer County Area, Colorado
(Harmony House Building Addition, Ft. Collins, CO)
MAPLEGEND
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
. .� Soil Map Unit Lines
� Soil Map Unit Points
Special Point Features
U Blowout
' ` Borrow Pit
tt Clay Spot
Clased Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
_ Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
_ Severely Eroded Spot
Sinkhole
. Slide or Slip
0o Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
- Wet Spot
Other
. Special Line Features
Water Features
Streams and Canals
Transportation
,+. Rails
ti Interstate Highways
US Routes
Major Roads
Local Roads
Background
� Aerial Photography
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 17, Sep 7, 2022
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
I'V,
USDn Natural Resources Web Soil Survey 4/10/2023
� Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—Larimer County Area, Colorado
Harmony House Building Addition,
Ft. Collins, CO
A-3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
74
Nunn clay loam, 1 to 3 percent
slopes
1.3
100.0%
Totals for Area of Interest
USDA Natural Resources Web Soil Survey
� Conservation Service National Cooperative Soil Survey
1.3
100.0%
4/10/2023
Page 3 of 3
�
�
0
498450
40° 31' 24" N I
�
�
�
�
0
�
�
498460
�
Hydrologic Soil Group—Larimer County Area, Colorado �
(Harmony House Bui�ding Addition, Ft. Collins, CO) �
0
A-4
498470 498480 498490 498500 498510 498520 4.98530
I I I ,, I I .I 40° 31' 24" N
40° 31' 20" N ' I I I I -I I
498450 498460 498470 4.98480 4984.90 498500
�
�
Map S�le: 1:547 iF printed on A portait (8.5" x 11") sheet.
� N Meters
0 5 10 ZO 30
� �
0 25 50 100 150
Map projection: Web Mercator Comer coordinates: WG584 Edge dcs: UTM Zone 13N WG584
USDn Natural Resources Web Soil Survey
� Conservation Service National Cooperative Soil Survey
�
���r�''�f� — �
�IiL•llilllll'�I ��� 1
�
�
I �
� �II
0
� �
_ �
�
�I �
I
�
_ �
0
�
�
�
� �
�
�
�
� �
499510 498520
I- 40° 31' 20" N
498530
3
iv
0
4/10/2023
Page 1 of 4
Hydrologic Soil Group—Larimer County Area, Colorado
(Harmony House Building Addition, Ft. Collins, CO)
MAPLEGEND
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
� A
� A/D
0 B
� B/D
0 C
0 C/D
� D
� Not rated or not available
Soil Rating Lines
;•ti� A
o �
� C/D
Q D
� Not rated or not available
Water Features
Streams and Canals
Transportation
,+. Rails
ti Interstate Highways
US Routes
Major Roads
Local Roads
Background
� Aerial Photography
,,�,y A/D
N B
„y B/D
. � C
�y C/D
,•�y D
.. Not rated or not available
Soil Rating Points
O A
o �o
■ B
� s/�
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 17, Sep 7, 2022
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
A-5
USDn Natural Resources Web Soil Survey 4/10/2023
� Conservation Service National Cooperative Soil Survey Page 2 of 4
Hydrologic Soil Group—Larimer County Area, Colorado
Harmony House Building Addition,
Ft. Collins, CO
� �
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
74
Nunn day loam, 1 to 3 C
percent slopes
Totals for Area of Interest
Description
1.3
1.3
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff:� None Specified
100.0%
100.0%
USDA Natural Resources Web Soil Survey 4/10/2023
� Conservation Service National Cooperative Soil Survey Page 3 of 4
Hydrologic Soil Group—Larimer County Area, Colorado
Harmony House Building Addition,
Ft. Collins, CO
�
Tie-break Rule: Higher
uSDn Natural Resources Web Soil Survey 4/10/2023
� Conservation Service National Cooperative Soil Survey Page 4 of 4
Runoff Coeffecients
Sub-Basins
Project: Harmony House Building Addition
Location: 3105 E. Harmony Road
Fort Collins, CO
Project Number:1068-3
Date: 7/19/2023
I�
Consultants, Inc.
16911 Potts PIacE. MEad, CO
970.217.9148
troy@i2-consultants.com
All calculations presented are based upon the criteria set forth in
Citv of Fort Collins Storm Drainaqe Desiqn Criteria
9/1 /2018
Existinq
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
1 % of site area
Lawns, Sandy soil (flat <2%) 0.13 5456.0 0.15 2.00 61.0°/o
Playground 0.03 1308.0 0.50 25.00 14.6%
Curb & gutter and walks 0.03 1092.0 0.95 100.00 12.2%
Gravel/Deck 0.02 680.0 0.50 40.00 7.6%
Roofs 0.01 409.0 0.95 90.00 4.6%
Avg. 0.36 24.24 100.0%
Total Area 0.21 0.36 24.24
Proposed
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
1 % of site area
Lawns, Sandy soil (flat <2%) 0.11 4740.0 0.15 2.00 53.0%
Playground 0.02 720.0 0.50 25.00 8.0%
Curb & gutter and walks 0.02 985.0 0.95 100.00 11.0°/o
Gravel/Deck 0.00 0.0 0.50 40.00 0.0%
Roofs 0.06 2500.0 0.95 90.00 27.9%
Avg. 0.49 39.24 100.0%
Total Area
0.21 0.49 39.24
Increase/Decrease in Impervious Area
(ac) (sq.ft)
Design Point Surface Improvement Area Area Comments
1
Playground
Curb & gutter and walks
Gravel/Deck
Roofs
Avg.
-0.01 -588.0
0.00 -107.0
-0.02 -680.0
0.05 2091.0
Reduction in area
Reduction in area
Reduction in area
Increase in area
Total Area
0.02 716.00
Netlncrease
� •
CASA_I mperv.xlsx\Su b-Basi ns 7/ 18/2023
TIME OF CONCENTRATION - 2-YEAR
PROJECT,
CALCULATED BY:
Cf = 1.00
Harmony House Building Addition
i2 Consultants, Inc.
DATE: 7/19/2023
� �.
RURAL OR NON URBANIZED
SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS
DATA TIME (To�) (t�) (URBANIZED) tc
BASIN DP AREA C C�Cf Length Slope t� Length Slope R V tt to Total L t�
ID Ac Ft % min Ft (fUft) Ft fps min min ft min min
(0) (1) (2) (3) (4) (5) (6) (7) (8) (8a) (9) (10) (11) (12) (13) (14)
H-A 1 0.21 0.36 0.36 20 2.0 4.9 75 0.020 1.0 1.5 0.8 5.7 95 10.5 5.7 Use Tc = 5.7 mins
A 1 0.21 0.49 0.49 45 2.0 6.1 50 0.02 1.0 1.5 0.6 6.6 95 10.5 6.6 Use Tc = 6.6 mins
�
z
3
4
5
6
7
Equations:
Non-urban
Tov 1. 87(1.1-CC f) �D^ v2 tt = L
S �1/3 6�V V=CVSW0.5
(1) (2) or Fig. 3-3
Velocity
V (1.4/n)*(R^2/3))*0.5)
S in fUft, R= Area/Wetted Perimeter in ft, n= Roughness Coeff.
Urbanized
t� _ (L/180)+10
(3)
TIME OF CONCENTRATION -100-YEAR
PROJECT.�
CALCULATED BY.
Cf = 1.25
Harmony House Building Addition
i2 Consultants, Inc.
DATE: 7/19/2023
RURAL R N N URBANIZED
SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS
DATA TIME (To�) (tt) (URBANIZED) tc
BASIN DP AREA C C'Cf Length Slope t� Length Slope R V h tc Total L tc
ID Ac Ft % min Ft % Ft fps min min ft min min
(0) (1) (2) (3) (4) (5) (6) (7) (8) (8a) (9) (10) (11) (12) (13) (14)
H-A 1 0.21 0.36 0.45 20 2.0 4.3 75 0.02 0.0 1.5 0.8 5.1 95 10.5 5.1 Use Tc = 5.1 mins
A 1 0.21 0.49 0.61 45 2.0 4.9 50 0.02 1.0 1.5 0.6 5.4 95 10.5 5.4 Use Tc = 5.4 mins
�
�
z
3
4
5
6
Equations:
Non-urban
Tov 1.87(1.1-CC�)'D^v2 tt= L
S �1/3 6�V V=CVSW0.5
(1) (2) or Fig. 3-3
Velocity
V (1.4/n)*(R^2/3))*0.5)
S in ft/ft, R= Area/Wetted Perimeter in ft, n= Roughness Coeff.
Urbanized
t� _ (L/180)+10
(3)
� 1
Rational Method
Direct Runoff - 2-YR
A-11
Project: Harmony House Building Addition
Location: 3105 E. Harmony Road
Fort Collins, Colorado
Project Number 1068-3
Date: 7/19/2023
��
Consultants, Inc.
16911 Potts Place, Mead, CO
970.2D.9148
troy@i2-consultants.com
Rational Method: Q= C,CIA Q: Q: Runoff in cfs (peak)
C: C: Runoff Coefficient
Cf: Cf: Frequency Adjustment Factor
I: I: Rainfall Intensity (in/hr) for design event
A: A: Basin Area (acres)
2-YEAR
Design Point Basin ID Area C CfC t� I QZ
1 H-A 0.21 0.36 0.36 5.7 2.72 0.20
1 A 0.21 0.49 0.49 6.6 2.58 0.26
C:\Users\troy�Dropbox�I2�Projects\1068-3 CASA\Documents\Drainage\CASA rational.xlsx 7/18/2023
Rational Method
Direct Runoff - 100-YR
A-12
Project: Harmony House Building Addition
Location: 3105 E. Harmony Road
Fort Collins, Colorado
Project Number 1068-3
Date: 7/19/2023
��
Consultants, Inc.
16911 Potts Place, Mead, CO
970.2D.9148
troy@i2-consultants.com
Rational Method: Q= C,CIA Q: Q: Runoff in cfs (peak)
C: C: Runoff Coefficient
Cf: Cf: Frequency Adjustment Factor
I: I: Rainfall Intensity (in/hr) for design event
A: A: Basin Area (acres)
100-YEAR
Design Point Basin ID Area C CfC t� I Q,00
1 H-A 0.21 0.36 0.45 5.1 9.89 0.92
1 A 0.21 0.49 0.61 5.4 9.69 1.22
C:\Users\troy�Dropbox�I2�Projects\1068-3 CASA\Documents\Drainage\CASA rational.xlsx 7/18/2023
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
Table 3.2-2. Surface Type - Runoff Coefficients
Surface Type Runoff Coefficients
Hardscape or Hard Surface
Asphalt, Concrete 0.95
Rooftop 0.95
Recycled Asphalt 0.80
Gravel 0.50
Pavers 0.50
Landscape or Pervious Surface
Lawns, Sandy Soil, Flat Slope < 2% 0.10
Lawns, Sandy Soil, Avg Slope 2-7% 0.15
Lawns, Sandy Soil, Steep Slope >7% 0.20
Lawns, Clayey Soil, Flat Slope < 2% 0.20
Lawns, Clayey Soil, Avg Slope 2-7% 0.25
Lawns, Clayey Soil, Steep Slope >7% 0.35
3.2.1 Composite Runoff Coefficients
Drainage sub-basins are frequently composed of land that has multiple surface types or zoning
classifications. In such cases a composite runoff coefficient must be calculated for any given drainage
sub-basin.
The composite runoff coefficient is obtained using the following formula:
„
� (c,xA� )
c = __�
A,
Where: C= Composite Runoff Coefficient
C; = Runoff Coefficient for Specific Area (A;), dimensionless
A; = Area of Surface with Runoff Coefficient of C;, acres or square feet
n= Number of different surfaces to be considered
At= Total Area over which C is applicable, acres or square feet
3.2.2 Runoff Coefficient Frequency Adjustment Factor
Equation 5-2
The runoff coefficients provided in Table 3.2-1 and Table 3.2-2 are appropriate for use with the 2-year
storm event. For any analysis of storms with higher intensities, an adjustment of the runoff coefficient is
required due to the lessening amount of infiltration, depression retention, evapotranspiration and other
losses that have a proportionally smaller effect on high-intensity storm runoff. This adjustment is
� �� 3.2 Runoff Coefficients
r,�t CO��IC1S Page 5
���
FORT COLLINS STORMWATER CRITERIA MANUAL
Hydrology Standards (Ch. 5)
3.0 Rational Method
applied to the composite runoff coefficient. These frequency adjustment factors, Cf, are found in Table
3.2-3.
Table 3.2-3. Frequency Adjustment Factors
Storm Return Period Frequency Adjustment
(years) Factor (Cf)
2, 5, 10 1.00
25 1.10
50 1.20
100 1.25
CxCF
PRODUCT OF CxCF
CANNOT EXCEED THE
VALUE OF 1
3.3 Time of Concentration
3.3.1 Overall Equation
The next step to approximate runoff using the Rational Method is to estimate the Time of
Concentration, T�, or the time for water to flow from the most remote part of the drainage sub-basin to
the design point under consideration.
The Time of Concentration is represented by the following equation:
T�=T;+Tt
Where: T� = Total Time of Concentration, minutes
T; = Initial or Overland Flow Time of Concentration, minutes
Tt = Channelized Flow in Swale, Gutter or Pipe, minutes
3.3.2 Overland Flow Time
Overland flow, T;, can be determined by the following equation:
1.87(1.1—CxCf)�
T, 3�
Where: C= Runoff Coefficient, dimensionless
Cf = Frequency Adjustment Factor, dimensionless
L= Length of Overland Flow, feet
S = Slope, percent
City of
F�t`�`
Equation 5-3
Equation 3.3-2
OVERLAND FLOW LENGTH
L=200' MAX IN DEVELOPED AREAS
L=500' MAX IN UNDEVELOPED
AREAS
3.3 Time of Concentration
Page 6
FORT COLLINS STORMWATER CRITERIA MANUAL
Hydrology Standards (Ch. 5)
3.0 Rational Method
Table 3.4-1. IDF Table for Rational Method
Duration
Intensity Intensity Intensity
(min) 2'Year 10-year 100-year
(in/hr) (in/hr) (in/hr)
5 2.85 4.87 9.95
6 2.67 4.56 9.31
7 2.52 4.31 8.80
8 2.40 4.10 8.38
9 2.30 3.93 8.03
10 2.21 3.78 7.72
11 2.13 3.63 7.42
12 2.05 3.50 7.16
13 1.98 3.39 6.92
14 1.92 3.29 6.71
15 1.87 3.19 6.52
16 1.81 3.08 6.30
17 1.75 2.99 6.10
18 1.70 2.90 5.92
19 1.65 2.82 5.75
20 1.61 2.74 5.60
21 1.56 2.67 5.46
22 1.53 2.61 5.32
23 1.49 2.55 5.20
24 1.46 2.49 5.09
25 1.43 2.44 4.98
26 1.4 2.39 4.87
27 1.37 2.34 4.78
28 1.34 2.29 4.69
29 1.32 2.25 4.60
30 1.30 2.21 4.52
31 1.27 2.16 4.42
32 1.24 2.12 4.33
33 1.22 2.08 4.24
34 1.19 2.04 4.16
35 1.17 2.00 4.08
36 1.15 1.96 4.01
37 1.16 1.93 3.93
38 1.11 1.89 3.87
r�-t,���
Duration
Intensity Intensity Intensity
2-year 10-year 100-year
(min) (�n/hr) (in/hr) (in/hr)
39 1.09 1.86 3.8
40 1.07 1.83 3.74
41 1.05 1.80 3.68
42 1.04 1.77 3.62
43 1.02 1.74 3.56
44 1.01 1.72 3.51
45 0.99 1.69 3.46
46 0.98 1.67 3.41
47 0.96 1.64 3.36
48 0.95 1.62 3.31
49 0.94 1.6 3.27
50 0.92 1.58 3.23
51 0.91 1.56 3.18
52 0.9 1.54 3.14
53 0.89 1.52 3.10
54 0.88 1.50 3.07
55 0.87 1.48 3.03
56 0.86 1.47 2.99
57 0.85 1.45 2.96
58 0.84 1.43 2.92
59 0.83 1.42 2.89
60 0.82 1.4 2.86
65 0.78 1.32 2.71
70 0.73 1.25 2.59
75 0.70 1.19 2.48
80 0.66 1.14 2.38
85 0.64 1.09 2.29
90 0.61 1.05 2.21
95 0.58 1.01 2.13
100 0.56 0.97 2.06
105 0.54 0.94 2.00
110 0.52 0.91 1.94
115 0.51 0.88 1.88
120 0.49 0.86 1.84
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
FORT COLLINS STORMWATER CRITERIA MANUAL
Hydrology Standards (Ch. 5)
3.0 Rational Method
Figure 3.4-1. Rainfall IDF Curve — Fort Collins
io.00 .
9.00
8.00
7.00
�
0
� 6.00
N
N
L
C
�+ 5.�
�N
C
d
C
C 4.00
�
�._
�_
�
�
�
\
♦
\
\
3.00
� -�
� ��
� ��
♦ ��
` �
2.00 � � �
� ���
��� ������
�� � �
�� ����
1.00 — � � � � � � � �� � � _ _ _ _ � � � � � ���� � � � � � � � � � �`
I�'����������������������������
0.00 .
0 10 20 30 40 50 60 70 80 90 100 110 120
Storm Duration (minutes)
c�tyof 3.4 Intensity-Duration-Frequency Curves for Rational Method
F�tf Page 9
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
: � � ►I ►�
Table 4.1-2. Land Use - Percent Impervious
Percent Impervious
Land Use (%)
Residential
Urban Estate 30
Low Density 50
Medium Density 70
High Density 90
Commercial
Commercial 80
Industrial 90
Undeveloped
Open Lands, Transition 20
Greenbelts, Agriculture 2
Offsite Flow Analysis (when
Land Use not defined) 45
Reference� For further guidance regarding zoning classifications, refer to the Land Use
Code, Article 4.
For Final Plan (FP) submittals, impervious values must be based on the proposed land surface types.
Refer to Table 4.1-3 for recommended percent impervious values.
Table 4.1-3. Surface Type — Percent Impervious
Percent Impervious
Surface Type (%)
Hardscape or Hard Surface
Asphalt, Concrete 100
Rooftop 90
Recycled Asphalt 80
Gravel 40
Pavers 40
Landscape or Pervious Surface
Playgrounds 25
Lawns, Sandy soil 2
Lawns, Clayey soil 2
r�t����
4.1 Input Parameters
Page 11
�
1
'
'
,
1
'
'
'
'
'
'
'
,
'
'
'
'
'
:y . �y :a J('�'' °� r
:� � .�s� itti��� . xl�;1.,, r 4 r.�
• • • •• • -. ' - .
�.�a � .
�.. . :.. �� 'l*r � i I
i
, ..
Addendum to the Final Drainage and
Erosion Control Study for
Harmony Technology Park
First Filing
Fort Collins, Colorado
Prepared for:
MAV Development
303 Detroit Street, Suite 301
Ann Arbor, Michigan 48104
Prepared by:
Stantec Consulting, Inc.
209 South Meldrum
Fort Collins, Colorado 80521
(970)482-5922
ad �
/
�
5�11�C
1
1
1
'
,l
�J
'
1
,
'
LJ
'
t
'
'
'
'
1
1
APPENDIX B
EXCERPTS FROM
FINAL DRAINAGE AND PROJECT
DEVELOPMENT REPORT
FOR
HARMONY TECHNOLOGI�' PARK
FIRST FILING
'
'
:1
'
,
1
1
'
'
1
'
'
'
'
'
,
1
'
'
1
Job Name: Harmony Technology Park
Client: Celest�ca
Date: 11 /12/97
By: The Sear Brown Group
Job Number 785-001
File Name: celestica drainage.dat
OMPOSITE RUNOFF COEFFICIE�iTS
0
Basin Area Imperv. Pervious C C Comp. Percent
# (A�) _ Area (Ac) Area (Ac) Imperv. Pervious C Impervious
1 3.77 " 3.51 0.26 0.95 0.2 0.90 93.10
3 1.97 1.6 0.37 0.95:. `-- : 0.2 . 0.81 81.22
� 4 - 0.52: ' 0 , 0.52 0.95 ' 0.2 0.20 0.00
5 1.8 0 1.8 � 0.95 0.2 0.20 0.00
6' 3.35 -:'=`1.82�°�- 1.53 0.95 0.2 0.61 54.33
� 1.34 1.28 0.08 0.95 0.2 0.91 94.03
8 1.41 1.31 0.1 0.95 0.2 0.90 92.91
9 2.68 2.3 0.38 0.95 0.2
0.84 85.82
10 2.93 2.93 0 0.95 0.2 0.95 100:00
11 8.07 0 8.07 0.95 0.2 0.20 0.00
OS-1 1.45 0.54 0.91 0.95
0.2 0.48 37.24
OS-2 2.21 1.36 0.85 0.95 0.2 0.66 61.54
OS-3 2.31 1.08 1.23 0.95 0.2 0.55 46.75
�S-4 0.94 0.18 0.76 0.95 0.2 0.34 19.15
� •
OS-1=WEST PART OF HARMONY RD.
OS-2=TECHNOLOGY PARKWAY
OS-3=EAST SIDE OF COUNTY RD. 9
OS-4=EAST PART OF HARMONY RD.
ot tin Utt�c�ai Lopy
.
a
�
�
� � � � � � � � � � � � � � � ■� � � �
ob Name Harmuny Tech Park
Client CelesUca
Date ,,,,:,., Time of Concentration (10 year)
By The Sear Brown Group
Job Number 785-001 Ti = Tc =(1.87(1.1 - C x C�D^0.5)!S^(1/3)
File Na e Celestica Drainage dal Cf = 1.0
Sub-Basin Data Initial/Overland Time
Travel Time Composite C Final Remarks
Desig Area C Length Slope Ti Length Slope Velocdy Tt Calculations Tc
�a0� lhl (%) (min) (ft) TVPe (%) (ft/s) (min) (min)
� 3�� 050 18 500 094 670 p 7.gp 25 q4�
SAO
3 � g� � B1 6� 2 00 3 34 300 P 2.30 1 6 3.13
6A7
4 0 52 0?0 20 ?5 00 2.57 140 G 070
2 ��� 5.00 Use a 5 minute mimmum
5 � 8 020 25 25A0 2.88 300 G 070 2 2.50
5 38
6 3.35 0 61 60 2A0 5.66 390 P 1.gp 2 325
8.91
7 1.3a 0 91 10 2A0 0.91 235 P
2.30 1.6 2.45 SAO Use a 5 minute mimmum
8 � 41 � 90 �4 2 00 0.95 205 P
2.4� 22 �,55 5.00 Use a 5 mmute minimum
9 2 68 0. 84 20 2.00 1. )0 930 P 0.80 2 775
10 2 93 0 95 5 9.45
2.00 0.50 400 P 2 80 i.6 4.17
� 1 B 07 5.00 Use a 5 minute mmimum
0 20 320 0 70 33.97 500 G 0.60 22 3 �g
OS-1 1 45 0 48 ? 37 70
� 1.23 4 B4 610 P 7.80 2.5 4.07
OS-2 2 21 0 66 8.91
20 1 23 3.42 750 P 1.8 1.95 6 41
OS-3 2 31 0 55 ? 9.83
� 1 23 4.29 1080 P 1.90 1 B 10A0
OS-4 0 94 0 34 ?p � � 1429
3 5.90 560 P 1 8 2 5 3.73
9 64
�
� � � � � � � � . � � � � � � � � � � �
Jub Name: Hannony Tech Park ' ; �
Client: Celestica � �
Date: ,�nz�9� Time of Concentration (100 year) '
By: The Sear Brown Group
Job Nu 785-001 TI = TC =(1.87(1.1 - C x C�D"0.5)/S^(1/3)
File Name: Celestica drainage.dat �
Cf = 1.25
Sub-Basin Data Initial/Overland Time Travel Time Composite C Final Remarks ,
Desig: Area C Length Slope Ti Length Slope Velocity Tt Calculations Tc
(ac) (h) (%) (min) (h) (%) (�s) (min) _ i
� 3.77 0.90 �g (min) ,
5.00 0.46 670 1.90 2.5 4.47
5.00
3 1.97 0.81 60 2.00 1.02 300 2.30 1.6 3.13 '
5.00 Use a 5 minute minimum �
4 0.52 0.20 � 20 25.00 2.43 140 0.70 2 1.17
5.00, Use a 5 minute minimum
5 1.8 0.20 ' 25 25.00 2.72 300 0.70 z �
2.50 5.22
6 3.35 0.61 60 2.00 3.92 390 1.90 2 3.25
7 1.34 0.91 10 7.17 4
2.00 0.47 235 2.30 1.6 2.45
5.00 Use a 5 minute minimum
8 1.41 0.90 10 2.00 0.47 205 2.40 2.2 1.55 1
5.00 Use a 5 minute minimum �
9 2.68 0.84 20 2.00 0.30 930 0.80 2 7.75
8A5
10 2.93 0.95 5 2.00 0.33 400 2.80 1.6
4� � 5.00 Use a 5 minute minimum
11 8.07 0.20 320 0.70 32.02 500 0.60 '
2.2 3.79 35.81 . �
OS-1 1.45 0.48 20 1.23 3.91 610 1.80 2.5 4.07 �
OS-2 � 2.21 0.66 7.98 � E
20 1.23 2.13 750 1.80 1.95 6.41 � '
OS-3 2,31 8.54 `
0.55 20 1.23 3.21 1080 1.90 1.8 10.00
OS-4 O.gq 13.21
. 0.34 20 1.23 5.23 560 1.80 2.5 3.73
_ 8.97
�
� � � � � �:• � � � � � � � � � � � � �
e � r .,
Job Name: Harmony Tech. Park � - �
Client: Celestica .
Date: StOR11 Drainage System Preliminary Design Data
BY The Sear Brown Group
Job Number: 785-001
File Name: Storm 10 yea� Cf = 1 A -
Celestica drainage.dat _ , - .
�������
00_�__�
��_�__-
s�a�����
s�s� �. ���
sa� ., ���
.��� �___
��1 _�___
��_��___
��_�___
��_�=__
��_�___
������■��..�.
C
C
z
Dinct Ww � ToW Stra�l
C IntanMV Mu Rundl RwwR RunoM Slop� C�W
I�NA�) fac) ldal Ich) lcis) (%) Ich
OBO SIB 3.7! 18.16 18.�8
oe� s.�2 �.e� e.ie aie
o m s e o.0 o.se o.se
ozo ss ie �.ee i.ee
oe� �e 3.is e3a e.3e
oai 58 ts� e.�o e.�e
0.90 � S.B � �� v �.
-"' •.a [.a0 10.17
oes s.e z.a� �e.ss
0.20 2.3 B 07 3J7
O.W �.B 1.15 3.70
0.88 /,1 2.21 8.13
O55 ' 3A 2.91 1.83
0 50 - 5 8 275
osa .o ..e
077 IB B�
7�OB
10.17
1.83
�ar
ao.
Sbps Siz�
1%) 6N
.
"m ��ps � RemaAit
�D^ Valociry Owpn V�kc�1y .
(c1s) (Itla) (ds) (Ns) -
CUH6 CUT TO POND A
CURB CUT TO PoNO B
aor+o e u�
FONO A AREA
- TVPE'R' INIEf IN SUMP
AREA INLET
TRENCH DRAIN
CURB CUT TO SWALE
BUIIDING ROOF
OPEN MEA
HARMONY RD
TYPE R INLETS TO R��<
T'PE R wLE7
30' RCP lo
��
� � � � � � � � � � � � � � � � � � �
Job Name: Harmony Tech Park �
Cliant: Celestica .
�aie: - Storm Drainage System Preliminary Design Data
BY The Sear Brown Group
Job Number 785-001
File Name: Celestica Drainaye.dat Storm 100 year Cf = 1.25
�������
ao� ,. ���
aa� .. ���
ao����i
oa��m■���
ao� �� ���
��■_�___
�m_�___
�� �___
��_�___
_� �___
��_�_=�
■���m���
������..-
ann om.r rorai snen
C InWisrty Ana Runolt Rumll Rurroll Slope Gpu
(�tl lac) (ctal (cic) 1c1a1 (%1 (ch
O.BO Y.00 3.77 33.83 93.83
O.Bt Q00 t.B7 17.73 17.73
� 010 8.00 0.57 1.17 1.17 .
o zo e.eo �.e � o� �.oi
061 B.ZO 3.35 20.88 20.88 .
0 91 Y.Op 1 3r 12.OE 12.08
0 GO
. . 0.� 1.�1 12.BB
0.� 7.� 2.68 71.17
0.95 8.00 Z.B3 38.37
O.X� 970 8.07 7.�8
0.18 7.80 1.�5 B.eE
O.6b I]0 2.77 1107
0.� 8 � 3.31 10.10
0.3/ 7.E0 0.&1 3.07
O u B 7.7$ 2�.7$
o� �e .a ��.
0 �, �.8 B.� 80.58
0.71 9.35 5.08 1B.)]
28�97
7.18
10�10
9.07
fi0�_SB
28.72
RariwNs
�W Sii�
t+y nm
Dssipn VNocM �+Wn VNocny
t�l lws7 l�l �w.i
CURB CLfT TO POND A
CURB CUi TO PONO B
POND B AREA
VONO A AREA
NPE'R' INLET IN SUMP
AREA W�f
TRENCH ORAIN
CUq6 CUf TO SWALE
BUILDING ROOF
OPEN AREA
HARMOryY RD
TYPE R IN�EfS TO RETENit(
_ TVPE R WLEf
�; . � . ,�� . ' ,.
u'
- -- --- - `
� _-_'_ �' 1qg26)�� � ..
-_--- i4925) -__ _____--��� \`�. � ��_ .
--'_ _ _ _____ ___" - i' �\ <. .g
_________________ �`\ __ AVAGO -�'� � ��
- _____'__' ' _- ___\ ______- ' \ ,1�
___ J2 LF
� ) - � ` � �.
"____���4929�i __.i'_,_.� - ___ � ___ � ':�` . \V
-_l_- c.. ����� �
'__ _ _- �. _��.*__._ �
" _ ___ - __ . . _ .
'_ _ _ __ -_-� - __ __ ..
_ _ __ ' '_ _ _ - __ � _
�-_"__' — "� — — ' '_-- —1 � �- � _� .'_. _. ____
_ _ _ _ _ �
�--�--- _ _ _ ` �— -- — — D50 - 13� RIFRRF_. — �I
\ � PUCE W/IN WINCWALLS
— � � — sJ � — 49?g f . _ _ _ � 34_CDOT CLA55 A BEDO�rvC = I I
_ — - � T � J —. — f— .- _...
\J __ y . . _ .. _ . . - I r
= __ _ � �
— ______ ___ -'I�I
__. ,y �A i
. �-_ - HARMONY ROAD - - -- '- "
_ -... /
�,. .
a �,
� }I i
�n kf F �
(� li II
� r
, I ` li � �. �a tv
t�
` ' �,.:.. y - } .
`
+'+22� 1 J' � �'.' .1
1.�
___. �9�� _ __-
_� _
NEW iB� STqiM 'H' ��
�SE�T C-RS � �
� "__�
t-�--: -� ._ _
...._ . � � �-T _ � . r �. . _ /nA11 �� �..
�� - ���_ � E%IS11NG iB�
--_— - - - } M RAIN
��^ti � .. � - �-.�� — STINt D
�i � . ��D�S..SS���/ ` — 92/
1<W] .� 15�W 16�00 % 1]�CO ' TGNELEVI9YL]2 �IB I 1�. ' � 19W '.= � '
STRIBKO � _— }}}
� I-1 — �_ , -f— —� '� �f� —� � CFFSET�.R<OR -� —} - - ...
F ^ .. � _... �� ..��1�� /pq1-" .' si�..� I ���
— _y '
.-__.___ ._.-___ rowe�tvanue �:. � �- �-�- I \�
,.i _____ " svCuwearirrvaszioe -- �� ___ 1�• ."
' .__+}___ .. sren.ra.e� - ' I�l I _�
� � � � _ arsE ss�ese � "'. ov=se* nnA . �' Q � . � sszz- . � - . . ♦ O,4 �iti ' � .. , , .
_ '.,1�, . � ': , ` . �9b . � � T I i � I
�p � �,. _ -� - - ---
_
� „ , - = - - - -r�,E��.�� r �
��� ,
I 1' I I M �' — .'� ''.. SLA9YA �� I I.����
L-�-J ' _� ::: I � ��-• • . OFFSEt283F SO�WE�.�a9II<] �� N.� _�
�� .. iOWELEW9Ei.53 .pFF5EtJ851R . � . .
STAP W I
.. _ - : OfFSE('.55.%R � TbNELEV�9i�Ji I 1
. _ _ _ _ _ - - _ . — . . . SWCVtVERLINJ�9N.9E I .
I �\ � — -_ . �. I WI�EMEiK . . __ SiAI]q6 . � / � / i / �� � ,'� I
� iI � �
— -� SIOEW0.KCH45E --_ ��iF5EF51AJfl / A I
� \ / . % ___ -i_ __'' __ _ - -- _seesneerceoo - _ _ . . � ' ��� i � � �� �� � �� �� I.i
r C , � � �A �! i _A �� ��' � ill �
�
L
n
n
w - --
o .... __(a92o) _-. ". .. ,- � HEWLETTPACKARD --. _--
Q __-(4919) --- -''- . �� (4915) - -
w = _ == =- -_
� _- � -- - , - _ - _ -
_ � _�_ _ _ --" . _
_—'_- _ _- _ _-
___ - -_-_--�. . -. __ - __ _-- _
_-s- . � ._.. _ -- _ '- . .. - _ _ _
__ - � �
— . . _ - __ . � _.._ _- ".
� - -^g � .. . ' � �
� _. . " _ __ _-' ,
_ _ _ i - _ ��- ..— - — -"f"to_- �
.__ NEW�' STORM'H�- _ "' . . - - .. . _ ._ �I . - 1 }
SEE SHEEt C 135 � � � Efl0901J CON1R0. FABRIC � � " - � / /
\ �I D50 - 6' BURIED RIPRPG �I NAG 95 �\ �
/ 5' Loxc x Y oEPiH x 5' MOE -- / � 5[[ SHEET C-t2t 3
% _�--�
I 1� .- 12' C�OT ClASS A BEDOING � / P /eq � -�� ___ .
��9 �4� ib91g� h _ -.
_ - � �—��� . _
_ -- - ___. .. . . . . . _ ___ _-
---' -- HARMONY ROAD - � � -
_ --_
_ _____� . ______. . . —� —�
..'_ ____ ___ —_ .- '
__ _ _ _ _ - � . . _—
. � _____-=1. . . . -__ - -- - _
�� 9� _ 9 / _
. B .._. -� - -
0 — — -�.,��>9� 2] N�N i .. 35�N 2EN ]YO� �-.]9W'J — — -
N W
— I � _ _ _ _ .. . I � - " � - _ �' ` ' . ' .
e ' _ . _ .. __ - � . ..-- -' __' -_._� � ___ .
___ ,,: _ -, _ _�.. - r -_.— - .'_ --� .. _ -r=_ _
� ,. _ - _ '___ _ ,_ . --..' ._ .' ...
`-. � ___ _—_ . .. ,
_._ -�..__w�-_.__�__—�. - ,. -_-_ .. . _. . . ._ . _ _ _ -� �..>r- -_ _ . .
_ o ___ . ___ __ - -_ .. __._. . _ . . - .
$ o . . --_ .. _- _ .__ _ .. � .- � .� . A __< - �-_.��.. — _ - - . . - __ ._
� ._ . .- ___ - c_ �_ • � - - ' -. �F - dw . -
' 'V .. - - - -_ ._ JlO- . �- —.L . - . J__� _. _
E F . - . _� . .. _ . .
3 �n ' � .. _____ . " .. , _ _
. .___-__�� _ _ � -.' _ - — _ - _ _ - _ _ �-
I _ _ _
g � ' ��
_ Z _
^ J
2 . � - _ _..-�. _. ..
� � _ . . - � � � �,
- E
�I
�
'���1
�. nuoisnaeeonaensnaeroeeseeoeo
nuo Mu�cHeo.iHcwoirvc aecr+noeo s�oaEs
nvo aoNo naews
2 CONTMCTORSHALLPROVIOETEMPOMRY
IRRIGPTION IN NON-IRRIWTE� GFASS SEEO
AREAS FOF ESTABLISHMENt OF GMSSES.
] STOCH PhES NOT TO E%LEE� 10' HIGH SOII.
l BLLOFFSREAflEP5015NfiBEoOURING
CONSTFOCTION A0.E TO9E RENEGETFtEO
AN� RETVRNED TO A$IMILAR CONOITION l�5
PRIOR TO GONSiqUCTION
- I W1IGNSIPANDHYMVLM�65%�
� EROSIONCONLPOLiABRIC
� STMWBPIECHECK�PM
'y � {�
€'d . p� s [
3' �4'S� J��fr}!�
��S � �gY 6
w"- $. m e � a"� F�
_ ?e
Ya �'
�[`���¢55e.
�5ns�a
j,� 4��`a°c
r^_P,
v��C
Y L,�II�IIY
I I�I�I�I�I�
I�
4 S
��4,�
g m'� g �'� � E
o (I8
I I �I �I �I �
I
I�
Illl�i
� STMWBPLEINLETFlIiEP I I I �
�� DiXECTIONOF0.0W I I�
tiF X� SILIFENCE
C�
iOW iOGOFWNH a
O Z
y �
oH � Jg
�D o
cu� unury rvonFicanory U a¢>. �
ceHrEROFw�oano0 '" �a �a
1-800-922-1987 " � � � "
E¢� Oz
E �
o � Ta o U �
roA a^'o i E� O
M.MeEA��.�rEs m
p E �po ` rnU'
a s � U O O
Ciry of Fort Collins, Colorado �� � LL� LL w¢
UTILITV PLAN APPROVAL � F
'IFPROVEO.
Cry Engmmr �a�� Pe�mit5eal
CNELNEO 4Y
WNer h Wmtewoler Otlty Do[e
CHECKm 9Y
Stormrn[er V[I�ly Dote
cnecKm er. po* g R �a oaie PRELIMINARY
CHECNEO HY: NOTFORCONSTRl1CTIpN
iroKc E g Oab oalnioe
CHECKED BE Date
MESE FIANS IV��E BEEN FEYIFMED 8Y iHE LOClL
EMIIT i0R CONCEW ONLY. iHE REVIEW WES NOi
IMPIX HESPoNSIBIt11Y H! iNE FEVIEWING
OEPIAINEM, TVE LOCA EH�tt ENGMEER. OR ME ��
LOGL EMIIY fOP I�CCURPLY NID CORPECiNESS OG
ME CALCOIATONS. NftMERNORE, iHE RENEY/ D�ES .:mowa �aee�
NOi IMPLY i1Ni OURNII11E5 OF IlEMS ON 1HE PlANS
Mf. lHE LINRL OIIM'TIIIFS REOUIRE�. iHE RMEW - -
SWLLL NOT BE CON51RUE0 IN ANT RE/SON PS pp� � �" o�
RCCEM�fICE OG RKWCVL HESPONSIBILIIY BY iME pr 'ngNan C-120
LOGL EMIIT GOfl AO�IIIOWL OI1PMfIlES �G IIEMS
SHOWN 11UT NAY BE FEOIIIRED DUkINC iHE ftevision SM1ael
CONSIPIICtION MiSE.
Q 6 0l 18
P�i
�
G�'�
�
v