Loading...
HomeMy WebLinkAboutDrainage Reports - 11/06/2023City of Fort Collins Approved Plans Approved by: sagenbroad Date: 11/06/2023 FINAL DRAINAGE REPORT ���1:3 Heartside Hill Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: CARE Housing, Inc. 1303 W. Swallow Road Fort Collins, CO 80525 Office: 970.282.7522 August 28, 2023 Job Number 21-1045-00 3 HIGHLAND ��VELOPMENT SERVICES August 28, 2023 Mr. Basil Hamdan, P.E. Fort Collins Utilities — Stormwater Department 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report for Heartside Hill Fort Collins Stormwater Department, ,� HIGHLAND _ �_ - � �� We are pleased to submit for your review, the Final Drainage Report for the Heartside Hill affordable residential housing project. This report describes the drainage design in accordance with the City of Fort Collins Stormwater Criteria Manual. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Highland DQvelo me�t Services Jas T. Claey ,.E., LEED AP %� �% Highland Development Services, Inc. 6355 Fairgrounds Avenue, Suite 100 � Windsor, CO 80550 � 970.674.7550 TABLE OF CONTENTS Tableof Contents ............................................................................................................................. i EngineerCertification ......................................................................................................................ii GeneralDescription and Location .................................................................................................. 1 SiteDescription and Location ...................................................................................................... 1 SiteSoils ....................................................................................................................................... 1 StormDrainage Criteria .................................................................................................................. 3 HydrologicCriteria ....................................................................................................................... 3 HydraulicCriteria ......................................................................................................................... 3 DrainageBasins ............................................................................................................................... 4 DrainageFacility Design .................................................................................................................. 5 DrainageConveyance Design ...................................................................................................... 5 Detention/Water Quality Pond Design ....................................................................................... 5 LowImpact Development ............................................................................................................... 6 Stormwater Pollution Prevention ................................................................................................... 8 Conclusions..................................................................................................................................... 9 References.................................................................................................................................... 10 Appendix....................................................................................................................................... 11 Appendix A— Site Descriptions, Characteristics, & References .................................................. A Appendix B— Rational Calculations ............................................................................................. B Appendix C— Pond Calculations .................................................................................................. C Appendix D— Low Impact Development Calculations ................................................................ D Appendix E— Inlet, Pipe, & Swale Capacity Calculations ............................................................ E Page i ENGINEER CERTIFICATION I hereby certify that this report (plan) for the final drainage design of Heartside Hill was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Stormwater Criteria Manual and Construction of Public and Private Improvements for the Responsible Parties thereof. I understand that the City of Fort Collins does not and shall not as ''ty for drainage facilities designed by others. L /C� �o S •�. ; y� rr, , t . : Jason T. Claeys, PE vJ��NAL Registered Professional Engineei State of Colorado No. 42122 Page ii GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION The project site is situated in the southeast quarter of Section 12, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, in the State of Colorado. The property consists of Lots 1 and 2, Block 1 of the Heart of the Rockies Second Subdivision, dated June 9, 1999. Heartside Hill is located within Lot 2, at the northwest corner of the intersection of S. Lemay Ave. and E. Trilby Rd. Lot 1 contains the existing Heart of the Rockies Christian Church. It is bounded by private residential lots to the north and west, E. Trilby Rd. to the south, and S Lemay Ave to the east. The existing church facilities are anticipated to remain. The site area is currently undeveloped and is approximately 8.84 acres. The development would consist of up to 72 CARE Housing for rent apartment units ([6] 12-unit buildings), 9 Habitat for Humanity (H4H) single-family detached lots, 2 L'arche group homes, and a planned shared community center to be designed and constructed at a future date. The project is anticipated to be completed in a single phase. The project site generally slopes from the southwest to the northeast at approximately 4% toward an existing pond at the northeast of the property. Storm runoff is currently conveyed from a grate inlet in the pond to a ditch along the east side of the property and into the existing storm drain sewer. The existing project site is approximately 0.0% impervious. No wetlands are located within the area of proposed development. The project site is not located within the FEMA floodway or floodplain and is within the non- printed FEMA FIRM panel 08069C1200F, effective 12/19/2006. The site is also not located within the City of Fort Collins floodplain. The proposed development includes six multi-family buildings with a clubhouse along with eleven low-income housing lots. The required parking areas, driveways, sidewalks, and open space are also included in the development. A rain garden is proposed to provide the stormwater quality enhancement requirement as a low impact development technique. The site was previously analyzed within the "Drainage Investigation for Heart of the Rockies Christian Church," prepared by Messner Engineering, Inc., dated June 29, 1999. SITE SOILS The Heatside Hill project site consists primarily of Renohill clay loam and a small portion of Longmont clay and are both classified as Type D hydrologic group. According to USDA/Natural Page 1 Resource Conservation Group, Type D soils a have very slow infiltration rate when thoroughly wet. These soils consist chiefly of clays that have a high shrink-swell potential, soils that have a high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils also have a very slow rate of water transmission. Per the "Preliminary Geotechnical Subsurface Exploration Report, Proposed Residential Development Lots 1 and 2, Heart of the Rockies Second Subdivision", prepared by Soilogic, Inc. dated August 13, 2021: "The subsurface materials encountered in the completed site borings were quite variable across the site, but generally consisted of a thin mantle of vegetation and topsoil underlain by brown/beige/rust lean clay with varying amounts of sand. A portion of the near-surface lean clay encountered at the location of boring 8-2 extending to a depth of about 3 to 4 feet below ground surface was somewhat mottled in color, appeared to contain bedrock fragments and was identified as possible existing fill material which may have been placed to develop present site grade. In general, the lean clay varied from medium stiff to very stiff in terms of consistency, exhibited variable swell potential (ranging from none to very high) at current moisture and density conditions and extended to depths between 2% to 18 feet below present site grade, where it was underlain by brown/olive/beige/gray/rust interbedded claystone/siltstone/ sandstone bedrock of varying composition. The bedrock varied from weathered to very hard in terms of hardness, also exhibited variable swell potential (ranging from low to high) at in-situ moisture and density conditions and extended to the bottom of each boring at depths ranging from approximately 15 to 30 feet below present site grades. In general, we judge the bedrock unit underlying the site to possess moderate to high swell potential overall." Groundwater was also observed during the subsurface soil exploration: "Groundwater was measured in borings 8-1, 8-2, 8-3 and 8-6 at depths between about 13 and 27 feet below ground surface, but was not encountered in any of the remaining site borings to the depths explored when checked immediately after completion of drilling. When checked seven (7J days after drilling, groundwater was measured in all borings with the exception of boring 8-3 at depths between about 5 and 15 feet below ground surface. The ground surface in the area of boring e-3 had been disturbed, such that subsequent groundwater level measurements could not be completed." There are not any borings within the direct vicinity of the proposed detention pond. The proposed detention pond bottom is 0.75 ft higher than the existing pond bottom. Currently there is no exposed ground water or wetland vegetation, so it is assumed adequate separation from groundwater is achieved. Page 2 STORM DRAINAGE CRITERIA This drainage report was prepared to meet or exceed the City of Fort Collins Stormwater Criteria Manual. The Criteria Manual and amendments to the Mile High Flood District's (MHFD) Urban Storm Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent imperviousness and runoff coefficients were calculated for each basin using the surface characteristics of each basin. The time of concentration was calculated using City of Fort Collins initial time of concentration and the intensity was calculated using the corresponding storm rainfall depth and the City of Fort Collins' Intensity-Duration-Frequency Curve. The City of Fort Collins area has a 2-yr, 1-hr rainfall depth of 0.82 inches and a 100-yr, 1-hr rainfall depth of 2.86 inches. These depths do account for the 1999 adjusted rainfall depths. HYDRAULIC CRITERIA The Heartside Hill storm drainage system will been designed to convey the minor and major storm events through the combination of private drives, storm sewer pipes and swales. Runoff flows determined with the rational method will be attenuated through the site. Inlet capacities will be calculated using MHFD's spreadsheet UD-Inlet_v4.05.xlsm. The Autodesk Hydraflow Express program will be used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales will be reviewed and where flows are found to be supercritical, the swales will be lined with turf reinforcement mat. All swale and pipe outlets will be protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection downstream of culverts. All supporting calculations are located in the Appendix. Page 3 DRAINAGE BASINS The Heartside Hill developed drainage basins are delineated by areas draining through the site. The drainage basins are placed to limit the runoff flowing from the site into Brittany Street. The site is broken into 3 main drainage systems: Drainage Basin D1: Drainage Basin D1 has an approximate area of 3.74 acres and is approximately 39.8% impervious. This basin consists of a portion of the existing church property and building, the future community center, the H4H single-family lots, and the park and open space. Runoff is conveyed via swales to a curb cut and is conveyed through Rain Garden D1 to detention Pond D. Drainage Basin D2: Drainage Basin D2 has an approximate area of 4.65 acres and is approximately 37.9% impervious. This basin consists of six low-income housing lots, private drives, parking areas, and detention Pond D. Runoff is conveyed to Pond D via swales, culverts and curb & gutter. Sub- Basins D2a, D2b, D2c, and D2d divide the overall Basin D2 for conveyance element sizing and capacity confirmation. Drainage Basin OS1: Drainage Basin OS1 pertains to the drainage from the existing improvements in Lot 1. This basin has an approximate area of 2.03 acres and is approximately 65.4% impervious. This basin consists of half of the existing church building, private drives, parking areas, and open space. Runoff is conveyed via roadways to a swale and to Rain Garden OS1 and ultimately to detention Pond D. A drainage easement is provided along the pathway to the detention pond. Page 4 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include swales, inlets, and storm sewer pipes. Stormwater detention and water quality enhancement are achieved through the use of detention Pond D and Rain Garden D1. DETENTION�4VATER QUALITY POND DESIGN An extended detention basin, Detention Pond D, will be utilized as the detention and water quality facility for Heartside Hill. For the preliminary drainage study, the FAA method was used to determine the detention volume needed. MHFD is referenced for the standard water quality capture volume (WQCV) with a 40-hr drain time. Below is a brief summary of the proposed design for the pand: Pond D: Extended detention basin for both Lots 1 and 2 with standard water quality treatment. A 100-yr orifice plate maximizes volume in the pond and restricts release rate into the existing stormwater system. The existing 100-yr release rate into the existing stormwater system is 13.2 cfs according to the Drainage Investigation for Heart of the Rockies Christian Church, prepared by Messner Engineering, Inc (Revised June 29, 1999). This release rate was established prior to the Fossil Creek Basin Master Drainage Plan update and is assumed to be included in the master plan. The 100-yr water surface elevation is 4911.03 feet, with a maximum depth in the pond of 3.28 feet. During an event that exceeds the 100-yr storm, or the pond outlet should be obstructed, overtopping will occur along on the east side of the pond into Lemay Ave. Pond Summary Table 100- Yr 100-yr Detention Combined Total pond WQCV 100-yr Max Pond Peak Peak WQCV Volume Volume Volume gottom WSE WSE Depth Inflow Release (ac-ft) �ac-ft) (ac-ft) Provided �ft) (ft) (ft) (ft) cfs (cfs) (ac-ft) Pond 44.16 13.20 0.08 0.82 0.90 1.46 4907.75 4908.86 4911.03 3.28 D Page 5 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: • Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or • Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID) techniques, Heartside Hill utilizes two (2) a bioretention ponds, Rain Garden D1 and Rain Garden OS1. Due to site constraints and the inability to treat the required amount of newly developed impervious area, the Rain Garden D1 is designed to treat a portion of the newly developed impervious area able to be directed to the bioretention pond, and Rain Garden OS1 is designed to treat the existing church impervious area. The rain gardens are designed to treat the total drainage area being directed to the rain garden. The result is that with the combination of both rain gardens, an equivalent of 83% of the total onsite impervious area is treated by a LID feature. The water quality capture volume provided within the LID features is: Rain Garden D1 is 2,914 cu-ft, and within Rain Garden OS1 is 1,845 cu-ft. Standard water quality capture volume is 0.08 ac-ft, treating the remaining area that is directed to Pond D. Both the LID and standard WQCVs provide an additional 20% volume to account for potential loss of volume due to the accumulation of sediment. Below is a description of the 4-step process for selecting structural BMPs: Mile High Flood District (MHFD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Page 6 Captured runoff from strategic areas are routed through bioretention pond/rain gardens. Rain gardens will slow runoff, promote infiltration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The bioretention pond/rain gardens are designed to provide water quality capture volume per Urban Drainage's recommendations and calculations. The captured runoff is designed for a 12- hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, durativn, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs The proposed project will improve upon site specific source controls compared to historic conditions by providing localized trash enclosures within the development for disposal of solid waste; a rain garden for water treatment prior to flows entering storm systems; and additional water quality measures to protect and prolong the design life of BMPS delineated in Step 1. Below is the Low Impact Development summary and all calculations are attached for reference. LID Treatment Summary Total Proposed Impervious Area 155,022 Total Impervious Area LID Treated (sq-ft) 128,370 Total % Impervious Area LID Treated 83% Water Quality Area Treatment Summary Description Area Area (sq-ft) (acres) Treatment Ratio Total Area Treated by LID 251,618 5.78 53.6% Total Area Treated by EDB 202,366 4.65 43.1% Total Area Not Treated 15,641 0.36 3.3% Total Improvement Area 469,625 10.78 100.0°/a Page 7 STORMWATER POLLUTION PREVENTION Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet protection, and gravel construction entrances. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto public streets or rights- of-way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6" coarse aggregate. The contractor will be responsible for clearing mud tracked onto public streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather conditions. Reference the "Erosion Control Report for Heartside Hill" for more detailed information. Page 8 CONCLUSIONS This Final Drainage Report for Heartside Hill has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed drainage system will be designed to convey the developed peak 100-yr storm water runoff through the site to the proposed detention pond, and ultimately to the existing storm system. Drainage conveyance systems is designed to convey drainage to the proposed roadways and collect onsite drainage and treat it in accordance with LID requirements before discharging it into the proposed detention pond. This drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities. It can therefore be concluded that development of Heartside Hill complies with the storm water jurisdictional criteria and the approved City of Fort Collins Stormwater Criteria Manual and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Page 9 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Mile Hi�h Flood Control District, Updated January 2016. 2. Fort Collins Stormwater Criteria Manual, Fort Collins Utilities, City of Fort Collins, Colorado, Dated December 2018, Adopted January 2019. 3. "Hydrologic Group Rating for Larimer County Area, Colorado", USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nres.usda.gov. [11/15/2021] 4. "Preliminary Geotechnical Subsurface Exploration Report, Proposed Residential Development Lots 1 and 2, Heart of the Rockies Second Subdivision", prepared by Soilo�ic, LLC, Dated August 13, 2021. 5. "Drainage Investigation for Heart of the Rockies Christian Church", prepared by Messner Engineering, Inc., Dated June 29, 1999. Page 10 APPENDIX Appendix A— Site Descriptions, Characteristics, & References Appendix B — Rational Calculations Appendix C — Pond Calculations Appendix D— Low Impact Development Calculations Appendix E— Inlet, Pipe, & Swale Capacity Calculations Page 11 APPENDIX A— SITE DESCRIPTIONS, CHARACTEIZISTICS, & REFERENCES Appendix A HEARTSIDE HILL ��i��_►� J (► ��I . �������������� � i � 1 ���� � � il ♦ ■�ii►: �1 . i���1� iniii������� ♦�1 ������ ��� � ♦ �1 � �i�D � �� . Di.■► �� �■ . �np �41 ii��ii i�, ��� Ui ����� I��►= ���� �i �i� �Iu� � iiii � ,�"� ,.- � i . � i. . .- =1 . •►•; , �'�� ��. -�� �= :� -- -- -. I -- -- �'�I ::-� . �%''%,'' .. � ::: __� %�:0:'�ii: ii � �`� �� �i •� � �� �/� ���4� � IIIIi1�. ����� pl'I .� I��� ��������■ pp = 1��� ■�������� mn � f::����C :���: ����C _ Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #24-94 ON THE NORTHEAST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND PORTNER DRIVE, ON TOP OF THE WEST END OF A CONCRETE HEADWALL ELEV= 4960.69 CITY OF FORT COLLINS BENCHMARK #25-94 ON THE NORTHWEST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND SOUTH LEMAY AVENUE, ON TOP OF THE SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE ELEV= 4913.16 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4960.69 (NAVD88 DATUM� - 3.19' NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4913.16 (NAVD88 DATUM� - 3.19' � Hydrologic Soil Group—Larimer County Area, Colorado � m asa�za asa�so aga�o asaaao asa�o asagza asa�so a�000 a�oao �° �'�"N I ,� S L_ I I_ I __� _ � E � �'� ``7 .�; - � �'W7���w `' ' ��,,., ,: . � , � � � , . , , , . ., , ¢ ' � ' �c' -- --- - — — — _ _— — �_ .. • F � , - r , ` - /`/ �\ ;'"� � '.�. ����'. . �y� �,#_ �� ` '.?'.!- .. \ _ :.;�. _ 7 �.� 'i 7', . _ � M � i Q�Q�Q����...((( �� �'• /�/� ���.� �w �1 � � ' � � - �; � . ��� � �T � .. ti= j . ,'• � 1R � s, . � � � �� ���'� � _ y i`�s A` ��i - � . � _ t ''� - � �� — .. ,�; , , . , �,; .:;4„r - � � — � � �_- -,�' ; �� � ,.. , : `' . Y� - � , � �,, ' � P �� �,� - - �r � ���1 ���" �� _ . ._ '�� � �' • � ^ J � R� t I� �T � � I � , � lil I� r.4 � r� •� � t�1 -• � — �t�' �''� " � r l � s ` � � � --' �� �I i: - ��, � � J a r �" � ����.• .��.� l°.C°J � ' ►� . •� v . + _ _� � I � r � � �� _ �� _- _ - _ � � -�-_ - �--_ -_-� _ - c�r, � ;-Soil Map may not be v,aliifd at th�"i's's a'I^. �� ��,�_ 40° 29' 39" N '._��� `•I I • ' �� � _ -_ �__� ��. 4�kA20 491760 499800 494840 49489� 49�,920 4,41960 49�5000 4�''i040 3 � Map Scale� 1:1,880 if printed on A landscape (ll" x 8.5") �eet ° N Meters � 0 25 50 100 150 /V � 0 50 100 Z00 30D Map projec�on: Web Mercator CAmer coordinates: WGS84 Edge bcs: UTM Zone 13N WGS84 Usbn Natural Resources Web Soil Survey � Conservation Service National Cooperative Soil Survey Hydrologic Soil Group—Larimer County Area, Colorado MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons � A 0 A/D 0 B 0 B/D Q C 0 C/D � D 0 Not rated or not available Soil Rating Lines � * A o � 0 C/D � D � Not rated or not available Water Features Streams and Canals Transportation � Rails ti Interstate Highways US Routes Major Roads Local Roads Background � Aeriai Photography . � A/D ,.v B ti B/D , � C . r C/o r,i D .. Not rated or not availabie Soil Rating Points 0 A 0 A/D ■ B � B/D MAP INFORM, The soil surveys that comprise your AO 124, 000. Warning: Soil Map may not be valid at t Enlargement of maps beyond the scale misunderstanding of the detail of mappi line placement. The maps do not show contrasting soils that could have been : scale. Please rely on the bar scale on each m measurements. Source of Map: Natural Resources Cc Web Soil Survey URL: Coordinate System: Web Mercator (E Maps from the Web Soil Survey are ba: projection, which preserves direction ar distance and area. A projection that pre Albers equal-area conic projection, sho accurate calculations of distance or are This product is generated from the USC of the version date(s) listed below. Soil Survey Area: Larimer County Are Survey Area Data: Version 16, Sep 2, Soil map units are labeled (as space all 1:50,000 or larger. Date(s) aerial images were photograph 12, 2018 The orthophoto or other base map on �n compiled and digitized probably differs imagery displayed on these maps. As a shifting of map unit boundaries may be Usbn Natural Resources Web Soil Survey � Conservation Service National Cooperative Soil Survey Hydrologic Soil Group—Larimer County Area, Colorado Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI I Percent of AOI 63 Longmont clay, 0 to 3 D percent slopes 90 Renohill clay loam, 3 to D 9 percent slopes Totals for Area of Interest Description 0.8 6.2% 12.8 13.6 Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soiis having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or c�ay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition 93.8% 100.0% US�n Natural Resources Web Soil Survey 12/21/2021 � Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Larimer County Area, Colorado Component Percent Cutoff.� None Specified Tie-break Rule: Higher USDn Natural Resources Web Soil Survey 12/21/2021 � Conservation Service National Cooperative Soil Survey Page 4 of 4 National Flood Hazard Layer FI RMette 105°3'S3"W 40°29'S7"N - i � �, , ,� � � � ^ � � _ 1. ,�'�'�;, �" r ..�� � � ,,,�, ' � � ._ ;p r. � � � r '� � , � � � � �� i� �i � ai . � .ti t � �� � �.� . ,�''+� ., ,, �'�' � � • � r � � � " i'%` � � � • � �+` ,�►,� _, _ .�.� � _ , •'� " �a' 4 Tcr�J F«FiS:�"1.512 " ► - `,� � ,�. �,�� • � � y � � � �r� `� _ r ! r � ,� �.��` � , . � � -� �� �� ,. � � �'i� c�f�Fort;�ollizis Y ,�AREA: C�F:�,��If �difVI ,,�,��L F �0 � O 10 �, ��"� � ''� * � +� �� :�� :, � ��� � � �� :�;> FEMA Legeni SEE FIS REPORT I SPECIAL FLC HAZARD ARI ���� c �� r� � � � � #� � � , � �`�y � � � �N' �i . � � � , �r, _ = � � ,. � ���� � ��� �� A : F ti � _ . + r � � � '�t� � ! � + � , + ?� ' � � . -�'. ;,,�i, � Y�� . � • �� � '��� J ������ � � .:.�, � � , � T�h�d R�{ i � y � ��� � �,.�� - � �. g �'� �'�� � � � �� J � `� `� �� �i � � �� � ' �+ � ���� F1`�'' "��+4�� � �—'r _ ��� � � r � � �� � ' � �!� 'y4. . :r. ." .� . .� � ,�� ��-� ;�' � �� � �. ,� � �� � .���-� e ,� i �— � - � OTHER AREAS ;� � FLOOD HAZP '�t �. T�''�� �� �d��� �7 OTHER ARI � � �� °lt � GENEf • � � STRUCTUF ��� � . _`x` ''•� � � ��,, + � � I .�� ���*.� n �' I �l'"1�7�" � � IY �� 'f +�I � _ ' _ ^ �i�r�i + h #� � � i F � ' y �u ��! .- l : �: � • '� , �A � � ! F. ^ � • � - ' � , •� '�- �� ' � ��' � ���� y;, ���• �[�, . .. t . IY. ' � . � -_ �' . � � ` �- F .� r ,� �,i f � i sR -�.�' �� � � � -� rsr=a ���,��;'� 1 � � �. �� � � s� � R ' j � r� '�t ��•� ' � � ,� � - , � '�"� �� �' �� �r�--�,�, . _�. ` ,� f � +. 1� � ���,f �� �e �� �� � MI�� � - • � r4 �a d 'S" �` � �f � s . _ '� �. °�v'� Y ' )r � ��# # �+ � � �- � m , _ 1 r� � .� ,� _�'R� � - � � _ _ , Feet 105°3Y6"W 40°2930"N 1:6,000 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 OTt FEATUF MAP PAN � This map digital flo The basei accuracy The flood authoritai was expo reflect ch time. The become s This map elements legend, sc FIRM pan unmappe regulaton FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method Table 3.4-1. IDF Table for Rational Method Duration Intensity Intensity Intensity (min) 2'Year 10-year 100-year (in/hr) (in/hr) (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 �`�rt�� Duration Intensity Intensity Intensity 2-year 10-year 100-year (min) (in/hr) (in/hr) (in/hr) 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 65 0.78 1.32 2.71 70 0.73 1.25 2.59 75 0.70 1.19 2.48 80 0.66 1.14 2.38 85 0.64 1.09 2.29 90 0.61 1.05 2.21 95 0.58 1.01 2.13 100 0.56 0.97 2.06 105 0.54 0.94 2.00 110 0.52 0.91 1.94 115 0.51 0.88 1.88 120 0.49 0.86 1.84 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method Figure 3.4-1. Rainfall IDF Curve — Fort Collins io.00 9.00 8.00 7.00 � 0 � 6.00 m L C � 5.� C N C 1O 4.00 c .� z 3.00 2.00 _ ! ! . . I��I�.' . . . . . . . _����� . . . . . ! _. , . ��� . . . . . . . . ������ . . . . �� � . . — i--. _.— �_. . .. . . . . ����� . . . . 1.00 �� �" j --- � � � � � � �.�_��_� � � -k _ i ,, , �, — �,--------- -------�----------- -- = — _— .—�— — — , - ---- o.� _ ---- - _ . 0 10 20 30 40 50 60 70 80 90 100 110 120 Storm Duration (minutes) c�tyof 3.4 Intensity-Duration-Frequency Curves for Rational Method �„�rt� S Page 9 0�� (c.l.s.) 17.C5 6.A6 17.99 6.h4 26.65 7?.87 CONSTRUCiiON SE�UENCE SiANDARp F�RM C PRQIECi_ NEAHL Of THF HOLKIE$ CMRiSTAN CNURLH SEOUENLE �OR ]99fl OULY COMFLEfE� B�: u6SNFR� MTE: a-2t-98 . INDIGTE HY USE OF A BAP LINE OR S'MBOLS WMEN EHOSION COMROt MEASUR6 WILL BE INS�ALLFO. AWOR MODIi1GT10N5 TO PN APPROVEO SCHEDULE M1Y REOUIRE SUBMTiNG ♦ NEW SCME�ULE FpR APPROVAL Bt iHE q1Y ENCINEER. .un I +ses I wrRior cnnon+c nmin wiNO ERpSqN CONLROL et 9�eome. neaaro�oi ea.„.�. vegetalne M netle Soil S onl e O��r� (Waler bVlicatian) IIIIIII1111111�11 r?AINFpu CROSION CONixOI saucruaw: nnninnnnnn seaimmt nao/eow� ia nte�. innnuninni s��. ea�i.� nunninnnn 5111 �mce 9a�la�e Illlllllllllllllllllltll sa�a aaq.p eon son .eoa.ero� co�io�� r�.m.s re..«m tionon%o��,aro ro.�q nimm�inim an„ vFCEfAiNE: Permananl SeeE Glonllrq Mulc�lnp/$ealont SOparvry SeeC PIan9�q J InMaliol�on IIIIIIII Nett�n9a/Mols/Blon4eb rnn,. S�IICNRES: �NS�P1lE0 6� HAIMNNm B! �£GEf,1TON / MIIICHINC CONIaACTOR onlc sueMrtho _ nvvaovco er crry or rom caurvs ory EROSION CONTROL NOTES: The City of Fort Collins Stormwoter Utility erosion control inspectar must be notified af least 24 hours prior to any construction on lhis s1te. All required perimeter silt fencing shall be install orior to any land disturbing activib� (stockpiling, stripping, grading, etc,), All other required control meosures sholl he installed at the apprnpriate time in the construction sequence os indicated in the apDroved project scheAule, canstruction plans, ond erosion co�trol report. Pre—Cisturbonce vegetation shall be protected and retained wherover possible. Remo�al or disturbance of existing vegetation shall be limiled to the areo required for immediate construction operotlons, and for the shortest practical period of time. All sois exposed during land disturbing octNity (sfripping, groding, utility insta�lations, stockpiling, fflling, etc.) Shall be kept in a roughened condition by ripping or discinq olong land contours until mulch, vegetation, or olher permanemt erasion contrci is instolled. No soils in areas outside project street rights of way shall remoin eaposed by lond dislnrbing activity (or more than thirty (30) days before re0uired temporory or perm�.�nent erosion control (e.g. seed/mulch, IondscoD�ng, etc.) �s installed, unless othrrwise apOroved by the Stormwoter Utility. The Froperty sholl be watered and mointained ot all Cmes during construction octivftes so as to prevent wind—caused erasion. All land disturbing activities sholl be irrmedotely discon6nued when /ug�tive dust impacts adjacent properties, os detern;ned by the Clty of Port Collins Engineering Department. AIl ternporory (structurol) erosion control measures shall be lnspected and repaired or re-onstructed ae necessary after each r noff event to ossure con6nued perfornonce of their function. NI relained sedlments, particularly those on poved �oadwry surfoces, sholl be removed and disvosed of in o monner ond location so as not to cause the,�r release into any drainageway. No scil stockpile shall exceed ten (10) feet in heighL All soil stockpiles s�all be protected from sediment tronsport by suAace roughening, wotering, and Derimeter sflt fe�cing. Any soil siockpile remvining after 30 days shall be seeded and mWched. �\ � CIty Ordinance prohibits the Irocking, dropping, or depositing of soils or soils or \ oj�y othe� moteriol onto City streets by or from any vehlcle. Any inadvertontly \ � d�pos�ited materiol sholl be deaned immediotely by the controctor. `j� � Exsting RCP � ` ���.�\ Storm Drain Lines I �� � i �� �'�\� � � ��� ��,��� � � � � �\\ � � Existinq � � T 25 i o0 ///��� � � �\ / 21" RCP � � 1 � . y /a '�� �\ V Storm Droin � o so � so Y��. ilndicates ` \� .s0 2.95 ac. 1" = 50' � � PropOsed a �� � � -- x #4i L� Contour Interval: 1' .� ~='SiR Fence' � A � �, �,a�e 1 .91 ac. Basin 'B' 6.5 22. � o `- �'4 26'� � p Existing 6' , I " .83 Crosspan Drainage� � '� Swale I` ' �- :1- • + . .' Inv. 21" = 03.76 \ - � �� ��� � � ��`� D / , _. ,. � Indicates Pkopo9ed � \ � � �� � � � P Straw Bdle Dike -- - - �oo � Proposed Straw � _ k � :�I Bale Filter \ \ � � .�_ _ y� � � � � ;I � 3:78 ac. #2 aa5��i � ' ` s.a is. •A� , \Sett�ing Bosi� I � " 25' '� � � #3 I �� 5.26�aG,. Bosin '�' 1.6 6. �'� dded ' � S�eded� �'�'� rea � b.' �. � ���� B <.�. � —� �M^/L �� D�i A,.;:� Ve l. F_I v��l4n�+��^� Proposed 'S�I:�en'ce'J : , in Swnle _�Typi�al) 4 :Fi I � t�._ .� I� Settling Basin IIOutlet Structure � I SEE DETAIL I � I �� > � IQ I 1 � �I � IB � T-1�"�. D � � i; � I J I I � !' � � ���' � � ��I I � I I I ' il �TYPein R' 11�nlet I o ��I I :�, :E.>: � � - -._ ... — . . . -� .- . � -. --_ -- -- -_ _ ,.__ — __— �` . �j...- ;�,`:� r� � - �? � � a d �' '� -_ _ � . � � _ � � � jg a � o�; --� _ . _ �- ��.- — _ �� — — -u _ '� ��.�: . — — �\� � �- — d"SD'-� _ ��� u � � sai2 _ - Typ�cally r,Gicates _..'s:'�g Ground Surface Contour �o�� Typically Indicates Proposed Fin�sh Surface Contour �� �' Drainage Basin Limit Identifier Typically Indicates Flowline -�oo� of Ditch or Swale Typicolly Indicates Silt Fence Typically Indicates Straw Bale � Filter or Dike Applicotion Typically Indicates Existing x 99•1 � Povement Surface Elevotion or Flow Line of Gutter Typically Indicates Proposed 8.0 Pavement Surface Elevation + or Flow Line of Gutter �o Typically Indicates Drainoge Flow Direction �, Concentration Point Identifier ��: L'as�n'B' -- Design po;^'.� B^si^ N,i�mhcr 3.15 ac. Area of in Acres Qioa c.f.s. 3.4 9.7 I QZ C.f.S. • N N N M � � N O r c rn 0 � � c � � o � U � � � c o m � o � � c � w � 0 � o v c � d J � C � o � �� N C � 4� 1 w - U � �� C � Vl � � � _ �� '� � m I �_ � w m c � w �z 0 W �' � � � � � ��� cn Q �z� W �Qo 0 � acn� � �mv� zwz Qxa � � p � r \ � � U v w E w „xa F � � � w � x o � � r � ad w � w x � J � � � U w p J CC U d DATE: APR 17.1998 SCALE: AS NOTED ORAWN: M.S.R. CHKD: D.R M. Project No. GRD-282-98 SHEET 3 of 6 City of Forf Collins, Colorado UTILITY PLAN APPROVAL APPROVED: Director o ngmeenng CHECKED BY: Water ostewater Utility CHECKED BY: ormwo er i i y CHECKED BY: orks ecreat�on CHECKED BY: CHECKED BY: 666[ 46�1i-o[ 50 �eyl cdd �.Oa;7ol ' �� DRAINAGE INVESTIGATION CALCULATIONS ' Clierrt: ARCHITECTURE ONE Project No: GRD-282-98 Project: HEART OF THE ROCKfES CHRlSTlAN CHURCH Date: Apr. 22, 1998 Location: Lot1, BIk1, Heart of the Rockies 2nd Subd., Fort Collins, CO By: D.R.M. . Rev. 3/28/99 ' PROPOSED CONDITtONS: (continued) DETERMINE OUTLET CONTROL StZING FOR SETTLING BASIN: ' Refer to attached Figure 13 and Figure 5- 3 for Outlet Sizing Detention Volume to be provided at 2 ft. depth = 3,600 cu. ft. = 8.083 ac. - ft. ' Depth = 2.0 feet ' From Figure 5- 3 required "Area per Row" = 0.17 sq. in. Minimum of eight (8) holes per row is to be provided. ' Therefore, the size of each hole is: 0.17 / 8= 0.02125 sq. in. per hole Try 1/8 in. diameter holes at 0.013 sq. in. per hole , 0.17 / 0.0't3 = 13 hole per row with 1/8 in. dia. hole ' For pipe with 13 cotumns (hales per row) use 6 in. dia. pipe from Figure 13. DETERMiNE PIPE SfZE FOR DtSCHARGE FROM SITE: Allowed Release Rate , Refer to the "Supplement to the Final Drainage Report foot Brittany Knolls P.U.D. - Filing 2" (See Attacheci; From Table 3 the maximum capacity for the dawnstream receiving 30" dia. pipe is 29.0 c.f.s. ' From table 3 the maximum capacity of the 2i" dia. pipe is 19.4 c.f.s. with a desi�n discharge of 13.2 c.f.s. , The estimate Q�no for the proposed site at Basin "A" D.P. #1 + D.P. #2 + D.P. #3 = 2fi.65 c.f.s. Therefore, ponding wili occur in the swale section adjacent to Lemay Avenue during the 100 Year Storm. n 8asin"A" D.P.#1 + D.P. #2= Q2 = CIACf = 3.23 x I x 1.25 = 4.04 x I(in./hr.) ' Time Q�oo Volume RELEASED Vol.Rei�e Voiume Det. min. c.f.s. cu. ft. c.f.s. cu. ft. cu. ft. ' 1Q 28.87 17,321 13.20 7,920 9,4Q1 Basins w/ �5 24.23 21,802 13.24 11,880 9,922 Improvements . 20 21.00 25,194 13.20 15,840 9,354 Detention Volume ' 25 18.57 27,859 13.20 19,800 8,059 30 16.96 30,523 13.20 23,760 6,7fi3 ' The�efore, 9,922 cu. ft. of detention ponding volume is required in the swale sectian adjacent to Lemay Avf Page 10 of 11 ' his unofficial copy was downloaded on Nov-12-2021 fi-om the City of Fort Collins Public Records Website: http://citydocs.fcgov.com or additional information or an official copy, please contacC CiCy of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA APPENDIX B — RATIONAL CALCULATIONS Appendix B � BAS�N SUMMARY: � 2ryr Veak Runoff 10-yr l a�nt haa n �aresl Imper�ous 4 n ce [IA1 ntensit 4: t nmr[oe Iminl ulCfr�ol R lac ezi Illn/nr)Y Ift'Izl Iminl ulCz.cl Pond Summary Table 100-yrVeakRunoff 100-yr 100-yr pzteMion Cwnbi�d T�a� Pond WQCV t00ryr PAaa �� c�p) mie�9ry 4�oo Peak Peak WQCJ Volume Pond Volume Volum Bottom WSE WSE Depth (c� � (ecrez� �In/hr) (R'/s) ��bw Release (ao-ft) �an�l (ao-fl)Q ProvideA �ft7 (Fl) (i� (R) (c[s) �cfs) (ao-(t) PontlD 44.16 13.20 0.08 082 0.90 123 490].]5 4908.&5 491103 3.28 - - _ EX 50 /NLET-0? �3 sa - .--`_ - o-oz o-eo s9' c.oz �-,-- - -•-��_ - "_ _ � --- � EX 34.00' <�=-'. .. ROW " o9s �ab sss ws� ,.. p so �: � ie � te" �_' �'\ \ �_ ' �ti-� --':� / J � � � � // I'� g^p / EX 35.50' � '� Sy`7S� �% � I ' �. . ROW -�---_� ' � �/.�'' - _'. -�� I � - � . / � �! �'_ - - - _ _ _ _ ! � EX SD /NCET 03 �) l / __ �\ � � BRITTANY KNOLLS / ` � �r � � I � \ \ �7�'`� ` qo � >� � : t,k ; I v = f A ex so iNcer-aa i ��� ,� �, �'�` �\ ;. � � � i . , ���/ . � � � � � ��.'�_�._- ss RAIN GARDEN O51 _ � %' � � � � � � \ r ; i "� ' ' WQCV(12HR)=1845CU-FT �� � � . �/�BLOCKI / �'� �� �Y' � o� . r i LOT 1 �� � /i � � � — � �� � %� i i � �� -�orz � �\ ����f .s✓ /�\�'� �\ p` \�� w� ��� os x I \ i I/ y / � � i � �� , �h \ � � �\\ x �� I / ,/ �or a ' i i ��, � � � � � r � � � ,." �our�el-os � � � � // �� ' � / � � _ � /i i , j � \� �\ ..� I � � ',./ / �,�.-IOT4 �28.00' //� \ \ EX SOMH 05 � � °�� \�_ � \ \ � ' 1� � J I/ o �.�s � I EAE T`j/�" � � '; , ��. ..fi ��� I. -��� � —►\UiE �. \'t �� °'� � \ �\�9Ja � . M1' / I/ / / j �, ` \ \ � - \ ��✓' � � SDMH-03 � - . k /� �/ / � /� I�' �,�, �'�` , I ��j`� � �a � f as.00� � / � � / � / � \ \ T � �`' \ � � UE �. / / / - - - � � ��I �,� / . �\ � r�� � � �-_) \ � � i 3� . / f. �� �� ' / /' ( � \ i � // , �f^�/ j / J� 7, \ \ � \ - � %'�� 1 Y � � / ���_ , � �� � � % '/� \�1, �\ � �\ EX Bnck ond Stucco � � � � : � �/ ^ ` � � ✓� � . \ ��r BuAdmg � ��. nl ` � / \ %� �� OS1 :1i� '.A�., FFE=aea3�o � � ... a9�5. � �� I f >� !' �\.. '� � I � ��x' �L�i� / � , � �// 2.03 0.89 ". / � � � I�\ \\ � . u' :a�� � :� � / Ile� � .'� l � , � '. \',��� ' � � I I �\ / � ` ��� :f�� \� �'!v,�,\ �... 7�� // � \ �./:v I �� \ / �\ �( � �\ \\�� ^..� L , 3.74 0.65 I / � I� ���� ��� \ \ ��� � \ � � / � . � 1 g '-=� \ �j��� /� .� - 'z.,:� � i� �� � � \ TRACT�A I 1�'� �� � V/ � / �i � / � � � �DRAINAGE & � \ � r'� � �� . > ��� I EX Playground ��� �/� � I � � PRIVATF ACCES � \ rt� � � ��� ��,y'� � � . I , EASEMENT) EX G rden 1 I \ . ''� : ' I .I \ � t / 0 I -�1 ���_ �� � � �� BLOCK3 . . � . wti� , . � � � � � — � � � r:�� � � �or i ��� ' A' �� I �� i �i� i � i�. � � . ��=� � � �-��"� ��/ \ t� � � � �''� � j' �— � _ _ � ��.� i �� � � � � �' � � � as`9z , � � ' / � \ � � � � .� � ,� ni �� b/ � '� � �� i a= ���_ �,� '� /�' � ` �/ � ���� ♦ °=5 �I _ � � ���� ������. ��, � �� ��! � I�., � � �; � � , � � ♦ , �� ; � , , o , � , , _ � ��� . , � ��, %� � � , �-� � ��, J , � �' � . -� � , _ _ - � � T� � � �� -- - � � � ; � � -_ � -�� � �( � r. � '�� � � � � � — � � � � � �r — 1 � � _ : , i - E�=_- ��_I_� ,_ f � - ' ` , ( , - .; --�\ _ = I-�I-_...za.00 - ------3U� . � � " � zo 0o D2c . .� . . .�- i � /� — - �--1--- �-- � _ �� .� i y � - ,55 �05 ,o -- - - — -- - a �> - II� Z ��� , I - �- EAE Y _ ._ I .. . Q �'T __ � � '.. �ti i� '� I�� I _. , � - ��-'. -:1 - --� __ - --_ - �.. >—.. 1 � - -- -- - 6 � � EXI9"U&OEI I � �_�—_� � �� �3'� _ _---. -_ _- -- D2A- - _ _ �'�r _ _.__ n � J ' I I �� % � � 4940 -I _ . _ _ NLET _ .. _ _ , �-+ 4928 I�--- i /; � L I. � �°[ � �20 -� ��� T _ 2 J � i���� �' �� � �� � . � � �.so o.s� :I � �� ---�� �� � �� �0° � �� - a9� 4 _� __, -- AI X � I" � � � �I � I j � � � I t, 9 f ..aa:aa rc a�oc � _�- azas Fc � � �i szie F� � o.^,a �>� �� � �� I I FF-<1.51 - - - elucz �'$ ao 8a f6 - __= FF=31.92 �- . I I a 25.es FG � : I � .. I �. I ' I a I� Ffs36.53 35.8s FG �.� � , 3125 FG o —�._ 2LDGa � I �� I , �� ' a V FF 25.03 24.3b FG � c,ra>oo' Exssso• � I� ,� � �--�� � .I .d � - � 9i - � I I I � Row Ro� � _ - � -� �'� - .---� L__ A i _ ��I _ � I� ' . —' .s.o � I � � - II � ' �_ � ���� �< =I. Rn� , � , � -y I �� ^ / APPROX LIMITS' . -� 7]�'— � . — � ! �i�. � I1� _ _ OF GRA�WG _ / _ �j EX 15' U&DE � r �� � . _ 1 ^��� . �'- -. _ _ - . PROPE \.y ' � � �- � � - - L� �. ,�1 t � � ��. �T�.��� . "'�' _���� �����-��—..�� � ��� -- ' � ^ � �`_ ;�'� � ��� - EX 57.50' - -.- , - . - . � _ � _. � ` v -� v ` � _� _ � - �-_ - - — —_, : � ` � � � � � � � � � �� � -- -- ` � �— � � j � �-- � � � � _� �\ �_ � \ 1�� � TRILBYROAD 9 / 0 � / / / k9 � / / / i9 � / � — —� % / � ; / / / / I' / / I � � A9ry / I / / _-J___,L__ _ � � - _� . �- � -- � � � � ' _-L"--�--- � I�� ;..�-�- Heartside Hill DEVELOPED IMPERVIOUS AREA CALCULATION Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 20-1045-00 Date: May 10, 2023 DESIGN CRITERIA: Fort Collins Stormwater Criteria Manual BASINS: % Impervious values from Table 3.2.2 in the Fort Collins Stormwater Criteria Manual Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Land Use � Runoff Impervious Coefficient C Paved 100% 0.95 Roof 90% 0.95 Walks 90% 0.95 Single-Family (SF) Lots 45% 0.55 Community Center (CC) Lot 70% 0.65 Lawns (Heavy, 2•7% Slope) 0% 0.25 frequency Return Adjustment Period Factor (Cf) 2-yearto 1.00 10- ear 100-year 1.25 Sub-basin Aro�,� A�o�,i AP,�Qa A.00r Awaie AsFio: Acuoc %4aw� Weighted% COMPOSITE Designation (sq feet) (acres) (sq feet) (sq feet) (sq feet) (sq feet� (sq teet) (sq feet) Impervious C to C C z ia ioo OSi 88,538 2.03 45,364 3,889 6,687 0 0 29,595 65.4% OJ2 0.89 Dl 163,080 3.74 24,710 3,742 5,916 33,798 23,353 71,561 39.8% 0.52 0.65 D2a 48,086 1.10 0 12,931 1,430 0 0 33,725 26.9% 0.46 0.57 D26 42,280 0.97 231 12,931 1,857 0 0 27,262 32.0% 0.50 0.62 02a+D26 90,366 2.07 231 25,861 3,287 0 0 6Q987 293% O.CS 0.60 D2c 67,394 1.55 44,316 0 4,531 0 0 18,546 71.8% 0.76 0.95 D2d 44,606 1.02 0 0 2,055 0 0 42,551 4.1% 0.28 035 D2 202,366 4.65 44,547 25,561 9,874 0 0 122,084 37.9% 0.53 0.66 Total 453,984 10.42 1ll,621 33,492 22,476 33,795 23,353 223,244 44.0% 0.56 0.70 21-1045-00 Rational Calcs.xisx Page 1 of 5 Highland Development Services lTRATION opment Services ria Manual Fort Collins Stormwater Criteria Manual 1.49 uation 5-3 V= - R2�3 S 1�2 -Equation 5-4 n L I�, = L-I- 1 � -Urbanized Check Equation 3.3-5 I80 �FC Overland Flow �t ��� �w shall not exceed for developed condition �w shall not exceed for undeveloped condition t� and urbanized basin check minimum t� = 5 min for urbanized basins 0 10-yr) INITIAL/OVERLAND TIME TRAVEL TIME (tt) Urban Check (t.) Final t� t;+t, HYDRAULIC t� AREA LENGTH SLOPE t; LENGTH SLOPE ROUGHNESS VELOCITY tt (min) OVERALL LENGTH t� -z-io (acres) (ft) (ft/ft� (min) (ft) (ft/ft) RADI,US COEFFICIENT (min) (ft/s) (min) (ft/ft) (min) ).72 2.03 240 0.0351 7.12 457 0.0128 0.10 0.016 2.27 3.36 10.48 697 13.87 10.48 ).52 3.74 300 0.0252 13.36 46S 0.0433 0.10 0.016 4.17 1.57 15.23 768 14.27 14.27 ).46 1.10 75 0.0760 SZ9 371 0.0392 0.14 0.030 2.65 233 7.62 446 12.48 7.62 ).50 0.97 18 0.1470 1.96 391 0.0343 0.14 0.030 2.48 2.63 5.00 409 12.27 5.00 ).76 1.55 109 0.0504 3.89 521 0.0389 0.10 0.016 3.96 2.20 6.09 630 13.50 6.09 ).28 1.02 93 0.0492 8.65 233 0.0050 0.14 0.030 0.94 4.11 12.76 326 11.81 11.81 ).56 10.42 240 0.0381 10.00 1048 0.0272 0.10 0.030 1.77 9.59 19.89 - - 19.89 Page 2 of 5 Highland Development Services lTRATION opment Services ria Manual Fort Collins Stormwater Criteria Manual uation 5-3 1.49 2�3 [� 1/2 V= - R J -Equation 5-4 n j.. = L+ 1 Q -Urbanized Check Equation 33-5 180 �FC Overland Flow L �' 60V �w shall not exceed for developed condition �w shall not exceed for undeveloped condition t� and urbanized basin check minimum t� = 5 min for urbanized basins r) INITIAL/OVERLAND TIME TRAVEL TIME (tt) Urban Check (t.) Final t� t;+t� HYDRAULIC tc AREA LENGTH SLOPE t; LENGTH SLOPE ROUGHNESS VELOCITY ti (m��) OVERALL LENGTH t� C10° (acres) (ft) (ft/ft� (min) (ft) (ft/ft� RADIUS COEfFICIENT (min) (ft) �ft/s� (min) (ft/ft) (min) ).89 2.03 240 0.0351 3.50 457 0.0128 0.10 0.016 2.27 3.36 7.16 697 13.57 7.16 ).65 3.74 300 0.0252 10.40 46S 0.0433 0.10 0.016 4.17 1.87 12.27 768 14.27 12.27 ).57 1.10 75 0.0760 4.34 371 0.0392 0.14 0.030 2.65 2.33 6.67 446 12.48 6.67 ).62 0.97 18 0.1470 1.56 391 0.0343 0.14 0.030 2.48 2.63 5.00 409 12.27 5.00 ).95 1.55 109 0.0504 1.74 521 0.0389 0.10 0.016 3.96 2.20 5.00 630 13.50 5.00 ).35 1.02 93 0.0492 7.90 233 0.0050 0.14 0.030 0.94 4.11 12.02 326 11.51 11.81 ).70 10.42 240 0.0381 7.40 1048 0.0272 0.10 0.030 1.77 9.89 17.29 - - 17.29 Page 3 of 5 Highland Development Services evelopment Services 21, 2021 Criteria Manual peak discharge (cfs) �unoff coefficient �infall intensity (in/hr) drainage area (ac) 1 = rainfall intensity (in/hr) P 1= one-hour point rainfall depth (in) 2g•SP t� = time of concentration (min) � �1 �+ t� ��o.�s66st) p _ 0.82 in 1 2yr - P�-soyr = 1.40 i1l Pi-iooyr = 2.86 in 2-yr Peak Runoff 10-yr Peak Runoff 100-yr Peak Runoff / �ervious t� Runoff Coeff C�A) Intensity Qz t� Runoff Coeff C(A) Intensity Qia t� Runoff Coeff. C�A) Intensity Qloo (min) (�z-io) (acres) (in/hr) (ft3/S) (min) (�z-io) (acres) (in/hr) ({�'/S) (min) (�iaa) (acres) (in/hr) (ft3/5) 65.4% 10.48 0.72 1.46 2.17 3.16 10.48 0.72 1.46 3.71 5.40 7.16 0.89 1.82 8.71 15.84 39.8% 14.27 0.52 1.94 1.90 3.68 14.27 0.52 1.94 3.25 6.28 12.27 0.65 2.42 7.10 17.17 26.9% 7.62 0.46 0.51 2.45 1.24 7.62 0.46 0.51 4.18 2.12 6.67 0.57 0.63 8.91 5.64 32.0% 5.00 0.50 0.48 2.85 1.38 5.00 0.50 0.48 4.87 2.36 5.00 0.62 0.60 9.95 6.02 71.8% 6.09 0.76 1.17 2.63 3.08 6.09 0.76 1.17 4.49 5.26 5.00 0.95 1.46 9.95 14.57 4.1% 11.81 0.28 0.29 2.07 0.60 11.81 0.28 0.29 3.53 1.02 11.81 0.35 036 7.21 2.61 44.0% 19.89 0.56 5.84 1.61 9.43 19.89 0.56 5.84 2.76 16.10 17.29 0.70 7.30 6.05 44.16 Page 4 of 5 Highland Development Services Heartside Hill Attenuated Flows Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 DESIGN CRITERIA: Fort Collins Stormwater Criteria Manual EQUATIONS: t� = t{ + tt -Equation 5-3 1.87�1.1 - CCf�y� _CoFC Overland Flow T� 50.33 V_ 1.49 R2�3 5. 1�z _Equation 5-4 n L tt 60V CONSTRAINTS: 300 ft- Overland flow shall not exceed for developed conditior Final t� = minimum of t; + tt and urbanized basin check 500 ft- Overland flow shall not exceed for undeveloped conditior recommended minimum t� = 5 min for urbanized basins Q� = n-yr peak discharge (cfs) C� = n-yr runoff coefficient Qn = Cn�n'4 I„ = n-yr rainfall intensity (in/hr) A = drainage area (ac) 28.5P1 I �1� .� t��0.7II6 I = rainfall intensity (in/hr) P, = one-hour point rainfall depth (in) t� = time of concentration (min) P�-zy� = 0.82 in. P,-,oy� = 1.40 in. P�-,00y� = 2.86 in. BASINS: DP/Manhole D2b Contributing Basins D2a+D2b Contributing Area (acres) 2.07 Runoff Coefficients Overland Flow Time Length (ft) Slope (%) t; (min) Travel Time Cz-io C�oo 0.48 0.60 75 7.60 2-yr to 10-yr 100-yr 5.14 4.15 Length (it) Slope (%) Hydraulic Roughness Velociry (ft/s) t� (min) Radius (ft) Coefficient 371 3.92% 0.10 0.016 3.97 1.56 84 2.74% 0.10 0.016 3.32 0.42 pipe conveyance 320 4.03% 0.10 0.016 4.03 1.32 Total Time 3.30 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 8.44 7.45 Intensities (in/hr) 2-yr 10-yr 100-yr 2.36 4.03 8.60 Discharge (cfs) 2-yr 10-yr 100-yr 2.34 3.99 10.65 APPENDIX C — POND CALCULATIONS Appendix C Heartside Hill Pond Summary Design Engineer: Design Firm: Project Number: Date: J.Claeys Highland Development Services 21-1045-00 May 10, 2023 Pond Summary Table 100-yr 100-yr Total Detention Combined Pond WQCV 100-yr Max Peak Peak WQCV Volume Pond Volume Volume Bottom WSE WSE Depth Inflow Release (ac-ft) �ac-ft) (ac-ft) Provided �ft) (ft) (ft) (ft) cfs cfs ao-ft Pond D 44.16 13.20 0.08 0.82 0.90 1.23 4907.75 4908.85 4911.03 3.28 21-1045-00 PondCalcs.xlsx Page 1 of 7 Highland Development Services Heartside Hill 100-yr Detention Volume - FAA Method Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 DESIGN CRITERIA Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual City of Fort Collins - Storm Water Criteria Manual Detention Volume Calculation - Pond D Runoff Coefficient (C) 0.56 Frequency Factor (C�) 1.25 Adjusted Runoff Coefficient (CC�) 0.70 Area (A ) 10.42 acres Allowed Release Rate 13.20 cfs Time (min) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Required Detention ft3 acre-ft 35,584 0.82 Detained Volume 1 ft3) 0 17,813 25,866 30,921 33,176 34,686 35, 584 34,775 33,791 32,501 31,079 29,373 27, 579 25,895 23,904 22,001 19,967 17,867 15,767 13,316 10,954 8,744 6,272 4, 041 1,591 Detained Volume (acre-ft) 0.00 0.41 0.59 0.71 0.76 0.80 0.82 0.80 0.78 0.75 0.71 0.67 0.63 0.59 0.55 0.51 0.46 0.41 0.36 0.31 0.25 0.20 0.14 0.09 0.04 21-1045-00 PondCalcs.xlsx Page 2 of 7 Highland Development Services 100-yr Intensity (/, in/hr) 0.00 9.95 7.72 6.52 5.60 4.98 4.52 4.08 3.74 3.46 3.23 3.03 2.86 2.72 2.59 2.48 2.38 2.29 2.21 2.13 2.06 2.00 1.94 1.89 1.84 Q�oo (cfs) 0.00 72.58 56.31 47.56 40.85 36.32 32.97 29.76 27.28 25.24 23.56 22.10 20.86 19.84 18.89 18.09 17.36 16.70 16.12 15.54 15.03 14.59 14.15 13.79 13.42 Accumulative Runoff Volume ��3� 0 21, 773 33, 786 42, 801 49, 016 54,486 59, 344 62,495 65,471 68,141 70, 679 72, 933 75, 099 77, 375 79, 344 81,401 83, 327 85,187 87,047 88,556 90,154 91,904 93, 392 95,121 96, 631 Accumu�ative Release Volume (ft3) 0 3,960 7, 920 11, 880 15,840 19,800 23,760 27,720 31,680 35,640 39,600 43,560 47,520 51,480 55,440 59,400 63, 360 67, 320 71,280 75,240 79,200 83,160 87,120 91,080 95,040 Heartside Hill Water Quality Pond and Outlet Sizing - Pond D Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 DESIGN CRITERIA: Urban Storm Drainage Criteria Manual (USDCM) Volume III, Urban Drainage and Flood Control District, June 2001 (Updated November 2010) REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 4.65 acres Basin D2 (not treated by LID) Composite. Imperviousness, I 37.9% W qCV (watershed inches) (WQCV� 0.174 inches 40-Hour�Drain Time (Fig SQ-2) Re uired WQCV Volume =; 12 * Area * 1.2 0.081 acre-feet Includin 20% for Sedimentation WATER QUALITY OUTLET SIZING (Per USDCM, Volume 3): Design Water Quality Depth, DWQ 1.10 ft Determine Kao Maximum Area per Row, a Circular Perforation Sizing Number of Rows, nr K40 = 0.013DWQ2 + 0.22DWQ - 0.10 a=WQCV/Kao 0.158 Number of Columns, nc (See Table 6a-1 for Max.) Choose Hole Diameter Use USDCM Volume 3, Figure 5 Total Area per Row, Ao Total Outlet Area, Ao, Does design work? Minimum Steel Plate Thickness Rectangular Perforation Sizing (Not Used) Number of Rows, nr Choose Rectangular Hole Width (w/ 2" Height) Use USDCM Volume 3, Figure 5 Total Outlet Area, Aot Does design work? Minimum Steel Plate Thickness 0.514 square inches 3 rows Ocolumns 3/4 inches 0.750 inches 0.44 square inches 1.33 square inches Yes 1/4 inch 2 rows Dinches 0.000 inches 0.00 square inches Yes 1/4 inch 21-1045-00 PondCalcs.xlsx Page 3 of 7 Highland Development Services Heartside Hill Water Quality Pond and Outlet Sizing - Pond D Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 WATER QUALITY TRASH RACK SIZING (Per USDCM, Volume 3) Circular Pertoration Trash Rack Sizing Required Open Area, At At=0.5.����e o.,2ao))�Aot 46 square inches Min. Distance between Columns, S� 3 inches Width of Trash Rack and Concrete Opening per Column �4 inches Use USDCM Volume 3, Table 6a-1 Total Width, W�o„� Height of Trash Rack Screen, Htr Type of Screen Screen Opening Slot Dimension Support Rod Type (See Table 6a-2) Spacing of Support Rod (O.C.) Total Screen Thickness (See Table 6a-2) Carbon Steel Frame Type (See Table 6a-2) Rectangular Pertoration Trash Rack Sizing (Not Used) Required Open Area, At (including 50% clogging) Ar=0.5 , ��� � e-a. i 2ao) �'Aot Width of Trash Rack Opening, Wopening Use USDCM Volume 3, Table 6b-1 Width of Concrete Opening, W�o�� Min Height of Trash Rack Screen, Ht, (including 2� a° below lowest openings) Type of Screen Screen Opening Slot Dimension Minimum Bearing Bar Size (See Table 6b-2) 4 inches 13 3/16 inches Check - Larger than Required S.S. #93 VEE Wire (US Filter) 0.139" (US Filter) #156 VEE 3/4 inches O.C. 0.31 inches 3/8in x 1.Oin flat bar 0 square inches �inches 12 inches 28.00 inches Kelmp KRP Series Aluminum Bar Gate (or Equal) 3/16" Bars on 1-3/16" Centers 1 in x 3/16 in 21-1045-00 PondCalcs.xlsx Page 4 of 7 Highland Development Services Heartside Hill Critical Pond Elevations Design Engineer: J.Claeys Design Firm: Highland Development Project Number: 21-1045-00 Date: May 10, 2023 DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Water Quality Capture Volume (WQCV): Tributary Area, A 4.65 acres Basin D2 (not treated by LID) Composite. Imperviousness, I WQCV (watershed inches) 37.9% 0.174 inches Required WQCV Volume =�wQZ V�* Area * 1.2 0.081 acre-feet 40-Hour Drain Time (Fig SQ-2) Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): V _ �A� + Az + A� Az �Depth 3 CONTOUR (FT) AREA (FTZ) AREA (ACRE) VOLUME DEPTH (FT) CUMULATIVE ACRE-FT) VOLUME ACRE-FT 4907.75 0 0.000 0.000 0.00 0.000 4908.0 333 0.008 0.001 0.25 0.001 4908.5 4236 0.097 0.022 0.75 0.023 4909.0 10791 0.248 0.083 1.25 0.106 4909.5 15632 0.359 0.151 1.75 0.257 4910.0 17276 0.397 0.189 2.25 0.446 4910.5 18982 0.436 0.208 2.75 0.654 4911.0 21073 0.484 0.230 3.25 0.883 4911.5 23258 0.534 0.254 3.75 1.138 4912.0 0.000 0.089 4.25 1.227 Required Water Quality Capture Volume (WQCV) _ 0.08 Acre-Ft Interpolates to an Elev. of Required 100-yr Detention Volume (including WQCV) _ 0.90 Acre-Ft Interpolates to an Elev. of Provided Freeboard (33% Additional Volume) _ 1.32 Acre-Ft Interpolates to an Elev. of 4908.85 ft 4911.03 ft 4911.86 ft 21-1045-00 PondCalcs.xlsx Page 5 of 7 Highland Development Services Heartside Hill Emergency Overflow Spillway Calculations Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 Broad-Crested Weir Equation-Trapezoidal Shape ; H s where: Q= Discharge (cfs) 0= CLH� +C�—�H� C= Weir Coeffecient V L = Weir length (ft) H = Average Weir Head (ft) H:V =Side Slope Calculations Knowns: Side Slopes (H:V) 4.00 Desired Spillway Head 0.75 ft Weir Coefficient 2.6 Spillway Elevation 4911.80 ft 100-yr Pond Inflow 58.88 cfs Calculated Spillway 31.87 ft Use Spillway Length 32 ft Spillway Freeboard 0.00 ft Total Spillway Depth 0.75 ft Top of Berm Elevation 4912.55 ft 21-1045-00 PondCalcs.xlsx - Spillway Page 6 of 7 Highland Development Services Heartside Hill Circular Orifice Plate Sizing - Pond D Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: May 10, 2023 Orifice Equation Q = CAo �2gOh � A� _ � " C 2goh where: C= Orifice Discharge Coefficient A o = Orifice Area (ftZ) D�, _ 576A� g = Gravity (32.2 ft/s�) n 4h = Difference in Elevation Head (ft) D o = Orifice Diameter (in) Calculations 100-yr Orifice Sizing Knowns: 100-yr Release Rate 13.20 cfs 100-yr WSEL 4911.03 ft Pond Outlet Invert 4907.25 ft Discharge Coefficient 0.65 Tailwater Elevation 4908.13 ft Orifice Diameter Orifice Area Centroid Elevation Actual Release Rate 16 1/2 in 1.486 ft` 4907.94 ft 13.20 cfs 100-yr Orifice Rating Table 21-1045-00 PondCalcs.xlsx Page 7 of 7 Highland Development Services APPENDIX D— LOW IMPACT DEVELOPMENT CALCULATIONS Appendix D Heartside Hili Low Impact Development Design Engineer: 1.Claeys Design Firm: Highland Development Services Project Number: 21-1045-00 Date: February 21, 2023 DESIGN CRITERIA Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Controi District, June 2001 (Revised lanuary 2016) City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. Low Impact Development Summary Development Area Breakdown Impervious Area % of Impervious Area Impervious Area Description Sq-Ft Acres Requiring (sq-ft) Requiring Treatment Treatment Existing Church Site 105,661 2.43 62,922 0% 0 Proposed Site 363,964 8.36 155,022 75% 116,266 Totals 443,462 10.78 217,943 - 116,266 LID Treatment Areas Area Drainage Imperviaus WQ�ulz-n. LID Contributing WQCVlZ.h, Treatment Facility Basins to LID % Impervious Area Treated (Watershed inches) (cu-fc) Method (sq-ft) (sq-fi) (includes 20% for sedimention) OS1 OSl 88,538 65.4% 58,940 0.20 1,811 Rain Garden D1 D1 163,080 39.8% 69,430 0.14 2,339 Rain Garden Standard Water Quality Areas Contributing Drainage Area Drainage Area a WQCV4o-n� WQ��ao-nr EDB Pond / Impervious (ac-ft) BdSInS (sq-ft) (acre) (watershed inches) includes 20% for sedimention Pond D D2 202,366 4.65 37.9% 0.17 0.081 LID Treatment Summary Total Proposed Impervious Area 155,022 Total Impervious Area LID Treated (sq-ft) 128,370 Total % Impervious Area LID Treated 83% Water Quality Area Treatment Summary Description Area Area Treatment Ratio s -ft acres Total Area Treated by LID 251,618 5.78 53.6% Total Area Treated by EDB 202,366 4.65 43.1% Total Area Not Treated 15,641 0.36 3.3% Total Improvement Area 469,625 10.78 100.0% Design Procedure Form: Rain Garden (RG) UD-BMP (Version 3.07, March 2018) Sheet 1 of 2 Designer: J.Claeys Company: Highland Development Services Date: February 21,2023 Project: Heartside Hill (Basin D1) Location: Fort Collins, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 39.8 % (100 % if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = la/100) i= 0.398 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.14 watershed inches (WQCV=0.8*(0.91*i3-1.19'iZ+0.78*i) D) Contributing Watershed Area (including rain garden area) Area = 163,080 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQ�� =�cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWocv ornEe = 1,949 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQcvuseR =�cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQ�� = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz, dist per unit vertical) Z= 4.00 ft/ ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AM;,, = 1298 sq ft D) Actual Flat Surface Area AA�„ai = 2373 sq ft E) Area at Design Depth (Top Surface Area) AToP = 3454 sq ft F) Rain Garden Total Volume VT= 2,914 cu ft iVr= iiAroc + An�t„aJ / 2) * Depth) Choose One 3. Growing Media Q 18" Rain Garden Growing Media Q Other (Explain): 4. Underdrain System Choose One A) Are underdrains provided? OO YES Q NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y=�ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol�2 =�cu ft iii) Orifice Diameter, 3/8" Minimum Do =� in 21-1045-00 UD-BMP_v3.07 (Basin D1).xlsm, RG 2/21/2023, 10:55 AM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: J.Claeys Company: Highland Development Services Date: February 21, 2023 Project: Heartside Hill (Basin D1) Location: Fort Collins, CO 5. Impermeable Geomembra�e Liner and Geotextile Separator Fabric Choose �ne Q YES A) Is an impermeable �iner provided due to proximity � NO of structures or groundwater contamination? 6. Inlet / Outlet Control Choose One Q Sheet Flow- No Energy Di55ipation Required A) Inlet Control 0 Concentrated Flow- Energy Dissipation Provided Choose One 7. Vegetation � Seed (Plan for frequent weed controi) Q Plantings 0 Sand Grown or Other High Infiltration Sod 8. Irrigation Choose One Q YES A) Will the rain garden be irrigated? � NO Notes: 21-1045-00 UD-BMP_v3.07 (Basin D1).xlsm, RG 2/21/2023, 10:55 AM Design Procedure Form: Rain Garden (RG) UD-BMP (Version 3.07, March 2018) Sheet 1 of 2 Designer: J.Claeys Company: Highland Development Services Date: February 21,2023 Project: Heartside Hill (Basin OS1) Location: Fort Collins, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 65.4 % (100 % if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = la/100) i= 0.654 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.20 watershed inches (WQCV=0.8*(0.91*i3-1.19'iZ+0.78*i) D) Contributing Watershed Area (including rain garden area) Area = 88,538 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQ�� =�cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWocvornEe = 1,509 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQcvuseR =�cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQ�� = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz, dist per unit vertical) Z= 4.00 ft/ ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AM;,, = 1158 sq ft D) Actual Flat Surface Area AA�t„ai = 1453 sq ft E) Area at Design Depth (Top Surface Area) AToP = 2236 sq ft F) Rain Garden Total Volume VT= 1,845 cu ft iVr= iiAroc + An�t„aJ / 2) * Depth) Choose One 3. Growing Media Q 18" Rain Garden Growing Media Q Other (Explain): 4. Underdrain System Choose One A) Are underdrains provided? OO YES Q NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y=�ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol�2 =�cu ft iii) Orifice Diameter, 3/8" Minimum Do =� in 21-1045-00 UD-BMP_v3.07 (Basin OS1).xlsm, RG 2/21/2023, 12:21 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: J.Claeys Company: Highland Development Services Date: February 21, 2023 Project: Heartside Hill (Basin OS1) Location: Fort Collins, CO 5. Impermeable Geomembra�e Liner and Geotextile Separator Fabric Choose �ne Q YES A) Is an impermeable �iner provided due to proximity � NO of structures or groundwater contamination? 6. Inlet / Outlet Control Choose One Q Sheet Flow- No Energy Di55ipation Required A) Inlet Control 0 Concentrated Flow- Energy Dissipation Provided Choose One 7. Vegetation � Seed (Plan for frequent weed controi) Q Plantings 0 Sand Grown or Other High Infiltration Sod 8. Irrigation Choose One Q YES A) Will the rain garden be irrigated? � NO Notes: 21-1045-00 UD-BMP_v3.07 (Basin OS1).xlsm, RG 2/21/2023, 12:21 PM APPENDIX E— INLET, PIPE, & SWALE CAPACITY CALCULATIONS Appendix E Heartside Hill TYPE C AREA WLET SIZING CALCULATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 1.Claeys Highland Development Services 21-1045-00 February 22, 2023 EQUATIONS: Q; = Grate Capacity w/o Reduction Factor (cfs) C= Orifice Discharge Coefficient = 0.67 Qi = CA 2gH A= Orifice area (ft�) - Open Area of Grate G = Gravitational Constant (32.2 ft/sz) H= Allowed Head on Grate, Ponding Depth (ft) Apply Reduction Factor for the Allowable Capacity. Qc = Qi�1 - F) Grate Dimensions and Information: Width ( W ): 3 ft Length (L ): 3 ft Opening Ratio (R ): 0.65 sqft/sqft Reduction Factor (F): 50% Inlet Grate Open Area (A ): 5.85 sqft Assumed Capacity per Head Allowed Inlet Inlet Capacity Capacity w/ Reduction A�lowed Head (ft) (Q;, cfs) Factor (Q�, cfs) 0.25 15.73 7.86 0.50 22.24 11.12 1.00 31.45 15.73 1.50 38.52 19.26 2.00 44.48 22.24 INLET SIZING CALCULATIONS :►'���``��`��� •:���`���`��`������ �`��`�``����� •/ �� I [1I ( L H _ � Design Flow Design Rate Allowed Head Inlet Capacity Flow Depth Inlet ID: (Q,00. cfs): (H, ft�: (C�, cfs) (H, ft) Inlet-D2a 5.64 1.5 19.26 0.13 Inlet-D2b 10.65 1.2 17.23 0.46 Outlet-DOl 13.20 2.17 23.17 0.70 Outlet-O51 16.14 0.25 7.86 1.05 Page1 Weir Report Hydraflow Express Extension for AutodeskOO Civil 3DOO by Autodesk, Inc. Inlet-D2c Capacity Rectangular Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Q vs Depth No.lncrements = 10 Depth (ft) 1.00 0.50 � �� -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) Inlet-D2c Capacity Tuesday, May 9 2023 = 0.45 = 15.08 = 6.75 = 2.23 = 15.00 Depth (ft) 1.00 0.50 � �� -0.50 0 2 4 6 8 10 12 14 16 18 20 Weir w.S. Length (ft) � Sewers Extension for Autodesk0 Civil 3D0 Plan ' Outfall Outfall 7 SDMH-02 OUTLET-D01 �D2a 3 Outfall INLET-D2c 4 �♦ ��u�fall � Inlet-D2b Number of lines: 8 I Date: 5/9/2023 Storm Sewers v2023.00 Page 1 �rt Invert Line Line HGL HGL HGL EGL EGL EGL Gnd/Rim Gnd/Rim Junct Vel � Dn Length Slope Up Dn Jnct Up Dn Jnct EI Up EI Dn Type Ave ) (ft) (ft) (%) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) 13 4926.01 12.059 1.00 4926.99 4927.43 4926.99 4927.35 4927.79 4927.35 4930.03 4927.81 MH 3.85 55 4926.13 42.009 1.00 4927.44 4926.99 4927.44 4927.82 4927.37 4927.82 4929.50 4930.03 Grate 5.02 76 4923.14 86.000 0.72 4924.68 j 4924.06 4924.68 4925.06 4924.45 4925.06 4926.47 4924.93 Grate 4.98 87 4909.17 33.000 5.15 4912.25 4910.54 4912.25 4912.87 4911.16 4912.87 4913.73 4911.51 Generic 6.34 72 4909.20 34.504 1.51 4910.97 4910.45 4910.97 4911.68 4911.16 4911.68 4912.43 4910.99 Grate 6.76 00 4906.85 15.086 0.99 4908.35 4908.20 4908.35 4909.03 4908.88 4909.03 4910.90 0.00 MH 6.63 19 4907.00 113.000 0.17 4909.42 4908.75 4909.70 4909.89 4909.22 4910.17 4911.96 4910.90 MH 5.49 25 4907.19 32.694 0.18 4909.89 4909.70 4910.36 4910.36 4910.17 4910.83 4909.85 4911.96 Grate 5.49 Number of lines: 8 I Date: 5/9/2023 Storm Sewers �file Proj. file: New.stm G�;y�1I111 20 30 40 50 60 70 80 90 100 110 120 130 140 EGL Reach (ft) 4917.00 4914.00 4911.00 4908.00 , ,•� �� Storm Sewers � � � � � O� � O � �O rn rn . �+"� u� �file Proj. file: New.stm M 7 C � � n co EGL Reach (ft) �:xi:�r�i�� 4933.00 4930.00 4927.00 4924.00 4921.00 Storm Sewers ) 20 30 40 50 60 70 80 90 100 �file Proj. file: New.stm � � � O� � O �MM . Olf] EGL Reach (ft) �:xx�r�i�� 4935.00 4932.00 4929.00 4926.00 4923.00 Storm Sewers ) 20 30 40 50 60 70 80 90 100 �file Proj. file: New.stm � � = o � mN EGL Reach (ft) C�;y��iI�l 4919.00 4916.00 4913.00 4910.00 4907.00 Storm Sewers ) 20 30 40 50 60 70 80 90 100 �file Proj. file: New.stm v � � O J M� EGL Reach (ft) C�;3►�:�iI�l 4922.00 4918.00 4914.00 4910.00 4906.00 Storm Sewers ) 20 30 40 50 60 70 80 90 100 Channel Report Hydraflow Express Extension for AutodeskOO Civil 3DOO by Autodesk, Inc. West Culverts Circular Diameter (ft) = 1.25 Invert Elev (ft) Slope (%) N-Value Calculations Compute by: No. Increments Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 = 100.00 = 2.00 = 0.016 Q vs Depth = 10 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Section Reach (ft) Wednesday, Feb 15 2023 = 1.13 = 7.910 = 1.16 = 6.80 = 3.13 = 1.12 = 0.75 = 1.84 0 1 2 3 Channel Report Hydraflow Express Extension for AutodeskOO Civil 3DOO by Autodesk, Inc. Inlet-D2b Pipe & East Culverts Circular Diameter (ft) = 1.50 Invert Elev (ft) Slope (%) N-Value Calculations Compute by: No. Increments Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 = 100.00 = 1.50 = 0.016 Q vs Depth = 10 Monday, Feb 20 2023 �xceeds 'Peak 100-yr Highlighted Depth (ft) 1.35 Q (cfs) = 11.14 Area (sqft) = 1.68 Velocity (ft/s) = 6.65 Wetted Perim (ft) = 3.75 Crit Depth, Yc (ft) = 1.28 Top Width (ft) = 0.90 EGL (ft) = 2.04 Section Reach (ft) 0 1 2 3 Channel Report Hydraflow Express Extension for AutodeskOO Civil 3DOO by Autodesk, Inc. Basin D2a & Basin D2b Swale Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 2.50 Invert Elev (ft) = 100.00 Slope (%) = 1.77 N-Value = 0.030 Calculations Compute by: Q vs Depth No.lncrements = 10 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wliwivna►m Swale Slo�e Wednesday, Feb 22 2023 = 1.50 = 47.97 = 9.00 = 5.33 = 12.37 = 1.55 = 12.00 = 1.94 Elev (ft) Section 103.00 102.50 102.00 101.50 101.00 100.50 100.00 99.50 Depth (ft) 3.00 2.50 2.00 1.50 1.00 � � � �� _n �n I 2 4 6 8 10 12 14 16 18 20 22 24 v Reach (ft) Channel Report Hydraflow Express Extension for AutodeskOO Civil 3DOO by Autodesk, Inc. OS1 - Offsite Spread for Easement Gutter Cross SI, Sx (ft/ft) = 0.020 Cross SI, Sw (ft/ft) = 0.083 Gutter Width (ft) = 2.00 Invert Elev (ft) = 100.00 Slope (%) = 2.25 N-Value = 0.016 Calculations Compute by: Known Q Known Q (cfs) = 15.84 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Spread Width (ft) EGL (ft) Wednesday, Aug 16 2023 = 0.46 = 15.84 = 2.97 = 5.33 = 17.34 = 0.60 = 16.87 = 0.91 Elev (ft) Section 101.00 100.75 100.50 100.25 100.00 99.75 Depth (ft) 1.00 0.75 0.50 0.25 � �� _n �� ) 2 4 6 8 10 12 14 16 18 20 22 24 v Reach (ft)