HomeMy WebLinkAboutDrainage Reports - 05/07/1996FINAL
STORM DRAINAGE
and
EROSION CONTROL REPORT
DUPLEX CONSTRUCTION
UNIT "B"
629-112 SOUTH MELDRUM STREET
CITY OF FORT COLLINS, CO
February 16, 1996
Prepared For:
Jim Schmid
401 West Mulberry Street
Fort Collins, CO 80521
(970) 221-0700
Prepared By:
Structured Engineering
31 8 East Oak Street
Fort Collins, Colorado, 80524
Phone (970) 495-0810
Fax (970) 224-1314
, ovecl Report
at,e ~ /tLCJc
FINAL
STORM DRAINAGE
and
EROSION CONTROL REPORT
DUPLEX CONSTRUCTION
UNIT "B"
629-112 SOUTH MELDRUM STREET
CITY OF FORT COLLINS, CO
February 16, 1996
Prepared For:
Jim Schmid
401 West Mulberry Street
Fort Collins, CO 80521
(970) 221-0700
Prepared By:
Structured Engineering
318 East Oak Street
Fort Collins, Colorado, 80524
Phone (970) 495-0810
Fax (970) 224-1314
February 16, 1996
Mr. Bas i l Hamden
Stormwater Utility
City of Fort Collins
PO Box 580
Fort Collins, Colorado 80522
Dear Basil,
Attached is the Final Storm Drainage Report that accompanies the
construction of a single duplex located in the Old Town drainage basin at 629-112
South Meldrum Street.
All design is in conformance with the latest edition of the City of Fort
Collins' Storm Drainage Design Criteria and Construction Standards.
~,~,'iet~~ ·"••····· ~ "'
·=' ~1
Josep t~'!/J"AJ~~~ ~
Structured Engine
r .
'
~---
Vi ne Drive
INTRODUCTION
FINAL STORM DRAINAGE
and
EROSION CONTROL REPORT
for
Duplex Construction -Unit B
629-112 South Meldrum
February1 6, 1996
A single duplex is proposed for construction on a residential lot within the
Old Town Drainage Basin between Laurel and Myrtle Streets at 629-112 South
Meldrum. 629 Meldrum is an existing one story frame house residence.
This report sums up the analysis that was undertaken to determine what, if
any, impacts the proposed construction will have on the historical drainage
patterns in each area.
The report will address the following:
1 .Site Descriptions
2.Storm Drainage
A. Design Criteria
B. Hydrology
C. Conformance With Existing Master Drainage Plans
3. Erosion Control
A. Erosion Control Measures
It is intended that the recommendations found in this report become an
integral part of the design and construction phases of the project.
1. SITE DESCRIPTION
The property is also known as Lot 9 of Block 86 of the City of Fort Collins.
The area is established and mature with landscaping and an older house. The
duplex site will be in the back half, or western part, of the lot. With the exception
of a water service installation, little disruption is planned for the front half of the
lot. Existing lot grading is at approximately . 5 %, generally from the back, (west)
of the lot towards the middle.
The Arthur Ditch traverses the front of the lot between the existing
residence and Meldrum Street. It is below grade and enclosed in a concrete box
culvert. Alleys along the west and south lot lines are paved. The alleys are of the
inverted crown type and have inverted pans down the center. Drainage from the
alleys is collected in a catch basin at the intersection of the two alleys and is
discharged into the Arthur Ditch culvert.
The only other existing drainage improvements immediately adjacent to the
site is curb and gutter along Meldrum Street.
There are no pronounced natural drainage features on the site.
The soils group making up both sites are primarily ML and CL-ML according
to the Larimer County Soils Survey by the Soil Conservation Service.
STORM DRAINAGE
A . Design Criteria
The City of Fort Collins has prepared a Storm Drainage Design Criteria and
Construction Standards (SDDC) which provides the basis for the analysis used in
predicting storm runoff and the recommended drainage improvements.
B. Hydrology
The Rational Method is used to predict the amount of runoff . The 100-year
return frequency was used in this report to predict major peak discharges, and 2-
year storm is analyzed to predict minor flows.
C. Conformance With Existing Master Drainage Plans
The Old Town Master Drainage Piao was prepared for the City of Fort
Collins by RCE Engineers on January 7, 1 993. RCE assumed a runoff coefficient
of .60 for the area proposed for construction of the duplexes. According to the
Stormwater Utility , if the percentage of imperviousness of a deve l oped si t e is less
than the 60% assumed by RCE in their report, then on -site detention is not
required. Calculations included with this report confirm that the site has an
imperviousness percentage less than 60%, hence detention is not analyzed nor
provided.
.3... EROSION CONTROL
The SDDC outlines the causes and results of soil erosion due to wind and
rain. Because each site is less than 1 acre in size, they are exempt from wind
eros ion control requirements. Along with the requ i rements of this report and the
erosion control plans, the SDDC shall be considered in it's entirety for guidelines to
aid i n preventing rainfall soil erosion. The SDDC will govern requirements and
specifications for earth moving at the construction site .
A cost estimate for erosion control measures is included with this report.
SUMMARY OF STORM DRAINAGE AND EROSION CONTROL MEASURES
The following is a summary of the storm drainage improvements and erosion
control measures that are to be observed during construction.
GENERAL EROSION CONTROL NOTES
1. Keep disturbed areas to a reasonable minimum at any one time.
2. Stabilize all disturbed areas.
3. Keep runoff to velocities not causing erosion.
4. Provide diversion channels to direct runoff around and away from
disturbed areas.
5. Keep all cut and fill slopes stabilized with terracing or scarifying
furrows perpendicular to the slope .
6. Protect stockpiled materials from wind erosion. Stockpiles are not to
be higher than 8'.
7. Permanent groun d cover is to be established on all disturbed areas.
Areas to be seeded which have been compacted by construction
activities are to be ripped or otherwise loosened prior to seeding.
8. Provide a temporary cover crop or an application of mulch to areas to
remain unseeded greater than one month. Disturbed areas which
have topsoil removed may require an application of fertilizer prior to
temporary seeding.
9. Inspect, clean and repair all erosion control measures the following
work day after each storm event.
10. Additional erosion control construction details and specifications shall
be taken from the City of Fort Collins Storm Drainage Design Criteria
and Construction Standards.
Mr. Basil Hamden
Stormwater Utility
City of Fort Collins
PO Box 580
Fort Collins, Colorado 80522
Dear Basil,
Attached is the cost estimate for erosion control measures associated with the
construction of a duplex (unit "B") at 629 South Meldrum Street.
Silt Fence -180 If @ $2.50 /If
Alternate; Seeding -.237 ac @ $1300/ac
Security required = $450.00 x 1.5 =
However, city policy requires a minimum escrow of ...
$450.00
$308 .10
$675.00
$1000,00
Basil, please feel free to call with any questions, comments or suggestions you may
have.
Very Truly Yours.
Joseph P. Marcisofsky, P.E.
Structured Engineering
LEGEND GRAPHIC SCALE 20 0 10 20 40 eo 0 DESIGN POINT @ BASIN DESIGNATION AREA (ACRES) = GAS METER C"Q., = POWER POLE 1'\ = STUMP = CABLE BOX 0 = CATCH BASIN 5001.5 C8J = ELECTRIC TRANSFORMER I ,-------I I • ( IN FEET ) 1 inch = 20 ft. = ELECTRIC VAULT NOTE: THERE SHALL BE NO DISTURBANCE = ELECTRIC BOX TO NEIGHBORING AREAS FINAL GRADING TO '-" = BRACE POLE . i '6 4999.1 I O _ CLOTHES LINE PIPES ENSURE SITE RUNOFF DOES NOT O 0 5001.5 ~~\5 fR\ = STORM DRAIN MANHOLE ENCROACH ON ADJACENT PROPERTIES. o\~o. r5000-L 149996 ___ 1 5002.3 I poo1.5 15001.1 ~ \W -, "' . \ 7 · ,,_-: 1, 5001·6 I 15001.6 ,,,. ~<::§:) ¢ = LIGHT ,. 36" DECIDUOUS TREE-\ '-1 .. sd,o.1 \ I ~--~~ 5001.7 I 5~.2 DECIDUOUS TRE 5000 \ . 1 \ I I ____ :-. I I / ---/--. '-., . ~-'+ \ I ; \ ~ I / I : , 52()1,2 · · · '\. ·. \ ) oodl 1·8 :' 100 LF EROSION . ' • ·_•4 . .. . ~ . . I . 5 1· 1 I I l / CONTROL FENCE \ ~ · 4 . \ d , I (INSIDE EXIST. FENCE AT P.L.) \. .'-. • · '\. 625 \ I' -I I C NC. DRAIN ~AN I 5001.5 SEE DETAIL SHT. 2 \ '." •. · • . ,. "-. MELDRUM \ ·49,9.9 I EOG~ OF PAVEMENT I _!001.6 · 5000·6 '•. '\... · · ... · ·.~001·3 '1-..,~.1.0 0 I . 8" 0 S TREE ' 'x500H · . '\. ~'c>v'f · : r. EXIST. sPoT ELE. (TYP.) 1 DEciou u °' .:<~; .. . ~ .. , •·· ~-.. ~ ,4~ , ... _ .. 1 \ 11 -sooo.1 -.· ·,_j_J,1soo1.o , , . · -. I. · f ·j 11 I . ' -, --\1 ,• r • . . "--~~,:...,.....:,..,,.;-..rr 7 ' \ I I I .. ·"-/ ~' ·,1 1v·;,-~~2 "-"' .. /1 · ,r---1· I " I I I I 3 DECIDUOUS TREE ' -------._,_ / .__:::-··-' ' ~~-.'...-·'/<,... .i ~...::::::.:-DRAINAGE BASiNS ~ .·· .:r-~~ / / ,,... . ·1 ~£1.r,-9 I / [ -.............. 9" DECIDUOUS TREE /-------~ ·r:-::--:::. . r.z---~; "' • > '. Vsooo I .. \ ~ ·I / . ~ CHAIN LINK rd• -------· :) -:::,-:._.. . ?.-fl. / i\_'-·~-STUDY AREA '\. .:._----4 • .f-/ / / J 5abo.2;~ . I ~--· ·• 001.5 ,-.. ..-, .--.r-... --;-. ,~-,-... .,~. s~;r::[~-:::::-=· '._ r\-....' \' ""'--"-• ~t:7:~~~ 1 B-~ .• I \ I I -. --------""'"5~4""''!"--~-:-~-~.,~..----------~ .----7-~-t•2o------7 . q -O · ' 0 c:.':. . _ . 'r: ;,_ ·•:\5001.4 .1--_ 5000.'!\ 4999.9 I 111/V\1 5 ,;---,5001.1 c• ✓ -~-C 5001 0 ·, ,, ? 500i-.-2-----11,./ , ,,, I. \ 1 15001.5 -----===""""~ ---~ .... -. .. ) · ,,-;,i -..... • ~r5001·/·r-------------\ ,11,i,i'sooo.i> I .·1 \I 1 .no "?'--:,..,s'· r o EXISTING ONE ,· ~ ·, '', '\ \ i i i , , \ 5002.5 1 I I I ~~ ;:-,J M"""""~ ...... --.. 1 · soo1.3 _. STORY FRAME _:.....~ol.6~ · ,,. 1 r1'-.. · 5000 8 _J I ~ I I I ~~iy I / -<\ ........_ __ ) HOUSE · 500~z27,'c-~ \ -l~-H:; ~~r.-_-.. . ._5ep<>·3 / I I ~ i-------~ \ ) 18" DECIDUOUS TREE ~-.. bc-15~\--+-5000--,.--• · .. 7 sopq.4 / I / -< . ['V ~1-\ ,,. ., 1 5000.3 .' I 11 " (PROPOSED DUPLEX ~---"!f.-,..:c: -1--,~ I \ '1 A. \ 14• -1 ; " 1-----+--1 -.," , ■ <::: _~, ~ ooo ·woOO. FENCE I' : , I [II -629 ~ELDRUM ~,,.,,,, 1 -.... -;. ffi5 \ '-I·· I ; I I !UNIT Bl 5001·2 · -;,1 (~-~, ~r----------,1· . 1/ .· r-w w 0:::: r-(/) ~ I I~ I / MIN. T.O.C.= 03.00 '\J/,1$1Jl\J,':--... t_200~.5-:----~~1.6...,.. ~-,·->//:', \ \ o . 5000.9 '1)l l ~II/ -----t---i ~ I I . soo1.3 ~-rsoo1T - ----6--~~ .a \ \ I-I t r l , ~ _ I y;·--.--z1>-...:::.--' ~ \ .• lu ,). · 5 1.4 j 41 --/-\'"'-"' \ 500'.6 , ... , \ ~ ,CJ' -----~ ___ ..,. : ~-7 -5001.3 · 5001.4 :,,-:1\'· \ \ ~ L ---~ kf1 ~ ~efs'~ ____ 02 5001.1 soor.3--~ 3 12" DEc1ouous TREE \ \ 1:-~~ · 5 o.4 =:) ________ ..,/.,_,_002. IJ1 ~~lyl / -0-= E.: =...o -. 5001· ~ -~ll . . . -,999.8 1-~I~ 5001.1 . . \ •'\ -. ;. •: 5000J! . ~-. · 0:::: ~ 1.4 . 5001.7 \ . 4 '\ . . ·. . " . \ . ~ 0 ---0 I . 5001.2 5001.5 001.3 ----- ---~.O.P~ - _. 5001~ --------~CON<:_ ORA~ ~A~~ •5001.~ \·• . ·,. \ ~•~ . -~ . .,I _j -------~----==r.!2------7--:----. . . . ,-~ .. ..;..1 ....... -· ------"---'--~ .... \. • , .... ,l·1 4 • _..-1.. ~~-=-,4,..;.--- -------- -----· --;-/\1\-1 ---------ld5001.6\· · , • . W _J ---------· ;:,vul.4 · "7<N .5 '\' ·. \ ·' . 5001.4 -sgga .... ____ --~ _______________ -_ --~ _____ -__ -__ -...._ -r-~~~-----_ ~ ~~ _ ----~ ----RIM = 5001.13 . 5001.1 \ • · \,. i . " 4· ,. ~ 5001 8 «/V\17 · 5001.7 ------ ---·.5001-.5 ·'. -.• .. ·. .41 5001.6 5001.7 RIM = 5001.8 • . vVV ._,..__ ----. 5001.6 ,. --_.,_ \5001.~--sooo.o ·. 4 ... \ \ 12" INV. E. & N. = 5000.01 6" INV. S. = 4999.91 629 SOUTH MELDRUM 5001.1 UNDERGROUND l,_2 \ '_~ IRRIGATION DITCH5001.4 5001.4 I r-=:) 0 (/)
.,, .,, .,, ......... ......... ......... ::c::c::c .,,.,,.,,
000 inoo
-N
_N., .,.,., ---NNN NNN
l SC...\rl--Ai'l.
SI"""'-v'\o 1 ~f r o v ~Nt e..~½ Cl/"~
Q D<e J ::. a_ µ 's -r .
~sJe. C:;
S½fg--(~. 1 ss . -0/(, ;;--✓
f?As \t-.l (!) D (:).J~ • J .
/rrL--. 10 '1:> ?O 'Sf
-\0"2..o sr-
(pCJ o Sr-
17-z.o SP-
2.e,r, Sr-
\~ 't>o Si:-
~ le $,~
'=,4'8 ~ t=-
-
C
(k IM-e..... l "'-~ C ~-.!>.S. = 4 ,o O s ,;:. .. l 0
Cai.,v...f...,.~\\-<L c_,,, 538 ~(,,s\-. G.'t6'(s')-r 4,oo(.\) .-=-.1=>1
~ f,r o """'-' o-.. bcJ v e ,,I A-c'J.&: Ci-1)t flc,..tt.vor\c.. ('lo l-
0.c.c.ou,.,k.t: for ~bo"c..
NJ~ 61-1s+-Cv-✓""~ ( 1b ~ ~ MCPc.0)
~\ "&,,.-_ ~.A-o--~ ':>
3/
''"'"" .........
111111111
111111111 :z::z::z: .,,.,,.,, 4-.. 000
lftOO /Jt.Lc<{ -N @ _N.,, .,,.,,.,, ---NNN
NNN
@I) C1Jer~,~ \01Yh--
-c(o tl,l,{,-: ,?5qg :_ , 51,
1sooc::>
' ff.5
4.
l 1S'E>O 5~
I a_ 'Z,.O
(ooO
Z1 Ge,
G.S-4,
-\bSc:,
(p 4 '2:,
"' <.. s \-
629 SOUTH MELDRUM STRUCTURED ENGINEERING PROJECT N 9603 HYDROLOGIC CALCULATION WORKSHEET BY: JPM RATIONAL METHOD PROCEDURE DATE: 16-Feb-96 BASIN DATA 11 INITIAUOVERLAND TIME TRAVEL TIME 11 TOTAL 11 Ti Tt II TIME II BASIN II DESIGN II ATIONA II EVENT AREA LENGT SLOPE Tc LENGT SLOPE VELOCITY II Tt II Tc II ESIGNATIO II STORM II COEFF II COEFF II II II C II Cf acres ft % min ft % fps II min II min [ENTER] II [ENTER] 11 [ENTER] 11 [ENTER] [ENTER] [ENTER] [ENTER] [ENTER] [ENTER] [ENTER] II H-1 I 2 yr I o.57 I 1.00 0.110 65 3.8 10.0 II 0.0 10.0 H-1 I 100 yr I o.57 I 1.25 0.110 65 3.8 10.0 0.0 10.0 D-1 I 2 yr I o.57 I 1.00 0.110 65 3.8 10.0 0.0 10.0 D-1 I 100 yr I o.57 I 1.25 0.110 65 3.8 10.0 0.0 10.0 H-2 I 2 yr I 0.44 I 1.00 0.237 185 0.5 21.1 0.0 21.1 H-2 I 100 yr I 0.44 I 1.25 0.237 185 0.5 17.6 0.0 17.6 D-2 I 2 yr I o.57 I 1.00 0.237 185 0.5 16.9 0.0 16.9 D-2 I 100 yr I o.57 I 1.25 0.237 185 0.5 12.4 0.0 12.4
RUNOFF SUMMARY 629 SOUTH MELDRUM
NOTE: MINIMUM VALUE OF Tc IS 10.0 MINUTES
BASIN DESIGN DESIGN DIRECT RUNOFF
POINT STORM
Tc AREA COEFF RODUC Q
mins acres C*Cf C*Cf*A in/hr cfs
H-1 1 2 yr 10.0 0.110 0.57 0.06 2.50 0.16
H-1 1 100 yr 10.0 0.110 0.71 0.08 7.20 0.56
D-1 1 2 yr 10.0 0.110 0.57 0.06 2.50 0.16
D-1 1 100 yr 10.0 0.110 0.71 0.08 7.20 0.56
H-2 2 2 yr 21 .1 0.237 0.44 0.10 1.80 0.19
H-2 2 100 yr 17.6 0.237 0.55 0.13 5.60 0.73
D-2 2 2 yr 16.9 0.237 0.57 0.14 2.00 0.27
D-2 2 100 yr 12.4 0.237 0.71 0.17 6.50 1.10
(
RAINFALL PERFORMANCE STANDARD EVALUATION
---------------------------------------------------------------------1 PROJECT: ~ 2.~ :;,, H.EL Q f2-'-' "'--lJ 0-t 1-(3 STANDARD FORM A I
. I
COMPLETED BY: J f vV' DATE: z/i .::.. / ~ I# !
!---------------------------------------------------------------------1 DEVELOPEDIEROOIBILITYI Asb I Lsb I Ssb I Lb Sb I PS I
SUBBASIN I ZONE I (ac) I (ft) I (i) . I (feet) (%) I (~) I
---------1------------------1-------1-------1--------------1-------1 I I I I 1° c < I 7\ 0 I I D --z.._ ~ e ~~ .7-~ 1 I I ! 0
.) · • '? I 1 0 I
I I I 1 I I I
I
I
I
I I I I I I
I I I I I
1· I I I
I I I I I I I I
I I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
I
I
I
I
I I I I I I
1---------------------------------------------------------------------I HOI/SF-A:1989
EFFECTIVENESS CALCULATIONS
1----------------------------------------------------------------------! I PROJECT: c'.:.zs .S o url. \Me.l&v..iv~ -U V\\t 5 STANDARD FORM B I
I / . I I COMPLETED BY: ~ (' 0-,\ DATE: -Z. 1 "I / 'i l,., I I ___________________ I
I I I Erosion Control C-Factor P-Factor I
I Method Value Value Comment I
f'M~=~-----------------:~~--------~::~----------------------I
6=JT..+f>L1~1-t€: 0 ~I'--+-'.]~ ' 0 8 r.o c.) I
115o t1 5ec_~l o."" t ,, I
-~11.Av~I M"l~ • , 7 ,4vc...· l,oc.:> -fA-f.1'11->C, 5'fAl.LS I
----------------------------------------------------------------------, MAJOR PS SUB AREA j
BASIN (:) BASIN (Ac) CALCULATIONS ------------------------------------------------------------------
I·
I
Lu + 'J (_ = , s 2(.0 1) .\-, 3{.oc..) -4-,41.(,0 -?')'= , 6 '-6
Lu rJ. 1 ~ , 5 z... }--p<-~ A-z.. ~ \,oO .
E,,'ffC-!..•nve.."'<."\'.:.::: ~-,o"') \OO ' 9.4..
0
/.,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I I I
----------------------------------------------------------------------1 HDI/SF-8:1989
_j