Loading...
HomeMy WebLinkAboutDrainage Reports - 06/22/1996,Final :4 Report Date 7- FINAL STORM DRAINAGE and EROSION CONTROL REPORT 605-1/2 SOUTH MELDRUM and 627-1/2 AND 629-3/4 SOUTH SHERWOOD CITY OF FORT COLLINS, CO May 16, 1995 (Revised June 29, 1995) Addendum No. 1 February 22, 1996 Prepared For: City of Fort Collins Stormwater Utility PO Box 580 Fort Collins, Colorado, 80522 Prepared By: Structured Engineering 318 East Oak Street Fort Collins, Colorado, 80524 Phone (970) 495-0810 Fax (970) 224-1314 February 22, 1996 Mr. Basil Hamden Stormwater Utility City of Fort Collins PO Box 580 Fort Collins, CO 80522 Dear Basil, Attached is Addendum 1 to the Final Storm Drainage and Erosion Control Report that accompanied the submittal for duplex construction at 605-1 /2 South Meldrum and 627-1 /2 and 629-3/4 South Sherwood, dated May 16,1995 and revised June 29, 1995. The reason for the addendum is to address the fact that staff in Development Review wants the alley behind the Sherwood duplexes to be constructed with an inverted crown with a concrete drain pan down the center. This addendum compares alley flows to pan capacities. If you should have any questions or suggestions concerning this addendum, do not hesitate to call. Si Jc Structured Engineering Addendum No.1 to the FINAL STORM DRAINAGE and EROSION CONTROL REPORT 605-1/2 SOUTH MELDRUM and 627-1/2 AND 629-3/4 SOUTH SHERWOOD May 16, 1995 (Revised June 29, 1995) Addendum February 22, 1996 This addendum, and the revised sheets C2, C3, and C4, become part of the original Final Storm Drainage and Erosion Control report titled as above. City staff at Development Review have requested the following revisions be made to the utility drawings for the above project. 1 . Alley construction behind the duplexes proposed along Sherwood should incorporate an inverted crown in lieu of the normal crown cross section originally proposed. A concrete drain pan is to be constructed down the center of the alley. 2. The concrete drain pans, including the pan already proposed for the alley behind 605 Meldrum, are to be a minimum of 3' wide, with a depth of 5/8". The original pan design called for a 2' wide pan, 2" deep. Calculations are included to determine pan capacities at .40% (Sherwood) and .64% (Meldrum). Drainage capacity of the revised alley and pan cross section is adequate for the anticipated 100yr runoffs. End boo ' �,� ti� � mow►) �10 b � " o oZ -11 :2 � Z z yoo e-N jk--e v -------------- —I IWA L, , J r. l I '-,)b V� / Z 1i1^d `Jvr-;1vL)( ✓.t") L7 � I LC///�� ,J\