HomeMy WebLinkAboutDrainage Reports - 02/20/2020Final Drainage Report
For
Stodgy Brewing Co., LLC
1802 and 1804 Laporte Avenue, Fort Collins, Colorado
AGPROfessionals
3050 67th Avenue, Suite 200
Greeley, CO 80634
(970) 535-9318
02/04/2020
City of Fort Collins Approved Plans
Approved by:
Date:
Dan Mogen
02/20/2020
Stodgy Brewing Company, LLC
ii
Table of Contents
Certifications ..................................................................................................................... 3
Introduction......................................................................................................................... 4
1. Location................................................................................................................... 4
2. Description of Property............................................................................................ 4
Drainage Basin and Sub-Basins.......................................................................................... 5
1. Major Basin Description.......................................................................................... 5
2. Sub-Basin Description............................................................................................. 5
Drainage Design Criteria .................................................................................................... 7
1. Development Criteria............................................................................................... 7
2. Four Step Process..................................................................................................... 7
3. Hydrological Criteria............................................................................................... 8
4. Hydraulic Criteria .................................................................................................... 8
Drainage Facility Design.................................................................................................... 9
1. General Concept....................................................................................................... 9
2. Specific Details........................................................................................................ 9
Conclusions....................................................................................................................... 10
1. Drainage Concept................................................................................................... 10
2. Compliance with Fort Collins Stormwater Criteria Manual.................................. 10
Erosion Control................................................................................................................. 11
1. Compliance with Erosion Control Criteria............................................................ 11
List of References............................................................................................................. 12
Appendices
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 4 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Introduction
1. Location
The proposed site is in part of the Southeast ¼ of the Northwest ¼ Section 10, Township
7 North, Range 69 West, of the 6th P.M., Larimer County, CO. This site is located on the
north side of Laporte Avenue in Fort Collins, Colorado and directly across from Frey
Avenue. Frey Subdivision and City Park North Subdivision are located directly south of
the proposed development. Larimer County Canal Number 2 borders the east side of the
proposed development. Salud Health Center borders the north and west side of the
proposed site. A vicinity map is shown in Appendix A.
2. Description of Property
The applicant is proposing the development of 1802 and 1804 Laporte Avenue into a
small brewery which will include the brewery, taproom, patio seating, on-site customer
parking, food truck parking, landscaping, and employee parking. The total property
acreage is 1.19. The proposed site is currently zoned Limited Commercial (C-L).
The existing site consists of a single-family residence located at 1804 Laporte Avenue,
one multi-use building, with occupancy of F-2, B, and A-2 at 1802 Laporte Avenue, and
a commercial building, occupancy B at 1800 Laporte Avenue (which is located on the
1802 Laporte Ave Parcel). The single-family residence currently located at 1804 Laporte
Ave. is going to be torn down and used for customer parking. The other buildings will be
kept and renovated. The multi-use building will be renovated and used for the brewery
and taproom. The commercial building will remain on-site for brewery office use. The
two buildings will be connected. The existing asphalt at the customer parking will remain
and be trimmed to match the proposed site plan.
Currently there are no stormwater features on-site.
There is one main soil type: Nunn clay loam with 1 to 3 percent slope (see USDA-NRCS
Custom Soil Resource Report in Appendix A).
Larimer No. 2 irrigation canal borders the property on the east.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 5 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Drainage Basin and Sub-Basins
1. Major Basin Description
The proposed site is in the West Vine Basin Master Drainage Plan. The proposed site is
currently not located within a proposed improvement or flood control and water quality
area. The West Vine Basin Plan with the project site labeled is shown in Appendix A.
The site has slopes ranging from approximately zero to five percent predominately
towards the south. The majority of the stormwater appears to flow south. Due to the
dense vegetation, runoff is dissipated either by interception from the large trees and/or a
velocity reduction in the sheet flow. A topographic map was downloaded from the United
States Geological Survey (USGS) website and is shown in Appendix A. The owners are
not aware of any previous drainage issues and there was no visible sign of any previous
drainage issues on site.
A Federal Emergency Management Administration (FEMA) map of the project area is
included in Appendix A. The property is located on panel 08123C1575E and is not
currently located within a 100-year floodplain.
No off-site flows are anticipated. Off-site flows from the east are intercepted by the
Larimer No. 2 irrigation canal. Off-site flows from the south are intercepted and diverted
by Laporte Avenue. Topography to the north is flat and off-site flows from the north
appear to flow east to northeast toward the Larimer No. 2 irrigation canal. Off-site flows
from the west flow south and bypass the site.
2. Sub-Basin Description
There are five sub-basin areas; Sub-basin A, Sub-basin B, Sub-basin C, Sub-basin D, and
Sub-basin E that were considered for the drainage report. See the Drainage Plan for the
Sub-basin delineation.
Sub-basin A includes the customer parking area and the trash enclosure. The customer
parking will include TrueGRID permeable pavers. For overall impervious calculations,
the TrueGRID was assumed to be 40% impervious. The permeable pavers will replace
the existing residence, pavement and gravel located at the 1804 Laporte Avenue address.
The TrueGRID system with sub-base and underdrain will provide treatment for the
proposed customer parking lot and trash enclosure. The underdrain is proposed on the
east side of Sub-basin A. The underdrain connects to a 1’ diameter inlet which connects
to a 4” solid pipe carrying flows to the east. Historically, Sub-basin A flowed toward the
southeast. Historical flow patterns will be maintained.
Sub-basin B is the proposed emergency access lane, handicap parking, entrance sidewalk,
and the southwest corner of the existing building. The asphalt for the emergency access
land and handicap parking is existing. The entrance sidewalk will be added at the existing
grade. The entrance is elevated to meet requirements of the access design and prevents
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 6 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
flows from exiting through the access. Historical flow patterns will be maintained for
Sub-basin B.
Sub-basin C is the front deck area, employee parking and front lawn/landscaping. No
proposed development will occur in Sub-basin C. The employee parking has been
delineated on the map to meet parking space requirements. The existing area is gravel
with a few weeds. The weeds and existing chain link fence will be removed but percent
impervious are not changing and no grading will occur. Historical flow patterns are
towards the south and will be maintained for Sub-basin C.
Sub-basin D is the majority of the existing buildings and the northeast corner of the
parcel that is densely vegetated. The existing deck/walkway that historically has been
between the buildings will be removed and the buildings will be connected with a
proposed conditioned hallway. Historically, Sub-basin D flows east and northeast. These
historical flow patterns will be maintained.
Sub-basin E is the sidewalk, parkway, and entrances. Sub-basin E sheet flows south to
the curb and gutter on Laporte Avenue. Historically, Sub-basin E flowed toward the
south. These historical flow patterns will be maintained and flows will be directed to the
curb and gutter on Laporte Avenue.
Sub-basin F is the right-of-way that includes the westbound lane of Laporte Avenue. The
westbound lane of Laporte Avenue historically is relatively flat and flows northeast. The
improvement of curb and gutter to this section of Laporte Avenue will direct flows from
Sub-basin E and Sub-basin F east and will tie into Laporte Avenue drainage.
Laporte Avenue was considered in the total site percent imperviousness but was not
included in a sub-basin as the site drainage is not impacted by Laporte Avenue.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 7 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Drainage Design Criteria
1. Development Criteria
The proposed site runoff was evaluated using the criteria set forth in the Fort Collins
Stormwater Criteria Manual (FCSCM) and Urban Drainage and Flood Control District
(UDFCD) Criteria Manual Volumes 1, 2, and 3.
2. Four Step Process
The Four Step Process recommended by UDFCD and City of Fort Collins was utilized to
reduce runoff volumes and minimize impacts on receiving waters from smaller, more
frequently occurring events.
Step 1. Employ Runoff Reduction Practices
To reduce runoff peaks, volumes, and pollutant loads, Stodgy Brewing is proposing to
implement the following:
TrueGRID Pro Plus Pavers (TrueGRID Pavers) are proposed in the customer
parking area. The TrueGRID Pro Plus Pavers are assumed at 40% impervious and
will be gravel filled. The TrueGRID Paver System will filter stormwater through
the subbase. An underdrain will be installed and direct flows to the curb and
gutter of Laporte Avenue. Specifications are in Appendix B.
No additional impermeable areas are being proposed. The existing site (excluding
the proposed parking area that will use the TrueGRID Plus Pavers) will remain
the same. The historical drainage pattern will be maintained.
Step 2. Implement BMPs That Provide a WQCV with Slow Release
The TrueGRID pavers will include an 8” subgrade with a 4” underdrain for treatment.
The design of the TrueGRID paver system will reduce runoff and encourages infiltration.
The subgrade acts as a filter for the precipitation falling directly on the surface of the
parking lot, the trash enclosure and small portion of the existing pavement.
The trash enclosure, concrete apron and small area of proposed asphalt south of the
concrete apron will be routed through the TrueGRID pavers system.
The site has existing and established vegetation around the site. The proposed
development does not disturb any of the established vegetation on the eastern border,
maintains the landscaped areas in front of the proposed brewery, and provides landscaped
areas in the proposed customer parking area.
Step 3. Stabilize Stream
Larimer No. 2 Irrigation Canal borders the proposed site. Minimal run-off historically
flows that direction. Vegetation bordering the canal includes large trees (cottonwoods and
elms) and lilac bushes. This established vegetation will continue to promote stabilized
banks on the canal and will be maintained and kept throughout the development process.
This area is within the Natural Habitat Buffer Zone.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 8 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Step 4. Implement Site Specific and Other Source Control BMPs
Site specific and other source control BMPs that will be implemented are:
Trash enclosure is placed adjacent to the parking lot and is fully enclosed. It is not
directly next to storm drains or surface water.
3. Hydrological Criteria
From FCSCM Chapter 5, Hydrology Standards, Table 3.4-1. the IDF (Intensity Duration
Frequency) Table was used to determine the 2 Year, 10 Year and 100 Year Peak Flow
Rate. The Table is in Appendix A.
Percentage of imperviousness was calculated for the existing site conditions and the
proposed site using the recommended values from Table 4.1-3. Surface Type – Percent
Impervious (FCSCM Chapter 5 Hydrology Standards). The overall percentage of
imperviousness for the existing site is approximately 50 percent and for the proposed site
is approximately 50 percent (see Percentage of Imperviousness Calculation in Appendix
A).
The project size and sub-basins are less than five acres, therefore the runoff calculations
were computed using the Rational Method. Table 1 summarizes the existing conditions
and proposed development flowrates for the sub-basins. Calculations are in Appendix A.
The total site runoff was calculated by adding the run-off of the sub-basins. Since the
majority of the sub-basins are independent of each other and time of concentrations are
close, the sum of the run-off of each basin was used.
Table 1: Peak Runoff Flowrates
Proposed Existing
Peak Runoff %
Imperviousness
2 Year
Peak
Flowrate
(cfs)
10 Year
Peak
Flowrate
(cfs)
100 Year
Peak
Flowrate
(cfs)
%
Imperviousness
2 Year Peak
Flowrate
(cfs)
10 Year Peak
Flowrate (cfs)
100 Year Peak
Flowrate (cfs)
DB-A 30% 0.18 0.31 0.86 79% 0.27 0.46 1.17
DB-B 72%0.35 0.60 1.54 70%0.35 0.59 1.51
DB-C 15% 0.18 0.31 0.84 15% 0.18 0.31 0.84
DB-D 47%0.51 0.88 2.24 47%0.51 0.88 2.24
DB-E 60 % 0.28 0.48 1.22 36% 0.17 0.29 0.73
DB-F 100%0.30 0.51 1.30 84%0.26 0.44 1.13
Total Site Runoff 51%1.80 3.09 8.00 51%1.74 2.97 7.62
cfs = cubic feet
per second
4. Hydraulic Criteria
The proposed site is not significantly increasing the imperviousness. The proposed
development is removing asphalt, gravel, and an existing building, and installing
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 9 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
TrueGRID permeable pavers. Since the site’s overall imperviousness area is not
increasing by 1000 square feet or more, a detention pond is not proposed as stated in
Chapter 1: Drainage Principles & Policies, 2.3.2 Detention Basin of the Fort Collins
Stormwater Criteria Manual (FCSCM). Best Management Practices (BMPs) are proposed
which include TrueGRID Permeable Pavers system.
TrueGRID Pavers are proposed for the customer parking lot. The TrueGRID ProPlus
Pavers are designed for commercial parking lots. For overall pervious calculations, the
TrueGRID was assumed to be 40% impervious. The Manufacturer’s Product
Specification Sheet is in Appendix B. 8” of subgrade is proposed under the TrueGRID
Pavers to infiltrate into the native soils or draining through the underdrain. The
underdrain is proposed on the east edge of the TrueGRID pavers. The underdrain will
drain south toward the southern property boundary. There will be an inspection port at
the southern end of the underdrain. The underdrain will be directed to a 4” PVC pipe and
flow east under the main entrance. It will flow to a drainage swale for a short distance
and then be directed to a sidewalk chase to the proposed curb and gutter on Laporte
Avenue.
For Laporte Avenue, the gutter on the westbound lane, located within the property
boundary and in the right of way, will capture runoff from Sub-basin A, Sub-basin B,
Sub-basin C, Sub-basin E and Sub-basin F. Having similar time of concentrations and
conservatively assuming they will enter at the same point, the combined 2 year designed
storm is 1.27 cfs. The 1.27 cfs can flow through the curb and gutter at a depth of
approximately 0.2 feet (3 inches). Hydraflow Express Extension for AudoCAD Civil 3D
was used to model the curb and gutter flow rate and is located in Appendix B.
Drainage Facility Design
1. General Concept
The proposed brewery and site development do not increase the percentage of
imperviousness significantly. The proposed customer parking area is TrueGRID
Permeable Pavers. The TrueGRID Pavers System treats stormwater falling on the
customer parking area, the trash enclosure area and small amount of proposed asphalt.
The site does not alter historic flows. A general drainage plan, drainage and erosion
control plan, and drainage and erosion control details are shown in Appendix C.
2. Specific Details
Installation and maintenance shall be in accordance with the manufacture’s technical
specifications in Appendix B.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 10 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Conclusions
1. Drainage Concept
Historical flow patterns and run-off amounts should be maintained in such a manner that
should reasonably preserve the natural character of the area and prevent property damage
of the type generally attributed to run-off rate and velocity increases, diversions,
concentration and/or unplanned ponding of storm run-off for the 100-year storm event.
The drainage design included in this report should be effective in treating the design
storm runoff from the employee parking lot, trash enclosure and a portion of the existing
asphalt. The remainder of the site will not increase the percentage of imperviousness, and
historical flow patterns will be maintained.
The Low Impact Development (LID) Requirements are met through the TrueGRID Paver
System. 80% of the stormwater created by the proposed development is treated. See
Appendix D with the LID Exhibit and Table 2 below. The customer parking area within
the proposed utility easement was removed from the treated area (net treated area).
Sub-basin E includes the development proposed in the right of way and sheet flows from
north to south and away from the project site. The improvements and modification to
Laporte Avenue are designed to direct stormwater east through the curb and gutter. It is
not feasible to treat the stormwater generated from this area, as stormwater is directed
away from the site and is in the right of way development area. This area is labeled as the
R.O.W. Development on the LID Exhibit.
Table 2: LID Treatment Summary Table
Areas Total Sq. Ft.
Total Developed Treated Area 6,251
Total Developed Untreated Area 856
Total On-Site Development 7,107
Developed Area in Utility Easement 937
Net Treated Area 5,695
% On-Site Treatment 80%
R.O.W. Development 11,002
2. Compliance with Fort Collins Stormwater Criteria Manual
The drainage design of Stodgy Brewing Company on Laporte Avenue is consistent with
the Fort Collins Stormwater Criteria Manual, the West Vine Basin Plan, and all state and
federal regulations governing stormwater discharge. The proposed site does not have a
mapped 100-year floodplain.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 11 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
Erosion Control
1. Compliance with Erosion Control Criteria
The site is developing over 10,000 square feet but under 1 acre. A Grading and Erosion
Plan is included in the Utility Plan set. The Erosion and Sediment Control Plan is
consistent with the Fort Collins and State of Colorado’s Stormwater Criteria Manual.
Erosion control plans and details can also be seen in Appendix C.
Stodgy Brewing Company, LLC
02/04/2020 Final Drainage Report Page 12 of 12
AGPROfessionals, 3050 67th Avenue, Suite 200, Greeley CO 80634 * 970-535-9318 * www.agpros.com
List of References
Autodesk, Inc. Hydraflow Express Extension for Civil 3D 2013. Computer Software,
Hydraflow Express Vers. 10.
City of Fort Collins. “West Vine Basin.” Selected Plan-Water Quality & Habitat
Improvements. Icon Engineering, Inc. Web. 8 August 2019.
<https://www.fcgov.com/utilities/img/site_specific/uploads/West_Vine.pdf?1343238085
>.
City of Fort Collins. “Fort Collins Stormwater Criteria Manual.” December 2018. Web.
31 July, 2019. <https://www.fcgov.com/utilities//img/site_specific/uploads/fcscm-cover-
page-contents-and-preface.pdf?1549566343>.
Federal Emergency Management Agency. "FEMA Flood Map Service Center." FEMA
Flood Map Service Center. FEMA, 2 May 2012. Web. 31 July, 2019.
<https://msc.fema.gov/portal>.
Larimer County IT, Enterprise GIS. “Land Information.” Search by Map. Larimer
County. Web. 12 August 2019.
<https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Land%20Informatio
n&run=Parcel&parcel=>
United States Department of Agriculture - Natural Resources Conservation Service.
"Web Soil Survey." Web Soil Survey. USDA - NRCS, 2006. Web. 31 July, 2019
<http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx>.
United States Geological Survey. “Maps.” Overview - Maps, United States Geological
Survey. USGS, 2016. Web. 12 August 2019. <www.usgs.gov/products/maps/topo-
maps>.
Urban Drainage and Flood Control District. Peak Runoff Prediction by the Rational
Method. Computer software. Software. Vers. 2.00. <http://udfcd.org/software>.
Urban Drainage and Flood Control District. "Urban Storm Drainage Criteria Manual
Volume 1." USDCM: Volume 1 Management, Hydrology and Hydraulics. UDFCD, Aug.
2018. Web. 12 August 2019. <http://udfcd.org/volume-one>.
Urban Drainage and Flood Control District. "Urban Storm Drainage Criteria Manual
Volumes 2." USDCM: Volume 2 Structures, Storage and Recreation. UDFCD,
September 2017. Web. 12 August 2019. <http://udfcd.org/volume-two>.
Urban Drainage and Flood Control District. "Urban Storm Drainage Criteria Manual
Volumes 3." USDCM: Volume 3 Stormwater Quality. UDFCD, April 2018. Web. 29
Nov. 2018. <http://udfcd.org/volume-three>.
Stodgy Brewing Company, LLC
Appendices
A. Hydrologic Computations
a. Vicinity Map
b. USDA-NRCS Soil Report
c. West Vine Basin Plan
d. USGS Topographic Map
e. FEMA FIRMette Map
f. FCSCM IDF Table
g. Percentage of Imperviousness
h. UD Rational Runoff Calculations
B. Hydraulic Computations
a. TrueGRID Permeable Paver Product Specification Sheet
b. Laporte Avenue Gutter Calculations
C. 24 x 36 Maps
a. General Drainage Plan
b. Drainage and Erosion Control Plan
c. Drainage and Erosion Control Details
D. LID Treatment Exhibit
Stodgy Brewing Company, LLC
APPENDIX A
Hydrologic Computations
Vi ity Map
This map was created by Larimer County GIS using data from multiple sources for
informal purposes only. This map may not reflect recent updates prior to the date of
printing. Larimer County makes no warranty or guarantee concerning the
completeness, accuracy, or reliability of the content represented.Date Prepared: 8/12/2019 9:54:20 AM
Miles0.1 0.1
12,000
0
Legend
1:
Notes
Scale
Tax Parcels
PLSS Township and Range
PLSS Sections
PLSS Quarter Sections
Railroads
Rivers and Streams
County Boundary
Rocky Mountain National Park
Incorporated Areas
City or Town
OVERLAND TRL
TAFT HILL RD
SHIELDS ST
.
...
....
....
..
.
.
..
.
.
.
..
.
.
...
.
...
.
.
.......
... .
.
...
....
..
...
.....
....
....
.....
..
..
...
..
..
...
.
......
.....
..
..
....
...
.....
.....
...
...
..
..
....
.
.
.
..
..
...
......
.....
.
.
..
....
....
....
.
...
...
.
.
..........
.......
.....
.......
...
.
...
.
.
.
.........
...
.
.
....
.... ..
...
.
.
...
.....
.....
...
..
....
...
...
.
.
.
......
......
..
....
.
....
.....
.
.....
.
.. .
...
.
...
.
....
..
...
..
..
..
..
...
...
...
.
..
.
.
..
.
..
.
.
.
.
...
..
..
.........
.
........
'
#!"
OP
OP
#!"
#!"
¥^
¥^
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
F
F
F
F
F
F
F
F
F
H
H
H
5050
4950
5050
5000
§¨¦25
§¨¦25
£¤287
£¤287
£¤287
£¤87
£¤87
£¤287
¬«14
¬«14
¬«1
¬«14
ARWOOD D
CO RD 40
GE A
HASTINGS DR
DR
W SWALLOW RD
MB
UTMAN PKWY
N SHIELDS ST
NT
CHERYLEN ST
DEL CLAIR RD
E OAK ST
WATER
E STUART ST
E VINE DR
E HORSETOOTH RD
L
SVC RD 2
DR
COUNTRY CLUB RD
FRONTAGE RD
WESTFIELD DR
W PROSPECT RD
RA
HULL ST
BUTTE PASS DR
HIL
W OAK ST
W LAKE ST
RIDGE
HICKORY ST
COLUMBIA RD
SITKA ST
NW
INTERNATIONAL BLVD
BALLARD LN
ROOKERY RD
ES
H
W MULBERRY ST
R I N FIELD DR
LANCER DR
ROCKY MOUNTA
S DR
E N
HEMLOCK ST
W WILLOX ST
FAIRWAY LN
S
SPAULDING LN
E DRAKE RD
E PROSPECT RD
E PITKIN ST
E ELIZABETH ST
RED O
ENN
OWENS AVE
E CO RD 40
ELDSTONE
E VINE DR
W CO RD 38 E
FALCON DR
HILLDALE R
N DR
W PITKIN ST
W MYRTLE ST
E SATURN DR
LOCUST ST
E LAUREL ST
CAPE C
STON
RE DR
OO
DR
EART
E PROSPECT RD
PRECISION DR
CHINOOK LN
AR
W LAKE ST
BRONSON ST
W DRAKE RD
CO RD 48
SCENIC DR
P WDERHORN
GILGALA
RG D
W MOUNTAIN AVE
ELM ST
SHEELY DR
LAPORTE AVE
UNIVERSITY AVE
OE
E MULBERRY ST
E MYRTLE ST
OLTZ DR
FRONTAGE RD
S WAY
TIMBE
CHESAPEAKE DR
YR RD
RCTIC
CO FAIR LN
WILLIAM NEAL PKWY
MOUNTAIN VISTA DR
HIDDEN POND DR
M USKR
E HARMONY RD
I LD
E
ST
ERGATE RD
YORKTOWN AVE
ORCHARD PL
HARRIS DR
FOSSIL CREEK DR
LA
L
RBOR AV
SYCAMORE ST
E SKYWAY DR
E SWALLOW RD
EDWARDS ST
E PLUM ST
CONIFER ST
E HARMONY RD
BUCKINGHAM ST
MBLEBUSH ST
CUSTER DR
E CO RD 42
BERWOO
SUNSTONE DR
MOFFETT DR
CRESTMORE PL
RA
W STUART ST
WABASH ST
UN
W LAUREL ST
PARKER ST
E OLIVE ST
E WILLOX LN
NN
COUNTRY CLUB RD
E LINCOLN AVE
IKING TRL
REE K DR
GTON RD
ROCK CREEK DR
E LINCOLN AVE
GALILEO DR
SI VER OAKS R
SCARBOROUGH DR
W PLUM ST
W EL IZABETH ST
BENT
PHEMISTE R RD
GARFIELD ST
E MAGNOLIA ST
BERR
ALERS W
COURSE
DARTMOUTH TRL
C
MAPLE HILL DR
E CO RD 36
SAGE CREEK RD
STONEHAVEN DR
ANTELOPE RD
MARIAH LN
ECLIPSE LN
E MULBERRY ST
Portner
Reservoir
Sherwood
Reservoir
Sheldon
Lake
B-22 Reservoir
Long Pond
Reservoir
Number 5
iFossil
Lake Canal
Cache la Poud
Dixon Canyon Lateral
Larim er an d W eld Canal
Warren
Lake
N Poudre Reservoir
Number 17
Terry
Lake
Nelson
Reservoir
Lindenmeier
Lake
Williams
Lake
Long Pond
Reservoir
Coll America
Ft Collins
Front Range
Community Coll Ft
Collins Campus
Colorado State Univ
Grandview
Cem
Harmony
Cem
Roselawn
Cem
FORT COLLINS
Laporte
Drakes
Harmony
Black Hollow
Junction
Giddings
Mountain
Mountain
View
Omega
Buckingham
Andersonville
Sinnard
McClellands
Arrowhead
COLORADO
QUADRANGLE LOCATION
FORT COLLINS QUADRANGLE
COLORADO-LARIMER CO.
7.5-MINUTE SERIES
FORT COLLINS, CO
2016
Expressway Local Connector
ROAD CLASSIFICATION
Ramp 4WD
Secondary Hwy Local Road
Interstate Route State RouteUS RouteWX./H
U.S. DEPARTMENT OF THE INTERIOR
U.S. GEOLOGICAL SURVEY
1 Laporte
8 Windsor
2 Wellington
3 Cobb Lake
4 Horsetooth Reservoir
5 Timnath
6 Masonville
7 Loveland
ADJOINING QUADRANGLES
1 2 3
4 5
6 7 8
This map was produced to conform with the
National Geospatial Program US Topo Product Standard, 2011.
A metadata file associated with this product is draft version 0.6.19
CONTOUR INTERVAL 10 FEET
NORTH AMERICAN VERTICAL DATUM OF 1988
SCALE 1:24 000
1000 500 0 METERS 1000 2000
21KILOMETERS00.51
1 0.5 0
MILES
1
1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
FEET
Imagery..................................................NAIP, July 2013
Roads................................ U.S. Census Bureau, 2015 - 2016
Names..........................................................GNIS, 2016
Hydrography....................National Hydrography Dataset, 2013
Contours............................National Elevation Dataset, 2001
Boundaries............Multiple sources; see metadata file 1972 - 2016
Public Land Survey System..................................BLM, 2011
Wetlands.........FWS National Wetlands Inventory 1977 - 2014
North American Datum of 1983 (NAD83)
World Geodetic System of 1984 (WGS84). Projection and
1 000-meter grid: Universal Transverse Mercator, Zone 13T
Produced by the United States Geological Survey
10 000-foot ticks: Colorado Coordinate System of 1983 (north
zone)
This map is not a legal document. Boundaries may be
generalized for this map scale. Private lands within government
reservations may not be shown. Obtain permission before
entering private lands.
U.S. National Grid
100,000-m Square ID
Grid Zone Designation
DE
13T
^
GN
UTM GRID AND 2016 MAGNETIC NORTHDECLINATION AT CENTER OF SHEET
0° 2´
1 MILS
8° 32´
152 MILS
NS
N
.
7
6
4
3
0
1
6
3
5
8
8
6
9
NG
A
R
E
F
N
O
.
U
S
G
S
X
2
4
K
1
5
8
7
5
105°6'49.94"W
105°6'12.48"W
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
None
None
None
0%
0%
0%
Roofs
% Impervious
90%
None 0%
0%
0%
0%
Asphalt, Concrete
Lawns, clayey soil
None
None
None
None
2769-02 11/21/19 12:49 PM
AGPROfessionals
CTV
Impervious Area Calculation Existing
None
None
Gravel Road
Ditch
None
Total SqFt
Acres Impervious
100%
2%
40%
10,822
12,281
16,974
9,741
0.22
0.28
0.01
0.09
0.00
0%
0%
0%
0%
0%
0.001,829
0.00
0.00
0.00
0.00
51%
0.00
0.00
0.00
0.00
51,647 0.60
0.00
0.00
26,257
51,647
Acres
1.19
0.60
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
None
None
None
0%
0%
0%
Roofs
% Impervious
90%
None 0%
0%
0%
0%
Asphalt, Concrete
Lawns, clayey soil
None
None
None
None
2769-02 11/21/19 12:50 PM
AGPROfessionals
CTV
Impervious Area Calculation Proposed
None
None
Gravel Road
Ditch
None
Total SqFt
Acres Impervious
100%
2%
40%
8,038
15,929
18,839
7,201
0.17
0.37
0.01
0.07
0.00
0%
0%
0%
0%
0%
0.001,829
0.00
0.00
0.00
0.00
51%
0.00
0.00
0.00
0.00
51,836 0.61
0.00
0.00
26,421
51,836
Acres
1.19
0.61
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.18 0.31
None
8.55
8.54
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
2,338
Acres
0.05
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
None
None
2769-02 11/21/19 12:46 PM
AGPROfessionals
CTV
DB-A (Proposed)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
000.00
0.00
0.00
0.05
0.95
0.00
0.95
0.25
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0
2,101
5,740
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
0%
2%
40%
0%
0%
0
525
2870
0
0
0
0
0.43
0.54
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
3395
0.43
0.00
7,841 0.18
30%
7,841 0.05
0.00
1.9
72
10.40
7.16
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.40
8.55
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
7.16
7.16
0.86
2.30 8.80
0.43
10-year
8.55
8.54
0.00
10.40
8.55
3.93
0.00
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.27 0.46
None
3.46
3.45
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
3,923
Acres
0.09
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
None
None
2769-02 11/20/19 2:12 PM
AGPROfessionals
CTV
DB-A (Existing)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
22002,316 0.05
0.03
0.00
0.01
0.95
0.00
0.95
0.25
0.00
0.00
0.00
0.00
0.50
0.00
0.00
1,313
0
1,313
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
0%
2%
40%
0%
0%
1247
0
657
0
0
0
0
0.83
1.04
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
4104
0.83
0.00
4,942 0.11
79%
4,942 0.09
0.00
1.9
72
10.40
5.00
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.40
5.00
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
0.80
0.79
1.17
2.85 9.95
0.83
10-year
3.46
3.45
0.00
10.40
5.00
4.87
0.00
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.35 0.60
None
5.01
5.01
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
5,042
Acres
0.12
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
None
None
2769-02 11/21/19 12:47 PM
AGPROfessionals
CTV
DB-B (Proposed)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
19992,104 0.04
0.07
0.00
0.00
0.95
0.00
0.95
0.25
0.00
0.00
0.00
0.00
0.50
0.00
0.00
3,113
1,753
0
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
0%
2%
40%
0%
0%
2957
438
0
0
0
0
0
0.77
0.97
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
5394
0.77
0.00
6,970 0.16
72%
6,970 0.12
0.00
2.8
134
10.74
5.00
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.74
5.01
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
2.04
2.04
1.54
2.85 9.95
0.77
10-year
5.01
5.01
0.00
10.74
5.01
4.87
0.00
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.35 0.59
None
5.23
5.22
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
4,892
Acres
0.11
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
None
None
2769-02 11/20/19 2:24 PM
AGPROfessionals
CTV
DB-B (Existing)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
21232,235 0.05
0.07
0.00
0.00
0.95
0.00
0.95
0.25
0.00
0.00
0.00
0.00
0.50
0.00
0.00
2,843
1,892
0
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
0%
2%
40%
0%
0%
2701
473
0
0
0
0
0
0.76
0.95
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
5297
0.76
0.00
6,970 0.16
70%
6,970 0.11
0.00
2.8
134
10.74
5.00
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.74
5.23
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
2.31
2.30
1.51
2.85 9.95
0.76
10-year
5.23
5.22
0.00
10.74
5.23
4.87
0.00
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.84
2.52 9.31
0.34
10-year
6.98
6.98
0.00
10.53
6.98
4.31
0.00
10.53
6.19
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.53
6.98
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
6.19
6.19
0.21
15%
9,148 0.03
0.00
7.7
95
0.34
0.43
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
3146
0.34
0.00
9,148
0%
0%
43
1718
815
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.00
45
6,873
1,630
100%
0%
0%
0%
0%
0%
2%
40%
0.00
0.00
0.01
0.95
0.000
0.95
0.25
0.00
0.00
2769-02 11/21/19 12:47 PM
AGPROfessionals
CTV
DB-C (Proposed & Existing) No grading proposed
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
5706000.01
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
Ditch
None
0.18 0.31
None
6.98
6.98
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
1,374
Acres
0.03
0%
0%
0%
0%
0%
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.51 0.88
None
4.98
4.97
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
6,196
Acres
0.14
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
Ditch
None
2769-02 11/20/19 2:52 PM
AGPROfessionals
CTV
DB-D (Proposed and Existing)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
50675,334 0.11
0.01
0.00
0.01
0.95
0.000
0.95
0.25
0.00
0.00
0.00
0.00
0.50
0.00
0.00
638
5,477
1,619
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
0%
2%
40%
0%
0%
606
1369
810
0
0
0
0
0.60
0.75
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0
7852
0.60
0.00
13,068 0.30
47%
13,068 0.14
0.00
5
83
10.46
5.00
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.46
5.00
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
100-year
3.48
3.48
2.24
2.85 9.95
0.60
10-year
4.98
4.97
0.00
10.46
5.00
4.87
0.00
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.26 0.44
None
2.03
2.03
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
4,002
Acres
0.09
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
Ditch
None
12/2/19 12:52 PM
AGPROfessionals
CTV
DB-F (Existing)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
000.000.95
0.000
0.95
0.25
0.00
0.00
2769-02
100%
0%
0%
0%
0%
0%
2%
40%
0.08
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.00
1,316
3302
0
658
0
0
0
0
0.00
0.00
3,476
0
0
3960
0.83
0.00
4,792
0%
0%
0.00
0.00
0.00
0.00
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0.11
84%
4,792 0.09
0.00
2
25
0.83
1.03
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.14
5.00
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
1.13
2.85 9.95
0.83
10-year
2.03
2.03
0.00
10.14
5.00
4.87
0.00
10.14
5.00
100-year
0.50
0.50
Project Number: Date:
3050 67th Avenue, Suite 200 Designed By: Sheet: of
Greeley, CO 80634 Checked By:
Telephone (970) 535-9318 Subject:
www.agpros.com
=User Entry
Solving for the Percent Impervious (I):
Description per UDFCD Table 6-3
Square Feet
Total Impervious Acres
Total Development Acres
Development %I Actual Design
Composite Runoff Coefficient
2-year Composite Runoff Coefficient (Cf=1.00)
10-year Composite Runoff Coefficient (Cf=1.00)
100-year Composite Runoff Coefficient (Cf=1.25)
(area/wetted perimeter)
Time of Concentration (Tc=Ti+Tt)
Overland Flow Time of Concentration (minutes)
Channelized Flow Time of Concentration (minutes)
Maximum Tc Allowed (L/180 +10)
Total Time of Concentration*
*If Tc is less than 5 minutes, Tc is equal to 5 minutes
Intensity (in/hr) Table 3.4-1
Flow Rate (cfs)
Q=ciA
0.30 0.51
None
1.12
1.11
2-year
Overland Slope (percent)
Overland Length (ft)
Channelized Roughness
Coefficient (manning's n)
0.00
4,791
Acres
0.11
0%
0%
0%
0%
0%
Asphalt, Concrete
Lawns, Clayey Soil, Avg Slope 2-7%
None
None
None
None
None
None
None
None
None
Gravel/Pavers
Ditch
None
12/2/19 4:44 PM
AGPROfessionals
CTV
DB-F (Proposed)
Roofs
% Impervious
90%
Total SqFt Acres Impervious
Runoff
Coefficient
Coefficient x Area
(SqFt)
000.000.95
0.000
0.95
0.25
0.00
0.00
2769-02
100%
0%
0%
0%
0%
0%
2%
40%
0.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0
4551
0
0
0
0
0
0
0.00
0.00
4,791
0
0
4551
0.95
0.00
4,791
0%
0%
0.00
0.00
0.00
0.00
0
0
0
0
00.00
0.00
0.00
0.00
0.00
0.00
0
0
0.11
100%
4,791 0.11
0.00
2
25
0.95
1.19
Channelized Velocity (ft/sec) 0.00
Length of channel (feet) 0
10.14
5.00
0.15
Hydraulic Radius (feet) 0
Longitudinal Slope (feet/feet) 0
1.30
2.85 9.95
0.95
10-year
1.12
1.11
0.00
10.14
5.00
4.87
0.00
10.14
5.00
100-year
-0.65
-0.65
Stodgy Brewing Company, LLC
APPENDIX B
Hydraulic Computations
1-855-355-GRID (4743)
Page 1 TRUEGRID Pavers: 2500 Summer St., # 3225, Houston, TX 77007
TRUEGRID® PRO Plus
Product Specification Sheet
Dimensions:
Pre-Assembled:
Cell Width:3-
Weight:5.22 lbs
Permeability:100% w/clean, uniform stone
Product Porosity:90% open
Compressive strength:Over 8000 psi filled
Material:Recycled High Density Polyethylene (100% post-consumer)
Color:Black with UV Stabilizer
Temperature Range:Dimensionally Stable for -58F to 194F
Moisture Absorption:.01%
Environmental Compatibility:Nontoxic, harmless to plants, animals, and microorganisms. Inert
material, groundwater neutral
Installation Speed:1000 sq/ft per man hour
Other features of TRUEGRID
Highly resistant to oils, gasoline, acids, salt, ammonia, and alcohol
May be saw cut
Patented design yields ultimate hoop strength
Circular elements provide multi-directional crush and shear strength
Flexible links allow expansion and contraction depending on environmental conditions
Built in X-Anchors allows weight of filler to hold grid down without any extra staking
Interlocking connectors
1-855-355-GRID (4743)
Page 2 TRUEGRID Pavers: 2500 Summer St., # 3225, Houston, TX 77007
Ground Preparation: Depends upon site condition and local conditions.
Suggested Sub-base:3/4
Depth of this layer should be a minimum of 6 - 8 Deeper for heavier loads.
For additional drainage, increase depth of sub-base.
Class 2 road base (crushed concrete) is also a typical sub-base material.
Gravel/sandy soil mix (60/40) is also common for grass fill applications.
Level sub-base before laying TrueGrid.
Installation:Layout and snap together pre-assembled sheets. (4 pcs per layer = 16 sq/ft)
If body weight does not level the grids, use plate vibrator or heavy cylinder to level.
Backfill:Any angular or round medium may be used. Fill cells with filler of choice.
typical.
TRUEGRID may be cut on site
Pre-cutting is not required
Angle grinder, circular saw, compass saw, or
handsaw are all options for cutting TRUEGRID.
Delivery:
Pallet content:800 sq/ft = 50 layers per pallet = 200 pcs
Pallet dimensions:
Approximate pallet weight:1,050 lbs
Truckload:24 pallets or 19,200 sq/ft
For more info on TRUEGRID
Please visit our website:
www.truegridpaver.com
Channel Report
Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Monday, Dec 2 2019
Laporte Avenue Gutter
Gutter
Cross Sl, Sx (ft/ft) = 0.020
Cross Sl, Sw (ft/ft) = 0.080
Gutter Width (ft) = 2.00
Invert Elev (ft) = 5053.72
Slope (%) = 1.00
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 1.27
Highlighted
Depth (ft) = 0.23
Q (cfs) = 1.270
Area (sqft) = 0.42
Velocity (ft/s) = 3.05
Wetted Perim(ft) = 5.69
Crit Depth, Yc (ft) = 0.28
Spread Width (ft) = 5.45
EGL (ft) = 0.37
0 2 4 6 8 10 12 14 16 18 20 22 24
Elev (ft) Depth (ft)Section
5053.00 -0.72
5053.50 -0.22
5054.00 0.28
5054.50 0.78
5055.00 1.28
Reach (ft)
Stodgy Brewing Company, LLC
APPENDIX C
24 x 36 Maps
Stodgy Brewing Company, LLC
APPENDIX D
LID Treatment Exhibit
PROPERTY BOUNDARY
3050 67th Avenue, Suite 200, Greeley, CO 80634
(970) 535-9318 fax: (970) 535-9854
DATE LAST SAVED: October 3, 2019
DATE: November 22, 2019DRAWN BY: AGPRO
REVISIONS:
R1
R2
R3
R4
R5 N
STODGY BREWING CO., LLC
LID TREATMENT EXHIBIT
--/--/--
--/--/--
--/--/--
--/--/--
--/--/--
DESC.
DESC.
DESC.
DESC.
DESC.FT COLLINS, CO