Loading...
HomeMy WebLinkAboutDrainage Reports - 08/08/2019City of Fort Collins Approved Plans Approved by: Date: Wes Lamarque 8/8/2019 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Gutter Capacity Based On Allowable Water Spread Maximum Flow Based On Allowable Water Spread QT =27.6 53.3 cfs Maximum Gutter Capacity Based on Allowable Gutter Depth Total Discharge for Major & Minor Storm Q = 18.7 81.5 cfs Max Flow Based on Allow. Gutter Depth (Safety Factor Applied)Qd =15.2 53.5 cfs Max. Allowable Gutter Capacity Based on Minimum of QT or Qd Qallow =15.2 53.3 cfs MAJOR STORM max. allowable capacity OK - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract A Inlet at Design Pt 8 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) MINOR STORM max. allowable capacity OK - greater than flow given on sheet 'Q-Peak' Project: Inlet ID: Design Information (Input) Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' Design Discharge for Half of Street (from Sheet Q-Peak )Qo =0.40 2.18 cfs Grate Analysis (Calculated) Under No-Clogging Condition Under Clogging Condition Actual Interception Capacity Qa =N/A N/A cfs Carry-Over Flow = Qo-Qa Qb =N/A N/A cfs Curb or Slotted Inlet Opening Analysis (Calculated) Under No-Clogging Condition Under Clogging Condition Actual Interception Capacity Qa =0.40 1.54 cfs Carry-Over Flow = Qb(GRATE)-Qa Qb =0.00 0.64 cfs Summary Total Inlet Interception Capacity Q = 0.40 1.54 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.00 0.64 cfs Capture Percentage = Qa/Qo =C% = 100.0 70.5 % INLET ON A CONTINUOUS GRADE Ridgewood Hills Tract A Inlet at Design Pt 8 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) MINOR STORM Allowable Capacity is based on Depth Criterion MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =16.7 52.8 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 10 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Project: Inlet ID: Design Information (Input) Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' Total Inlet Interception Capacity Q = 0.9 4.1 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.0 cfs Capture Percentage = Qa/Qo =C% = 100 100 % INLET ON A CONTINUOUS GRADE Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 10 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) MINOR STORM Allowable Capacity is based on Depth Criterion MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =16.7 52.8 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 11 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Project: Inlet ID: Design Information (Input) Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' Total Inlet Interception Capacity Q = 0.9 5.3 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.0 cfs Capture Percentage = Qa/Qo =C% = 100 100 % INLET ON A CONTINUOUS GRADE Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 11 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) MINOR STORM Allowable Capacity is based on Depth Criterion MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =16.7 52.8 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 12 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Project = Inlet ID = Design Information (Input) Grate Information Curb Opening Information Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 8.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) INLET IN A SUMP OR SAG LOCATION Ridgewood Hills Tract A Gutter & Inlet Analysis at DP 12 Override Depths