Loading...
HomeMy WebLinkAboutDrainage Reports - 07/11/2022HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 1 of 9 HCI ENGINEERING A division of HABERER CARPENTRY INC. DRAINAGE REPORT FOR: Planetscale Living Affordable Housing Project 906 E. Stuart Street, Fort Collins, CO Owner: Planetscale Limited ATTN: Serdar Badem 12933 Regan Lane, Saratoga, CA Serdar.Badem@Gmail.com Engineer Contact(s): HCI Engineering T. Garrett Goodlin, P.E. 621 Southpark Dr., Suite 1600 Littleton, CO 80120 PH: 303-979-3900 FX: 303-278-7814 6/2/2022 Estimated Project Dates: Project Start Date: 7/1/2022 Project Completion Date: 12/31/2022 City of Fort Collins Approved Plans Approved by: Date: HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 2 of 9 Table of Contents: I. General Location & Description ................................................................................................................3 A. Project Location .............................................................................................................................. 3 B. Description of Property .................................................................................................................. 3 C. Topographic Data............................................................................................................................ 4 D. FEMA and Flood Zone Data ......................................................................................................... 4 E. Soils Information ............................................................................................................................. 4 II. Drainage Facility Design ............................................................................................................................4 A. Hydrological Criteria ....................................................................................................................... 4 III. Stormwater Management Facility Design .................................................................................................5 A. Stormwater Conveyance Facilities ................................................................................................. 5 B. Easements ....................................................................................................................................... 5 C. Compliance with Standards ............................................................................................................ 6 D. Maintenance Plan ....................................................................................................................... 6 E. Conclusion ....................................................................................................................................... 6 IV. References .................................................................................................................................................6 Appendix A, Maps & Reference Materials .............................................................................................................7 Appendix B, Hydrology Calculations ......................................................................................................................8 Appendix C, Drainage Plan .....................................................................................................................................9 HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 3 of 9 I. General Location & Description A. Project Location The Site, an area consisting of 0.32 acres, is located at 906 E. Stuart Street, Fort Collins, CO, which is more precisely located in a part of Tract 7, East Acres Subdivision, lying in the NE Quarter of Section 24, Township 7 North, Range 69 west of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The Site is bordered by Stuart Street Right-of- Way to the south, and existing residential land uses to the west, north and east. Refer to the following map. SITE MAP The Site is approximately located at Latitude, 40 33 49 Longitude, 105 03 40 B. Description of Property The Site is currently developed with an existing two-story residence with associated driveway and yard. Site improvements will consist of a proposed Four Unit townhome with associated permeable paver drive and parking, with yard. As part of this development, construction activities will consist of a new structure built on the existing foundation, utility installation, , paving, fine grading and landscaping. In addition to this, the site driveway and parking lot are proposed to be constructed of permeable pavers. The Site disturbed area and construction HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 4 of 9 limits total approximately 0.28 acres. The existing and developed Site and basin percent impervious values are listed in Table 1 below: Table 1 ONSITE % Impervious Existing Site Proposed Site 50.8% (0.32 acres) 40.5% (0.32 acres) C. Topographic Data The General Existing Site Topographic Conditions for The Site are itemized in Table 2 below: Table 2 Description Result Location of Occurrence Highest Elevation 4982 South of Site Lowest Elevation 4980 North of Site Steepest Slope 25% East limits Average Slope 1 - 3% Most of The Site D. FEMA and Flood Zone Data According to the FEMA Flood Insurance Rate Map: Community-Panel No. 08069C0983H, Effective May 2, 2012, The Site is located in Zone X unshaded. These are areas of 0.2% annual chance of flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. The Regulatory Flood Elevation adjacent to The Site is coincident with the project survey elevation of 4953 (worst-case scenario). E. Soils Information Soil Classifications for The Site are reported by N.R.C.S. as consisting of Type C soil for 100% of The Site (Santana loam, 1 to 3 percent slopes) Refer to Attachments for the includ .R.C.S. Websoil Survey Repo averaging 0.32, The Site has a high to susceptibility to sheet and rill erosion by water. With a Wind erodibility group of 5 The Site has a low susceptibility to erosion due to wind. II. Drainage Facility Design A. Hydrological Criteria Due to the size of this site, the rational method was used to determine the runoff for the 10-yr and 100-yr storm event. (See Appendix B) The rainfall intensities given in the Urban Storm Drainage Criteria Manual (USDCM) are as follows: TABLE 3 1-HOUR POINT RAINFALL VALUES FOR CITY OF FORT COLLINS (INCHES) 2-YR 5-YR 10-YR 100-YR 0.83 1.09 1.40 2.86 HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 5 of 9 III. Stormwater Management Facility Design A. Stormwater Conveyance Facilities There are no existing drainage structures or features on the site. Flows are directed east away from the building toward the existing concrete driveway, or west to the existing side yard. Flows then sheet flow to the northeast off the property. Flows then enter an existing landscaped swale contained in the property to the north, which directs flows east to the Springmeadows Ct. Right-of-Way. Flows are then routed by curb and gutter to the north where they either enter a single curb inlet, or overtop the curb to Spring Creek. The historic drainage patterns are mimicked in the proposed condition. Flows produced on the north and east are directed to the new permeable pavers. Flows produced on the west and south side of the property are directed away from the building to one of two new landscape swales with underdrain to ensure adequate slope away from the structure. The underdrains direct the flows to the permeable pavers. Once flows enter the permeable pavers they will either infiltrate through the system or be directed to the northeast off of the property, matching the historic condition. Due to the permeability of the new pavers, the volume and rate of flows are both reduced in the proposed condition. Historic Direct Runoff Comparison The site has been evaluated as a single basin of 0.32 acres. The composite percent impervious of the existing site is 50.8% and the 10-year and 100-year flows are 0.23 & 0.63 CFS, respectively. The composite percent impervious of the proposed site is 40.5% (10.3% less) and the 10-year and 100-year flows are 0.69 & 0.95 CFS (0.02 CFS and 0.02 CFS less), respectively. The change in the Direct Peak Runoff values for The Site for the 10 and 100-year storm events are shown in the following Table. TABLE 4 DIRECT RUNOFF SUMMARY Area Area % Imp. Time of Concentration Runoff Coefficient Direct Basin Runoff Design (Acres) C10 C100 Q10 (cfs) Q100 (cfs) HISTORIC 0.32 50.8% 6.64 0.51 0.69 0.71 0.97 TOTAL PROPOSED 0.32 40.5% 6.75 0.50 0.68 0.69 0.95 B. Easements There is an existing HOA easement directly east of this property, between Spring Meadow Court ROW and The Site. The HOW has stated that it will not allow any construction and/or stormwater work in this area and is also not willing to grant any drainage easements to accommodate any increase in flows. HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 6 of 9 C. Compliance with Standards The proposed Site has been evaluated using the rational method as set forth by UDSCM. Both the 100-yr and 10-yr storms have been evaluated. The stormwater conveyance system has been designed to comply with conveyance methods and capacities. This project will be complying with the Low Impact Development drainage requirements set forth in the City of Fort Collins Stormwater Criteria Manual LID Implementation Manual. (See Appendix A) The project will comply with both options for the implementation of LID systems, as all new private impervious area will be treated by the proposed permeable pavers. The required detached public sidewalk drains south to the Stuart Street ROW. D. Maintenance Plan The owner will compete a monthly maintenance inspection to clean and remove and trash, debris and vegetation that is restricting or not allowing permeable pavers, landscape areas and underdrains to drain. This will include mowing or trimming of landscaped areas. Any repairs to the grading because of washout and/or sedimentation will be removed. E. Conclusion The proposed project has been analyzed utilizing the City of Fort Collins Stormwater Criteria Manual. This drainage letter and associated calculations are limited to the project shown by the attached Drainage Plan. Based on the above findings and attached calculations HCI Engineering finds the proposed development to be in compliance with the drainage criteria set forth in Report 1. No negative impacts are anticipated as a result of this development to adjacent properties or downstream. Sincerely, T. Garrett Goodlin, P.E. HCI Engineering IV. References 1. City of Fort Collins Stormwater Criteria Manual (December 2018), by The City of Fort Collins. 2. Drainage Criteria Manual (Volume 1, 2 & 3), by Mile High and Flood Control District, current versions. 3. FEMA website Flood Insurance Rate Maps. 4. USDA, Web Soil Survey, Soil Map Data HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 7 of 9 Appendix A, Maps & Reference Materials FEMA Firmette NRCS Soil Map NRCS Soil Data CFCSCM Excerpt o Low Impact Development o Runoff Coefficients o Percent Impervious Values FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.2 Runoff Coefficients Page 4 3.2 Runoff Coefficients Runoff coefficients used for the Rational Method are determined based on either overall land use or surface type across the drainage area. For Overall Drainage Plan (ODP) submittals, when surface types may not yet be known, land use shall be used to estimate flow rates and volumes. Table 3.2-1 lists the runoff coefficients for common types of land uses in the City. Table 3.2-1. Zoning Classification - Runoff Coefficients Land Use Runoff Coefficient (C) Residential Urban Estate 0.30 Low Density 0.55 Medium Density 0.65 High Density 0.85 Commercial Commercial 0.85 Industrial 0.95 Undeveloped Open Lands, Transition 0.20 Greenbelts, Agriculture 0.20 Reference: For further guidance regarding zoning classifications, refer to the Land Use Code, Article 4. For a Project Development Plan (PDP) or Final Plan (FP) submittals, runoff coefficients must be based on the proposed land surface types. Since the actual runoff coefficients may be different from those specified in Table 3.2-1, Table 3.2-2 lists coefficients for the specific types of land surfaces. FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 4.0 SWMM 4.1 Input Parameters Page 11 Table 4.1-2. Land Use - Percent Impervious Land Use Percent Impervious (%) Residential Urban Estate 30 Low Density 50 Medium Density 70 High Density 90 Commercial Commercial 80 Industrial 90 Undeveloped Open Lands, Transition 20 Greenbelts, Agriculture 2 Offsite Flow Analysis (when Land Use not defined) 45 Reference: For further guidance regarding zoning classifications, refer to the Land Use Code, Article 4. For Final Plan (FP) submittals, impervious values must be based on the proposed land surface types. Refer to Table 4.1-3 for recommended percent impervious values. Table 4.1-3. Surface Type – Percent Impervious Surface Type Percent Impervious (%) Hardscape or Hard Surface Asphalt, Concrete 100 Rooftop 90 Recycled Asphalt 80 Gravel 40 Pavers 40 Landscape or Pervious Surface Playgrounds 25 Lawns, Sandy soil 2 Lawns, Clayey soil 2 HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 8 of 9 Appendix B, Hydrology Calculations Rational Calculations o Percent Impervious o Time of Concentration o Direct Runoff 10-Year Storm o Direct Runoff 100-Year Storm o Direct Runoff Summary & routed Runoff Summary HCI Engineering, - 621 SouthPark Dr., Suite 1600, Littleton CO, 80120 - 720-252-3484 Page 9 of 9 Appendix C, Drainage Plan