Loading...
HomeMy WebLinkAboutDrainage Reports - 05/26/2021DRAINAGE REPORT FOR OAK 140 AT 140 EAST OAK STREET FORT COLLINS, CO 80524 PREPARED FOR DECEMBER 22, 2020 City of Fort Collins Approved Plans Approved by: Date: Dan Mogen 05/26/2021 December 22, 2020 Dan Mogen City of Fort Collins Utilities Stormwater Engineering 700 Wood Street Fort Collins, CO 80521 RE: Oak 140 Drainage Report JVA Job No. 3258c Dear Dan: The following Drainage Report and attached drainage maps have been prepared for the Oak 140 redevelopment project. The report and drainage maps have been produced in accordance with the City of Fort Collins and the latest local Mile High Flood District recommendations. It is our understanding that the information provided herein meets all requirements of the City of Fort Collins. Please contact us if you have any questions regarding this submission. Sincerely, JVA, Inc. __________________________ Erik T. Nakos, P.E. Project Manager Oak 140 Drainage Report Page 1 of 7 TABLE OF C ONTENTS GENERAL LOCATION AND EXISTING SITE INFORMATION ......................................................... 3 DRAINAGE BASINS AND HISTORIC RUNOFF .......................................................................... 4 HISTORIC DRAINAGE ..................................................................................................... 4 PROPOSED DRAINAGE .................................................................................................. 4 DRAINAGE DESIGN CRITERIA ............................................................................................ 5 HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES ................................................. 5 HYDRAULIC CRITERIA .................................................................................................... 5 VARIANCES FROM THE CRITERIA......................................................................................... 5 FOUR STEP PROCESS ........................................................................................................ 5 DRAINAGE FACILITY DESIGN ............................................................................................. 6 GENERAL CONCEPT ..................................................................................................... 6 STORMWATER POLLUTION PREVENTION/EROSION CONTROL .................................................. 6 TEMPORARY EROSION CONTROL .................................................................................... 6 PERMANENT EROSION CONTROL .................................................................................... 6 CONCLUSIONS................................................................................................................ 7 REFERENCES ................................................................................................................... 7 Appendix A Referenced Information 1. Vicinity Map 2. Geotechnical Report Summary Logs of Exploratory borings 3. FEMA FIRM Map 4. NRCS Websoil Survey 5. Figure 1: Historic percentage of Imperviousness 6. Figure 2: Proposed Percentage of Imperviousness Appendix B Hydrologic/Hydraulic Computations 1. Rational Method Calculations 2. BMP Calculations Oak 140 Drainage Report Page 2 of 7 ENGINEER S STATEMENT: I hereby certify that this report (plan) for the Drainage Design for the Oak 140 redevelopment was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Standards for the Responsible Parties thereof. I understand that the City of Fort Collins ______________________________ Erik T. Nakos Registered Professional Engineer State of Colorado No. 40776 Oak 140 Drainage Report Page 3 of 7 GENERAL LOCATION AND EXISTING SITE INFORMATION The Oak 140 (site) is located in Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, in Larimer County, Fort Collins, Colorado. Refer to Appendix A for the site vicinity map. The site is bordered to the south by E Oak Street, to the east by Remington Street, and to the east by Montezuma Fuller Alley. Developed residential areas are to the north, south, east and west of the site. The existing site, platted as Lots 23-26, 29 and W 33 Ft Lot 30 all in Block 121, FTC (same owner: Fort Collins Downtown Development Authority), is predominantly gravel and asphalt from a previously demolished building. This site is part of the master drainage plan for the Old Town Drainage Basin and designed to conform to the drainage basin design. The site is approximately 0.58 acres of previously developed property and has a historical percent impervious of 92.6%. With the historical building removed years ago, the existing site has less percent imperviousness with a gravel lot, however the drainage design was calculated to the historical site. The existing ground surface is relatively flat, generally sloping to the east at grades ranging from 0.1% to 3.0%. From the geotechnical report dated May 5, 2020 the soil is mainly clayey sand. Groundwater was encountered at 14 ft to 20 ft below the ground surface. The Summary Logs of Exploratory Borings from the geotechnical report is attached in Appendix A. The site is located outside FEMA and City of Fort Collins mapped 100-year and 500-year floodplains, per FEMA Flood Risk Map Number 08069C0979H, effective date 05/02/2012. The site is comprised of hydrologic soil group C/D per NRCS soil survey. The FEMA Firm Map and NRCS Websoil Survey are included in Appendix A. In general, the proposed redevelopment of the site consists of constructing a new building and surrounding hardscape for proposed pedestrian pathways. In the new building, the roof drains will be conveyed to 3rd floor LID planters to be used as LID treatment. Any excess flow will bypass the system through a series of overflows and be conveyed to the public storm system to the south in Oak street. The site development will decrease the overall percent impervious slightly by 1.3% to a total of 91.3% from the historical 92.6%. The Old Town Drainage Basin requirements are that detention is required if there is an increase of impervious area by an additional 5,000 SF from the historical site. Since there is no proposed increase of imperviousness of the site from the historical site, there is no detention required for this project. However, as part of the City of Fort Collins Storm Criteria, there are water quality and LID treatment requirements because the project includes over 1,000 SF of new or modified impervious area. The water quality requirement for the site is fulfilled by the existing Udall water quality facility located to the east of the site by the Cache la Poudre River. The LID requirement is to treat 50% of the added or modified impervious area. The proposed LID planters on the 3rd floor of the building will treat the proposed roof (not including terrace areas) which will exceed the required 50%, and thus the entire site will be considered treated. Oak 140 Drainage Report Page 4 of 7 DRAINAGE BASINS AND HISTORIC RUNOFF HISTORIC DRAINAGE The existing site consists of one basin. The runoff from the existing site sheet flows to the east through a sidewalk chase and into Remington Street. Then appears to flow north in Remington Street to Mountain Ave and is then captured in the curb inlet on the south side of Mountain Ave, west of Remington St. PROPOSED DRAINAGE Proposed drainage patterns are to remain generally the same as the current but will utilize a LID treatment system for the roof area imperviousness before discharging to the public storm system. The bioretention system will be utilized for low impact development (LID) treatment requirements of the site. With the added or modified imperviousness area for the project being 0.69 acres, the 50% required area to treat is 0.34 acres. With the proposed roof area being treated, 0.42 acres, this project will exceed the City requirement by treating 61% of the added or modified imperviousness. The bioretention systems will reduce runoff, treat and slowly release the water quality capture volume as part of the four step process for the City of Fort Collins criteria on BMP selection. Detention will not be required as we are meeting the planned design outlined in the Old Town Basin Master Drainage Plan and not increasing the site imperviousness as compared to historical imperviousness. For the purposes of calculations, the site was divided into 5 basins. Basin 1 includes the proposed building roof that is conveyed to the LID planter on the 3rd floor. Basin 2 consists of the area of the LID planter itself. Basin 3 is the roof/terrace areas that are not conveyed to the LID planter and are conveyed to site overflow systems that discharges at ground level. Basin 4 consists of the area within the property line to the north of the building that has modified impervious area. Basin 5 is the area outside the property line that has modified impervious area. Most of the proposed building roof (Basin 1) is draining to the bioretention system (Basin 2) to be treated with the LID planter, with larger storm events bypassing the system through the drain basin control structure and overflow drains in the planter. The area of the building roofs and terraces that is not conveyed to the LID (Basin 3) is combined downstream of the planter and discharges in an underground storm drain into the inlet at Oak Street. Precautionary overflow from all building areas are combined and conveyed to discharge at ground level during emergency situations. The surrounding proposed hardscapes (Basins 4 & 5) will drain to either the south in the Oak storm system or to Remington Street as the site has done historically and is not anticipated to have any additional impacts to the surrounding area. There are four downspouts draining into the LID planter. Each of the downspouts will discharge into the side of the drain basin control structure that will drain into the LID planter and be treated. The discharge from the structure will have concrete splash blocks and cobble to act as a forebay to provide further energy dissipation. The LID system will fill up to provide the required WQ treatment and is designed to slowly drain in 12 hours per typical Rain Garden design. In larger events, the volume will overtop the weir in the structure to flow to the plumbing primary. There is also an overflow in the LID system that will flow to the plumbing overflow system. The primary and overflow systems are designed for the 100-yr storm by the plumbing engineer per the International Plumbing Code, as is required for building elements. Primary drains will be piped Oak 140 Drainage Report Page 5 of 7 to the public inlet at the south side of the site. Overflow drains will discharge at ground level to be collected at area drains and connected to that storm drain line to the existing inlet. DRAINAGE DESIGN CRITERIA HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES The drainage for the site was designed to meet or exceed the City of Fort Collins Standards and Specifications, including the Stormwater Criterial Manual which incorporates most of the Mile Urban Storm Drainage Criteria Manual (USDCM). The design one hour point rainfall used for the 2 year and 100 year storm events are 0.82 inches and 2.86 inches respectively. The Rational Method (Q=CIA) was used to determine the storm runoff (Q) from the areas contributing to the new storm system, with composite runoff coefficients (C) and contributing areas (A) given for design points in sub-basins. The runoff coefficients for various land usages were obtained from FCDCM, Chapter 5. Intensities (I) were determined using the Time-Intensity- Frequency equations, and a calculated Time of Concentration (tc). Hydraulic Criteria. See Appendix B for the runoff coefficient calculations. HYDRAULIC CRITERIA The proposed drainage system has been designed to comply with the City of Fort Collins Stormwater Criteria Manual. The MHFD UD-BMP spreadsheet version 3.07 was used to analyze the designed bioretention. Area drains were sized using MHFD calculations are included with the rational calculations in Appendix B. Complete drainage plans, details, dimensions, etc. are included in the grading and drainage plans in the construction documents. VARIANCES FROM THE CRITERIA No variances are requested for this design. FOUR STEP PROCESS The Four Step Process implemented by the City of Fort Collins for stormwater quality management is: 1. Reduce runoff through use of Low Impact Development (LID) and Minimizing Directly Connected Impervious Area (MDCIA) 2. Implement BMPs that provide a WQCV with slow release. 3. Stabilize Streams 4. Implement site specific and other source control BMPs. This project is addressing this Four Step Process in the following ways; Oak 140 Drainage Report Page 6 of 7 1. The reduction of impervious area compared to historical, as well as the use of LID bioretention planters to reduce runoff 2. The use of the LID biorentention system to capture and slow release, as well as the use of the existing Udall facility. 3. There is no negative impact to stream erosion with the development of this site as compared to historical. 4. The dumpsters are located in the trash enclosure with walls/fences which will limit the risk of trash and debris from leaving the dumpster area. The enclosure is also located far away from the storm drainage facilities so that highly polluted runoff from that area opportunity to be cleaned prior to runoff into the public storm drain. DRAINAGE FACILITY DESIGN GENERAL CONCEPT The s private storm drainage system has been designed to convey the 100-year storm event through a combination of bioretention, inlets and pipes that connect into the existing curb inlet in Oak Street. The hardscape around the building will be graded to drain into the ROW as it has historically done. The existing public system in Oak Street and Remington are assumed to have sufficient capacity for the developed flow as the developed impervious and runoff rates are less than the historical rates. The proposed bioretention planters located on the 3rd floor of the building will treat storm runoff for a minimum of 50% of the modified or added impervious area on the site for water quality treatment prior to discharging into the public storm system, satisfying the City of Fort Collins LID requirements. These features will facilitate sedimentation and filtration while limiting erosion, providing both treatment and slowed release of the water quality capture volume. The proposed redevelopment of this site will serve to limit water quality and quantity impacts to natural drainageways by decreasing the frequency, rate, duration, and volume of runoff. STORMWATER POLLUTION PREVENTION/EROSION CONTROL As site is less than 1 acre of disturbed area, an erosion control report is not required per City of Fort Collins Storm Criteria. However, an erosion control plan and escrow is submitted to meet with City requirements. During construction, temporary erosion and sediment control practices will be used to limit soil erosion and sediment discharge off the site and into public existing stormwater infrastructure. TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, vehicle tracking control, concrete washout areas, and inlet and slope protection provided using erosion control wattles/sediment control logs, rock socks, etc. All temporary erosion control measures are to be removed after they are deemed unnecessary. A general erosion control plan has been provided in the civil construction documents. PERMANENT EROSION CONTROL Criteria Manual Volume 3 (USDCM) provides guidelines for the selection of appropriate permanent Oak 140 Drainage Report Page 7 of 7 structural BMPs for a site that is to be developed or redeveloped. The Oak 140 is best characterized rvious area on the project site. The BMP decision tree for such sites is provided in Figure 2-2 of the USDCM. As previously stated, the site and surrounding vicinity is comprised of hydrologic soil group Type C/D soils, per the NRCS soil survey. The water quality capture volume (WQCV) for this site is accounted for in the existing Udall water quality and detention facility. No detention is required on the site. Runoff will be collected in the private storm system before connecting to the public storm system, or sheet flow into the ROW as it has done historically. The existing storm system should have sufficient capacity for the sites runoff flows as the imperviousness and runoff from the site is less than the historical flows. CONCLUSIONS This Drainage Report for the Oak 140 has been prepared to comply with the stormwater criteria set by the City of Fort Collins and the Mile High Flood Control District. The proposed drainage system presented in this report is designed to convey the 100-year peak stormwater runoff through the site via the proposed and existing storm systems. Through calculations, modeling, and review of the proposed storm drain system, there appears to be adequate capacity to convey the proposed flows to the existing storm system. It can therefore be concluded that development of the Oak 140 complies with all of the stormwater jurisdictional criteria and will not adversely affect the existing streets, storm drain system and/or detention/water quality facilities. REFERENCES 1. City of Fort Collins Stormwater Criteria Manual, City of Fort Collins, December 2018. 2. Geotechnical Investigation Proposed Apartment Complex, 140 East Oak Street, Fort Collins, Colorado CTL Thompson Incorporated, Dated May 5, 2020. 3. Mile High Flood District, August 2018 version. 4. FEMA Flood Insurance Rate Map, Map Number 08069C0979H, Map Revised May 2, 2012 5. USDA NRCS Web Soil Survey APPENDIX A REFERENCED INFORMATION Oak 140 140 East Oak St Fort Collins, CO MAP NOT TO SCALE (Image from Google Earth) APPENDIX B HYDROLOGIC/HYDRAULIC COMPUTATIONS JVA Incorporated JVA Office: 213 Linden St, S 200 Fort Collins Fort Collins, CO 80524 Ph: (970) 225 9099 Version 2019_XT: 9/3/2019 Project Information: Job Name: Oak 140 Job Number: 3258c Date: 12/22/2020 Designed by: EJK Municipality : Fort_Collins Soil Type: C/D Runoff Calculations: Minor Design Storm: 2 year Major Design Storm: 100 year Detention Calculations: Minor Storm Detention: 10 year plus 100 % WQCV Major Storm Detention: 100 year plus 100 % WQCV Detention Volume by:Enter WQCV : 0 cf (GB, PP, PLD, SFB, EDB,etc.) Allowable Release Rates (if applicable): Max release rate 1 cfs / acre? Yes Site Area: 0.00 acres Enter Offsite flows to bypass site (these will be added to the allowable release rates) Q10 = 0.00 cfs (bypass flows)Q10allow = 0.00 cfs Q100 = 0.00 cfs (bypass flows)Q100allow = 0.00 cfs Rainfall Data Information: Enter City, Town, or County: Fort_Collins Frequency of Design Event Do you need to Calc P1? No 2 yr 0.82 in 5 yr 1.14 in 10 yr 1.40 in 100 yr 2.86 in Runoff Coefficient Calculations: Use UDFCD Equations? No Intensity Duration Values: I-D-F FortCollinsIDF One Hour Point Rainfall P1 3258c - Rational Calculations INTRO Page 1 of 8 JV A I n c o r p o r a t e d Jo b N a m e : Oa k 1 4 0 I% C2 C5 C1 0 C1 0 0 21 3 L i n d e n S t , S 2 0 0 Jo b N u m b e r : 32 5 8 c St r e e t s P a v e d 10 0 % 0. 9 5 0. 9 5 0. 9 5 1. 0 0 Fo r t C o l l i n s , C O 8 0 5 2 4 Da t e : 12 / 2 2 / 2 0 Co n c r e t e D r i v e s / W a l k s 90 % 0. 9 5 0. 9 5 0. 9 5 1. 0 0 Ph : ( 9 7 0 ) 2 2 5 9 0 9 9 By : EJ K Ro o f 90 % 0. 9 5 0. 9 5 0. 9 5 1. 0 0 Gr a v e l 40 % 0. 5 0 0. 5 0 0. 5 0 0. 6 3 La n d s c a p i n g ( B s o i l ) 2% 0. 1 5 0. 1 5 0. 1 5 0. 1 9 Oa k 1 4 0 La n d s c a p i n g ( C / D s o i l ) 2 % 0 . 2 5 0 . 2 5 0 . 2 5 0 . 3 1 Hi s t o r i c R u n o f f C o e f f i c i e n t & T i m e o f C o n c e n t r a t i o n C a l c u l a t i o n s Pl a y g r o u n d 1 0 % 0 . 1 1 0 . 1 1 0 . 1 1 0 . 1 4 Lo c a t i o n : Fo r t _ C o l l i n s Ar t i f i c i a l T u r f 25 % 0. 2 0 0. 2 0 0. 2 0 0. 2 5 Mi n o r D e s i g n S t o r m : 2 Ma j o r D e s i g n S t o r m : 10 0 So i l T y p e : C/ D Ba s i n D e s i g n D a t a I ( % ) = 10 0 % 9 0 % 9 0 % 4 0 % 1 0 % 2 5 % 2 % 2 % I ( % ) tc C o m p tc Fi n a l Ba s i n Na m e De s i g n Po i n t Apa v e d st r e e t s (s f ) Adr i v e s / c o nc ( s f ) Aro o f (s f ) Agr a v e l (s f ) Apl y g n d (s f ) Aar t . t u r f (s f ) Als c a p e ( B so i l ) (s f ) Als c a p e (C / D s o i l ) (s f ) ATo t a l (s f ) ATo t a l (a c ) Im p (% ) C2 C 5 C 1 0 C 1 0 0 Up p e r mo s t Le n g t h (f t ) Sl o p e (% ) ti (m i n ) Le n g t h (f t ) Sl o p e (% ) Ty p e o f L a n d S u r f a c e K Ve l o c i t y (f p s ) tt (m i n ) Ti m e o f Co n c ti + t t = t c To t a l Le n g t h (f t ) tc=( L / 1 8 0 ) + 10 ( m i n . ) Mi n tc H 1 6 , 5 0 5 2 , 0 8 3 1 6 , 7 4 3 25 , 3 3 1 0 . 5 8 9 2 . 6 % 0 . 9 5 0 . 9 5 0 . 9 5 1 . 0 0 10 0 1 . 0 % 2. 8 30 0 1 . 0 % Pa v e d a r e a s & s h a l l o w pa v e d s w a l e s 20 2 . 0 2 . 5 5 . 3 4 0 0 1 2 . 2 5 . 3 0 0 . 0 0 Pa v e d a r e a s & s h a l l o w pa v e d s w a l e s 20 0 1 0 . 0 0 0 . 0 0 Pa v e d a r e a s & s h a l l o w pa v e d s w a l e s 20 0 1 0 . 0 0 0 . 0 0 Pa v e d a r e a s & s h a l l o w pa v e d s w a l e s 20 0 1 0 . 0 0 0 . 0 0 Pa v e d a r e a s & s h a l l o w pa v e d s w a l e s 20 0 1 0 . 0 TO T A L S I T E 6 , 5 0 5 2 , 0 8 3 1 6 , 7 4 3 0 0 0 0 0 2 5 , 3 3 1 0 . 5 8 9 2 . 6 % 0 . 9 5 0 . 9 5 0 . 9 5 1 . 0 0 Ba s i n Na m e De s i g n Po i n t Ti m e o f Co n c (t c ) C2 C 5 C 1 0 C 1 0 0 2 5 1 0 1 0 0 ATo t a l (s f ) ATo t a l (a c ) Q2 Q 5 Q 1 0 Q 1 0 0 H 1 5 . 3 0 . 9 5 0 . 9 5 0 . 9 5 1 . 0 0 2 . 8 0 0 . 0 0 4 . 7 8 9 . 7 6 2 5 , 3 3 1 0 . 5 8 1 . 5 4 0 . 0 0 2 . 6 4 5 . 6 7 0 0 0 0 . 0 0 0 0 0 0 . 0 0 0 0 0 0 . 0 0 0 0 0 0 . 0 0 TO T A L S I T E 2 5 , 3 3 1 0 . 5 8 1 . 5 4 0 . 0 0 2 . 6 4 5 . 6 7 In i t i a l O v e r l a n d T i m e ( t i) Tr a v e l T i m e ( t t) tt=L e n g t h / ( V e l o c i t y x 6 0 ) tc U r b a n i z e d C h e c k ON Ru n o f f C o e f f ' s R a i n f a l l I n t e n s i t i e s ( i n / h r ) Ar e a F l o w R a t e s ( c f s ) Ru n o f f C o e f f ' s 32 5 8 c - R a t i o n a l C a l c u l a t i o n s H i s t o r i c P a g e 2 o f 8 JVA Incorporated Job Name: Oak 140 I% C2 C5 C10 C100 213 Linden St, S 200 Job Number: 3258c Streets Paved 100% 0.95 0.95 0.95 1.00 Fort Collins, CO 80524 Date: 12/22/20 Concrete Drives/Walks 90% 0.95 0.95 0.95 1.00 Ph: (970) 225 9099 By: EJK Roof 90% 0.95 0.95 0.95 1.00 Gravel 40% 0.50 0.50 0.50 0.63 Landscaping (B soil) 0% 0.15 0.15 0.15 0.19 Oak 140 Landscaping (C/D soil) 0% 0.25 0.25 0.25 0.31 Composite Runoff Coefficient Calculations Playground 10% 0.11 0.11 0.11 0.14 Location: Fort_Collins Artificial Turf 25% 0.20 0.20 0.20 0.25 Minor Design Storm: 2 Major Design Storm: 100 Soil Type: C/D Basin Design Data I (%) = 100% 90% 90% 40% 10% 25% 0% 0%I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%)C2 C5 C10 C100 1 1 16,966 16,966 0.39 90.0% 0.95 0.95 0.95 1.00 2 2 1,133 1,133 0.03 90.0% 0.95 0.95 0.95 1.00 TOTAL TO LID 0 0 18,099 0 0 0 0 0 18,099 0.42 90.0% 0.95 0.95 0.95 1.00 3 3 3,823 3,823 0.09 90.0% 0.95 0.95 0.95 1.00 4 4 3,061 338 3,399 0.08 99.0% 0.95 0.95 0.95 1.00 PROPERTY TOTAL 3,061 338 21,922 0 0 0 0 0 25,321 0.58 91.2% 0.95 0.95 0.95 1.00 5 5 64 4,522 522 5,108 0.12 80.9% 0.88 0.88 0.88 0.93 PROJECT TOTAL 3,125 4,860 21,922 0 0 0 0 522 30,429 0.70 89.5% 0.94 0.94 0.94 0.99 Runoff Coeff's 3258c - Rational Calculations Developed C Page 3 of 8 JVA Incorporated Job Name: Oak 140 213 Linden St, S 200 Job Number: 3258c Fort Collins, CO 80524 Date: 12/22/20 Ph: (970) 225 9099 By: EJK Oak 140 Time of Concentration Calculations Location:Fort_Collins Minor Design Storm:2 Major Design Storm:100 Soil Type:C/D Sub-Basin Data tc Comp tc Final Basin Name Design Point ATotal (ac)C5 Upper most Length (ft) Slope (%) ti (min) Length (ft)Slope (%) Type of Land Surface Cv Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180) +10 (min)Min tc 1 1 0.39 0.95 80 2.0%2.0 Paved areas & shallow paved swales 20 0.0 0.0 2.0 80 10.4 5.0 2 2 0.03 0.95 5 1.0%0.6 Paved areas & shallow paved swales 20 0.0 0.0 0.6 5 10.0 5.0 3 3 0.09 0.95 45 2.0%1.5 Paved areas & shallow paved swales 20 0.0 0.0 1.5 45 10.3 5.0 4 4 0.08 0.95 33 0.5%2.0 150 1.0% Paved areas & shallow paved swales 20 2.0 1.3 3.2 183 11.0 5.0 5 5 0.12 0.88 20 2.0%1.4 Paved areas & shallow paved swales 20 0.0 0.0 1.4 20 10.1 5.0 Initial Overland Time (ti)Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON 3258c - Rational Calculations Developed Tc Page 4 of 8 JV A I n c o r p o r a t e d Jo b N a m e : O a k 1 4 0 21 3 L i n d e n S t , S 2 0 0 J o b N u m b e r : 3 2 5 8 c Fo r t C o l l i n s , C O 8 0 5 2 4 D a t e : 1 2 / 2 2 / 2 0 Ph : ( 9 7 0 ) 2 2 5 9 0 9 9 B y : E J K Oa k 1 4 0 LI D A R E A C a l c u l a t i o n s p e r C i t y o f F o r t C o l l i n s Th e i m p l e m e n t a t i o n o f L I D s y s t e m s r e q u i r e s o n e o f t h e f o l l o w i n g t w o o p t i o n s : Ac r e s N o t e s To t a l P r o j e c t A r e a = 0 . 7 0 A r e a w i t h i n t h e d r a i n a g e b o u n d a r y To t a l P r o j e c t I m p e r v i o u s A r e a = 0 . 6 9 A r e a o f i m p e r v i o u s s u r f a c e s Ad d e d o r M o d i f i e d I m p e r v i o u s A r e a = 0 . 6 9 A r e a o f i m p e r v i o u s s u r f a c e s - e x i s t i n g i m p e r v i o u s s u r f a c e a r e a Re q u i r e d I m p e r v i o u s A r e a t o be t r e a t e d b y L I D = 0. 3 4 50 % o f a d d e d o r m o d i f i e d i m p e r v i o u s a r e a Pr o v i d e d T r e a t m e n t A r e a = 0. 4 2 61 % 32 5 8 c - R a t i o n a l C a l c u l a t i o n s L I D A R E A P a g e 5 o f 8 JV A I n c o r p o r a t e d Jo b N a m e : O a k 1 4 0 21 3 L i n d e n S t , S 2 0 0 J o b N u m b e r : 3 2 5 8 c Fo r t C o l l i n s , C O 8 0 5 2 4 D a t e : 1 2 / 2 2 / 2 0 Ph : ( 9 7 0 ) 2 2 5 9 0 9 9 B y : E J K Oa k 1 4 0 Wa t e r Q u a l i t y C a p t u r e V o l u m e ( W Q C V ) C a l c u l a t i o n s ( U D F C D V o l u m e 3 C h a p t e r 3 ) Fo r L I D D e s i g n W Q C V = a ( ( 0 . 9 1 I 3)- ( 1 . 1 9 I 2)+ ( 0 . 7 8 I ) ) W h e r e : W Q C V = W a t e r Q u a l i t y C a p t u r e V o l u m e ( w a t e r s h e d i n c h e s ) a = D r a i n T i m e C o e f f i c i e n t ( s e e t a b l e b e l o w ) I = I m p e r v i o u s n e s s ( % / 1 0 0 ) Dr a i n a g e T i m e ( h r s ) C o e f f i c i e n t , a 12 0 . 8 24 0 . 9 40 1 . 0 0 a= 0 . 8 0 1 2 h o u r d r a w d o w n t i m e I= 0 . 9 0 0 % / 1 0 0 W Q C V = 0 . 3 2 2 w a t e r s h e d i n c h e s V= ( W Q C V / 1 2 ) * A * 4 3 5 6 0 W Q C V = 0 . 3 2 2 w a t e r s h e d i n c h e s A = 0 . 4 2 a c r e V = 5 8 3 c f R e q u i r e d V = 0 . 0 1 3 a c r e - f t Fo r t C o l l i n s S t o r m w a t e r Cr i t e r i a M a n u a l Fo r t C o l l i n s S t o r m w a t e r Cr i t e r i a M a n u a l 32 5 8 c - R a t i o n a l C a l c u l a t i o n s W Q C V P a g e 6 o f 8 JV A I n c o r p o r a t e d Jo b N a m e : Oa k 1 4 0 21 3 L i n d e n S t , S 2 0 0 Jo b N u m b e r : 32 5 8 c Fo r t C o l l i n s , C O 8 0 5 2 4 Da t e : 12 / 2 2 / 2 0 Ph : ( 9 7 0 ) 2 2 5 9 0 9 9 By : EJ K Oa k 1 4 0 De v e l o p e d S t o r m R u n o f f C a l c u l a t i o n s De s i g n S t o r m : 10 0 Y e a r Po i n t H o u r R a i n f a l l ( P 1) : 2. 8 6 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) C*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes 1 1 0 . 3 9 1 . 0 0 5 . 0 0 0 . 3 9 9 . 9 5 3 . 8 8 5. 0 0 0 . 3 9 9. 9 5 3 . 8 8 RD T O L I D 3 . 8 8 2 2 0 . 0 3 1 . 0 0 5 . 0 0 0 . 0 3 9 . 9 5 0 . 2 6 5. 0 0 0 . 0 3 9. 9 5 0 . 2 6 LI D 5. 0 0 0 . 4 2 9. 9 5 4 . 1 3 LI D U D & A D 4 . 1 3 1 0 i n P V C 2 . 0 % 4 . 1 4. 3 1 4 . 9 0. 0 0 5 . 0 0 3 3 0 . 0 9 1 . 0 0 5 . 0 0 0 . 0 9 9 . 9 5 0 . 8 7 5. 0 0 0 . 0 9 9. 9 5 0 . 8 7 Ov e r f l o w R D 0 . 8 7 1 2 i n P V C 2 . 5 % 0 . 9 7. 9 48 6 . 2 0. 1 3 5 . 1 3 5. 1 3 0 . 5 0 9. 8 9 4 . 9 8 OA K I N L E T 4 . 9 8 1 2 i n P V C 2 . 0 % 5 . 0 7. 0 10 5 . 6 0. 0 3 5 . 1 6 4 4 0 . 0 8 1 . 0 0 5 . 0 0 0 . 0 8 9 . 9 5 0 . 7 8 5. 0 0 0 . 0 8 9. 9 5 0 . 7 8 5 5 0 . 1 2 0 . 9 3 5 . 0 0 0 . 1 1 9 . 9 5 1 . 0 8 5. 0 0 0 . 1 1 9. 9 5 1 . 0 8 Pi p e P i p e / S w a l e T r a v e l T i m e TO T A L T O L I D TO T A L T O O A K I N L E T Di r e c t R u n o f f T o t a l R u n o f f I n l e t s 32 5 8 c - R a t i o n a l C a l c u l a t i o n s Q 1 0 0 P a g e 7 o f 8 JV A I n c o r p o r a t e d Jo b N a m e : Oa k 1 4 0 21 3 L i n d e n S t , S 2 0 0 Jo b N u m b e r : 32 5 8 c Fo r t C o l l i n s , C O 8 0 5 2 4 Da t e : 12 / 2 2 / 2 0 Ph : ( 9 7 0 ) 2 2 5 9 0 9 9 By : EJ K Oa k 1 4 0 De v e l o p e d S t o r m R u n o f f C a l c u l a t i o n s De s i g n S t o r m : 2 Y e a r Po i n t H o u r R a i n f a l l ( P 1) : 0. 8 2 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) C*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes 1 1 0 . 3 9 0 . 9 5 5 . 0 0 0 . 3 7 2 . 8 5 1 . 0 5 5. 0 0 0 . 3 7 2. 8 5 1 . 0 5 R D T O L I D 1. 0 5 2 2 0 . 0 3 0 . 9 5 5 . 0 0 0 . 0 2 2 . 8 5 0 . 0 7 5. 0 0 0 . 0 2 2. 8 5 0 . 0 7 L I D 5. 0 0 0 . 3 9 2. 8 5 1 . 1 2 L I D U D & A D 1. 1 2 10 i n P V C 2 . 0 % 1. 1 4. 3 1 4. 9 0. 0 0 5 . 0 0 3 3 0 . 0 9 0 . 9 5 5 . 0 0 0 . 0 8 2 . 8 5 0 . 2 4 5. 0 0 0 . 0 8 2. 8 5 0 . 2 4 O v e r f l o w R D 0. 2 4 12 i n P V C 2 . 5 % 0. 2 7. 9 4 8 6. 2 0. 1 3 5 . 1 3 5. 1 3 0 . 4 8 2. 8 3 1 . 3 5 O A K I N L E T 1. 3 5 12 i n P V C 2 . 0 % 1. 4 7. 0 1 0 5. 6 0. 0 3 5 . 1 6 4 4 0 . 0 8 0 . 9 5 5 . 0 0 0 . 0 7 2 . 8 5 0 . 2 1 5. 0 0 0 . 0 7 2. 8 5 0 . 2 1 5 5 0 . 1 2 0 . 8 8 5 . 0 0 0 . 1 0 2 . 8 5 0 . 2 9 5. 0 0 0 . 1 0 2. 8 5 0 . 2 9 Pi p e P i p e / S w a l e T r a v e l T i m e TO T A L T O L I D TO T A L T O O A K I N L E T Di r e c t R u n o f f T o t a l R u n o f f I n l e t s 32 5 8 c - R a t i o n a l C a l c u l a t i o n s Q M i n o r P a g e 8 o f 8 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =90.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.900 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.32 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 18,099 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =583 cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =6.25 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =326 sq ft D) Actual Flat Surface Area AActual =1133 sq ft E) Area at Design Depth (Top Surface Area)ATop =1133 sq ft F) Rain Garden Total Volume VT=590 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) EJK JVA, Inc. December 22, 2020 Oak 140 140 Oak Street, Fort Collins, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.07, RG 12/22/2020, 10:47 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW THE LINER IF THE SUBGRADE IS ANGULAR 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) EJK JVA, Inc. December 22, 2020 Oak 140 140 Oak Street, Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.07, RG 12/22/2020, 10:47 AM