Drainage Letter Report
Date: October 23, 2018
Project: Collindale Industrial Park – Minor Amendment Project No. 1281-001
Fort Collins, Colorado
Attn: Mr. Wes Lamarque
City of Fort Collins Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Dear Wes:
This letter serves to address the stormwater impacts of the above referenced project. This project is located at
the southwest corner of the intersection of Timberline Road and Danfield Court. The site currently consists of
rooftop, concrete walks and patio, asphalt parking areas, trees, and other vegetation. The site presently drains
west to east via overland flow into a series of area and curb inlets located in the center of the parking lot and
drive aisles. Only one inlet is getting relocated which is in the landscaping area to the west side of the building.
It’s going to be placed within the new flowline, but the historic flows will still be getting routed to it. The rest of
the inlets are going to remain exactly where they are and at the same elevation to preserve historic drainage
patterns. The inlets release into the City’s storm sewer system within Timberline Road. Historic drainage
patterns will generally be preserved. The total impervious area within the project boundary of the existing site is
approximately 247,996 square-feet with a composite percent impervious of 97%.
The proposed redevelopment will be removing some parking islands, an associated storage building, a portion of
some sidewalks, and some asphalt associated with the parking lots. The new project is proposing to modify the
parking lot to increases parking count as well as adding some additional sidewalks and associated landscaping
amenities. The new project intends to maintain existing drainage patterns as well as utilizing all the existing
storm infrastructure except for relocating one inlet. The total impervious area within the project boundary of the
proposed redevelopment is roughly 241,181 square-feet with a composite percent impervious of 97%.
Therefore, these improvements are reducing the overall impervious area for the site. Due to the reduction in
impervious area there will not be any detention or water quality provided with this improvement. For additional
clarification on these calculations please see the attached Runoff Coefficient Calculations at the back of this
letter.
Northern Engineering was unable to locate any previous drainage reports associated with the existing
development. However, existing percent impervious and drainage patters were maintained so no adverse
impacts will occur with downstream infrastructure. Therefore, no additional drainage analysis or infrastructure is
needed for this minor amendment. If there are any concerns or questions, please give Northern Engineering a
call.
Cody N. Snowdon, PE
Project Manager
Blaine Mathisen, EI
Project Engineer
10.23.18
CHARACTER OF SURFACE: PercentageImperviousProject:MadwireStreets, Parking Lots, Roofs, Alleys, and Drives:Calculations By:B. MathisenAsphalt ……....……………...……….....…...……………….…………………………………..100%Date:Concrete …….......……………….….……….………………..….…………………………………90%Gravel ……….…………………….….…………………………..………………………………..40%Roofs …….…….………………..……………….…………………………………………….. 90%Pavers…………………………...………………..……………………………………………..22%Lawns and LandscapingSandy Soil ……..……………..……………….……………………………………………..0%Clayey Soil ….….………….…….…………..……………………………………………….0%2-year Cf = 1.00100-year Cf = 1.25Basin IDBasin Area(s.f.)Basin Area(ac)Area ofAsphalt(ac)Area ofConcrete(ac)Area ofGravel (ac)Area ofLawns andLandscaping(ac)2-yearComposite RunoffCoefficient10-yearComposite RunoffCoefficient100-yearComposite Runoff CoefficientComposite% Imperv.Existing3283777.543.750.360.001.850.750.750.9473%Proposed3283777.543.780.330.012.000.740.740.9271%Existing (Impervious)2479965.693.750.360.000.000.950.951.0097%Existing (Pervious)803811.850.000.000.001.850.150.150.190%Proposed (Impervious)2411815.543.780.330.010.000.950.951.0097%Proposed (Pervious)871962.000.000.000.002.000.150.150.190%Proposed Pervious Area Only Impervious Area BreakdownOverall AreaExisting Impervious Area OnlyProposed Imperverious Area OnlyExisting Pervious Area OnlyCOMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONSNotesOverall AreaOctober 3, 201810-year Cf = 1.00**Soil Classification of site is Sandy Loam**Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I.Page 1 of 1D:\Projects\BD-18-011\Drainage\Hydrology\1281-001_Rational-Calcs.xlsx\Hist-C-Values
VAULT
F.O.
VAULT
F.O.
S
MH
MH
F.O.
CONTROL
IRR
MH
D
VAULT
F.O.
DD
DCTFO
VAULT
F.O.HY DT
VAULT
F.O.
MH
MH
MH MH
GX
XXXXXXXXXXXXXXXXXX X X X
XXW
TIMBERLINE RD.DANFIELD CT.
E N G I N E E R N GI
EHTRON R N
09.06.2018
D:\PROJECTS\BD-18-011\DWG\DRNG\1281-001_EXSTDRNG.DWG
( IN FEET )
0
1 INCH = 80 FEET
80 80
Existing (sf)Proposed (sf)
Asphalt 163455 164130
Concrete 15873 14273
Roofs 68668 61894
Gravel 0 399
Landscaping 80381 87682
Total 328377 328377
Composite Impervious 73%71%
EXISTING PERVIOUS V. IMPERVIOUS
EXHIBIT A1
FORT COLLINS, CO
COLLINDALE INDUSTRIAL PARK - MINOR AMENDMENT
REFER TO THE DRAINAGE LETTER
REPORT ASSOCIATED WITH THE
COLLINDALE INDUSTRIAL PARK
MINOR AMENDMENT BY
NORTHERN ENGINEERING FOR
ADDITIONAL CLARIFICATION AND
MORE DETAILED CALCULATIONS.
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
VAULTF.O.
S
F.O.
IRRIRRIRRIRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
CT
CONTROL
IRR
FO
VAULTF.O.
T
VAULT
F.O.
CONTROL
IRR
CONTROL
IRR
G
CONTROL
IRR
CONTROLIRR
CONTROLIRR
CONTROLIRR
CONTROLIRR
XXXXXXXXXXXXXXXXXX X X X
XXW CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
T
T TIMBERLINE RD.DANFIELD CT.
PROPOSED PERVIOUS V. IMPERVIOUS
EXHIBIT A2
FORT COLLINS, CO
COLLINDALE INDUSTRIAL PARK - MINOR AMENDMENT
E N G I N E E R N GI
EHTRON R N
10.03.2018
D:\PROJECTS\BD-18-011\DWG\DRNG\1281-001_DRNG.DWG
Existing (sf)Proposed (sf)
Asphalt 163455 164616
Concrete 15873 14273
Roofs 68668 61894
Gravel 0 399
Landscaping 80381 87196
Total 328377 328377
Composite Impervious 73%71%
( IN FEET )
0
1 INCH = 80 FEET
80 80
REFER TO THE DRAINAGE LETTER
REPORT ASSOCIATED WITH THE
COLLINDALE INDUSTRIAL PARK
MINOR AMENDMENT BY
NORTHERN ENGINEERING FOR
ADDITIONAL CLARIFICATION AND
MORE DETAILED CALCULATIONS.