Loading...
HomeMy WebLinkAboutDrainage Reports - 06/04/2021April 14, 2021 DRAINAGE LETTER AND LID REPORT HOMESTEAD AT CLARENDON HILLS Fort Collins, Colorado Prepared for: Kenneth R. Mitchell Mosaic Real Estate LLC 1021 Nightingale Drive Fort Collins, Colorado. 80525 Prepared by: 301 North Mason Street, Suite 100 Fort Collins, Colorado 80524 Phone: 970.221.4158 www.northernengineering.com Project Number: 1013-008 City of Fort Collins Approved Plans Approved by: Date: Dan Mogen 06/04/2021 Drainage Letter and LID Report Homestead at Clarendon Hills Date: April 14, 2021 Project: Homestead at Clarendon Hills Project No. 1013-008 Final Development Plan (FDP) Fort Collins, Colorado Attn: City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 To whom it may concern: Homestead at Clarendon Hills The site is located in southwest Fort Collins bounded to the north by Front Range Community College, to the east by existing Clarendon Hills Subdivision, to the south by Clarendon Hills Drive and Langdale Drive, and to the west by South Shields Street. The project is part of the Drainage Report for Clarendon Hills by Stuart and Associates written in 1986. The proposed development consists of 8 low-density single-family lots and a detention area. The project site also contains an existing irrigation ditch along the north property line. The project was included in the drainage report for Clarendon Hills Subdivision. Therefore, this letter intends to show conformance with the approved drainage design, including general drainage patterns and imperviousness. This letter also documents how the project meets new Low Impact Development requirements implemented City of Fort Collins since the approval of the original project. Original Drainage Patterns The original Clarendon Hill drainage design divided the subdivision into 3 basins. The current project site is split by two of these basins - Drainage Basin A draining to the north, and Drainage Basin B draining to the south. Drainage Basin B flows into Clarendon Hills Drive and Langdale Drive and travels via gutter and pan flow south along Clarendon Hills Drive. The flow is then collected by inlets at Clarendon Hills Drive and Hinsdale Drive and conveyed to a series of existing detention ponds. Drainage Basin A generally flows to the northeast to an existing irrigation ditch on the property. A small undisturbed area north of the irrigation ditch will flow into the Front Range Community College drainage system. From there, it flows through existing drainage ways east to Mail Creek, and eventually to Fossil Creek. An Existing Drainage Exhibit and excerpts from the original report are provided in the appendices for reference. Page | 3 Proposed Drainage Patterns The Homestead at Clarendon Hills project was divided into seven proposed drainage basins that essentially follow the established drainage patterns, as well as the drainage patterns approved with the Drainage Report for Clarendon Hills. Basin A encompasses the rear of the lots and open space between the rear lot lines and the existing irrigation ditch. The only proposed improvements with Basin A are landscaping in the rear of the lots. Flows from the basin will drain north into the irrigation ditch. Basin A is consistent with Basin A from the Drainage Report for Clarendon Hills. Basin B will roughly match the existing area draining south to the existing Clarendon Hills ponds. Proposed improvements will include single-family homes, the front and side of the lots, driveways, walks, and detention area. Basin B is further subdivided into Basins B1, B2, B3, and B4. Basins B1 and B3 consists of the open space at the west and east ends that will discharge into the Clarendon Hills and Langdon Drives curb and gutter. Basins B2 consists of Lots 1 through 8 building envelopes, driveways and detention pond. The project was graded to allow the building envelopes to drain to south, and small swales and curb and gutter in the shared driveway will convey drainage towards the detention pond. Basin B4 consists of the landscaping along the front of the pond that is incapable of draining into the detention pond. The release rate from the detention pond is reduced to accommodate the undetained releases from Basins B1, B3, and B4. An exhibit calculating the release rate is included in the appendices. The percent impervious for the lots was developed by assuming a typical building footprint of 3,250 square feet. The building footprint was placed along the rear building envelope to maximize the length of the driveway. This resulted in 49% imperviousness on a 7,982 sq. ft. lot. The area of the driveway was adjusted on the other lots to maintain a 49% imperviousness on the other lots. Along with the shared driveway, this resulted in a percent imperviousness of 51% in Basin B3. An exhibit is included in the appendices. Additionally, Basin OS1 and OS2 are on the east and the north sides of the site to quantify flows to the Front Range Community College campus. Basin OS1 consists of the side and rear of Lot 8 and adjacent open space. Basin OS2 is a small sliver of open space on the north side of the irrigation ditch that drains directly to the Front Range Community College campus. Development of Existing Runoff Coefficient The drainage for Clarendon Hills Subdivision was originally analyzed in the Drainage Report: Clarendon Hills: Fort Collins, Colorado prepared by Stuart and Associates in 1986 as part of the approval process for Clarendon Hills 1st Filing. Homestead for Clarendon Hills is in the northwest corner of the original drainage master plan for Clarendon Hills 1st Filing. In the approved original drainage report for Clarendon Hills (1st Filing), the project site was planned as office and multi-family with a developed runoff coefficient of C=0.50. According to the approved drainage report for Clarendon Hills 4th Filing, prepared by Land Development Services and dated April 9, 1991, a church site of 8.27 acres in the middle of the Clarendon Hills 4th Filing was assumed to be an offsite undeveloped drainage basin with a developed Page | 4 runoff coefficient of C=0.25. According to the approved drainage report for Clarendon Hills 6th Filing, prepared by Land Development Services and dated January 8, 1992, the original developer of Clarendon Hills swapped the northwest corner of Clarendon Hills (including Homestead for Clarendon Hills) for the church site in Clarendon Hills 4th Filing. The old church site was then developed as Clarendon Hills 6th Filing with runoff coefficients from 0.28 to 0.70. Because of the subsequent drainage studies and land swaps, we assumed an existing runoff coefficient of C=0.25 for Homestead at Clarendon Hills. A runoff coefficient of 0.25 is consistent with the following design considerations: The Fort Collins Stormwater Criteria Manual for lawns with clayey soil and an average slope of 2% to 7% requires a runoff coefficient of C = 0.25. The existing slopes throughout the site is between 2% to 7% with clayey soil. The drainage report for Clarendon Hills 4th Filing assumed a runoff coefficient C=0.25 for the church site, and the church site was subsequently part of a land swap for the northwest corner of the Clarendon Hills Subdivision. Detention Per the Clarendon Hills 1st that required 10.46 acre-feet to detain the 100-year developed storm and release at a 2-year historic Assuming a historic runoff coefficient of 0.25, detention from Basin B was provided as long as the overall flow at Design Point B does not exceed 1.9 cfs. Because of the increased impervious area within Basin B, detention is required within Basin B2 to reduce the post-developed flow rates at Design Point B to equal or less than 1.9 cfs. Since Basins B1, B3, and B4 will be released into the surrounding curb and gutter undetained, the detention pond in Basin B2 is designed to release the 100-year event at 1.5 cfs. A release rate of 1.5 cfs is required to maintain a 100-year flow rate of 1.9 cfs at Design Point B. (See the included flowrate calculations included in the appendices.) Detention Spillway The detention pond is designed to overflow at the west driveway entrance on Clarendon Hills Drive. In the even the outlet orifice is blocked, stormwater will first overflow through a weir into the west rain garden. Then, it will overflow through a curb cut at the northwest end of the rain garden. Finally, stormwater will overflow through the curb and gutter at a high point located at the back of sidewalk at the west entrance. Hydraulic calculations are included in the appendices. Inlets By limiting the 100-year flowrate at Design Point B, the flowrate at the existing inlets will match or decrease from the projected flowrates in the previously approved Clarendon Hills drainage reports. This results in matching or decreasing runoff to the existing inlets that were designed and approved with the earlier project, so no additional inlet calculations have been provided as a part of this report. Water Quality/LID Conformance water quality plus 50% site treated with LID (including pavers) equals 100% of site-treated (requirements met), Page | 5 (page 14). This project proposes to treat 90.5% of the new impervious areas through two rain gardens as LID treatment. However, due to grading constraints along the east side of the project and requirements to provide a maintenance access for the ditch company, a gravel pedestrian path (9.5% of new impervious area) will not be treated by either the rain gardens or the detention pond. An exhibit showing the area of LID treatment is included in the appendices. Although exact impervious area is unavailable at this preliminary stage, the building envelopes will drain towards the rain gardens and the detention pond. The high point along each lot line is set at the rear of the building envelopes to maximize as much of the lot draining towards the south. Space limitations on the detention pond and rain gardens, natural buffer offsets from the ditch, and fire accessibility requirements restrict the drainage towards the front. Even with the grading restrictions, the proposed flowrate into the Mail Creek Basin is 2.2 cfs less than the existing flowrate. Erosion and Sediment Control During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since more than 10,000 sf will be disturbed as a part of this project, a comprehensive Stormwater Management Plan will be prepared for this project at final design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. Floodplains There are no regulatory floodplains associated with the project. Conclusions The proposed grading concept matches the original drainage patterns. The site matches the designed imperviousness draining to the existing Clarendon Hills curb and gutter. Onsite detention will be provided for the increased imperviousness of the area draining to towards the existing Clarendon Hills ponds, and onsite detention will be required to maintain historic flow rates within Clarendon Hills. Stormwater quality has been provided and meets the city requirements for Low Impact Development treatment. Therefore, it is my professional opinion that Homestead at Clarendon Hills satisfies all applicable stormwater criteria and will effectively limit potential damage associated with its stormwater runoff. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Frederick S. Wegert, PE Project Engineer Page | 6 Compliance Statement I hereby attest this report for the final drainage design for Homestead at Clarendon Hills was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and ill not assume liability for drainage facilities designed by others. 4/14/202 ATTACHMENT 1 HYDROLOGIC CALCULATIONS TYPICAL LOT IMPERVIOUSNESS EXHIBIT FEMA Firmette FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 Table 3.4-1. IDF Table for Rational Method Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) 5 2.85 4.87 9.95 39 1.09 1.86 3.8 6 2.67 4.56 9.31 40 1.07 1.83 3.74 7 2.52 4.31 8.80 41 1.05 1.80 3.68 8 2.40 4.10 8.38 42 1.04 1.77 3.62 9 2.30 3.93 8.03 43 1.02 1.74 3.56 10 2.21 3.78 7.72 44 1.01 1.72 3.51 11 2.13 3.63 7.42 45 0.99 1.69 3.46 12 2.05 3.50 7.16 46 0.98 1.67 3.41 13 1.98 3.39 6.92 47 0.96 1.64 3.36 14 1.92 3.29 6.71 48 0.95 1.62 3.31 15 1.87 3.19 6.52 49 0.94 1.6 3.27 16 1.81 3.08 6.30 50 0.92 1.58 3.23 17 1.75 2.99 6.10 51 0.91 1.56 3.18 18 1.70 2.90 5.92 52 0.9 1.54 3.14 19 1.65 2.82 5.75 53 0.89 1.52 3.10 20 1.61 2.74 5.60 54 0.88 1.50 3.07 21 1.56 2.67 5.46 55 0.87 1.48 3.03 22 1.53 2.61 5.32 56 0.86 1.47 2.99 23 1.49 2.55 5.20 57 0.85 1.45 2.96 24 1.46 2.49 5.09 58 0.84 1.43 2.92 25 1.43 2.44 4.98 59 0.83 1.42 2.89 26 1.4 2.39 4.87 60 0.82 1.4 2.86 27 1.37 2.34 4.78 65 0.78 1.32 2.71 28 1.34 2.29 4.69 70 0.73 1.25 2.59 29 1.32 2.25 4.60 75 0.70 1.19 2.48 30 1.30 2.21 4.52 80 0.66 1.14 2.38 31 1.27 2.16 4.42 85 0.64 1.09 2.29 32 1.24 2.12 4.33 90 0.61 1.05 2.21 33 1.22 2.08 4.24 95 0.58 1.01 2.13 34 1.19 2.04 4.16 100 0.56 0.97 2.06 35 1.17 2.00 4.08 105 0.54 0.94 2.00 36 1.15 1.96 4.01 110 0.52 0.91 1.94 37 1.16 1.93 3.93 115 0.51 0.88 1.88 38 1.11 1.89 3.87 120 0.49 0.86 1.84 FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 9 Figure 3.4-1. Rainfall IDF Curve – Fort Collins Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) ex a EX A 2.382 14.25 14.25 17.21 0.25 0.25 0.31 1.92 3.29 6.10 1.1 2.0 4.5 ex b EX B 0.684 7.41 7.41 7.01 0.25 0.25 0.31 2.52 4.31 8.80 0.4 0.7 1.9 ex os1 EX OS1 0.147 11.08 11.08 10.32 0.25 0.25 0.31 2.13 3.63 7.72 0.1 0.1 0.4 ex os2 EX OS2 0.064 5.42 5.42 5.02 0.25 0.25 0.31 2.85 4.87 9.95 0.0 0.1 0.2 ex a North 2.594 14.06 14.06 16.80 0.25 0.25 0.31 1.92 3.29 6.20 1.25 2.13 5.03 Combined Basins Velocity (Swale Flow), V = 15·S ½ Rational Equation: Q = CiA (Equation 6-1 per MHFD) Design Point Basin Area (acres) Tc (Min)Runoff C Intensity Flow Velocity (Gutter Flow), V = 20·S ½ EXISTING DIRECT RUNOFF COMPUTATIONS (MHFD) Overland Flow, Time of Concentration: Project:Homestead at Clarendon Gutter/Swale Flow, Time of Concentration:Calculations By:F. Wegert Tt = L / 60V (Equation 6-4 per MHFD)Date:December 18, 2020 Tc = Ti + Tt (Equation 6-2 per MHFD) Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual (Equation 6-4 per MHFD)} (Equation 3.3-2 per Fort Collins Stormwater Manual) Page 3 of 3 Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) a A 1.368 14.25 14.25 17.32 0.24 0.24 0.30 1.92 3.29 6.10 0.6 1.1 2.5 b B1 0.041 7.80 7.80 7.27 0.29 0.29 0.36 2.46 4.21 8.80 0.0 0.0 0.1 b B2 1.630 10.47 10.47 7.99 0.60 0.60 0.75 2.21 3.78 8.59 2.2 3.7 10.6 b B3 0.013 11.37 11.37 10.86 0.20 0.20 0.25 2.13 3.63 7.57 0.0 0.0 0.0 b B4 0.070 5.00 5.00 5.00 0.25 0.25 0.31 2.85 4.87 9.95 0.0 0.1 0.2 os1 OS1 0.092 6.12 6.12 5.16 0.46 0.46 0.57 2.67 4.56 9.95 0.1 0.2 0.5 os2 OS2 0.064 5.00 5.00 5.00 0.25 0.25 0.31 2.85 4.87 9.95 0.0 0.1 0.2 a North 1.525 14.25 14.25 17.21 0.25 0.25 0.31 1.92 3.29 6.10 0.7 1.3 2.9 b South 1.753 9.67 9.67 7.55 0.58 0.58 0.72 2.26 3.86 8.59 2.3 3.9 10.9 Velocity (Gutter Flow), V = 20·S ½ DEVELOPED DIRECT RUNOFF COMPUTATIONS (MHFD) Overland Flow, Time of Concentration: Project:Homestead at Clarendon Gutter/Swale Flow, Time of Concentration:Calculations By:F. Wegert Tt = L / 60V (Equation 6-4 per MHFD)Date:December 18, 2020 Tc = Ti + Tt (Equation 6-2 per MHFD) Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Combined Basins Velocity (Swale Flow), V = 15·S ½ Rational Equation: Q = CiA (Equation 6-1 per MHFD) Design Point Basin Area (acres) Tc (Min)Runoff C Intensity Flow (Equation 6-4 per MHFD)} (Equation 3.3-2 per Fort Collins Stormwater Manual) Page 3 of 3 105°5'59.00"W 105°5'21.55"W ATTACHMENT 2 HYDRAULIC CALCULATIONS Area Inlet Performance Curve: Rain Garden Overflow Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 3.1416*Dia.of grate * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Nyloplast 24" Dome Diameter of Grate (ft): 2 Open Area of Grate (ft2):1.88 Rim Elevation (ft): 5089.60 Reduction Factor: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5089.60 0.00 0.00 0.00 0.10 5089.70 0.30 1.60 0.30 0.20 5089.80 0.84 2.27 0.84 0.30 5089.90 1.55 2.77 1.55 0.40 5090.00 2.38 3.20 2.38 10-Year 0.50 5090.10 3.33 3.58 3.33 0.60 5090.20 4.38 3.92 3.92 0.70 5090.30 5.52 4.24 4.24 0.80 5090.40 6.74 4.53 4.53 0.90 5090.50 8.05 4.81 4.81 1.00 5090.60 9.42 5.07 5.07 100-Year 10-Year Design Flow =1.80 cfs100-Year Design Flow = 5.12 cfs 5.10.3 HPQ 5.0)2(67.0 gHAQ 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Di s c h a r g e ( c f s ) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Area Inlet Performance Curve: Detention Pond Overflow Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: FABRICATED Length of Grate (ft): 3.00 Width of Grate (ft): 3.00 Open Area of Grate (ft2):7.65 Grate Elevation (ft): 5089.60 Allowable Capacity: 0.80 Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5089.60 0.00 0.00 0.00 0.10 5089.70 0.91 10.40 0.91 0.20 5089.80 2.58 14.71 2.58 0.30 5089.90 4.73 18.01 4.73 0.40 5090.00 7.29 20.80 7.29 0.52 5090.12 10.80 23.72 10.80 Q100 0.60 5090.20 13.39 25.48 13.39 0.70 5090.30 16.87 27.52 16.87 0.80 5090.40 20.61 29.42 20.61 0.90 5090.50 24.59 31.20 24.59 1.00 5090.60 28.80 32.89 28.80 100-Year Flow = 10.6 cfs 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Di s c h a r g e ( c f s ) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow 5.10.3 HPQ 5.0)2(67.0 gHAQ ATTACHMENT 3 DETENTION POND CALCULATIONS STATE DRAIN TIME CALCULATIONS WATER QUALITY CALCULATIONS LID CALCULATIONS AND EXHIBIT Project Number: Project Name: Project Location: Date: Basin Notes Historic Basin EX A 4.6 cfs Historic Basin EX OS1 0.4 cfs Historic Basin EX OS2 0.2 cfs Total Q100 to the North 5.2 cfs Proposed Basin A 2.5 cfs Proposed Basin OS1 0.5 cfs Proposed Basin OS2 0.2 cfs Total Q100 to the North 3.2 cfs Change in Q100 to the North 2.0 cfs Results in a decrease for the 100-year storm. Basin Notes Historic Basin EX B 1.9 cfs Total Q100 to the South 1.9 cfs Proposed Basin B1 0.1 cfs Proposed Basin B3 0.0 cfs Proposed Basin B4 0.2 cfs Detention Pond Release Rate 1.5 cfs Pond release rate determined by subtracting Basin B1, B3, and B4 from Basin EX B. Total Q100 to the South 1.9 cfs Change in Q100 to the South 0.0 cfs No change for the 100-year storm. Q100 Historic vs. Developed Flowrates to the North Historic vs. Developed Flowrates to the South HISTORIC VS. DEVELOPED FLOWRATES 1013-008 Homestead at Clarendon Fort Collins, Colorado Q100 December 18, 2020 Pond No : B2 100-yr 0.75 12.74 min Storage 7373 ft3 1.63 acres Water Quality 0 ft3 Max Release Rate =1.50 cfs 0.17 ac-ft Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 3649 1.00 1.50 450 3199 10 7.720 5663 1.00 1.50 900 4763 15 6.520 7174 1.00 1.50 1350 5824 20 5.600 8215 1.00 1.50 1800 6415 25 4.980 9132 1.00 1.50 2250 6882 30 4.520 9946 1.00 1.50 2700 7246 35 4.080 10474 1.00 1.50 3150 7324 40 3.740 10973 1.00 1.50 3600 7373 45 3.460 11421 1.00 1.50 4050 7371 50 3.230 11846 1.00 1.50 4500 7346 55 3.030 12224 1.00 1.50 4950 7274 60 2.860 12587 1.00 1.50 5400 7187 65 2.720 12968 1.00 1.50 5850 7118 70 2.590 13298 1.00 1.50 6300 6998 75 2.480 13643 1.00 1.50 6750 6893 80 2.380 13966 1.00 1.50 7200 6766 85 2.290 14278 1.00 1.50 7650 6628 90 2.210 14589 1.00 1.50 8100 6489 95 2.130 14842 1.00 1.50 8550 6292 100 2.060 15110 1.00 1.50 9000 6110 105 2.000 15404 1.00 1.50 9450 5954 110 1.940 15653 1.00 1.50 9900 5753 115 1.890 15943 1.00 1.50 10350 5593 120 1.840 16196 1.00 1.50 10800 5396 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1013-008 Homestead at Clarendon Project Number : Project Name : Detention Pond A = Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1013-008_Pond_FAA_Fort Collins A Lots.xls Project: Date: Outlet Elevation:5086.57 0.17 ac. ft. Grate Elevation:5089.6 0.19 ac. ft. Crest of Pond Elev.:5090.6 5089.41 Freeboard.:1.2 ft Maximum Elevation Minimum Elevation cu. ft. acre ft cu. ft. acre ft 5086.6 N/A 0.0 0 0.0 0.00 0.0 0.00 5087.0 5086.6 567.8 0.4 122.1 0.00 122.1 0.00 5087.5 5087.0 2,375.7 0.5 735.9 0.02 858.0 0.02 5088.0 5087.5 3,379.2 0.5 1,438.7 0.03 2,296.7 0.05 5088.5 5088.0 3,602.6 0.5 1,745.5 0.04 4,042.1 0.09 5089.0 5088.5 3,740.2 0.5 1,835.7 0.04 5,877.8 0.13 5089.5 5089.0 3,809.3 0.5 1,887.4 0.04 7,765.2 0.18 5090.0 5089.5 3,860.6 0.5 1,917.5 0.04 9,682.7 0.22 5090.6 5090.0 3,920.8 0.6 2,334.4 0.05 12,017.1 0.28 Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 1013-008 Fort Collins, Colorado F. Wegert B2 Elev at Design Volume: Homestead at Clarendon 12/18/2020 Pond Outlet and Volume Data Design Volume: 12/17/2020 6:00 PM P:\1013-008\Drainage\Detention\ 1013-008_Stage-Storage A Lots.xlsx\Pond Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Selected BMP Type = RG Stage [ft] Area [ft^2] Stage [ft]Discharge [cfs] Watershed Area = 1.63 acres 0.00 0 0.00 0.00 Watershed Length =500 ft 0.40 568 0.18 0.37 Watershed Length to Centroid = 100 ft 0.90 2,376 0.43 0.58 Watershed Slope =0.018 ft/ft 1.40 3,379 0.68 0.73 Watershed Imperviousness = 51.0%percent 1.90 3,603 0.93 0.85 Percentage Hydrologic Soil Group A = 0.0%percent 2.40 3,740 1.18 0.96 Percentage Hydrologic Soil Group B = 0.0%percent 2.90 3,809 1.43 1.05 Percentage Hydrologic Soil Groups C/D = 100.0%percent 3.40 3,861 1.68 1.14 Target WQCV Drain Time = 12.0 hours 4.00 3,921 1.93 1.22 2.18 1.30 User Input 2.43 1.37 2.68 1.44 2.84 1.48 2.93 1.51 3.18 1.57 3.43 1.63 3.68 1.69 4.00 1.76 After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif Create a new stormwater facility, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =N/A 0.82 1.14 1.40 2.27 2.86 in CUHP Runoff Volume =0.023 0.048 0.078 0.109 0.228 0.312 acre-ft Inflow Hydrograph Volume =N/A 0.048 0.078 0.109 0.228 0.312 acre-ft Time to Drain 97% of Inflow Volume =0.4 1.0 1.3 1.8 2.8 3.3 hours Time to Drain 99% of Inflow Volume =0.4 1.1 1.4 1.8 2.8 3.4 hours Maximum Ponding Depth =0.96 0.53 0.83 1.07 2.12 2.88 ft Maximum Ponded Area =0.06 0.02 0.05 0.06 0.08 0.09 acres Maximum Volume Stored =0.023 0.005 0.016 0.029 0.111 0.176 acre-ft Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. Stormwater Detention and Infiltration Design Data Sheet Homestead at Clarendon Fort Collins, Colorado Location for 1-hr Rainfall Depths (use dropdown): After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. SDI_Design_Data_v2.00.xlsm, Design Data 12/18/2020, 8:52 AM Booleans for Message Booleans for CUHP Watershed L:W 1 CUHP Inputs Complete Watershed Lc:L 1 CUHP Results Calculated Watershed Slope FALSE Time Interval RunOnce 1 CountA 1 Draintime Coeff 0.8 User Precip 1 Equal SA Inputs 1 Equal SD Inputs 1 Stormwater Detention and Infiltration Design Data Sheet 0 1 2 3 4 5 6 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV SDI_Design_Data_v2.00.xlsm, Design Data 12/18/2020, 8:52 AM Project Number : Project Name : Project Location : Pond No :Calc. By:F. Wegert Orifice Dia (in):5 9/16 Orifice Area (sf):0.1688 Orifice invert (ft):5086.57 Orifice Coefficient:0.65 Elevation Stage (ft)Velocity (ft/s)Flow Rate (cfs)Comments 5086.57 0.00 0.00 0.00 5086.75 0.18 2.21 0.37 5087.00 0.43 3.42 0.58 5087.25 0.68 4.30 0.73 5087.50 0.93 5.03 0.85 5087.75 1.18 5.66 0.96 5088.00 1.43 6.23 1.05 5088.25 1.68 6.76 1.14 5088.50 1.93 7.24 1.22 5088.75 2.18 7.70 1.30 5089.00 2.43 8.13 1.37 5089.25 2.68 8.54 1.44 5089.41 2.84 8.79 1.48 <-100 Year Elev. 5089.50 2.93 8.92 1.51 5089.75 3.18 9.30 1.57 5090.00 3.43 9.66 1.63 5090.25 3.68 10.00 1.69 5090.50 3.93 10.34 1.74 5090.75 4.18 10.66 1.80 5091.00 4.43 10.97 1.85 5091.25 4.68 11.28 1.90 5091.50 4.93 11.58 1.95 5091.75 5.18 11.87 2.00 ORIFICE RATING CURVE Orifice Rating Curve 1013-008 Homestead at Clarendon Fort Collins, Colorado Pond B2 Orifice Design Data Project Number : Project Name : Project Location : Pond No :Calc. By: Q=3.3LH 1.5 Length (L)=10.00 FT Crest Elevation =5089.70 FT Depth Above Crest (ft) Elevation (ft) Flow (cfs) 0.00 5089.70 0.00 0.10 5089.80 1.04 0.20 5089.90 2.95 0.30 5090.00 5.42 0.40 5090.10 8.35 0.47 5090.17 10.63 Q100 0.50 5090.20 11.67 0.60 5090.30 15.34 0.70 5090.40 19.33 0.80 5090.50 23.61 0.90 5090.60 28.18 Crest of Pond Q100 = 10.6 CFS Input Parameters: Depth vs. Flow: B2 SHARP-CRESTED WEIR This equation can be used to derive the stage-discharge relationship for a sharp crested weir where the depth of flow is small compared to the length of weir. Reference 1) Hydrologic Analysis and Design, Richard H McCuen, Prentice Hall, 1989. Pg.549. * where Q is flow rate in CFS * where L is the crest length of the weir (FT) * where H is the height of flow over the crest (FT) Governing Equations: 1013.008 Homestead at Clarendon Fort Collins, Colorado F. Wegert Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.510 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 34,627 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =482 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =353 sq ft D) Actual Flat Surface Area AActual =495 sq ft E) Area at Design Depth (Top Surface Area)ATop =571 sq ft F) Rain Garden Total Volume VT=533 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) Frederick S. Wegert Northern Engineering December 17, 2020 Homestead at Clarendon - East Rain Garden Fort Collins, Colorado UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 1013-008_UD-BMP_v3.07 Rain Garden East.xlsm, RG 12/17/2020, 5:17 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Frederick S. Wegert Northern Engineering December 17, 2020 Homestead at Clarendon - East Rain Garden Fort Collins, Colorado Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 1013-008_UD-BMP_v3.07 Rain Garden East.xlsm, RG 12/17/2020, 5:17 PM Project: Date: Bottom Elevation:5088.6 578 ft 3 Overflow Elevation:5089.7 603 ft 3 Crest of Pond Elev.:5090.5 5089.7 Freeboard.:0.8 ft 1 ft Maximum Elevation Minimum Elevation cu. ft. acre ft cu. ft. acre ft 5088.6 N/A 495.2 0 0.0 0.00 0.0 0.00 5089.0 5088.6 542.6 0.4 207.6 0.00 207.6 0.00 5089.5 5089.0 570.8 0.5 278.4 0.01 485.9 0.01 5090.0 5089.5 598.2 0.5 292.3 0.01 778.2 0.02 5090.5 5090.0 625.7 0.5 306.0 0.01 1,084.1 0.02 Water Depth: Volume at Overflow: Project Number: Project Location: Calculations By: Pond No.: Rain Garden Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 1013-008 Fort Collins, Colorado F. Wegert East Rain Garden Elev at Design Volume: Homestead at Clarendon 12/18/2020 Pond Outlet and Volume Data Design Volume1: Notes: 1) The MHFD spreadsheet UD-BMP is a password protected black box that prevents the user from multiplying the water quality volume by 120% per Fort Collins Stormwater Manual. Therefore, the Design Volume on this spreadsheet is 482 cu. ft. * 1.2. The 482 cu. ft. is the water quality volume from the UD- BMP. 12/17/2020 5:30 PM P:\1013-008\Drainage\LID\ 1013-008_Stage-Storage East.xlsx\Pond Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.510 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 31,852 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =444 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =325 sq ft D) Actual Flat Surface Area AActual =430 sq ft E) Area at Design Depth (Top Surface Area)ATop =570 sq ft F) Rain Garden Total Volume VT=500 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) Frederick S. Wegert Northern Engineering December 17, 2020 Homestead at Clarendon - West Rain Garden Fort Collins, Colorado UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 1013-008_UD-BMP_v3.07 Rain Garden West.xlsm, RG 12/17/2020, 5:32 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Frederick S. Wegert Northern Engineering December 17, 2020 Homestead at Clarendon - West Rain Garden Fort Collins, Colorado Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 1013-008_UD-BMP_v3.07 Rain Garden West.xlsm, RG 12/17/2020, 5:32 PM Project: Date: Bottom Elevation:5088.6 533 ft 3 Overflow Elevation:5089.7 572 ft 3 Crest of Pond Elev.:5090.0 5089.6 Freeboard.:0.4 ft 1 ft Maximum Elevation Minimum Elevation cu. ft. acre ft cu. ft. acre ft 5088.6 N/A 430.0 0 0.0 0.00 0.0 0.00 5089.0 5088.6 493.3 0.4 184.7 0.00 184.7 0.00 5089.5 5089.0 570.0 0.5 265.8 0.01 450.5 0.01 5090.0 5089.5 647.2 0.5 304.3 0.01 754.8 0.02 Design Volume1: Volume at Overflow: Project Number: Project Location: Calculations By: Pond No.: Water Depth: West Rain Garden Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 1013-008 Fort Collins, Colorado F. Wegert West Rain Garden Elev at Design Volume: Homestead at Clarendon 12/18/2020 Pond Outlet and Volume Data Notes: 1) The MHFD spreadsheet UD-BMP is a password protected black box that prevents the user from multiplying the water quality volume by 120% per Fort Collins Stormwater Manual. Therefore, the Design Volume on this spreadsheet is 444 cu. ft. * 1.2. The 444 cu. ft. is the water quality volume from the UD- BMP. 12/17/2020 5:40 PM P:\1013-008\Drainage\LID\ 1013-008_Stage-Storage West.xlsx\Pond Project:Homestead at Clarendon Calc. By: Location:Fort Collins, Colorado Date: 39,434 sf 50% 19,717 sf 100% 39,434 sf 35,681 sf 90.5% 578 cf 603 cf 533 cf 572 cf 1111 cf 1175 cf 35,681 sf 90.5% 7,373 cf 7,373 cf 0.17 ac.-ft. 8,149 cf 0.19 ac.-ft. LID & Water Quality Summary F. Wegert 12/18/20 Project Summary LID Summary Total New Impervious Area Target LID Treatment Percentage Minimum Area to be Treated by LID measures Target Water Quality Treatment Percentage Detention Detention Treatment Area Minimum Area to be Treated by Water Quality measures Rain Gardens Rain Garden Treatment Area East Rain Garden Volume (Required) East Rain Garden Volume (Design) West Rain Garden Volume (Required) Percent Total Project Area Treated West Rain Garden Volume (Design) Total Rain Garden Volume (Required) Total Rain Garden Volume (Design) Water Quality Summary Percent Total Project Area Treated Storage Volume (Required) Total Detention Volume (Required) Total Detention Volume (Design) Project: Calc. By: Location: Date: Surface Area (SF)% Imperv.Imperv. Area (SF) Surface Area (SF)% Imperv.Imperv. Area (SF) Rooftop 0 100%0 Rooftop 25,025 90%22,523 Concrete 0 100%0 Concrete 0 100%0 Asphalt 0 100%0 Asphalt 13,158 100%13,158 Gravel 0 40%0 Gravel 9,384 40%3,754 Landscaping 142,798 0%0 Landscaping 95,231 0%0 Total 142,798 0 Total 142,798 39,434 39,434 Surface Area (SF)% Imperv.Imperv. Area (SF) Surface Area (SF)% Imperv.Imperv. Area (SF) Rooftop 25,025 90%22,523 Rooftop 25,025 90%22,523 Concrete 0 100%0 Concrete 0 100%0 Asphalt 13,158 100%13,158 Asphalt 13,158 100%13,158 Gravel 0 40%0 Gravel 0 40%0 Landscaping 0 0%0 Landscaping 0 0%0 35,681 35,681 Additional Impervious Area (SF) Existing Developed Onsite Impervious Area Onsite Impervious Areas Homestead at Clarendon Fort Collins, Colorado F. Wegert 12/18/20 Extended Detention Rain Gardens Total Total Developed Imperv. Area with LID TreatmentDeveloped Imperv. Area with WQ Treatment ATTACHMENT 4 PREVIOUS REPORT EXCERPTS This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA ATTACHMENT 5 USDA NRCS SOILS REPORT ATTACHMENT 6 DRAINAGE EXHIBITS