Loading...
HomeMy WebLinkAboutDrainage Reports - 05/24/20212900 South College Avenue, Ste. 3D Fort Collins, CO 80525 303-740-9393 • Fax: 303-721-9019 www.jrengineering.com Memorandum To:Wes Lamarque From:JR Engineering Date:4/28/2021 Subject:Lot 1 of the Warren Federal Credit Union – East Drake – Final Drainage Report 1ST Amendment This memo has been prepared to certify that the drainage and proposed improvements for the re-plat of lot 1 of the Warren Federal Credit Union –East Drake, is in compliance with Lot 1, 3 and Tract A, of the Warren Federal Credit Union – East Drake - Final Drainage Report; as prepared by Interwest Consulting Group. Introduction: Lot 1 of the Warren Federal Credit Union – East Drake (Site), is located in the northwest quarter of Section 29, Township 7 North, Range 68 West of the 6th Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Refer to the attached Vicinity Map. The site is bounded to the north by East Drake Road, Illinois Dive to the west, Lot 2 of the Warren Federal Credit union to the south, and the existing parking lot of the Warren Federal Credit Union – East Drake development to the east. The total area of the site is 0.25 acres of land. The proposed development includes the construction of an office building and a future commercial/retail building, walks, patios, and a landscape area. A walk going north-south has been proposed to connect to an existing walk within the East Drake Road ROW. Existing Conditions: The site is within a property that is part of the approved Warren Federal Credit – East Drake – Final Drainage Report. Detention for the site has been provided by an off-site existing water quality and detention pond as stated in the Final Drainage Report for Rigden Farm Northwest Roads, as prepared by JR Engineering. The site is currently undeveloped and is composed primarily of dry vegetation, with the exception of an existing drainage pan on the site. The site is located in a FEMA flood zone X in the non-published FIRM panel 08069C1000F, dated 12/19/2006. The soils on the site are primarily composed of type B soils - with Satanta loam, 3 to 5 % making up 94.7% of the site. A minority of the soils on the site are characterized as type C soils – with Nunn clay loam, 3 to 5% slopes making up 5.3% of the overall site. For additional information on the soil-groups, refer to the attached Hydrologic Soil Group map. City of Fort Collins Approved Plans Approved by: Date: 2900 South College Avenue, Ste. 3D Fort Collins, CO 80525 303-740-9393 • Fax: 303-721-9019 www.jrengineering.com Proposed Development: Lot 1 of the Warren Federal Credit Union - East Drake will be re-plated into two separate lots. Lot 1 will be developed into the Bachus and Schanker law office building, and lot 2 will be developed into a commercial/retail building. Basin 1A is 0.15 Acres and 59.0 % impervious, includes lot 1 of the re-plat, the Bachus and Schanker law office building, proposed walk, landscape area. Runoff from basin 1A is collected with nyloplast landscape drains and roof drains, which drain to design point 2, as shown in the attached Bachus and Schanker Office Building Drainage Plan (Attached). Basin 2A is 0.02 Acres and 37.0% impervious, included within lot 1 of the re-plat is an existing concrete pan, and landscape area. Basin 2A drains into the existing parking lot at design point 1, as shown in the attached Bachus and Schanker Office Building Drainage Plan. The runoff is then treated by LID pervious pavers and drains into an inlet represented as design point B2 in the attached Interwest drainage map. Basin 1B is 0.07 Acres and 72.9% imperious, included within lot 2 of the re-plat designated to be a future office/ commercial/retail building. Basin 1B drains to design point 3, as shown in the attached Bachus and Schanker Office Building Drainage Plan. Runoff from basin 1B confluences with the upstream runoff from basin 1A at design point 3.1. The runoff is ultimately conveyed into an existing manhole and is represented as design point C, as shown within the attached Interwest drainage map. Basin 2B is 0.01 Acres and is 2.0 % impervious. This basin is part of lot 2 of the replat. Runoff from basin 2B drains south off the property and onto the undeveloped lot 2 of the Warren Federal Credit Union - East Drake at design point 4, as shown in the attached Bachus and Schanker Office Building Drainage Plan. Basin 3B is 0.01 Acres and is 25.3% impervious. This basin is part of lot 2 of the replat. Runoff from basin 3B drains west off the property onto Illinois drive at design point 5, as shown in the attached Bachus and Schanker Office Building Drainage Plan. Basins 1A, 2A, 1B, 2B, and 3B are part of basins C and B2, from the Interwest drainage report. Additional impervious area will be added to basin B2 from the site connection to the existing sidewalk along the East Drake ROW, with walks along the building(s) eastern parking. The net percent impervious of the proposed improvements to the site is 58.1 % percent. The proposed site imperviousness is well below the Interwest future assumed imperviousness of 73% impervious for Basin C as well as the 72% impervious for Basin B2. Therefore the proposed additions to the site are anticipated to not adversely affect the LID measures put in place during the development of the East Warren Federal Credit Union subdivision or the downstream stormwater infrastructure. Low Impact Development Approved LID measures were designed by Interwest to treat 51% of the runoff, as shown in the attached Interwest LID exhibit. The sidewalk extension to the East Drake Road ROW within Basin 2A is tributary to the LID pervious pavers. The required LID treatment determined by Interwest was 30,130 sq-ft. The provided treatment area was for 30,477 sq-ft. of total impervious area. The new walk adds 236 sq-ft. of impervious area, Su b d i v i s i o n : Ea s t W a r r e n F e d e r a l C r e d i t U n i o n Pr o j e c t N a m e : Ba c h u s a n d S c h a n k e r Lo c a t i o n : Fo r t C o l l i n s Pr o j e c t N o . : Ca l c u l a t e d B y : AR J Ch e c k e d B y : 0 Da t e : 1/ 2 6 / 2 1 1A 0 . 1 5 0 . 9 5 0 . 0 1 0 . 0 7 0 . 0 9 0 . 9 5 0 . 0 9 0 . 5 4 0 . 6 7 0 . 2 5 0 . 0 6 0 . 0 9 0 . 1 1 0 . 7 0 0 . 8 7 2A 0 . 0 2 0 . 9 5 0 . 0 1 0 . 3 4 0 . 4 2 0 . 9 5 0 . 0 0 0 . 0 0 0 . 0 0 0 . 2 5 0 . 0 1 0 . 1 6 0 . 2 0 0 . 5 0 0 . 6 2 1B 0 . 0 7 0 . 9 5 0 . 0 0 0 . 0 6 0 . 0 7 0 . 9 5 0 . 0 5 0 . 7 0 0 . 8 8 0 . 2 5 0 . 0 1 0 . 0 5 0 . 0 6 0 . 8 1 1 . 0 0 2B 0 . 0 1 0 . 9 5 0 . 0 0 0 . 0 0 0 . 0 0 0 . 9 5 0 . 0 0 0 . 0 0 0 . 0 0 0 . 2 5 0 . 0 1 0 . 2 5 0 . 3 1 0 . 2 5 0 . 3 1 3B 0 . 0 1 0 . 9 5 0 . 0 0 0 . 2 3 0 . 2 8 0 . 9 5 0 . 0 0 0 . 0 0 0 . 0 0 0 . 2 5 0 . 0 0 0 . 1 9 0 . 2 4 0 . 4 2 0 . 5 2 To t a l 0 . 2 6 0 . 6 9 0 . 8 6 Ru n o f f Co e f f i c i e n t Pa v e d S u r f a c e R o o f s L a w n s Ba s i n s T o t a l We i g h t e d 2 YE A R C CO M P O S I T E R U N O F F C O E F F I C I E N T C A L C U L A T I O N S Ba s i n I D A r e a ( a c ) 10 - Y E A R C 10 0 - YE A R C Ru n o f f Co e f f i c i e n t Ar e a ( a c ) 10 - Y E A R C 10 0 - YE A R C 39 7 9 2 . 0 0 To t a l A r e a (a c ) Ru n o f f Co e f f i c i e n t Ar e a ( a c ) 10 - Y E A R C 1 0 0 - Y E A R C Ba s i n s T o t a l We i g h t e d 10 0 Y E A R C X: \ 3 9 7 0 0 0 0 . a l l \ 3 9 7 9 2 0 0 \ E x c e l \ D r a i n a g e \ U p d a t e d D r a i n a g e _ C a l c s _ T e m p l a t e _ v 2 . 0 7 . x l s m P a g e 1 o f 1 1 / 2 9 / 2 0 2 1 Pr o j e c t N a m e : Ba c h u s a n d S c h a n k e r Su b d i v i s i o n : Ea s t W a r r e n F e d e r a l C r e d i t U n i o n Pr o j e c t N o . : Lo c a t i o n : Fo r t C o l l i n s Ca l c u l a t e d B y : AR J De s i g n S t o r m : Ch e c k e d B y : 0 Da t e : TR A V E L T I M E ST R E E T Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (ac) I (in/hr) Q (cfs) Qstreet (cfs) C*A (ac) Slope (%) Qpipe (cfs) C*A (ac) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) RE M A R K S 1 2A 0. 0 2 0. 5 0 7. 0 0. 0 1 4. 3 1 0. 0 dr a i n s t o p a n Ba c h u s a n d S c h a n k e r o f f i c e 2 1A 0. 1 5 0. 7 0 10 . 0 0. 1 1 3. 7 8 0. 4 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) R e t a i l / c o m m e r c i a l o f f i c e 3 1B 0. 0 7 0. 8 1 11 . 0 0. 0 6 3. 6 3 0. 2 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) Ba c h u s a n d S c h a n k e r o f f i c e , r e t a i l / c o m m e r c i a l o f f i c e 3. 1 11 . 0 0. 1 7 3. 6 3 0. 6 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) Dr a i n s s o u t h o f f t h e p r o p e r t y a n d o n t o t h e u n d e v e l o p e d 4 2B 0. 0 1 0. 2 5 6. 0 0. 0 0 4. 5 6 0. 0 l o t 2 o f t h e W a r r e n F e d e r a l C r e d i t U n i o n - E a s t D r a k e Dr a i n s w e s t o f f t h e p r o p e r t y o n t o I l l i n o i s d r i v e 5 3B 0. 0 1 0. 4 2 9. 0 0. 0 0 3. 9 3 0. 0 No t e s : St r e e t a n d P i p e C * A v a l u e s a r e d e t e r m i n e d b y Q / i u s i n g t h e c a t c h m e n t ' s i n t e n s i t y v a l u e . DI R E C T R U N O F F T O T A L R U N O F F S T R E E T P I P E ST A N D A R D F O R M S F - 3 ST O R M D R A I N A G E S Y S T E M D E S I G N (R A T I O N A L M E T H O D P R O C E D U R E ) 10 - Y e a r 39 7 9 2 . 0 0 1/ 2 6 / 2 1 X: \ 3 9 7 0 0 0 0 . a l l \ 3 9 7 9 2 0 0 \ E x c e l \ D r a i n a g e \ U p d a t e d D r a i n a g e _ C a l c s _ T e m p l a t e _ v 2 . 0 7 . x l s m P a g e 1 o f 1 2 / 1 / 2 0 2 1 Pr o j e c t N a m e : Ba c h u s a n d S c h a n k e r Su b d i v i s i o n : Ea s t W a r r e n F e d e r a l C r e d i t U n i o n Pr o j e c t N o . : Lo c a t i o n : Fo r t C o l l i n s Ca l c u l a t e d B y : AR J De s i g n S t o r m : Ch e c k e d B y : 0 Da t e : TR A V E L T I M E ST R E E T Design Point Basin ID Area (ac) Runoff Coeff. tc (min) C*A (ac) I (in/hr) Q (cfs) tc (min) C*A (ac) I (in/hr) Q (cfs) Qstreet (cfs) C*A (ac) Slope (%) Qpipe (cfs) C*A (ac) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) RE M A R K S 1 2A 0. 0 2 0. 6 2 7. 0 0. 0 1 8. 8 0 0. 1 dr a i n s t o p a n Ba c h u s a n d S c h a n k e r o f f i c e 2 1A 0. 1 5 0. 8 7 10 . 0 0. 1 3 7. 7 2 1. 0 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) R e t a i l / c o m m e r c i a l o f f i c e 3 1B 0. 0 7 1. 0 0 11 . 0 0. 0 7 7. 4 2 0. 5 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) Ba c h u s a n d S c h a n k e r o f f i c e , r e t a i l / c o m m e r c i a l o f f i c e 3. 1 11 . 0 0. 2 0 7. 4 2 1. 5 ro o f d r a i n s a n d s u r r o u n d i n g b u i l d i n g i n t o i n l e t ( s ) Dr a i n s s o u t h o f f t h e p r o p e r t y a n d o n t o t h e u n d e v e l o p e d 4 2B 0. 0 1 0. 3 1 6. 0 0. 0 0 9. 3 1 0. 0 l o t 2 o f t h e W a r r e n F e d e r a l C r e d i t U n i o n - E a s t D r a k e Dr a i n s w e s t o f f t h e p r o p e r t y o n t o I l l i n o i s d r i v e 5 3B 0. 0 1 0. 5 2 9. 0 0. 0 0 8. 0 3 0. 0 No t e s : St r e e t a n d P i p e C * A v a l u e s a r e d e t e r m i n e d b y Q / i u s i n g t h e c a t c h m e n t ' s i n t e n s i t y v a l u e . ST O R M D R A I N A G E S Y S T E M D E S I G N ST A N D A R D F O R M S F - 3 (R A T I O N A L M E T H O D P R O C E D U R E ) 39 7 9 2 . 0 0 PI P E 10 0 - Y e a r DI R E C T R U N O F F T O T A L R U N O F F 1/ 2 6 / 2 1 ST R E E T X: \ 3 9 7 0 0 0 0 . a l l \ 3 9 7 9 2 0 0 \ E x c e l \ D r a i n a g e \ U p d a t e d D r a i n a g e _ C a l c s _ T e m p l a t e _ v 2 . 0 7 . x l s m P a g e 1 o f 1 2 / 1 / 2 0 2 1