Loading...
HomeMy WebLinkAboutLot Certifications - 04/20/2001 (3)1 R� North Star design, inc. April 17, 2001 0 Jay Barber City of Fort Collins Storm Water 700 Wood Street Fort Collins, CO 80522 E Re: New Belgium Brewery Office Pond volume certification Jay; 60 ��0/j 3 . This letter is to indicate the volume of the Detention Pond A as was constructed with the Office Addition to the New Belgium Brewery. The survey of the pond was conducted by JR Engineering and the as -constructed volume calculations for the Detention Pond A are attached. The required detention for Detention Pond A with the Office Addition was calculated to be 0.125 acre-feet. A variance was granted to the 1' freeboard requirement for this pond because of the proximity of the irrigation ditch and the small required size of the pond. As you can see from the calculations, the pond provides approximately 0.114 acre-feet of detention as surveyed. This is approximately 92% of the required volume (about 480 cubic feet less than the required volume). The restrictions placed on this area by the existing building, the proposed building and the existing irrigation ditch have made it difficult to achieve the design volume in the pond. It is the desire of the owner to request that you to accept the volume provided in this pond as adequate and, if required, provide excess volume in the existing pond east of this pond. This could be accomplished by slightly increasing the allowable release from Pond A and slightly decreasing the reiease rate for the pond to the east. Please advise if this is acceptable. I appreciate your time in reviewing this submittal. r� __�l PPQ0 REC,�sl �J Patricia Kro t President 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 9 970-686-1188 Fax LOCATION: PROJECT NO: COMPUTATIONS BY SUBMITTED BY: DATE: NEW BELGUIM BREWERY Detention Pond A = Stage/Storage New Belguim Brewery Office Pond 110-03 ppk NORTH STAR DESIGN 4/ 18/01 V = 1 /3 d (A + B + sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour DESIGN POND VOLUME 100-yr WSEL- Overflow elev Stage (ft) Surface Area W) Incremental Storage (ac-ft) Total Storage (ac-ft) 49.62 0 50 498 0.00 0.00 51 2926 0.04 0.04 52.0 3948 0.08 0.115 52.1 3956 0.01 0.125 52.2 4194 0.10 0.134 Total required detention = ASBUILT POND VOLUME Overflow elev 0.125 Ac. Ft. Stage (ft) Surface Area li (ft`) Incremental Storage (ac-ft) Total Storage (ac-ft) 49.62 0 50 166 0.00 0.00 51 2371 0.02 0.02 52.0 3918 0.07 0.096 52.1 3926 0.01 0.105 52.2 4220 0.09 0.114 detention.xls North Star Antos design, inc. April 17, 2001 Jay Barber City of FortCoWns Storm Water 700 Wood Street Fort Collins, CO 80322 Ito. New Belgium Brewery Office Ppad volume certification Jay; �anlil�3 . 0 This letter is to indicate the volume of the Detention Pond A as was constructed with the Office Addition to the New Belgium Brewery. The mrvey of the pond was conducted by JR Engineering and the as -constructed volume calculations for the Detention Pond A are attached: The required detention for Detention Pond A with the Office Addition was calculated to be 0.125 acre-feet. A variance was granted to the l' freeboard requirement for this pond because of the proximity of the irrigation ditch and the small required si2a of the pond. As you can see liom the calculations, the pond provides approximately 0.114 acre-feet of detention as surveyed. This is approxunatelY 921/9 of the required volume (about 480 cubic feet less than the required volume). Thu restrictions placed on this area by the existing building, the proposed building and the a-wting irrigation ditch have merle it difficult to achieve the design volume in the pond. it is the desire of the owner to request that YOU to accept the volume provided in this pond as adequate and, if required, provide excess volume in the existing pond east of this pond. This could be accomplished by slightlY increasing the allowable release from Pond A and slightly decrwmg the release rate for the pond to the east. Please advise if this is acceptable. I appreciate Your time in reviewing this submittal. 700 Automation Drive, Unit I Wlndeon, Colorado 80550 070.686.6638 phone a 870-6'46.1999 Fax ;i detentbnxls NEW BELGUIM BREWERY Det®ntlon Pond A - Stage/Storage LOCATMN: NewBdv=BwwwyOfoePond PROJECT NO: 110-03 COMITITATIONSBY: pp]: SUBMIT 16 BY:. NORTH STAR DESIGN DATE: 4118/01 V =1/3 d (A+ B + egrgA`8)) where V = volume between oontoure, ft d = tlaplh between contoure. R A = surfaoe area of contour DESIGN POND VOLUME 700•yr WSEL- OveMow elev Surface !� incremental Storage Total She 498 0.00 0,00 MSF2 2926 004 0.04 3948 0:08 0.1 5 39M Ot 0.125 . 94 - 0.10 0.1 Tote) required deten*m a ASSUILT POND VOLUME Overflow owv 0.125 Ac. Ft. Stage fl Su ca "" Area te) increments storage ac fl Total -%rage aafl 49.82 0 - -- 50 156 0.00" 0.00 5T 23T1 0.02 0.02 52.0 3918 OAT _ _ .0.096 521 3928 0.01 106 4220 O:Q9 0.11