Loading...
HomeMy WebLinkAboutLot Certifications - 11/07/2013Daniel Mogen From: Sent: To: Cc: Subject: Attac.hrnents: Dan, Brake, Michael <MBrake@JREngineering.com> Thursday, November 07, 2013 2:37 PM Daniel Mogen ceri@tritoncommunities.com Oakridge Business Park Additional Drainage Certification Information Oakridge Lot 2 units c74 and 75 DC.j:>df Attached is the upd_ated drainage certification for units C74 and C75. Units C7 4 and C75 Additional Notes: Addit.ional drainage inlets and stprrn ~ewer pipe were addecl above and beyond th.e original approved grading plan due to the flat site grades. The additional in.lets and storm sewer were added to pick Lip drainage in isolated areas and to improve upon the site slopes. The site drainage will function consistent With the approved drainage plans. Minor elevations differences occur between the approved site plan and the asbuiltS. These elevation differences will have not impact on the drainage functiom~Jity of the site. Units A1 and A2 Additional Notes: Additional drainage inlets and storm sewer pipe were added above and beyond the original approved grading plan due to the flat site grades. The addit_i.onal inlets a_nd storm sewer were added to pick up drainage in isolated areas and to improve upon the site slopes. The site drai_nc1ge wiJI function consistent with the approved drainage plans. Regards, Michael Brake, PE, PLS Project Manager 2900 S. College Avenue, Suite 30 Fort Collins, CO 80525 970-217-4911 C~II · 303-,267-6231 Direct 1