Loading...
HomeMy WebLinkAboutLot Certifications - 11/02/200016/31/00 TUE 16:48 FAX 9704428T24 EYNC WEST la 002 ABSOLUTE SURVEYING, INC: Profovipldnal Land Surveyons Aupst,29,2000 Job No. 00-1554 Jason Bumguner BunigarnerCustom Homes loll Belvedere Court Fort: Collins CO 90525 Loveland, CO SMS Rix (M) 203-1443 DRAINAGE CERTIFICATE Lot 29,_MiT4wMnt YqUq.P.R& 83� Naha Val Nive A survey of the finished grade for Lot 29, Ngrarriont Valley P.U.D. with an address of 833 Napa Valley Drive was conducted by me or under my supervision on August 9, 2000. The survey was performed using an assumed elevation on the southwest PrOPcrtY corner with an elevation of 14.12as shown on the subdivision grading plan by others. A copy of the grading: plan is attached as part of this certificate. Finished elevations an noted by the clouded figures. Drainage directions are, consistent with the grading rading plan and all finished grades are in reasonable Compliance with that plan. bie. only variation ft0M the plan is that the finished floor of the structure is 1.4 feet higher than shown on the plan, !,.Mark F. Corbridge, a duly registered Land surveyor in the state of Colorado, do hereby state that this Deainaje Certificate is the direct result oftlevation shots taken by me or personnel "d I et my supervision, at the,desetibed site on August 9, 2000, • Piocurste PMOIGO conipiete ABSOLUTE SURVEYING, INC. Professional Land Surveyors 2881 N. Monroe Ave. Suite 3, Loveland, CO 80538 Phone: (970) 203=1552 Fax (970) 203=1443 August 28, 2000 STORMWATER Job No. 00-1554 Jason Bumgarner AUG S 1 M Bumgarner Custom Homes 1013 Belvedere Court Fort Collins CO 80525 DRAINAGE CERTIFICATE Lot 29, Miramont Valley R U.D. 833 Napa Valley Drive A survey of the finished grade for Lot 29, Miramont Valley P.U.D. with an address of 833 Napa Valley Drive was conducted by me or under my supervision on August 9, 2000. The survey was performed using an assumed elevation on the southwest property corner with an elevation of 24.12 as shown on the subdivision grading plan by others. A copy of the grading plan is attached as part of this certificate. Finished elevations are noted by the clouded figures. Drainage directions are consistent with the grading plan and all finished grades are in reasonable compliance with that plan. The only variation from the plan is that the finished floor of the structure is 1.4 feet higher than shown on the plan. I, Mark F. Corbridge, a duly registered Land Surveyor in the State of Colorado, do hereby state that this Drainage Certificate is the direct result of elevation shots taken by me or personnel under my supervision, at the described site on August 9, 2000. • Accurate 9 Precise 15 2f •\••},46 / LAN! ) • Complete I] DRAINAGE CERTIFICATE Lot 29, Afirmwnt Valley P. U.D. 833 Nape Volley Drive T 2f ,c �� ■