HomeMy WebLinkAboutLot Certifications - 11/02/200016/31/00 TUE 16:48 FAX 9704428T24 EYNC WEST
la 002
ABSOLUTE SURVEYING, INC:
Profovipldnal Land Surveyons
Aupst,29,2000
Job No. 00-1554
Jason Bumguner
BunigarnerCustom Homes
loll Belvedere Court
Fort: Collins CO 90525
Loveland, CO SMS
Rix (M) 203-1443
DRAINAGE CERTIFICATE
Lot 29,_MiT4wMnt YqUq.P.R&
83� Naha Val Nive
A survey of the finished grade for Lot 29, Ngrarriont Valley P.U.D. with an address of 833
Napa Valley Drive was conducted by me or under my supervision on August 9, 2000.
The survey was performed using an assumed elevation on the southwest PrOPcrtY corner
with an elevation of 14.12as shown on the subdivision grading plan by others.
A copy of the grading: plan is attached as part of this certificate. Finished elevations an
noted by the clouded figures. Drainage directions are, consistent with the grading
rading plan and
all finished grades are in reasonable Compliance with that plan. bie. only variation ft0M
the plan is that the finished floor of the structure is 1.4 feet higher than shown on the plan,
!,.Mark F. Corbridge, a duly registered Land surveyor in the state of Colorado, do hereby
state that this Deainaje Certificate is the direct result oftlevation shots taken by me or
personnel "d I et my supervision, at the,desetibed site on August 9, 2000,
• Piocurste PMOIGO conipiete
ABSOLUTE SURVEYING, INC.
Professional Land Surveyors
2881 N. Monroe Ave. Suite 3, Loveland, CO 80538
Phone: (970) 203=1552 Fax (970) 203=1443
August 28, 2000 STORMWATER
Job No. 00-1554
Jason Bumgarner AUG S 1 M
Bumgarner Custom Homes
1013 Belvedere Court
Fort Collins CO 80525
DRAINAGE CERTIFICATE
Lot 29, Miramont Valley R U.D.
833 Napa Valley Drive
A survey of the finished grade for Lot 29, Miramont Valley P.U.D. with an address of 833
Napa Valley Drive was conducted by me or under my supervision on August 9, 2000.
The survey was performed using an assumed elevation on the southwest property corner
with an elevation of 24.12 as shown on the subdivision grading plan by others.
A copy of the grading plan is attached as part of this certificate. Finished elevations are
noted by the clouded figures. Drainage directions are consistent with the grading plan and
all finished grades are in reasonable compliance with that plan. The only variation from
the plan is that the finished floor of the structure is 1.4 feet higher than shown on the plan.
I, Mark F. Corbridge, a duly registered Land Surveyor in the State of Colorado, do hereby
state that this Drainage Certificate is the direct result of elevation shots taken by me or
personnel under my supervision, at the described site on August 9, 2000.
• Accurate
9 Precise
15 2f
•\••},46
/ LAN! )
• Complete
I]
DRAINAGE CERTIFICATE
Lot 29, Afirmwnt Valley P. U.D.
833 Nape Volley Drive
T 2f ,c
�� ■