Loading...
HomeMy WebLinkAboutGrading Plans - 03/19/2012EXj- h Jl1'r �-vl 590' WWE = 5003.2' 1 W on 1 0 � 6 arwpe ww s.eexo I . . LI N $$ "® �. i I 1 Site Plan 1401E- - MAIM Level = 00'-O" on Archltacturat Drauings Area Schedule (Gross Building) I • 9.006'-e" above sea level Leval Area Comments -.L2we'_MCIn14vt1�. (i'_4tLF_E4niteecural Drwlnaa OOS O' level S above sea - upper Leval 10. 9 7/9, gr A1cN=Urffiprawtn0 Upper Level 1206 SF Finished p1@ 9 V8" above sea levee) Main Level 2197 SF Finished - Lower Leval • 3'-1O 1C"_Qn Arcnitectur r imo "_gqe'_=&--dpQ,s"sp level Lower Level 1393 SF Finished -L4weLLevel II = -11'-4 1/e" on Arci l6ectural l2rMinas Lower Level 651 SF Finished Storage 7/0 above we level Grand total4 5446 SF Drawng List Sheet Number Sheel Name Al Site A2 Main Level Plan A2 1 Garage Plan I Elevation A3 Upper Level A4 Lower Level AS Elevations AS Elevations AS Sections A9 Sections A10 Sections All Sections Al2 Section I Details A13 Roof Framing A14 First Floor Framing A15 Main B Upper Electrical A16 Lower Level Electrical General notes: � l t l i Wa .. Q Note' 4,236 sq. ft. J! _ of Impervious surface g ae 5 ' gB \ ♦ eS II •- 4 _ NW-WO'W l I9ow - General Contractor to review all drawings 9 prior to construction - Any discrepancy or concerns in the plans are to be brought to my attention prior to construction - 6eneral contractor to provide full sets of drawing to all sub -contractors - Sub -contractor are to ask questions to general contractor prior to calling David E. Hweter - All dimensions are to rough framing (U.N.O.) unless noted otherwise - 5ub-Contractors are to site verify all conditions - Stamped structural drawing always supersede non -stamped drawings - Truss drawings are to be prepared by an license truss company, these shop drawing are to be reviewed by general contractor and structural engineer before being fabricated - All vent stacks to be vented out back side of roof when possible and painted to match roof color Site Note5 1. Licensed Surveyor to stake lot 9 house, Owners and builder to approve layout before excavation 2. Solid contour lines indicates proposed grading, Dashed contour lines indicates existing grading,final grading will be verify on site with owners 3. Grades on any portion of the lot shall have a minimum slope of 2%. 4. Runoff should flow away from occupied structures, a minimum of 10% in the first five feet. There must be positive drainage away from all foundation openings (i.e windows, walk -outs). 5. Ground elevationsshall be a minimum of 0.5' below the top of foundation as outlined in the current International Building Code. 6. Contractor to verify any discrepancies with top of foundation heights 7. contractor shall be responsible for locating utilities prior to construction EW 77Al