HomeMy WebLinkAboutLot Certifications - 08/08/1994PPARSONS & ASSOCIATES OK �c aim� CONSULTING ENGINEERS Glenn Schlueter Stormwater Utility 235 Mathews Fort Collins, CO 80522-0580 Re: Drainage Certification: Building A, B, C, and R Save*Mor Self Storage. Dear Glenn: This letter is to inform you that a drainage inspection and as -built survey has been completed for the above referenced buildings at Save*Mor Self Storage. All drainage conforms to the original concept with storm flows collecting to a central low point of inverted crowns and flowing to outfall points along the Coy Ditch. The enclosed as -built drawing reflects field elevations that are approx. 0.80' lower than the elevations as designed for the project. This is due to an error in the vertical datum, and has no effect on the overall drainage concept for the project. All improvements for the above referenced buildings are completed with the exception of a 30' section of curb and gutter immediately west of Building R and completion of final riprap outfalls at both spillways to the Coy Ditch. These improvements will be completed by Friday, August 12, according to Dick Ummell; Save*Mor Construction Superintendent. Please release the Certificate of Occupancy for these units. If you have any questions or require additional information, please do not hesitate to call. /-458 `E Ito Sincerely, Gary A. Odehnal, P.E. Parsons & Associates, Inc. Project Engineer 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [3031 221.2400 XI EXIT A EXIT LINDEN STREET s OFFICE Z P NA -r :11 77- roI[q 9 �d8 ► e6 a P PARSONS & Irk ASSOCIATES CONSULTING ENGINEERS ¢ OK ice--��� Glenn SchlueterSto�[ 235 Mathew Utility 4 235 Mathews Fort Collins, CO 80522-0580 Re: Drainage Certification: Building A, B, C, and R Save*Mor Self Storage. Dear Glenn: This letter is to inform you that a drainage inspection and as -built survey has been completed for the above referenced buildings at Save*Mor Self Storage. All drainage conforms to the original concept with storm flows collecting to a central low point of inverted crowns and flowing to outfall points along the Coy Ditch. The enclosed as -built drawing reflects field elevations that are approx. 0.80' lower than the elevations as designed for the project. This is due to an error in the vertical datum, and has no effect on the overall drainage concept for the project. All improvements for the above referenced buildings are completed with the exception of a 30' section of curb and gutter immediately west of Building R and completion of final riprap outfalls at both spillways to the Coy Ditch. These improvements will be completed by Friday, August 12, according to Dick Ummell; Save*Mor Construction Superintendent. Please release the Certificate of Occupancy for these units. If you have any questions or require additional information, please do not hesitate to call. Sincerely, Gary A. Odehnal, P.E. Parsons & Associates, Inc. Project Engineer • 432 Link lane Plaza • Ft. Collins, Colorado 80524 • [3031 221-2400 No Text