HomeMy WebLinkAboutLot Certifications - 12/18/19952
Redpeak Engineering
2061 Huntington Cirde
Fort Collins, Colorado 80526
(970) 498-0272
December 18, 1995
Mr. Basil Hamden
Stormwater Utility
City of Fort Collins
235 Mathews Street
Fort Collins, CO 80524
RE: Laurie Subdivision P.U.D. (AKA: Chelsea Ridge Subdivision P.U.D.)
Project Number : 93-907
Stormwater Certification of Improvements
Dear Basil:
Please find enclosed the following infomiabon relating to the Wooded Creek Court and South Shields
Street intersection for the Chelsea Ridge Subdivision:
1. Field Notes .(Intermill Land Surveying)
2. "As Built" Plans
3. Original Erosion Control Estimate (December 28, 1992)
h is my opinion, based on the survey information provided by Intermill Land Surveying and my field
observations of December 15, 1995, that the improvements constructed are in substantial
confasmance to the plans approved by the City of Fort Collins. Therefore, based on acceptance of
this certification, we request that the City of Fort Collins:
l . Complete final inspection and formally accept improvements for maintenance_
2. Release any escrow funds relating to this project.
Please call me at (970) 498-0272 should you have additional questions.
Sincerely,
Jeffrey W. Couch P.E.
Encl.
cc: Lee Barker, Classic Custom Builders
Rob Persichitte, Intermill Land Surveying
December 28, 1992
Ms. Cathy Malers
Stormwater Utility
City of Fort Collins
235 Mathews Street
Fort Collins, Colorado 80524
RE: Laurie Subdivision P.U.D. (AKA: Chelsie Ridge Subdivision)
Erosion Control Estimate
Dear Cathy:
Here are the cost estimates for the erosion control improvement alternatives
for the Laurie Subdivision P.U.D. These three alternatives are calculated based on
guidelines established in Section 2.3 of the City of Fort Collins Storm Drainage
Design Criteria.
Alternative "A". Owner's Construction Costs
ITEM ITEM QUANTITY UNIT AMOUNT TOTAL
NUMBER COST
1. Straw Bales 500 L.F. 2.00 1,000.00
2. Rip Rap 50 C.Y. 20.00 1,000.00
TOTAL 2,000..00
Grading, paving and landscaping for this site are considered part of the building
construction improvements.
The security amount required for Alternative "A" will be 150% x $ 2,000.00 =
$ 3,000.00
Page 2 of 2
December 28, 1992
Alternative "B". City of Fort Collins' Seeding Costs (Based on Annual
Landscape Bid)
Disturbed Area (1.38 Acres = 60,112.8 square feet)
ITEM ITEM QUANTITY UNIT AMOUNT TOTAL
NUMBER . COST
1 Revegetation 60,112.8 Sq. Ft. $ 0.0294 $ 1,767.32
TOTAL $ 1,767.32
The security amount required for Alternative "B" will be 150% x $ 1,767.32 =
$ 2,650.98
Alternative "C". Minimum Costs
A minimum of $ 1-000.00 has been established for erosion control security
amounts.
Based on this analysis, Alternative "A" should be used to establish the cost
for erosion control rehabilitation. $ 3,000.00 should be provided as the erosion
control security amount.
Please feel free to contract me if you have additional questions.
Sincerely,
1
Jeff Couch, P.E. IS
cc: Lowell Persons, Classic Custom Builders
DATE
Intermill Land Surveying
- Registered in Colorado & Wyoming
1301 N. Cleveland Ave.
Loveland, Colorado 80537
(303) 669-0516
TRANSMITTAL LETTER
November 17, 1995
TO: City of Loveland
Water\Wastewater Dept.
200 N. Wilson Ave.
Loveland, CO. 80537
ATTENTION: JEFF COUCH
RE: Laurie Subdivision P.U.D: As-Builts
PROJECT NO: P-98-1526
REMARKS: Jeff; Enclosed please find two (2) copies of the
As -Built plan for the above referenced site.
Please call Lee Barker as to time frame for
"compliance letter".
Sincerely:
INTERMILL LAND SURVEYING, INC.
Az Ae;ao?,��/��
Robert G. Persichitte
Project Manager
cc: Lee Barker
605 S. College Ave.
Fort Collins, CO. 80524
(970) 493-5059
.;
x
Cv1 �*'